Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Grand Canal
Dublin 2
THIS MONUMENT TO FIRST CLASS ARCHITECTURE ENJOYS AN EXCLUSIVE ENVIRONMENT
IN THE CENTRAL BUSINESS DISTRICT OF DUBLIN 2 MAKING IT THE PERFECT CHOICE
FOR OFFICE SPACE WITH ITS COMMANDING PRESENCE IN A PIVOTAL LOCATION.
WELCOME TO VELASCOSET IN A PRIME LOCATION ALONG THE BANKS OF THE GRAND CANAL IS 51,000 SQUARE FEET OF LANDMARK OFFICE SPACE IN A SYLVAN URBAN SETTING.
VELASCO Grand Canal
Dublin 2
Striking Design A SIGNATURE OFFICE BUILDING WITH AN IMPRESSIVE DESIGN
STYLE FEATURING 8 STOREYS OF FLEXIBLE AND EFFICIENT
FLOOR PLATES.
Velasco offers an abundance of versatile accommodation configurations to suit
the most judicious office occupier; a true indication of its grand design style. Full
floor to ceiling glazing on each aspect adds to its vibrant character delivering
bright, unrivalled views over the Grand Canal and Clanwilliam Terrace.
With an international LEED Gold standard for environmental and energy
efficiency, Velasco showcases excellent design credentials, including: 6
shower facilities, 64 secure bicycle spaces and 13 car parking spaces with
an electric charging point, making it a true office building of tomorrow.
THE NAME VELASCO Inspired by the muse for the Rolls
Royce flying angel emblem, Lady Eleanor Velasco Thornton,
whose assembly facility once occupied this site.
2
SIGNATURE OFFICE BUILDING Available Q4 2016
3
5
BUSINESS NEIGHBOURS Facebook, Accenture, Google,
Bord Gáis Energy and Matheson
are some of the companies
located in this innovative
commercial quarter.
Grand Canal
A WATERSIDE LOCATION STEEPED IN HISTORY
Prime Business NeighbourhoodMINUTES WALK FROM MERRION SQUARE AND GEORGIAN DUBLIN, THIS PREMIUM OFFICE
SPACE OCCUPIES A WATERSIDE LOCATION IN DUBLIN’S CENTRAL BUSINESS DISTRICT.
With its distinctive glass façade enabling natural light throughout and panoramic views across
the Dublin city skyline, Velasco is destined to become one of Dublin’s landmark structures
with its Grade A quality specifications. It offers potential occupants the opportunity to
reside in a thriving business hub among some of the biggest Fortune 500 companies.
64
Grand Canal Plaza
Bord Gáis HQ
Grand Canal Cycle LaneGoogle Buildings
CAFÉS Enjoy lunch in a host of superb cafés.
Olive Green Espresso Bar and 3fe are among
many of the fine artisan cafés nearby.
ENTERTAINMENT Enjoy a wealth of
entertainment options with close proximity
to a choice of world famous shows at the
renowned Bord Gáis Energy Theatre, top
class sporting action at the Aviva Stadium
and high profile concerts at the 3Arena.
BARS Unwind after work with a choice of
Dublin’s most popular pubs on your doorstep
from The Schoolhouse to Slattery’s Bar.
7
RESTAURANTS Dine in style with
an array of excellent eateries only
minutes walking distance away,
such as Angelina’s, Osteria Lucio,
Asador and The Schoolhouse
Restaurant.
HOTELS Experience some
of Dublin’s finest 5-star hotels
and enjoy real style at
The Marker Hotel or
indulge in boutique
luxury at the
Dylan Hotel.
Slattery’s, Bath Avenue
Schoolhouse Hotel The Marker Hotel
Bord Gáis Theatre
6
Beneath the lush green canopy of ash and willow trees lining the famous Grand Canal
is an unrivalled choice of upmarket restaurants, bars and lifestyle conveniences
adding to its lingering appeal.
Professionals have instant access to the finest eateries, 5 -star hotels and cultural
attractions including the Bord Gáis Energy Theatre, RDS and Aviva Stadium enhancing
the lure of this pivotal location for networking, entertaining and socialising.
Unrivalled Amenities DUBLIN 2 IS A BUSTLING BUSINESS ADDRESS MARRYING THE CULTURAL
HERITAGE OF GEORGIAN DUBLIN WITH THE LIFESTYLE DEMANDS OF
PROFESSIONAL URBANITES.
A LOCATION THAT HAS EVERYTHING
3fe Café
DUBLINBIKES Nearby Dublinbikes
stations are within easy reach
on Lower Mount St, Herbert
St, Lower Grand Canal St.
and Herbert Place.
LUAS A short 10-minute
walk to the green LUAS
line at St. Stephen’s Gn
links commuters to
north and south
Dublin city.
9
EXCEPTIONAL TRANSPORT
BUS The city centre is accessible
by key Dublin Bus routes 4, 7, 8 and
120 on Northumberland Rd. A short
walk to nearby Pearse Street gives
commuting professionals easy
access to services 1, 47, 56A and
77A connecting them to a range
of popular destinations.
DART & TRAIN Grand Canal Dock
DART station is within 400 metres
walking distance serving all major
InterCity and National Rail Stations.
AIRCOACH Professionals can
access Dublin International
Airport via the Aircoach 702
service on Northumberland Rd.
8
Superb Commuting HubTHE PRIME LOCATION OF VELASCO GIVES COMMUTERS A WORLD OF SWIFT
TRANSPORT OPTIONS CONNECTING THEM TO THE WIDER CITY AND BEYOND.
Velasco has the advantage of heightened connectivity with high-frequency Dublin Bus
services and a choice of Dublinbikes stations on its doorstep. Commuting professionals
are mere minutes from the nearest DART station at Grand Canal Dock and enjoy easy
access to key train stations via the LUAS light rail network at St. Stephen’s Green.
Mount Street Bridge
Barrow Street DART StationDublin Airport
11
SUPERB STONEWORK Blue
Limestone works with the natural
environment to enhance this
premium office space.
GOLD STANDARD CREDENTIALS With an International LEED Gold
standard, Velasco is a testament
to outstanding energy and
environmental efficiency.
10
Craftsmanship at its Finest FIRST CLASS CRAFTSMANSHIP FEATURES IN EVERY DETAIL WITH EXTENSIVE
USE OF THE FINEST NATURAL MATERIALS.
A commanding plaza to the fore of the building with a stepped entrance sets the tone for this
distinctive landmark; Blue Limestone is skillfully used throughout to stunning effect complementing
the highest specification glazing, which reflects the natural beauty and serenity
of the Grand Canal.
31
TRANQUIL ENVIRONMENTFlourishing greenery and mature
trees add energy to this dynamic
business address in the heart
of the city.
1312
Primed for ProductivityVELASCO FEATURES HIGHLY EFFICIENT FLOOR PLATES
THROUGHOUT WHICH MAXIMISE PRODUCTIVITY TO
MEET THE NEEDS OF ANY OFFICE OCCUPIER.
This agile work environment enjoys a vibrant outlook within
this exclusive address. Panoramic views across the Grand
Canal provide an inspiring setting for professionals
working within this Grade A office space.
ST. STEPHEN’S GREEN
TRINITY COLLEGE
THE CUSTOMSHOUSE
3ARENA
AVIVA
AVIVA
To PORT
Tunnel
FITZWILLIAMSQUARE
ST. STEPHEN’S GREEN
LEESON
ST. LOW
ER
LEESON
PAR
K
SUSSEX RD
FITZ
WIL
LIA
M P
LACE
HATCH ST. LOWER
LAD
LA
NE
JAM
ES S
T.
BAGGOT ST. LOWER
BAGGOT ST. LOWER
BAGGOT ST. UPPER
PEMBROKE LANE
EGLIN RD
FLEMING PLPEMBROKE RD
BAGGOT LANE
MOUNT ST. LOWER
MERRION SQ. S
NASSAU ST
TOWNSEND ST
SAN
DW
ITH
ST. UP
PE
R
DAME ST
NORTHUMBERLAND RD
GRAND CANAL ST. LOWER
SHELBOURNE RD
TRIT
ON
VIL
LE R
D
PEARSE ST
HANOVER QUAY
SIR JOHN ROGERSON’S QUAY
MAYOR ST UPPER
MAYOR ST LOWER
RINGSEND RD
GR
AN
D C
AN
AL
QU
AY
MA
CK
EN
ST
CA
RD
IFF
LN
LIM
E S
T.
ER
NE
ST.
UP
PE
R
ER
NE
ST.
LO
WE
R
WES
TLA
ND
RO
W
BU
RR
OW
ST S
LOT
TS
RD
MER
RIO
N S
T. U
PPER
KIL
DA
RE
ST
MER
RION
SQ
. E
STEP
HEN
S PL
.
LANDSDOWNE RD
HERBERT RD
BALL
SBR
IDG
E AV
ENU
ESERPENTIN
E AVE
LANDSDOWNE PK
HERBERT PLACE
HADDINGTON RD
BATH AVENUE
HADDINGTON RD
WILTON TERRACE
WA
TER
LOO
RD
HE
YLE
SBU
RY
LN
WE
LLIN
GTO
N R
D
RA
GLA
N R
D
HER
BER
T P
K.
GRAND PARADE
CLANWIL
LIAM
PL.
MERRION SQUARE
RIVER LIFFEY
RIVER LIFFEY
GRAND CANALPEARSE ST
STATION
TARA ST STATION
GRANDCANAL
STATION
LANSDOWNE STATION
LEESON
ST. UPPER
DA
WSO
N S
T
COLLEGE ST
O’C
ON
NEL
L ST
LO
WE
R
WE
STM
OR
ELA
NS
ST
TAR
A S
T
NORTH
UMBERLAND RD
WIL
LIAMAM
LPLLPL.
GRANDCANAL
STATION
THE CONVENTION
CENTRE
5
81
210
30
325
4
5
7
6
9
14
15
11
1216
18
19
27
13
17
35
17
23
2021
22
29
24
28
29
31
31 32
34
33
28
5
6
RAIL
DART
DUBLIN BUS
DUBLINBIKES
RESTAURANTS/BARS
1 The Schoolhouse
2 Oil Can Harry’s
3 Juniors Café & Deli
4 Foodgame
5 Insomnia (x4)
6 Lotts & Co.
7 The Chop House
8 Slattery’s Pub
9 3fe
10 Dobbins
11 The 51 Bar
12 Smyth’s Pub
13 OCBs Sandwich/Salad Bar
14 Osteria Lucio
15 Gasworks Bar
16 Asador
17 Milano (x2)
18 Angelina’s
HOTELS
19 Dylan Hotel
20 O’Callaghan Davenport Hotel
21 O’Callaghan Mont Clare Hotel
22 Grand Canal Hotel
23 The Marker Hotel
LIFESTYLE CONVENIENCES
24 Whitewash Laundry
25 Freeman’s Bike Repairs
26 Thrifty Car Rental
27 Hertz
28 Meagher’s Pharmacy (x2)
29 The Punnet Food Emporium
30 Olive Green Espresso Bar
31 EuroSpar
32 MyDental Clinic
ENTERTAINMENT
33 Bord Gáis Energy Theatre
34 Aviva Stadium
35 3Arena
MAP
15
TRAVEL TIMES FROM VELASCO
Grand Canal Dock DART Station 5 min
Spencer Dock Luas Station 15 min
Connolly Station 20 min
Pearse St. DART Station 10 min
Port Tunnel 10 min
Dublin Airport via Tunnel 20 min
Bord Gáis Theatre
Verizon HSBC The Marker Hotel
Mason Hayes
& Curran
Trinity CollegeTwitter
Grand Canal Sq.CapitaPearse St. Dart Station
KBC Facebook
17
LinkedIn ESB NAMA / NTMA
St. Stephen’s Green
GoogleAmazon
Merrion Sq.Grand Canal Dart Station
IDABank of Ireland
Grand CanalBruce Shaw
Blackstone/Brown Brothers Harriman
Bord Gáis
16
19
OFFICE
Lower Ground Floor
SCHEDULE OF ACCOMMODATION
LG FLOOR = 6,609 sq. ft
GROUND FLOOR = 5,285 sq. ft
1st FLOOR = 5,7 16 sq. ft
2nd FLOOR = 7,8 15 sq. ft
3rd FLOOR = 7,8 15 sq. ft
4th FLOOR = 6,943 sq. ft
5th FLOOR = 6,953 sq. ft
6th FLOOR = 3 ,907 sq. ft
TOTAL = 51 ,042 sq. ft
+ 13 CAR SPACES
NOT TO SCALE
FLOOR PLANS OFFICE OCCUPIERS HAVE THE FREEDOM TO OPTIMISE THE FLEXIBLE NATURE
OF VELASCO’S FLOOR PLANS TO SUIT CHANGING OFFICE REQUIREMENTS
AND WORKFORCE STRUCTURES.
VERSATILE CONFIGURATIONS Velasco offers adaptable office
accommodation to suit any
business culture.
BRIGHT OFFICE SPACE
Extensive glazing ensures this
prominent office building benefits
from natural daylight to create a
comfortable work environment.
VERSATILE CONFIGURATIONS Velasco offers adaptable office
accommodation to suit any
business culture.
BRIGHT OFFICE SPACE
Extensive glazing ensures this
prominent office building benefits
from natural daylight to create a
comfortable work environment.
18
21
1st Floor
SCHEDULE OF ACCOMMODATION
LG FLOOR = 6,609 sq. ft
GROUND FLOOR = 5,285 sq. ft
1st FLOOR = 5,716 sq. ft
2nd FLOOR = 7, 8 1 5 sq. ft
3rd FLOOR = 7, 8 1 5 sq. ft
4th FLOOR = 6,943 sq. ft
5th FLOOR = 6,953 sq. ft
6th FLOOR = 3 ,907 sq. ft
TOTAL = 51 ,042 sq. ft
+ 13 CAR SPACES
NOT TO SCALE
Ground Floor
SCHEDULE OF ACCOMMODATION
LG FLOOR = 6,609 sq. ft
GROUND FLOOR = 5, 285 sq. ft
1st FLOOR = 5,7 16 sq. ft
2nd FLOOR = 7, 8 1 5 sq. ft
3rd FLOOR = 7, 8 1 5 sq. ft
4th FLOOR = 6,943 sq. ft
5th FLOOR = 6,953 sq. ft
6th FLOOR = 3 ,907 sq. ft
TOTAL = 51 ,042 sq. ft
+ 13 CAR SPACES
NOT TO SCALE
20
UP
UP
23
3rd Floor
SCHEDULE OF ACCOMMODATION
LG FLOOR = 6,609 sq. ft
GROUND FLOOR = 5,285 sq. ft
1st FLOOR = 5,7 16 sq. ft
2nd FLOOR = 7,8 15 sq. ft
3rd FLOOR = 7, 8 1 5 sq. ft
4th FLOOR = 6,943 sq. ft
5th FLOOR = 6,953 sq. ft
6th FLOOR = 3 ,907 sq. ft
TOTAL = 51 ,042 sq. ft
+ 13 CAR SPACES
NOT TO SCALE
2nd Floor
SCHEDULE OF ACCOMMODATION
LG FLOOR = 6,609 sq. ft
GROUND FLOOR = 5,285 sq. ft
1st FLOOR = 5,7 16 sq. ft
2nd FLOOR = 7, 8 1 5 sq. ft
3rd FLOOR = 7,8 15 sq. ft
4th FLOOR = 6,943 sq. ft
5th FLOOR = 6,953 sq. ft
6th FLOOR = 3 ,907 sq. ft
TOTAL = 51 ,042 sq. ft
+ 13 CAR SPACES
NOT TO SCALE
22
25
5th Floor
SCHEDULE OF ACCOMMODATION
LG FLOOR = 6,609 sq. ft
GROUND FLOOR = 5,285 sq. ft
1st FLOOR = 5,7 16 sq. ft
2nd FLOOR = 7,8 15 sq. ft
3rd FLOOR = 7,8 15 sq. ft
4th FLOOR = 6,943 sq. ft
5th FLOOR = 6,953 sq. ft
6th FLOOR = 3 ,907 sq. ft
TOTAL = 51 ,042 sq. ft
+ 13 CAR SPACES
NOT TO SCALE
4th Floor
SCHEDULE OF ACCOMMODATION
LG FLOOR = 6,609 sq. ft
GROUND FLOOR = 5,285 sq. ft
1st FLOOR = 5,7 16 sq. ft
2nd FLOOR = 7,8 15 sq. ft
3rd FLOOR = 7,8 15 sq. ft
4th FLOOR = 6,943 sq. ft
5th FLOOR = 6,953 sq. ft
6th FLOOR = 3 ,907 sq. ft
TOTAL = 51 ,042 sq. ft
+ 13 CAR SPACES
NOT TO SCALE
24
252726
6th Floor
SCHEDULE OF ACCOMMODATION
LG FLOOR = 6,609 sq. ft
GROUND FLOOR = 5,285 sq. ft
1st FLOOR = 5,7 16 sq. ft
2nd FLOOR = 7,8 15 sq. ft
3rd FLOOR = 7,8 15 sq. ft
4th FLOOR = 6,943 sq. ft
5th FLOOR = 6,953 sq. ft
6th FLOOR = 3,907 sq. ft,
TOTAL = 51 ,042 sq. ft
+ 13 CAR SPACES
NOT TO SCALE
29
2nd Floor
2nd FLOOR = 7,815 sq. ft
62 Workstations
2 Managers Office
4 Phone Booths
3 2 Person Office
3 12 Person Meeting Room
2 4 Person Meeting Room
1 PERSON PER 10 sq. m
NOT TO SCALE
Sample Layout 2
28
2nd Floor
2nd FLOOR = 7,815 sq. ft
86 Workstations
3 1 Person Office
1 2 Person Office
1 12 Person Meeting Room
1 6 Person Meeting Room
1 PERSON PER 8 sq. m
NOT TO SCALE
Sample Layout 1
INTERNAL OFFICE FINISHES
> Walls – Emulsion painted dry lining.
> Floors – Carpet tiles on 600mm x 600mm raised access
flooring medium duty.
> Columns – Emulsion painted dry lining.
> Ceilings – Metal suspended ceiling system to suit 1500mm
square planning module. Perforated 1200mm x 300mm
ceiling tile with a linear plasterboard margin at the
interface with the external glazed façade. System is to
incorporate light fittings, smoke detectors, illuminated
signage, supply and extract ventilation grilles, etc.
Emulsion painted plasterboard margins will incorporate
down lighting.
RECEPTION
> Walls – Mixture of white back painted glass panels and
feature sections of vertical oak timber slats with built-in
acoustic fabric behind.
> Floors – Large format mid-grey porcelain tiles with a R10
slip resistance.
> Columns – Emulsion painted plaster.
> Ceilings – Emulsion painted plasterboard with recessed
lighting and semi-concealed linear supply and return
ventilation diffusers.
> Reception Desk – A bespoke unit of high quality materials
– polished concrete, Corian, steel and timber framing to be
provided.
LIFT LOBBIES
> Walls – Mixture of black back painted glass panels and
feature sections of vertical oak timber slats with built in
acoustic fabric behind.
> Floors – Large format mid-grey porcelain tiles with a R10
slip resistance.
> Ceilings – Emulsion painted plasterboard with recessed
lighting and semi-concealed linear supply and return
ventilation diffusers.
> Doors to lift core – Brushed stainless steel with brushed
stainless steel surround.
> Doors to toilets and stair core – Blacked stained oak
timber finish.
31
TOILETS
> Walls – Large format ceramic wall tiles.
> Floors – Large format mid-grey porcelain tiles with a R10
slip resistance.
> Ceilings – Metal ceiling suspended tile system with
margins of emulsion painted plasterboard. System is to
incorporate recessed downlight fittings, smoke detectors,
illuminated signage, semi-concealed supply and extract
ventilation grilles, etc.
> Doors – Timber doorsets finished in high quality white
satinwood finish.
> WC Cubicles – Full height cubicle system with black back
painted glass doors and white high pressure laminate
internal dividing walls and rear access system.
> Vanity unit – Dark grey Corian vanity worktop with white
vitreous china wash hand basins. Full width bespoke
mirror over, incorporating under mirror illumination,
concealed paper towel dispensers, hand driers and
soap dispensers.
> Sanitary ware – Wall mounted WC pans and urinals with
concealed cisterns.
SHOWERS
6 no. shower rooms and an accessible shower room adjacent
to the bike storage.
PASSENGER LIFTS
> Manufacturer – Kone
> Size – 3 no. 13 person
> Lift speed – 1.6m/s
> Internal lift car finish – Oak side wall interior with full
height mirror to rear wall and porcelain tiled floor to
match lift lobbies. Brushed stainless steel lift car doors
/ control panel with white panel ceiling with down light
illumination.
> Waiting time – Complies with BCO i.e Passenger up peak
average interval is less than 25 seconds. CIBSE GUIDE D
star rating is 6–STAR. One of the three passenger
lifts performs as a fire fighting lift.
SPECIFICATIONSOCCUPANCY
Means of Escape – 1 person per 6 sq.m
Internal Climate – 1 person per 8 sq.m
Lift provision – 1 person per 8 sq.m
Sanitary Provision – 1 person per 8 sq.m
Toilet ratio – 50% male & 50% female provision
to BS6465-1 2006
PLANNING MODULE
1.5m square generally throughout
STRUCTURAL GRID
9m x 7.5m and 8.6m x 7.5m generally
FLOOR LOADING
> Office Floors – 4.0 kN/sq.m (+ 1 kN per sq.m partitions)
> Lift Lobby & Toilet Areas – 4.0 kN/sq.m
> External Terrace – 5.0 kN/sq.m
> Plant Rooms – 7.5 kN/sq.m
> Areas of Roof outside plant areas – 1.5 kN/sq.m
> Bicycle Storage & Shower Areas – 3.0 kN/sq.m
FLOOR HEIGHTS
> Reception floor to ceiling – 3m generally
> Office floor to ceiling – 2.75m generally
> Raised floor zone – nominal 150mm (top of structural slab
to top of raised access floor tile)
> Ceiling light zone – nominal 150mm (underside
of services to finished ceiling level)
> Structure – 325mm flat slab generally
STRUCTURE
The structure is a concrete flame with lateral stability
provided by the concrete core. At ground to underside of
second floor there are perimeter V columns expressed
externally and above this from second to underside of sixth
floor perimeter concrete columns on a 9m & 8.6m x 7.5m
module. The sixth floor is constructed in steel set back from
the perimeter to create a generous terrace to the perimeter
of the building.
EXTERNAL FAÇADE
The façade is composed of a palette of high quality materials
consisting primarily of high performance glass, naturally
anodised aluminium and stone.
On the upper levels there is a unitised double skin façade
system comprised of outward opening single glazed
laminated panel with a passively externally ventilated cavity
with motorised (BMS controlled) interstitial solar/glare roller
blinds (with user occupant local override control) and a fixed
internal insulated double glazing unit with high performance
solar coating. The framing of the unitised system is natural
anodised aluminium with a 75mm projecting feature
element.
On the first, ground and lower ground floor levels there is an
insulated double glazing curtain walling toggle fixed system
with high performance solar coating. Internally there are
motorised (BMS controlled) solar/glare roller blinds (with user
occupant local override control).
To the circulation core façade there is a rain screen system
with aluminium panels set within a natural anodised
aluminium framing system with a 75mm projecting feature
element.
To the top level of the façade, the top of level 5 (6th floor
terrace) and the bottom of the level 2 is a 300mm high
mid-grey limestone band. The same limestone finish wraps
around the soffit of the cantilevered projecting façade at
level 2.
EXTERNAL LANDSCAPE
To the main building entrance is a granite paved concourse
with directional recessed strip lighting. There are two raised
planted areas with bright coloured feature walls facing
the building. These feature walls will be illuminated from
recessed strip lighting.
There is a linear grass area along Clanwilliam Place in
keeping with existing adjacent buildings. This grassed area
separates the upper levels of the building from the linear
lightwell which brings daylight into the lower ground floor
level. The base of the lightwell is paved in granite with a
20m long Omos aluminium planter to one side.
The soft landscape areas contribute to the LEED aspirations
for the building.
30
CAR & BICYCLE PARKING
> Car parking spaces – 13 including 1 no. accessible space
and 1 no. electric charging point.
> Bicycle spaces – 64 secure spaces located at lower ground
floor level and 4 spaces located at the main entrance to
meet the requirements of LEED.
Standby Power
Life Safety Generator installed by Landlord to supply
essential landlord electrical loads in the event of
mains failure.
BUILDING MANAGEMENT SYSTEM
A complete Building Management System will control all
primary Mechanical Plant and Environmental Systems
on each floor. The system will be open network to allow
interface with other systems.
PROTECTIVE INSTALLATION
Fire Alarm System
Fire Detection and Alarm is in accordance with IS 3218 and
designed to L-1 Standard. There are individual loops to each
Tenant Floor.
Security Systems
An IP based CCTV system will monitor all Landlord core
areas, reception, entrance foyer and all external areas. Base
access control systems / security systems are designed to
allow for future tenant interface. There are security turnstiles
provided adjacent to reception.
Communication
An incoming telecommunication room will be served by
two different Telecom duct networks to allow for diverse
connections to the building. Each of these communication
rooms has spare duct capacity in addition to the Telecom
service to the street for future connections to other
providers. Cable tray distribution will be provided from
the telecommunication room to IT riser which services
the office floors.
LEED & BER
The building is targeting LEED Gold and a BER A3 Rating.
ACCESSIBILITY
> Step-free access is provided to the office accommodation
from the external and internal circulation spaces.
> Accessible WCs are provided at each floor.
> An accessible WC & Shower and changing room is provided
at lower ground floor level adjoining the cycle storage.
33
Fresh Air Supply
Offices 10 litres / second / person at 1 per
8sq.m
Toilets 10 air changes / hr / extract make-up
air via office
Acoustics Levels
Office Open Plan NR35
Toilets NR40
Staircore NR45
Reception Area NR40
ELECTRICAL INSTALLATION
The building has a dedicated ESB substation, which will
provide a new supply for the development at Low Voltage.
There is an adjacent client switchroom which will house all
tenant metering and switchgear.
A Distribution Board is provided at each floor level for future
Tenant use.
DESIGN PARAMETERS
One person per 8sq.m
Lighting 12w per sq.m
Small Power 25w per sq.m
Misc. Small Power 20w per sq.m
Mechanical Plant 35w per sq.m
Lighting
> Offices – Energy efficient LED Modular Recessed
Dimmable Luminaries to comply with the Design Intent of
CIBSE Lighting Guide LG7.
> Reception – Bespoke lighting design to reflect high quality
Reception Area.
> Toilets – Low energy lighting scheme provided.
Lighting Control
The main tenant lighting control system will utilise lighting
control modules connected on a communication network
to allow daylight and occupancy control. The system will be
programmable for any reasonable future fit-out requirement.
Landlord areas will be provided with standalone presence /
lighting control sensors. Emergency Lighting to IS 3217.
32
SPECIFICATIONSMECHANICAL INSTALLATION
Air Conditioning & Mechanical Systems
Fresh air is provided by a high efficiency thermal wheel heat
recovery air handling unit. The fresh air will be filtered and
tempered with both heating and cooling as required. There
will be a four pipe fan coil air conditioning system located
in the ceiling voids.
Heating
There will be high efficiency gas fired condensing boilers
installed to generate low temperature hot water (LTHW) to
provide heating for the following applications:
• FCU in open plan office & reception area
• Radiators in cores and back of house areas
• Air handling unit heating coil
Cooling
The offices will be served by chilled water circuit served from
a landlord central chiller. High efficiency air cooled chillers
shall be installed to generate chilled water (CHW) to provide
cooling for the following applications:
• FCU in open plan office & reception area
• Air handling unit cooling coil
Water Services
Mains, cold and hot water will be piped to the various
outlets and sanitary facilities to be provided in the office
development. A hot water storage cylinder will be provided
in the sub-basement plantroom to meet the requirements of
the sanitary facilities, future fit-out tea stations, and cleaning
facilities.
DESIGN PARAMETERS
Winter Temperature
Outside -5°C db (100% saturated)
Internal Office 21°C +/-2°C No RH Control
Toilets 21°C No RH Control
Reception 21°C +/-2°C No RH Control
Summer Temperature
Outside 26°C db 20°C wb
Internal Office 22°C +/-2°C De-humid control only
Toilets 22°C +/-2°C No RH Control
Reception 21°C +/-2°C De-humid control only
DISCLAIMER: The particulars and information contained in this brochure are issued by Jones Lang LaSalle on the understanding that all the negotiations are conducted through them. Whilst every care has been taken in the preparation of the particulars and information they do not constitute an invitation to treat, an offer or a contract of any nature whether express or implied. All descriptions, dimensions, maps, plans, artists’ impressions, references to condition, permissions or licences of use or occupation, access and other details are for guidance only and may be subject to change, without prior notification. The particulars and information are given in good faith but no intending purchaser/tenant should rely on them as statements or representations of fact and is specifically advised to undertake its own due diligence (at its own expense) to satisfy itself as to the accuracy and/or correctness of the particulars and information given. None of Jones Lang LaSalle or their employees, agents or affiliate companies, makes any warranty or representations whether express or implied with respect to the particulars and/or information and which are to the fullest extent permitted by law, disclaimed; furthermore, such parties accept no liability in respect of any loss suffered by any intending purchaser/tenant or any third party arising out of the particulars or information. Prices are quoted exclusive of applicable taxes such as VAT (unless otherwise stated) and all negotiations are conducted on the basis that the purchaser/lessee shall be liable for any applicable taxes or VAT arising out of the transaction.
35
PROFESSIONAL TEAM
Joint Developers / Development Manager Hardwicke
Joint Developers Ardstone Capital
Project Architect / LEED AP / Assigned Certifier RKD Architects
Civil and Structural Engineer / Façade Engineer Arup
Concept Architect Shay Cleary Architects
Main ContractorBennett Construction Ltd.
Landscape Consultant Mitchell and Associates
Branding & Marketing Originate Creative
Quantity Surveyor / PSDPBruce Shaw / Bruce Shaw Safety Management
M&E Services Engineer Ethos Consulting Engineers
Acoustic ConsultantAWN Consulting
Fire and DAC ConsultantG. Sexton and Partners Ltd.
34
Hardwicke has a sterling reputation for delivering pioneering national and international
developments. With an exceptional heritage spanning over 80 years, Hardwicke’s expert
team is committed to delivering another signature office space in addition to their 3 million
sq. ft of office space already developed. This enviable track record reinforces everything
that Hardwicke brings to Velasco.
Ardstone Capital has strong market credentials and an aptitude for identifying prime
opportunities. With a highly skilled team that enjoys international recognition for its ability
to bring premium specification commercial space to prime locations, Ardstone makes the
ideal partner for Velasco. The Ardstone name is associated with the successful completion
of key office developments across the UK, including the city of London, and other
European markets.
DEVELOPMENT TEAMVELASCO IS A TESTAMENT TO THE COMBINED EXPERTISE, KNOWLEDGE AND
REPUTATION OF TWO OF IRELAND’S MOST PROMINENT PROPERTY DEVELOPMENT
AND REAL ESTATE INVESTMENT FIRMS, HARDWICKE AND ARDSTONE CAPITAL, WHO
BRING A POWERFUL COMBINATION OF PROFESSIONALISM AND HIGH PERFORMANCE
TO EVERY MARKET OPPORTUNITY.
Their strategic partnership together with a first class design team drives the development of this
premium office space, which satisfies demand for workspace in Dublin’s most dynamic business location.
3636
PRSA No. 002273
Ger Carr
T + 353 1 673 1600
Deirdre Costello
T +353 1 673 1600
FOR FURTHER INFORMATION:
VELASCO.IE
De
sig
ne
d b
y o
rig
inat
e.ie
PRSA No. 002273
Ger Carr
T + 353 1 673 1600
Deirdre Costello
T +353 1 673 1600