25
Department of Defense GPS Status and GPS Modernization Mr. Ray Swider Assistant for GPS, Positioning and Navigation US Department of Defense

GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

Department of DefenseGPS Status and GPS Modernization

Mr. Ray SwiderAssistant for GPS, Positioning and Navigation

US Department of Defense

Page 2: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

2

Session Overview

• GPS Constellation Status• GPS Modernization Program• OCS Upgrades• GPS III• Questions and Answers

Page 3: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

3

27 Operational Satellites

6 - Block II 18 - Block IIA 3 - Block IIR

27 Operational Satellites

6 - Block II 18 - Block IIA 3 - Block IIR

SVN 22 SVN 36 SVN 24 SVN 51

SVN 25

SVN 38

SVN 27

SVN 19

SVN 30

SVN 13

SVN 35

SVN 44

SVN 33

SVN 31

SVN 37

SVN 46

SVN 17

SVN 34

SVN 21

SVN 40

SVN 23

SVN 26

SVN 43

SVN 32

SVN 29

A B C D E F1

2

3

4

5

SVN 39

SVN 15

Constellation Status

SVN 41

LaunchedNov 10

Page 4: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

4

Goal of GPS Modernization ProgramNavwar Capability While Providing Civil Enhancements

•• MilitaryMilitary–– ProtectionProtection of service for US/Allied forces

• Add new signals and increased signal power to improve Navwarcapability

• Modify select platforms to detect and locate GPS jamming• Develop and field improved anti-jam and security technologies

–– PreventionPrevention of adversary exploitation• Spectrally separate new military signals from civil signals• Modify select platforms to accomplish mission

•• CivilCivil–– PreservationPreservation of civil use while providing enhancements

• Add new signals to improve accuracy and signal redundancy

The Termination of Selective Availability is thefirst step in the GPS Modernization Process

Page 5: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

5

1227 MHz 1575 MHz1176 MHz

L2 L1L5

P(Y)P(Y)

C/AC/A

P(Y)P(Y)

C/AC/A

P(Y)P(Y)

P(Y)P(Y)

C/AC/A

P(Y)P(Y)

C/AC/A

P(Y)P(Y)

C/AC/AMM MM

Present Signal

New Civil General Utility Signal

Civil Safety of LifeApplications and New MilitarySignals

Modernized Signal Evolution

Page 6: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

6

GPS Modernization ProgramApproval Status

• Operational Requirements Document (ORD) signed• Amendment to President’s Budget (PB) sent to

Congress• Congressional approval for GPS Modernization as a

“New Start” received– Block IIR Modification letter contract awarded - Aug 00– Block IIF Undefinitized Contract Change for Modernization

development issued on current contract - Aug 00– GPS-III Systems Architecture and Requirements Definition

(SARD) Phase• Contracts awarded to Boeing and Lockheed Martin - Nov 9 00

Page 7: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

7

GPS Modernization Capabilities

Capabilities FY00 FY05 FY10 FY15 FY20

P(Y) - L1 / L2C/A - L1

C/A - L2MEarth

L5

MHigh Power

Satellite Block II/A/R Block IIA/R/R-Mod GPS-IIISystems Block IIF

FOC

FOCIOC

FOCIOC

IOC

Page 8: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

8

Block IIR- Modified Satellites

L1 L2

L1 Enhancements

•Increased P(Y) codepower

•Increased C/A codepower

•New ME code athigher power thanthe upgraded P(Y)code

L1 Enhancements

•Increased P(Y) codepower

•Increased C/A codepower

•New ME code athigher power thanthe upgraded P(Y)code

- Two new military signals (ME on L1 and L2)- One new civil signal (C/A code on L2)

- Increased power on all existing navigation signals (no changesrequired to batteries or solar arrays)

L2 Enhancements

•Increased P(Y) codepower

•New C/A code withincreased powerover the current C/Acode power levels

•New ME code athigher power thanthe upgraded P(Y)code

L2 Enhancements

•Increased P(Y) codepower

•New C/A code withincreased powerover the current C/Acode power levels

•New ME code athigher power thanthe upgraded P(Y)code

Page 9: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

9

Block IIF Satellites

L1 L2

•Two new military signals (Mearth) L1 and L2• Two new civil signals (C/A on L2 starting with Block IIR - Modified and new civil code on L5)

• Could increase power on some of these signals

•Two new military signals (Mearth) L1 and L2• Two new civil signals (C/A on L2 starting with Block IIR - Modified and new civil code on L5)

• Could increase power on some of these signals

L5

L1 Enhancements

•New ME code added

•Complete definition ofall new capabilitiespending detaileddesign decisions

L1 Enhancements

•New ME code added

•Complete definition ofall new capabilitiespending detaileddesign decisions

L2 Enhancements

•New ME code added

•C/A code added

•Complete definition ofall new capabilitiespending detailed designdecisions

L2 Enhancements

•New ME code added

•C/A code added

•Complete definition ofall new capabilitiespending detailed designdecisions

L5 Signal

•New robust Civil Signal

L5 Signal

•New robust Civil Signal

Page 10: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

10

OCS Upgrades

• Architectural Evolution Plan (AEP)– A phased approach to replacing existing mainframe based

legacy control system with open architecture, distributednetwork

• Launch, Anomaly and Disposal Operations (LADO)– Replaces AFSCN Command and Control System

functionality for GPS by FY04

• IMOSC Development– Develops integrated Block II/IIA/IIF mission operations

support center to replace existing MOSC

• High-Fidelity System Simulator– First installation at Vandenberg AFB for initial crew training;

to be complete by end of CY00

Page 11: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

11

OCS Modernization

• Initiated OCS SPI Modernization Study - 22 Aug00– Define Operations Concept and Top-Level

Implementation Approach– Define Block IIR and Block IIF Test and Operational

Capability– Provides NTE for System Development Cost

• Modifies both legacy and new distributed architecture

• Development begins Spring 01

Page 12: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

12

Ensure best GPS system for the next 30 years

GPS III Program Objectives• Plan and grow system capabilities to meet future user

needs for precise positioning and timing services– GPS ORD objective values as the target

• Procure most cost-effective system to meet future militaryand civilian requirements through 2030– Reduce Total Ownership Costs– Conscientious cost - benefit analyses for future requirements

• Make optimal use of system augmentations andcomplementary systems

• Re-look at entire GPS system architecture– Identify system-level trades for all system segments - space,

control segment and user equipment

Page 13: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

13

Three phase approach - flexible, allows future changes, reduces risk

GPS III Program Approach• System Architecture / Requirements Definition (SA/RD)

– Space, UE and OCS system-level trades - open, iterative process– Define system architecture to lead into a System Requirements

Review (SRR)

• Preliminary Design and Risk Reduction (PD/RR)– Competitive Source Selection after SA/RD phase– Two qualified sources compete for system design to reduce risk in

Engineering, Manufacturing and Design (EMD) phase

• EMD / Production– Down-select to single contractor at Preliminary Design Review

(PDR) - FY03– Conduct risk analysis for EMD– Solidify EMD Phase strategy

Page 14: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

14

GPS III SARD Phase

• Purpose– Assess system wide architectural alternatives

to:• Meet ORD requirements• Reduce total ownership costs• Provide flexibility and robustness to meet evolving

military and civil requirements for the next 30 years

Page 15: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

15

GPS III SARD Phase

• Overview– Competitive selection of two contractor teams

• Contracts awarded to Boeing and Lockheed Martin Nov 00• 12 month study

– Government SARD Team• JPO lead ensemble of military and civil agency participation• Review and blend contractors’ analysis and other

government studies• Form the final baseline and alternatives to be presented to

the Defense Acquisition Board (DAB)

Page 16: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

16

Backup Charts

Page 17: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

17

DoD’s processes can accommodate civil involvement

DoD Requirements andAcquisition Process

• DoD Directive 5000 series provides well establishedDecision Support Systems for:– Requirements Generation– Acquisition Management– Planning, Programming and Budgeting

• Bottom-up approach to making decisions with focuson:– Resolving issues at lowest levels– Building consensus

Page 18: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

18

Conceptual Civil Involvement in Acquisition,Requirements and Policy Structure

MDA

ExecutiveSecretariat

DoDPos/Nav

DOTPos/Nav

SeniorSteeringGroup

GPS JPO

AFAE/AFPEO

IGEBOverarchingIntegratedProduct

Team(OIPT)

Integrating IPT (IIPT)

Working-levelIPT (WIPT)

Acquisition Requirements

FAA /USCG

WAAS/LAAS/NDGPS

IGEBAdvisory

Board

AFSPC

AF/XO

Policy and Plans

Agency/ServiceRequirementsProcessesExecution

IPTs

Inter-AgencyRequirementsCouncil (IRC)

InteragencyRequirementsBoard (IRB)

• Flag Level

• JROC Equivalent

O-6 and Flag FieldReview

UsersForum

Coordinate and A

djudicate Interagency Requirem

ents

Page 19: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

19

OverarchingIntegrated

ProductTeam(OIPT)

Integrating IPT (IIPT)

Working-level IPT(WIPT)

JPO Lead

IGEB

Civil Involvement inAcquisition Process

• IPT Structure– Provide strategic guidance, and

program status/assessment– Identify and resolve issues at

appropriate level– Seeks opportunities for acquisition

reform– “Inter-disciplinary” participation

• Civil representation at each IPT level– 3 -5 civil representatives– Full civil participation through

Extended DOT Pos/Nav structure• IGEB

– Fulfills role defined in PDD– Provides advisory role to DAB– Structure currently exists

ExecutionLevel IPTs

DOT Extended Pos/NavEXCOM

To gain broad civilconsensus on GPS issues

DOT Extended Pos/NavWorking Group

To work elementsinvolving civil issues

Milestone Decision Authority (MDA):USD(AT&L)

DAB

Page 20: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

20

Civil Involvement inRequirements Process

• NPOESS Model– Provides forum to address

requirements and solutiontrades which cross military/civilboundaries

• Independent process fromprogram development

– Each agency’s requirementsare accountable and traceable

– Focused “user community”participation in field

• Civil representation at eachlevel

– Not identical to IPTrepresentation

– Broad representation throughExtended DOT Pos/Navstructure

• IGEB– Fulfills role defined in PDD– Provides advisory role to DAB– Structure currently exists

AFSPC lead --- parallel level to execution IPTs to participate

in and provided guidance for development activities

Milestone Decision Authority (MDA):USD(AT&L)

DAB

DOT ExtendedPos/NavEXCOM

To gain broad civilconsensus on GPS

issues

DOT ExtendedPos/Nav

Working Group To work elements

involving civil issues

JROC- Approve MilRequirement

JRB- Coord &Adjudicate MilRequirement

JRP- Coord &AdjudicateMilitaryRequirement

Inter-AgencyRequirementsCouncil (IRC)

InteragencyRequirementsBoard (IRB)

• Flag Level

• JROC Equivalent

O-6 and Flag FieldReview

UsersForum

Coordinate and A

djudicate Interagency Requirem

ents

IGEB

Services’Requirements

Process

OperatingAgencies’

RequirementsProcesses

Page 21: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

21

Civil Involvement in Requirements Process(IRC and IRB)

• Interagency Requirements Council– Validates interagency requirements only– Resolves or forwards issues

• Interagency Requirements Board– Reviews interagency requirements– Resolves or forwards issues

• Military & Civil chains each review &validate their unique requirements &formulate positions as required toaddress any issues in interagencyprocess

Milestone Decision Authority (MDA):USD(AT&L)

DAB

DOT ExtendedPos/NavEXCOM

To gain broad civilconsensus on GPS

issues

DOT ExtendedPos/Nav

Working Group To work elements

involving civil issues

JROC- Approve MilRequirement

JRB- Coord &Adjudicate MilRequirement

JRP- Coord &AdjudicateMilitaryRequirement

Inter-AgencyRequirementsCouncil (IRC)

InteragencyRequirements

Board• Flag Level

• JROC Equivalent

O-6 and Flag FieldReview

UsersForum

Coordinate and A

djudicate Interagency Requirem

ents

IGEB

Services’Requirements

Process

OperatingAgencies’

RequirementsProcesses

Page 22: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

22

Civil Involvement in Requirements Process(User’s Forum)

• All (JPO, field, HQ) use Users’ Forum as exclusiveprocess to communicate issues, concerns, needs

– JPO to communicate all requirements trades whichaffect user performance prior to “decision”

• “What does it mean to the customer” approach– Avoid multiple unconsolidated/conflicting inputs to JPO

and/or HQ which could cause confusion, poor decisions,chaos, if unchecked

• Civil community implement “field” structure/process toconduct civil-only activities & to participate in users’forum

– Disciplined, results-oriented, fiscally aware approach• Military & civil core user reps to actively participate,

represent agency, strive for consensus at lowestpossible level

– Properly represent issues, disagreements, needs, &outcomes

– Provide timely information/responsesSpecific Focus Teams

Core User Reps

AFSPC/DOTField Co-chairs

Milestone Decision Authority (MDA):USD(AT&L)

DAB

DOT ExtendedPos/NavEXCOM

To gain broad civilconsensus on GPS

issues

DOT ExtendedPos/Nav

Working Group To work elements

involving civil issues

JROC- Approve MilRequirement

JRB- Coord &Adjudicate MilRequirement

JRP- Coord &AdjudicateMilitaryRequirement

Inter-AgencyRequirementsCouncil (IRC)

InteragencyRequirements

Board• Flag Level

• JROC Equivalent

O-6 and Flag FieldReview

UsersForum

Coordinate and A

djudicate Interagency Requirem

ents

IGEB

Services’Requirements

Process

OperatingAgencies’

RequirementsProcesses

Page 23: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

23

IGEB Advisory Group

• Purpose– Increased civil/commercial input– International input?– Structured IAW FACA rules

• Membership?• Grow from the IRT

– Establish based on present IRT Experience– Need New Task Order– Need Membership Suggestions

Page 24: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

24

Civil Involvement in Plans andPolicy Process

• Structure to supportPlans and Policy alreadyin place

• Draws from existingPos/Nav policy structureswithin DoD and DOT

• Consolidates at the IGEB

IGEB

SSG

DOT Extended Pos/Nav

DoDPos/Nav

Underlying Agency Staff Structures

Page 25: GPS: The Global Positioning System - Department of Defense · 2017. 4. 12. · SVN 22 SVN 36 SVN 24 SVN 51 SVN 25 SVN 38 SVN 27 SVN 19 SVN 30 SVN 13 SVN 35 SVN 44 SVN 33 SVN 31 SVN

25

Way Ahead

• DoD/DOT MOA -- “Civil Use of the GlobalPositioning System” revision in process– Revision of MOA will document roles and

responsibilities to put conceptual structure in place– Completion of revision currently planned for 2nd

Quarter of FY01