Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
GPS based gamma survey for decommissioning NORM sitesE. Ruedig, PhD, CHP
T. Alecksen
M. Schierman, CHP
24 September 2019
ERG
True distribution of
soil contaminationInvestigation grid
+ =OR
ERG Note: figure after Lively, J. The Art and Power of Data Imaging. ICEM2013.
GPS gamma survey data➢ Method for gathering soil concentration data for gamma emitting NORM over large areas
Critical assumption: a stable correlation between soil concentrations and gamma count rate
➢ Cost effective compared to traditional soil sampling
➢Survey parameters can be optimized based upon study goals: obtain more quantitative survey data, with a commensurate response on survey cost, or perform a survey that is less quantitative in nature (scoping only – high uncertainties).
➢ Sensitive to all gamma-emitting radionuclides, including NORM, so the set of nuclides that contribute to ambient gamma must be understood at some phase of the project.
ERG
Overview –Ambrosia Lake West Facility
ERGAverage Ra-226 Concentration (Bq g-1)
Colorado
New Mexico
Me
an
Un
sh
ield
ed
Ga
mm
a C
ou
nt
Ra
te (
cts
s-1
)
p < 0.001
Adj R2 = 0.24
Grey bands represent the 95 prediction limits
Improving gamma survey data quality
Physical parameters:
• Scan more slowly
• Position the detector closer to the ground
• Survey tighter transects
• Use a shield
Detector parameters
• Use newer, digital electronics
• Avoid algorithmic processing of data
Environmental parameters
• Control for ambient radon
• To the detector, radon in the ground is the same as radon in the air!
Grey bands = 8am to 5pmERG
Date
Co
nc
en
trati
on
of
Rad
on
-22
2
(No
rma
liz
ed
)G
am
ma C
ou
nt
Rate
(N
orm
ali
ze
d)
Results: radium-226/gamma correlation
p < 1E-7
Adj R2 = 0.63
ERG
Mean Ra-226 Concentration (Bq g-1)Mean Ra-226 Concentration (Bq g-1)
p = 0.117
Adj R2 = 0.053
Me
an
Sh
ield
ed
Ga
mm
a C
ou
nt
Ra
te
(cts
s-1
)
Me
an
Un
sh
ield
ed
Ga
mm
a C
ou
nt
Ra
te (
cts
s-1
)
Grey bands represent the 95 prediction limitsGrey bands represent the 95 prediction limits2019 Survey2016 Survey
ERG
2019 Survey 2016 Survey
Note: histograms are log/log plots.Note: color bins in both figures generated using 10 geometric intervals with the same color ramp.
65m 65m
LOG - Normalized gamma count rate
LO
G -
No
rma
lize
d n
um
be
r o
f o
cc
urr
en
ce
s
(Grey) 2019 Survey
(Outlines) 2016 Survey
The authors wish to gratefully acknowledge:
BHP, for funding this work, and especially BHP’s site staff:Kent Applegate, Theresa Ballaine,
Michaella Gorospe, and Sandra Ross
Our field crew:Tom Bottomly, Jake Halstead,
Patrick Hendrickson, Sam Paterniti
Acknowledgements
ER
G