IMSA Canadian Prairie Section2012 Annual Conference & Trade ShowTechnical Presentation

GPS Based Emergency Preemption

April 19, 2012

Nathaniel Papay, P.Eng. – EPCOR TechnologiesEric Whitby – EPCOR Technologies

With: Trevor Crawford – City of Spruce Grove

Robert Kosterman – City of Spruce Grove

Page 2: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

• Project Overview• Project Structure• Preemption Service Package

• Deployment Details• Site Investigation and Design• Customized Solutions• Field Installation• Testing & Commissioning

• Operation• Benefits• Traffic Maintenance/Upgrades• Enhancements

• Questions

Agenda

Page 3: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Overview

• Project Details– Municipality: City of Spruce Grove

– Scope: Eng/Proc/Const encompassing:

• 22 Intersections

• 10 Vehicles

– Timeline: Jan 2011 – Sept 2011

– System: GTT Opticom GPS (second installation in Western Canada)

Page 4: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Project StructureOwner/Project Sponsor

City of Spruce GroveEngineering Dept Major Stakeholder

City of Spruce GroveFire Services

Consultant

Engineering & Project ManagementEPCOR Technologies

ConstructionEPCOR TechnologiesCommercial Services

Supplier/Technical SupportTrafco Canada

Vehicle Systems InstallerWhyte Communications Inc.

Page 5: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Emergency Preemption Overview

• What is an Emergency Preemption System? – A system that can manipulate traffic signals in the path of an emergency vehicle, stopping conflicting traffic and allowing the emergency vehicle right‐of‐way (or a green light) to pass through uninhibited.

– Helps reduce response times and enhance traffic safety.

Page 6: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

ITS Canada Architecture

• ITS Architecture for Canada v.2.0– ``framework for planning, defining, and integrating intelligent transportation systems``

• Service Package: slice of the physical architecture that addresses a specific service

• Pre‐emption is part of the Emergency Routing Service Package

Page 7: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

ITS Canada Architecture

Page 8: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

GTT GPS Opticom Overview

• Vehicle to Intersection Communication

• Controller determines preemption routines based on direction and speed of vehicle.

Page 9: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Project Schedule

• Project Tendered in July 2010

• Pre‐Contract Site Investigation Sept‐Oct

• Contract Signing December 2010

• Deployment January – August, 2011

• Systems Testing/Tweaking, Aug‐Sept, 2011

Page 10: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Site Investigation – Traffic Inventory

• E/A: Econolite TS2 Cabinets w/ AC3‐1000 or 2100 Controllers with Autoscope

• Traconex TS1 Cabinets w/ TMP 390 Controllers and Loops

• Mix of fully‐actuated and fixed‐timed.

• AWF on HWY 16A

Page 11: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Pre‐Contract Site Investigation

• Report and Findings– Cabinet/Controller Status

• Cabinet space, accessibility to Power

– Cable Pull Status• Conduit space, broken conduits

– Missing Material• Fusing, Traconex D Harness and Cards

– Additional work requirements:• Custom wiring solutions, junction box/conduit repair

No D Harness or Card

Page 12: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Pre‐Contract Site Investigation

– Report Card provided to agency with breakdown of mitigation strategies required to be done and pricing for any additional work

– Cabinets varied from very old to recent

– Cabinet wiring, conduit status varied

Page 13: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Pre‐Contract Site Investigation 

• Purpose– Reduce Project Risk to the agency

– Identify and understand issues/complexities

• Results– Greater detail of project timelines

– Increased project cost accuracy before contract signing

– Better design and preparation

– Increase comfort level for owner

Page 14: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Design – Cabinet Wiring• Issue: Power Distribution Accessibility

• Proposed additional fusing for future devices

• Solution: fuse panel and terminal block

GTT Phase Selector

Fuse Block

Preemption TB

D Harness & J‐4 Card

Page 15: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Design – Preemption Timings• 6 possible preempts per intersection

– NB/SB Opposing Throughs

– EB/WB Opposing Throughs

– Each approach with Left‐Turn Movement (as applicable)

SB/NB

WB/EB

SB & SBLT

WB & WBLT

NB & NBLT

EB & EBLT

Page 16: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Design – Preemption Timings• Critical timings for Intersection Safety

– Minimum Green (5‐10s)

– Ped Clearance (7‐18s)

– Yellow Change (3‐4s)

– Red Clearance (2‐3s)

• Delay before signal turns Green from a Red Phase is based on:– Pedestrian Crossing Lengths

– Road Widths 

– Min Green 

Max Delay ~ 35s (worst case)

Page 17: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Design – Preemption Timings• Left‐Turn Trap Avoidance = Utilize All‐Red Phase

– For intersections that have programmed left‐turn phases.

Without All-Red Phase, NB Left Turn Preemption Call Results in SB Left Turn Trap

Page 18: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Field Installation• Primary Tasks

– Cable Installation

– Antenna Mounting

– Cabinet Wiring

– Controller Programming

– Vehicle Equipment Installation

• Installed on new or existing infrastructure, traffic poles

• TAS: short term traffic interruption of single travel lane for 1‐2 hrs during off‐peak periods.

Page 19: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Testing & Commissioning• Pre‐Field Testing: confirm timings

– Virtual Controller Software

• Field Testing with Test Vehicle– All approaches and sequences

– Comm between intersections

• 45 day User Test Period– Data log review and analysis

– Performance tweaking

• System Inspection and Demonstration 

Page 20: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Operations – Benefits

“SGFS has noticed an improved response time in the outlining areas of Spruce Grove with a marked improvement in public and Firefighter safety.  Every time a Fire Apparatus or Ambulance respond through an intersection, particularly with a red light, there is the potential for serious collision.  The pre‐emptive system has virtually removed this risk from the responses.”

‐ Fire Chief Robert Kosterman

Page 21: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Maintenance/Upgrade Considerations• Part of regular cabinet maintenance 

• Adds additional level of complexity to the wiring and programming of signals. Any cabinet upgrades or  modifications may negatively affect the pre‐emption.

• Preemption is uniquely setup according to a specific controller type

• Important Points:– Knowledgeable and trained technicians

– Up‐to‐date Documentation

Page 22: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Enhancements

• Central Management Software– Manage Equipment Inventory, Configuration & System Security

– Maintain system performance

– Monitor usage across the system and at intersections

– Requires Municipal Communication Network

Page 23: GPS Based Emergency Preemption - IMSA Safetycanadianprairie.imsasafety.org/2012 Technical Sessions/GPS Based Emergency Preemption...Emergency Preemption Overview • What is an Emergency

Enhancements

• Expanded Integration– Transit Signal Priority

• Additional GPS based Transit features: Next Stop Announcements, Fleet management, Travel Times

– Emergency vehicles from Neighbouring Communities

– Utilization of GPS clocks for Signal Coordination