Upload
pkcauto88
View
217
Download
0
Embed Size (px)
Citation preview
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
1/18
v rnm n ' ini i iv in
Industrial Energy Efficiency
National Environment Agency
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
2/18
www.E2Singapore.gov.sg
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
3/18
Energy Efficiency ImprovementAssistance Scheme (EASe)
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
4/18
Objective of Objective of EASeEASe
building sectors to carry out detailed studies ontheir energy consumption, also known as energy
appraisals, and identify potential areas for energyefficiency improvement
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
5/18
EASeEASe
Form of Assistance
- , ,carrying out energy appraisals and identifypotential areas for energy efficiencyimprovement
Qualifying costs include:
Use of instrumentation and evaluation toolsExpendablesOverheads
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
6/18
Eligibility CriteriaEligibility Criteria
wner or opera or o n us r a ac y orbuilding in SingaporeCompany
Consultant
Expert consultant or ESCO under the ESCOAccreditation Scheme, orQualified internal teams with good track record
in carrying out energy appraisals of comparablescale and scope
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
7/18
rant or nergy c entTechnologies II
(GREET II)
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
8/18
GREET IIGREET II
Launched at National Energy Efficiency Conference on 24 May 11Launched at National Energy Efficiency Conference on 24 May 11
To encourage owners and operators of industrialfacilities to invest in energy efficient equipmentor technologies
Objective
Targeted at Energy Efficiency NationalPartnership (EENP) partners to encourage themto implement an energy management system
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
9/18
GREET IIGREET II
Form of Assistance
Co-funds part of the qualifying costs, cappedat $4 mil per project.
Qualifying costs include: Manpower cost
Professional services
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
10/18
Owner or operator of industrial facility EENP artner who has im lemented an enerCom an
Eligibility CriteriaEligibility Criteria
management system
Involve installation and use of energy efficient
equipment or technologies with a proven track recordof energy savings in an industrial facility
Result in measurable and verifiable energy savings
Project
Completed within 18 months from grant approval Minimum estimated project cost of $200,000, if
applicant is not an SME & if annual energyconsumption is > 5GWh
Payback period of more than 3 years & up to 7 years
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
11/18
Singapore Certified EnergyManager (SCEM) Training Grant
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
12/18
Singapore Certified EnergySingapore Certified EnergyManager (SCEM) Training GrantManager (SCEM) Training Grant
Objective
SCEM gives participants a thorough understanding of the key energy issues either in the building or
industry sector. It will help them develop thetechnical skills and competence needed to manageenergy services and management work within theorganisation they serve.
12
Training grant provided for Professional levelcandidates. Candidates only need to pay $963 (Incl.GST) for full course (80% subsidy).
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
13/18
Eligibility CriteriaEligibility Criteria
be Singaporean or Permanent Resident have a relevant degree in engineering or science have at least 1 year of relevant experience
Application for the Grant to be made via theRegistered Training Providers
Candidates
13
-- BCA Academy- SEAS
Applications must be supported by a companysletter
Application
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
14/18
Design for Efficiency (DfE)
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
15/18
Design for Efficiency (Design for Efficiency (DfEDfE))
To encourage investors in new facilities inSin a ore to incor orate ener and resource
Objective
efficiency improvements into manufacturingdevelopment plans early in the design stage
Form of Funds 80% or S$600,000 (whichever is lower)
of the cost of conducting a design workshop
15
assistance
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
16/18
Design for Efficiency (Design for Efficiency (DfEDfE))
Description of An intensive, highly integrative and multi-
disciplinary 2-3 day session that brings together
workshop
external energy consultants at the design stage
Designworksho
Opportunities in:o Resource efficiency reduced demand of
energy, water, gases etco Waste reduction and reuse
16
outcomeso - , , .
Conceptual design for high-efficiency plant &systems
Preliminary estimates of net cost &payback/return
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
17/18
For more information on the mentionedenergy efficiency schemes, please visit
www.E2Singapore.gov.sg
7/27/2019 Government's Initiatives in Industrial Energy Efficiency[1].pdf
18/18
Thank You