BETS Consulting Services Ltd. House No. 10, Road No. 135, Gulshan-1, Dhaka-1212, Bangladesh; Tel: +880-2-9889923-24;
Fax: +880-2-9889967, E-mail: [email protected], Web: www.betsbd.com
Government of the People’s Republic of Bangladesh
Ministry of Road Transport and Bridges Roads and Highways Department
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT
Land Acquisition and Resettlement Action Plan
BOOK OF APPENDICES
November 2018
Submitted by:
TABLE OF CONTENTS
Appendix 1: Category wise Plot Index ...................................................................................................................... 1 Appendix 2: Affected Structures and HHs with Affected Structures ....................................................................... 29 Appendix 3: Other Structures to be Affected ........................................................................................................... 35 Appendix 4: Tree Loss ............................................................................................................................................. 39 Appendix 5: List of Project Affected Households (Structure/Land) ........................................................................ 51 Appendix 6: List of Sharecroppers/ Employees ...................................................................................................... 70 Appendix 7: Attendees List of Consultation Meetings ............................................................................................ 87 Appendix 8: Monitoring Form ............................................................................................................................... 127 Appendix 9: Terms of Reference for the LARAP Implementing NGO ................................................................. 131 Appendix 10: Terms of Reference for External Monitoring .................................................................................. 139 Appendix 11: List of NGO and Job Training ......................................................................................................... 144
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-1
Appendix 1: Category wise Plot Index Summary: Category-wise total land to be acquired (Acre) for the project
Type of Land
(as per record)
No.of Plot
(Govt)
No.of Plot
(Private) No.of Plot
Govt land to
be acquired
(Area)
Private land to
be acquired
(Area)
Total land to
be acquired
(Area)
Agriculture Land 31 364 395 42.2 155.7 197.9
Commercial Land 2 3 5 0.9 1.5 2.4
Homestead Land 9 33 42 4.8 18.6 23.4
Khal 12 0 12 3.1 0.0 3.1
Road 7 1 8 3.2 0.1 3.3
Salt Land / Fish Gher 62 386 448 78.9 178.1 257.0
Waterbody 5 2 7 8.5 0.6 9.2
Total: 128 789 917 141.7 354.6 496.3
Appendix 1-1: Government Land
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
Agriculture Land
6 Bodorkhali Ghona 65 04 3123 1.967 1.967 Full Plot Agriculture Land Government
9 Bodorkhali Ghona 65 04 3161 3.789 2.718 Partial Plot Agriculture Land Government
14 Bodorkhali Ghona 65 04 3187 0.394 0.291 Partial Plot Agriculture Land Government
15 Bodorkhali Ghona 65 04 3158 4.973 0.592 Partial Plot Agriculture Land Government
20 Bodorkhali Ghona 65 04 3526 8.943 0.053 Partial Plot Agriculture Land Government
21 Bodorkhali Ghona 65 04 3122 2.543 0.919 Partial Plot Agriculture Land Government
151 Uttar Nolbila 07 03 855 1.058 0.618 Partial Plot Agriculture Land Government
210 Japua 05 01 277 0.208 0.056 Partial Plot Agriculture Land Government
213 Japua 05 01 278 0.121 0.121 Full Plot Agriculture Land Government
214 Japua 05 01 279 0.186 0.055 Partial Plot Agriculture Land Government
252 Japua 05 01 379 0.175 0.087 Partial Plot Agriculture Land Government
255 Japua 05 01 45 0.367 0.074 Partial Plot Agriculture Land Government
269 Japua 05 01 89 0.28 0.039 Partial Plot Agriculture Land Government
280 Japua 05 01 86 0.318 0.133 Partial Plot Agriculture Land Government
470 Rampur 47 03 2013 519.105 9.193 Partial Plot Agriculture Land Government
780 Palakata 53 06 8042 1.129 0.036 Partial Plot Agriculture Land Government
783 Palakata 53 06 8030 0.091 0.003 Partial Plot Agriculture Land Government
794 Palakata 53 06 8025 3.199 0.146 Partial Plot Agriculture Land Government
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-2
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
795 Palakata 53 06 8024 3.212 0.347 Partial Plot Agriculture Land Government
796 Palakata 53 06 8023 3.244 0.447 Partial Plot Agriculture Land Government
801 Palakata 53 07 8303 893.211 20.603 Partial Plot Agriculture Land Government
805 Palakata 53 04 99999 0.874 0.095 Partial Plot Agriculture Land Government
842 Palakata 53 04 5604 8.257 0.853 Partial Plot Agriculture Land Government
845 Palakata 53 04 5801 5.179 0.173 Partial Plot Agriculture Land Government
885 Fasiakhali 34 02 2179 0.021 0.003 Partial Plot Agriculture Land Government
900 Fasiakhali 34 02 2071 0.772 0.216 Partial Plot Agriculture Land Government
904 Palakata 53 03 4407 6.986 0.346 Partial Plot Agriculture Land Government
907 Palakata 53 03 4405 5.291 1.331 Partial Plot Agriculture Land Government
908 Palakata 53 03 4404 0.215 0.026 Partial Plot Agriculture Land Government
919 Palakata 53 03 4372 0.32 0.025 Partial Plot Agriculture Land Government
949 Palakata 53 03 4280 2.482 0.646 Partial Plot Agriculture Land Government
Total Agricultural Land (Acre): 42.212
Commercial Land
8 Badorkhali Ghona 65 05 4009 1.772 0.789 Full Plot Commercial Land Government
251 Uttar Nolbilla 07 01 39 0.501 0.098 Partial Plot Commercial Land Government
Total Commercial Land (Acre) 0.087
Homestead Land
25 Bodorkhali Ghona 65 04 3196 1.586 0.146 Partial Plot Homestead Land Government
30 Bodorkhali Ghona 65 04 3191 0.164 0.019 Full Plot Homestead Land Government
31 Bodorkhali Ghona 65 04 3186 5.187 3.28 Partial Plot Homestead Land Government
32 Bodorkhali Ghona 65 04 3203 2.083 0.268 Partial Plot Homestead Land Government
33 Bodorkhali Ghona 65 04 3188 0.728 0.406 Partial Plot Homestead Land Government
89 Dhalghata 02 06 6939 0.413 0.413 Full Plot Homestead Land Government
295 Uttar Nolbilla 07 02 290 0.17 0.019 Full Plot Homestead Land Government
902 Fasiakhali 34 02 2148 0.533 0.151 Partial Plot Homestead Land Government
903 Fasiakhali 34 02 2147 0.46 0.135 Partial Plot Homestead Land Government
Total Homestead Land (Acre): 4.837
Khal
90 Dhalghata 02 06 6940 0.172 0.172 Full Plot Khal Government
96 Uttar Nolbila 07 03 765 2.698 0.406 Partial Plot Khal Government
105 Uttar Nolbila 07 03 774 0.446 0.171 Partial Plot Khal Government
111 Uttar Nolbila 07 03 781 0.315 0.046 Partial Plot Khal Government
123 Uttar Nolbila 07 03 803 0.252 0.102 Partial Plot Khal Government
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-3
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
134 Uttar Nolbila 07 03 814 0.216 0.051 Partial Plot Khal Government
194 Uttar Nolbila 07 03 1037 0.182 0.075 Full Plot Khal Government
201 Uttar Nolbila 07 03 1064 3.605 0.741 Partial Plot Khal Government
267 Uttar Nolbilla 07 02 201 39.944 0.544 Partial Plot Khal Government
273 Uttar Nolbilla 07 02 265 21.437 0.583 Partial Plot Khal Government
329 Uttar Nolbilla 07 02 327 0.461 0.067 Partial Plot Khal Government
645 Uttar Nolbila 07 03 99999 0.104 0.104 Full Plot Khal Government
Total Khal Land (Acre): 3.062
Road
27 Badorkhali Ghona 65 05 4110 1.281 0.362 Partial Plot Road Government
39 Bodorkhali Ghona 65 04 3195 1.066 0.065 Partial Plot Road Government
75 Uttar Nolbila 07 03 728 0.703 0.108 Partial Plot Road Government
211 Uttar Nolbila 07 03 1094 0.433 0.134 Partial Plot Road Government
364 Uttar Nolbilla 07 02 373 0.607 0.115 Partial Plot Road Government
368 Uttar Nolbilla 07 02 377 1.626 0.118 Partial Plot Road Government
901 Fasiakhali 34 02 2223 3.901 2.29 Partial Plot Road Government
Total Road Land (Acre): 3.192
Salt Land /Fish Gher
5 Badorkhali Ghona 65 05 4006 1.095 0.189 Partial Plot Salt Land /Fish Gher Government
6 Badorkhali Ghona 65 05 4007 3.817 0.015 Partial Plot Salt Land /Fish Gher Government
7 Bodorkhali Ghona 65 04 3183 0.707 0.317 Partial Plot Salt Land /Fish Gher Government
10 Bodorkhali Ghona 65 04 3162 0.725 0.527 Partial Plot Salt Land /Fish Gher Government
11 Bodorkhali Ghona 65 04 3163 0.614 0.455 Partial Plot Salt Land /Fish Gher Government
13 Bodorkhali Ghona 65 04 3164 0.793 0.558 Partial Plot Salt Land /Fish Gher Government
16 Bodorkhali Ghona 65 04 3165 0.785 0.56 Partial Plot Salt Land /Fish Gher Government
17 Bodorkhali Ghona 65 04 3168 1.414 0.833 Partial Plot Salt Land /Fish Gher Government
19 Bodorkhali Ghona 65 04 3179 0.288 0.254 Partial Plot Salt Land /Fish Gher Government
22 Bodorkhali Ghona 65 04 3178 0.216 0.154 Partial Plot Salt Land /Fish Gher Government
23 Bodorkhali Ghona 65 04 3167 0.758 0.627 Partial Plot Salt Land /Fish Gher Government
24 Bodorkhali Ghona 65 04 3180 1.62 1.048 Partial Plot Salt Land /Fish Gher Government
26 Bodorkhali Ghona 65 04 3181 2.033 1.458 Partial Plot Salt Land /Fish Gher Government
27 Bodorkhali Ghona 65 04 3182 0.286 0.182 Partial Plot Salt Land /Fish Gher Government
28 Bodorkhali Ghona 65 04 3184 1.798 1.403 Partial Plot Salt Land /Fish Gher Government
Badarkhali Ghona 65 00 14 574.142 22.34 Full Plot Salt Land /Fish Gher Government
125 Dhalghata 02 06 6805 1.182 0.628 Partial Plot Salt Land /Fish Gher Government
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-4
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
135 Dhalghata 02 06 8331 0.6 0.04 Partial Plot Salt Land /Fish Gher Government
136 Dhalghata 02 06 8332 1.008 0.084 Partial Plot Salt Land /Fish Gher Government
137 Dhalghata 02 06 7067 13.949 0.721 Partial Plot Salt Land /Fish Gher Government
138 Dhalghata 02 06 7050 4.69 0.197 Partial Plot Salt Land /Fish Gher Government
139 Dhalghata 02 06 7069 3.599 0.317 Partial Plot Salt Land /Fish Gher Government
165 Dhalghata 02 07 10223 0.737 0.147 Partial Plot Salt Land /Fish Gher Government
171 Dhalghata 02 07 10215 1.097 0.161 Partial Plot Salt Land /Fish Gher Government
176 Dhalghata 02 07 10193 1.534 0.593 Partial Plot Salt Land /Fish Gher Government
180 Dhalghata 02 07 10209 7.138 1.847 Partial Plot Salt Land /Fish Gher Government
182 Dhalghata 02 07 10210 1.774 0.262 Partial Plot Salt Land /Fish Gher Government
191 Dhalghata 02 07 10089 8.962 2.949 Partial Plot Salt Land /Fish Gher Government
385 Kaligonj 04 01 210 0.506 0.004 Partial Plot Salt Land /Fish Gher Government
399 Kaligonj 04 01 371 0.305 0.184 Partial Plot Salt Land /Fish Gher Government
403 Kaligonj 04 01 335 0.33 0.169 Partial Plot Salt Land /Fish Gher Government
411 Kaligonj 04 01 357 0.553 0.236 Partial Plot Salt Land /Fish Gher Government
412 Kaligonj 04 01 297 29.478 2.777 Partial Plot Salt Land /Fish Gher Government
227 Japua 05 01 360 0.187 0.004 Partial Plot Salt Land /Fish Gher Government
230 Japua 05 01 361 0.116 0.1 Partial Plot Salt Land /Fish Gher Government
234 Japua 05 01 326 0.09 0.076 Partial Plot Salt Land /Fish Gher Government
285 Japua 05 04 4936 0.043 0.009 Full Plot Salt Land /Fish Gher Government
305 Jhapua 05 03 2234 0.3 0.028 Partial Plot Salt Land /Fish Gher Government
308 Jhapua 05 03 2202 0.064 0.012 Partial Plot Salt Land /Fish Gher Government
325 Jhapua 05 03 2235 0.988 0.338 Partial Plot Salt Land /Fish Gher Government
357 Jhapua 05 03 2259 1.515 0.219 Partial Plot Salt Land /Fish Gher Government
109 Uttar Nolbila 07 03 778 1.911 0.942 Partial Plot Salt Land /Fish Gher Government
268 Uttar Nolbilla 07 02 202 28.779 0.527 Partial Plot Salt Land /Fish Gher Government
272 Uttar Nolbilla 07 02 263 5.122 0.124 Partial Plot Salt Land /Fish Gher Government
318 Uttar Nolbilla 07 02 316 8.994 2.668 Partial Plot Salt Land /Fish Gher Government
319 Uttar Nolbilla 07 02 317 0.958 0.871 Full Plot Salt Land /Fish Gher Government
321 Uttar Nolbilla 07 02 319 1.696 0.666 Full Plot Salt Land /Fish Gher Government
324 Uttar Nolbilla 07 02 322 0.336 0.061 Full Plot Salt Land /Fish Gher Government
327 Uttar Nolbilla 07 02 325 1.308 0.134 Partial Plot Salt Land /Fish Gher Government
328 Uttar Nolbilla 07 02 326 1.727 0.149 Partial Plot Salt Land /Fish Gher Government
336 Uttar Nolbilla 07 02 334 0.038 0.027 Full Plot Salt Land /Fish Gher Government
348 Uttar Nolbilla 07 02 347 2.172 0.168 Partial Plot Salt Land /Fish Gher Government
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-5
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
352 Uttar Nolbilla 07 02 356 3.952 0.511 Partial Plot Salt Land /Fish Gher Government
359 Uttar Nolbilla 07 02 363 1.466 0.532 Partial Plot Salt Land /Fish Gher Government
363 Uttar Nolbilla 07 02 371 6.514 1.361 Partial Plot Salt Land /Fish Gher Government
366 Uttar Nolbilla 07 02 375 2.12 0.807 Partial Plot Salt Land /Fish Gher Government
373 Uttar Nolbilla 07 02 382 1.153 0.245 Partial Plot Salt Land /Fish Gher Government
374 Uttar Nolbilla 07 02 383 1.579 0.363 Partial Plot Salt Land /Fish Gher Government
375 Uttar Nolbilla 07 02 384 1.51 0.434 Partial Plot Salt Land /Fish Gher Government
376 Uttar Nolbilla 07 02 385 0.653 0.222 Full Plot Salt Land /Fish Gher Government
519 Uttar Nolbila 07 03 1470 0.972 0.056 Partial Plot Salt Land /Fish Gher Government
469 Rampur 47 03 2008 1936.676 25.055 Partial Plot Salt Land /Fish Gher Government
Total Salt Land /Fish Gher Land (Acre): 78.945
Waterbody
29 Bodorkhali Ghona 65 04 3185 0.23 0.073 Partial Plot Waterbody Government
36 Bodorkhali Ghona 65 04 3124 0.625 0.103 Partial Plot Waterbody Government
471 Rampur 47 03 99999 5.985 2.636 Partial Plot Waterbody Government
472 Rampur 47 03 2001 834.155 3.194 Partial Plot Waterbody Government
Badarkhali Ghona 65 00 12 90.647 2.509 Full Plot Waterbody Government
Total Waterbody Land (Acre): 8.515
Appendix 1-2: Private
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
Agriculture Land
23 Badorkhali Ghona 65 05 4102 1.34 0.572 Partial Plot Agriculture Land Private
28 Badorkhali Ghona 65 05 4141 1.979 0.01 Partial Plot Agriculture Land Private
29 Badorkhali Ghona 65 05 4142 4.376 1.33 Partial Plot Agriculture Land Private
30 Badorkhali Ghona 65 05 4144 5.421 1.352 Partial Plot Agriculture Land Private
31 Badorkhali Ghona 65 05 4146 6.204 1.63 Partial Plot Agriculture Land Private
32 Badorkhali Ghona 65 05 4148 4.121 1.07 Partial Plot Agriculture Land Private
33 Badorkhali Ghona 65 05 4149 4.08 1.172 Partial Plot Agriculture Land Private
34 Badorkhali Ghona 65 05 4152 3.697 1.294 Partial Plot Agriculture Land Private
35 Badorkhali Ghona 65 05 4153 3.942 2.097 Partial Plot Agriculture Land Private
37 Badorkhali Ghona 65 05 4156 4.008 2.184 Partial Plot Agriculture Land Private
44 Badorkhali Ghona 65 05 4164 1.293 0.576 Partial Plot Agriculture Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-6
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
45 Badorkhali Ghona 65 05 4165 2.941 0.926 Partial Plot Agriculture Land Private
46 Badorkhali Ghona 65 05 4166 4.049 1.382 Partial Plot Agriculture Land Private
47 Badorkhali Ghona 65 05 4167 4.45 1.528 Partial Plot Agriculture Land Private
57 Badorkhali Ghona 65 05 4185 1.507 0.079 Partial Plot Agriculture Land Private
59 Badorkhali Ghona 65 05 4187 0.4 0.066 Partial Plot Agriculture Land Private
62 Bodorkhali Ghona 65 04 3125 0.782 0.782 Full Plot Agriculture Land Private
63 Bodorkhali Ghona 65 04 3126 5.033 0.46 Partial Plot Agriculture Land Private
67 Bodorkhali Ghona 65 04 3140 1.382 0.107 Partial Plot Agriculture Land Private
69 Bodorkhali Ghona 65 04 3142 0.174 0.05 Partial Plot Agriculture Land Private
74 Bodorkhali Ghona 65 04 3147 3.14 1.822 Partial Plot Agriculture Land Private
195 Japua 05 01 260 0.324 0.117 Partial Plot Agriculture Land Private
196 Japua 05 01 261 0.291 0.134 Partial Plot Agriculture Land Private
197 Japua 05 01 262 0.283 0.103 Partial Plot Agriculture Land Private
198 Japua 05 01 263 0.436 0.135 Partial Plot Agriculture Land Private
199 Japua 05 01 265 0.053 0.053 Full Plot Agriculture Land Private
200 Japua 05 01 266 0.023 0.023 Full Plot Agriculture Land Private
201 Japua 05 01 376 0.403 0.171 Partial Plot Agriculture Land Private
202 Japua 05 01 264 1.089 0.278 Partial Plot Agriculture Land Private
203 Japua 05 01 269 0.078 0.078 Full Plot Agriculture Land Private
204 Japua 05 01 267 0.443 0.091 Partial Plot Agriculture Land Private
205 Japua 05 01 270 0.025 0.025 Full Plot Agriculture Land Private
206 Japua 05 01 273 0.039 0.039 Full Plot Agriculture Land Private
207 Japua 05 01 274 0.027 0.027 Full Plot Agriculture Land Private
208 Japua 05 01 268 1.094 0.163 Partial Plot Agriculture Land Private
209 Japua 05 01 271 0.26 0.034 Partial Plot Agriculture Land Private
211 Japua 05 01 272 0.456 0.073 Partial Plot Agriculture Land Private
212 Japua 05 01 275 0.307 0.046 Partial Plot Agriculture Land Private
216 Japua 05 01 282 0.011 0.011 Full Plot Agriculture Land Private
238 Japua 05 01 327 1.438 1.438 Full Plot Agriculture Land Private
239 Japua 05 01 325 0.72 0.72 Full Plot Agriculture Land Private
240 Japua 05 01 324 0.581 0.565 Partial Plot Agriculture Land Private
241 Japua 05 01 323 0.697 0.322 Partial Plot Agriculture Land Private
242 Japua 05 01 322 0.75 0.002 Partial Plot Agriculture Land Private
243 Japua 05 01 133 0.454 0.175 Partial Plot Agriculture Land Private
244 Japua 05 01 297 0.631 0.08 Partial Plot Agriculture Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-7
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
245 Japua 05 01 134 0.823 0.823 Full Plot Agriculture Land Private
247 Japua 05 01 119 0.05 0.038 Partial Plot Agriculture Land Private
248 Japua 05 01 135 2.181 1.626 Partial Plot Agriculture Land Private
249 Japua 05 01 123 0.907 0.181 Partial Plot Agriculture Land Private
250 Japua 05 01 120 0.856 0.122 Partial Plot Agriculture Land Private
251 Japua 05 01 122 2.311 2.037 Partial Plot Agriculture Land Private
253 Japua 05 01 121 0.859 0.244 Partial Plot Agriculture Land Private
254 Japua 05 01 83 0.314 0.144 Partial Plot Agriculture Land Private
256 Japua 05 01 82 0.922 0.424 Partial Plot Agriculture Land Private
257 Japua 05 01 81 0.3 0.14 Partial Plot Agriculture Land Private
258 Japua 05 01 80 0.591 0.315 Partial Plot Agriculture Land Private
259 Japua 05 01 79 1.627 0.812 Partial Plot Agriculture Land Private
260 Japua 05 01 78 0.535 0.264 Partial Plot Agriculture Land Private
261 Japua 05 01 77 0.628 0.328 Partial Plot Agriculture Land Private
262 Japua 05 01 76 0.398 0.202 Partial Plot Agriculture Land Private
263 Japua 05 01 91 0.366 0.011 Partial Plot Agriculture Land Private
264 Japua 05 01 75 0.189 0.084 Partial Plot Agriculture Land Private
265 Japua 05 01 74 0.324 0.133 Partial Plot Agriculture Land Private
266 Japua 05 01 90 0.492 0.077 Partial Plot Agriculture Land Private
267 Japua 05 01 73 0.54 0.24 Partial Plot Agriculture Land Private
268 Japua 05 01 72 0.566 0.239 Partial Plot Agriculture Land Private
270 Japua 05 01 71 0.413 0.151 Partial Plot Agriculture Land Private
271 Japua 05 01 70 0.401 0.132 Partial Plot Agriculture Land Private
272 Japua 05 01 84 0.596 0.402 Partial Plot Agriculture Land Private
273 Japua 05 01 69 0.695 0.171 Partial Plot Agriculture Land Private
274 Japua 05 01 87 0.311 0.245 Partial Plot Agriculture Land Private
275 Japua 05 01 68 0.363 0.071 Partial Plot Agriculture Land Private
277 Japua 05 01 88 2.329 0.867 Partial Plot Agriculture Land Private
278 Japua 05 01 85 0.417 0.181 Partial Plot Agriculture Land Private
279 Japua 05 01 8 0.82 0.156 Partial Plot Agriculture Land Private
281 Japua 05 01 6 0.759 0.443 Partial Plot Agriculture Land Private
101 Uttar Nolbila 07 03 770 0.427 0.164 Partial Plot Agriculture Land Private
112 Uttar Nolbila 07 03 782 0.602 0.127 Partial Plot Agriculture Land Private
113 Uttar Nolbila 07 03 783 0.364 0.166 Partial Plot Agriculture Land Private
114 Uttar Nolbila 07 03 784 0.657 0.611 Partial Plot Agriculture Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-8
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
115 Uttar Nolbila 07 03 785 0.524 0.483 Partial Plot Agriculture Land Private
116 Uttar Nolbila 07 03 786 0.428 0.277 Partial Plot Agriculture Land Private
117 Uttar Nolbila 07 03 787 0.334 0.232 Partial Plot Agriculture Land Private
118 Uttar Nolbila 07 03 788 0.221 0.119 Partial Plot Agriculture Land Private
122 Uttar Nolbila 07 03 802 2.54 0.15 Partial Plot Agriculture Land Private
127 Uttar Nolbila 07 03 807 0.395 0.093 Partial Plot Agriculture Land Private
128 Uttar Nolbila 07 03 808 0.227 0.147 Partial Plot Agriculture Land Private
129 Uttar Nolbila 07 03 809 0.314 0.289 Partial Plot Agriculture Land Private
130 Uttar Nolbila 07 03 810 0.625 0.625 Full Plot Agriculture Land Private
131 Uttar Nolbila 07 03 811 0.433 0.361 Partial Plot Agriculture Land Private
133 Uttar Nolbila 07 03 813 0.505 0.135 Partial Plot Agriculture Land Private
147 Uttar Nolbila 07 03 851 2.363 0.026 Partial Plot Agriculture Land Private
148 Uttar Nolbila 07 03 852 1.385 0.873 Partial Plot Agriculture Land Private
150 Uttar Nolbila 07 03 854 0.34 0.294 Partial Plot Agriculture Land Private
152 Uttar Nolbila 07 03 856 0.229 0.078 Partial Plot Agriculture Land Private
153 Uttar Nolbila 07 03 857 0.648 0.007 Partial Plot Agriculture Land Private
156 Uttar Nolbila 07 03 860 0.33 0.212 Partial Plot Agriculture Land Private
157 Uttar Nolbila 07 03 861 0.095 0.073 Partial Plot Agriculture Land Private
158 Uttar Nolbila 07 03 862 0.184 0.009 Partial Plot Agriculture Land Private
159 Uttar Nolbila 07 03 863 0.905 0.003 Partial Plot Agriculture Land Private
187 Uttar Nolbila 07 03 1030 0.469 0.001 Partial Plot Agriculture Land Private
188 Uttar Nolbila 07 03 1031 0.089 0.08 Partial Plot Agriculture Land Private
189 Uttar Nolbila 07 03 1032 0.096 0.07 Partial Plot Agriculture Land Private
191 Uttar Nolbila 07 03 1034 0.677 0.057 Partial Plot Agriculture Land Private
217 Uttar Nolbila 07 03 1117 0.59 0.01 Partial Plot Agriculture Land Private
218 Uttar Nolbila 07 03 1118 0.563 0.273 Partial Plot Agriculture Land Private
229 Uttar Nolbila 07 03 1617 0.265 0.262 Partial Plot Agriculture Land Private
236 Uttar Nolbilla 07 01 24 0.153 0.04 Partial Plot Agriculture Land Private
237 Uttar Nolbilla 07 01 25 0.17 0.006 Partial Plot Agriculture Land Private
245 Uttar Nolbilla 07 01 33 0.472 0.143 Partial Plot Agriculture Land Private
246 Uttar Nolbilla 07 01 34 0.403 0.065 Partial Plot Agriculture Land Private
248 Uttar Nolbilla 07 01 36 0.298 0.054 Partial Plot Agriculture Land Private
249 Uttar Nolbilla 07 01 37 0.04 0.037 Partial Plot Agriculture Land Private
250 Uttar Nolbilla 07 01 38 0.999 0.2 Partial Plot Agriculture Land Private
253 Uttar Nolbilla 07 01 41 0.38 0.098 Partial Plot Agriculture Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-9
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
254 Uttar Nolbilla 07 01 42 0.977 0.202 Partial Plot Agriculture Land Private
257 Uttar Nolbilla 07 01 45 0.37 0.1 Partial Plot Agriculture Land Private
259 Uttar Nolbilla 07 01 47 0.129 0.011 Partial Plot Agriculture Land Private
260 Uttar Nolbilla 07 01 48 0.185 0.081 Partial Plot Agriculture Land Private
261 Uttar Nolbilla 07 01 49 0.465 0.107 Partial Plot Agriculture Land Private
264 Uttar Nolbilla 07 01 52 0.119 0.084 Partial Plot Agriculture Land Private
265 Uttar Nolbilla 07 01 53 0.146 0.024 Partial Plot Agriculture Land Private
281 Uttar Nolbilla 07 02 276 0.279 0.002 Partial Plot Agriculture Land Private
282 Uttar Nolbilla 07 02 277 0.465 0.031 Partial Plot Agriculture Land Private
283 Uttar Nolbilla 07 02 278 0.44 0.056 Partial Plot Agriculture Land Private
284 Uttar Nolbilla 07 02 279 0.463 0.046 Partial Plot Agriculture Land Private
288 Uttar Nolbilla 07 02 283 0.676 0.099 Partial Plot Agriculture Land Private
289 Uttar Nolbilla 07 02 284 0.706 0.131 Partial Plot Agriculture Land Private
302 Uttar Nolbilla 07 02 297 0.143 0.028 Partial Plot Agriculture Land Private
303 Uttar Nolbilla 07 02 298 0.478 0.014 Partial Plot Agriculture Land Private
359 Kalar Mar Chhara 03 01 18 0.08 0.061 Partial Plot Agriculture Land Private
360 Kalar Mar Chhara 03 01 17 0.13 0.13 Full Plot Agriculture Land Private
361 Kalar Mar Chhara 03 01 16 0.212 0.053 Partial Plot Agriculture Land Private
362 Kalar Mar Chhara 03 01 34 0.313 0.146 Partial Plot Agriculture Land Private
363 Kalar Mar Chhara 03 01 33 0.242 0.229 Partial Plot Agriculture Land Private
364 Kalar Mar Chhara 03 01 22 6.053 2.057 Partial Plot Agriculture Land Private
367 Kalar Mar Chhara 03 01 30 0.171 0.001 Partial Plot Agriculture Land Private
369 Kalar Mar Chhara 03 01 29 1.29 0.094 Partial Plot Agriculture Land Private
473 Esonkhali 06 00 78 0.542 0.04 Partial Plot Agriculture Land Private
475 Esonkhali 06 00 77 0.311 0.074 Partial Plot Agriculture Land Private
476 Esonkhali 06 00 75 0.519 0.168 Partial Plot Agriculture Land Private
477 Esonkhali 06 00 63 0.519 0.519 Full Plot Agriculture Land Private
478 Esonkhali 06 00 64 0.08 0.08 Full Plot Agriculture Land Private
479 Esonkhali 06 00 62 0.358 0.259 Partial Plot Agriculture Land Private
480 Esonkhali 06 00 65 0.666 0.633 Partial Plot Agriculture Land Private
481 Esonkhali 06 00 66 0.861 0.372 Partial Plot Agriculture Land Private
482 Esonkhali 06 00 67 0.286 0.02 Partial Plot Agriculture Land Private
483 Esonkhali 06 00 59 0.173 0.156 Partial Plot Agriculture Land Private
484 Esonkhali 06 00 60 2.851 1.306 Partial Plot Agriculture Land Private
485 Esonkhali 06 00 17 0.341 0.156 Partial Plot Agriculture Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-10
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
486 Esonkhali 06 00 18 0.175 0.147 Partial Plot Agriculture Land Private
487 Esonkhali 06 00 14 8.16 2.039 Partial Plot Agriculture Land Private
488 Esonkhali 06 00 13 1.179 0.312 Partial Plot Agriculture Land Private
489 Esonkhali 06 00 10 0.173 0.117 Partial Plot Agriculture Land Private
490 Esonkhali 06 00 12 1.085 0.292 Partial Plot Agriculture Land Private
491 Esonkhali 06 00 11 3.125 0.937 Partial Plot Agriculture Land Private
492 Esonkhali 06 00 20 1.517 0.001 Partial Plot Agriculture Land Private
493 Esonkhali 06 00 19 0.301 0.027 Partial Plot Agriculture Land Private
494 Esonkhali 06 00 9 1.804 0.557 Partial Plot Agriculture Land Private
495 Esonkhali 06 00 8 1.436 0.401 Partial Plot Agriculture Land Private
496 Esonkhali 06 00 7 2.855 0.845 Partial Plot Agriculture Land Private
497 Esonkhali 06 00 36 1.191 0.165 Partial Plot Agriculture Land Private
741 Japua 05 01 7 3.15 0.41 Partial Plot Agriculture Land Private
742 Palakata 53 05 7416 0.603 0.021 Partial Plot Agriculture Land Private
743 Palakata 53 05 7415 1.229 0.321 Partial Plot Agriculture Land Private
744 Palakata 53 05 7436 0.904 0.607 Partial Plot Agriculture Land Private
745 Palakata 53 05 7430 0.71 0.166 Partial Plot Agriculture Land Private
746 Palakata 53 05 7463 0.264 0.108 Partial Plot Agriculture Land Private
747 Palakata 53 05 7437 1.194 0.831 Partial Plot Agriculture Land Private
748 Palakata 53 05 7438 0.247 0.247 Full Plot Agriculture Land Private
749 Palakata 53 05 7414 1.989 1.986 Partial Plot Agriculture Land Private
750 Palakata 53 05 7462 0.206 0.206 Full Plot Agriculture Land Private
751 Palakata 53 05 7460 0.518 0.513 Partial Plot Agriculture Land Private
752 Palakata 53 05 7461 0.341 0.334 Partial Plot Agriculture Land Private
753 Palakata 53 05 7413 2.955 1.326 Partial Plot Agriculture Land Private
754 Palakata 53 05 7459 1.345 0.43 Partial Plot Agriculture Land Private
755 Palakata 53 05 7439 1.58 0.437 Partial Plot Agriculture Land Private
756 Palakata 53 05 7440 0.294 0.015 Partial Plot Agriculture Land Private
757 Palakata 53 05 7465 0.573 0.196 Partial Plot Agriculture Land Private
758 Palakata 53 05 7464 0.189 0.087 Partial Plot Agriculture Land Private
759 Palakata 53 05 7429 2.231 0.658 Partial Plot Agriculture Land Private
760 Palakata 53 05 7503 5.755 0.289 Partial Plot Agriculture Land Private
761 Palakata 53 05 7518 37.259 1.183 Partial Plot Agriculture Land Private
762 Palakata 53 05 7428 1.855 0.066 Partial Plot Agriculture Land Private
764 Palakata 53 06 8101 1.331 0.019 Partial Plot Agriculture Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-11
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
765 Palakata 53 06 8156 5.776 0.209 Partial Plot Agriculture Land Private
766 Palakata 53 06 8111 1.287 0.015 Partial Plot Agriculture Land Private
767 Palakata 53 06 8100 1.28 0.256 Partial Plot Agriculture Land Private
768 Palakata 53 06 8114 3.509 0.101 Partial Plot Agriculture Land Private
769 Palakata 53 06 8155 3.891 0.371 Partial Plot Agriculture Land Private
770 Palakata 53 06 8109 3.326 0.143 Partial Plot Agriculture Land Private
771 Palakata 53 06 8097 0.647 0.391 Partial Plot Agriculture Land Private
772 Palakata 53 06 8110 3.56 0.32 Partial Plot Agriculture Land Private
773 Palakata 53 06 8157 2.219 0.467 Partial Plot Agriculture Land Private
774 Palakata 53 06 8159 1.195 0.327 Partial Plot Agriculture Land Private
775 Palakata 53 06 8046 5.921 0.804 Partial Plot Agriculture Land Private
778 Palakata 53 06 8095 0.405 0.405 Full Plot Agriculture Land Private
779 Palakata 53 06 8160 1.447 0.607 Partial Plot Agriculture Land Private
781 Palakata 53 06 8099 1.84 1.151 Partial Plot Agriculture Land Private
782 Palakata 53 06 8033 4.052 0.23 Partial Plot Agriculture Land Private
784 Palakata 53 06 8098 5.678 2.32 Partial Plot Agriculture Land Private
785 Palakata 53 06 8047 6.525 4.921 Partial Plot Agriculture Land Private
786 Palakata 53 06 8096 4.347 2.962 Partial Plot Agriculture Land Private
787 Palakata 53 06 8049 7.041 0.125 Partial Plot Agriculture Land Private
788 Palakata 53 06 8032 32.885 0.459 Partial Plot Agriculture Land Private
789 Palakata 53 06 8048 1.477 0.258 Partial Plot Agriculture Land Private
790 Palakata 53 06 8031 2.017 0.184 Partial Plot Agriculture Land Private
793 Palakata 53 06 8091 20.202 3.888 Partial Plot Agriculture Land Private
797 Palakata 53 06 8093 10.413 2.65 Partial Plot Agriculture Land Private
798 Palakata 53 06 8062 2.177 0.02 Partial Plot Agriculture Land Private
799 Palakata 53 06 8064 1.758 0.06 Partial Plot Agriculture Land Private
800 Palakata 53 07 8604 3.772 0.341 Partial Plot Agriculture Land Private
803 Palakata 53 04 5611 0.64 0.049 Partial Plot Agriculture Land Private
804 Palakata 53 04 5626 0.739 0.004 Partial Plot Agriculture Land Private
806 Palakata 53 04 5621 0.628 0.25 Partial Plot Agriculture Land Private
807 Palakata 53 04 5613 6.385 0.999 Partial Plot Agriculture Land Private
808 Palakata 53 04 5615 1.146 0.318 Partial Plot Agriculture Land Private
809 Palakata 53 04 5612 0.176 0.176 Full Plot Agriculture Land Private
810 Palakata 53 04 5616 3.748 1.852 Partial Plot Agriculture Land Private
811 Palakata 53 04 5617 1.063 0.53 Partial Plot Agriculture Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-12
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
812 Palakata 53 04 5610 0.237 0.126 Partial Plot Agriculture Land Private
813 Palakata 53 04 5638 0.594 0.1 Partial Plot Agriculture Land Private
814 Palakata 53 04 5639 0.511 0.166 Partial Plot Agriculture Land Private
815 Palakata 53 04 5622 1.296 1.193 Partial Plot Agriculture Land Private
816 Palakata 53 04 5606 4.251 0.462 Partial Plot Agriculture Land Private
817 Palakata 53 04 5624 0.874 0.344 Partial Plot Agriculture Land Private
818 Palakata 53 04 5632 1.521 0.578 Partial Plot Agriculture Land Private
819 Palakata 53 04 5631 2.513 1.136 Partial Plot Agriculture Land Private
820 Palakata 53 04 5633 1.614 0.637 Partial Plot Agriculture Land Private
821 Palakata 53 04 5625 0.857 0.542 Partial Plot Agriculture Land Private
822 Palakata 53 04 5635 1.502 0.607 Partial Plot Agriculture Land Private
823 Palakata 53 04 5840 0.229 0.052 Partial Plot Agriculture Land Private
824 Palakata 53 04 5640 0.3 0.273 Partial Plot Agriculture Land Private
825 Palakata 53 04 5641 0.818 0.246 Partial Plot Agriculture Land Private
826 Palakata 53 04 5836 1.534 0.78 Partial Plot Agriculture Land Private
827 Palakata 53 04 5623 0.832 0.064 Partial Plot Agriculture Land Private
828 Palakata 53 04 5837 1.231 0.542 Partial Plot Agriculture Land Private
829 Palakata 53 04 5838 1.484 0.629 Partial Plot Agriculture Land Private
830 Palakata 53 04 5839 1.517 0.482 Partial Plot Agriculture Land Private
831 Palakata 53 04 5817 0.041 0.041 Full Plot Agriculture Land Private
832 Palakata 53 04 5816 0.219 0.17 Partial Plot Agriculture Land Private
833 Palakata 53 04 5835 0.124 0.046 Partial Plot Agriculture Land Private
834 Palakata 53 04 5643 0.735 0.145 Partial Plot Agriculture Land Private
835 Palakata 53 04 5841 3.092 0.274 Partial Plot Agriculture Land Private
836 Palakata 53 04 5815 0.211 0.065 Partial Plot Agriculture Land Private
837 Palakata 53 04 5834 0.381 0.025 Partial Plot Agriculture Land Private
839 Palakata 53 04 5619 7.834 1.361 Partial Plot Agriculture Land Private
840 Palakata 53 04 5618 1.025 0.032 Partial Plot Agriculture Land Private
841 Palakata 53 04 5609 13.472 1.223 Partial Plot Agriculture Land Private
843 Palakata 53 04 5818 0.213 0.009 Partial Plot Agriculture Land Private
844 Palakata 53 04 5607 1.273 0.056 Partial Plot Agriculture Land Private
856 Fasiakhali 34 02 2166 0.253 0.115 Partial Plot Agriculture Land Private
857 Fasiakhali 34 02 2045 0.115 0.092 Partial Plot Agriculture Land Private
858 Fasiakhali 34 02 2167 0.2 0.143 Partial Plot Agriculture Land Private
859 Fasiakhali 34 02 2168 0.107 0.106 Partial Plot Agriculture Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-13
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
860 Fasiakhali 34 02 2160 0.24 0.089 Partial Plot Agriculture Land Private
861 Fasiakhali 34 02 2044 3.751 0.485 Partial Plot Agriculture Land Private
862 Fasiakhali 34 02 2028 1.77 0.924 Partial Plot Agriculture Land Private
863 Fasiakhali 34 02 2025 2.242 0.361 Partial Plot Agriculture Land Private
865 Fasiakhali 34 02 2169 1.239 0.806 Partial Plot Agriculture Land Private
866 Fasiakhali 34 02 2171 0.36 0.358 Partial Plot Agriculture Land Private
867 Fasiakhali 34 02 2024 0.113 0.113 Full Plot Agriculture Land Private
868 Fasiakhali 34 02 2042 1.494 0.616 Partial Plot Agriculture Land Private
869 Fasiakhali 34 02 2029 1.877 1.867 Partial Plot Agriculture Land Private
870 Fasiakhali 34 02 2172 0.131 0.13 Partial Plot Agriculture Land Private
871 Fasiakhali 34 02 2030 0.145 0.144 Partial Plot Agriculture Land Private
872 Fasiakhali 34 02 2170 1.29 1.282 Partial Plot Agriculture Land Private
873 Fasiakhali 34 02 2174 0.179 0.178 Partial Plot Agriculture Land Private
874 Fasiakhali 34 02 2159 0.23 0.229 Partial Plot Agriculture Land Private
877 Fasiakhali 34 02 2175 0.161 0.138 Partial Plot Agriculture Land Private
878 Fasiakhali 34 02 2041 0.307 0.504 FALSE Agriculture Land Private
879 Fasiakhali 34 02 2176 0.154 0.128 Partial Plot Agriculture Land Private
880 Fasiakhali 34 02 2177 0.237 0.213 Partial Plot Agriculture Land Private
881 Fasiakhali 34 02 2040 0.433 0.431 Partial Plot Agriculture Land Private
882 Fasiakhali 34 02 2178 0.115 0.103 Partial Plot Agriculture Land Private
883 Fasiakhali 34 02 2052 8.581 0.469 Partial Plot Agriculture Land Private
884 Fasiakhali 34 02 2023 1.79 1.78 Partial Plot Agriculture Land Private
886 Fasiakhali 34 02 2031 0.149 0.14 Partial Plot Agriculture Land Private
887 Fasiakhali 34 02 2022 1.668 0.998 Partial Plot Agriculture Land Private
891 Fasiakhali 34 02 2032 0.392 0.064 Partial Plot Agriculture Land Private
893 Fasiakhali 34 02 2021 0.809 0.02 Partial Plot Agriculture Land Private
894 Fasiakhali 34 02 2157 0.869 0.238 Partial Plot Agriculture Land Private
895 Fasiakhali 34 02 2039 0.196 0.012 Partial Plot Agriculture Land Private
896 Fasiakhali 34 02 2173 0.09 0.028 Partial Plot Agriculture Land Private
899 Fasiakhali 34 02 2158 0.361 0.032 Partial Plot Agriculture Land Private
905 Palakata 53 03 4406 5.724 0.515 Partial Plot Agriculture Land Private
906 Palakata 53 03 4392 0.687 0.259 Partial Plot Agriculture Land Private
910 Palakata 53 03 4383 0.647 0.17 Partial Plot Agriculture Land Private
911 Palakata 53 03 4391 0.676 0.675 Partial Plot Agriculture Land Private
912 Palakata 53 03 4378 0.438 0.286 Partial Plot Agriculture Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-14
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
914 Palakata 53 03 4390 0.659 0.144 Partial Plot Agriculture Land Private
915 Palakata 53 03 4377 0.465 0.465 Full Plot Agriculture Land Private
916 Palakata 53 03 4371 0.206 0.1 Partial Plot Agriculture Land Private
917 Palakata 53 03 4384 0.662 0.623 Partial Plot Agriculture Land Private
918 Palakata 53 03 4385 1.775 0.845 Partial Plot Agriculture Land Private
920 Palakata 53 03 4374 1.312 0.628 Partial Plot Agriculture Land Private
921 Palakata 53 03 4373 0.177 0.142 Partial Plot Agriculture Land Private
922 Palakata 53 03 4375 2.24 0.803 Partial Plot Agriculture Land Private
923 Palakata 53 03 4325 1.753 0.066 Partial Plot Agriculture Land Private
924 Palakata 53 03 4324 0.983 0.369 Partial Plot Agriculture Land Private
925 Palakata 53 03 4376 1.528 0.203 Partial Plot Agriculture Land Private
926 Palakata 53 03 4386 2.998 1.044 Partial Plot Agriculture Land Private
927 Palakata 53 03 4396 2.506 0.305 Partial Plot Agriculture Land Private
928 Palakata 53 03 4393 3.398 1.077 Partial Plot Agriculture Land Private
929 Palakata 53 03 4394 3.119 0.861 Partial Plot Agriculture Land Private
930 Palakata 53 03 4395 3.499 0.669 Partial Plot Agriculture Land Private
931 Palakata 53 03 4340 4.988 1.802 Partial Plot Agriculture Land Private
932 Palakata 53 03 4323 4.792 1.572 Partial Plot Agriculture Land Private
933 Palakata 53 03 4342 1.029 0.01 Partial Plot Agriculture Land Private
934 Palakata 53 03 4368 29.833 1.202 Partial Plot Agriculture Land Private
935 Palakata 53 03 4297 1.549 0.278 Partial Plot Agriculture Land Private
936 Palakata 53 03 4298 0.834 0.834 Full Plot Agriculture Land Private
937 Palakata 53 03 4299 0.735 0.636 Partial Plot Agriculture Land Private
938 Palakata 53 03 4341 12.179 4.339 Partial Plot Agriculture Land Private
939 Palakata 53 03 4300 0.413 0.184 Partial Plot Agriculture Land Private
940 Palakata 53 03 4296 2.638 1.225 Partial Plot Agriculture Land Private
941 Palakata 53 03 4292 0.972 0.56 Partial Plot Agriculture Land Private
942 Palakata 53 03 4301 0.406 0.043 Partial Plot Agriculture Land Private
944 Palakata 53 03 4305 0.66 0.001 Partial Plot Agriculture Land Private
945 Palakata 53 03 4295 0.308 0.126 Partial Plot Agriculture Land Private
946 Palakata 53 03 4294 0.331 0.143 Partial Plot Agriculture Land Private
947 Palakata 53 03 4293 0.694 0.114 Partial Plot Agriculture Land Private
948 Palakata 53 03 4286 4.355 0.482 Partial Plot Agriculture Land Private
950 Palakata 53 03 4270 49.282 5.857 Partial Plot Agriculture Land Private
951 Palakata 53 03 4269 5.936 0.842 Partial Plot Agriculture Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-15
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
Fasiakhali 34 02 2140 0.471 0.001 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2141 0.204 0.085 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2142 0.352 0.295 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2143 0.09 0.083 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2144 0.108 0.108 Full Plot Agriculture Land Private
Fasiakhali 34 02 2145 0.15 0.15 Full Plot Agriculture Land Private
Fasiakhali 34 02 2146 0.222 0.169 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2219 0.853 0.515 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2224 0.018 0.018 Full Plot Agriculture Land Private
Fasiakhali 34 02 2225 0.016 0.001 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2228 0.025 0.002 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2229 0.023 0.023 Full Plot Agriculture Land Private
Fasiakhali 34 02 2230 0.029 0.029 Full Plot Agriculture Land Private
Fasiakhali 34 02 2231 0.031 0.002 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2235 0.065 0.043 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2236 0.739 0.397 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2237 0.364 0.177 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2245 0.514 0.016 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2322 0.099 0.035 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2323 0.152 0.05 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2324 0.032 0.011 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2325 0.047 0.018 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2326 0.11 0.053 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2356 0.06 0.041 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2358 0.238 0.033 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2359 0.23 0.046 Partial Plot Agriculture Land Private
Fasiakhali 34 02 2424 0.075 0.03 Partial Plot Agriculture Land Private
Fashiakhali 34 01 370 0.377 0.218 Partial Plot Agriculture Land Private
Fashiakhali 34 01 371 0.04 0.026 Partial Plot Agriculture Land Private
Fashiakhali 34 01 372 0.142 0.093 Partial Plot Agriculture Land Private
Fashiakhali 34 01 373 0.841 0.675 Partial Plot Agriculture Land Private
Fashiakhali 34 01 374 0.072 0.055 Partial Plot Agriculture Land Private
Fashiakhali 34 01 375 0.067 0.052 Partial Plot Agriculture Land Private
Fashiakhali 34 01 382 0.049 0.035 Partial Plot Agriculture Land Private
Fashiakhali 34 01 383 0.081 0.033 Partial Plot Agriculture Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-16
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
Fashiakhali 34 01 388 0.042 0.033 Partial Plot Agriculture Land Private
Fashiakhali 34 01 389 0.073 0.061 Partial Plot Agriculture Land Private
Fashiakhali 34 01 399 0.315 0.083 Partial Plot Agriculture Land Private
Total Agriculture Land (Acre): 155.71
Commercial Land
2 Badorkhali Ghona 65 05 4002 10.789 1.137 Partial Plot Commercial Land Private
3 Badorkhali Ghona 65 05 4004 17.897 0.362 Partial Plot Commercial Land Private
15 Badorkhali Ghona 65 05 4093 0.749 0.007 Partial Plot Commercial Land Private
Total Commercial Land (Acre): 1.506
Homestead Land
7 Badorkhali Ghona 65 05 4008 0.576 0.438 Full Plot Homestead Land Private
9 Badorkhali Ghona 65 05 4010 0.564 0.132 Full Plot Homestead Land Private
10 Badorkhali Ghona 65 05 4011 4.058 1.127 Partial Plot Homestead Land Private
16 Badorkhali Ghona 65 05 4094 2.066 0.747 Partial Plot Homestead Land Private
17 Badorkhali Ghona 65 05 4095 1.23 0.789 Full Plot Homestead Land Private
18 Badorkhali Ghona 65 05 4096 1.21 1.173 Full Plot Homestead Land Private
19 Badorkhali Ghona 65 05 4098 0.878 0.663 Full Plot Homestead Land Private
22 Badorkhali Ghona 65 05 4101 1.129 0.417 Full Plot Homestead Land Private
24 Badorkhali Ghona 65 05 4103 7.371 2.141 Partial Plot Homestead Land Private
39 Badorkhali Ghona 65 05 4158 3.018 1.694 Partial Plot Homestead Land Private
48 Badorkhali Ghona 65 05 4168 5.599 2.243 Partial Plot Homestead Land Private
53 Badorkhali Ghona 65 05 4175 1.16 0.013 Partial Plot Homestead Land Private
58 Badorkhali Ghona 65 05 4186 1.535 1.499 Full Plot Homestead Land Private
64 Bodorkhali Ghona 65 04 3137 2.392 0.011 Partial Plot Homestead Land Private
65 Bodorkhali Ghona 65 04 3138 0.637 0.637 Full Plot Homestead Land Private
68 Bodorkhali Ghona 65 04 3141 2.855 1.845 Full Plot Homestead Land Private
81 Dhalghata 02 06 6938 0.074 0.074 Full Plot Homestead Land Private
274 Uttar Nolbilla 07 02 269 0.315 0.004 Partial Plot Homestead Land Private
285 Uttar Nolbilla 07 02 280 0.484 0.092 Partial Plot Homestead Land Private
286 Uttar Nolbilla 07 02 281 0.111 0.073 Full Plot Homestead Land Private
296 Uttar Nolbilla 07 02 291 1.803 0.397 Full Plot Homestead Land Private
297 Uttar Nolbilla 07 02 292 0.03 0.005 Full Plot Homestead Land Private
298 Uttar Nolbilla 07 02 293 0.168 0.001 Full Plot Homestead Land Private
313 Uttar Nolbilla 07 02 310 0.114 0.019 Full Plot Homestead Land Private
853 Fasiakhali 34 02 2150 0.328 0.02 Partial Plot Homestead Land Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-17
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
854 Fasiakhali 34 02 2149 0.089 0.007 Partial Plot Homestead Land Private
855 Fasiakhali 34 02 2161 0.489 0.234 Partial Plot Homestead Land Private
864 Fasiakhali 34 02 2151 0.2 0.199 Full Plot Homestead Land Private
875 Fasiakhali 34 02 2221 0.111 0.11 Full Plot Homestead Land Private
876 Fasiakhali 34 02 2152 1.168 1.161 Full Plot Homestead Land Private
889 Fasiakhali 34 02 2222 0.45 0.406 Partial Plot Homestead Land Private
890 Fasiakhali 34 02 2220 0.18 0.006 Partial Plot Homestead Land Private
898 Fasiakhali 34 02 2153 0.829 0.225 Partial Plot Homestead Land Private
Total Homestead Land (Acre): 18.602
Road
38 Badorkhali Ghona 65 05 4157 0.274 0.068 Partial Plot Road Private
Total Road Land (Acre): 0.068
Salt Land / Fish Gher
4 Badorkhali Ghona 65 05 4005 0.887 0.064 Partial Plot Salt Land/ Fish Gher Private
40 Dhalghat 002 004 1501 19.774 0.435 Partial Plot Salt Land/ Fish Gher Private
41 Dhalghat 002 004 1513 442.85 7.755 Partial Plot Salt Land/ Fish Gher Private
42 Dhalghata 02 06 6754 0.314 0.039 Partial Plot Salt Land/ Fish Gher Private
43 Dhalghata 02 06 6753 0.249 0.171 Partial Plot Salt Land/ Fish Gher Private
44 Dhalghata 02 06 6752 0.267 0.202 Partial Plot Salt Land/ Fish Gher Private
45 Dhalghata 02 06 6751 0.517 0.385 Partial Plot Salt Land/ Fish Gher Private
46 Dhalghata 02 06 6750 0.21 0.149 Partial Plot Salt Land/ Fish Gher Private
47 Dhalghata 02 06 6749 0.724 0.507 Partial Plot Salt Land/ Fish Gher Private
48 Dhalghata 02 06 6748 0.247 0.166 Partial Plot Salt Land/ Fish Gher Private
49 Dhalghata 02 06 6747 0.562 0.425 Partial Plot Salt Land/ Fish Gher Private
50 Dhalghata 02 06 6746 0.628 0.441 Partial Plot Salt Land/ Fish Gher Private
54 Dhalghata 02 06 6744 0.327 0.181 Partial Plot Salt Land/ Fish Gher Private
55 Dhalghata 02 06 6947 0.158 0.017 Partial Plot Salt Land/ Fish Gher Private
57 Dhalghata 02 06 7169 0.273 0.005 Partial Plot Salt Land/ Fish Gher Private
58 Dhalghata 02 06 6948 0.231 0.021 Partial Plot Salt Land/ Fish Gher Private
59 Dhalghata 02 06 6745 0.291 0.289 Partial Plot Salt Land/ Fish Gher Private
61 Dhalghata 02 06 6792 0.319 0.038 Partial Plot Salt Land/ Fish Gher Private
62 Dhalghata 02 06 6741 0.074 0.027 Partial Plot Salt Land/ Fish Gher Private
63 Dhalghata 02 06 6742 0.072 0.024 Partial Plot Salt Land/ Fish Gher Private
64 Dhalghata 02 06 7172 0.233 0.078 Partial Plot Salt Land/ Fish Gher Private
65 Dhalghata 02 06 6950 0.361 0.099 Partial Plot Salt Land/ Fish Gher Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-18
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
66 Dhalghata 02 06 6740 0.571 0.54 Partial Plot Salt Land/ Fish Gher Private
67 Dhalghata 02 06 7174 0.435 0.076 Partial Plot Salt Land/ Fish Gher Private
68 Dhalghata 02 06 6949 0.957 0.314 Partial Plot Salt Land/ Fish Gher Private
69 Dhalghata 02 06 6796 0.179 0.142 Partial Plot Salt Land/ Fish Gher Private
70 Dhalghata 02 06 6738 0.205 0.205 Full Plot Salt Land/ Fish Gher Private
71 Dhalghata 02 06 6960 0.528 0.389 Partial Plot Salt Land/ Fish Gher Private
72 Dhalghata 02 06 8316 1.152 0.542 Partial Plot Salt Land/ Fish Gher Private
73 Dhalghata 02 06 7170 0.667 0.429 Partial Plot Salt Land/ Fish Gher Private
74 Dhalghata 02 06 7171 0.095 0.095 Full Plot Salt Land/ Fish Gher Private
75 Dhalghata 02 06 7173 2.755 0.777 Partial Plot Salt Land/ Fish Gher Private
76 Dhalghata 02 06 6964 0.014 0.014 Full Plot Salt Land/ Fish Gher Private
77 Dhalghata 02 06 6797 0.247 0.247 Full Plot Salt Land/ Fish Gher Private
78 Dhalghata 02 06 7055 0.459 0.311 Full Plot Salt Land/ Fish Gher Private
79 Dhalghata 02 06 6739 0.605 0.605 Partial Plot Salt Land/ Fish Gher Private
80 Dhalghata 02 06 6959 1.246 0.721 Partial Plot Salt Land / Fish
Gher Private
82 Dhalghata 02 06 6962 0.601 0.392 Partial Plot Salt Land/ Fish Gher Private
83 Dhalghata 02 06 6794 1.063 0.752 Partial Plot Salt Land/ Fish Gher Private
84 Dhalghata 02 06 6737 0.227 0.227 Full Plot Salt Land/ Fish Gher Private
85 Dhalghata 02 06 6963 1.282 1.124 Partial Plot Salt Land/ Fish Gher Private
86 Dhalghata 02 06 6736 0.591 0.591 Partial Plot Salt Land/ Fish Gher Private
87 Dhalghata 02 06 7021 0.544 0.544 Full Plot Salt Land/ Fish Gher Private
88 Dhalghata 02 06 6968 0.061 0.061 Full Plot Salt Land/ Fish Gher Private
91 Dhalghata 02 06 6735 0.727 0.727 Partial Plot Salt Land/ Fish Gher Private
92 Dhalghata 02 06 8315 0.682 0.334 Partial Plot Salt Land/ Fish Gher Private
93 Dhalghata 02 06 7022 0.097 0.005 Partial Plot Salt Land/ Fish Gher Private
94 Dhalghata 02 06 6967 0.087 0.086 Partial Plot Salt Land/ Fish Gher Private
95 Dhalghata 02 06 6961 1.228 0.736 Partial Plot Salt Land/ Fish Gher Private
96 Dhalghata 02 06 6965 0.127 0.111 Partial Plot Salt Land/ Fish Gher Private
97 Dhalghata 02 06 6829 0.08 0.069 Partial Plot Salt Land/ Fish Gher Private
98 Dhalghata 02 06 6734 0.529 0.527 Partial Plot Salt Land/ Fish Gher Private
99 Dhalghata 02 06 6821 0.148 0.128 Partial Plot Salt Land/ Fish Gher Private
100 Dhalghata 02 06 6814 0.404 0.299 Partial Plot Salt Land/ Fish Gher Private
101 Dhalghata 02 06 6966 0.29 0.134 Partial Plot Salt Land/ Fish Gher Private
102 Dhalghata 02 06 6822 0.18 0.039 Partial Plot Salt Land/ Fish Gher Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-19
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
104 Dhalghata 02 06 6733 0.518 0.518 Full Plot Salt Land/ Fish Gher Private
105 Dhalghata 02 06 7054 0.633 0.142 Partial Plot Salt Land/ Fish Gher Private
106 Dhalghata 02 06 6883 0.131 0.007 Partial Plot Salt Land/ Fish Gher Private
107 Dhalghata 02 06 6798 0.433 0.398 Partial Plot Salt Land/ Fish Gher Private
108 Dhalghata 02 06 7020 1.378 0.018 Partial Plot Salt Land/ Fish Gher Private
109 Dhalghata 02 06 6799 0.159 0.064 Partial Plot Salt Land/ Fish Gher Private
110 Dhalghata 02 06 6732 1.02 0.947 Partial Plot Salt Land/ Fish Gher Private
111 Dhalghata 02 06 6800 0.161 0.008 Partial Plot Salt Land/ Fish Gher Private
112 Dhalghata 02 06 6941 8.78 1.501 Partial Plot Salt Land/ Fish Gher Private
113 Dhalghata 02 06 6969 0.186 0.039 Partial Plot Salt Land/ Fish Gher Private
114 Dhalghata 02 06 6811 0.15 0.055 Partial Plot Salt Land/ Fish Gher Private
115 Dhalghata 02 06 6970 0.272 0.033 Partial Plot Salt Land/ Fish Gher Private
116 Dhalghata 02 06 6812 0.163 0.061 Partial Plot Salt Land/ Fish Gher Private
117 Dhalghata 02 06 6731 0.994 0.518 Partial Plot Salt Land/ Fish Gher Private
118 Dhalghata 02 06 6813 0.127 0.032 Partial Plot Salt Land/ Fish Gher Private
119 Dhalghata 02 06 6971 0.67 0.011 Partial Plot Salt Land/ Fish Gher Private
120 Dhalghata 02 06 6806 1.077 0.728 Partial Plot Salt Land/ Fish Gher Private
121 Dhalghata 02 06 6937 4.862 3.648 Partial Plot Salt Land/ Fish Gher Private
122 Dhalghata 02 06 6807 0.399 0.18 Partial Plot Salt Land/ Fish Gher Private
123 Dhalghata 02 06 6808 0.404 0.162 Partial Plot Salt Land/ Fish Gher Private
124 Dhalghata 02 06 6809 0.391 0.143 Partial Plot Salt Land/ Fish Gher Private
126 Dhalghata 02 06 6730 2.179 0.869 Partial Plot Salt Land/ Fish Gher Private
127 Dhalghata 02 06 6815 0.592 0.126 Partial Plot Salt Land/ Fish Gher Private
128 Dhalghata 02 06 6816 0.362 0.019 Partial Plot Salt Land/ Fish Gher Private
129 Dhalghata 02 06 6817 0.351 0.003 Partial Plot Salt Land/ Fish Gher Private
130 Dhalghata 02 06 6729 0.289 0.229 Partial Plot Salt Land/ Fish Gher Private
131 Dhalghata 02 06 6725 0.37 0.256 Partial Plot Salt Land/ Fish Gher Private
132 Dhalghata 02 06 6724 0.304 0.187 Partial Plot Salt Land/ Fish Gher Private
133 Dhalghata 02 06 6723 0.327 0.06 Partial Plot Salt Land/ Fish Gher Private
134 Dhalghata 02 06 6722 0.219 0.015 Partial Plot Salt Land/ Fish Gher Private
140 Dhalghata 02 06 6929 1.339 0.015 Partial Plot Salt Land/ Fish Gher Private
141 Dhalghata 02 06 6882 10.251 3.54 Partial Plot Salt Land/ Fish Gher Private
142 Dhalghata 02 07 10619 0.382 0.013 Partial Plot Salt Land/ Fish Gher Private
143 Dhalghata 02 07 10618 0.581 0.025 Partial Plot Salt Land/ Fish Gher Private
144 Dhalghata 02 07 10614 0.231 0.006 Partial Plot Salt Land/ Fish Gher Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-20
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
146 Dhalghata 02 07 10605 0.61 0.056 Partial Plot Salt Land/ Fish Gher Private
147 Dhalghata 02 07 10601 0.64 0.127 Partial Plot Salt Land/ Fish Gher Private
148 Dhalghata 02 07 10590 0.618 0.018 Partial Plot Salt Land/ Fish Gher Private
149 Dhalghata 02 07 10589 0.298 0.032 Partial Plot Salt Land/ Fish Gher Private
150 Dhalghata 02 07 10583 0.094 0.062 Partial Plot Salt Land/ Fish Gher Private
151 Dhalghata 02 07 10582 0.191 0.066 Partial Plot Salt Land/ Fish Gher Private
152 Dhalghata 02 07 10576 0.4 0.199 Partial Plot Salt Land/ Fish Gher Private
153 Dhalghata 02 07 10575 0.257 0.257 Full Plot Salt Land/ Fish Gher Private
154 Dhalghata 02 07 10574 0.262 0.174 Partial Plot Salt Land/ Fish Gher Private
155 Dhalghata 02 07 10573 0.261 0.005 Partial Plot Salt Land/ Fish Gher Private
156 Dhalghata 02 07 10220 0.187 0.187 Full Plot Salt Land/ Fish Gher Private
157 Dhalghata 02 07 10651 0.083 0.076 Partial Plot Salt Land/ Fish Gher Private
158 Dhalghata 02 07 10222 0.103 0.103 Full Plot Salt Land/ Fish Gher Private
159 Dhalghata 02 07 10221 0.148 0.148 Full Plot Salt Land/ Fish Gher Private
160 Dhalghata 02 07 10219 0.363 0.298 Partial Plot Salt Land/ Fish Gher Private
161 Dhalghata 02 07 10224 3.198 1.561 Partial Plot Salt Land/ Fish Gher Private
162 Dhalghata 02 07 10204 1.161 0.018 Partial Plot Salt Land/ Fish Gher Private
163 Dhalghata 02 07 10202 0.585 0.094 Partial Plot Salt Land/ Fish Gher Private
164 Dhalghata 02 07 10201 0.404 0.081 Partial Plot Salt Land/ Fish Gher Private
166 Dhalghata 02 07 10195 2.038 0.135 Partial Plot Salt Land/ Fish Gher Private
167 Dhalghata 02 07 10226 8.555 3.821 Partial Plot Salt Land/ Fish Gher Private
168 Dhalghata 02 07 10225 1.297 0.204 Partial Plot Salt Land/ Fish Gher Private
169 Dhalghata 02 07 10194 5.557 0.226 Partial Plot Salt Land/ Fish Gher Private
170 Dhalghata 02 07 10208 1.317 1.317 Full Plot Salt Land/ Fish Gher Private
172 Dhalghata 02 07 10207 0.459 0.331 Partial Plot Salt Land/ Fish Gher Private
173 Dhalghata 02 07 10186 1.753 0.031 Partial Plot Salt Land/ Fish Gher Private
174 Dhalghata 02 07 10185 0.402 0.058 Partial Plot Salt Land/ Fish Gher Private
175 Dhalghata 02 07 10181 1.441 0.698 Partial Plot Salt Land/ Fish Gher Private
177 Dhalghata 02 07 10180 4.96 3.391 Partial Plot Salt Land/ Fish Gher Private
178 Dhalghata 02 07 10179 0.381 0.122 Partial Plot Salt Land/ Fish Gher Private
179 Dhalghata 02 07 10176 1.959 0.764 Partial Plot Salt Land/ Fish Gher Private
181 Dhalghata 02 07 10088 7.346 1.4 Partial Plot Salt Land/ Fish Gher Private
183 Dhalghata 02 07 10211 6.025 0.628 Partial Plot Salt Land/ Fish Gher Private
184 Dhalghata 02 07 10087 4.766 3.654 Partial Plot Salt Land/ Fish Gher Private
185 Dhalghata 02 07 10086 0.49 0.274 Partial Plot Salt Land/ Fish Gher Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-21
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
186 Dhalghata 02 07 10135 0.448 0.023 Partial Plot Salt Land/ Fish Gher Private
187 Dhalghata 02 07 10083 1.275 0.024 Partial Plot Salt Land/ Fish Gher Private
188 Dhalghata 02 07 10085 0.901 0.766 Partial Plot Salt Land/ Fish Gher Private
189 Dhalghata 02 07 10084 0.414 0.214 Partial Plot Salt Land/ Fish Gher Private
190 Dhalghata 02 07 10096 2.63 0.101 Partial Plot Salt Land/ Fish Gher Private
192 Dhalghata 02 07 10064 3.888 0.722 Partial Plot Salt Land/ Fish Gher Private
193 Dhalghata 02 07 10063 0.48 0.137 Partial Plot Salt Land/ Fish Gher Private
194 Dhalghata 02 07 10090 8.382 0.318 Partial Plot Salt Land/ Fish Gher Private
Dhalghata 02 07 10600 0.462 0.068 Full Plot Salt Land/ Fish Gher Private
370 Kaligonj 04 01 360 0.592 0.064 Partial Plot Salt Land/ Fish Gher Private
371 Kaligonj 04 01 359 0.689 0.624 Partial Plot Salt Land/ Fish Gher Private
372 Kaligonj 04 01 358 0.026 0.026 Full Plot Salt Land/ Fish Gher Private
373 Kaligonj 04 01 356 0.427 0.356 Partial Plot Salt Land/ Fish Gher Private
374 Kaligonj 04 01 362 0.478 0.322 Partial Plot Salt Land/ Fish Gher Private
375 Kaligonj 04 01 193 0.522 0.007 Partial Plot Salt Land/ Fish Gher Private
376 Kaligonj 04 01 363 1.063 0.287 Partial Plot Salt Land/ Fish Gher Private
377 Kaligonj 04 01 342 0.177 0.177 Full Plot Salt Land/ Fish Gher Private
378 Kaligonj 04 01 211 0.532 0.325 Partial Plot Salt Land/ Fish Gher Private
379 Kaligonj 04 01 355 0.115 0.115 Full Plot Salt Land/ Fish Gher Private
380 Kaligonj 04 01 369 0.267 0.01 Partial Plot Salt Land/ Fish Gher Private
381 Kaligonj 04 01 201 1.95 0.627 Partial Plot Salt Land/ Fish Gher Private
382 Kaligonj 04 01 354 0.06 0.056 Full Plot Salt Land/ Fish Gher Private
383 Kaligonj 04 01 341 0.542 0.474 Partial Plot Salt Land/ Fish Gher Private
384 Kaligonj 04 01 212 0.312 0.148 Partial Plot Salt Land/ Fish Gher Private
386 Kaligonj 04 01 339 0.09 0.09 Full Plot Salt Land/ Fish Gher Private
387 Kaligonj 04 01 353 0.094 0.068 Partial Plot Salt Land/ Fish Gher Private
388 Kaligonj 04 01 338 0.091 0.091 Full Plot Salt Land/ Fish Gher Private
389 Kaligonj 04 01 352 0.08 0.011 Partial Plot Salt Land/ Fish Gher Private
390 Kaligonj 04 01 340 0.121 0.121 Full Plot Salt Land/ Fish Gher Private
391 Kaligonj 04 01 215 0.203 0.002 Partial Plot Salt Land/ Fish Gher Private
392 Kaligonj 04 01 202 2.861 1.864 Partial Plot Salt Land/ Fish Gher Private
393 Kaligonj 04 01 336 0.111 0.111 Full Plot Salt Land/ Fish Gher Private
394 Kaligonj 04 01 337 0.085 0.085 Full Plot Salt Land/ Fish Gher Private
395 Kaligonj 04 01 370 4.027 1.083 Partial Plot Salt Land/ Fish Gher Private
397 Kaligonj 04 01 343 0.171 0.16 Partial Plot Salt Land/ Fish Gher Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-22
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
398 Kaligonj 04 01 344 0.271 0.232 Partial Plot Salt Land/ Fish Gher Private
400 Kaligonj 04 01 345 0.237 0.181 Partial Plot Salt Land/ Fish Gher Private
401 Kaligonj 04 01 346 0.263 0.16 Partial Plot Salt Land/ Fish Gher Private
402 Kaligonj 04 01 348 0.426 0.288 Partial Plot Salt Land/ Fish Gher Private
404 Kaligonj 04 01 334 0.796 0.009 Partial Plot Salt Land/ Fish Gher Private
405 Kaligonj 04 01 300 0.637 0.369 Partial Plot Salt Land/ Fish Gher Private
406 Kaligonj 04 01 301 0.046 0.046 Full Plot Salt Land/ Fish Gher Private
407 Kaligonj 04 01 299 2.195 1.051 Partial Plot Salt Land/ Fish Gher Private
408 Kaligonj 04 01 303 5.03 2.499 Partial Plot Salt Land/ Fish Gher Private
409 Kaligonj 04 01 302 0.408 0.281 Partial Plot Salt Land/ Fish Gher Private
410 Kaligonj 04 01 305 0.433 0.043 Partial Plot Salt Land/ Fish Gher Private
413 Kaligonj 04 02 1037 0.989 0.001 Partial Plot Salt Land/ Fish Gher Private
414 Kaligonj 04 02 1064 0.291 0.003 Partial Plot Salt Land/ Fish Gher Private
415 Kaligonj 04 02 1038 0.323 0.024 Partial Plot Salt Land/ Fish Gher Private
416 Kaligonj 04 02 1017 2.056 0.769 Partial Plot Salt Land/ Fish Gher Private
417 Kaligonj 04 02 1039 0.281 0.058 Partial Plot Salt Land/ Fish Gher Private
418 Kaligonj 04 02 1060 0.609 0.073 Partial Plot Salt Land/ Fish Gher Private
419 Kaligonj 04 02 1103 0.778 0.225 Partial Plot Salt Land/ Fish Gher Private
420 Kaligonj 04 02 1028 2.776 0.225 Partial Plot Salt Land/ Fish Gher Private
421 Kaligonj 04 02 1040 0.987 0.443 Partial Plot Salt Land/ Fish Gher Private
422 Kaligonj 04 02 1014 0.062 0.062 Full Plot Salt Land/ Fish Gher Private
423 Kaligonj 04 02 1051 0.274 0.146 Partial Plot Salt Land/ Fish Gher Private
424 Kaligonj 04 02 1057 0.17 0.17 Full Plot Salt Land/ Fish Gher Private
425 Kaligonj 04 02 1026 0.965 0.965 Full Plot Salt Land/ Fish Gher Private
426 Kaligonj 04 02 1104 1.521 0.953 Partial Plot Salt Land/ Fish Gher Private
427 Kaligonj 04 02 1121 0.068 0.03 Partial Plot Salt Land/ Fish Gher Private
428 Kaligonj 04 02 1059 0.541 0.508 Partial Plot Salt Land/ Fish Gher Private
429 Kaligonj 04 02 1125 1.229 0.008 Partial Plot Salt Land/ Fish Gher Private
430 Kaligonj 04 02 1025 0.59 0.59 Full Plot Salt Land/ Fish Gher Private
431 Kaligonj 04 02 1013 2.06 2.06 Full Plot Salt Land/ Fish Gher Private
432 Kaligonj 04 02 1122 0.115 0.115 Partial Plot Salt Land/ Fish Gher Private
433 Kaligonj 04 02 1058 0.925 0.877 Partial Plot Salt Land/ Fish Gher Private
434 Kaligonj 04 02 1105 1.364 1.352 Partial Plot Salt Land/ Fish Gher Private
435 Kaligonj 04 02 1056 0.337 0.337 Full Plot Salt Land/ Fish Gher Private
436 Kaligonj 04 02 1047 0.04 0.04 Full Plot Salt Land/ Fish Gher Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-23
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
437 Kaligonj 04 02 1124 0.842 0.297 Partial Plot Salt Land/ Fish Gher Private
438 Kaligonj 04 02 1015 3.851 3.808 Partial Plot Salt Land/ Fish Gher Private
439 Kaligonj 04 02 1106 0.807 0.807 Full Plot Salt Land/ Fish Gher Private
440 Kaligonj 04 02 1119 0.48 0.259 Partial Plot Salt Land/ Fish Gher Private
441 Kaligonj 04 02 1016 0.205 0.2 Partial Plot Salt Land/ Fish Gher Private
442 Kaligonj 04 02 1112 0.478 0.261 Partial Plot Salt Land/ Fish Gher Private
443 Kaligonj 04 02 1111 0.302 0.271 Partial Plot Salt Land/ Fish Gher Private
444 Kaligonj 04 02 1123 0.158 0.158 Full Plot Salt Land/ Fish Gher Private
445 Kaligonj 04 02 1055 1.949 0.789 Partial Plot Salt Land/ Fish Gher Private
446 Kaligonj 04 02 1012 1.951 1.899 Partial Plot Salt Land/ Fish Gher Private
447 Kaligonj 04 02 1048 0.062 0.048 Partial Plot Salt Land/ Fish Gher Private
448 Kaligonj 04 02 1107 0.704 0.658 Partial Plot Salt Land/ Fish Gher Private
449 Kaligonj 04 02 1050 0.273 0.236 Partial Plot Salt Land/ Fish Gher Private
450 Kaligonj 04 02 1024 5.428 4.908 Partial Plot Salt Land/ Fish Gher Private
451 Kaligonj 04 02 1110 0.492 0.48 Partial Plot Salt Land/ Fish Gher Private
452 Kaligonj 04 02 1011 4.704 1.04 Partial Plot Salt Land/ Fish Gher Private
453 Kaligonj 04 02 1046 0.536 0.259 Partial Plot Salt Land/ Fish Gher Private
454 Kaligonj 04 02 1049 0.344 0.204 Partial Plot Salt Land/ Fish Gher Private
455 Kaligonj 04 02 1109 0.596 0.295 Partial Plot Salt Land/ Fish Gher Private
456 Kaligonj 04 02 1045 0.369 0.018 Partial Plot Salt Land/ Fish Gher Private
457 Kaligonj 04 02 1043 0.545 0.143 Partial Plot Salt Land/ Fish Gher Private
458 Kaligonj 04 02 1108 0.437 0.041 Partial Plot Salt Land/ Fish Gher Private
459 Kaligonj 04 02 1027 1.647 1.086 Partial Plot Salt Land/ Fish Gher Private
460 Kaligonj 04 02 1041 0.355 0.152 Partial Plot Salt Land/ Fish Gher Private
461 Kaligonj 04 02 1042 1.136 0.504 Partial Plot Salt Land/ Fish Gher Private
462 Kaligonj 04 02 1023 3.857 0.793 Partial Plot Salt Land/ Fish Gher Private
464 Kaligonj 04 02 1020 0.327 0.131 Partial Plot Salt Land/ Fish Gher Private
465 Kaligonj 04 02 1004 0.445 0.149 Partial Plot Salt Land/ Fish Gher Private
466 Kaligonj 04 02 1003 1.083 0.405 Partial Plot Salt Land/ Fish Gher Private
467 Kaligonj 04 02 1002 0.84 0.224 Partial Plot Salt Land/ Fish Gher Private
468 Kaligonj 04 02 1001 92.067 5.105 Partial Plot Salt Land/ Fish Gher Private
215 Japua 05 01 372 0.289 0.187 Partial Plot Salt Land/ Fish Gher Private
217 Japua 05 01 371 0.101 0.051 Partial Plot Salt Land/ Fish Gher Private
218 Japua 05 01 370 0.155 0.108 Partial Plot Salt Land/ Fish Gher Private
219 Japua 05 01 281 0.466 0.048 Partial Plot Salt Land/ Fish Gher Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-24
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
220 Japua 05 01 368 0.389 0.14 Partial Plot Salt Land/ Fish Gher Private
221 Japua 05 01 283 0.415 0.045 Partial Plot Salt Land/ Fish Gher Private
222 Japua 05 01 284 0.708 0.061 Partial Plot Salt Land/ Fish Gher Private
223 Japua 05 01 366 0.337 0.261 Partial Plot Salt Land/ Fish Gher Private
224 Japua 05 01 286 0.064 0.004 Partial Plot Salt Land/ Fish Gher Private
225 Japua 05 01 365 0.326 0.148 Partial Plot Salt Land/ Fish Gher Private
226 Japua 05 01 364 0.589 0.265 Partial Plot Salt Land/ Fish Gher Private
228 Japua 05 01 363 0.694 0.331 Partial Plot Salt Land/ Fish Gher Private
229 Japua 05 01 362 0.311 0.142 Partial Plot Salt Land/ Fish Gher Private
231 Japua 05 01 359 0.261 0.104 Partial Plot Salt Land/ Fish Gher Private
232 Japua 05 01 358 0.253 0.118 Partial Plot Salt Land/ Fish Gher Private
233 Japua 05 01 357 0.345 0.161 Partial Plot Salt Land/ Fish Gher Private
235 Japua 05 01 290 4.015 1.385 Partial Plot Salt Land/ Fish Gher Private
236 Japua 05 01 329 1 0.135 Partial Plot Salt Land/ Fish Gher Private
237 Japua 05 01 328 0.891 0.842 Partial Plot Salt Land/ Fish Gher Private
282 Japua 05 04 4092 5.753 0.168 Partial Plot Salt Land/ Fish Gher Private
284 Japua 05 04 4084 1.056 0.091 Partial Plot Salt Land/ Fish Gher Private
286 Japua 05 04 4083 1.471 0.355 Partial Plot Salt Land/ Fish Gher Private
287 Japua 05 04 4070 1.189 0.825 Partial Plot Salt Land/ Fish Gher Private
288 Japua 05 04 4069 0.336 0.151 Partial Plot Salt Land/ Fish Gher Private
289 Japua 05 04 4068 0.778 0.699 Partial Plot Salt Land/ Fish Gher Private
290 Japua 05 04 4066 1.536 0.447 Partial Plot Salt Land/ Fish Gher Private
292 Japua 05 04 4056 1.63 0.008 Partial Plot Salt Land/ Fish Gher Private
293 Japua 05 04 4063 3.006 2.203 Partial Plot Salt Land/ Fish Gher Private
294 Japua 05 04 4062 0.1 0.084 Partial Plot Salt Land/ Fish Gher Private
295 Japua 05 04 4060 0.231 0.231 Full Plot Salt Land/ Fish Gher Private
296 Japua 05 04 4061 0.276 0.111 Partial Plot Salt Land/ Fish Gher Private
297 Japua 05 04 4057 3.313 0.463 Partial Plot Salt Land/ Fish Gher Private
298 Japua 05 04 4058 1.008 0.323 Partial Plot Salt Land/ Fish Gher Private
299 Japua 05 04 4059 0.173 0.118 Partial Plot Salt Land/ Fish Gher Private
300 Japua 05 04 4091 4.181 0.614 Partial Plot Salt Land/ Fish Gher Private
301 Japua 05 04 4012 10.152 4.008 Partial Plot Salt Land/ Fish Gher Private
302 Japua 05 04 4010 0.276 0.154 Partial Plot Salt Land/ Fish Gher Private
303 Japua 05 04 4002 0.272 0.005 Partial Plot Salt Land/ Fish Gher Private
304 Japua 05 04 4001 1.213 0.342 Partial Plot Salt Land/ Fish Gher Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-25
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
306 Jhapua 05 03 2230 0.219 0.208 Partial Plot Salt Land/ Fish Gher Private
307 Jhapua 05 03 2229 1.079 0.904 Partial Plot Salt Land/ Fish Gher Private
309 Jhapua 05 03 2199 0.038 0.038 Full Plot Salt Land/ Fish Gher Private
310 Jhapua 05 03 2201 0.312 0.312 Full Plot Salt Land/ Fish Gher Private
311 Jhapua 05 03 2198 0.077 0.077 Full Plot Salt Land/ Fish Gher Private
312 Jhapua 05 03 2200 0.13 0.13 Full Plot Salt Land/ Fish Gher Private
313 Jhapua 05 03 2195 0.077 0.077 Full Plot Salt Land/ Fish Gher Private
314 Jhapua 05 03 2197 0.077 0.077 Full Plot Salt Land/ Fish Gher Private
315 Jhapua 05 03 2194 0.075 0.075 Full Plot Salt Land/ Fish Gher Private
316 Jhapua 05 03 2196 0.064 0.063 Full Plot Salt Land/ Fish Gher Private
317 Jhapua 05 03 2192 0.075 0.075 Full Plot Salt Land/ Fish Gher Private
318 Jhapua 05 03 2191 0.059 0.059 Full Plot Salt Land/ Fish Gher Private
319 Jhapua 05 03 2193 0.108 0.095 Partial Plot Salt Land/ Fish Gher Private
320 Jhapua 05 03 2188 0.066 0.066 Full Plot Salt Land/ Fish Gher Private
321 Jhapua 05 03 2190 0.104 0.084 Partial Plot Salt Land/ Fish Gher Private
322 Jhapua 05 03 2203 0.805 0.156 Partial Plot Salt Land/ Fish Gher Private
323 Jhapua 05 03 2189 0.121 0.093 Partial Plot Salt Land/ Fish Gher Private
324 Jhapua 05 03 2187 0.066 0.066 Full Plot Salt Land/ Fish Gher Private
326 Jhapua 05 03 2184 0.066 0.066 Full Plot Salt Land/ Fish Gher Private
327 Jhapua 05 03 2186 0.174 0.13 Partial Plot Salt Land/ Fish Gher Private
328 Jhapua 05 03 2185 0.18 0.129 Partial Plot Salt Land/ Fish Gher Private
329 Jhapua 05 03 2183 0.101 0.101 Full Plot Salt Land/ Fish Gher Private
330 Jhapua 05 03 2182 0.273 0.18 Partial Plot Salt Land/ Fish Gher Private
331 Jhapua 05 03 2180 0.097 0.097 Full Plot Salt Land/ Fish Gher Private
332 Jhapua 05 03 2181 0.092 0.047 Partial Plot Salt Land/ Fish Gher Private
333 Jhapua 05 03 2179 0.183 0.123 Partial Plot Salt Land/ Fish Gher Private
334 Jhapua 05 03 2177 0.214 0.214 Full Plot Salt Land/ Fish Gher Private
335 Jhapua 05 03 2178 0.159 0.005 Partial Plot Salt Land/ Fish Gher Private
336 Jhapua 05 03 2174 0.246 0.176 Partial Plot Salt Land/ Fish Gher Private
337 Jhapua 05 03 2175 0.82 0.402 Partial Plot Salt Land/ Fish Gher Private
341 Jhapua 05 03 2122 0.057 0.003 Partial Plot Salt Land/ Fish Gher Private
342 Jhapua 05 03 2118 0.051 0.002 Partial Plot Salt Land/ Fish Gher Private
343 Jhapua 05 03 2116 0.053 0.002 Partial Plot Salt Land/ Fish Gher Private
344 Jhapua 05 03 2115 0.026 0.001 Partial Plot Salt Land/ Fish Gher Private
345 Jhapua 05 03 2114 0.08 0.001 Partial Plot Salt Land/ Fish Gher Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-26
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
346 Jhapua 05 03 2127 0.138 0.069 Partial Plot Salt Land/ Fish Gher Private
348 Jhapua 05 03 2047 0.841 0.226 Partial Plot Salt Land/ Fish Gher Private
349 Jhapua 05 03 2852 0.468 0.012 Partial Plot Salt Land/ Fish Gher Private
350 Jhapua 05 03 2046 0.212 0.07 Partial Plot Salt Land/ Fish Gher Private
351 Jhapua 05 03 2176 0.44 0.44 Full Plot Salt Land/ Fish Gher Private
352 Jhapua 05 03 2851 4.081 1.461 Partial Plot Salt Land/ Fish Gher Private
353 Jhapua 05 03 2045 1.903 1.002 Partial Plot Salt Land/ Fish Gher Private
354 Jhapua 05 03 2256 19.612 9.981 Partial Plot Salt Land/ Fish Gher Private
355 Jhapua 05 03 2258 7.281 2.635 Partial Plot Salt Land/ Fish Gher Private
356 Jhapua 05 03 2044 0.24 0.12 Partial Plot Salt Land/ Fish Gher Private
358 Jhapua 05 03 2260 8.854 1.294 Partial Plot Salt Land/ Fish Gher Private
80 Uttar Nolbila 07 03 739 0.703 0.066 Full Plot Salt Land/ Fish Gher Private
81 Uttar Nolbila 07 03 740 0.548 0.548 Full Plot Salt Land/ Fish Gher Private
82 Uttar Nolbila 07 03 741 2.589 1.511 Full Plot Salt Land/ Fish Gher Private
83 Uttar Nolbila 07 03 742 1.338 0.493 Partial Plot Salt Land/ Fish Gher Private
84 Uttar Nolbila 07 03 743 0.995 0.333 Partial Plot Salt Land/ Fish Gher Private
85 Uttar Nolbila 07 03 744 5.168 1.476 Partial Plot Salt Land/ Fish Gher Private
86 Uttar Nolbila 07 03 745 0.553 0.099 Partial Plot Salt Land/ Fish Gher Private
87 Uttar Nolbila 07 03 746 0.403 0.059 Partial Plot Salt Land/ Fish Gher Private
88 Uttar Nolbila 07 03 747 0.463 0.051 Partial Plot Salt Land/ Fish Gher Private
89 Uttar Nolbila 07 03 748 0.496 0.05 Partial Plot Salt Land/ Fish Gher Private
90 Uttar Nolbila 07 03 749 1.124 0.044 Partial Plot Salt Land/ Fish Gher Private
99 Uttar Nolbila 07 03 768 0.393 0.086 Partial Plot Salt Land/ Fish Gher Private
100 Uttar Nolbila 07 03 769 0.28 0.078 Partial Plot Salt Land/ Fish Gher Private
102 Uttar Nolbila 07 03 771 1.315 0.748 Full Plot Salt Land/ Fish Gher Private
103 Uttar Nolbila 07 03 772 0.506 0.436 Full Plot Salt Land/ Fish Gher Private
104 Uttar Nolbila 07 03 773 0.701 0.675 Full Plot Salt Land/ Fish Gher Private
106 Uttar Nolbila 07 03 775 0.212 0.212 Full Plot Salt Land/ Fish Gher Private
107 Uttar Nolbila 07 03 776 0.168 0.134 Full Plot Salt Land/ Fish Gher Private
108 Uttar Nolbila 07 03 777 0.259 0.037 Full Plot Salt Land/ Fish Gher Private
125 Uttar Nolbila 07 03 805 1.414 0.482 Partial Plot Salt Land/ Fish Gher Private
149 Uttar Nolbila 07 03 853 0.876 0.491 Full Plot Salt Land/ Fish Gher Private
179 Uttar Nolbila 07 03 911 1.206 0.002 Partial Plot Salt Land/ Fish Gher Private
190 Uttar Nolbila 07 03 1033 0.195 0.094 Full Plot Salt Land/ Fish Gher Private
200 Uttar Nolbila 07 03 1063 1.185 0.346 Full Plot Salt Land/ Fish Gher Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-27
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
202 Uttar Nolbila 07 03 1065 0.229 0.229 Full Plot Salt Land/ Fish Gher Private
203 Uttar Nolbila 07 03 1066 0.288 0.288 Full Plot Salt Land/ Fish Gher Private
204 Uttar Nolbila 07 03 1067 0.905 0.576 Full Plot Salt Land/ Fish Gher Private
205 Uttar Nolbila 07 03 1068 1.517 0.807 Full Plot Salt Land/ Fish Gher Private
210 Uttar Nolbila 07 03 1073 4.266 0.084 Partial Plot Salt Land/ Fish Gher Private
213 Uttar Nolbila 07 03 1112 0.923 0.153 Partial Plot Salt Land/ Fish Gher Private
214 Uttar Nolbila 07 03 1113 0.489 0.489 Full Plot Salt Land/ Fish Gher Private
215 Uttar Nolbila 07 03 1114 1.433 1.399 Partial Plot Salt Land/ Fish Gher Private
228 Uttar Nolbila 07 03 1189 0.445 0.149 Partial Plot Salt Land/ Fish Gher Private
287 Uttar Nolbilla 07 02 282 0.453 0.017 Partial Plot Salt Land/ Fish Gher Private
301 Uttar Nolbilla 07 02 296 1.554 0.377 Partial Plot Salt Land/ Fish Gher Private
310 Uttar Nolbilla 07 02 305 1.316 0.229 Partial Plot Salt Land/ Fish Gher Private
311 Uttar Nolbilla 07 02 306 3.858 0.784 Partial Plot Salt Land/ Fish Gher Private
312 Uttar Nolbilla 07 02 309 0.605 0.141 Partial Plot Salt Land/ Fish Gher Private
314 Uttar Nolbilla 07 02 311 0.176 0.081 Full Plot Salt Land/ Fish Gher Private
315 Uttar Nolbilla 07 02 312 0.204 0.127 Full Plot Salt Land/ Fish Gher Private
316 Uttar Nolbilla 07 02 313 0.184 0.184 Full Plot Salt Land/ Fish Gher Private
317 Uttar Nolbilla 07 02 314 1.125 0.213 Partial Plot Salt Land/ Fish Gher Private
323 Uttar Nolbilla 07 02 321 0.164 0.006 Full Plot Salt Land/ Fish Gher Private
330 Uttar Nolbilla 07 02 328 0.104 0.052 Full Plot Salt Land/ Fish Gher Private
331 Uttar Nolbilla 07 02 329 0.081 0.002 Full Plot Salt Land/ Fish Gher Private
335 Uttar Nolbilla 07 02 333 3.786 0.895 Partial Plot Salt Land/ Fish Gher Private
337 Uttar Nolbilla 07 02 335 1.46 1.224 Full Plot Salt Land/ Fish Gher Private
338 Uttar Nolbilla 07 02 336 1.088 0.423 Full Plot Salt Land/ Fish Gher Private
342 Uttar Nolbilla 07 02 340 0.111 0.073 Full Plot Salt Land/ Fish Gher Private
343 Uttar Nolbilla 07 02 341 4.192 2.281 Partial Plot Salt Land/ Fish Gher Private
345 Uttar Nolbilla 07 02 343 3.523 0.133 Partial Plot Salt Land/ Fish Gher Private
347 Uttar Nolbilla 07 02 345 3.942 0.159 Partial Plot Salt Land/ Fish Gher Private
353 Uttar Nolbilla 07 02 357 0.178 0.178 Full Plot Salt Land/ Fish Gher Private
354 Uttar Nolbilla 07 02 358 0.118 0.118 Full Plot Salt Land/ Fish Gher Private
355 Uttar Nolbilla 07 02 359 0.233 0.233 Full Plot Salt Land/ Fish Gher Private
356 Uttar Nolbilla 07 02 360 2.475 0.65 Partial Plot Salt Land/ Fish Gher Private
357 Uttar Nolbilla 07 02 361 5.628 1.677 Partial Plot Salt Land/ Fish Gher Private
361 Uttar Nolbilla 07 02 368 2.215 0.739 Partial Plot Salt Land/ Fish Gher Private
365 Uttar Nolbilla 07 02 374 1.32 0.482 Partial Plot Salt Land/ Fish Gher Private
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-28
Sl No.
Mauza Name JL No.
Sheet No.
Plot No.
Total Area of
Plot (Acre)
Area to be
acquired (Acre)
Full/Partial Status
Type of Land Owning Status
367 Uttar Nolbilla 07 02 376 2.16 0.605 Partial Plot Salt Land/ Fish Gher Private
370 Uttar Nolbilla 07 02 379 1.424 0.327 Partial Plot Salt Land/ Fish Gher Private
371 Uttar Nolbilla 07 02 380 1.158 0.256 Partial Plot Salt Land/ Fish Gher Private
372 Uttar Nolbilla 07 02 381 1.017 0.212 Partial Plot Salt Land/ Fish Gher Private
498 Uttar Nolbila 07 03 1192 0.156 0.002 Partial Plot Salt Land/ Fish Gher Private
499 Uttar Nolbila 07 03 1191 0.974 0.001 Partial Plot Salt Land/ Fish Gher Private
500 Uttar Nolbila 07 03 1102 0.736 0.733 Full Plot Salt Land/ Fish Gher Private
501 Uttar Nolbila 07 03 1100 9.066 0.827 Partial Plot Salt Land/ Fish Gher Private
502 Uttar Nolbila 07 03 1103 0.54 0.507 Partial Plot Salt Land/ Fish Gher Private
503 Uttar Nolbila 07 03 1099 2.148 0.338 Partial Plot Salt Land/ Fish Gher Private
504 Uttar Nolbila 07 03 1104 0.735 0.196 Partial Plot Salt Land/ Fish Gher Private
505 Uttar Nolbila 07 03 1105 0.174 0.023 Partial Plot Salt Land/ Fish Gher Private
506 Uttar Nolbila 07 03 1106 0.325 0.044 Partial Plot Salt Land/ Fish Gher Private
507 Uttar Nolbila 07 03 1115 2.949 2.52 Partial Plot Salt Land/ Fish Gher Private
508 Uttar Nolbila 07 03 1101 0.635 0.219 Partial Plot Salt Land/ Fish Gher Private
Total Salt Land / Fish Gher Land (Acre) 178.094
Waterbody
320 Uttar Nolbilla 07 02 318 0.41 0.298 Full Plot Waterbody Private
341 Uttar Nolbilla 07 02 339 1.04 0.35 Partial Plot Waterbody Private
Total Waterbody Land (Acre): 0.648
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-29
Appendix 2: Affected Structures and HHs with Affected Structures Summary: Classification of residential structures to be affected
Upazila Union Pucca Semi-puca Tin Katcha Total Sq (m2)
Moheshkhali Dhalghata 1 1 13 4 19 2,011.24
Kalarmarchara 0 4 12 0 16 2,838.24
Chakaria
Badarkhali 7 6 14 3 30 7,373.04
Chiringa 9 6 32 2 49 4,297.43
Fasiakhali 5 7 9 1 22 2,210.02
Saharbil 0 0 0 0 0 0
Total 22 24 80 10 136 18,729.98
Summary: Classification of commercial structures to be affected
Upazila Union Pucca Semi-puca Tin Katcha Total Sq (m2)
Moheshkhali Dhalghata 0 0 0 0 0
Kalarmarchara 0 0 0 0 0
Chakaria
Badarkhali 1 0 2 1 4 140.63
Chiringa 0 0 2 0 2 42.58
Fasiakhali 0 0 0 1 1 5.58
Saharbil 0 0 0 0 0
Total 1 0 4 2 7 188.79
Appendix 2-1: Residential structures to be affected
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-30
Appendix 2-2: Commercial structures to be affected *Counted in HHs with residential structures affected
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-35
Appendix 3: Other Structures to be Affected
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-39
Appendix 4: Tree Loss No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Badarkhali Mehogoni Timber 5
Badarkhali Akashmoni Timber 30
Badarkhali Shisu Timber 22
Badarkhali Coconut Fruit bearing 7
Badarkhali Raintree Timber 3
Badarkhali Bamboo Timber 50
Badarkhali Malaria Timber 20
Badarkhali Coconut Fruit bearing 2
Badarkhali Banyan Timber 1
Badarkhali Jaue Tree Timber 1
Badarkhali Plum Fruit bearing 1
Badarkhali Malaria Timber 34
Badarkhali Eucalyptus Timber 7
Badarkhali Coconut Fruit bearing 3
Badarkhali Date Fruit bearing 10
Badarkhali Malaria Timber 62
Badarkhali Coconut Fruit bearing 62
Badarkhali Maleria Timber 10
Badarkhali Plum Fruit bearing 1
Badarkhali Malaria Timber 62
Badarkhali Coconut Fruit bearing 2
Badarkhali Malaria Timber 100
Badarkhali Raintree Timber 1
Badarkhali Coconut Fruit bearing 2
Badarkhali Mango Fruit bearing 3
Badarkhali Date Fruit bearing 2
Badarkhali Jam Fruit bearing 1
Badarkhali Raintree Timber 2
Badarkhali Melenda Timber 1
Badarkhali Raintree Timber 2
Badarkhali Malaria Timber 29
Badarkhali Betel Nut Fruit bearing 3
Badarkhali Date Fruit bearing 1
Badarkhali Raintree Timber 2
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-40
No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Badarkhali Coconut Fruit bearing 3
Badarkhali Raintree Timber 2
Badarkhali Raintree Timber 1
Badarkhali Akashmoni Timber 2
Badarkhali Malaria Timber 2
Badarkhali Coconut Fruit bearing 2
Badarkhali Malaria Timber 1
Badarkhali Akashmoni Timber 2
Badarkhali Guava Fruit bearing 2
Badarkhali Aistratran Timber 14
Badarkhali Raintree Timber 1
Badarkhali Banyan Timber 2
Badarkhali Coconut Fruit bearing 1
Badarkhali Bamboo Timber 2
Badarkhali Date Fruit bearing 3
Badarkhali Palm Fruit bearing 2
Badarkhali Mango Fruit bearing 2
Badarkhali Raintree Timber 2
Badarkhali Malaria Timber 6
Badarkhali Tamarind Fruit bearing 1
Badarkhali Mango Fruit bearing 1
Badarkhali Belgium Timber 1
Badarkhali Eucalyptus Timber 50
Badarkhali Sofeda Fruit bearing 1
Badarkhali Coconut Fruit bearing 6
Badarkhali Eucalyptus Timber 7
Badarkhali Mehogoni Timber 10
Badarkhali Mango Fruit bearing 10
Badarkhali Olive Fruit bearing 8
Badarkhali Papaya Fruit bearing 150
Badarkhali Coconut Fruit bearing 3
Badarkhali Guava Fruit bearing 1
Badarkhali Papaya Fruit bearing 2
Badarkhali Mango Fruit bearing 1
Badarkhali Raintree Timber 2
Badarkhali Eucalyptus Timber 2
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-41
No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Badarkhali Coconut Fruit bearing 4
Badarkhali Eucalyptus Timber 3
Badarkhali Raintree Timber 5
Badarkhali Coconut Fruit bearing 2
Badarkhali Date Fruit bearing 2
Badarkhali Bamboo Timber 50
Badarkhali Jackfruit Fruit bearing 1
Badarkhali Coconut Fruit bearing 1
Badarkhali Date Fruit bearing 1
Badarkhali Mehogoni Timber 5
Badarkhali Coconut Fruit bearing 4
Badarkhali Mango Fruit bearing 1
Badarkhali Palm Fruit bearing 1
Badarkhali Bamboo Timber 130
Badarkhali Mango Fruit bearing 6
Badarkhali Betel Nut Fruit bearing 8
Badarkhali Betel Nut Fruit bearing 7
Dhalghata Raintree Timber 3
Dhalghata Date Fruit bearing 2
Dhalghata Mango Fruit bearing 2
Dhalghata Coconut Fruit bearing 13
Dhalghata Flower tree Timber 2
Dhalghata Malaria Timber 3
Dhalghata Coconut Fruit bearing 16
Dhalghata Tamarind Fruit bearing 1
Dhalghata Raintree Timber 3
Dhalghata Mango Fruit bearing 2
Dhalghata Coconut Fruit bearing 13
Dhalghata Date Fruit bearing 2
Dhalghata Raintree Timber 3
Dhalghata Date Fruit bearing 2
Dhalghata Coconut Fruit bearing 13
Dhalghata Mango Fruit bearing 2
Dhalghata Raintree Timber 1
Dhalghata Neem Timber 1
Dhalghata Date Fruit bearing 2
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-42
No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Dhalghata Coconut Fruit bearing 11
Dhalghata Raintree Timber 1
Dhalghata Malaria Timber 1
Dhalghata Neem Timber 1
Dhalghata Coconut Fruit bearing 10
Dhalghata Neem Timber 1
Dhalghata Malaria Timber 3
Dhalghata Flower tree Timber 1
Dhalghata Coconut Fruit bearing 2
Dhalghata Raintree Timber 2
Dhalghata Malaria Timber 1
Dhalghata Neem Timber 1
Dhalghata Coconut Fruit bearing 11
Dhalghata Raintree Timber 3
Dhalghata Mango Fruit bearing 2
Dhalghata Date Fruit bearing 2
Dhalghata Coconut Fruit bearing 13
Fasiakhali Raintree Timber 3
Fasiakhali Mango Fruit bearing 2
Fasiakhali Coconut Fruit bearing 13
Fasiakhali Date Fruit bearing 2
Dhalghata Raintree Timber 2
Dhalghata Malaria Timber 1
Dhalghata Neem Timber 1
Dhalghata Coconut Fruit bearing 11
Dhalghata Raintree Timber 1
Dhalghata Malaria Timber 2
Dhalghata Neem Timber 1
Dhalghata Coconut Fruit bearing 2
Dhalghata Coconut Fruit bearing 7
Dhalghata Plum Fruit bearing 1
Dhalghata Date Fruit bearing 3
Dhalghata Badam Fruit bearing 2
Dhalghata Plum Fruit bearing 2
Dhalghata Date Fruit bearing 3
Dhalghata Tamarind Fruit bearing 1
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-43
No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Dhalghata Coconut Fruit bearing 6
Fasiakhali Akashmoni Timber 140
Fasiakhali Mango Fruit bearing 10
Fasiakhali Malaria Timber 50
Fasiakhali Mango Fruit bearing 1
Fasiakhali Akashmoni Timber 300
Fasiakhali Mango Fruit bearing 10
Fasiakhali Jackfruit Fruit bearing 10
Fasiakhali Betel Nut Fruit bearing 13
Fasiakhali Malaria Timber 50
Fasiakhali Mango Fruit bearing 10
Fasiakhali Jackfruit Fruit bearing 3
Fasiakhali Betel Nut Fruit bearing 22
Fasiakhali Coconut Fruit bearing 3
Fasiakhali Date Fruit bearing 1
Fasiakhali Mango Fruit bearing 1
Fasiakhali Malaria Timber 70
Fasiakhali Jackfruit Fruit bearing 14
Fasiakhali Mango Fruit bearing 17
Fasiakhali Malaria Timber 16
Fasiakhali Mango Fruit bearing 26
Fasiakhali Coconut Fruit bearing 7
Fasiakhali Papaya Fruit bearing 4
Fasiakhali Mehogoni Timber 12
Fasiakhali Coconut Fruit bearing 9
Fasiakhali Mango Fruit bearing 12
Fasiakhali Black Plum Fruit bearing 4
Fasiakhali Mehogoni Timber 2
Fasiakhali Bamboo Timber 3
Fasiakhali Arjun Timber 1
Fasiakhali Mango Fruit bearing 12
Fasiakhali Mehogoni Timber 1
Fasiakhali Black Plum Fruit bearing 1
Fasiakhali Betel Nut Fruit bearing 8
Fasiakhali Belgium Timber 100
Fasiakhali Guava Fruit bearing 5
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-44
No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Fasiakhali Jam Fruit bearing 5
Fasiakhali Mango Fruit bearing 20
Fasiakhali Mehogoni Timber 1
Fasiakhali Gamari Timber 5
Fasiakhali Mango Fruit bearing 4
Fasiakhali Betel Nut Fruit bearing 25
Fasiakhali Belgium Timber 50
Fasiakhali Flower tree Timber 5
Fasiakhali Mango Fruit bearing 20
Fasiakhali Guava Fruit bearing 5
Fasiakhali Mango Fruit bearing 4
Fasiakhali Hog Plum Fruit bearing 2
Fasiakhali Guava Fruit bearing 2
Fasiakhali Olive Tree Fruit bearing 2
Fasiakhali Coconut Fruit bearing 18
Fasiakhali Mango Fruit bearing 22
Fasiakhali Betel Nut Fruit bearing 19
Fasiakhali Jackfruit Fruit bearing 9
Fasiakhali Mehogoni Timber 60
Fasiakhali Malaria Timber 25
Fasiakhali Betel Nut Fruit bearing 25
Fasiakhali Coconut Fruit bearing 75
Fasiakhali Belgium Timber 2
Fasiakhali Black Plum Fruit bearing 1
Fasiakhali Date Fruit bearing 2
Jhapua Coconut Fruit bearing 13
Palakata Mango Fruit bearing 20
Palakata Guava Fruit bearing 15
Palakata Coconut Fruit bearing 10
Palakata Hog Plum Fruit bearing 12
Palakata Shisu Timber 3
Palakata Mango Fruit bearing 5
Palakata Jackfruit Fruit bearing 4
Palakata Coconut Fruit bearing 1
Palakata Belgium Timber 6
Palakata Betel Nut Fruit bearing 2
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-45
No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Palakata Plum Fruit bearing 1
Palakata Coconut Fruit bearing 4
Palakata Belgium Timber 6
Palakata Coconut Fruit bearing 4
Palakata Betel Nut Fruit bearing 2
Palakata Plum Fruit bearing 1
Palakata Bamboo Timber 500
Palakata Malaria Timber 200
Palakata Coconut Fruit bearing 50
Palakata Mango Fruit bearing 5
Palakata Belgium Timber 5
Palakata Malaria Timber 15
Palakata Mango Fruit bearing 1
Palakata Raintree Timber 5
Palakata Bamboo Timber 50
Palakata Malaria Timber 100
Palakata Mango Fruit bearing 6
Palakata Malaria Timber 20
Palakata Coconut Fruit bearing 1
Palakata Date Fruit bearing 2
Palakata Plum Fruit bearing 1
Palakata Akashmoni Timber 6
Palakata Coconut Fruit bearing 6
Palakata Plum Fruit bearing 1
Palakata Malaria Timber 30
Palakata Malaria Timber 10
Palakata Coconut Fruit bearing 1
Palakata Malaria Timber 950
Palakata Betel Nut Fruit bearing 2
Palakata Malaria Timber 130
Palakata Gamari Timber 5
Palakata Coconut Fruit bearing 1
Palakata Jackfruit Fruit bearing 1
Palakata Malaria Timber 400
Palakata Belgium Timber 200
Palakata Mango Fruit bearing 3
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-46
No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Palakata Malaria Timber 60
Palakata Mango Fruit bearing 10
Palakata Jackfruit Fruit bearing 4
Palakata Malaria Timber 70
Palakata Shisu Timber 2
Palakata Malaria Timber 1
Palakata Coconut Fruit bearing 2
Palakata Gooseberry Fruit bearing 1
Palakata Malaria Timber 100
Palakata Malaria Timber 180
Palakata Mango Fruit bearing 1
Palakata Guava Fruit bearing 1
Palakata Akashmoni Timber 15
Palakata Malaria Timber 5
Palakata Coconut Fruit bearing 2
Palakata Pea nut Fruit bearing 2
Palakata Malaria Timber 100
Palakata Mango Fruit bearing 8
Palakata Hog Plum Fruit bearing 1
Palakata Coconut Fruit bearing 1
Palakata Belgium Timber 430
Palakata Akashmoni Timber 210
Palakata Malaria Timber 360
Palakata Mango Fruit bearing 10
Palakata Belgium Timber 50
Palakata Mango Fruit bearing 5
Palakata Guava Fruit bearing 2
Palakata Malaria Timber 35
Palakata Coconut Fruit bearing 3
Palakata Belgium Timber 5
Palakata Malaria Timber 100
Palakata Coconut Fruit bearing 4
Palakata Betel Nut Fruit bearing 3
Palakata Plum Fruit bearing 1
Palakata Belgium Timber 3
Palakata Raintree Timber 15
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-47
No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Palakata Malaria Timber 10
Palakata Coconut Fruit bearing 3
Palakata Malaria Timber 2
Palakata Raintree Timber 3
Palakata Coconut Fruit bearing 1
Palakata Raintree Timber 2
Palakata Eucalyptus Timber 4800
Palakata Coconut Fruit bearing 1
Palakata Eucalyptus Timber 20
Palakata Raintree Timber 2
Palakata Coconut Fruit bearing 1
Palakata Mango Fruit bearing 1
Palakata Bamboo Timber 100
Palakata Eucalyptus Timber 3
Palakata Raintree Timber 6
Palakata Coconut Fruit bearing 6
Palakata Raintree Timber 1
Palakata Segun Timber 3
Palakata Belgium Timber 5
Palakata Coconut Fruit bearing 3
Palakata Malaria Timber 6
Palakata Date Fruit bearing 5
Palakata Coconut Fruit bearing 9
Palakata Plum Fruit bearing 2
Palakata Malaria Timber 150
Palakata Shisu Timber 2
Palakata Betel Nut Fruit bearing 3
Palakata Betel Nut Fruit bearing 2
Palakata Rose Apple Fruit bearing 2
Palakata Betel Nut Fruit bearing 2
Palakata Malaria Timber 7
Palakata Betel Nut Fruit bearing 3
Palakata Coconut Fruit bearing 10
Palakata Mehogoni Timber 1
Palakata Coconut Fruit bearing 14
Palakata Mango Fruit bearing 6
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-48
No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Palakata Plum Fruit bearing 8
Uttar Nolvila Bamboo Timber 800
Uttar Nolvila Belgium Timber 20
Uttar Nolvila Garjan Timber 2
Uttar Nolvila Mango Fruit bearing 5
Uttar Nolvila Garjan Timber 12
Uttar Nolvila Maleria Timber 4
Uttar Nolvila Sharifa Timber 1
Uttar Nolvila Lichi Fruit bearing 1
Uttar Nolvila Badi Tree Timber 1
Uttar Nolvila Neem Timber 12
Uttar Nolvila Malaria Timber 6
Uttar Nolvila Mango Fruit bearing 5
Uttar Nolvila Betel Nut Fruit bearing 15
Uttar Nolvila Black Plum Fruit bearing 2
Uttar Nolvila Malaria Timber 4
Uttar Nolvila Bamboo Timber 177
Uttar Nolvila Akashmoni Timber 8
Uttar Nolvila Neem Timber 1
Uttar Nolvila Mango Fruit bearing 10
Uttar Nolvila Date Fruit bearing 1
Uttar Nolvila Betel Nut Fruit bearing 16
Uttar Nolvila Jackfruit Fruit bearing 3
Uttar Nolvila Black plum Fruit bearing 4
Uttar Nolvila Cotton tree Timber 1
Uttar Nolvila Flower tree Timber 3
Uttar Nolvila Betel nut Fruit bearing 20
Uttar Nolvila Mango Fruit bearing 3
Uttar Nolvila Palm tree Fruit bearing 2
Uttar Nolvila Olive Fruit bearing 1
Uttar Nolvila Plum Fruit bearing 2
Uttar Nolvila Gamari Timber 2
Uttar Nolvila Bamboo Timber 1200
Uttar Nolvila Mehegoni Timber 10
Uttar Nolvila Flower Tree Timber 1
Uttar Nolvila Akashmoni Timber 2
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-49
No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Uttar Nolvila Malaria Timber 30
Uttar Nolvila Badi Tree Timber 5
Uttar Nolvila Betel nut Fruit bearing 4
Uttar Nolvila Jackfruit Fruit bearing 3
Uttar Nolvila Mango Fruit bearing 4
Uttar Nolvila Black Plum Fruit bearing 1
Uttar Nolvila Bamboo Timber 350
Uttar Nolvila Akashmoni Timber 2
Uttar Nolvila Flower Tree Timber 5
Uttar Nolvila Mango Fruit bearing 1
Uttar Nolvila Coconut Fruit bearing 2
Uttar Nolvila Black Plum Fruit bearing 2
Uttar Nolvila Betel Nut Fruit bearing 20
Badarkhali Madar tree Timber 4
Badarkhali Raintree Timber 5
Badarkhali Malaria Timber 2
Badarkhali Flower tree Timber 13
Badarkhali Cotton tree Timber 3
Badarkhali Acatashamsia Timber 12
Badarkhali Gamari Timber 2
Badarkhali Guava Fruit bearing 4
Badarkhali Fambara Fruit bearing 2
Badarkhali Sharifa Fruit bearing 2
Badarkhali Papaya Fruit bearing 5
Badarkhali Hog Plum Fruit bearing 3
Badarkhali Date Fruit bearing 4
Badarkhali Mango Fruit bearing 9
Badarkhali Coconut Fruit bearing 14
Badarkhali Other tree Fruit bearing 2
Badarkhali Bilambu Fruit bearing 1
Badarkhali Betel Nut Fruit bearing 7
Badarkhali Black Plum Fruit bearing 5
Badarkhali Tamarind Fruit bearing 8
Badarkhali Flower tree Timber 3
Badarkhali Malaria Timber 5
Badarkhali Betel Nut Fruit bearing 14
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-50
No. Name of PAH Name of Mouza Name of Tree Kind of tree No. of tree
Badarkhali Coconut Fruit bearing 3
Badarkhali Date Fruit bearing 3
Badarkhali Black Plum Fruit bearing 8
Badarkhali Mango Fruit bearing 6
Badarkhali Badi tree Timber 6
Badarkhali Palm Fruit bearing 6
Badarkhali Guava Fruit bearing 7
Badarkhali Banana tree Fruit bearing 20
Badarkhali Black Plum Fruit bearing 2
Badarkhali Jackfruit Fruit bearing 2
Badarkhali Betel Nut Fruit bearing 10
Badarkhali Mango Fruit bearing 5
Badarkhali Date Fruit bearing 3
Badarkhali Coconut Fruit bearing 5
Badarkhali Mehegoni Timber 8
Badarkhali Akashmoni Timber 7
Badarkhali Coconut Fruit bearing 10
Badarkhali Mango Fruit bearing 15
Badarkhali Betel Nut Fruit bearing 25
Badarkhali Black Plum Fruit bearing 3
Badarkhali Jackfruit Fruit bearing 9
Badarkhali Shoita Fruit bearing 4
Badarkhali Akashmoni Timber 3
Badarkhali Malaria Timber 8
Badarkhali Mango Fruit bearing 5
Badarkhali Coconut Fruit bearing 5
Badarkhali Guava Fruit bearing 4
Total: 15587
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-51
Appendix 5: List of Project Affected Households (Structure/Land)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-70
Appendix 6: List of Sharecroppers/ Employees
Appendix 6-1: List of Sharecroppers/ Employees (Interviewed)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-71
Appendix 6-2: List of Sharecroppers/ Employees (Not Interviewed)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-87
Appendix 7: Attendees List of Consultation Meetings
Appendix 7-1: 1st Consultation Meetings (1) Meeting in Moheshkhali (12 Mar 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-88
(2) Meeting in Chakaria (13 Mar 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-89
(3) Meeting in Kalamarchara (14 Mar 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-90
(4) Meeting in Dhalghata (15 Mar 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-91
(5) Meeting in Badarkhali (17 Mar 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-92
Appendix 7-2: 2nd Consultation Meetings (1) Meeting in Chakaria (5 July 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-93
(2) Meeting in Moheshkhali (7 July 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-94
(3) Meeting in Dhalghata (8 July 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-95
(4) Meeting in Badarkhali (10 July 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-96
(5) Meeting in Kalarmarchara (10 July 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-97
(6) Meeting in Fasiakhali (11 July 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-98
Appendix 7-3: Supplemental Consultation Meetings (for re-alignment) (1) Meeting in Badarkhali (13 August 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-99
(2) Meeting in Kalamarchara (13 August 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-100
Appendix 7-4: Supplemental Consultation Meetings (for compensation policy) (1) Meeting in Kalamarchara (6 November 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-101
(2) Meeting in Badarkhali (6 November 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-102
(3) Meeting in Dhalghata (7 November 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-103
(4) Meeting in Chiringa (8 November 2018)
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-104
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-127
Appendix 8: Monitoring Form Resettlement and Rehabilitation Monitoring Form
1) Pre-Construction
Major items of action Specific action steps (sub-items) Unit Planned
Total 1st Year 2nd Year
Comments 1st qtr
2nd qtr
3rd qtr
4th qtr
1st qtr
2nd qtr
3rd qtr
4th qtr
1)
Recruitment, training and deployment
1. Deployment of managerial staff
Man-month
2. Deployment of resettlement workers
Man-month
3. Training and mobilization
No. of RWs
2)
Adopting the Land and Resettlement Action Plan
1. Review of LARAP %
2. Devise corrections to the LARAP %
3. Submission of comments to DC %
4. Approval of RP with corrections %
3) Socioeconomic Survey
1. Designing the Surveys %
2. Field Survey and collection of data %
3. Computerization of field data %
4. Data analysis and report generation %
4) Valuation of affected property
1 Formation of PVAT % 2 Planning for valuation %
3 Communication and collection of data %
4 Recommendation %
5) Information campaign
1 Distribute information brochure EP
2 Personal contacts EP
3 Public consultation meetings/FGD Times
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-128
Major items of action Specific action steps (sub-items) Unit Planned
Total 1st Year 2nd Year
Comments 1st qtr
2nd qtr
3rd qtr
4th qtr
1st qtr
2nd qtr
3rd qtr
4th qtr
6)
Relocation of Project Affected Persons
1 Motivate EPs EP
2 Payment of Transfer Grant EP
7) Identification of Eps
1 Collection of award data EP 2 Assigning ID numbers EP 3 Photographing of EPs EP 4 Issuance of ID cards EP 5 Distribution of ID cards EP
8) Grievance Redress
1 Members given in GRCs Nos.
2 Receiving complaints / claims from EPs EP
3 Disposing off complaints EP
4 Assist EPs in replacement land purchase/Relocation
HHs
9)
Information Management/ Technical services
1 Finalization of resettlement budget %
2 Preparation of information brochure %
3 Preparation of operation manual %
4 Designing ID card, EP file, EC %
5 Develop ID numbering system %
6 Computerization of award data EP
7 Develop software for EP file & EC %
8 Develop software for computerized MIS %
10)
Resettlement Assistance to Project Affected Persons.
1 Assist EPs to collect CCL EP
2 Preparation of EP files and ECs Sets
3 Opening bank account by the EPs Nos.
4 Organize payment of benefits from DC EP
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-129
Major items of action Specific action steps (sub-items) Unit Planned
Total 1st Year 2nd Year
Comments 1st qtr
2nd qtr
3rd qtr
4th qtr
1st qtr
2nd qtr
3rd qtr
4th qtr
5 Assist vulnerable EPs in resettlement Nos.
11)
Relocation and Compensation
1 Relocated HHs %
2 Compensated HHs (house/shop) %
3 Compensated HHs (land) %
4 Compensated HHs (crops/trees) %
5 Compensated HHs (livelihood) %
12)
Livelihood Restoration Assistance
1 Job training conducted %
2 Employment of PAHs after job training %
13)
Supervision and Management
1 Supply of manpower and logistics mms
2 Liaison with DC and other agencies Times
3 Monitoring Month
4 Administrative management Month
14) Performance Reporting
1 Inception report Nos. 2 Monthly progress report Nos. 3 Draft final report Nos. 4 Final report Nos.
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-130
2) During and After the Construction
Major items of action Specific action steps (sub-items) Unit Planned
Total 1st Year 2nd Year Xth Year
Comments 1st qtr
2nd qtr
3rd qtr
4th qtr
1st qtr
2nd qtr
3rd qtr
4th qtr
1st qtr
2nd qtr
3rd qtr
4th qtr
1) Grievance Redress
1 Members given in GRCs Nos.
2 Receiving complaints / claims from EPs EP
3 Disposing off complaints EP
4 Assist EPs in replacement land purchase/Relocation
HHs
2) Livelihood restoration
1 Job training conducted % Generally should be completed at pre-construction
2 Employment of PAHs after job training %
3 HHs with reduced income after alternation of livelihood
%
3)
Supervision and Management
1 Supply of manpower and logistics mms
2 Liaison with DC and other agencies Times
3 Monitoring Month
4 Administrative management Month
4)
Performance Reporting
1 Inception report Nos.
2 Monthly progress report Nos.
3 Draft final report Nos.
4 Final report Nos.
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-131
Appendix 9: Terms of Reference for the LARAP Implementing NGO Terms of Reference for the LARAP Implementing NGO
1. Introduction
In Bangladesh, export and import cargoes have increased by 10% in the last 5 years. However, as almost all cargoes
(98%) are handled at Chittagong, the capacity of the terminal facility has already been exceeded. Accordingly,
expansion of the port is required to meet the demand as vessels are commonly forced to wait for berthing. As this
situation is detrimental to the economic growth of the country, the Government of Bangladesh has been preparing
the seventh five-year development plan (from 2016 to 2020) which calls for new port infrastructure for the port of
Chittagong including a coal terminal in the Matarbari area (water depth – 15.3 m) to be developed by a Yen Loan.
The Government of Japan and the Government of Bangladesh have strengthened their bilateral relationship through
the Bay of Bengal Industrial Growth Belt Initiative (BIG-B).
In the course of the survey, the Prime Minister’s Office determined the future concept on the Matarbari port
development. To maximize the performance of the freight transport route from the Matarbari Port to inland area,
accessibility from Matarbari Port to N1 will need to be secured. Road and Highway Department (RHD) will be the
implementing authority of the access road.
The Land Acquisition and Resettlement Action Plan (LARAP) for the project which complies with the Resettlement
Framework (RF) is prepared based on relevant national law of GOB Acquisition and Requisition of Immovable
Property Act 2017 (ARIPA 2017) and with the policy of the JICA Guidelines for Environmental and Social
Considerations and World Bank OP 4.12. LARAP Implementing NGOs (INGOs) will be hired by the RHD for the
implementation of the LARAP.
2. Description of the Project
The objective of the Project is to strengthen the port logistics capacity of Bangladesh by constructing a deep sea
port at Matarbari area in Chittagong Division, thereby contributing to acceleration of logistics with neighboring
countries. The Matarbari Port Access Road should be connected with N1 for ensuring smooth freight transport route
in the Region. The outline of the access road is as follows;
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-132
Table-1 Outline of Access Road Facilities Size
North-south connecting road at port Embankment: ROW-90m, L=1.6km (4 lanes)
Access road (From Matarbari port to
National Route 1)
Embankment: ROW=80m、L=18.7km
Bridge: ROW=25.6m、L=7.0km
Total: 25.7km (The target of the project is only 2 lanes though ROW is
secured for 4 lanes for future 4 lanes.)
Source: Preparatory Survey on Matarbari Port Development Project
3. Scope of Work- General
The general scope of work shall include i) dissemination of information as described in the policy framework
regarding LARAP implementation procedure; ii) conducting public consultations, iii) assisting Project Directors
and his/her staff in implementation of Abbreviated Resettlement Plan and iv) maintain close co-ordination with the
Resettlement Specialist (RS) of Detailed Design/Construction Supervision Consultant (DDC/CSC) and RHD staff.
Displacement and other impacts due to the project are shown in the table below.
Table-2: Summary of Resettlement and Land Acquisition Serial Type of Impact Amount/No Comments
1 Land Required for the Project 201 ha 1-1 Private land to be Acquired 144 ha Loss of Residential land 8 ha Loss of Agricultural land 63 ha Loss of Salt farm 72 ha 1-2 Government land to be transferred 57 ha 2 Affected Household 2-1 Household with their structures / land
affected 614 households
With their Houses affected 130 households Including 33 households of informal settlers
With their Shops affected 7 households 2 households with both houses and shops affected
Loss of Land (Residential land and/or Salt farm)
576 households 90 households with both structures and land affected.
2-2 Households with their livelihood affected 515 households Sharecroppers 258 households Agri-Labours 26 households Labours in salt/shrimp farm etc. 112 households Other employees 119 households
Source: Preparatory Survey on Matarbari Port Development Project
A list of the affected households with demographic and socioeconomic information will be provided to the INGO
by RHD.
Key implementation issues in the delivery of the tasks includes: (i) consultation and stakeholder participation; (ii)
dissemination of relevant information; (iii) assisting executing agency (RHD) in payment of compensation and other
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-133
resettlement grants (iv) assisting Project Affected Persons (PAPs) in the process of resettlement.
4. Scope of Work- Specific Tasks
Scope of Work for the INGOs consists of two components, where separate NGOs will be appointed.
4.1. Component A
4.1.1 Information Campaign: The consultant will design, plan and implement an information campaign in the
affected areas to facilitate the implementation of LARAP. The campaign would include measures such as
distribution of information booklets, leaflets, notices and other materials among the PAPs, carrying out community
meetings, public announcements and any other measures necessary to provide information to all PAPs in the project
area.
4.1.2 Identification of Entitled Persons: Consult census/survey data and prepare final list of affected households,
commercial business enterprises and community establishment now staying within the Right of Way (ROW) from
the list.
4.1.3 Assistance to PAPs during relocation: The INGO will assist the PAPs during pre and post relocation period in
close coordination with Deputy Commissioner (DC) Office and RHD.
4.1.4 Grievances redress procedure: The INGO staff will also assist PAPs, where necessary, in preparing
grievance redress cases for consideration by the Grievance Redress Committee (GRC).
4.1.5 Assistance to RHD in Payment of Resettlement Benefits to PAPs: The selected INGO will assist RHD in
processing entitlements for the PAPs and making payment of resettlement benefits to them. The INGO will compile
and process data and develop & operate a menu driven computerized Management Information System (MIS). The
INGO will prepare EP’s files with type and quantity wise losses and Entitlement Card (EC) mentioning amount of
compensation/benefits for each of the EPs and prepare Indent mentioning category wise amount of compensation
/benefits. The indent would be approved by the Project Director before making payment. The INGO will prepare
payment debit voucher on behalf of RHD and assist RHD in preparing Measurement Book. The debit voucher will
be signed jointly by INGO and EA representative and the cheque will be signed by INGO and be issued in public
place in presence of Local Government representatives. The RHD will place fund with INGO for making payment
and the INGO will submit vouchers with other documents on regular basis to the Project Director after making
payment.
4.2. Component B
4.2.1 Assistance for livelihood restoration: The INGO will conduct information dissemination of vocational training
to PAPs so that they can participate in the training properly. INGO will monitor the progress of livelihood restoration.
Assistance will be given to job finding where necessary.
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-134
4.2.2 Assistance for affected salt/shrimp farmers to find alternative land: INGO will assist affected salt/shrimp
farmers to identify similar land that can be utilized for salt farm and shrimp cultivation as a substitute site.
5. LARAP Implementation Schedule and Tasks
The implementation of the LARAP is scheduled to start from XX January 2019 and expected to be completed by
XX December 2021. The INGO will be deployed for a period of 15 (fifteen) months and will be responsible to
implement all resettlement activities stated in the TOR. The Project Director, in consultation with the RS of the
DDC/CSC will provide time schedule as per the requirement of the resettlement program.
6. Major Activities to be performed by Implementing NGO
The selected INGO will assist RHD in implementing successfully all stipulations agreed in the LARAP entirety,
fairly and transparently. In this context, the major functions to be performed by the INGO are:
6.1. Component A
6.1.1 Information dissemination and feedback:
(i) Ensure dissemination of the project and resettlement policy related information to the project-affected persons
and others (community groups, local administration, etc.) that might be considered instrumental in the effective and
transparent implementation of the LARAP. Even though the LARAP recommends some dissemination mechanisms,
the INGO can suggest more in the process of its implementation and would gather information and disseminate it
upward to the project authority.
(ii) During implementation of the project, extensive consultation and collaboration with key stakeholders on a
continued basis is planned. The selected INGO will be required to assist RHD in organizing such consultation
programs and facilitate consultation with local government representatives, local leaders, etc.
6.1.2 Identification of Entitled Persons:
(i) Consult census/survey data and prepare final list of affected households, commercial business enterprises and
community establishment now staying within the Right of Way (ROW) from the list.
6.1.3 Assisting PAPs in resettlement process:
(i) The main purpose is to make the PAPs and EPs aware of the project goals, importance, GRC procedures,
compensation entitlement and receiving procedures, etc. Some of the major activities are: (a) Inform the EPs about
the documents required for claiming compensation from DC office & resettlement benefit from RHD (b) checking
with the PAPs to make sure that they have all the required documents to claim compensation from DC and RHD (c)
whether or not there are usufruct rights of others on the properties within ROW and informing the people with such
rights about the compensation policies.
(ii) Inform the PAP households, especially the non-tilted persons and/or vulnerable ones, about the “compensation
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-135
in cash and/or kind” option stipulated in the LARAP and ensure fulfillment of the choices made by them.
6.1.4 Grievances redress procedure
The selected INGO will play vital role in the grievance redress process. The most important preconditions for doing
this with maximum effectiveness are that the INGO will build personal rapport and confidence with the PAPs and
will be fully aware of all socioeconomic problems/issues arising from the project. Among other things, the INGO
will:
(i) Ensure that the PAPs are fully aware of the grievance redress procedure and the process of bringing their
complaints to the GRC.
(ii) Assist the PAPs in any usual manner (e.g., preparing applications, accompanying them to the hearing and
explaining the grievance to the GRC and the like) to bring the complaints to the committee.
(iii) Impartially investigate the veracity of the complaints and try to settle them amicably, fairly and transparently
before they go to the redress committee or the courts of law.
(iv) For more focused work in this area, the INGO will prepare a list of problem cases in implementation of LARAP.
In doing so, the INGO will pay special attention to the problems and needs of the vulnerable PAPs and recommend
to the RHD with probable mitigation measures.
6.1.5 Information management
The selected INGO will collect computerized Census and Socio Economic Survey (SES) data related to the pre-
acquisition condition of the PAP households and the nature and magnitude of all categories of losses as well as the
compensation thereof determined by RHD. All essential information will have to be generated by using one or more
menu-driven MIS. Among other things, the INGO will:
(i) Collect CCL from the DC office and prepare statement for assessing additional payment on the basis of quantity
of affected properties and LARAP PVAT rate.
(ii) Collect and computerize all information related to different types of payments and additional supports provided
to the EP and update the EP file and EC.
(iii) Prepare ‘entitlement card’ for the individual EPs as per their types of losses and the amount of compensation
due for each type of loss from legal title and the amount of additional compensation/resettlement benefits if any, to
be paid by RHD through INGO.
(iv) Record and maintain details of the issues/disputes causing delay in the disbursement/receipt of compensation
and the persons involved in them, including the cases brought to the courts of law, if there is any.
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-136
(v) Document information on the cases, with reasons, brought to and resolved by the GRC, with decisions going in
favor of or against the complainants.
(vi) Collect and maintain relocation information on the homestead losers by categories of EP households such as
legal owners, informal settlers, tenants and others.
6.1.6 Progress reports
The LARAP requires that all PAPs are paid the stipulated compensations/entitlements before they are evicted from
the properties and/or construction work begins. The selected INGO will provide RHD weekly report on the progress
in LARAP implementation, including any issue that might be hindering progress. The report will be brief consisting
of both quantitative and qualitative information on:
(i) The INGO in its report should reflect the status of total number of EPs identified by DC for compensation and
progress of payment in a particular period and resettlement benefits paid against DC’s payment and other benefits
as per LARAP policy by zones and EP categories.
(ii) Number of focus groups formed and meeting held with the affected persons with issues discussed.
(iii) Number of vulnerable affected households male headed and female headed have received cheques and be
deployed in project civil works according to their eligibility.
(iv) Number of cases received by the Grievance Redress Committee indicating the types of grievance made in favor
of or against the complainants.
(v) Any other issues that are relevant to implementing the policies stipulated in the LARAP.
6.2 Component B
6.2.1 Assisting livelihood restoration of PAPs:
(i) Inform PAPs of the implementation of vocational training. Assist PAPs to obtain consent from family of
vocational training persons shall be obtained.
(ii) Monitor livelihood restoration of PAPs and review/update livelihood restoration program in consultation with
the concerned PAPs where necessary. INGO shall monitor the following items; - Implementation status of vocational training: quarterly after the beginning of vocational training. - Job finding: 3 months after completion of vocational training program. - Situation of employment and livelihood restoration: Once a year from above mentioned.
(iii) Provide assistance for job finding after vocational training where necessary.
6.2.2 Assisting the affected salt/shrimp farmers to find alternative land
(i) Assist affected salt/shrimp farmers to identify similar land that can be utilized for salt farm and shrimp cultivation
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-137
as a substitute site if they prefer maintaining the same livelihood even after the Project implementation.
6.2.3 Information management
(i) Record implementation status of vocational training/ job finding status of EPs/ situation of employment and
livelihood restoration
(ii) Record implementation status of assisting salt/shrimp farmers to identify similar land and livelihood restoration
situation
6.2.5 Progress reports
The selected INGO will report RHD weekly on the progress in implementation of livelihood restoration, including
any issue that might be hindering progress. The selected INGO will make reporting documents quarterly.
7. Staff requirements
The INGO is free to determine the number of members to be working in the team. A bar chart shall indicate the
proposed timing of their input. The team members shall meet the following criteria:
(i) The Team Leader (Resettlement Specialist) is the spokesman for the INGO. He/she shall hold Masters in Social
Science and have at least 15 years of relevant experience in implementation of LARAP, report writing etc. He/she
shall have conducted at least 5 trainings/ workshops in Resettlement Issues, and must be fluent in English.
(ii) The Deputy Team Leader (Resettlement Expert) will assist Team Leader in LARAP Implementation process.
He shall hold Masters in Social Science and have at least 10 years of relevant experience in implementation of
LARAP. He shall have conducted at least 5 trainings/ workshops in Resettlement Issues, and must be fluent in
English.
(iii) MIS specialist shall hold a degree in Statistics/Mathematics/Computer Science having more than 10 years of
relevant experience in Resettlement tools (EP/EC), and be fluent in English.
(iv) Gender and livelihood development specialist will have at least masters in any discipline with 7 years experience
in the relevant field.
(v) Area Manager shall hold Masters in Social Science and have at least 5 years of relevant experience in
implementation of LARAP. He shall have conducted at least 3 trainings/ workshops in Resettlement Issues, and
must be fluent in English.
(vi) Enumerators shall be graduates with at least two years relevant experience
A. INGO selection criteria:
The INGO should have registration with concerned Authorities and experience in implementation of Resettlement
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-138
Action Plan. The INGO will be selected through quality and cost based selection method.
B. Implementation arrangements
The INGO has to keep office near the concerned locality (more than one in each zone) during the time of
implementation of the LARAP in order to ease contact with the APs, the cost of which will be specified in the
budget. The INGO will make its own transport arrangements, which will be reflected in the budget.
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-139
Appendix 10: Terms of Reference for External Monitoring
Terms of Reference for the External Monitoring and Evaluation Agency (access road) A. Project Background The Government of Bangladesh (GOB) has requested loan assistance from Japan International Cooperation Agency (JICA) for the development of Matarbari port with its access road to N1 for ensuring smooth freight transport route. While Chittagong Port Authority (CPA) will be the implementing authority of port component, Road and Highway Department (RHD) will be the implementing authority of the access road component. RHD has prepared Land Acquisition and Resettlement Action Plan (LARAP) that will mitigate adverse social impacts due to the project. The LARAP is consistent with the JICA Guidelines for Environmental and Social Considerations. An LARAP Implementing Agency (IA) i.e. Implementing NGO (INGO) or Social Consulting Firm will be hired by the RHD for implementation of the LARAP. To monitor activities of the LARAP IA/INGO, RHD will engage an External Monitoring and Evaluating Agency.
Figure-1: Location of the Project
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-140
Key Objective of External Monitoring Monitoring involves the collection and analysis of data on resettlement activities with the applying accruing information. Monitoring allows project participants to keep track of resettlement activities, to determine whether resettlement objectives are being achieved, and to make whatever changes are necessary to improve resettlement performance. Evaluation is an assessment of resettlement performance and results in light of stated the objectives. Evaluation for purposes of the LARAP is proposed to include a participatory component allowing the project participants to comment on their experience of the project. To be successful, monitoring and evaluation begins with clear resettlement design followed by identification and elaboration of appropriate criteria and indicators. Indicators and Means for Verification Indicators form the key elements of any monitoring and evaluation system. Indicators also make possible the comparison of inputs with the completion of outputs and achievement of objectives and goals, thus providing the basis for performance evaluation. Four categories of indicators have been formulated to facilitate monitoring of Progress, Outputs, Effects, Impacts and Compliance in implementing the resettlement. Effect Monitoring This will be used to measure the extent to which the immediate objectives have been achieved and give an idea of the results emanating from implementing the LARAP e.g., percentage of APs now accessing better housing or improved livelihoods on account of being successfully resettled. Impact Monitoring This is the process through which, assessment of the overall achievement of the resettlement goal will be made. Specifically, this is the system that will generate data to gauge success towards implementation of this LARAP in terms of impact of the resettlement on the APs. The basis for impact monitoring is the baseline social-economic survey data against which the wellbeing of APs will be compared. The External Monitoring and Evaluation Agency will review implementation process as per set policies in the LARAP and assess the achievement of resettlement objectives, the changes in living standards and livelihoods, restoration of the economic and social base of the affected people, the effectiveness, impact and sustainability of entitlements, the need for further mitigation measures if any, and to learn strategic lessons for future policy formulation and planning. Scope of Work The scope of work of the External Monitoring and Evaluation Agency will include the following tasks: (1) To review and verify the progress in land acquisition/resettlement implementation of the Project and whether
they have been followed as provided in the LARAP. (2) Provide a summary of whether involuntary resettlement was implemented (a) in accordance with the LARAP,
and (b) in accordance with the stated policy. (3) Verify expenditure & adequacy of budget for resettlement activities. (4) Describe any outstanding actions that are required to bring the resettlement activities in line with LARAP.
Describe further mitigation measures needed to meet the needs of any affected person or families judged and/or perceiving themselves to be worse off as a result of the Project. Provide a timetable and define budget requirements for these supplementary mitigation measures.
(5) Describe any lessons learned that might be useful in developing the new national resettlement policy and legal/institutional framework for involuntary resettlement.
(6) To Identify, quantify, and qualify the types of conflicts and grievances reported and resolved and assess whether the consultation and participation procedures followed in accordance with the LARAP.
(7) To identify the strengths and weaknesses of the land acquisition/resettlement objectives and approaches, implementation strategies.
(8) Identification of the categories of impacts and evaluation of the quality and timeliness of delivering entitlements (compensation and rehabilitation measures) for each category and how the entitlements were used and their impact and adequacy to meet the specified objectives of the plans. The quality and timeliness of delivering entitlements, and the sufficiency of entitlements as per approved policy.
(9) To review the quality and suitability of the relocation sites from the perspective of the both affected and host communities.
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-141
(10) Review results of internal monitoring and verify claims through sampling check at the field level to assess whether land acquisition/resettlement objectives have been generally met. Involve the affected people and community groups in assessing the impact of land acquisition for monitoring and evaluation purposes.
(11) To monitor and assess the adequacy and effectiveness of the consultative process with affected PAPs, particularly those vulnerable, including the adequacy and effectiveness of grievance procedures and legal redress available to the affected parties, and dissemination of information about these.
B. Methodology and Approach The general approach to be used is to monitor activities and evaluate impacts ensuring participation of all stakeholders especially women and vulnerable groups. Monitoring tools should include both quantitative and qualitative methods. The external monitor should reach out to cover: (1) 100% of PAPs who had property, assets, incomes and activities severely affected by Project works and had to
relocate either to resettlement sites or who chose to self-relocate, or whose source of income was severely affected.
(2) 10% of persons who had property, assets, incomes and activities marginally affected by project works and did not have to relocate;
(3) 10% of those affected by off-site project activities by contractors and sub-contractors including employment, use of land for contractor's camps, pollution, public health etc.;
C. Other Stakeholders and their Responsibility 1. Roads and Highways Department (RHD): Roads & Highways Department will establish, for the Project, a Project Implementation Unit (PIU) headed by a Project Director (PD), at the project office that will be responsible for the overall execution of the Project. The PIU will consist of two units namely Engineering Service Unit (ESU) and Resettlement Unit (RU) for total implementation of the project. The PD will work on deputation from RHD at the level of Superintending Engineer or Additional Chief Engineer. The project will be overseeing by the PD, RHD. One implementation committee will be formed to provide overall guidelines and cooperation for project implementation and keep liaison with various stakeholders including Donor, different government organizations and other relevant agencies. (1) Acquire, hold, manage and dispose of land and other property to private sector developers, to carry out the
planning, engineering, design, construction, marketing, sales and other operations under the regulations of master plan
(2) Execute works in connection with the utilization of infrastructure such as supply and discharge of water, electricity, transportation and other services and amenities and generally to do anything necessary or expedient for purposes of such development and for purposes incidental thereto, provided that save as provided in this Act, nothing contained in this Act shall be construed as authorizing the disregard by the Authority of any law for the time being in force.
(3) Lead, monitor and evaluate the implementation of the project. 2. LARAP Implementing Agency (IA) / Implementing NGO (INO): RHD will engage an experienced IA/INGO for implementation of the LARAP in the field level in coordination with the DC, RHD and consultants. The IA/INGO will be engaged to assist the supervision consultant for updating of LARAP during detailed design phase and will be continuing for implementation of the LARAP. The tasks of the IA/INGO are to: (1) Verify results of internal monitoring; (2) Assess whether resettlement objectives have been met; specifically, whether (3) Livelihoods and living standards have been restored or enhanced; (4) Assess resettlement efficiency, effectiveness, impact and sustainability, drawing (5) Lessons as a guide to future resettlement policy making and planning; and (6) Ascertain whether the resettlement entitlements were appropriate to meeting the objectives, and whether the
objectives were suited to PAP conditions. (7) Undertake any other assessment relevant to the resettlement process.
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-142
D. Team Composition of the External Monitoring and Evaluation Agency
Table-1 Team composition and qualifications Position/expertise Qualification and experience
1. Team Leader/ Resettlement Expert
Masters in social science with 10 years working background in planning, implementation and monitoring of involuntary resettlement for infrastructure projects. Experience in institutional capacity analysis and implementation arrangement for preparation and implementation of resettlement plans, and knowledge in latest social safeguard policies of the international development financing institutions in Bangladesh
2. Social Impact Specialist/Anthropology
Masters in social science with 5 years working experience in social impact assessment including census and socio-economic surveys, stakeholders’ consultation, and analysing social impacts to identify mitigation measures in compliance with social safeguard policies of the international development financing institutions and national legislations. Experience of preparing resettlement framework and action plans and implementation of plans for externally financed projects is essential.
3. Data Analyst Graduate with working experience and knowledge of software, preferably relational, those are most commonly used in Bangladesh; demonstrated ability to design and implement automated MIS(s) for monitoring progress, comparing targets with achieved progress and the procedural steps
E. Time Frame and Reporting External monitoring of the LARAP will be undertaken alongside that of other project components. External Monitoring and Evaluation Agency will take place as follows: Post Project Monitoring: In order to determine final impacts of the resettlement activity, a final evaluation cum an impact assessment will be undertaken 6 months after conclusion of resettlement to evaluate whether the intended objectives were realised. For this, suitable baseline indicators related to income, assets, land ownership, expenditure pattern of key activities, housing conditions, access to basic amenities, demographic characteristics, indebtedness, etc. will be applied.
The monitoring reports should be submitted to RHD. An evaluation report at the end of the project should be submitted to the RHD and concerned parties with critical analysis of the achievement of the program and performance of RHD and IA/INGO. The external monitors will provide monitoring and evaluation report covering the following aspects: • Whether the resettlement activities have been completed as planned and budgeted; • The extent to which the specific objectives and the expected outcomes/results have been achieved and the
factors affecting their achievement or non-achievement; • The extent to which the overall objective of the Resettlement Plan, pre project or improved social and economic
status, livelihood status, have been achieved and the reasons for achievement / non achievement; • Major areas of improvement and key risk factors; • Major lessons learnt; and • Recommendations. Formats for collection and presentation of monitoring data will be designed in consultation with RHD, consultant’s resettlement specialist. F. Qualification of the Independent External Monitoring Agency The External Monitoring and Evaluation Agency will have at least 5 years of experience in resettlement policy analysis and implementation of resettlement plans. Further, work experience and familiarity with all aspects of resettlement operations would be desirable. NGOs, Consulting Firms having requisite capacity and experience as follows can qualify for services of and external monitor for the project.
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-143
(1) NGOs, Consulting firms duly registered with GOB agencies or a department of any recognized university is eligible.
(2) The applicant should have prior experience in social surveys in land based infrastructure projects and
preparation of Resettlement Plan (RP), Abbreviated Resettlement Plan (ARP), Resettlement Action Plan (RAP), Land Acquisition or Resettlement Action Plan (LARAP) as per guidelines on involuntary resettlement of any of the JICA, ADB, World Bank and DAC-OECD.
(3) The applicant should have extensive experience in implementation and monitoring of resettlement plans,
including the preparation of implementation tools. (4) The applicant should be able to produce evidences of monitoring using tools such as computerized
Management Information System with set criteria for measuring achievement. (5) The applicant should have adequate manpower with capacity and expertise in the field of planning,
implementation and monitoring of involuntary resettlement projects as per donor's guidelines.
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-144
Appendix 11: List of NGO and Job Training
1. BURO Bangladesh ( NGO )
(1) Contact: Md. Abdul Rahim
Branch Manager, Badarkhali Branch
01733220189
(2) TRAINING :
- Human Resource Development Training
- Agricultural Training
- Fisheries Training
- Poultry Farming Training
- Micro loans for Fisheries, Agricultural and Poultry ect.
2. ASHA ( NGO )
(1) Contact: Mohammed Piplu
Branch Manager
Badarkhali Brach
01730084745
(2) TRAINING :
- They have no training program
- They give Micro Loans
3. COAST ( NGO )
- No training
- Soler panel supply with installment ( 0% interest )
- Micro Loans
4. PROTTASHI ( NGO )
5. BGS ( NG0 )
(1) Contact: Abdu Rahim Bhuttu
Branch Manager, Moheshkhali Branch
01818521493
(2) TRAINING :
- Computer Training
- Mobile Repair Training
- Refrigerator Repair training
- Betel leaf cultivation training
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-145
- Fish Breeding Training
- Fish culture Training
- Beef Fattening Training
- Tailoring Training
6. RIC ( NGO )
7. GRAMIN BANK ( NGO )
8. ISDDE ( NG0 )
9. BRAC ( NGO )
(1) Contact: Jhuddo Mitro Barua
Branch Manager, Badarkhali Branch
01708114154
(2) TRAINING :
- Human Resource Development Training
- Fisheries Training
- Poultry Farming Training
- Livestock Farming Training
- Handicraft training
- Micro Loans
10. ACF ( NGO )
11. WFP ( NGO )
12. SARTV ( NGO )
13. CCDB ( NGO )
14. ISPA ( NGO )
(1) Contact: MD. Harun
Branch Manager, Mohesh Khali Branch
01716280168
(2) TRAINING
• Computer Training
• Mobile Repair Training
• Refrigerator Repair training
MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Land Acquisition and Resettlement Action Plan – Book Appendices
A-146
• Betel leaf cultivation training
• Fish Breeding Training
• Fish culture Training
• Beef Fattening Training
• Driving Training
• Tailoring Training
• Parlor Training
• Boutiques Training
• Tourism Training