Government of the People’s Republic of Bangladesh Ministry of Local Government, Rural Development and Cooperatives
(MOLGRD&C)
Local Government Engineering Department (LGED)
.
Second Rural Transport Improvement Project
(RTIP-II) REGION-1 & 2
SOCIAL AND RESETTLEMENT ACTION PLAN (SRAP) Third Year UZR Subprojects with Acquisition of Private Land
August 2016
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
I
Table of Contents
Social and Resettlement Action Plan (SRAP) Region-1 & 2
Third Year UZR Subprojects with acquisition of private land
SL No. Contents Page
Definition of selected terms v
Executive summary vii
1. INTRODUCTION
1.1 Project background............................................................................... 1
1.2 Project area........................................................................................... 1
1.3 Third Year Subprojects in RTIP-II ………………………………….. 4
1.4 Social Implication of UZR Subprojects with Land Acquisition …….. 4
1.5 Measures to Minimize Impacts ……………………………………….. 5
1.6 Social & Resettlement Action Plan SRAP)............................................ 5
1.7 Approval and Disclosure …………………………………………….. 5
2. SOCIO-ECONOMIC INFORMATION 6
2.1 Sub-project areas ……………………………………………………… 6
2.2 Brief Socio economic profile of sub-project area …………………….. 6
2.2.1 Dewangonj Upazila ………..………………………………………….. 6
2.2.2 Kamarkhanda Upazila………………………………………………… 7
2.2.3 Derai Upazila………………………………………………………. 9
2.3 Gender and Vulnerability ……………………………………………. 10
2.4 Ethnic Composition and Tribal People ……………………………….. 10
2.5 Consultation and Feedback ……………………………………… 11
2.5.1 Objectives of consultation and participation ………………………… 11
2.5.2 Consultation process ………………………………………………… 11
2.5.3 Summary of community feedback and project response …………….. 13
3. LEGAL AND POLICY FRAMEWORK 15
3.1 Legal Framework …………………………………………………… 15
3.2 The World Bank Policy ……………………………………………… 15
3.3 Project Policy Framework …………………………………………… 16
3.3.1 Basic Policy Principles ……………………………………………… 16
3.3.2 Impact Mitigation Principles ………………………………………… 16
3.3.3 Eligibility for Compensation and Assistance 17
4. SOCIAL MANAGEMENT PLAN 18
4.1 Ensuring participation of local people and transparency of the
resettlement plan 18
4.2 Grievance Redress Mechanism (GRM)…………………… 18
4.2.1 Introduction and Objectives …………………………………………. 18
II
4.2.2 Grievance Redress Focal Points ……………………………………… 19
4.2.3 Formation of GRC and SCC …………………………………………. 19
4.2.4 Orientation and Disclosure of GRC and SCC ……………………….. 19
4.2.5 Grievance Redress Process ………………………………………….. 20
4.2.6 GRC Documentation and Reporting ………………………………… 21
5. RESETTLEMENT ACTION PLAN (RAP) 22
5.1 Subprojects with Involuntary Resettlement Issues …………………… 22
5.2 Objectives of RAP …………………………………………………… 22
5.3 Strategy and Guidelines for acquisition and Resettlement…………… 22
5.4 Subproject Impacts and Affected Persons …………………………… 23
5.4.1 Subproject Areas and Impacts
………………………………………… 23
5.4.2 Occupations of the Affected Households Heads……………………... 23
5.4.3 Project Affected Persons by Gender ………………………………… 24
5.4.4 House/structure affected on private lands…..……………………….. 25
5.4.5 Transition Allowance …………………………………………………. 25
5.4.6 Affected Trees ………………………………………………………… 26
5.4.7 Standing crops………………………………………………………… 26
5.4.8 Loss of fruits before harvesting ……………………………………… 27
5.5 Eligibility of Entitlements……………………………………………... 27
5.5.1 Eligibility cut-off date…………………………………………………. 27
5.5.2 Eligible persons (EP) for compensation and assistance ………………. 28
5.5.3 Eligibility considerations …………………………………………....... 29
5.5.4 Vulnerability ………………………………………………………… 29
5.5.5 Entitlement Matrix ……………………………………………………. 29
5.5.6 Market price survey methodology …………………………………… 32
5.5.6 Finance ………………………………………………………………. 33
6. IMPLEMENTATION ARRANGEMENTS 34
6.1 Institutional Arrangement…………………………………………….. 34
6.2 Implementation Schedule ………………………………………….. 35
6.3 Payment of Compensation and Cash payment ……………………….. 36
6.3.1 Resettlement Budget ………………………………………………… 36
6.3.2 Payment Process…………………………………………………….. 36
7. MONITORING AND EVALUATION 38
7.1 Monitoring Arrangements …………………………………………… 38
7.2 Internal Monitoring……………………………………………….. 39
7.3 Indicators of Internal Monitoring …………………………………… 40
7.4 Independent External Monitoring ………………………………… 40
7.5 Reporting Requirements …………………………………………… 41
III
List of Tables
SL Description Page
1.1 Population and literacy rate of three Upazilas with acquisition. 2
1.2 UZR Subproject with Length and Land Acquisition. 4
2.1 Consultation and participation status 12
2.2 District-wise FGD with women groups 13
4.1 List of the UZRS in three districts with acquisition 18
5.1 Project Affected Units in three UZRs with acquisition 23
5.2 Primary and Secondary Occupations of the Affected Households 24
5.3 Distribution of PAPs by gender 24
5.4 Distribution of female owners by profession and type of loss 24
5.5 Transition allowance and number of eligible persons for the allowance 25
5.6 Trees Affected on Acquired land by Contract and district 26
5.7 Affected standing crops in the three UZRs with acquisition 27
5.8 Date of commencement census and cut-off-date by contract packages/sub
projects 28
5.9 Number of affected HHs and summary of their losses for sub-project works. 28
5.10 Losses by impact categories by the subproject intervention 29
5.11 Compensation heads and amount 34
6.1 Proposed Resettlement Budget (In Taka), Based on Market Price 36
IV
List of Figures
SL Figures Page
1. Map of the project area(RTIP-II) 3
2. Map of Dewangonj Upazila 7
3. Map of Kamarkhanda Upazila 8
4. Map of Derai Upazila 9
List of Appendix
SL. Appendix No. Contents Page
1. Appendix - 1 Action plan for Land Acquisition and SRAP Preparation
&Implementation for Phase-II Program
42
2. Appendix – 2 Land Acquisition avoided completely 43
3. Appendix -3 Summary of present status of acquisition 44
4. Appendix -4 Steps and responsibilities in resettlement activities 45
5. Appendix -5 Major tasks and responsibilities involved in Land
acquisition and SRAP implementation
46
6. Appendix -6 Monitoring progress in CUL payment 47
7. Appendix -7 Summary information on compensation payment for private
lands and other assets by the deputy commissioners
48
8. Appendix -8 Summary information on compensation (top-up) payment
by LGED for private lands and other assets as per contract
and Mouza
49
9. Appendix-9 Information of grievance redress activities 50
10. Appendix -10 Details of affected trees by size, numbers and volume 51
11. Appendix- 11 List of Inventory 52
12. Appendix -13 Entitlement Matrix of the SIMF 109
ACRONYMS & ABBREVIATIONS--------------------- ----
113
V
DEFINITION OF SELECTED TERMS
The various terms used in this SRAP are briefly defined below for clarity and consistency:
Affected Persons or Project Affected Person (AP/PAP): Persons affected directly or indirectly
by the project-induced changes in use of land, water, or other natural resources are called PAPs.
In other words, a person who as a consequence of the changes sustains (a)damages by reason of
severing land, or (b)loss of immovable property in any manner, or(c) experience loss of income
and livelihood. Such impacts may be temporary or permanent in nature and most often occurs
through land expropriation and clearing existing land for construction.
Compensation: Payment made in cash to the affected persons/households for the land, structures,
loss of income, immovable properties which have to be shifted for construction works of the
subprojects.
Cut-off Dates: Date of notification under Section 3 of 1982 Ordinance is the cutoff date for title
owners. The commencement date of Census will be considered cutoff date for all others, including
non-titleholders for resettlement benefits. Cut- off dates for the three UZRs of this SRAP showed
in Table 5.8 (page 28)
Census Survey: A survey covering 100%households being affected by the project, irrespective
of their ownership to the land.
Occupiers: Project affected person who have built structures, planted trees, opened business on
the UZR land reserves. They have own land attached to the road or nearby. Occupiers are informal
settlers encroached into the road reserve or into public land.
Community Participation and Consultation: The active process of sharing information seeking
inputs from community about the project, seeking community-wide inputs, and integrating those
in the project design as well planning mitigation measures.
Displacement: Refers to physical displacement in terms of physical dislocations as well as
economic displacement due to loss of land, access to land as well as forest resources, commercial
establishments and any other impacts such as severance that adversely affects lives and livelihood
sources.
Displaced Persons: Project affected person due to the involuntary taking of land resulting in(i)
relocation or loss of shelter;(ii) los of assets or access to assets; or(iii) loss of income sources or
means of livelihood, whether or not he/she must move to another location; or a person affected by
the involuntary restriction of access to legally designated parks and protected areas resulting in
adverse impacts on the livelihoods.
VI
Entitlements: Range of measures comprising of compensation resettlement benefits, including
shifting allowance, subsistence, and relocation, which a displaced person is entitled to, depending
on the nature of losses, to restore and/or improve the living standards.
Household: A household unit includes family members who share food from the same kitchen.
In the project area, it consists of parents with children living together as an economic and
production unit.
Relocation: Rebuilding housing, assets –including productive land, and public infrastructure, in
a new location.
Rehabilitation: Re-establishing incomes, livelihoods, living and social systems.
Resettlement Action Plan (RAP): A time bound action plan with budget setting out resettlement
impact strategy, objectives, entitlement, actions, implementation responsibilities, monitoring and
evaluation.
Replacement Cost: The costs of replacing lost assets (e.g., land, houses/structures, trees and
crops) and income, including cost of transaction.
Vulnerable Person: The vulnerable group/persons may include (i) persons below nationally
defined poverty line; (ii) indigenous people or adibasis; (iii) poor women-headed households; (iv)
landless and marginal farmers; (v) people with disability (vi) elderly and (vii) any other groups or
persons found to be disproportionately affected by project impacts.
VII
Executive Summary
Project objectives
The Second Rural Transport Improvement Project (RTIP-II) is being implemented by the Local
Government Engineering Department (LGED) under the Ministry of Local Government, Rural
Development & Cooperatives with co-financing from the World Bank (IDA). The Project aims
overall improvement of rural transportation system by rural roads, boat landing sites/ghat, river
dredging and rural market centers. The project will facilitate easy and cost effective transportation
of goods, marketing of agricultural products with reducing transport cost, developing the market
system, impact on increasing agricultural products and creation of short and long-term
employment opportunities for the rural people. Finally, the project will contribute in poverty
reduction.
Rationale for Social and Resettlement Action Plan (SRAP) with acquisition of lands
This SRAP has been completed based on Social Impact Management Framework (SIMF) for
implementation of the 3-UZRs where land acquisitions require in between a total of 13 UZR
subprojects for execution in Region-1and a total of 17 UZR subprojects for execution in Region-2
under the third year. Twenty five of these subprojects have been designed avoiding any acquisition
of additional private land. Acquisition of private land has been decided at least in three
subprojects; 1sub-project from each of the following districts- Jamalpur, Sirajgonj and
Sunamgonj. About 17.05 acres of land (6.90 ha, 1 Acre = 2.4711 ha) has been proposed for
acquisition in these three districts following the Land Acquisition and Requisition of Immovable
Property Ordinance II (1982) of Bangladesh. The Ordinance provides certain safeguards for the
owners and has provision for payment of “fair compensation” for the property acquired through
the office of Deputy Commissioner (DC). Acquisition of private land has been considering for
one more UZR in Brahmanbaria district and another UZR in Mymensingh district has been
dropped.
Moreover, this SRAP has been designed to (i) address and mitigate the impacts of UZR
development; (ii) comply with the safeguard requirements of the World Bank (WB); and (iii) be
able to pay compensation to the households affected by UZR development in order to meet the
project development schedule.
Scope and objectives of the SRAP
The primary goal of the SRAP is to plan adequate mitigation measures and provide compensation
and resettlement assistance to those physically and economically affected persons through
appropriate mitigation measures. These include (i) provision for compensation payments for land
acquisition, structures, trees and standing crops; (ii) payment of additional grant to the affected
persons to reach at replacement costs (recommended by Market Price Valuation Committee); (iii)
Transfer and reconstruction assistance for displacement during site development (if any); (iv)
Special assistance for the poor, particularly vulnerable women who will not be able to go back at
least to their pre-project standard of living with normal compensation; and (v) provision for
implementation framework, monitoring and evaluation.
Disclosure and Consultation
During SRAP preparation, disclosure and consultation has been followed through community
people participatory mechanism. All subprojects have been identified and designed through
disclosure of information to the community and consultation with the local peoples. RTIP-II has
established Consultation and Participation Plan for addressing the requirement of community
VIII
including needs assessment. In this regard155 FGDs and 203 hot-spot discussion were conducted
in the mainstream areas for 4233-participants.
In addition, women were specially consulted through 49 FGDs along the 30 roads in the 12 project
districts. Rate of participation of women in these FGDs were moderately. So, FGD was conducted
with only female beneficiaries of mainstream population area of each UZR. A total of 390women
participated in these FGDs.
Community consultation was done in each Kilo Meter of the road or in important public gathering
places at the time of Social and environmental screening.
Summary of the Property Loss
All the possible measures were taken to avoid acquisition of private land and loss of other
properties. But it could not avoid acquiring of 17.05 acres of land to implement the three UZRs.
Most of the land will be required for widening the existing road area. Two of these three roads
crossed open field and another UZR in Sunamgonj goes through Haor (land remains under water
for 7 months in the year). There were no structures by the side of the UZRs. So, no structure will
be affected for implementation of these UZRs. 88 owners will loss 765 numbers of trees (63 large
trees, 404 medium trees and 298 small trees). Among these 88 owners 34 owners will loss 192
fruit trees. Standing crops of 7.22 Acres of land will be affected for construction of the UZR. The
census report shows that there are 241 number of affected land owners will loss standing crops,
where 231 are male and 10 are Female. Total project affected persons (HH members) are 2512
where 1173 (46.7%) are male and 1339 (53.3%) are female. Main profession of most the affected
HH is agriculture (86.93%). Among 421 affected land owners there are only 13 business man and
16 are housewife. These 16 women will be assisted to recover rapidly from the impact of
acquisition. There are no squatters or illegal occupiers along the UZRs. No indigenous people or
any kind of indigenous interests will be hampered due to implementation of UZR works.
SRAP Implementation and Cost Estimation
A Compensation and Entitlement Matrix has been prepared for the affected persons under the
UZRs with acquisition of private lands. The affected persons are eligible for
compensation/assistance according to this SRAP. An amount of Tk 4,26,71,123 ($538981) has
been proposed to LGED for providing compensation and assistance to the affected persons. The
project considered compensation for affected property according to their type, extent and severity.
LGED will review the recommendations and approve for delivery of compensation and assistance
to the eligible affected persons.
This Compensation and Entitlement Matrix constructed on the basis of SIMF where the views of
Operational Policy 4.12 of the World Bank has been reflected.
This Social and Resettlement Action Plan has been reviewed and agreed by LGED and the
Government of Bangladesh. The SRAP will be shared with the Bank for review and clearance.
The SRAP will be disclosed locally before implementation. The impacts and entitlements along
with implementation arrangements will be translated in Bangla and placed in the LGED offices in
the Upazila and District level. The SRAP will be uploaded in the LGED website immediately after
its clearance from the Bank along with its Bangla translation.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 1
SOCIAL AND RESETTLEMENT ACTION PLAN (SRAP)
Third Year UZR Subprojects in RTIP-II with Private Land Acquisition
1 INTRODUCTION
1.1 Project Background
The Second Rural Transport Improvement Project (RTIP-II) is being implemented by the Local
Government Engineering Department (LGED) under the Ministry of Local Government, Rural
Development & Cooperatives with co-financing from the World Bank (IDA). The Project aims
overall improvement of rural transportation system by rural roads, boat landing sites/ghat, river
dredging and rural market centers. The project will facilitate easy and cost effective
transportation of goods, marketing of agricultural products with reducing transport cost,
developing the market system, impact on increasing agricultural products and creation of short
and long-term employment opportunities for the rural people.
The project is financing improvement of the following components.
i. 750 Km Upazila Road (UZR);
ii. 500 km Union Road (UNR) ;
iii. Rehabilitation of 3550 km rural roads under Rehabilitation and Periodic Maintenance
(RPM);
iv. Maintain 450 km rural roads under Performance Based Maintenance Work (PBMC);
v. 50 nos. Growth Center Market (GCM) and
vi. The project is also financing for dredging of about 44 km river routes as the 20 River
jetties/ boat landing stations.
The Project will be implemented over 5 (five) years in 3 (three) phases. Only some UZRs will
require acquisition of land from private ownership and resumption of public land from
authorized and unauthorized private uses. Accordingly, the project has been preparing Social
and Resettlement Action Plan (SRAP) to mitigate the adverse impact of acquisition or
displacement of the people following the Social Impact Management Framework (SIMF) of
the project.
1.2 Project Area
The 26 project districts covered under RTIP-II have been grouped into two regions; Region-
1 and Region-2, each containing 13 districts. The project area covers 60,000 sq.km. Total area
of Region-1 (R1) is 25,201 sq.km where 66,217,965 people are living. Total land area in
Region-2(R2) is 34,710 sq.km with a population of 21,918,041 persons. Ratio of male and
female in the project districts are 1.04 male(s)/female. Indigenous people are living in some
of the project districts of both regions. High percentage (from total population) of indigenous
people live in the project districts as follows- in Mymensingh and Netrokona 1.42%, in
Sherpur 1.24%, in Tangail 1.13%, as per Population Census, 2011 by Bangladesh Bureau of
Statistics (BBS).
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 2
There are 70.63 Km of UZRs under Region-1 and 148.2 Km under Region-2 (SUN/UZR-32
of 10.06 Km included from Second year program) where project activities have been proposed
under the Third year program (Phase-III). Proposed improvement works for three3rd year
UZRs with acquisition covers an influence area of 787.24sq.km where about one million
people are living. Population density varies significantly from 579 people (Derai) to
1527people (Kamarkhanda) per sq.km in the sub-projects influence area.
Upazila wise area, population and rate of literacy in the three third year UZRs with land
acquisition are given below in Table 1.1.
Table 1.1 Population and literacy rate of three Upazilas with acquisition.
SL Upazila &
District
Population Literacy Rate Area
(sq. km² )
Population
Male Female Total Total
(%)
Male
(%)
Female
(%)
Density/
Sq-km
Region - 1
1. Dewanganj,
Jamalpur 126623 131510 258133 32.5 35.0 30.1 267.51 965
2. Kamarkhanda,
Sirajgonj 68411 70234 138645 46.2 48.9 43.7 98.80 1527
Sub- Total 195034 201744 396778
Region - 2
3. Derai,
Sunamganj 122636 121054 243690 37.1 38.5 35.8 420.93 579
Total 317670 322798 640468 787.24 813.56
Source: Population & Housing Census-2011, National Volume-2 Bangladesh Bureau of Statistics
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 3
Figure 1:Map of the Project Area (RTIP-2)
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 4
1.3 Third Year UZR Subprojects in RTIP-II
The Third year subprojects are located in the Central and North-East to South-East Districts of
the country. There are 30 UZRs (30-packages), 17 UNRS, 129 RPM Roads, and 15 GCMs
proposed for improvement under Third year work program in RTIP-II. Only three of the UZR
subprojects involve acquisition of additional private land including two in Region 1 and one in
Region 2.
1.4 Social Implication of Third Year UZR Subprojects with Land Acquisition
Land Acquisition Plan (LAP) has been prepared by LGED with the assistance from Design and
Supervision Consultant (D&SC). LGED will place funds for acquisition of land to the DCs
based on their requisition. The DCs will complete all the procedural requirements for land
acquisition. Among 29 UZRs under3rdyear program, acquisition completely avoided for 25
UZRs (one subproject dropped in Region 1) and subsequently list of the UZRs can be seen in
Appendix 2. Land acquisition could not be fully avoided in three subprojects, this SRAP has
prepared for these 3UZR subprojects. One UZR under Nasinagar Upazila of Brahmanbaria
District is under process of land acquisition. The civil works components of the Project
requiring acquisition of land are presented in Table-1.
Table 1.2: UZR Subproject witth Length and Land Acquisition
Sl.
# District Road
Length
(km)
Land requirements (Decimal)
Agri-land
(Decimal)
Vity Land
(Decimal)
Total Land
requirement
(Decimal)
Region - 1
1. Jamalpur Bagharchar-Sananadabari
Via Goalkanda Rd. 4.80 272.49 20.15 292.64
2. Sirajgonj
Alokdiar (jamtoli)-
Someshpur (Belkuchi
Upazila) GC Road
3.25 455.64 48.48 504.12
Region - 2
3. Sunamgonj Derai- Jagnnathpur via
Jagdol, Bhurakhati Road
10.06 908.42 - 908.42
Total 18.11 1636.55 68.63 1705.18
Source: Census of Project Affected Persons, 2016
421 private owners in 421 households will be losing 17.05acres of land in three Upazilas. There
are no structures by the side of these three UZRs and no private owner of structures will be
affected and no encroachers of existing land reserve will have to shift their structures back in
their land. The owners of land to be acquired are the units of entitlement under this SRAP
called entitled person (EP) under SRAP and those losing land due to acquisition are awardees
in the legal process of land acquisition.
Most of the cases additional lands will be required for widening or correcting alignments of the
UZRs. No households will be physically displaced due to project works. So, no affected person
will be required to relocate.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 5
1.5 Measure to Minimize land acquisition
Activities for improvement of UZRs have largely been limited to existing available land of the
roads. Acquisition of private land has been proposed only at critical requirements for ensuring
road safety including curve correction and widening. To avoid or minimize land acquisition RTIP-
II has taken different measures from the beginning of project activities. LGED has taken the following
steps to minimize impacts:
Through detail survey, social screening and consultation with stakeholders, land acquisition
has been minimized by using alternative design measures as follows;
1. Pala siding
2. Toe wall, etc
1.6 Social and Resettlement Action Plan (SRAP)
This SRAP has been prepared for the Third year UZR subprojects under RTIP-II requiring land
acquisition, to deal with compensation and resettlement assistance to the persons losing land
and other assets and income. The SRAP deals with the social and resettlement issues resulting
from land acquisition and population displacement. This SRAP includes a social management
plan and contains measures for social development and safeguards compliance, monitoring and
evaluation, budget and implementation arrangement. Tribal peoples are not living in group or
individually by the side of these three UZRs and no tribal people are among the affected
persons. These three subprojects, therefore did not trigger Bank OP 4.10 on Indigenous
Peoples. The SRAP indicates responsibility and timeline for implementation of actions so that
project activities can be implemented in the stipulated timeframe.
These roads are selected for improvement after conducting Social Screening and detail field
survey. There are private land owners along these 3 roads out of 30 to claim for loss of lands
or other properties for the implementation of RTIP-II program. Impacts of subproject
interventions have been assessed to mitigate unavoidable adverse impacts, these affected
persons will be compensated for their land and their other assets. Methodology of assessing
current price of affected properties is mentioned in another paragraph.
1.7 Approval and Disclosure
This SRAP with land acquisition has been prepared by the consultants for the LGED PMU.
PMU will share the SRAP with the World Bank for their review and prior consent. After getting
the consent from the Bank, LGED will take necessary steps for local disclosure and
implementation. The SRAP will be translated into Bangla language prior to local disclosure.
LGED has already informed the communities of the provisions of the SIMF on compensation
and assistance and of the mechanism to hear and resolve grievances of the affected persons and
others. The SRAP will be uploaded in the LGED website immediately after its clearance from the Bank
including a Bangla translation.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 6
2 SOCIO-ECONOMIC INFORMATION
2.1 Sub-project Areas
List of the Upazilas and Districts where land acquisition required for improvement of third year
UZRs is given below
SL. No. Upazila District
01. Dewangonj Jamalpur
02. Kamarkhand Sirajgonj
03. Derai Sunamgonj
2.2 Brief Socioeconomic Profile of Subproject Areas
Socio-economic conditions of three third year sub-projects area wehere of lands acquisition
will be required for improvement of the UZRs is given below.
2.2.1 Dewanganj Upazila
Dewanganj is an Upazila of Jamalpur District in the Division of Dhaka, Bangladesh. RTIP-2
has been developing 4.8 km long UZR- Bagharchar-Sanandabari Hat via Goalkanda Rd, under
Package no: JAM/UZR-64 in this Upazila.
Geography
Dewanganj Upazila is located at 25°06' and 25°26' N 89°40' and 89°51' E . There are 60,716
units of household in the Upazila and total area of the Upazila is 267.51 sq. km.
Demographics
As of the Bangladesh census, 2011 population of Dewanganj Upazila is 2,58,133. Males
constitute 49.05% of the population, and females 50.95%. Average literacy rate in the Upazila
is 32.5% where 35.0% males and 30.1% females are literate.
Administrative
Deawangonj town area is under Dewangonj Pourashava (Municipality) including 9 wards.
There are 8 Unions 42 Mouzas and i66 villages in the Upazila.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 7
Economy
One of the largest sugar factories in
Bangladesh Zeal-Bangla sugar Mill is in
Dewanganj. Main crops of the Upazila are
Paddy, jute, sugarcane, mustard seed, wheat,
potato, garlic, cabbage, cauliflower, brinjal,
varieties of pulse and vegetables. There are
many fisheries, dairies, poultry firms, 1 Cattle
breeding farm, 1 hatchery, 1400 Cottage
Loom industries, 39 handicraft, 72
blacksmith, 11 potteries, 71 bamboo and cane
work, 159 wood work, 96 jute and cotton work
firms in Dwanganj.
Main professions are Agriculture (39.34%),
fishing (1.81%), agricultural labourer
(28.77%), wage labourer (3.76%), business
(9.44%), service (5.69%) and others 11.19%.
Structure
Figure : 2 Dewangonj Upazila
of agricultural Land in the Upazila is, total cultivable land 16385.27 hectares, fallow land
2554.03 hectares; single crop 16.67%, double crop 45.86% and treble crop 9.81%; land under
irrigation 771.35 hectares. Land control Among the peasants 14.04% are landless, 40.96%
marginal, 27.82% small, 13.58% intermediate and 3.60% rich; cultivable land per head is 0.18
hectare.
Hats and bazars are 33, most important markets in the Upazila is Dewanganj Bazar,
Bahadurabad Bazar, Zalorchor Bazar under Bahadurabad Union.
Upazila health complex is the main Health center in the Upazila. Other notable health services
in the Upazila are 8 nos. family planning centre, 2 nos. satellite clinic.
2.2.2 Kamarkhanda Upazila
Kamarkhanda is an Upazila of Sirajganj District under Division of Rajshahi Division. . RTIP-
2 has been developing 3.254 km long UZR- Alokdiar (Jamtoil)-Shomeshpur (Belkuchi
Upazila) GC Road, under Package no: Sirajganj/UZR-76 in this Upazila.
Geography
Kamarkhanda Upazila is located at 24°18' and 24°27' N 89°35' and 89°42' E . Total area of the
Upazila is 90.80 sq. km.
Demographics
Population of Kamarkhanda Upazila is 1,38,645. Males constitutes 49.34% of the population,
and females 50.66%. Average literacy rate in the Upazila is 46.2% where 48.9.0% males and
43.7% females are literate.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 8
Figure : 3 Kamarkhanda Upazila
Administrative
Kamarkhanda Upazila consists of 4 Unions, 55 Mauzas, and 93 villages. The average
Population of each Union Mauzas and village are 34661, 2581 and 1491 respectively.
Economy
Main sources of income in the Upazila is agriculture (47.06%), non-agricultural labourer (4%),
industry (1.14%), business (16.57%), transport and communication (3.87%), service (8.70%),
construction works (0.87%), religious service (0.27%), rent and remittance (0.26%) and others
17.26%. There are a number of dairies and artificial breeding centre in the Upazila.
Private agricultural Landowner is 57.74%, landless 42.26%; agricultural landowner: urban
39.18% and rural 59.17%. Main crops in the Upazila are Paddy, wheat, jute, sugarcane,
mustard, vegetables. Main exports are Mustard seed, molasses, vegetables, bamboo and cane
products.
All the unions of the Upazila are under rural electrification net-work. However 17.26% of the
dwelling households have access to electricity.
Communication facilities in Kamarkhanda is Pucca road 55 km, mud road 208 km; railway 10
km; waterway 4.58 nautical miles. There are 85 Bridges, 97 culverts, 1 Railway station.
There are 16 notable Hat-Bazars (markets) in Kamarkhanda Upazila. The most important
markets in the Uapazila are Jamtail Bazar, Kamarkhanda Bazar, Bhadraghat Bazar; Baradhul
Hat, 'Balarampur Hat.
Upazila health complex is the main Health centre in the Upazila. Other health services are 4
family welfare centre and 2 satellite clinic.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 9
2.2.3 Derai Upazila Derai is an Upazila of Sunamganj District under the Division of Sylhel, Bangladesh. RTIP-2
has been developing 10.06 km long UZR Derai-Jagannathpur via Jagdol, Bhurakhali Road
under Package no. SUN/UZR-32 in this Upazila.
Geography :
Derai is the third biggest Upazila of Sunamganj District in respect of area, Total area of Deari
is 420.93 sq. km. It is located between 24 º39´ and 24º53´ north latitudes and between 91º10´
and 91º28´ east longitudes.
Demography
Population of Dewanganj Upazila is 243690. Males constitute 50.32% of the population, and
females 49.68%. Average literacy rate in the Upazila is 37.1% where 38.5% males and 35.8%
females are literate.
Figure : 4 Derai Upazila
Administrative
There is a Pourashava (municipality) including 9 Wards in Derai. There are 9 Unions, 137
Mouzas and 232 villages.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 10
Economy
Main sources of income Agriculture 74.85%, non-agricultural labourer 5.30%, industry 0.24%,
commerce 8.14%, transport and communication 0.26%, service 3.19%, construction 0.64%,
religious service 0.38%, rent and remittance 0.70% and others 6.30%.
Ownership of agricultural land in the Upazila is Landowner 49.11%, landless 50.89%;
agricultural landowner: urban 43.25% and rural 50.04%. Main crops Paddy, chilli, potato,
onion, vegetables. Jute is an extinct or nearly extinct crop in the Upazila. Main fruits are
Mango, jackfruit, wood-apple, banana, litchi, blackberry, guava.
There are 150 numbers of Fisheries, 5 hatcheries and 120 poultry firms in the Upazila
Communication facilities in Deari Upazila is Pucca road 20 km, mud road 520 km; waterway
46 nautical miles.
Access to electricity All the wards and unions of the upazila are under rural electrification net-
work. However 9.93% of the dwelling households have access to electricity.
Noted factories are Rice mill 12, flour mill 2, saw mill 8, brick-field 5, ice factory 3, pipe
factory 1. There are also cottage industries on weaving and bamboo work.
There are about 20 markets in the Upazila. The important hat-bazars (markets) are Derai,
Rajanagar, Tanakhali, Ratanganj, Bhatipara, Shyamar Char, Banglabazar and Dhalbazar and
Dhal Mela. Fishermen of Derai get a good quantity of fish from haor (big water bodied area).
Main exports Fish.
2.3 Gender and Vulnerability
Women constitute about half of the national population in Bangladesh. They are now
increasingly recognized to play an effective and critical role in the process for sustainable and
equitable development for men and women in the country. The subprojects under RTIP-II in
each phase will therefore include a gender analysis for gender inclusive design, implementation
and operation.
The gender policy of RTIP-II is to promote women’s participation in project planning and
implementation and Minimize social vulnerability. A Senior Sociologist at the PMU assist the
PD in the process of land acquisition and resettlement of affected persons and in managing
social issues including gender and vulnerability and Tribal peoples Issues
2.4 Ethnic Composition and Tribal Peoples
The tribal peoples of Bangladesh refer to native ethnic minorities in southeastern, northwestern,
north-central and northeastern regions of the country. These regions include the Chittagong
Hill Tracts (CHT), Sylhet Division, Rajshahi Division and Mymensingh and Sherpur District.
They are diverse ethnic communities including Australoid, Tibeto-Burman and Sino-Tibetan
races. RTIP-II covers 26 plain districts outside the CHT. The tribal peoples living in the plain
areas make up about 0.6% of the project area population, lower than the national figure of over
1.1%.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 11
However, none of the three UZR subprojects involving acquisition of land is through any
settlement of the tribal communities and no tribal people will be displaced or affected with land
acquisition or improvement of the road. These three subprojects, therefore did not trigger Bank
OP 4.10 on Indigenous Peoples and therefore, Tribal Peoples Plan (TPP) for the Third Year
UZR Subprojects is not required.
2.5 Consultations and Feedback
Stakeholder consultations, especially the FGDs, and Hot-Spot Discussions (HSDs) were
focused on the need for private land acquisition and other public lands along the roads. As to
the potential adverse impacts, LGED explained the impact mitigation provisions adopted in the
SIMF and the details of the implementation arrangements and compensation procedure.
2.5.1 Objectives of Consultation and Participation:
The main objective of consultation and participation in RTIP-II is to disseminate project
objectives and obtain feedbacks from the communities, beneficiaries and affected persons. It
ensures easy accessibility of the project beneficiaries into project activities to provide timely
disclosure of relevant and adequate information that is understandable and readily accessible
to affected people. RTIP-II has been conducting Community consultation in different stages of
project activities to enable the project to incorporate all relevant views of affected people and
other stakeholders into decision making, such as project design, mitigation measures, the
sharing of development benefits and opportunities, and implementation issues.
2.5.2 Consultation Process
Public consultations, especially the FGDs were focused on the need for resuming public lands
along the roads. As to the potential adverse impacts, LGED explained the impact mitigation
provisions adopted in the SIMF and the details of the implementation arrangements and
compensation procedure. During physical verification of the roads, hot-spot discussions were
conducted to gather stakeholder’s feedback to minimize displacement in general and especially
to avoid acquisition of homesteads, commercial establishments, community facilities and so-
on. Consultation includes project beneficiaries, local public representatives, and local elite
persons from civil society, local women groups and others with direct and indirect stakes in the
project. FGDs were conducted in scheduled places where the potential participants were invited
and FGDs were open for everybody. Consultations were carried out at each kilometer roads
during social screening of UZRs sub projects.
The following Table 2.1 shows District wise consultations sessions in different stages of 3rdyear
work implementation of RTIP-II.
The following table (2.1) shows District wise consultations and participants in different stages
of the Third Year Work Program of RTIP-II. Totally 2257 (men and women) persons consulted
through 167 FGDs along the 30 roads and 343 persons consulted were female. In addition 1797
men from the roadside communities consulted in hot spots.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 12
Table 2.1: Consultation and Participation Status
No.
of
Roads
No.
of
FGDs
Number of FGD
Participants
In the mainstream area
No. of key
informants
interviewed
No. of
Hotspot
discussion
Partici-
pants in
hot spot
discussions Male Female Total
Region 1
Dhaka 01 05 53 09 62 08 05 42
Gazipur 01 10 99 21 120 08 15 127
Jamalpur 01 03 29 09 38 08 05 47
Kishoreganj 02 06 65 10 75 16 10 66
Mymensingh 05 26 241 42 283 40 25 170
Netrakona 01 03 31 07 38 08 05 48
Sirajganj 02 06 66 09 75 16 10 68
Sub-Total 13 59 584 107 691 104 75 568
Region 2
Comilla 05 40 428 88 516 27 71 765
Chadpur 01 02 20 12 32 05 06 51
B.Baria 04 20 284 62 346 12 21 162
Habigonj 01 08 176 36 212 04 10 78
Sunamgonj 03 09 132 05 137 09 09 66
Chittagong 03 17 290 33 323 12 13 106
Sub-Total 17 108 1449 257 1706 78 143 1359
Total 30 155 1914 343 2257 173 203 1796
Source: Social Screening Reports of Phase-III UZRs
In addition, women specially consulted through 49 FGDs along the 30 roads in the 14
project districts. Rate of participation of women in these FGDs were low. To convey the
message of development to more female project beneficiaries and to gain feedback from
them, at least one separate FGD conducted with only female beneficiaries of mainstream
population area of each UZR. A total of 390 women participated in 49 FGDs (Table 2.2).
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 13
Table 2.2 District-Wise FGDs with Women Groups
SL
No.
Districts No. of
Roads
No. of
FGDs
Number of female
participants
1 Region 1
2 Dhaka 01 02 18
3 Gazipur 01 02 21
4 Jamalpur 01 02 12
5 Kishoreganj 02 04 26
6 Mymensingh 05 10 60
7 Netrakona 01 03 19
8 Sirajganj 02 04 36
Sub-total 13 27 192
Region -2
1. Comilla 05 08 66
2. Chadpur 01 01 13
3. B.Baria 04 04 30
4. Habigonj 01 02 27
5. Sunamgonj 03 03 31
6. Chittagong 03 04 31
Sub-Total 17 23 214
Total 30 49 390
2.5.3 Summary of Community Feedback and Project Response
Different issues were raised in the consultation process. Summary of the issues raised in the
consultations were as follows:
i) Marking the road area by accurate measurement to avoid unnecessary displacement.
ii) Avoiding displacement as far as possible.
iii) Allowing sufficient time to transfer land..
iv) Arranging government land for replacement.
v) Avoiding cutting down trees as far as possible.
vii) Giving preference to the affected people in construction works.
viii) Arranging compensation as early as possible.
ix) Considering market value at the time of fixing Compensation.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 14
x) Considering vulnerability.
xi) Using proper materials for construction of the UZR.
xii) Supervising with responsibility.
Project Response:
The D&S Consultant appointed survey firms for detailed engineering survey on ground. The
survey firms collected Mauza Map (cadastral map) and arranged engineering survey based on
the maps. The survey reports were reviewed by LGED for acceptance through site verification.
So, requirement of land area were identified accurately. Measures were taken to acquire
minimum quantity of land. The affected 62 persons will get Tk 1281,875 as transition
allowance equivalent to price of three years crops of their land and 241 owner of private land
will get Tk.494661 for their standing crops in the land. They will get compensation for their
affected land. 62 persons will loss their agricultural lands due to acquisition amounts 20% or
more of the total agricultural land of affected person. They will get Transition Allowance.
Transition allowance @ BDT 1500 per decimal of acquired agricultural land ( if acquisition
amounts 20% or more of agricultural land of affected person/s) has been mentioned in the loss
category 5 (Loss of agricultural, business, employment & rental income) of Entitle Matrix
(Page 21) in the SIMF Special assistance will be provided to the vulnerable affected persons
including the vulnerable women head of households. LGED, D&S Consultant, and
Management Consultant have arrangement to monitor the quality of the construction works
and activities for social impact management.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 15
3 LEGAL AND POLICY FRAMEWORK
3.1 Legal Framework
The principal legal instrument governing land acquisition in Bangladesh is the Acquisition and
Requisition of Immovable Property Ordinance, 1982 (Ordinance II of 1982 including
amendments up to 1994) and other land laws and administrative manuals relevant to alluvion/
deluvion land, char and khas land administration in Bangladesh. The 1982 Ordinance requires
that compensation be paid for (i) land and assets permanently acquired (including standing
crops, trees, houses); and (ii) any other damages caused by such acquisition. The Deputy
Commissioner (DC) determines (a) market value of acquired assets on the date of notice of
acquisition (based on the registered value of similar property bought and/or sold in the area
over the preceding 12 months), and (b) 50% premium on the assessed value (other than crops)
due to compulsory acquisition.
The Ordinance in Bangladesh directs the Government to pay compensation to only titled
owners for their acquired assets. The Ordinance does not cover project affected persons without
titles like informal settler (squatters), occupiers, and informal tenants and lease-holders
(without registered agreements). So, social and economic impacts as a consequence of land
acquisition are not dealt by this Ordinance. The affected persons without titles in Phase II
operation for improvements of UZRs in Region-1 are covered under the guidelines and policy
framework adopted in the SIMF.
3.2 The World Bank Policy
Social safeguards compliance issues are generally expected to relate to the World Bank’s
Operational Policies on Involuntary Resettlement (OP 4.12) and Indigenous Peoples (OP 4.10).
The WB policy is to anticipate and avoid or where avoidance is not possible, minimize adverse
social and economic impacts from land acquisition or restrictions on land use by (i) providing
compensation for loss of assets at replacement cost and (ii) ensure that resettlement activities
implemented with appropriate disclosure of information, consultation and informing properly
the affected persons. The World Bank policy on Involuntary Resettlement is to improve
livelihoods or restore livelihoods of displaced person at least up to the pre-project condition
considering gender, vulnerability and disability issues.
The Bank’s broad objective towards indigenous people, as for all the people in its member
countries to ensure that the development process fosters full respects for their dignity, human
rights, and cultural uniqueness. More specifically, the objective at the center of this directive
is to ensure that indigenous peoples do not suffer adverse effects during the development
process, particularly from Bank-financed projects, and that they receive culturally compatible
social and economic benefits.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 16
3.3 Project Policy Framework
3.3.1 Basic Policy Principles
LGED will select the subprojects and consider alternative designs with an emphasis on
avoiding or minimizing adverse impacts on private landowners and those who have been
using its own and other public lands with and without authorization. To minimize adverse
impacts, LGED will use the following principles:
• Avoid or minimize acquisition of private lands;
• Use as much public land as possible;
• Avoid or minimize displacement from homesteads,
• Loss of land valued higher in terms of productivity and uses,
• Loss of buildings/structures that are used for permanent business/commercial activities.
• Dislocation of squatters/encroachers; and
• Impacts on community facilities, such as educational institutions, places of worship,
cemeteries, etc., and buildings/structures that are socially and historically important.
• Sections of the roads will be realigned only where it is necessary to meet the required
technical and safety standards, or to avoid affecting concentrations of commercial activities.
Where adverse impacts are found unavoidable, LGED will adopt appropriate mitigation
measures as per the SIMF.
3.3.2. Impact Mitigation Principles
LGED will follow Impact Mitigation Principles stated as guidelines in the SIMF during
implementation of this SRAP. Guidelines to mitigate impacts are as follows
• Resettlement of the project affected persons will be planned and developed as an integral
part of the subproject design.
• Project affected persons will be given sufficient time and assurance of compensation for
their affected properties. They will be compensated for their land and other assets before
transferring their land to LGED and before any civil works on their land begin..
• All affected non-land assets, trees, seasonal and perennial crops, orchards and other
immovable items of value, will be compensated at replacement costs fixed at the time of
cut-off-date
• Absence of legal titles in cases of public land users will not be considered a bar to
resettlement and rehabilitation assistance, especially for the socio-economically vulnerable
groups.
• Affected persons will be compensated for their crops in the land, fruits in the trees and
severity of losses.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 17
• Vulnerability, in terms of socio-economic characteristics of the affected persons/
households, will be identified and mitigated according to the provisions as per the SIMF.
• Plan and implement the construction works in a manner to avoid/minimize inconvenience
and disruption to the road users, and to business/trading activities where applicable.
• Where the project activities cause community-wide impacts affecting community facilities,
access to common property resources, etc., LGED will rebuild them with its own resources
and/or provide alternatives in consultation with the user communities.
•
3.3.3 Eligibility for Compensation and Assistance
Regardless of their tenure status to the lands used for a subproject, the affected
persons/households will be eligible for compensation and assistance. According to the PAP
Census, LGED has identified the following impacts for mitigation:
Private Landowners : Persons who have legal rights to the affected lands and other
assets, such as houses, other structures, trees etc. grows or built
on them. (There are no affected persons without title in the sub-
project areas).
Owners of Trees
businesses
: Owners of trees will be compensated in consideration of their
size, maturity and other characteristics that influence in market
price. The owners of trees will be allowed to keep the fell own
trees.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 18
4. SOCIAL MANAGEMENT PLAN
The Social Management Plan addresses all non-safeguards social issues related to
implementation of the 03 UZR subprojects. The sub-projects are located in three project
Districts of RTIP-II. List of the subprojects with acquisition of private land are given below:
Table 4.1 : List of the UZRS in three districts with acquisition
4.1 Ensuring participation of local people and transparency of the resettlement plan
At the time of preparation of LAP & SRAP, participatory consultation approaches were
followed for acquisition of private land where required. The list of Project Affected Person
(PAPs) titled and non-titled and properties were reviewed in the concerned stakeholder
consultation meetings. As a part of the SRAP preparation, the PAPs were informed in details
about the compensation policies adopted in the SRAP, the payment process, the documents
required to claim the Compensation-Under-Law' (CUL) and the arrangements for 'spot
payment' by the acquisition officials, and the procedure to bring grievances to the Grievance
Redress Committees (GRCs) before making payment.
The SIMF has been made available to the communities in local Bangla language and all social
management instruments have been developed in Bangla including the SCM and GRM.
4.2. Grievance Redress Mechanism (GRM)
4.2.1. Introduction and Objectives
LGED has adopted a Suggestion and Complaint Mechanism (SCM) for addressing project
related complaints and grievances on procurement, contract management, land acquisition,
resettlement and environmental impact management. SCM suggested forming committees in
district level and at Upazila level including LGED, local people who have connectivity with
mass people and project affected persons. Main objective of these committees is to solve
grievances in initial stage. The committees ensure easy accessibility of the project
beneficiaries. This will help to avoid lengthy legal procedure to mitigate problems and public
unrest which would delay the commencement and completion of project activities.
Sl.
# Package No. Location Name of the UZR
Length
(km)
Region- 1
01. JAM/UZR-64 Jamalpur
Bagharchar-Sananadabari Via
Goalkanda Rd. 4.80
02. SIR/UZR-76
Sirajgonj Alokdiar (jamtoli)- Someshpur
(Belkuchi Upazila) GC Road 3.25
Region-2
03. SUN/UZR-32 Sunamgonj Derai- Jagnnathpur via Jagdol,
Bhurakhati Road 10.06
`Total 3.1 18.11
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 19
[4.2.2. Grievance Redress Focal Points
A Suggestion and Complaint Committee (SCC) at the district level already active for
receiving and settlement of complaints and suggestions from local communities on
procurement, contract management, corruption and fraud, financial management, social,
environmental, health safety. A Grievance Redress Committee (GRC) at the Upazila level
already active to ensure accessibility by the affected persons for resolving land acquisition
and resettlement related grievances. If the resolution attempt at the local level fails, the GRC
refers the complaint to District level SCC. It is responsibility of GRC to inform the PAPs fully
about their rights to offer suggestion and make complaints including grievances related to
resettlement process. GRC arrange investigations and hearing of the complaints. Where tribal
people are among the affected persons, the membership composition of the GRCs will take
into account any traditional conflict resolution arrangements that the tribal communities may
practice.
The Executive Engineer at the district level will be the focal point for SCCs and the Upazila
Engineer will be the focal point for GRCs at the Upazila level.
4.2.3. Formation of GRC and SCC:
SCC is consisting of a seven members committee. LGED Executive Engineer is convener and
District Sociologist is Member Secretary of SCC for the concerned project District. The other
members of SCC are Upazila Engineer of respective Upazila, District Administration level
first class officer, two local civil society member, and representative of Contractors.
GRC is at the Upazila level committee for redressing grievances. Upazila LGED Engineer is
the Convener and LGED Community Organizer is the Member Secretary of GRC. The other
GRC members are Local UP Member/Ward Councilor, Teacher from local educational
institution, Representative of Local NGO, Representative from Local Women’s Group and
Representative from the PAP Group.
All the GRCs and SSCs are subject to prior approval of Project Director.
4.2.4. Orientation and Disclosure of GRC and SCC
Orientation and disclosure sessions on SCC and GRC arranged at district level. XENs, Upazila
Engineers, Assistant Engineers and Community Organizers attended the sessions and
facilitated by the Senior Sociologist of RTIP-II PMU, Social Development and Resettlement
Specialist from MS Consultants, Social Development and Resettlement Specialists from DS
Consultants of Region 1 & 2. All of these sessions were presided over by Senior LGED
Officials.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 20
Disclosure meetings on SCC and GRC arranged at district level. All the SCC and GRC
members including XENs, Upazila Engineers, Assistant Engineers, Community Organizers,
public representatives, member local communities attended in the meeting.
Ledger Books and other supporting materials have been provided to the District and Upazila
LGED offices for documentation of the SCM and GRM processes. These books are opened
to all interested persons and entities for reference.
4.2.5. Grievance Redress Process
Grievance petition and timeline: Any person including the project affected persons can
submit his/her complaints directly to the complaint Box or by directly writing in SCM Books,
sending complaints through postal mail or email. All complains to GRC will be received at
the office of the Upazila Engineer through the Community Organizer.
The community organizer and/or the District Sociologist will visit the ongoing subprojects
regularly in each month with the role of grievance redress focal person. In each visit, they will
interact with the residents alongside the UZRs and owners of affected land whether acquired
or resumed from authorized or unauthorized occupation. If any complaints or grievances are
voiced by any of the community members, those will be formally received in writing within
a week and produced to the GRC or SCC as appropriate for resolution.
Any complaints on project social development and resettlement process should be produced
or bring in notices to the grievance focal points within 6 months of commencements of civil
works for subprojects with implementation period of 12 months. The local LGED offices will
inform the communities and affected persons while disclosing about the SCM. Any petitioner
will be notified for hearing at least 5 working days before.
Hearing and Resolution: GRCs and SCCs sit at least once in a month in their respective
offices. Written notice issues and cellular phone message sent for Complainers to appear in
the hearing. The committees ensure proper presentation of complaints and grievances as well
as impartial hearings and investigations and transparent resolution. If the resolution attempt at
the local level fails, GRC refers the complaint to the SCC. The SCC makes decision and
communicates it to the concerned GRC within a week of the complaint receipt. If the
aggrieved person is not satisfied with the decision of the SCC, then SCC refers the case to
PMU, LGED, Dhaka. LGED can refer the case to the Ministry of Local Government, Rural
Development & Cooperatives (MLGRD&C) with the minutes of hearings at local and
headquarters level. The Ministry takes decision on unsolved cases within four weeks by an
official designated by the Secretary of Local Government Division of MLGRD&C. A deed of
understanding is prepared between the aggrieved person/s and GRC/SCC/LGED for a settled
complaint. A decision agreed with the aggrieved person/s at any level of hearing is binding
upon LGED.
Complaint at the World Bank GRS: An aggrieved person can also place his/her complaint
to the World Bank Grievance Redress Service (GRS), in the event that he/she is not satisfied
with the resolution from the project GRM. Complaints must be in writing in the official
language of the World Bank and addressed to the World Bank GRS. Complaints at GRS will
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 21
be accepted by mail, fax, email and by hand delivery to the GRS at the World Bank
Headquarters in Washington or World Bank Country Offices.
GRS Contacts: Email: [email protected]
Fax (Washington): +1-202-614-7313
Country Office Fax (Dhaka): 02 5566-7778
4.2.6. GRC Documentation and Reporting
Complaints and suggestions may come to GRC in different methods. Whatever be the method
- writing in SCM Book, postal mail or e-mail, all the complaints will be written in Complaint
Ledger Register. The recorded complaints in the Complaint Ledger Register which are eligible
for hearing are recorded in Intake Register with a Case number, detail address of the
complainer and summary of the objection. After hearing decision of the GRC, date of field
investigation, date & result of hearing and if aggrieved person is satisfied from hearing then
agreement with him are written in Resolution Register. After agreement with aggrieved
person or after referring unsolved cases to SCC, GRC records the case history, progress and
management action in the Closing Register.
Grievance resolution is a continuous process. GRC and SCC send reports on all resolved and
unresolved complaints to PMU and PMU keeps all records. PMU also prepares periodic reports
on grievance resolution process and publish on the LGED Website.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 22
5. RESETTLEMENT ACTION PLAN (RAP)
5.1. Subprojects with Involuntary Resettlement Issues
A total of 18.11 km roads in 03 UZRs will be improved with acquisition of private land.
Despite cordial efforts from LGED, involuntary resettlement issues could not avoided in these
three subprojects.
This Resettlement Action Plan (RAP) has been prepared to deal with the issues related to
involuntary resettlement. Social safeguard compliance according to the SIMF is mandatory
for all subprojects under RTIP-II.
5.2 Objectives of the RAP
Overall objectives of the RAP are to compensate the unavoidable losses and restore pre-project
income stream and livelihoods of the affected persons. This RAP covers the losses and impacts
those could not be avoided with any other ways. The specific objectives include the following:
1. Identify the affected persons experiencing loss of land, assets and income due to the
project.
2. Assess their individual losses and determine compensation loss of assets and cash
assistance for livelihood restoration.
3. Engage the affected persons in resettlement process and address their grievances
related resettlement.
4. Provide institutional support to the affected persons for compensation and
livelihood restoration assistance.
5. Carry out disclosure of information, consultation, and the informed participation of
those affected.
6. Provide opportunities for interested vulnerable persons including women to
employment in project civil works.
5.3 Strategy and Guidelines for Land Acquisition and Resettlement
The Project strategy on use of land is adopted as follows:
As far as possible, the alignment of UZR will be selected where the improvement works can
be carried out within the existing alignment.
However, at special circumstances of critical requirements, in three UZRS of 18.11 km under
Region-1and Region 2 acquisition of private land and trees cannot be avoided. The RAP has
been developed for management of losses due to acquisition and entitlements as per the SIMF
commensurate to the losses.
These roads are selected through social screening and census of affected persons where
involuntary resettlement issues were identified. Consultation with beneficiaries was held at that
time. Further consultation will be held with them after finalization of the RAP. Market price of
their lost properties has been assessed during PAP Census. The loss of asset and income and
their current market price will be verified before RAP implementation. DC office and LGED
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 23
will directly pay the affected persons for their lost properties and diminished income so that
they can receive replacement cost for their losses.
5.4 Subproject Impact and Affected Persons
5.4.1 Sub-Project Area and Impacts
Most of the required land is agricultural. 421 number of HH and 2512number of HH members
(PAPs) (Male 1173 and female 1339) will be affected from this acquisition. All the affected
HHs was interviewed and their loss is measured. The UZRs have been developing on the
existing alignments. In most of the cases land required for widening of UZRs. So, threat of
totally displacement is very low.
The completed UZRs will enhance accessibility of the beneficiaries of the UZRs.
Transportation will be easy, fast and economic. Marketing of local products will be more
dynamic. Doors will be open for new employment in transport, trading etc. It is expected that
impact of the UZRs will be impressive.
Table 5.1 Project Affected Units in three UZRs with acquisition
SL Name of UZR and package number
No. of HH
members
(PAPs)
No. of Affected Households
Male
headed
household
Female
headed
Household
Total
Region- 1
1 Bagharchar-Sananadabari Via
Goalkanda Rd.(JAM/UZR-64) 482 53 03 56
2 Alokdiar (jamtoli)- Someshpur
(Belkuchi Upazila) GC
Road(SIR/UZR-76)
1228
206 08 214
Region- 2
3. Derai- Jagnnathpur via Jagdol,
Bhurakhati Road(SUN/UZR-32)
802 146 05 151
Total 2512 405 16 421
Source: Census of Project Affected Persons, 2016
5.4.2 Occupations of the Affected Households Heads:
Though displacement will be done for the better interest of the society, but there will be more
or less effect on the people whose properties will be shifted. It was tried to identify the losses
in the PAPs census. It has been revealed from the census that among 421 numbers of affected
HH, 405 are male and 16 are female household head. Most of the PAPs found depend on
agriculture. Agriculture is the primary occupation of 86.93% of the affected households
followed by 3.80% Housewife and business 3.09 %. Ninety six PAPs HH found have secondary
occupation.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 24
Table-: 5.2: Primary and Secondary Occupations of the Affected Households
Source: Census of Project Affected Persons, 2016
5.4.3 Project Affected Persons by Gender
Project affected persons Survey indicates that among 421 Households there are only 16 female
headed household who will loss land and trees in result of acquisition.
Table 5.3 shows that 2512 will be affected from project development activities. Among these
project affected persons (PAPs) 1173 (46.7%) male and 1339 (53.3%) female.
Table 5.3: Distribution of PAPs by gender
SL. Gender Number %
1. Male 1173 46.7
2. Female 1339 53.3
3. Total 2512 100 Source: Census of Project Affected Persons, 2016
There are 16 female household heads who will be affected from acquisition. Traditionally most
of the rural females in Bangladesh are not involved in income generation activities. Table 5.4
shows that by profession 100% female household heads are housewife. All of these females
have earning from agriculture. Moreover, other members of the household have income form
different sources.
Table 5.4 : Distribution of female household heads by profession and type of loss
Sl
# Profession
Type of Land Type of loss of the female PAPs
Number Agricultur
e Land
Residentia
l Land
Commercial
Land
Residentia
l Structure
Commercia
l Structure Trees
1. Housewif
e
16 - - - - - 16
2. Business 00 - - - - - -
3. Labor 00 - - - - - -
4. Other
income
00 - - - - - -
Total 16 - - - - - 16
Source: Census of Project Affected Persons, 2016
Primary Occupation Secondary Occupation
Ag
ricu
ltu
re
Bu
sin
ess
La
bo
r
Ho
use
wif
e
Oth
ers
To
tal
Ag
ricu
ltu
re
Bu
sin
ess
La
bo
r
Ho
use
wif
e
Oth
ers
To
tal
366 13 08 16 18 421 26 17 21 0 32 96
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 25
5.4.4 House/Structure Affected on Private Lands
Three UZRs in Jamalpur, Sirajgonj and Sunamgonj are developing mostly on the existing
alignment. The UZRs crossed open agricultural fields. Moreover, UZR of Sunamgonj is in the
Haor (large water body area) area where filed remains under water for six months in the year.
None of the three UZRs are usable in the wet season. During PAPs census no structures either
residential or business found annexed with the UZRs. So, no structures on the private lands or
on public lands will be affected for implementation of the three UZRS. No one will be
physically displaced or loss income during development of the UZRs.
5.4.5 Transition Allowance
If the acquired land is agricultural and amounts to 20% or more of the total productive land
owned by an affected household, a transition allowance is provisioned for addressing the
severity of loss. Transition allowance for severe loss of agricultural land is equivalent to three
times harvest value of the crops produced in a year on the acquired land.
Most of the land proposed for acquisition for improvement of 3rd year UZRs under the
subprojects are agricultural land. Among the three subprojects, 62 land owners will loss
agricultural lands amounts to 20% or more of their total productive land. These severely
affected agri-land owners are eligible for transition allowance (TA) @ BDT 1500 per decimal
of acquired agricultural land according to Entitlement Matrix of the SIMF (source- Entitlement
Matrix, No. 5- LOSS OF AGRICULTURAL, BUSINESS, EMPLOYMENT & RENTAL
INCOME).
List of the affected persons eligible for transition allowance is given at Appendix-11. Total
allowance and number of affected owners is shown in the following Table.
Table 5.5 Transition allowance and number of eligible persons for the allowance
SL Name of the subprojects and Package
number
Number of land
owners affected
severely
Volume
of land
acquired
(decimal)
Total
transition
allowance @
BDT 1500
per decimal Male Female
Region 1
1. Bagharchar-Sananadabari Via Goalkanda
Rd.(JAM/UZR-64) 19 0 173.72
260580
2.
Alokdiar (jamtoli)- Someshpur
(Belkuchi Upazila) GC Road
(SIR/UZR-76)
13 01 141.21 211820
Sub- Total 32 01 314.93 472400
Region 2
3. Derai- Jagnnathpur via Jagdol,
Bhurakhati Road (SUN/UZR-32) 27 02 539.65 809475
Total 59 03 854.58 1281875
Source: Census of Project Affected Persons, 2016
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 26
5.4.6 Trees Affected
Trees are another major loss item. During the Census survey on project affected persons the
investigators walked through the UZRs. The investigators identified 765 trees those will be cut
down for the development works. Of these affected trees, 63 trees are large,404 trees are
medium in size and 298 are small. In terms of productivity, 192 of these trees are fruit trees
and 573 are timber trees. Value of the affected trees determined by asking local people, affected
person and local timber traders for same kind of trees. The value will be reviewed by Market
Price Survey Committee before payment of compensation. Details of the affected trees can be
seen in Appendix 10.
In the light of SIMF precaution was taken to avoid unnecessary fell down of trees. More caution
will be taken at the time of implementation of civil works to save trees as far as possible. Within
the acquired land trees are affected as per the following Table 5.6:
Table-5.6: Trees Affected on acquired Lands by Contract and Districts
Source: Census of Project Affected Persons, 2016
Note: Sizes of trees are measured by circumference:
Small:7″ to 2′-6″; Medium: 2′-7″ to 5′-0″ and large 5′-0″ and more.
(Source: Divisional Forest Officer (DFO), Dhaka)
5.4.7 Standing Crops
At the time of PAP census, standing crops were identified on the acquired agricultural land of
the amount of 7.22 acres. The acquired lands with standing crops are owned by 241 owners,
The owners will be affected by losing standing crops from their agricultural land. Market price
of the affected crops were determined discussing with the local farmers. The following table
(Table 5.7) shows affected standing crops in the acquired land, number of affected persons and
compensation for the loss.
District Package Number of Trees (Fruit) Number of Trees (Timber) Total
trees
Total
Affected
Owners Large Medium Small Total Large Medium Small Total
Region 1
Jamalpur JAM/UZR-64
0 13 0 13 0 57 120 177 190 12
Sirajgonj SIR/UZR-76 45 113 21 179 18 221 157 396 575 76
Sub-total 45 126 21 192 18 278 177 573 765 88
Region 2
Sunamgonj SUN/UZR-32 - - - - - - - - - -
Total 45 126 21 192 18 278 277 573 765 88
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 27
Table- : 5.7 Affected Standing Crops in the three UZRs with acquisition.
Sl. Name of the subproject
Affected
land
(acre)
Number of
affected owners
of land
Compensation
(Tk.)
Male Female
Region 1
1. Bagharchar-Sananadabari Via
Goalkanda Rd.(JAM/UZR-64) 269.32 49 03 164283
2. Alokdiar (jamtoli)- Someshpur
(Belkuchi Upazila) GC Road
(SIR/UZR-76) 453.02 182 07 330378
Region 2
3. Derai- Jagnnathpur via Jagdol,
Bhurakhati Road (SUN/UZR-32)
- - - -
Total 722.34 231 10 494661
Source: Census of Project Affected Persons, 2016
5.4.8 Loss of Fruits before Harvesting
The UZR subprojects passed across the agricultural field. At present only a few people are
living along the UZRs. Most of the affected trees grew few years ago after construction of the
road in first stage. Before existence of the road the land was low agricultural land. Due to
improvement of the UZRs 34 owners will loss 192 fruit trees. All of the affected trees are not
matured enough for fruits. Fruits grow only in few trees of the UZRs. In Region 1 PAPs census
was conducted after harvesting of fruits at JAM/UZR-64 and SIR/UZR-76. UZR SUN/UZR-
32 is in the haor area. There are no trees by the UZR. So, no trees will be felled before
harvesting in the subproject area. None of these trees are from any orchard used as a source of
livelihood. Mainly fruits of these trees used for self-consumption of the affected persons. But
the owners of the fruit trees will be compensated for fruits according to type of trees and number
of years required to get a new tree at fruit bearing age.
5.5 Eligibility of Entitlement
5.5.1 Eligibility Cut-off-Date
Compensation eligibility will be limited by a cut-off date for each project or subproject under
financing facility on the day of the beginning of the census survey for the impact assessment
in order to avoid an influx of outsiders. Each affected person will be identified and confirms
their presence on the site prior to the cut-off date. If anybody claims after the cut-off date will
not be eligible for compensation. In this RAP the following entitlements are applicable for
affected persons losing land and trees. There will also be special provisions for vulnerable
displaced persons. Cut-off-Dates of the Third Year UZRs with acquisition of private lands is
given below.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 28
Table-5.8: Date of commencement of census (cut-off-date) by contract packages/sub
projects.
Sl.
Districts
Package No/Name of sub-projects
Start date
of census
(Beginning)
Cut-off-
date
(Ending
date)
Region-1
1 Jamalpur
Bagharchar-Sananadabari Via Goalkanda
Rd.(JAM/UZR-64) 02.02.2016 03.02.201
6
2 Sirajgonj
Alokdiar (jamtoli)- Someshpur (Belkuchi Upazila)
GC Road (SIR/UZR-76) 01.04.2016 03.04.201
6
Region- 2
3. Sunamgonj
Derai- Jagnnathpur via Jagdol, Bhurakhati Road
(SUN/UZR-32) 10.06.2016 13.06.201
6 Source: Census of Project Affected Persons, 2016
5.5.2 Eligible Person for Compensation and Assistance
The following table shows that from the three UZRs in three districts 421 HH will be affected,
1705.18decimal (17.05 acre) of land will be required for the UZRs and affected persons for
lands will be compensated Taka 34084170. Total 765 trees owned by 110 HHs will be required
to cut down for development works and the owners will be compensated Tk. 2898000 for the
affected trees.
Table-5.9:Number of affected HHs and summary of their losses for sub-project works
Sl. Name of
Road
Land Trees Total
compen-
sation
(land +
tree)
(Taka)
Owne
r Nos Decimal
Compensa
tion
(Taka)
Owner
Nos
Large
Nos
Medium
Nos Small
Nos
Compen
-sation
for trees
(Taka)
Compe
nsation
for
fruits
Re gion 1 1. Bagharchar-
Sananadabari
Via
Goalkanda
Rd.
56 292.64 7084593 12 0 70 120 141500 7000 7233093
2. Alokdiar
(jamtoli)-
Someshpur
(Belkuchi
Upazila) GC
Road
214 504.12 25379483 76 63 334 178 2756500 173000 28308983
Sub-Total 270 796.76 32464076 88 63 404 298 2898000 180000 35542076
Re gion 2
3. Derai-
Jagnnathpur
via Jagdol,
Bhurakhati
Road
151 908.42 6805047 - - - - - - 6805047
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 29
Source: Census of Project Affected Persons, 2016
Replacement cost includes current market price of land plus the expenditure for legalizing the
land transfer including cost of stamp purchase and other duties (Please see Annex B2 of SIMF).
In addition to this amount 16 female headed household will get Tk.3,24,00.00 as special
assistance to recover losses. They may need to hire mentors and workers in this regard.
5.5.3 Eligibility Considerations
RTIP-II resettlement measures include compensation for acquired assets at replacement cost.
According to the SIMF provisions, replacement cost for land and structures on the land is
applicable for acquisition of private land only. As there are no squatters or any type of illegal
occupiers on the road area, all the affected persons will be compensated on the basis of their
legal entitlements.
5.5.4 Vulnerability :
During PAPs census investigators visited household physically and tried to identify
vulnerability to assess requirements of assistance .National Poverty Line of Bangladesh (per
capita daily income US$2.00) considered to assess whether any households were vulnerable.
The other criteria were also considered as poor women headed households, landless and
marginal farmers, peoples with disability, elderly, indigenous people. Vulnerability was not
found in the male headed households. There are 16 Female headed household and they have
income from agricultural lands. Some of them have income from tiny poultry and cow & goat
rearing. Other members of these female headed household have also income. Though
vulnerability is not marked in these household but they need assistance for rapid recovering
from losses due to acquisition. Their requirement of assistance assessed and allocated Taka.
Tk.3,24,000.00 in the budget. Vulnerability will be further reviewed before payment of
compensation.
5.5.5 Entitlement Matrix
A Compensation and Entitlement Matrix for these subprojects has been prepared for attending
the losses of the affected persons. This Matrix has been constructed on the basis of SIMF
Entitlement Matrix (Appendix-4) in compliance with the OP 4.12 of the World Bank on
Involuntary Resettlement. Table 5.10 references the losses by impact category qualifying
compensation and assistance as per the EM included with the SIMF adopted for RTIP-II.
Table 5.10 Losses by Impact Categories by the Subproject Intervention
Loss category Unit of
losses
Quantity
of losses
No. of
Entitled
Persons
Reference of SIMF EM (clause #)
Region 1 Package No. JAM/UZR-64
Total 421 1705.18 39269123 88 63 404 298 2898000 180000 42347123
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 30
Land (agri &
residential)
Deci 292.64 56 Compensation-under-law (CUL) or replacement cost
(Market price with registration cost), whichever is
higher.
Ref: Loss category 1 (Loss of agricultural & other
lands) of SIMF.
Structures Sft 0 0 Compensation-under-law (CUL) or replacement cost
(Market price with registration cost), whichever is
higher.
Shiftable structures: Transfer and
Reconstruction Grant (TRG) @ Tk 50 per
sq.ft. of floor area with a minimum of Tk
4,000 and maximum of Tk 6,000.
· Non-shiftable structures11: TRG @ Tk 75 per
sq.ft. of floor area with minimum of Tk 5,000
and maximum of Tk 7,000.
· Allowed to keep the salvageable materials.
Ref: Loss category 3 ( Loss of houses/structures
used for living, business & other
Activities) of SIMF.
Tress No. 190 12 Current market value of trees, based on
species, size and maturity.
Current market prices of fruits on trees,
if they are felled before harvest.
· Owners are allowed to fell the trees and keep
them
- Ref: Loss category 4 (Loss of trees and crops on
acquired private & public lands)
Standing Crops Deci 269.32 52 Current market price of crops based on Variety.
Owners are allowed to harvest the crops, and keep
them.·
Ref: Loss category 4 (Loss of trees and crops on
acquired private & public lands)
Fruits
No. 13 trees 02
Current market price of fruits on trees, if they are
felled before harvest. Owners are allowed to
harvest the fruits and keep them.
Ref: Ref: Loss category 4 (Loss of trees and crops
on acquired private & public lands)
Price of fruit/fruit trees will be determined
considering the maturity and harvest price of fruits.
Ref: Clause 41, (1)- Acquired land and other assets,
Bullet-3.
Severe impact on
productive land
(loss of more than
20% of land holding
of affected owner)
Deci 174 19
Transition allowance @ BDT 1500 per decimal of
acquired agricultural land.
Ref: Loss category 5 (Loss of agricultural, business,
employment & rental income) in SIMF.
Assistance Deci 9.76 03 Special assistance provided on account of impacts
by gender-
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 31
Ref:clause 50, Resettlement Plan RP,Bullet 6.SIMF
Region 1 Package No. SIR/UZR- 76
Land (agri &
residential)
Deci 504 214 Compensation-under-law (CUL) or replacement
cost (Market price with registration cost), whichever
is higher.
Ref: Loss category 1 (Loss of agricultural & other
lands) of SIMF.
Structures Sft 0 0 Compensation-under-law (CUL) or replacement
cost (Market price with registration cost),
whichever is higher.
Shiftable structures: Transfer and
Reconstruction Grant (TRG) @ Tk 50 per
sq.ft. of floor area with a minimum of Tk
4,000 and maximum of Tk 6,000.
· Non-shiftable structures11: TRG @ Tk 75 per
sq.ft. of floor area with minimum of Tk 5,000
and maximum of Tk 7,000.
· Allowed to keep the salvageable materials.
Ref: Loss category 3 ( Loss of houses/structures
used for living, business & other
Activities) of SIMF.
Tress No. 575 76 Current market value of trees, based on
species, size and maturity.
Current market prices of fruits on trees,
if they are felled before harvest.
· Owners are allowed to fell the trees and keep
them
- Ref: Loss category 4 (Loss of trees and crops on
acquired private & public lands)
Standing Crops Deci 453.02 189 Current market price of crops based on Variety.
Owners are allowed to harvest the crops, and keep
them.·
Ref: Loss category 4 (Loss of trees and crops on
acquired private & public lands)
Fruit
No. 179 trees 32
Current market price of fruits on trees, if they are
felled before harvest. Owners are allowed to
harvest the fruits and keep them.
Ref: Ref: Loss category 4 (Loss of trees and crops
on acquired private & public lands)
Price of fruit/fruit trees will be determined
considering the maturity and harvest price of fruits.
Ref: Clause 41, (1)- Acquired land and other
assets, Bullet-3.
Severe impact on
productive land
Deci 134.71
14
Transition allowance @ BDT 1500 per decimal of
acquired agricultural land.
Ref: Loss category 5 (Loss of agricultural, business,
employment & rental income) in SIMF.
Assistance Deci 21.48 08 Special assistance provided on account of impacts
by gender-
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 32
Ref:clause 50, Resettlement Plan RP,Bullet 6.
SIMF
Region 2 Package No. SUN/UZR-32
Land (agri only) Deci 908.42 151 Compensation-under-law (CUL) or replacement
cost (Market price with registration cost),
whichever is higher.
Ref: Loss category 1 (Loss of agricultural & other
lands) of SIMF.
Structures Sft 0 0 No impacts
Tress No. 0 0 No impacts
Standing Crops Deci 0 0 No impacts
Severe impact on
productive land Deci 540
29
Transition allowance @ BDT 1500 per decimal of
acquired agricultural land.
Ref: Loss category 5 (Loss of agricultural, business,
employment & rental income) in SIMF.
Assistance
Deci 25.88 03
Special assistance provided on account of impacts
by gender-
Ref:clause 50, Resettlement Plan RP,Bullet 6.
SIMF Source: Census of Project Affected Persons, 2016
Entitlement Matrix for payment of compensation can be seen at annexure -12.
5.5.6 Market Price Survey Methodology
For this SRAP replacement cost of the affected properties assessed during PAPs census
conducted by trained Sociologists of RTIP-II and consultants. During PAPs census
investigators visited the affected spots, went door to door of the affected persons, talked with
local and concern peoples to assess the market price. The market price of the affected
properties mentioned in the SRAP will be reviewed prior to implementation of SRAP by a ten-
member Market Price Survey Committee formed by LGED following the guidelines of SIMF.
The Market price of the affected properties will be implemented with the assistance of DS
Consultants. These rates will be indexed for inflation, if the payment is made after 12 months
from the date of current market price assessment. Structure of the Market Price Survey
Committee is as follows:
SL.
No. Representative Organization Position in the
Committee
1. Executive Engineer, Office of the
Superintending Engineer (Region), LGED Convener
2. Representative of the District
Commissioner (DC) DC Office Member
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 33
3. Representative of Executive Engineer,
Public Works Department, concerned
district
Public Works
Department
(PWD)
Member
4. Representative of Divisional Forest
Officer Dept. of Forest Member
5. Upazila Engineer LGED Member
6. Social Deve. Specialist/ARE, RTIP-II D&S Consultant Member
7. Sociologist , RTIP-II, LGED LGED Member
8. UP Chairman/his representative of
concern UP
Local
Government Member
9. Representative of Local NGO (BRAC
Officer/ Representative) NGO Member
10. Sr. Assistant Engineer of the concern
XEN office LGED
Member
Secretary
The replacement cost of land, trees and crops will be finalized by the committee from the
sources of sale and purchase of same kind of assets in the locality. The Committee will collect
market price from buyers and sellers of land, trees and crops. Valuation process to determine
compensation rates and standards were as follows:
• The surveyors will consider the quality of the lands under acquisition with current use,
cropping intensity, value of the crops produced, accessibility from the present roads and
other characteristics that influence on the market price. The survey will conduct with three
groups of respondents- i) randomly selected 10-15 land owners of the same mouza adjacent
with road, ii) recent buyers and sellers of similar kind of lands in the same and adjacent
mouzas, iii) Deed writers at Land Registration office who handled same kind of land
adjacent to the road in the same mouza.
• In case of variations in average prices reported by the three groups are insignificant (10%
or less), average of the reported price will be fixed as current price of the lands. If the
variation is significant (more than 10%) the current prices will be negotiated in open
meetings with the affected and other land owners, community leaders, CBOs/NGOs and
the like.
• Market prices of different trees are determined by surveying the prevailing prices paid by
timber and fuel wood traders in the local markets. The compensation for trees will be fixed
at the highest prices offered by a trader. Harvest price will be paid for fruits in the trees, if
affected. Market price of harvest price of crops for agricultural land has been determined
using the same method.
5.5.7 Finance
The affected persons are eligible for compensation/assistance according to this RAP. An
amount of Taka: Tk 4,26,71,123 ($538981.00) has been proposed to LGED for providing
compensation and assistance to the affected persons. The project considered compensation for
affected property according to their type, extent and severity. LGED will review the
recommendations and approve for delivery of compensation and assistance to the eligible
affected persons. The recommendations of this RAP for compensation and assistance are
presented in the following Table 5.13.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 34
Table 5.11: Compensation Heads and Amount
Sl No. Compensation Amount (Tk.)
1. Compensation for agricultural land 3,11,77,820
2. Compensation for vity land (non-agricultural high land) 29,06,350
3. Registration costs 34,08,417
4. Standing crops 4,94,661
5. Transition allowance to agriculture land losers 12,81,875
6 Trees 28,98,000
7. Compensation for loss of fruits 1,80,000
8. Special Assistance 3,24,000
Total (in Taka) 4,26,71,123
6. IMPLEMENTATION ARRANGEMENT
6.1 Institutional Arrangements
The Project Director (PD), RTIP-II, LGED is the head of Project Management Unit. Among
the responsibilities, he has to oversee the preparation and implementation of phase-wise land
acquisition and resettlement action plans. The PD is accountable to the Chief Engineer, LGED.
The PD oversees land acquisition, resettlement and Grievance redress processes. It is his
responsibility to ensure that SRAPs are implemented in full, including compensation payment,
before the civil works start on the ground. In this regard, a Senior Sociologist at PMU is
assisting the PD in land acquisition and resettlement process including gender and
vulnerability. In carrying out the resettlement activities, LGED will utilize its existing staff up
at the District & Upazila levels, and has appointed additional field staff under the project. The
key LGED staff consists of an Executive Engineer (XEN) in each district, an Upazila Engineer
(UE), Assistant Engineer, Community Organizer and a Surveyor, with other supporting staffs
at the Upazila. The project has appointed full-time District Sociologist (DS), Assistant
Engineer (RTIP-II) in each district. The Deputy Commissioner (DC) office is the acquiring
body for land acquisition and pay CUL payments on behalf of the requiring body LGED.
District Sociologist (DS), Assistant Engineer (RTIP-II) follow up the acquisition cases at the
DC office. In this effort, the PMU will be actively assisted by the Social Scientist Cum
Resettlement Specialist of MSC and Social Development/Resettlement Specialist of D & S
Consultants for land acquisition and resettlement services.
D & SC Professionals provided all kinds of the technical services required for preparation and
implementation of the SRAP along with monitoring and reporting. The XENs and UEs
coordinate all these activities at the district and Upazila level and liaise with the concerned DCs
and Upazila Nirbahi Officers (UNOs). The DSs and COs will directly work with the D&SC
professionals and participate in carrying out the process tasks for TPDP preparation and
implementation.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 35
The PMU will also set up information processing facility to collate and update the resettlement
database to monitor progress in land acquisition and delivery of entitlements with the required
number of appropriately qualified persons.
There are outlines in SIMF to implement SRAP which will be followed at the time of
implementation. There is land acquisition or any kind of displacement for improvement of
the UZR. The MSC and D&SC professionals will assist LGED to implement the
development plan.
6.2 Implementation Schedule:
The SRAP preparation process include census of the affected assets and their owners, and
survey of current market prices of the various affected items (such as displacement of PAPs,
squatters from Public Lands, or any other issues related with displacement of vulnerable people
and Indigenous people). The SRAP has prepared and will be implemented following the
timeframe shown below:
Tentative Implementation Schedule of Resettlement Action Plan (SRAP)
Sl.
No.
Resettlement Activities Tentative time
requirement
1. Census survey with Cut- off Dates (Social Screening) by D&SC Completed
2. Consultations and information campaign with community people/ road
users with FGD by D&SC
Running process
3. Design/Development of SRAP implementation tools Completed
4. Identification of PAPs Completed
5. Joint Inventory Verification (JIV) based on detail design within
subproject alignment area
15-days
6. Market survey for the preparation of individual entitlement for Top-up
payment by LGED
Completed
7. Submission of Resettlement Budget and individual entitlement by
MSC with the assistance of D&SC
15-days
8. Approval of Resettlement Budget by LGED (Top-up) 15-dayes
9. Payment of compensation/resettlement benefits for PAPs & Squatters
by LGED
15-days
10. Training and income generation program for PAPs 15-days
11. Monitoring and Evaluation programs Running process
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 36
6.3. Payment of Compensation and Cash Payment
6.3.1 Resettlement Budget
Budget has been prepared to meet the cost of affected properties for the PAPs who will be
affected along the roadside. Market price of land and other affected properties has been
assessed by a Committee formed by LGED with the assistance from D&S Consultant.
The major direct cost items are agricultural land for which affected households will be paid at
replacement/ market prices. There may also be a few items, such as trees, etc, which will add
to the cost of resettlement. Compensation policy is described in details in the Entitlement Policy
(Annexure-12).
Table-6.1: Proposed Resettlement Budget (In Taka), Based on Market Price
Item
No
Compensation Categories No. of PAPs
Area (Acres)
Average Unit Cost at
Market Price (Tk)
per Acre
Total
Replacement
cost (Tk)
Main
compensation Classifications Male Female
1 2 3 4 5 6 7 8
1
Land
Agriculture 376 16 16.3655 1905100 31177820
Viti Land 28 01 0.6863 4234800 2906350
Sub-Total 34084170
4
3
Other Grants Registration
cost
10% of market price of land (Stamp duty +
registration cost + deed writing cost ) 3408417
Standing Crops 231 10 Tk 684.803 per decimal x 722.34 decimal 494661
Transition
Allowance
59 03 Three years harvest price @ Tk. 1500 per
decimal. X 212.73 decimal
1281875
Special
assistance
0 16 Assistance for female headed HH to help
rapid recovery from impact of acquisition.
324,000
Sub-Total 5508953
Trees and
Fruits
Trees No. of
Trees
No. of
HHs
Average rate (Tk.)
Large 63 18 503500 ÷63 = 7992 503500
Medium 404 55 2030500 ÷ 404 = 5025 2030500
Small 298 37 364000 ÷ 298 = 1221.48 364000
Compensation
for Fruits 192 34 180000 ÷ 192 = 937.5
1,80,000
Sub-Total 957 110 - 3078000
Grand Total (Taka) 42,671,123
6.3.2 Payment Process
Compensation Payment for the UZRs with land acquisition:
List of Project Affected Persons (PAPs) and Replacement cost of the affected properties or
losses prepared after conducting a PAPs Census by LGED with the assistance of D&S
Consultants. The replacement cost estimated by the investigators after discussing with local
people and people related with selling or buying of same kind of goods or services.
LGED has formed a ten member Market Price Survey Committee in all project districts for
ensuring the actual market price assessment survey for affected person who will be
compensated by the project and make sure the rates is standard and acceptable. The Market
Price Survey Committee will verify replacement cost of the affected properties assessed at the
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 37
time of PAPs Census following guidelines of Social Impact Management Framework (SIMF). •
A list of project affected persons and list of the lost properties are prepared from the Land
Acquisition Plan conducted by DS Consultants. The LAPs were already verified from field by
the XEN.
• Market Price Survey Committee will submit the assessed value to XEN for approval of PMU.
• The Market Price Survey Committee will also assess grants according to the SIMF for affected
persons.
• If the Government estimates for affected properties is lower than replacement cost estimated
by the Market Price Survey Committee; LGED will bridge up the gaps by paying directly the
PAPs as Top-Up.
• XEN will arrange payments for affected properties and will arrange approved resettlement.
• LGED will ensure that the compensations/entitlements to the PAPs are paid in full before they
are evicted from the acquired/not acquired private and public lands.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 38
7. MONITORING AND EVALUATION
LGED will set up an internal monitoring system to report quarterly involving the Upazila
Engineer at the Upazila level and the Executive Engineer at the district level. The District
Sociologists will primarily be responsible for collection of monitoring data on land acquisition
and implementation of resettlement plans, indigenous people’s plans (if any) and gender
actions in the process. The project Management Support Consultant team will include a senior,
experienced Social Scientist who will prepare six-monthly reports on monitoring of land
acquisition and implementation of resettlement plans, indigenous peoples plans (if any) and
gender actions in the process.
The LGED PMU will be responsible for monitoring, reporting and evaluation, including the
design of the M&E system. Independent reviews of the LGED land acquisition process will be
carried out at regular intervals through the RTIP-II integrated performance audit procedure on
a 15% sample of roads under a construction phase. The timing of these independent audits, and
the tasks of the auditor for each audit, will be done annually or as determined from time-to-
time based on the status of implementation of the Project Work Plan. In respect of land
acquisition, the audits will at different stages review the LGED land acquisition process and its
monitoring results, and the implementation of the RAPs. This will provide timely feedback on
the effectiveness of the planning and implementation process for land acquisition and
resettlement of affected and on its monitoring. It will generate prompt feedback on problems
and issues to be addressed by the Project. An independent impact evaluation will be carried out
on 15% sample roads under each construction phase to evaluate the adequacy of the mitigation
policies, the socio-economic impact of the Project on the persons affected, and the achievement
of the social development goals as well as lessons for future projects. This independent
evaluation will require inputs at project-start (to collect baseline data), during implementation
(to expand the baseline data base and collect interim evaluation data) and at project-end (for
evaluation). LGED will contract with local consultants to carry out the independent impact
evaluation. Annex A5 presents the outline terms of reference for the independent evaluation.
LGED has prepared the TOR for Independent Performance Auditing (IPA) and shared with the
Bank before appraisal. All IPA reports including supervision of RP/IPP implementation will
be shared with the Bank.
7.1 Monitoring Arrangement
Monitoring is the process of regular observation, in respect of that the close monitoring ensures
the proper implementation of SRAP. The MSC will assist LGED to set up a system to monitor,
report on progress and performance in land acquisition and resettlement activities. Independent
reviews of the LGED land acquisition process will be carried out at regular intervals through
the RTIP-II Integrated Performance Audit (IPA) procedure on a 15% sample of roads under
construction phase. In respect of land acquisition the audits will review the LGED land
acquisition process and its monitoring results and the implementation of the RAPs.
Monitoring also is an integral part of every project, from start to finish. A project is a series of
activities (investments) that aim at solving particular problems within a given time frame and
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 39
in a particular location. The investments include time, money, human and material resources.
Before achieving the objectives, a project goes through several stages. Monitoring should take
place at and be integrated into all stages of the project cycle. The three basic stages include:
• Project planning (situation analysis, problem identification, definition of the goal,
formulating strategies, designing a work plan, and budgeting);
• Project implementation (mobilization, utilization and control of resources and project
operation); and
• Project evaluation.
Contract wise Monthly Monitoring report on land acquisition, CUL payment by DCs and Top-
up payment will be submitted to PMU by MSC with the assistance of D&SC. The indicators
for monitoring land acquisition are related to various steps followed in the legal process up to
CUL payment by DCs. The indicators are as follows:
i) Number of LAPs submitted to DCs;
ii) Number of UZRs where Notice Under Section 3, 6 and 7 issued;
iii) Number of UZRs where Joint price verification completed;
iv) Progress of submission of compensation amount to DCs.
v) Number of Project affected person (PAPs) including Affected claim for compensation
or assistance;
vi) Number of PAPs submitted legal documents in support of their claims;
vii) Numbers of PAPs including Affected get compensation and assistance;
viii) Number of PAPs including Affected replaced;
ix) Number of tribal people compensated.
x) Number of School teachers trained on safety to deliver safety classes.
xi) Number of public consultation done regarding Land Acquisition and Resettlement.
xii) Number of grievance cases recorded, heard and settled in GRC and SCC.
xiii) Information submitted to LGED for comprehensive IT based maintenance
management system.
7.2 Internal Monitoring
LGED will set up an internal monitoring system to report quarterly involving the Upazila
Engineer at the Upazila level and the Executive Engineer at the district level. The District
Sociologists will primarily be responsible for collection of monitoring data on land acquisition
and implementation of resettlement plans, indigenous peoples plans (if any) and gender actions
in the process. The project Management Support Consultant team will include a senior,
experienced Social Scientist who will be prepare six-monthly reports on monitoring of land
acquisition and implementation of resettlement plans, indigenous peoples plans (if any) and
gender actions in the process.
The primary objectives of independent performance auditing of project are to review the
efficacy of internal monitoring, and design and conduct periodic third party monitoring and
provide feedback to LGED and the World Bank on improvement of the measures being applied
and enhancement of the implementation process. These audits are independent of SIMF but
will also cover pertinent issues on land acquisition and resettlement, and identify the problems
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 40
to be addressed by LGED and the need for further mitigation measures. TOR for IPA is being
prepared by LGED and will be placed with the Bank for agreement before appraisal.
7.3 Indicators of Internal Monitoring:
The following monitoring indicators are required to be reported:
• Achievement of resettlement activities against agreed implementation plan.
• Fund sufficiency for implementation of SRAP.
• Amount of compensation already paid.
• Numbers of affected persons get full compensation according to SRAP.
• Number of consultations taken with affected persons.
• Number of affected persons used the grievance redress procedures.
• Type of grievances raised.
• Outcomes from Grievance Redress Process.
• Number cases resolved and unresolved in Grievance Redress Process.
7.4 Independent External Monitoring
The primary objectives of independent performance auditing of project are to review the
efficacy of internal monitoring, and design and conduct periodic third party monitoring and
provide feedback to LGED and the World Bank on improvement of the measures being
applied and enhancement of the implementation process. These audits are independent of
SIMF but will also cover pertinent issues on land acquisition and resettlement, and identify
the problems to be addressed by LGED and the need for further mitigation measures. TOR
for IPA is being prepared by LGED and will be placed with the Bank for agreement before
appraisal.
Scope of Tasks
The IPA, in addition to overall project performance, will cover the following tasks to cover
also the SIMF objectives and procedures:
(1) To identify monitoring indicators and develop baseline of the indicators through a well
designed baseline survey at the outset of each subproject implementation. Essential
indicators are provided in Annex-B3.
(2) To review specific monitoring indicators for undertaking monitoring for Resettlement
plans (RP), Indigenous peoples plans (IPP) and Gender actions.
(3) To review and verify the progress in land acquisition/resettlement implementation of
the Project, including implementation of the RPs.
(4) Identify the strengths and weaknesses of the land acquisition/resettlement, approaches
and implementation strategies.
(5) Assess the quality, timeliness and sufficiency of delivery of different categories of
entitlements (compensation and rehabilitation measures).
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 41
(6) Review the results of internal monitoring and verify claims through sampling checks at
the field level, involving affected people and community groups, to assess whether land
acquisition/resettlement targets and objectives are generally being met.
(7) Monitor and assess the adequacy and effectiveness of the consultative process with
PAPs, particularly vulnerable groups and women, including the adequacy and
effectiveness of grievance procedures and legal redress available to the affected parties,
and dissemination of information about these.
(8) Verify expenditure and adequacy of budget for resettlement activities.
(9) Provide a summary of whether land acquisition and involuntary resettlement is being
implemented (a) in accordance with the RPs/IPPs, and (b) in accordance with the stated
policy.
(10) Describe any outstanding actions that are required to bring the resettlement activities in
line with the policy and the RP.
7.5 Reporting Requirements
The PMU shall prepare and send status reports to the WB on SRAP implementation
periodically and a Final Progress Report upon completion of the resettlement program. LGED,
MSC and D&SC will assist PMU in preparation of these reports.
During subproject implementation, LGED will establish a monthly monitoring system
involving LGED staff at the sub-project Upazila. The Resettlement Specialist assisted by
Sociologist shall prepare monthly progress reports on all aspects of resettlement operations.
The Resettlement Specialist of the MSC will conduct periodic reviews and supervision
missions during the implementation stage and will report to LGED on the progress of all
aspects of resettlement activities. It is understood that a post-evaluation of SRAP activities will
be carried out by the WB to assess the resettlement impact and the efficacy of the SRAP policy.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 42
Appendix—1
Actionplan for Land Acquisition and SRAP Preparation & Implementation for Phase-IIProgram
Major Tasks Responsibility 2016 2017
Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July
Land Acquisition
LAPs submitted to DCs LGED
LAPs Approval:
At District Level DLAC
Notice 3 issued DC
JIV completed DC/LGED/D&S
C
Notice-6 issued DC
CUL budgets prepared DC
CUL budgets submitted to LGED DC
CUL funds placed with DCs LGED
Notice-7 issued DC
CUL payment begins DC
SRAP Preparation & Implementation
PAP census taken & cut-off dates fixed LGED/D&SC
Consultation & information campaign LGED/D&SC
GRCs formed LGED/D&SC
Market price surveys completed LGED/D&SC
Assets valuation completed LGED/D&SC
• Compensation budgets for Affected prepared LGED/D&SC
•Compensation budget for Affected approved LGED
• Payment to Affected completed LGED/D&SC
Top-up and other grant calculation begins LGED/D&SC
Top-up and other grant calculation approved LGED
Top-up and other grant payment by LGED LGED/D&SC
Site handover LGED/D&SC
Civil Works
Construction begins
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 43
Appendix—2
Land Acquisition avoided completely The following table shows list of UZRs where Land acquisition avoided in LAP completely.
Region
Package No
Name of UZR
Total
length
(km) 1 2 3 4
R-1
DHA/UZR-61 Paragram GC to Kolatia GC rd via Dhalikandi
F.Ghat(N.Por). 6.341
GAZ/UZR-62 Latifpur Bridge (R&H)-Vowel Mirzapur G.C. via
Boraibari 7.540
KIS/UZR-65
a) Guzadia bazar-Tarail R&H Road via Raijani 1.820
a1)Tarail RHD-Guzadia GC via Pongpachiha bazar road 0.960
b) Nilgonj GC to Kishorejong Mymensingh Road 1.050
MYM/UZR-67 Taldighi R&H-Munshir hat GC Road 10.360
MYM/UZR-68 Chechua-Khamarer Bazar Road Via Mogaltola &
Syedpara Bazar Road. 4.350
MYM/UZR-70 Haluaghat-Nalitabari Rd. 8.570
MYM/UZR-71 Dapunia GC-Myn.Tangail R&H Rd. at khagdohar via
Sarkari pukurpar 7.620
NET/UZR-74 Teosree GC-Taral GC (Dhankunia Ferry Ghat) road via
Akarsree & Singher Bazar 7.820
SIR/UZR-78 Shimuldair RHD-Harinathpur GC. 6.150
Sub-total 62.581
R-2
(SUN/UZR-79) Kalipur to pagla-jagannathpur RHD via Haiderpur 6.88
(SUN/UZR-80) Dharmpassa-joysree road 5.3
(HAB/UZR-63) Pakuria Battala-Asampara bazaar via Rema Tea garden 9.23
(BRA/UZR-
47a)
Panchabati R&h road-Akhaura Bara bazaar road(haliday
road). 2.78
(BRA/UZR-
47b) Kharea R&H to Shimrail GC via Kheora bazaar road 2.86
(BRA/UZR-48) Nurpur GC-Kalibari R&H (B.Baria) road 8.45
(COM/UZR-53) Abidpur GC-Debpur bazaar (Gakkhur) RHW road. 2.44
(COM/UZR-56) Debidwar GC oto Dulalpur GC via Abdullapur (Debidwar
Portion). 13.25
(COM/UZR-57) Monohorgonj GC-Laksmanpur-Bipulasar R&H Rd. 6.41
(COM/UZR-60) Chaandla GC to Sonarampur road via Madabpur, Jangar,
Dalfa, hatbalibari. 6.56
(CHA/UZR- 49) Thakur bazaar (U.H.C) GC-Jadabpur R&H Net work 1.75
(CTG/UZR-50a) Hazrat Mohsin Awolia-Gahira road. 4.3
(CTG/UZR-
50b) Borer Hat-Sikdarkhil Mirer Hat GC road. 4.02
(CTG/UZR-51a) Heako GC to Sikdarkhil road 3.81
(CTG/UZR-
51b)
Mohammed Takirhat GC to Katirhat road via Samitirhat
bazaar(Fatickchari portion) 6.4
Sub-total 116.33
Grand total 148.2
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 44
Appendix –3
Summary of Present Status of Land Acquisition as Per Districts
SL Name of the UZR
with Package No.
Date of
administrativ
e approval
Date of
submission
to DC
office
Date of
DLAC
Date
of
Notice
US3
Date of Joint
verification
Date of
Notice
US6
Date of
Notice
US7
Date of
request
for fund
Date of
land
handover
Region 1
1. Bagharchar-
Sananadabari
Via Goalkanda
Rd.(JAM/UZR-
64)
13.03.2016 13.04.2016 17.04.2016 28.06
.2016 15.06.2016
29.06.
2016
- - -
2. Alokdiar
(jamtoli)-
Someshpur
(Belkuchi
Upazila) GC
Road
(SIR/UZR-76)
20.02.2016 - - - - -
- - -
Region 2
3. Derai-
Jagnnathpur via
Jagdol,
Bhurakhati
Road
(SUN/UZR-32)
23.02.2016 10.03.2016 20.06.2016 20.07
.16 10.10.2016
- - - -
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 45
Appendix-4
Steps and responsibilities in resettlement activities
Sl. No. Steps Responsibility
01. Community Consultation on selection of roads LGED
02. Social Screening D&SC
03. Topographic Survey D&SC
04. Verification of Topographic Survey LGED
05. Preparation of LAP D&SC
06. Submission of LAP to DC office LGED
07. Census Survey D&SC
08. JIV-Joint Inventory Verification DC Office/LGED/ Consultants
09. Notice U/S 3, 6 & 7 DC Office/DLAC
10. CUL-Compensation Under-Law DC Office
11. Market price survey LGED, MSC & D&SC
12. Top-up budget preparation MSC & D&SC
13. Top-up payment LGED
14. SRAP preparation MSC & D&SC
15. SRAP Implementation LGED & D&SC
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 46
Appendix-5
Major Tasks and responsibilities Involved in Land Acquisition and SRAP Implementation
Major Tasks Responsibility
Land Acquisition
Topographic Survey & Designs D&S Consultants
Field Verification of Designs LGED
LAPs preparation D&S Consultants
Administrative Approval of each LAP LGRD Ministry/LGED
LAPs submitted to DCs in the project districts LGED/XEN of the District
Approval in the project districts District DLACs/DC
Notice 3 issued in the project districts DCs
JIV completed for each contract in the project districts DC/LGED/D& S Consultants
Notice-6 issued in the project districts DCs
Affected assets assessed & CUL budgets prepared for
each LAP
Line department & finally by DCs
CUL budgets submitted to LGED DCs
CUL Budgets approved LGED
CUL funds placed with DCs LGED
Notice-7 issued DCs
CUL payment begins DCs
SRAP Preparation & Implementation
PAP census taken & cut-off dates established LGED/D&S Consultants
Consultation & information campaign LGED/D&S Consultants
GRCs formed LGED/D&S Consultants
Market price surveys completed LGED/D&S Consultants
Assets valuation through JIV completed DC/LGED
Compensation budgets for Affected prepared LGED/D&S Consultants
Compensation budget for Affected approved LGED
Payment to Affected completed LGED/D&S Consultants
Top-up and other grant calculation begins LGED/D&S Consultants
Top-up and other grant calculation approved LGED
Top-up and other grant payment LGED/D&S Consultants
PAP relocation (self relocation) LGED
Site handover LGED
Civil Works
Contract tendering and award LGED
Construction begins LGED/Contractors
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 47
Apendix-6 :
Monitoring Progress in CUL Payment Progress as on: ………………………………
Sl.
No.
Contract
Package No.
Name of
Road
LAC No Land
Acquired
(Acre)
Total No.
of EPs
CUL Payment No. of Compensation Cases in Following Categories
Full Partial Document Court Vested Khas Ready Abroad
1 2 3 4 5 6 7 8 9 10 11 13 14 15
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 48
Appendix-7
Summary Information on Compensation Payment for Private Lands and Other Assets by the Deputy Commissioners
Progress as on: ……………………………………………….
Sl.
No
.
District Name of Road LAC cases
Total
No. of
EPs
Number & Percentage of Entitled Persons (EPs) Paid (Cumulative) by DCs For
Land House/ Structures Trees Amenities Other Losses
No. of
EPs
No.& %
of EPs
Paid
No. of
EPs
No.& %
of EPs
Paid
No. of
EPs
No. & %
of EPs
Paid
No. of
EPs
No.& %
of EPs
Paid
No. of
EPs
No.& %
of EPs
Paid
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 49
Appendix-8:
Summary Information on Compensation (Top-Up) Payment by LGEDfor Private Lands and other Assets
as per Contract and Mouza
Progress as on: …………………………………..
Sl.
No.
District Name of
Road
Total No. of EPs Number & (Percentage) EPs Paid Top-up by LGED for Loss of
Fund by
DC
Paid by
DC
Eligible for
Top-up
Lands (All) House/Structures Trees (All) Other Losses
Eligible Paid Eligible Paid Eligible Paid Eligible Paid
1 2 3 4 5 6 7 8 9 10 11 12 13 14
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 50
Appendix-9
Information on Grievance Redress Committee Activities
Progress as on: …………………………………………….
Package No.
No. of
Meetings
(Cl)
No. cases
lodged
No. of Grievances Lodged by Reason and Affected Groups
(Cumulative)
No. of Grievances Reviewed by Reason and Affected Groups
(Cumulative) No. of Grievances
Accepted for Redress (Cl) Reasons No. of Lodged by Reasons No. of Reviewed for
1 2 3 4 5 9 Legal
EPs
S-R
EPs Other 1 2 3 4 5 9 Legal EPs S-R EPs Other Legal EPs S-R EPs Other
1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Reasons: 1-5 for Five Major Reasons and 9 for all other reasons (Name the major reasons listed under the codes).
Affected Groups: Legal EPs - Owners recognized by law; S-R EPs - Socially-Recognized Owners (Affected, etc); others - persons not identified by
socioeconomic survey, or persons and community groups acting independently or on behalf of the PAPs.
Note: (Other land include Khas land or other lands own by any government organization)
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 51
Appendix-10
Details of affected trees by size, number and value on acquired land
Regio
n-1 District Package
Number of Trees (Fruit) Number of Trees (Timber) Total
Affected
Owners
Large value Medium value Small value Total
Trees
value Larg
e
value Medium value Small value Total
Trees
value
R-1
Jamalpur JAM/UZR-64 - - 13 19500 - - 13 19500 - - 57 62000 120 60000 177 122000 12
Sirajganj SIR/UZR-76 45 374000 113 796000 21 87000 179 1257000 18 129500 221 1153000 157 217000 396 1499500 76
R-2 Sunamganj SUN/UZR-32 - - - - - - - - - - - - - - - - -
Total 45 374000 126 815500 21 87000 192 1276500 18 129500 278 1215000 277 2167000 573 1621500 88
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 52
Appendix-11
SECOND RURAL TRANSPORT IMPROVEMENT PROJECT , (RTIP-II), LGED
List of Inventory (Land & structure)
Alokdiar (Jamtoil)-Shomespur (Belkuchi Upazila) GC Road, SIR/UZR-76
Sl.
No.
Name & address of
APs
HH
members Khati
an
No.
Plot
No.
Agricultural land High (Vity) land Standing
crops Transe
ction
Allowa
nce
Assista
nce Duty &
Fee Total
Area Value Area Value M F
1. Rokib Uddin gong S/O.
Late Nazim Pramanik
Vill- Alokdiar
2 2 672 878 1.02 51000 0 0 714 0
0
5100 56814
2. Shohidul Islam gong
S/O. Munu Shekh Vill-
Alokdiar
1 2 836 876 2.65 132500 0 0 1855 0
0
13250 147605
3. Kohinur Begum W/O.
Hormuja Rahman Vill-
Alokdiar
6 6 602 893 1.50 75000 0 0 1050 0 15000 7500 98550
4. Md. Sanawar Hossain
S/O. Late Habibur
Rahman Shekh Vill-
Alokdiar
1 5 1152,
1040
894,
895 2.92 146000 0 0 2044 0
14600 162644
5. Abu Taher S/O. Late
Azizul Haque Vill-
Alokdiar
2 1 40 896 1.26 63000 0 0 882 0
6300 70182
6.
Abdul Hamid gong
S/O. Late Mazem
Sarkar Vill- Alokdiar.
2 3 09 897 2.78 139000 0 0 1946 0
13900 154846
7. Md. Sanawar Hossain
S/O. Late Habibur 1 2 664 898 1.99 99500 0 0 1393 0
9950 110843
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 53
Rahman Shekh Vill-
Alokdiar.
8.
Md. Abdul Jalil gong
S/O. Late Mojabot Ali
Shekh Vill- Alokdiar.
10 3 664,1
80
898,9
09 2.62 131000 0 0 0 0
13100 144100
9.
Md Bodiuzzaman S/O.
Vill- Alokdiar. 3 2 653 914 .50 25000 0 0 350 0
2500 27850
10
Shohidul Islam S/O.
Tozammel Haque 3 2 653 914 3.21 160500 0 0 2247 0
16050 178797
11.
Alhaz Abdul Mamun S/O.
Late Alhaz Shomsher Ali
Vill- Alokdiar. 3 4
554,6
53
914,
915 3.48 174000 0 0 2436 0
17400 193836
12.
Mst. Jorna Khatun gong
W/O. Late Atahar Ali
sarkar Vill- Alokdiar.
3 2 691 916 1.5 75000 0 0 1050 0 15000 7500 98550
13
Abdul Malek gong S/O.
Late Saykot Ali sarker
Vill- Alokdiar.
5 5 1129 921 2.66 133000 0 0 1862 0
13300 148162
14.
Md. Anowar Hossain
S/O. Jabbar Ali Vill-
Alokdiar.
2 3 63 918 2.75 137500 0 0 1925 0
13750 153175
15.
Md. Abdul Malek gong
S/O. Late Saykot Ali
Vill- Alokdiar.
4 2 412 919 2.25 112500 0 0 1575 0
11250 125325
16.
Laxmi Rani Halder
W/O. Narayan Halder
Vill- Alokdiar.
3 2 1202 953 11.25 562500 0 0 7875 16875 56000 56250 699500
17.
Abdul Latif Sarker
gong S/O. Late Entaz
Ali Sarker Vill-
Alokdiar.
2 3 653 954 5.82 291000 0 0 4074 8735
29100 332909
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 54
18. Md. Abu Musa Sarker
gong S/O. Md. Fajlul
Haque Sarker Vill-
Tengrail.
2 1 823 956 4.54 227000 0 0 3178 0
22700 252878
19.
Niranjan Halder gong
S/O. Late Duliram
Chandra Halder Vill-
Tengrail.
4 2 634,9
43 1234 4.16 208000 0 0 2912 0
20800 231712
20.
Niranjan Halder gong
S/O. Late Duliram
Chandra Halder Vill-
Tengrail.
4 2 630,9
43
1231,
1233 0 0 5.54 277000 0 0
27700 304700
21.
Hazi Abdul Mannan
gong S/O. Late Alhaz
Shomsher Ali
Vill- Tengrail.
6 2
782,8
55,
1040
1307,
1308,
1310
4.75 237500 0 0 3325 0
23750 264575
22.
Ripon Sarker &
Nazmul Haque gong
S/O. Late Abul Hossen
Sarker, Vill- Tengrail.
3 1 634,7
82
1311,
1324 7.10 355000 0 0 4970 10650
35500 406120
23.
Abdul Gafur S/O. Late
Monser Pramanik
Vill- Tengrail.
4 2 634 1311 1.35 67500 0 0 945 0
6750 75195
24.
Sukomal Sarker S/O.
Banesshowar Sarker
Vill- Tengrail.
2 3 634 1311 1.35 67500 0 0 945 0
6750 75195
25.
Mohendra Nath
Mondal S/O. Mongal
pramanik Vill-
Tengrail.
1 1 859 1325 0.94 47000 0 0 658 0
4700 52358
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 55
26.
Porimoldas gong S/O.
Late Motilal das Vill-
Tengrail.
2 1 7 1326 0.283 14150 0 0 198 0
1415 15763
27.
Tusar Kanti das gong
S/O. Late
Tarapodo das Vill-
Tengrail.
2 3 7 1326 0.284 14200 0 0 199 0
1420 15819
28.
Nazmul Haque gong S/O.
Late Abul Hossain Sarker
Vill- Tengrail. 5 2 1174 1330 1.46 73000 0 0 1022 0
7300 81322
29.
Md. Shafiqul Islam
gong S/O. Late Rustom
Ali Sarker Vill-
Tengrail.
1 1 1141 1331 0.74 37000 0 0 518 0
3700 41218
30.
Md. Nazmul Islam
gong S/O. Late Habibur
Rahman Vill- Tengrail. 2 1 1141 1331 0.74 37000 0 0 518 0
3700 41218
31.
Fatik Chandra Biswash
S/O. Late Bijoy
Chandra Biswash Vill-
Tengrail.
3 2 779 1334 1.09 54500 0 0 763 0
5450 60713
32.
Ratan Kumar Biswash
S/O. Late Natobar
Biswash Vill- Tengrail.
2 2 779 1334 2.180 109000 0 0 1526 0
10900 121426
33.
Birandra nath Biswas
S/O. Late Bijoy nath
Biswas Vill- Tengrail.
6 3 779 1335 1.11 55500 0 0 777 0
5550 61827
34.
Askhay Kumar gong
S/O. Late Umesh sarker
Vill- Tengrail.
2 1
667,1
5,
471
1340 3.45 172500 0 0 2415 0
17250 192165
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 56
35.
Tarapodo Halder S/O.
Late Fatik Halder Vill-
Tengrail.
2 1 782,8
20
1339,
1337 4.60 230000 0 0 3220 0
23000 256220
36.
Hazi Hasen Ali S/O.
Late Sujabot Ali Vill-
Alokdiar
3 1
782,7
77,78
1
1440,
1439,
3009
17.68 884000 0 0 12376 26520
88400 1011296
37.
Md. Rezaul Karim S/O.
Late Atawar Rahman
Tengrail
7 4 1139 3150 0.50 25000 0 0 350 0
2500 27850
38.
Ainal Haque Sarker
S/O. Fotai sarker
Alokdiar
1 1 892,8
93 1438 4.00 200000 0 0 2800 0
20000 222800
39.
Abdul Hai gong S/O.
Late Mozam PK Vill-
Char Tengrail
2 1 892,1
209
3008,
3010 10.06 503000 0 0 7042 15090
50300 575432
40.
Abdur Razzaque S/O.
Abdul Aziz Vill- Char
Tengrail
5 2 372 3021 1.40 70000 0 0 980 0
7000 77980
41
Ataur Rahman Sarker
S/O. woajuddin sarker
Vill- Alokdiar
5 2 50 3022 3.95 197500 0 0 2765 0
19750 220015
42.
Abdul Sattar gong S/O.
Late Babur Ali Vill-
Nandina Madhu
4 1 150 3026 0 0 3.13 156500 0 0
15650 172150
43.
Md. Shahzahan Ali
S/O.Md. Abdush Vill-
Nandina Madhu
2 3 732 3027 0 0 1.29 64500 0 0
6450 70950
44.
Md. Alom sarker gong
S/O. Late Sekander
Vill- Vill- Nandina
Madhu
5 2 158 3037 0 0 3.13 156500 0 0
15650 172150
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 57
45.
Md. Alom sarker gong
S/O. Late Sekander
Vill- Vill- Nandina
Madhu
2 1 165,7
05 3038 0 0 1.00 50000 0 0
5000 55000
46.
Abdul Momin gong
S/O. Kobirul Islam
Vill- Nandina Madhu
3 1 981,6
16
3039,
3040 0 0 3.77 188500 0 0
18850 207350
47.
Ashraful Alam S/O.
Late Riaz Uddin 3 2 820 3041 1.78 89000 0 0 1246 0
8900 99146
48.
Razia Sultana W/O.
Late Riaz Uddin Vill-
Nandina
7 2 370 3046 2.39 119500 0 0 1673 0 20000 11950 153123
49.
Abu Bakkar S/O. Late
Tayab Ali Vill-Nandina
Diar para
1 1 888 3047 0.94 47000 0 0 658 0
4700 52358
50.
Islam sarker & Abdul
Khalek gong S/O. Late
Harun Sarker & Late
Bosir Mondal
2 1 888 3047 2.26 113000 0 0 1582 0
11300 125882
51.
Fazal Mondal S/O. Late
Kohel Mondal Vill-
Char Tengrail
1 3 770 3049 0.90 45000 0 0 630 0
4500 50130
52.
Islam Sarker S/O. Late
Harun sarker Vill-
Nandina Madhu
4 1 770 3049 0.90 45000 0 0 630 0
4500 50130
53
Md. Shahin S/O. Late-
Fazal Mandal
Vill- Char Tengrail
3 1 929 3050 1.02 51000 0 0 714 0
5100 56814
54.
Md. Shahidul Islam
gong S/O. Late Younus
Ali Vill- Viar Char
3 1 929 3050 1.02 51000 0 0 714 0
5100 56814
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 58
55.
Muq Noni gong S/O.
Late Montaz Sarker
Vill-Nandina
3 2 760 3051 0.78 39000 0 0 546 0
3900 43446
56.
Mozid Sarker &Hakim
Member gong S/O.
Late zoynal Sarker &
Antaz Akondo Vill-
Tengrail
2 1 370 3052 1.13 56500 0 0 791 0
5650 62941
57.
Mofazzal Kari & Mozid
Sarker S/O. Ansar
Mondol &joinal Sarker
Vill- Tengrail
2 4 1117 3053 1.06 53000 0 0 742 0
5300 59042
58.
Alhaz Abdul Aziz S/O.
Late Shoheb Ali
Akondo Vill- Viarchar
1 3 1077 3054 3.24 162000 0 0 2268 0
16200 180468
59.
Islam Sarker S/O. Late
Haran Sarker Vill-
Viarchar
3 4 996 3056 0.75 37500 0 0 525 0
3750 41775
60. Abdul Khalek Mondol
S/O. Late Bashir
Mondol Vill-Char
Tengrail
2 5 996 3056 0.75 37500 0 0 525 0
3750 41775
61.
Fazal Haque S/O. Late
Kohel Mondol Vill-
Char Tengrail
4 2 605 3057 0.75 37500 0 0 525 0
3750 41775
62.
Abdur Rashid gong
S/O. Late Osman
Mondol Vill-Viar Char
3 2 605 3057 0.50 25000 0 0 350 0
2500 27850
63.
Md. Shohidul gong
S/O. Late Younus Ali
Viar Char
5 3 605 3057 0.50 25000 0 0 350 0
2500 27850
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 59
64.
Saykot Ali S/O. Yasin
Vill- Viar Char 4 3 177 3058 0.50 25000 0 0 350 0
2500 27850
65.
Noni Sarker S/O.
Montaz Sarker Vill-
Nandina
3 3 177 3058 0.50 25000 0 0 350 0
2500 27850
66.
Abdul Hakim gong
S/O. Late Intaz Ali
Akondo Vill- Char
Tengrail
4 2 1193,
1194 3059 1.00 50000 0 0 700 0
5000 55700
67.
Md. Abdul Mozid S/O.
Late Joynal Sarker Vill-
Viar Char
2 2 1193,
1194 3059 0.50 25000 0 0 350 0
2500 27850
68.
Poran Sarker S/O. Late
Kantu Sarker Vill-
Nandina
3 5 61 3060 0.75 37500 0 0 525 0
3750 41775
69.
Hazi Abdul Aziz S/O.
Late Ramjan Ali Viar
Char
4 2 61 3060 2.50 125000 0 0 1750 0
12500 139250
70.
Golam & Mostafa
Mondol S/O. Late
Mozibor Mondol Vill-
Viar Char
3 2 705 3061 1.00 50000 0 0 700 0
5000 55700
71.
Selim Reza gong S/O.
Late Tozammel Haque
Vill-Jamtoil East Bazar
4 4 705 3061 0.50 25000 0 0 350 0
2500 27850
72.
Johurul Islam gong
S/O. Late Halem Ali
Sarker Vill- Nandina
3 2 616 3062 1.50 75000 0 0 1050 0
7500 83550
73.
Md. Mofazzal Kari
S/O. Late Amser Ali
Mondol Vill- Viar Char
2 2 600 3063 0 0 1.49 74500 0 0
7450 81950
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 60
74.
Hazi Hasen Ali gong
S/O. Late Intaz Shekh
Vill- Viar Char
5 4 148 3064 0 0 3.16 158000 0 0
15800 173800
75.
Hazi Abdul Aziz S/O.
Late Shaheb Ali Vill-
Viar Char
4 2 283 3065 0 0 2.12 106000 0 0
10600 116600
76.
Goijar Hossain Mondol
gong S/O. Jamsher Ali
Vill- Tengrail
2 3 483,
806 3441 0 0 4.00 200000 0 0
20000 220000
77.
Abu Bakkar S/O. Late
Toyab Ali Vill-
Nandina Madhu (Diar
para)
2 3 643 1886 1.25 56250 0 0 875 0
5625 62750
78.
Harez Mondol S/O.
Late Bahez Mondol
Vill- Nandina Madhu
1 2 1032 1887 1.61 72450 0 0 1127 0
7245 80822
79.
Abdul Kader gong S/O.
Md. Hasen Shekh Vill-
Nandina Madhu (Diar
para)
2 1 326 1888 0 0 1.87 84150 0 0
8415 92565
80.
Abdul Alim S/o. Md.
Hasen Ali Shekh Vill-
Nandina Modhu
1 3 326 1888 0 0 1.03 46350 0 0
4635 50985
81.
Mrs. Mohila Begum
W/O. Md. Hasen Ali
Shekh Vill- Nandina
Modhu
3 1 326 1888 0 0 0.84 37800 0 0 10000 3780 51580
82.
Abdul Kader gong S/O.
Md. Hasen Ali Shekh
Vill- Nandina Modhu
3 2 858 1889 2.55 114750 0 0 1785 0
11475 128010
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 61
83.
Abu Bakkar gong S/O.
Late Lal Miah Sarker
Vill- Nandina Madhu
(Diar para)
3 2 858 1889 2.55 114750 0 0 1785 0
11475 128010
84.
Akbar Ali gong S/O.
Late Zaher PK. Vill-
Nandina Modhu
5 7 456 1919 1.61 72450 0 0 1127 0
7245 80822
85.
Abdul Kader gong S/O.
Md. Hasen Ali Shekh
Vill- Nandina Modhu
(Diar para)
6 2 456 1919 0 0 1.61 72450 0 0
7245 79695
86.
Abu Sayed gong S/O.
Late Lal Mia Sarker
Vill-Nandina Madhu
4 2 87,
950
1920,
1921 4.00 180000 0 0 2800 0
18000 200800
87.
Abdul Razzak S/O.
Late Tasir Uddin
Sarker Vill-Nandina
Modhu
1 3 506 1923 0 0 0.98 44100 0 0
4410 48510
88.
Saiful Sarker S/O. Late
Suzabot Ali Sarker
Vill- Nandina Modhu
(Diar para)
1 6 530 1924 0 0 0.96 43200 0 0
4320 47520
89.
Ismail Hossain gong
S/O. Late Munsar Ali 3 2 754 1925 0.61 27450 0 0 427 0
2745 30622
90.
Md. Akbar Ali gong
S/O. Late Zeher PK.
Vill- Nandina Modhu
(Diar para)
2 3 538 1922 0 0 1.17 52650 0 0
5265 57915
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 62
91.
Moti Master S/O. Late
Joran Mondol Vill-
Nandina Madhu
6 6 204 1936 0 0 0.85 38250 0 0
3825 42075
92.
Md. Hakim Mondol
S/O. Late Haran
Mondol Vill- Nandina
Modhu
1 2 942 1937 0 0 0.95 42750 0 0
4275 47025
93.
Md. Maznu Mondol
S/O. Md. Abdul Halim
Vill- Nandina Modhu
(Diar para)
1 2 631 1938 0 0 0.75 33750 0 0
3375 37125
94.
Maznu PK. S/O. Late
Khorshed PK. Vill-
Nandina
Modhu
6 2 538 1939 0.75 33750 0 0 525 0
3375 37650
95.
Shefali Begum W/O.
Abdul Barek Sarker
Vill- Nandina Modhu
6 2 331 1940 1.50 67500 0 0 1050 0 15000 6750 90300
96.
Jabed Ali 6 3 513 1941 4.35 195750 0 0 3045 0
19575 218370
97.
Md. Hawadal S/O. Late
Jabed Mondol Vill-
Nandina Modhu
6 2 639 1942 0 0 0.84 37800 0 0
3780 41580
98.
Abdul Goni S/O. Late
Afsar Ali Shekh Vill-
Nandina Modhu (Diar
para)
7 2 525 1943 0 0 1.38 62100 0 0
6210 68310
99.
Nannu Akondo Gong
S/O. Late Afzal
Akondo Vill- Nandina
Modhu
3 2 86 2436 1.00 45000 0 0 700 0
4500 50200
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 63
100
.
Tofazzal Hossain gong
S/O. Late Intaz Sarker
Vill- Nandina Modhu
2 4 756 2438 1.5 67500 0 0 1050 0
6750 75300
101
.
Md. Hamidul gong S/O.
Hormuj Sarker Vill-
Nandina Modhu
1 2 998,8
69
2440,
2441,
2443
6.50 292500 0 0 4550 9750
29250 336050
102
.
Hasan gong S/O.
Korman Ali Mondol
Vill- Nandina Modhu
5 3 870 2444 2.50 112500 0 0 1750 0
11250 125500
103
.
Wahed Jamal S/O.
Akbar Munsi Vill-
Nandina Modhu
6 4 362 2447 2.50 112500 0 0 1750 0
11250 125500
104
.
Motahar Akondo S/O.
Late Mozid Akondo
Vill- Nandina Modhu
2 5 312 2448 2.00 90000 0 0 1400 0
9000 100400
105
.
Motahar gong S/O.
Late Mozid Akondo
Vill- Nandina Modhu
4 3 672 2450 1.50 67500 0 0 1050 0
6750
75300
106
.
Moni gong S/O. Late
Aynul Haque Vill-
Nandina Modhu
3 4 1056 2451 1.25 56250 0 0 1050 0
5625 62925
107
.
Hannan gong S/O. Late
Abdul Kuddush Vill-
Nandina Modhu
1 2 122 2455 1.50 67500 0 0 1050 0
6750 75300
108
.
Motaleb gong S/O. Late
Harun Shekh Vill- Char
Mijal
4 2 854 2456 5.04 226800 0 0 3528 7560
22680 260568
109
.
Obydul Sarker S/O.
Siddique Sarker Vill-
Nandina Modhu
3 2 930 2446 2.50 112500 0 0 1750 0
11250 125500
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 64
110
.
Salim Reza gong S/O.
Late Tozammel
Hossain Vill- Jamtail
East Bazar
5 2 571 2464 2.50 112500 0 0 1750 0
11250 125500
111
.
Md. Sohrab Ali gong
S/O. Late Bashir Uddin
Talukder Vill- Viar
Char
4 4 311 2465 1.50 67500 0 0 1050 0
6750 75300
112
.
Helal gong S/O. Late
Razab Ali 6 1 833 2466 1.5 67500 0 0 1050 0
6750 75300
113
.
Kad Banu gong W/O.
Osman Mondol Vill-
Viar Char
3 2 851 2467 1.25 56250 0 0 875 0 12000 5625 74750
114
.
Haran Mondol S/O.
Late Dosim Mondol
Vill- Nandina Modhu
3 2 26 2476 1.50 67500 0 0 1050 0
6750 75300
115
.
Tara Talukder gong
S/O. Late Golzer
Talukder Vill- Nandina
Modhu
3 1 73,
74 2462 3.50 157500 0 0 2450 0
15750 175700
116
.
Danesh Ali gong S/O.
Late Mobarak Ali
Mondol
4 2 839,4
12
2485,
2482 4.00 180000 0 0 2800 0
18000 200800
117
.
Haran Mondol S/O.
Late Dosim Mondol
Vill- Nandina Modhu
1 3 1027 2486 0 0 2.00 90000 0 0
9000 99000
118
.
Abdul Barik gong S/O.
Late Azizul Haque
Vill- Nandina Modhu
2 1
673,
(47,
53)
2488,
2487 3.00 135000 0 0 2100 0
13500 150600
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 65
119
.
Motiur Rahman S/O.
Late Nozabot Sarker
Vill- Nandina Modhu
1 3 465,
596
2489,
2493 3.00 135000 0 0 2100 0
13500 150600
120
.
Md. Saiful Islam S/O.
Yasin Ali Mondol 1 2 1002 2494 2.00 90000 0 0 1400 0
9000 100400
121
.
Golam Mohammad
S/O. Late Mojibeur
Rahman Vill-Viar Char
4 3 456 2495 2.00 90000 0 0 1400 0
9000 100400
122
.
Hasinur Alom S/O.
Hazi Shazahan Ali Vill-
Viar Char
4 3 1052 2505 1.5 67500 0 0 1050 0
6750 75300
123
.
Hazi Abdul Aziz S/O.
Late Ramzan Munsi
Vill- Viar Char 4 2
106,1
63,18
6,100
7
2523,
2500,
2504,
2522
6.00 270000 0 0 4200 9000
27000 310200
124
.
Md. Saykot Ali Shekh
S/O. Late Montazj Ali
Shekh Vill- Viar Char
1 1 729 2527 1.75 78750 0 0 1225 0
7875 87850
125
.
Md. Shajahan Shekh
S/O. Late Montaj
Shekh 4 3
728,
727,
727
2528,
2508,
2506,
2507
6.00 270000 0 0 4200 9000
27000 310200
126
.
Md. Salim Reza Gong
S/O. Late Tozam
Mondol Vill- Jamtail
East Bazar
2 5
573,4
77,
839
2536,
2535,
2585
6.25 281000 0 0 4375 9375
28100 322850
127
.
Golzer Talukder gong
S/O. Late Basir Uddin
Talukder Vill- Viar
Char
3 3 576 523 4.09 163600 0 0 2863 0
16360 182823
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 66
128
.
Md. Shazahan Ali
Mondol S/O. Late
Jomsher Ali Mondol
Vill- Viar char
5 2
184,
20,
19
522,
521,
520
5.50 220000 0 0 3850 8250
22000 254100
129
.
Golam Hossain
Mondoa S/O. Late
Mozibor Rahman
Mondol Vill- Viar Char
2 5 770 519 2.50 100000 0 0 1750 0
10000 111750
130
.
Md. Imamul Hasan
S/O. Md. Mofazzal
Hossain Vill- Viar Char
1 3 853 518 1.00 40000 0 0 700 0
4000 44700
131
.
Md. Shaheb Ali Gong
S/O. Late Khadem Ali
Vill- Viar Char
2 6 699,6
99
515,
516 2.00 80000 0 0 1400 0
8000 89400
132
.
Mobarak Ali gong S/O.
Mongla Akondo Vill-
Someshpur
3 5 716 514 1.00 40000 0 0 700 0
4000 44700
133
.
Abdul Kader S/O.
Ebarat Ali Vill-
Someshpur
2 4 26 513 0.50 20000 0 0 350 0
2000 22350
134
.
Md. Shazahan Ali
Mondol S/O. Late
Jamsher Ali Mondol
Vill-Viar Char
1 3
314,
466,
509
525-
527,
534-
536,
551
11.50 460000 0 0 8050 17250
46000 531300
135
.
Saidul Islam S/O. Late
Ismail Akondo Vill-
Viar Char
2 6 770 537 1.50 60000 0 0 1050 0
6000 67050
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 67
136
.
Pashan Ali Shekh gong
S/O.Late Hatem Ali
Shekh Vill- Viar Char
2 5 716,7
84
549,
550 3.00 120000 0 0 2100 0
12000 134100
137
.
Abdul Momin S/O.
Late Abdul Wazed
Mondol Vill- Viar Char
3 7 269 551 0.75 30000 0 0 525 0
3000 33525
138
.
Motahar Ali Mondol
S/O. Late Mozibor Ali
Mondol Vill- Viar Char
2 6 343 554 3.00 120000 0 0 2100 0
12000 134100
139
.
Faridul Islam Sarker
gong Late Ishak Ali
Sarker Vill- Shomespur
2 4 208,
269 562 1.50 60000 0 0 1050 0
6000 67050
140
.
Md. Shahzahan Ali
Mondol S/O. Late
Jamsher Ali Mondol
Vill- Viar Char
2 5 269 567 1.00 40000 0 0 700 0
4000 44700
141
.
Harmuj Ali Akondo
S/O. Late Deowar
Akondo Vill- Viar Char
1 5 269 567 0.75 30000 0 0 525 0
3000 33525
142
.
Mohammad Ali Shekh
S/O. Late Montaz Ali
Shekh Vill- Viar Char
1 3 860 568 1.00 40000 0 0 700 0
4000 44700
143
.
Mohammad Ali Gong
S/O. Late Montaz Ali
Shekh Vill- Viar Char
1 4 819 569 1.50 60000 0 0 1050 0
6000 67050
144
.
Jahurul Islam S/O. Late
Barkat Ali Sarker Vill-
Viar Char
1 3 819 569 1.00 40000 0 0 700 0
4000 44700
145
.
Shahzahan Ali Shekh
S/O.Montaz Ali Shekh
Vill- Viar Char
3 7 819 569 1.00 40000 0 0 700 0
4000 44700
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 68
146
.
Abdur Rahman S/O.
Jahurul Islam Vill- Viar
Char
3 3
388,
389,
392
570 1.25 50000 0 0 875 0
5000 55875
147
.
Afroza Jahan W/O.
Abdul Malek Sarker
Vill- Char Someshpur
1 2
388,
389,
392
570 1.25 50000 0 0 875 0 12000 5000 67875
148
.
Abdul Halim S/O.
Md.Shahzahan Ali
Vill- Viar Char
7 3
388,
389,
392
570 1.00 40000 0 0 700 0
4000 44700
149
.
Md. Moin Uddin gong
S/O. Abdul Malek
Sarker
6 2 576 590 1.25 50000 0 0 875 0
5000 55875
150
.
Abdush Salam Akondo
S/O. Afzol Akondo
Vill- Someshpur
6 2 576 590 1.25 50000 0 0 875 0
5000 55875
151
.
Hazi Shahzahan Ali
S/O. Late Jomsher Ali
Vill- Viar Char
5 2 846,
818
592,
594 3.90 156000 0 0 2730 0
15600 174330
152
.
Khaleque gong S/O.
Easer Mondol Vill-
Someshpur
2 3 818 595 1.25 50000 0 0 875 0
5000 55875
153
.
Jahangir gong S/O.
Eashhak Sarker
Vill- Someshpur
4 3 710 600 1.25 50000 0 0 875 0
5000 55875
154
.
Golam Akand S/O.
Late Azu Akand Vill-
Someshpur 3 2
270,
534,
192,
882
602,
604,
608,
606,
609
11.50 460000 0 0 8050 17250
46000 531300
155
.
Md. Iliash Hossain S/O.
Late Abdush Samad 4 2 882 609 1.25 50000 0 0 875 0
5000 55875
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 69
Sarker Vill- Char
Someshpur
156
.
Abbash Gong S/O. Late
Abdul Barik Vill- Viar
Char
2 1 185 621 1.00 40000 0 0 700 0
4000 44700
157
.
Iman Ali S/O. Late
Osman Goni Vill- Viar
Char
5 1 185,
392
621,
622 3.00 120000 0 0 2100 0
12000 134100
158
.
Ziaur Rahman S/O. Md
Quaran Sarker Vill-
Someshpur
4 2 362,
867
623,
625 3.00 120000 0 0 2100 0
12000 134100
159
.
Milton gong S/O. Late
Suzab Mondol Vill-
Viar Char
4 2 867 626 0.50 20000 0 0 350 0
2000 22350
160
.
Md. Abdul Malek
Sarker S/O. Late
Abdush Samad Sarker
Vill- Char Someshpur
3 4 404,
404
629,
633 3.00 120000 0 0 2100 0
12000 134100
161
.
Rabiul Islam S/O. Late
Sarim pramanik Vill-
Char Someshpur
2 2 404 629 2.00 80000 0 0 14000 0
8000 102000
162
.
Selim Gong S/O. Late
Salam Vill- Someshpur 3 4 404 633 2.50 100000 0 0 1750 0
10000 111750
163
.
Iliash Hossin S/O. Late
Samad Sarker Vill-
Char Someshpur
2 1 370 636 1.25 50000 0 0 875 0
5000 55875
164
.
Sagor gong S/O.
Mortuz Sarker Vill-
Someshpur
3 2 370 636 1.25 50000 0 0 875 0
5000 55875
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 70
165
.
Halim gong S/O. Juran
Mohori Vill-
Someshpur
3 4 74 640 1.25 50000 0 0 875 0
5000 55875
166
.
Nazrul Islam S/O. Late
Abdul Awal Vill-
Someshpur
5 2 74 640 1.25 50000 0 0 875 0
5000 55875
167
.
Motaleb Gong S/O.
Late Abdul Mozid
Sarker Vill- Someshpur
3 2 362 644 1.00 40000 0 0 700 0
4000 44700
168
.
Md. Arif S/O. Gonesh
Miah Vill- Someshpur 3 2 456 655 1.00 40000 0 0 700 0
4000 44700
169
.
Buddu gong S/O. Late
Fadu Mondol Vill-
Someshpur
3 2 555 653 2.00 80000 0 0 1400 0
8000 89400
170
.
Jahurul gong S/O. Late
Suzab Sarker Vill-
Someshpur
3 2 555 653 3.25 130000 0 0 2275 0
13000 145275
171
.
Salim Gong S/O. Late
Hasibur Rahman Vill-
Someshpur
4 3 555,
678 651 1.60 64000 0 0 1120 0
6400 71520
172
.
Md. Ashinur Alom S/O.
Hazi Shahzahan Ali
Mondol Vill- Viar Char
2 3 669 650 2.60 104000 0 0 1820 0
10400 116220
173
.
Safi Shekh S/O. Jahurul
Islam Shekh Vill-
Someshpur
3 2 430 649 2.00 80000 0 0 1400 0
8000 89400
174
.
Joynal Sarker S/O. Late
Nabi Sarker Vill-
Someshpur
3 4 362 644 1.00 40000 0 0 700 0
4000 44700
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 71
175
.
Md. Shafi gong S/O.
Khokshed Sarker Vill-
Char Someshpur
4 3 456 655 1.50 60000 0 0 1050 0
6000 67050
176
.
Md. Golam Azam S/O.
Late Jahurul Khan Vill-
Char Someshpur
2 3 274 656 2.00 80000 0 0 1400 0
8000 89400
177
.
Md. Amzad Hossain
S/O. Late Delwar
Sarker Vill- Someshpur
4 2 891 753 1.00 40000 0 0 700 0
4000 44700
178
.
Golam Mostafa Gong
S/O. Late Mokdom
Vill- Someshpur
5 3 891 753 1.00 40000 0 0 700 0
4000 44700
179
.
Md. Shah Alom S/O.
Late Shobhan Vill-
Sarutia
6 3 400 750 1.75 70000 0 0 1225 0
7000 78225
180
.
Md. Moin Uddin gong
S/O. Abdul Malek
Sarker Vill- Char
Someshpur
3 1 867,
186
744,
749 4.50 180000 0 0 3150 0
18000 201150
181
.
Golam Azom S/O. Late
Jahurul Khan Vill-
Char Someshpur
4 2 311 732 2.00 80000 0 0 1400 0
8000 89400
182
.
Nazmul Islam S/O.
Late Abul Hossain
Sarker Vill- Someshpur
5 2 311 732 1.50 60000 0 0 1050 0
6000 67050
183
.
Liakot gong S/O. Late
Kalachand Vill-
Someshpur
3 2 165 730 1.50 60000 0 0 1050 0
6000 67050
184
.
Reza Shaheob S/O.
Late Azgor Khan Vill-
Char Someshpur
4 2 105 726 1.25 50000 0 0 875 0
5000 55875
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 72
185
.
Md. Aminul Islam S/O.
Late Santo Master
Vill- Someshpur
5 2 538 723 2.15 86000 0 0 1505 0
8600 96105
186
.
Md. Abdur Rouf S/O.
Late Ismail Shekh Vill-
Someshpur
2 1 473 717 1.91 76400 0 0 1337 0
7640 85377
187
.
Abdul Hamid gong
S/O. Late Tahaz Uddin
Vill- Someshpur
1 2 141 716 2.80 112000 0 0 1960 0
11200 125160
188
.
Md. Samsul Alom S/O.
Late Dosim pramanik
Vill- Char Someshpur
2 3 693,
694
715
2.00 80000 0 0 1400 0
8000 89400
189
.
Md. Salim Reza S/O.
Late Siddik Shekh Vill-
Char Someshpur
3 1 786 708 2.75 110000 0 0 1925 0
11000 122925
190
.
Md. Abdul Malek
Sarker S/O. Late
Abdush Samad Sarker
Vill- Char Someshpur
6 3
166,
213,
168,,
757
712,
711,
710
6.02 240800 0 0 4214 9030
24080 278124
191
.
Iliash Hossin S/O. Late
Samad Sarker Vill-
Char Someshpur
7 1 346 706 1.43 57200 0 0 1001 0
5720 63921
192
.
Shahzahan Shekh S/O.
Late Montaz Shekh
Vill- Char Someshpur
5 2 601 704 1.00 40000 0 0 700 0
4000 44700
193
.
Abdur Razzak gong
S/O. Kurman Ali Khan
Vill- Char Someshpur
3 2 412,
755 703 13.75 550000 0 0 9625 20625
55000 635250
194
.
Abdul Baten S/O. Late
Abdul Mozid Sarker
Vill- Someshpur
5 3 87 1515 2.50 100000 0 0 1750 0
10000 111750
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 73
195
.
A. Motalib S/O. Late
Abdul Mozid Vill-
Someshpur 2 1 87 1517 3.00 120000 0 0 2100 0
12000 134100
196
.
Abdul Kuddush Sarker
S/O. Late Abdur
Rahman Vill-
Someshpur
3 1 778 1523 2.00 80000 0 0 1400 0
8000 89400
197
.
Delbar Pramanik S/O.
Late Nayeb Ali
Pramanik Vill-
Someshpur
2 3 24 1524 1.00 40000 0 0 700 0
4000 44700
198
.
Akbar Ali, Abdul
Kader S/O. Jaher Ali
Vill- Someshpur
2 3 174 1525 2.50 100000 0 0 1750 0
10000 111750
199
.
Mayna gong S/O. Late
Abdul Kader Vill- Char
Someshpur
1 2 653 1542 0.50 20000 0 0 350 0
2000 22350
200
.
Abdul Momin gong
S/O. Late Akbar Ali
Vill- Someshpur
6 2 653 1542 0.50 20000 0 0 350 0
2000 22350
201
.
Yachin Ali gong S/O.
Md. Kalim Uddin
Mondol Vill- Char
Someshpur
3 1 653 1542 0.50 20000 0 0 350 0
2000 22350
202
.
Sukur gong S/O. Late
Ali Mondol Vill- Char
Someshpur
7 3 653 1542 0.50 20000 0 0 350 0
2000 22350
203
.
Ismail Hossain S/O.
Abdul Kashem Vill-
Char Someshpur
2 3 253 1544 .75 30000 0 0 525 0
3000 33525
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 74
204
.
Yachin Ali gong S/O.
Md. Kalim Uddin
Mondol Vill- Char
Sompur
5 2 774 1546 2.50 100000 0 0 1750 0
10000 111750
205
.
Buddi Pramanik S/O.
Late Gotha Pramanik
Vill- Char Someshpur
6 1 373 1547 3.00 120000 0 0 2100 0
12000 134100
206
.
Korimul gong S/O.
Late Salim Uddin V
Char Someshpur 4 2
69,
476
1551,
1552 1.50 60000 0 0 1050 0
6000 67050
207
.
Md, Hasen Ali S/O.
Late Nayeb Ali Vill-
Char Someshpur
3 2 521 1553 0 0 3.00 120000 0 0
12000 132000
208
.
Saidul Sarker gong
S/O. Late Jubbar Sarker
Vill- Char 1 2 68 1555 4.00 160000 0 0 2800 0
16000 178800
209
.
Abdur Rashid Sarker
S/O. Late Ayel Ali
Sarker V- Char
Someshpur
2 1 250 702 0 0 1.625 65000 0 0
6500 71500
210
.
Md. Siraj Sarker S/O.
Late Jendar Sarker Vill-
Char S
2 2 250 702 1.625 65000 0 0 1625 0
6500 73125
211
.
Borhan Ali gong S/O.
Late Kashem Ali,
Masud Rana gong
S/o.Late Khokon
Mondol V.Char
Someshpur
5 2 462 701 3.75 150000 0 0 2625 0
15000 167625
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 75
212
.
Gazi Md. Shorhab Ali
S/O. Late Nayeb Ali
Vill- Char Someshpur 5 2
514,
772,
583
401,
402,
403
11.24 449600 0 0 7868 16860
44960 519288
213
.
Md. Abdul Aziz S/O.
Late Beleat Ali Mondol
Vill- Char Someshpur 2 3 583 400 2.41 96400 0 0 1687 0
9640 107727
214
.
Md. Abdul Hye gong
S/O. Late Belaet
Mondol Vill- Char S.
pur
2 3 772 399 3.25 130000 0 0 2275 0
13000 145275
Total 683 545 455.64
2
2027750
0
48.48
5 2301850 330378 211820 155000 2257935 25534483
Sl.
No.
Name & address of
APs
HH
members Khati
an
No.
Plot
No.
Agricultural land High (Vity) land Standin
g crops
Transe
ction
Allowa
nce
Duty &
Fee Total
Area Value Area Value M F
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 76
SECOND RURAL TRANSPORT IMPROVEMENT PROJECT , (RTIP-II), LGED
List of Inventory (Affected Trees)
Alokdiar (Jamtoil)-Shomespur (Belkuchi Upazila) GC Road, SIR/UZR-76
SL Name & Address
Fruit Trees Timber Trees Total
Value
Small Medium Large Compe
nsation
for fruit
Small Medium Large Nos. Value
Nos. Value Nos
.
Value Nos. Value Nos Value Nos
.
Value
1. Md. Abdul Jalil gong S/O. Late
Mojabot Ali Shekh Vill-
Alokdiar.
0 0 0 0 1 10000 1800 0 0 1 1500 0 0 13300
2. Mts.Jhorna Khatun gong S/O.
Late Atahar Ali Sarker Vill-
Alokdiar
0 0 0 0 0 0 0 0 0 5 7500 4 14000 21500
3. Abdul Malek gong S/O. Late
Saykot Ali Sarker Vill-
Alokdiar.
0 0 0 0 2 20000 4000 0 0 15 240000 0 0 264000
4. Md. Abu Musa Sarker gong
S/O. Md. Fajlul Haque Sarker
Vill- Tengrail.
0 0 0 0 7 60000 6000 0 0 5 50000 0 0 116000
5. Niranjan Halder gong S/O.
Late Duliram Chandra Halder
Vill- Tengrail.
0 0 0 0 0 0 0 17 17000 0 0 0 0 17000
6. Niranjan Halder gong S/O.
Late Duliram Chandra Halder
Vill- Tengrail.
1 5000 0 0 0 0 0 1 1000 0 0 0 0 6000
7. Ripon Sarker & Nazmul Haque
gong S/O. Late Abul Hossen
Sarker
Vill- Tengrail.
0 0 0 0 1 10000 1500 25 25000 0 0 0 0
36500
8. Mohendra Nath Mondal S/O.
Mongal pramanik Vill-
Tengrail.
0 0 0 0 0 0 0 0 0 1 1500 0 0 1500
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 77
9. Porimoldas gong S/O. Late
Motilal das Vill- Tengrail. 0 0 0 0 0 0 0 0 0 16 24000 0 0 24000
10. Tusar Kanti das gong S/O.
Late Tarapodo das Vill-
Tengrail.
0 0 0 0 0 0 0 7 7000 0 0 0 0 7000
11. Nazmul Haque gong S/O. Late
Abul Hossain Sarker Vill-
Tengrail.
0 0 0 0 0 0 0 0 0 8 12000 0 0 12000
12. Fatik Chandra Biswash S/O.
Late Bijoy Chandra Biswash
Vill- Tengrail.
0 0 0 0 0 0 0 0 0 1 1500 0 0 1500
13. Ratan Kumar Biswash S/O.
Late Natobar Biswash Vill-
Tengrail.
0 0 0 0 0 0 0 3 18000 0 0 0 0 18000
14. Birandra nath Biswas S/O.
Late Bijoy nath Biswas Vill-
Tengrail.
0 0 0 0 0 0 0 2 2000 0 0 0 0 2000
15. Tarapodo Halder S/O. Late
Fatik Halder Vill- Tengrail. 0 0 0 0 0 0 0 0 0 15 113000 0 0 113000
16. Abdul Sattar gong S/O. Late
Babur Ali Vill- Nandina
Madhu
0 0 0 0 0 0 0 0 0 0 0 2 7000 7000
17. Md. Shahzahan Ali S/O.Md.
Abdush Vill- Nandina Madhu 1 2000 6 38500 0 0 4000 0 0 0 0 0 0 44500
18. Md. Alom sarker gong S/O.
Late Sekander Vill- Vill-
Nandina Madhu
0 0 0 0 0 0 0 10 40000 0 0 0 0 40000
19. Md. Alom sarker gong S/O.
Late Sekander Vill- Vill-
Nandina Madhu
0 0 4 28000 0 0 4000 0 0 7 10500 0 0 42500
20. Abdul Momin gong S/O.
Kobirul Islam Vill- Nandina
Madhu
0 0 6 42000 0 0 6000 0 0 6 27000 0 0 75000
21. Ashraful Alam S/O. Late Riaz
Uddin 1 5000 0 0 0 0 0 0 0 0 0 2 8000 13000
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 78
22. Md. Shahidul Islam gong S/O.
Late Younus Ali Vill- Viar
Char
0 0 0 0 0 0 0 3 3000 0 0 0 0 3000
23. Md. Abdul Mozid S/O. Late
Joynal Sarker Vill- Viar Char 0 0 2 2000 0 0 500 0 0 0 0 2 7000 9500
24. Johurul Islam gong S/O. Late
Hatem Ali Sarker Vill-
Nandina Modhu
0 0 0 0 0 0 0 10 10000 0 0 0 0 10000
25. Harez Mondol S/O. Late Bahez
Mondol - Vill Nandina Madhu 0 0 0 0 0 0 0 0 0 3 30000 0 0 30000
26. Abdul Alim S/o. Md. Hasen
Ali Shekh Vill- Nandina
Modhu
0 0 0 0 2 20000 1800 0 0 0 0 0 0 21800
27. Mrs. Mohila Begum W/O. Md.
Hasen Ali Shekh Vill- Nandina
Modhu
0 0 0 0 5 50000 10000 0 0 0 0 0 0 60000
28. Abdul Kader gong S/O. Md.
Hasen Ali Shekh Vill- Nandina
Modhu
0 0 0 0 0 0 0 2 2000 2 3000 0 0 5000
29. Abu Bakkar gong S/O. Late Lal
Miah Sarker Vill- Nandina
Madhu (Diar para)
0 0 7 42000 0 0 4000 0 0 0 0 0 0 46000
30. Abu Sayed gong S/O. Late Lal
Mia Sarker Vill-Nandina
Madhu
0 0 12 120000 0 0 12000 0 0 0 0 0 0 132000
31. Abdul Razzak S/O. Late Tasir
Uddin Sarker Vill-Nandina
Modhu
0 0 2 14000 0 0 3000 0 0 0 0 0 0 17000
32. Saiful Sarker S/O. Late
Suzabot Ali Sarker Vill-
Nandina Modhu (Diar para)
0 0 0 0 0 0 0 3 3000 0 0 0 0 3000
33. Ismail Hossain gong S/O. Late
Munsar Ali 4 20000 0 0 0 0 2000 0 0 0 0 0 0 22000
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 79
34. Md. Hakim Mondol S/O. Late
Haran Mondol Vill- Nandina
Modhu
0 0 6 42000 0 0 6000 0 0 0 0 0 0 48000
35. Md. Maznu Mondol S/O. Md.
Abdul Halim Vill- Nandina
Modhu (Diar para)
0 0 0 0 1 20000 3600 0 0 0 0 0 0 23600
36. Maznu PK. S/O. Late
Khorshed PK. Vill- Nandina
Modhu
0 0 3 21000 0 0 4500 0 0 0 0 0 0 25500
37. Md. Hamidul gong S/O.
Hormuj Sarker Vill- Nandina
Modhu
0 0 0 0 0 0 0 0 0 17 170000 0 0 170000
38. Hasan gong S/O. Korman Ali
Mondol Vill- Nandina Modhu 0 0 0 0 0 0 0 0 0 2 3000 0 0 3000
39. Wahed Jamal S/O. Akbar
Munsi Vill- Nandina Modhu 0 0 0 0 0 0 0 0 0 10 15000 0 0 15000
40. Obydul Sarker S/O. Siddique
Sarker Vill- Nandina Modhu 0 0 0 0 0 0 0 9 9000 0 0 0 0 9000
41. Danesh Ali gong S/O. Late
Mobarak Ali Mondol 0 0 0 0 0 0 0 0 0 5 50000 3 48000 98000
42. Haran Mondol S/O. Late
Dosim Mondol Vill- Nandina
Modhu
0 0 3 30000 0 0 4500 1 4000 0 0 0 0 38500
43. Abdul Barik gong S/O. Late
Azizul Haque Vill- Nandina
Modhu
0 0 0 0 0 0 0 0 0 9 90000 0 0 90000
44. Golam Mohammad S/O. Late
Mojibeur Rahman Vill-Viar
Char
0 0 0 0 0 0 0 0 0 2 20000 0 0 20000
45. Hazi Abdul Aziz S/O. Late
Ramzan Munsi Vill- Viar Char 0 0 0 0 0 0 0 4 4000 2 20000 0 0 24000
46. Md. Saykot Ali Shekh S/O.
Late Montazj Ali Shekh Vill-
Viar Char
0 0 0 0 0 0 0 0 0 3 4500 0 0 4500
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 80
47. Md. Shajahan Shekh S/O. Late
Montaj Shekh 0 0 0 0 0 0 0 0 0 0 0 1 3500 3500
48. Golzer Talukder gong S/O.
Late Basir Uddin Talukder
Vill- Viar Char
0 0 0 0 0 0 0 0 0 2 3500 0 0 3500
49. Md. Shazahan Ali Mondol
S/O. Late Jomsher Ali Mondol
Vill- Viar char
0 0 0 0 0 0 0 0 0 7 13000 0 0 13000
50. Golam Hossain Mondoa S/O.
Late Mozibor Rahman Mondol
Vill- Viar Char
0 0 2 10500 0 0 3000 2 14000 1 2000 0 0 29500
51. Md. Shaheb Ali Gong S/O.
Late Khadem Ali Vill- Viar
Char
0 0 0 0 9 45000 8100 0 0 0 0 0 0 53100
52. Md. Shazahan Ali Mondol
S/O. Late Jamsher Ali Mondol
Vill-Viar Char
0 0 0 0 17 139000 20400 0 0 16 23000 0 0 182400
53. Saidul Islam S/O. Late Ismail
Akondo Vill- Viar Char 0 0 0 0 0 0 0 1 1000 3 30000 0 0 31000
54. Pashan Ali Shekh gong
S/O.Late Hatem Ali Shekh
Vill- Viar Char
2 7000 0 0 0 0 2000 0 0 10 57500 0 0 66500
55. Abdul Momin S/O. Late Abdul
Wazed Mondol Vill- Viar Char 0 0 3 21000 0 0 0 0 0 0 0 0 0 21000
56. Faridul Islam Sarker gong Late
Ishak Ali Sarker Vill- Somspur 4 20000 0 0 0 0 0 0 0 0 0 0 0 20000
57. Harmuj Ali Akondo S/O. Late
Deowar Akondo Vill- Viar
Char
1 5000 0 0 0 0 0 0 0 0 0 1 16000 21000
58. Mohammad Ali Shekh S/O.
Late Montaz Ali Shekh Vill-
Viar Char
0 0 0 0 0 0 0 0 0 0 0 1 16000 16000
59. Mohammad Ali Gong S/O.
Late Montaz Ali Shekh Vill-
Viar Char
0 0 3 21000 0 0 2700 0 0 0 0 0 0 23700
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 81
60. Jahurul Islam S/O. Late Barkat
Ali Sarker Vill- Viar Char 0 0 3 21000 0 0 2700 0 0 2 3500 0 0 27200
61. Md. Arif S/O. Late Gonesh
Miah Vill- Someshpur 0 0 0 0 0 0 0 8 8000 1 1500 0 0 9500
62. Md. Salim Reza S/O. Late
Siddik Shekh Vill- Char
Someshpur
0 0 0 0 0 0 0 1 1000 3 21000 2 10000 32000
63. Abdur Razzak gong S/O.
Kurman Ali Khan Vill- Char
Someshpur
0 0 12 84000 0 0 10800 0 0 7 27500 0 0 122300
64. Abdul Baten S/O. Late Abdul
Mozid Sarker Vill- Someshpur 0 0 0 0 0 0 0 8 8000 0 0 0 0 8000
65. A. Motalib S/O. Late Abdul
Mozid Vill- Someshpur 0 0 0 0 0 0 0 0 0 7 10500 0 0
10500
66. Delbar Pramanik S/O. Late
Nayeb Ali Pramanik Vill-
Someshpur
1 1000 0 0 0 0 0 0 0 0 0 0 0 1000
67. Buddi Pramanik S/O. Late Gotha
Pramanik Vill- Char Someshpur 0 0 0 0 0 0 0 0 0 1 1500 0 0 1500
68. Korimul gong S/O. Late Salim
Uddin V Char Someshpur 0 0 2 10500 0 0 2000 0 0 2 3000 0 0 15500
69. Md, Hasen Ali S/O. Late
Nayeb Ali Vill- Char
Someshpur
0 0 1 7000 0 0 1500 0 0 0 0 0 0 8500
70. Saidul Sarker gong S/O. Late
Jubbar Sarker Vill- Char
Someshpur
0 0 9 59500 0 0 7200 0 0 0 0 0 0 66700
71. Abdur Rashid Sarker S/O. Late
Ayel Ali Sarker V- Char
Someshpur
0 0 5 35000 0 0 6000 0 0 0 0 0 0
41000
72. Md. Siraj Sarker S/O. Late Jendar
Sarker Vill- Char Someshpur 0 0 0 0 0 0 0 35 35000 0 0 0 0 35000
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 82
73. Borhan Ali gong S/O. Late
Kashem Ali, Masud Rana
gong S/o.Late Khokon
Mondol V.Char Someshpur
0 0 0 0 0 0 0 4 4000 16 24000 0 0
28000
74. Gazi Md. Shorhab Ali S/O.
Late Nayeb Ali Vill- Char
Someshpur
0 0 17 115500 0 0 20400 0 0 5 7500 0 0 143400
75. Md. Abdul Aziz S/O. Late Beleat
Ali Mondol Vill- Char Someshpur 6 22000 0 0 0 0 2500 1 1000 0 0 0 0 25500
76. Md. Abdul Hye gong S/O. Late
Belaet Mondol Vill- Char
Someshpur
0 0 5 31500 0 0 4500 0 0 3 30000 0 0 66000
Total 21 87000 113 796000 45 374000 173000 157 217000 221 1153000 18 12950
0 2929500
SL Name & Address
Fruit Trees Timber Trees Total
Value
Small Medium Large Compe
nsation
for fruit
Small Medium Large Nos. Value
Nos. Value Nos
.
Value Nos. Value Nos Value Nos
.
Value
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 83
SECOND RURAL TRANSPORT IMPROVEMENT PROJECT , (RTIP-II), LGED
List of Inventory (Land & structure)
Bagharchar-Sanandabari Hat via Goalkanda Road, Jamalpur-JAM/UZR/ 64
Sl.
No.
Name & address of
APs
HH
members Kha
tian
No.
Plot
No.
Agricultural
land High (Vity) land
Standing
crops
Transectio
n
Allowance Assistance Duty &
Fee Total
Area Value Area Value M F
1. Abdus satter S/o.
Asgor Ali Vill- Abar
char.
3 5 188 4848 13.94 278800 0 0 8713 20910 0 27880 336303
2.
Jashim Uddin S/o.
Nasor Uddin Vill-
Sanandabari.
5 3 615 4847 1.45 29000 0 0 906 0 0 2900 32806
3.
Tofazzal Haque
(Rajon Ali) S/o.
Islam Molla Vill-
Haruabari.
4 3 710,
711 4846 10.14 202800 0 0 6338 15210 0 20280 244628
4.
Rasul Mamud S/o.
Gopon Sarkar Vill-
Sanandabari.
8 6 982 4828 3.48 69600 0 0 2175 0 0 6960 78735
5.
Rasul Mamud S/o.
Gopon Sarkar Vill-
Sanandabari.
8 6 982 4801 3.91 78200 0 0 2444 0 0 7820 88464
6.
Gonjar Ali(Ansar
Ali) S/o. Torip
Uddin Vill-
Matherchar.
5 3 535 4800 7.18 143600 0 0 4488 10770 0 14360 173218
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 84
7.
Sayed Ali, S/o. Tonu
Mondal. Vill-
Haruabari. 8 6 910 4877 3.96 79200 0 0 2475 0 0 7920 89595
8.
Sayed Ali S/o. Tonu
Mondal Vill-
Haruabari. 8 6 590 4878 2.59 51800 0 0 1619 0 0 5180 58599
9.
Sayed Ali S/o. Tonu
Mondal Vill-
Haruabari. 8 6 590 4793 4.91 98200 0 0 3069 0 0 9820 111089
10.
Rostum Ali S/o.
Rohaman Ali Vill-
Haruabari. 4 3 962 4792 3.91 78200 0 0 2444 0 0 7820 88464
11.
Akram Ali S/o.
Tojammel
Haque,Vill-
Sanandabari.
3 3 13 4791 4.70 94000 0 0 2938 0 0 9400 106338
12.
Jamal Uddin S/o.
Manser Ali Vill-
Haruabari. 2 1
117
5 4788 5.54 110800 0 0 3463 8310 0 11080 133653
13.
Sayed Jamal (gong)
S/o. Mohor Ali Vill-
Haruabari. 2 2 139 4784 0 0 0.80 24000 0 0 0 2400 26400
14.
Hamida Khatun
(gong) W/o. Osman
Goni Vill-
Haruabari
8 7 117
5 4783 4.06 81200 0 0 406 0 40000 8120 129726
15.
Khaybor Ali S/o.
Abbus Ali Vill-
Haruabari
4 3 530 4782 1.48 29600 0 0 925 0 0 2960 33485
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 85
16.
Khaybor Ali S/o.
Abbus Ali Vill-
Haruabari 4 3 530 4776 0 0 9.24 277200 0 0 0 27720 304920
17.
Ensab Ali S/o. Jasim
Uddin Vill-
Sanandabari. 4 3 439 4778 14.78 295600 0 0 9238 22170 0 29560 356568
18.
Shamsul
Haque(gong)
S/o.Aman Ali Vill-
Haruabari.
2 3 805 4779 1.74 34800 0 0 1088 0 0 3480 39368
19.
Abdul Khalek S/o.
Ahmmed Ali Vill-
Sanandabari. 3 4 272 4730 11.93 238600 0 0 7456 17895 0 23860 287811
20.
Mujibur Rahman
S/o. Moslem Uddin
Vill- Haruabari. 1 1
124
8 4721 5.57 111400 0 0 3481 8355 0 11140 134376
21.
Abdul Wahed S/o.
Abdul Majhid Vill-
Sanandabari. 8 4 203 4722 9.03 180600 0 0 5644 13545 0 18060 217849
22.
Osman Goni S/o.
Younis Ali Vill-
Sanandabari. 5 3
114
5 4716 0.55 11000 0 0 344 0 0 1100 12444
23.
Abdus Rashid S/o.
Kashem Ali Vill-
Sanandabari. 2 4 906 4715 3.73 74600 0 0 2331 0 0 7460 84391
24.
Sopura Khatun W/o.
Sofor Ali Vill-
Sanandabari.
3 2 565 4713 2.80 56000 0 0 1750 0 25000 5600 88350
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 86
25.
Abdul Wahed S/o.
Abdul Majhid Vill-
Sanandabari. 8 4 203 4712 3.75 75000 0 0 2344 0 0 7500 84844
26.
Younus Ali S/o.
Mahar Ali Vill-
Sanandabari 5 3 391 4711 4.65 93000 0 0 2906 0 0 9300 105206
27.
Jamat Ali(gong)
S/o.Mahmud Ali
Vill- Sanandabari. 6 4 641 4710 1.74 34800 0 0 1088 0 0 3480 39368
28.
Hasen Ali S/o. Alim
Uddin Vill-
Haruabari. 5 4
113
8 4709 2.11 42200 0 0 1319 0 0 4220 47739
29.
Chandu Sheikh S/o.
Danesh Ali Vill-
Haruabari. 4 3
102
3 4851 5.97 119400 0 0 3731 8955 0 11940 144026
30.
Abdus Satter Abdul
Karim S/o. Asgor
Ali Vill- Abar char. 3 5 188 4848 9.77 195400 0 0 6106 14655 0 19540 235701
31.
Rasul Mamud S/o.
Gopon Sarkar Vill-
Sanandabari. 4 4 982 4845 1.63 32600 0 0 556 0 0 3260 36416
32.
Tofazzal Haque
S/o. Islam Molla
Vill- Haruabari. 4 4
710,
711 4846 11.09 221800 0 0 6931 16635 0 22180 267546
33.
Rasul Mamud S/o.
Gopon Sarkar Vill-
Sanandabari.
8 6 982 4828 1.74 34800 0 0 1088 0 0 3480 39368
34.
Ashab Uddin S/o.
Torit Uddin Vill-
Matherchar.
6 4 31 4834 0.83 16600 0 0 519 0 0 1660 18779
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 87
35.
Rasul Mamud S/o.
Gopon Sarkar Vill-
Sanandabari.
8 6 982 4801 4.54 90800 0 0 2838 0 0 9080 102718
36.
Gonjar Ali(Ansar
Ali) S/o. Torip
Uddin Vill-
Matherchar.
5 3 535 4800 7.18 143600 0 0 4488 10770 0 14360 173218
37.
Sayed Ali, S/o. Tonu
Mondal. Vill-
Haruabari.
8 6 910 4877 3.96 79200 0 0 2475 0 0 7920 89595
38.
Ensab Ali S/o. Jasim
Uddin Vill-
Sanandabari.
4 3 439 4778 11.40 228000 0 0 7125 17100 0 22800 275025
39.
Sayed Ali, S/o. Tonu
Mondal. Vill-
Haruabari.
8 6 590 4793 5.02 100400 0 0 3138 7530 0 10040 121108
40.
Rostum Ali S/o.
Rohaman Ali Vill-
Haruabari.
4 3 962 4792 4.06 81200 0 0 2538 0 0 8120 91858
41.
Akram Ali S/o.
Tojammel
Haque,Vill-
Sanandabari.
3 3 13 4791 4.70 94000 0 0 2969 0 0 9400 106369
42.
Jamal Uddin S/o.
Manser Ali Vill-
Haruabari. 2 1 654 4788 5.54 110800 0 0 3463 8310 0 11080 133653
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 88
43.
Jamal Uddin S/o.
Manser Ali Vill-
Haruabari. 2 1 654 4789 3.17 63400 0 0 0 0 0 6340 69740
44.
Khaybor Ali
Somiron nesa S/o.
Abbus Ali Vill-
Haruabari
4 3 530 4782 1.53 30600 0 0 956 0 0 3060 34616
45.
Habibar Rahman
Abdul Goful S/o.
Intaj Ali Vill-
HaRuabari.
5 4 113
2 4775 0 0 6.56 196800 0 0 0 19680 216480
46.
Khaybor Ali S/o.
Abbus Ali Vill-
Haruabari 4 3 530 4776 0 0 3.55 106500 0 0 0 10650 117150
47.
Dorbesh Ali Akando
S/o. Iman Ali
Akando Vill-
Sanandabari
7 4 713 4777 6.33 126600 0 0 2469 9495 0 12660 151224
48.
Ensab Ali S/o. Jasim
Uddin Vill-
Sanandabari.
4 3 439 4778 11.40 228000 0 0 7125 17100 0 22800 275025
49.
Azizur Rahman
(gong) S/o. Abdul
Hai Akand Vill-
Sanandabari.
3 3 338 4731 2.53 50600 0 0 1581 0 0 5060 57241
50.
Abdul Khalek S/o.
Ahammed Ali Vill-
Sanandabari. 3 4 272 4730 10.82 216400 0 0 6763 16230 0 21640 261033
51.
Abdul Wahed
(gong) S/o. Abdul 8 4 203 4722 11.09 221800 0 0 6931 16635 0 22180 267546
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 89
Majhid Vill-
Sanandabari.
52.
Sopura Khatun W/o.
Sofor Ali Vill-
Sanandabari. 3 2 565 4713 2.90 58000 0 0 1813 0 25000 5800 90613
53.
Abdul Wahed
(gong) S/o. Abdul
Majhid Vill-
Sanandabari.
8 4 203 4712 3.48 69600 0 0 2175 0 0 6960 78735
54.
Younus Ali S/o.
Mahar Ali Vill-
Sanandabari 5 3 391 4711 4.33 86600 0 0 2706 0 0 8660 97966
55.
Jamat Ali(gong)
S/o.Mahmud Ali
Vill- Sanandabari. 6 4 641 4710 1.74 34800 0 0 1088 0 0 3480 39368
56.
Hasen Ali S/o. Alim
Uddin, l- Haruabari. 5 4 1138 4709 2.11 42200 0 0 1319 0 0 4220 47739
274 208 - - 272.49 5449800 20.15 604500 164283 260580
90000
605430 7084593
Sl.
No.
Name & address of
APs
HH
members Kha
tian
No.
Plot
No.
Agricultural
land High (Vity) land
Standing
crops
Transectio
n
Allowance Assistance Duty &
Fee Total
Area Value Area Value M F
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 90
SECOND RURAL TRANSPORT IMPROVEMENT PROJECT , (RTIP-II), LGED
List of Inventory (Affected Trees)
Bagharchar-Sanandabari Hat via Goalkanda Road, Jamalpur-JAM/UZR/ 64
SL.
No.
Name & Address
Fruit Trees Timber Trees Total
Value
Small Medium Large Small Medium Large
Nos. Value No. Value Nos. Value Compen
sation
for fruits
Nos
.
Value Nos. Value Nos. Value
1. Akram Ali S/o. Tojammel
Haque,Vill- Sanandabari. 0 0 0 0 0 0 0 0 0 20 20000 0 0 20000
2. Sayed Jamal(gong) S/o. Mohor
Ali Vill- Haruabari. 0 0 8 12000 0 0 4000 25
1250
0 0 0 0 0 28500
3. Hamida Khatun (gong) H/o.
Osman Goni Vill- Haruabari 0 0 0 0 0 0 0 10 5000 0 0 0 0 5000
4. Khaybor Ali S/o. Abbus Ali
Vill- Haruabari 0 0 0 0 0 0 0 15 7500 0 0 0 0 7500
5. Shamsul Haque(gong)
S/o.Aman Ali Vill- Haruabari. 0 0 0 0 0 0 0 20
1000
0 0 0 0 0 10000
6. Abdul Khalek S/o. Ahmmed
Ali Vill- Sanandabari. 0 0 0 0 0 0 0 10 5000 0 0 0 0 5000
7. Ashab Uddin S/o. Torit Uddin
Vill- Matherchar. 0 0 0 0 0 0 0 20
1000
0 0 0 0 0 10000
8. Akram Ali S/o. Tojammel
Haque,Vill- Sanandabari. 0 0 0 0 0 0 0 0 0 20 20000 0 0 20000
9. Habibar Rahman Abdul Goful
S/o. Intaj Ali Vill- HaRuabari. 0 0 5 7500 0 0 3000 10 5000 0 0 0 0 15500
10. Dorbesh Ali Akando S/o. Iman
Ali Akando Vill- Sanandabari 0 0 0 0 0 0 0 0 0 7 7000 0 0 7000
11. Azizur Rahman (gong) S/o.
Abdul Hai Akand Vill-
Sanandabari.
0 0 0 0 0 0 0 0 0 10 15000 0 0 15000
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 91
12. Abdul Khalek S/o. Ahammed
Ali Vill- Sanandabari. 0 0 0 0 0 0 0 10 5000 0 0 0 0 5000
0 0 13 19500 0 0 7000 120 6000
0 57 62000 0 0 148500
SL.
No.
Name & Address
Fruit Trees Timber Trees Total
Value
Small Medium Large Small Medium Large
Nos. Value No. Value Nos. Value Compen
sation
for fruits
Nos
.
Value Nos. Value Nos. Value
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 92
SECOND RURAL TRANSPORT IMPROVEMENT PROJECT , (RTIP-II), LGED
List of Inventory (Land & structure)
Deari-Jagannathpur via Jagdal Bhurakhali Road, Package No. SUN/UZR-32,
Upazila- Derai, Sunamgonj.
Sl.
No.
Name & address of
APs
HH
members Kha
tian
No.
Plot
No.
Agricultural land High (Vity) land Structure Grant Transition
Allowance
Assistance Duty &
Fee Total
Area Value Area Value
Shiftable Non
shiftable TR
G HCG
M F Ar
ea
Co
mp.
Are
a
Co
mp.
1.
Malshi Kumar
Bormon gong S/O.
Kali Charon
Barmon Vill-
Chanpur
2 3 638 2563 1.42 8520
- - - - - - - -
- - 852 9372
2. Malshi Kumar
Bormon gong S/O.
Kali Charon
Barmon Vill-
Chanpur
2 3 638 2564 1.68 10080
- - - - - - - -
- - 1008 11088
3. Gobinda Chandra
Barmon S/O.
Aboni Chandra
Barmon Vill-
Chanpur
2 2 452 2565 1.36 8160
- - - - - - - -
- - 816 8976
4. Gobinda Chandra
Barmon S/O.
Aboni Chandra
Barmon Vill-
Chanpur
2 2 452 2566 1.23 7380
- - - - - - - -
- - 738 8118
5. Jamshed Kha S/O.
Alom Kha Vill-
Shakitpur 1 4
205
,20
6,2
08
2777 51.51 309060
- - - - - - - -
77265 - 30906 417231
6. Asshini Kumar
gong S/O.Kalinath 3 3 5, 2894 2.20 13200
- - - - - - - - - - 1320 14520
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 93
Chakraboti Vill-
Chanpur
140
7. Asshini Kumar
gong S/O.
Kalinath
Chakraboti Vill-
Chanpur
3 3 562 2902 2.99 17940
- - - - - - - -
- - 1794 19734
8. Bonk Bihari gong
S/O. Chandra
Nath Koibotto Das
Vill- Chanpur
4 3 627 2903 1.35 8100
- - - - - - - -
- - 810 8910
9. Bonk Bihari gong
S/O. Chandra
Nath Koibotto Das
Vill- Chanpur
4 3 627 2904 1.18 7080
- - - - - - - -
- - 708 7788
10. Dipcharon
Koibotto Das S/O
Tara Chandra Vill-
Sakitpur
2 3 469 2908 1.36 8160
- - - - - - - -
- - 816 8976
11. Jamshed Kha S/O.
Alom Kha Vill-
Shakitpur 1 4
205
,20
6,2
08
2912 33.26 199560
- - - - - - - -
49890 - 19956 269406
12. Renu Mohan Ray
S/O. Reboti
Mohan Roy Vill-
Chanpur
1 3 529 2941 3.44 20640
- - - - - - - -
- - 2064 22704
13. Asshini Chakra
Boti gong Azid
Ullah, Akter Ullah
Vill- Lakhai
2 3 9,8,
6 2942 51.57 309420
- - - - - - - -
77355 - 30942 417717
14. Pari Lal Roy S/O.
Praholad RoyDirai 2 4 478 2944 3.73 22380
- - - - - - - - - - 2238 24618
15. Bonk Bihari gong
S/O. Chandra 4 3 627 2945 6.36 38160
- - - - - - - - 9540 - 3816 51516
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 94
Nath Koibotto Das
Vill- Chanpur
16. Debendra Chandra
Roy S/O. Jadu
Nath Roy Dirai
3 2 666 2946 4.48 26880
- - - - - - - -
- - 2688 29568
17. Kunjo Mohan
Barmon S/O.
Uttam Roy
Barmon Chanpur
4 2 449 2948 8.03 48180
- - - - - - - -
12045 - 4818 65043
18. Nilchand Das
gong S/O. Rada
Charon Das Vill-
Chanpur
2 3 672 2954 7.68 46080 - - - - - - - -
11520
- 4608 62208
19. Sukmoy Barmon
S/O. Mohananda
Barmon Vill-
Chanpur
2 2 538 2955 3.67 22020
- - - - - - - -
- - 2202 24222
20. Ishan Chandra Das
gong S/O. Isshar
Chandra Das Vill-
Chanpur
3 2 581 2957 4.78 28680
- - - - - - - -
- - 2868 31548
21. Bhagoban Sutra
Dar S/O. Boirangi
Sutra Dar Vill-
Chanpur
1 4 496 2958 4.84 29040
- - - - - - - -
- - 2904 31944
22. Nilchand Das
gong S/O. Rada
Charon Das Vill-
Chanpur
2 3 672 2959 5.59 33540
- - - - - - - -
- - 3354 36894
23.
Sushila Sundori
Das gong H/O.
Sadoy Chandra
Das Vill- Chanpur
1 3 550 2960 6.45 38700
- - - - - - - -
9675 19000 3870 71245
24. Suduram koibarto
Das S/O. Tara 2 4 673 2962 5.06 30360
- - - - - - - - - - 3036 33396
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 95
chand koibarto
Vill- Chanpur
25. Malshi Kumar
Bormon gong S/O.
Kali Charon
Barmon Vill-
Chanpur
2 3 638 2563 1.57 9420
- - - - - - - -
- - 942 10362
26. Malshi Kumar
Bormon gong S/O.
Kali Charon
Barmon Vill-
Chanpur
2 3 638 2564 1.98 11880
- - - - - - - -
- - 1188 13068
27. Gobinda Chandra
Barmon S/O.
Aboni Chandra
Barmon Vill-
Chanpur
2 3 452 2565 1.87 11220
- - - - - - - -
- - 1122 12342
28. Gobinda Chandra
Barmon S/O. Aboni
Chandra Barmon
Vill- Chanpur
2 3 452 2566 1.72 10320
- - - - - - - -
- - 1032 11352
29. Jatindra Mohan
Barmon gong S/O.
Narendra Kishor
Barmon Vill-
Chanpur
3 2 665 2623 3.54 21240
- - - - - - - -
- - 2124 23364
30. Jamshed Kha S/O.
Alom Kha Vill-
Shakitpur 1 4
205
,20
6,2
08
2777 45.99 275940
- - - - - - - -
68985 - 27594 372519
31. Asshini kumar
Chakra boti S/O.
Kali kumar
Chakra Boti Vill-
Chanpur
2 3 5,1
40 2894 1.84 11040
- - - - - - - -
- - 1104 12144
32. Jatindra Chandra
Chakra borti gong 2 4 562 2902 2.48 14880
- - - - - - - - - - 1488 16368
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 96
S/O.KrisnaChandr
a Chakraborti Vill-
Lakhai Khana
33. Bonk Bihari gong
S/O. Chandra
Nath Koibotto Das
Vill- Chanpur
4 3 627 2903 0.99 5940
- - - - - - - -
- - 594 6534
34. Bonk Bihari gong
S/O. Chandra
Nath Koibotto Das
Vill- Chanpur
4 3 627 2904 1.00 6000
- - - - - - - -
- - 600 6600
35. Dipcharon
Koibotto Das S/O
Tara Chandra Vill-
Sakitpur
2 3 469 2908 2.01 12060
- - - - - - - -
- - 1206 13266
36. Ramesh Chandra
Mohissha Das
gong, S/O. Rajendra
Mohissha Das
Vill- Chanpur
3 4
502
,52
0
2913 2.12 12720
-
- - - - - - -
- - 1272 13992
37.
Jamshed Kha S/O.
Alom Kha Vill-
Shakitpur 1 4
205
,20
6,2
08
2912 26.18 157080
- - - - - - - -
39270 - 15708 212058
38. Renu Mohan Ray
S/O. Reboti Mohan
Roy Vill- Chanpur
1 3 529 2941 3.17 19020
- - - - - - - -
- - 1902 20922
39. Asshini kumar
Chakra borti S/O.
Kalidas
Chakraborti Vill-
Lakhai
2 3
6,8,
9,1
3
2942 33.02 198120
- - - - - - - -
49530 - 19812 267462
40. Rajoni Barmon
gong S/O.
Ramchandra
1 4 621 2943 4.55 27300
- - - - - - - -
- - 2730 30030
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 97
Barmon Vill-
Anowarpur
41. Pari Lal Roy S/O.
Praholad, RoyDirai 2 4 478 2944 4.75 28500
- - - - - - - - - - 2850 31350
42. Bonk Bihari gong
S/O. Chandra
Nath Koibotto Das
Vill- Chanpur
4 3 627 2945 6.49 38940
- - - - - - - -
9735 - 3894 52569
43. Debendra Chandra
Roy S/O. Jadu
Nath Roy Dirai
3 2 666 2946 14.51 87060
- - - - - - - -
21765 - 8706 117531
44. Nilchand Das
gong S/O. Rada
Charon Das Vill-
Chanpur
2 3 672 2954 7.04 42240
- - - - - - - -
- - 4224 46464
45. Sukmoy Barmon
S/O. Mohananda
Barmon Vill-
Chanpur
2 2 538 2955 3.95 23700
- - - - - - - -
- - 2370 26070
46. Nironjon das gong
S/O. Joydeb
kumar das Vill-
Chanpur
3 3 626 2957 5.01 30060
- - - - - - - -
- - 3006 33066
47. Bhagoban Sutra
Dar S/O. Boirangi
Sutra Dar Vill-
Chanpur
1 4 496 2958 5.10 30600
- - - - - - - -
- - 3060 33660
48. Nilchand Das
gong S/O. Rada
Charon Das Vill-
Chanpur
2 3 672 2959 5.66 33960
- - - - - - - -
- - 3396 37356
49. Sushila Sundori
Das gong H/O.
Sadoy Chandra
Das Vill- Chanpur
1 3 550 2960 7.25 43500
- - - - - - - -
- 22000 4350 69850
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 98
50. Nilchand Das
gong S/O. Rada
Charon Das Vill-
Chanpur
2 3 672 2961 4.83 28980
- - - - - - - -
- - 2898 31878
51. Suduram koibarto
Das S/O. Tara
chand koibarto
Vill- Chanpur
2 4 673 2962 5.15 30900
- - - - - - - -
- - 3090 33990
52. Lal Muhammad
Talukder S/O.
Jamal Uddin
Talukder Vill-
Baro Nadipur
2 3
28,
37,
46
1359 1.25 7500
- - - - - - - -
- - 750 8250
53. Jaban Ullah
Talukder S/O.
Asmot Ullah
Talukder Vill-
Dirai
3 2 75 1362 7.92 47520
- - - - - - - -
11880 - 4752 64152
54. Jaban Ullah
Talukder S/O.
Asmot Ullah
Talukder Vill-
Dirai
3 2 75 1362 7.80 46800
- - - - - - - -
11700 - 4680 63180
55. Ebarot Ullah
Talukder S/O.
Azman Ullah
Talukder Vill-
Karimpur
2 2 102 520 3.33 19980
- - - - - - - -
- - 1998 21978
56. Waris Ullah gong
S/O. Iasin Ullah
Vill- Mathiapur
2 3 132 2120 3.80 22800
- - - - - - - -
- - 2280 25080
57. Hason Ali S/O.
Noim Ullah Vill-
Mathiapur
3 2 241
,5 2119 2.77 16620
-
- - - - - - -
- - 1662 18282
58. Noyan Ram
Nomosudra gong
S/O. Nondiram
3 3 169 2137 4.47 26820
- - - - - - - -
- - 2682 29502
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 99
Nomosudra Vill-
Mathiapur
59. Arman Miah gong
S/O. Fazil
Muhammad Vill-
Mathiapur
1 4 114 2138 3.43 20580
- - - - - - - -
- - 2058 22638
60. Muhammad
Cherag Ali S/O.
Amud
Samsunnesa Bibi
H/O. Cherag Ali
Vill- Mathiapur
3 2 21 1251 4.59 27540
- - - - - - - -
- - 2754 30294
61. Muhammad
Cherag Ali S/O.
Amud
Samsunnesa Bibi
H/O. Cherag Ali
Vill- Mathiapur
3 2 21 1256 6.06 36360
- - - - - - - -
9090 - 3636 49086
62. Muhammad Cherag
Ali S/O. Amud
Samsunnesa Bibi
H/O. Cherag Ali
Vill- Mathiapur
3 2 21 1257 1.96 11760
- - - - - - - -
- - 1176 12936
63. Abdul Gafur,
Fazar Ali S/O.
Ayat Ullah Vill-
Mathiapur
2 2 78 1324 3.86 23160
- - - - - - - -
- - 2316 25476
64. Abdul Latif ,
Abdul Mannan
S/O. Rahim Ullah,
Hason Ullah S/O.
Azimullah Vill-
Mathiapur
2 3 16 1323 11.28 67680
- - - - - - - -
16920 - 6768 91368
65. Md. Tota Miah
S/O. Torab Miah
Vill- Jagodol
4 2 43 1428 1.88 11280
- - - - - - - -
- - 1128 12408
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 100
66. Md. Tota Miah
S/O. Torab Miah
Vill- Jagodol
4 2 43 1431 1.92 11520
- - - - - - - -
- - 1152 12672
67. Rahamot Ullah
gong S/O. …Vill-
Uttar Jagodol
3 2 69 1432 2.85 17100
- - - - - - - -
- - 1710 18810
68. Rahamot Ullah
gong S/O. …Vill-
Uttar Jagodol
3 2 69 1434 1.70 10200
- - - - - - - -
- - 1020 11220
69. Jahir Ali S/O.
Katai Ullah Vill-
Singhanath
2 3 40 1437 1.63 9780
- - - - - - - -
- - 978 10758
70. Kanturam
Ramchandra S/O.
Asuram
Ramchandra Vill-
Singhanath
3 2 30 1445 12.95 77700
- - - - - - - -
19425 - 7770 104895
71 Kanturam
Ramchandra S/O.
Asuram
Ramchandra Vill-
Singhanath
3 2 30 1446 6.17 37020
- - - - - - - -
9255 - 3702 49977
72. Chand Ali Hazi
gong S/O. SAbdor
Hazi Vill-
Kamribiz
2 3 186 1448 56.07 336420
- - - - - - - -
84105 - 33642 454167
73. Mahatabur
Rahman S/O. Hazi
Rashid Vill-
Sitaharon
3 3 253 1537 7.18 43080
- - - - - - - -
10770 - 4308 58158
74. Polairam
Nomosudra S/O.
Porairam
Nomosudra Vill-
Singhanath
2 2 261 1540 3.49 20940
- - - - - - - -
- - 2094 23034
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 101
75. Farida Begum
gong W/O. Abdul
Kuddus Vill-
Puraton Jagodol
3 3 258 1541 2.93 17580
- - - - - - - -
- 9000 1758 29338
76. Gonai Ullah gong
S/O. Nosor Ullah
Vill- Jagodol
3 3 242 1542 2.54 15240
-
- - - - - - -
-
1524 16764
77. Kamini
Nomosudra W/O.
Durlobram
Nomosudra Vill-
Singhanath
3 3 31 1531 7.78 46680
- - - - - - - -
11670 24000 4668 87018
78. Mahatabur
Rahman S/O. Hazi
Rashid Vill-
Sitaharon
3 3 253 1537 1.68 10080
- - - - - - - -
- - 1008 11088
79. Polairam
Nomosudra S/O.
Porairam
Nomosudra Vill-
Singhanath
2 2 261 1540 2.04 12240
- - - - - - - -
- - 1224 13464
80. Farida Begum
gong W/O. Abdul
Kuddus Vill-
Puraton Jagodol
3 3 258 1541 1.47 8820
- - - - - - - -
- 5000 882 14702
81. Digendra Kumar
Dasgong S/O.
Dinnath Das Vill-
Singhanath
3 2 87 401 1.33 7980
- - - - - - - -
- - 798 8778
82. Digendra Kumar
Dasgong S/O.
Dinnath Das Vill-
Singhanath
3 2 117
,86 399 14.09 84540
- - - - - - - -
21135 - 8454 114129
83. Padmapasi Chakra
borti S/O. 2 3 149 398 1.08 6480
- - - - - - - - - - 648 7128
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 102
Surendra Chakra
bortiVill- Boshar
Khal
84. Digendra Kumar
Dasgong S/O.
Dinnath Das Vill-
Singhanath
3 2 181 397 2.85 17100
- - - - - - - -
- - 1710 18810
85. Hormohan Das
S/O. Haribol Das
Vill- Singhanath
3 2 303 395 1.74 10440
- - - - - - - -
- - 1044 11484
86. Suchindra Kumar
Das S/O. Loknath
Das Vill-
Singhnath
2 4 292 394 1.89 11340
- - - - - - - -
- - 1134 12474
87. Digendra Kumar
Dasgong S/O.
Dinnath Das Vill-
Singhanath
3 2 87 401 1.82 10920
- - - - - - - - -
- 1092 12012
88. Digendra Kumar
Dasgong S/O.
Dinnath Das Vill-
Singhanath
3 2 117
,86 399 15.52 93120
- - - - - - - -
- - 9312 102432
89. Digendra Kumar
Dasgong S/O.
Dinnath Das Vill-
Singhanath
3 2 45 1004 1.54 9240
- - - - - - - -
- - 924 10164
90. Digendra Kumar
Dasgong S/O.
Dinnath Das Vill-
Singhanath
3 2 45 1008 1.03 6180
- - - - - - - -
- - 618 6798
91. Sharot Chandra
Sarker gong S/O.
Shankar Sharker
Vill- Singhanath
3 3 73 1014 1.18 7080
- - - - - - - -
- - 708 7788
92. Bipin Bihari
Chakra Borti S/O.
Bishnu Charon
2 3 56 1015 3.19 19140
- - - - - - - -
- - 1914 21054
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 103
Bihari Chakra
Borti Vill-
Singhanath
93. Poranmoni Das
gong S/O.Porsis
Das Vill-
Singhanath
2 2 259 1037 2.02 12120
- - - - - - - -
- - 1212 13332
94. Upendra Kumer
gong S/O.
Rupnath Das Vill-
Singhanath
3 3 158 1071 2.95 17700
- - - - - - - -
- - 1770 19470
95. Jogendra
NathS/O. Dinnath
Vill- Singhanath
3 2 158 1072 1.85 11100
- - - - - - - -
- - 1110 12210
96. Digendra Kumar
Dasgong S/O.
Dinnath Das Vill-
Singhanath
3 2 124 1078 1.85 11100
-
- - - - - - -
- - 1110 12210
97. Md. Ainullah S/O.
Miahjan Ullah
Vill- Kamribiz
2 4 116 1137 18.86 113160
- - - - - - - -
28290 - 11316 152766
98. Md. Ainullah S/O.
Miahjan Ullah
Vill- Kamribiz
2 4
116
,11
8
1036 27.04 162240
- - - - - - - -
40560 - 16224 219024
99. Sukh Lal Das S/O.
Dumai Das Vill-
Singhnath
2 3 313 1083 1.80 10800
- - - - - - - -
- - 1080 11880
100
.
Md. Ainullah S/O.
Miahjan Ullah
Vill- Kamribiz
2 4 118 1134 22.73 136380
- - - - - - - -
34095 - 13638 184113
101
.
Mahendra Kumer
Das S/O. Udoy
Chandra das Vill-
Sharang Pasha
2 3 217 1133 4.34 26040
- - - - - - - -
- - 2604 28644
102
.
Md. Ainullah S/O.
Miahjan Ullah
Vill- Kamribiz
2 4
116
,11
8
1124 3.31 19860
- - - - - - - -
- - 1986 21846
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 104
103
.
Poranmoni Das
gong S/O.Porsis
Das Vill- Sinhnath
2 2 259 1118 2.64 15840
- - - - - - - -
- - 1584 17424
104
.
Latif Das gong
S/O. Nilchandra
dasVill- Singhnath
3 3 98 1120 3.64 21840
- - - - - - - -
- - 2184 24024
105
.
Latif Das gong
S/O. Nilchandra
dasVill- Singhnath
3 3 98 1120 0.87 5220
- - - - - - - -
- - 522 5742
106
.
Ramoni Ranjan
Chakra Borti gong
S/O. Ramraton
Chakra Borti Vill-
Singhnath
3 3 279 1093 2.23 13380
- - - - - - - -
- - 1338 14718
107
.
Razchandra Das
S/O. Rammohan
Das Vill- Raznau
3 2 141 137 2.81 16860
- - - - - - - -
- - 1686 18546
108
.
Kopil Kisan Das
S/O. Late
Kulchandra Das
Vill- Natun Para
2 2 142 128 1.12 6720
- - - - - - - -
- - 672 7392
109
.
Satish Chandra
Das S/O.
Sarupchandra Das
Vill- Singhnath
2 3 149 127 1.43 8580
- - - - - - - -
- - 858 9438
110
.
Nipendra gong
S/O. Kalinath Das
Vill- Nurpur
2 2
151
,16
0
55 1.50 9000
- - - - - - - -
- - 900 9900
111
.
Md. Abdul Jabber
Khan S/O. Late
Azob Khan Vill-
Doulotpur
2 4 156 54 1.90 11400
- - - - - - - -
- - 1140 12540
112
.
Kunjo gong S/O.
Sanaton Das Vill-
Sharongpasha
3 3 172 53 2.46 14760
- - - - - - - -
- - 1476 16236
113
.
Prashanna Kumer
Dey gong S/O. 3 4 77 52 2.68 16080
- - - - - - - - - - 1608 17688
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 105
Prokash Chandra
Dey Vill- Nurpur
114
.
Nobin Das S/O.
Gunmoni Das
Vill- Kamribiz
4 2 178 5 2.34 14040
- - - - - - - -
- - 1404 15444
115
.
Digendra Kumar
Dasgong S/O.
Dinnath Das Vill-
Singhanath
3 2
9,9
4,9
8
136 5.62 33720
- - - - - - - -
- - 3372 37092
116
.
Razchandra Das
S/O. Rammohan
Das Vill- Raznau
3 2 141 137 4.15 24900
- - - - - - - -
- - 2490 27390
117
.
Nobin Chandra
Das gong S/O.
Sunballob Das
Vill- Nurpur
3 3 144 138 2.41 14460
- - - - - - - -
- - 1446 15906
118
.
Kamini gong S/O.
Kalinath Das Vill-
Nurpur
3 4 142 140 1.31 7860
- - - - - - - -
- - 786 8646
119
.
Md. Washik Ali
S/O. Late Kabir
Ali Vill- Horipur
3 3 149 146 4.81 28860
- - - - - - - -
- - 2886 31746
120
.
Kamini gong S/O.
Kalinath Das Vill-
Nurpur
3 4 142 147 1.87 11220
-
- - - - - - -
- - 1122 12342
121
.
Surendra Kumer
gong S/O. Rashik
LAl Das Vill-
Nurpur
2 3 99 158 1.87 11220
- - - - - - - -
- - 1122 12342
122
.
Mubarok Ullah gong
S/O.Abdul Muhammad Ullah Vill- Baro
nogodipur
2 3 238 1247 14.04 84240
- - - - - - - -
- - 8424 92664
123
.
Warid Ullah gong
S/O. Khodaboks
Vill- Kamribiz
3 2 69 1229 2.22 13320
- - - - - - - -
- - 1332 14652
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 106
124
.
Waris Ali S/O.
Major Ali Vill-
Kamribiz
2 2 583 1210 1.54 9240
- - - - - - - -
- - 924 10164
125
.
MubarokUllah gong
S/O. Abdul Muhammad Ullah Vill-
Baro nogo dipur
2 3 238 1247 6.67 40020
- - - - - - - -
- - 4002 44022
126
.
Arob Ullah gong
S/O. Abdullah
Vill- Hossenpur
3 3 2 303 1.28 7680
- - - - - - - -
- - 768 8448
127
.
Saifur gong S/O.
Abid Ali Vill-
Hossenpur
2 3 70 301 0.93 5580
- - - - - - - -
- - 558 6138
128
.
Iskander Ali S/O.
Isob Ali Vill-
Nokdipur
3 2 23,
57 311 1.21 7260
- - - - - - - -
- - 726 7986
129
.
Abdur Rahman
gong S/O. Abdur
Ali Vill-
Hossenpur
2 4 72 386 1.43 8580
- - - - - - - -
- - 858 9438
130
.
Iskander Ali gong
S/O. Fayej Ali
Vill- Hossenpur
3 2 20 387 3.09 18540
- - - - - - - -
- - 1854 20394
131
.
Taz Uddin gong
S/O. Rushan
Talukder Vill-
Hossenpur
3 3 42 395 3.99 23940
-
- - - - - - -
- - 2394 26334
132
.
Jahur Uddin
S/O.Rushan
Talukder Vill-
Hossenpur
3 3 32 397 5.27 31620
- - - - - - - -
- - 3162 34782
133
.
Jahur Uddin S/O.
Rushan Talukder
Vill- Hossenpur
3 3 32 398 11.37 68220
-
- - - - - - -
17055 - 6822 92097
134
.
Syad Mustafa
Janpir S/O. Abdul
Wahed Vill-
Ishabpur
3 2 50 492 9.70 58200
- -
-
- - - - -
- - 5820 64020
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 107
135
.
Nosiyot Ullah gong
S/O.Moheb Ullah
Vill- Hossenpur 3 3 251 146 5.18 31080
- - - - - - - - - - 3108 34188
136
.
Abdur Rahman
S/O. Nosimullah
Vill- Hossenpur
2 3 215 901 1.87 11220
- - - - - - - -
- - 1122 12342
137
.
Arob Ullah gong
S/O. Abdullah
Vill- Hossenpur
3 3 2 762 1.06 6360
- - - - - - - -
- - 636 6996
138
.
Iskander Ali S/O.
Isob Ali Vill-
Nokdipur
3 2 23,
57 311 3.21 19260
- - - - - - - -
- - 1926 21186
139
.
Rezzak Ali S/O.
Barek Ali Vill-
Hossenpur
2 2 336 420 1.80 10800
- - - - - - - -
- - 1080 11880
140
.
Torab Ali S/O.
Asob Ali Vill-
Hossenpur
3 2 336 419 1.97 11820
- - - - - - - -
- - 1182 13002
141
.
Iskander Ali gong
S/O. Fayej Ali
Vill- Hossenpur
3 2 20 388 1.65 9900
- - - - - - - -
- - 990 10890
142
.
Mukter Ali gong
S/O. Maboshar Ali
Vill- Hossenpur
3 2 20 391 1.77 10620
- - - - - - - -
- - 1062 11682
143
.
Taz Uddin gong
S/O. Rushan
Talukder Vill-
Hossenpur
3 3 42 395 2.07 12420
- - - - - - - -
- - 1242 13662
144
.
Jahur Uddin
S/O.Rushan
Talukder Vill-
Hossenpur
3 3 32 397 12.62 75720
- - - - - - - -
18930 - 7572 102222
145
.
Syad Mustafa
Janpir S/O. Abdul
Wahed Vill-
Ishabpur
3 2 50 492 4.33 25980
- - - - - - - -
- - 2598 28578
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 108
146 Ashraf Ali S/O.
Anas Ali Vill-
Hossenpur
3
4 300 764 3.73 22380
- - - -
- - - -
- - 2238 24618
147
.
Shah Md.Iakub
Ali gong S/O.Late
Shah Md. Ilias Ali
Vill- Hossenpur
4 2 2 760 1.25 7500
- - - - - - - -
- - 750 8250
148
.
Arob Ullah gong
S/O. Abdullah
Vill- Hossenpur
3 3 2 752 18.68 112080
- - - - - - - -
28020 - 11208 151308
149
.
Elahi Boks gong
S/O. Hazi Asad
Ullah
3 2 2,3,
4,5 291 4.10 24600
- - - - - - - -
- - 2460 27060
150
.
Musmim Ali/
Ahamod Ali S/O.
Usob Ali
2 2 40 297 1.63 9780
- - - - - - - -
- - 978 10758
151
.
Elahi Baksha gong
S/O. Hazi Asad
Ullah
3 2 2,3,
4,5 215 1.30 7800
- - - - - - - -
- - 780 8580
382 420 908.4
2 5450520 809475
79000 545052 6884047
Sl.
No.
Name & address of
APs
HH
members Kha
tian
No.
Plot
No.
Agricultural land High (Vity) land Structure Grant Transition
Allowance
Assistance
Duty &
Fee Total
Area Value Area Value
Shiftable Non
shiftable
TR
G HCG
M F Ar
ea
Co
mp.
Are
a
Co
mp.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 109
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 109
Appendix-12
Entitlement Matrix based on SIMF
1. LOSS OF AGRICULTURAL & OTHER LANDS
Ownership
Type
Entitled
Person
Entitlement Responsibilit
y
Private
Legal Owners,
as determined
by DCs, or by
courts in cases
of legal
disputes
Compensation-under-law (CUL) or replacement
cost1, whichever is higher.
If applicable (subject to paragraphs 41 & 42)
• Top-up equal to the difference between CUL
and replacement cost.
• Transition allowance (TA) for income loss
(see Loss Category 5 below).
• CUL paid
by DCs
• Top-up &
TA paid by
LGED
Public
Lands/VNR
lands under
lease
Leaseholders
Three-month advance notice and contractual
obligations with the public agencies (DCs if
VNR), as determined by DCs
Paid by DCs
Vested & Non-
Resident
Property (not
under lease)
Current
Owners/Users
(without lease)
Transition allowance for income loss (see Loss
Category 5).
Paid by LGED
2. LOSS OF HOMESTEAD LANDS
Location Entitled
Person
Entitlement Responsibility
Homesteads
on Private
Lands
Legal Owners,
as determined
by DCs, or by
courts in cases
of legal
disputes
In addition to CUL & applicable top-up (as for
Agricultural & Other Lands):
• Relocation assistance, including land
development, where households choose to
relocate on their own, or developed plots if
they decide to relocate in public lands
arranged by LGED.
• Restoration of pre-acquisition level basic
utilities (water supply, sanitation, electricity,
etc.).
By LGED
1 Replacement cost include current market price of land plus the expenditure for legalizing the land transfer including cost of stamp
purchase and other duties (see Annex B2).
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 110
Location Entitled
Person
Entitlement Responsibility
Homesteads
on Public
Lands
Vulnerable
Squatters
• Relocation assistance, including developed
plots on LGED or other public lands to be
arranged by LGED.
• Provision of water supply & sanitation
facilities.
By LGED
Homesteads
on VNR Lands
Present
Owners/Users
(without lease)
• Assistance to move and rebuild the houses in
the same homestead, in cases of partial
acquisitions.
• Assistance to settle in developed plots on
public lands arranged by LGED, where
acquisition requires relocation elsewhere; or
• Six months’ rent for comparable living
accommodations.
• Provision of water supply & sanitation
facilities.
By LGED
Lessees • Contractual obligations with the public
agencies (DCs), as determined by DCs
Paid by DCs
3. LOSS OF HOUSES/STRUCTURES USED FOR LIVING, BUSINESS & OTHER
ACTIVITIES
Type &
Location
Entitled Person Entitlement Responsibilit
y
All Houses/
Structures on
Acquired
Private Lands
Legal owners, as
determined by
DCs, or by
courts in cases of
legal disputes.
• Compensation-under-law (CUL) or
replacement cost, whichever is higher.
• Transfer Grant (TG) to cover the carrying
costs of household goods, at one-eighth
(12.5%) of the replacement costs of the
affected structures, in cases where a house
is to be removed and constructed elsewhere.
• Rental Allowance (RA) to cover 3 (three)
months’ rental of a comparable residential
house in the upazila town, in cases where a
house is to be removed and constructed
elsewhere.
• Allowed to keep the salvageable materials.
CUL paid by
DCs and Top-
Up paid by
LGED in case
replacement
cost is higher
than CUL.
TG and RA
paid by LGED
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 111
Type &
Location
Entitled Person Entitlement Responsibilit
y
Shiftable &
Non-shiftable
Structures on
Acquired
Public Lands
Vulnerable
Squatters
• Shiftable structures2: Transfer and
Reconstruction Grant (TRG) @ Tk 50 per
sq.ft. of floor area with a minimum of Tk
4,000 and maximum of Tk 6,000.
• Non-shiftable structures3: TRG @ Tk 75
per sq.ft. of floor area with minimum of Tk
5,000 and maximum of Tk 7,000.
• Allowed to keep the salvageable materials.
TRG paid by
LGED
Houses/
Structures on
VNR Lands
Current
Owners/Users
• TRG (Amounts are to be determined in
consultation with the current owners/users).
• Allowed to keep the salvageable materials.
TRG paid by
LGED
•
4. LOSS OF TREES AND CROPS ON ACQUIRED PRIVATE & PUBLIC LANDS
Location Entitled Person Entitlement Responsibility
On private
Lands
Legal owners as
determined by
DCs, or by
courts in cases of
legal disputes
Current
cultivator of
agricultural
lands (including
tenants)
• Current market value of trees, based on
species, size and maturity.
• Current market prices of fruits on
trees, if they are felled before harvest.
• Current market price of crops based on
variety
• Owners are allowed to fell the trees
and harvest the crops, and keep them.
By DCs (included
in the CUL)
and/or
By LGED
(included in the
top-up)
On public Lands • Squatters
• Private
groups,
NGOs, etc.*
As those stipulated above for trees and
fruits.
By LGED
On VNR Lands
Present
Owner/User
As those stipulated above for trees and
fruits.
By LGED
* Public lands, especially along the roads, are sometimes leased out to private groups and NGOs for
tree plantation under income generation programs.
2 Small structures on poles, which can be shifted without dismantling are not eligible for compensation (road side small pan-bidi
shops, groceries and tea stalls). 3 Non-shiftable structures with costly materials (RCC roof or CI sheet roof with brick walls) will not be eligible for this entitlement.
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 112
5. LOSS OF AGRICULTURAL, BUSINESS, EMPLOYMENT & RENTAL INCOME
Impact Type Entitled Person Entitlement Responsibility
Agricultural:
• If acquisition
amounts to
20% or more of
the total
productive land
holding
Legal Owners,
as determined by
DCs, or by
courts in cases of
legal disputes.
Transition allowance @ BDT 1500 per
decimal of acquired agricultural land.
By LGED
• If acquired
VNR lands are
agricultural
Present
Owners/Users
Transition allowance equivalent to three
times the harvest prices of one year’s crops
produced on the acquired agricultural
lands.
By LGED
Business:
• Temporary
closure of
businesses in
existing
premises
Business
Owners
(premise/land
owners &
tenants)
Compensation, based on daily net income,
for the actual number of days the
businesses remain closed or needed to
complete the civil works, whichever is
smaller.
By LGED
• Partially
affected
businesses
Business
Owners
(premise/land
owners &
tenants)
Compensation, calculated as above, for the
number of days needed to repair and
reopen the individual businesses, or
complete the civil works, whichever is
smaller.
By LGED
• Businesses
requiring
removal from
the existing
premises and
spots
Business
Owners
(premise/land
owners &
tenants)
Compensation, calculated as above, for the
number of days the business owners need
to find alternative locations themselves,
which will be paid for a maximum of 90
days.
By LGED
• Loss of
employment
income
Business
Employees
Compensation at current daily wage rate
for the period needed to reopen the
businesses, which will be for a maximum
of 30 days.
By LGED
• Loss of income
from rented-out
premises
Legal Owners Three months’ rent at the current rates to
the owners of the premises.
By LGED
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 113
6. UNFORESEEN LOSSES
Impact Type Entitled Person Entitlement Responsibility
As may be identified during
subproject preparation &
implementation
As identified As determined in consultation
with IDA and the stakeholders.
By LGED
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 114
ACRONYMS & ABBREVIATIONS
PAP Project Affected person
BC Bitumen Carpeting
CBO Community-Based Organization
CO Community Organizer
CUL Compensation-Under-Law
D&SC Design and Supervision Consultancy
DC Deputy Commissioner
DF Department of Forest
DLAC District Land Acquisition Committee
DS Design and Supervision/District Sociologist
EP Entitled Persons
FGD Focused Group Discussion
GAP Gender Action Plan
GCM Growth Centre Market
GoB Government of Bangladesh
GRC Grievance Redress Committee
HCG House Construction Grant
HH Household
HTG House Transfer Grant
IDA International Development Agency
IP Indigenous Peoples
IPP Indigenous People’s Plan
IRI International Roughness Index
JIV Joint Inventory Verification
LA Land Acquisition
LAP Land Acquisition Plan
LCS Labor Contracting Societies
LGD Local Government Division
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 115
LGED Local Government Engineering Department
MLGRD&C Ministry of Local Government, Rural Development &
Cooperatives
MMC Market Management Committee
MS Management Support
NGO Non-Government Organization
OP Operational Policy
OP 4.10 Operational Policy 4.10 on Indigenous Peoples
OP 4.11 Operational Policy 4.11 on Physical Cultural Resources
OP 4.12 Operational Policy 4.12 on Involuntary Resettlement
PAP Project Affected Person
PBMC Performance-Based Maintenance Contract
PD Project Director
PM Project Manager
PMU Project Management Unit
PWD Public Works Department
SRAP Social and Resettlement Action Plan
RCC Reinforced Cement Concrete
RHD Roads & Highways Department
RP Resettlement Plan
RTIP-I Rural Transport Improvement Project-I
SCC Suggestion and Complaints Committee
SCM Suggestion and Complaints Mechanism
SIMF Social Impact Management Framework
TA Transition Allowance
TG Transfer Grant
TRG Transfer and Reconstruction Grant
UE Upazila Engineer
UNR Union Road
UP Union Parishad
UZR Upazila Road
VNR Vested and Non-resident
LGED RTIP-II, Third Year UZR Subprojects involving land acquisition 116
WB World Bank
WMS Women’s Market Sections
XEN Executive Engineer