No. Tariff/ 2018-19 (Qtrly Adjst) Government of Pakistan
Ministry of Energy Power Division
***
Islamabad the September 30, 2019
Registrar NEPRA, NEPRA, Tower, G-5/1 Islamabad.
Government Inspector of Electricity, 0/o CEA CFFC, Islamabad.
Chief Executive Officer (PITC) Chief Executive Officer IESCO WAPDA House Lahore Islamabad.
Chief Executive Officer LESCO, Chief Executive Officer HESCO, Lahore. Hyderabad.
Chief Executive Officer MEPCO, Chief Executive Officer QESCO, Multan. Quetta.
Chief Executive Officer GEPCO, Chief Executive Officer PESCO, Gujranwala. Peshawar.
,5 Chief Executive Officer FESCO Chief Executive Officer SEPCO, Fi z
• F. Faisalabad. Sukkur ip
Chief Executive Officer TESCO Peshawar.
Subject: TARIFF NOTIFICATIONS OF DISCOs
I am directed to forward the subject noted Notifications Nos. SRO. 1167(1)/2019 to
SRO No.1176 (1)/2019 dated 30th September 2019 for information and further necess r action.
For info & n.a. please • SA (T-I) Copy to: - SA ( I) - DR Dy. - M
CC M (T)
Government of Pakistan Ministry of Energy ******************
Islamabad, the 30thSeptember2019
NOTIFICATION
S.R.O. / 167 (1)/2019. -Pursuant to section 31(7) of the Regulation of
Generation, Transmission and Distribution of Electric Power Act, 1997, the Federal
Government notifies the adjustment in the approved tariff, on account of periodic adjustments for 3rd and 4th Quarters of FY 2018-19 and annual
indexation/adjustment of distribution margin with immediate application as
determined and recommended by National Electricity Power Regulatory Authority
(NEPRA) vide decisions both dated September 27,2019 in respect of Islamabad
Electric Supply Company Limited (IESCO), as Schedule I, IIA & 11B by way of
amendment in its notification no. SRO. 04(1) 2019 dated January 1, 2019.
The above adjustments is being notified along with tariff differential subsidy for
lifeline, domestic consumer consuming up to 300 units and additional charge of Rs.
0.30 per unit for maintaining uniform tariff on all category of consumers (except for
lifeline and domestic consumer consuming up to 300 units) so that the consolidated
revenue requirement approved and determined by NEPRA on September 27,2019
is maintained. The said adjustment shall be shown separately in the consumers' bill
by the XWDISCOs and applicable for next twelve-monthly billing cycles effective
from October 1st 2019.
SCHEDULE OF ELECTRICITY TARIFFS
S-1
A-1 GENERAL SUPPLY :TARIFF - RESIDENTIAL
Sr. No. TARITT CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
a) For Sanctioned load leas than 6 kW
1 Up to 50 Units
For Consumption exceeding 50 Units
001 - 100 Units
101.111 200 Units
iv 201 • 300 Units
• 301 - 700 Units
vi Above 700 Units
b) For Sanctioned load 5 kW & above
0.53
0.63
0.63
0.63
0.53
0.63
0.63
Peak Off-Peak !oak I Off-Peak
0.63 0.53 Time Of Use
A-2 GENERAL SUPPLY TARIFF - COMMERCIAL
_.--
Sr. Ito. TARIFF CATEGORY / PARTICULARS
Uniform Annual 0.31 and Qtrly
Adjustmoota
Rs/kWh
Applicable Uniform Annual D.7,1 and QUI),
Aitiaistmon.
Rs/kWh 0.63
a) b)
e)
For Sanctioned load less than 6 kW Tor Sanctioned load 5 kW S above
Tim. Of Use
0.63 0.53 0.63
Peak Off-Peak Peak Off-Peak
0.63 0.63 0.53 0.63
A-3 GENERAL SERVICES
Sr. No. TAROT CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh 0.63
• 0.63
General Services
B INDUSTRIAL SUPPLY TARIFFS
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual DX and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Re/kWh
0.53 0.63
111 Upto 26 kW (at 400/230 Volts) 0.53
32(s) exceeding 25-500 kW (at 400 Volta) 0.53
Peak Off-Peak Peak Off-Peak Time Of Use
0.63 0.63 0.63 0.53
11 ( la) Up to 25 KW 0.63 0.53 32(b) exceeding 25-600 kW (at 400 Volts)
0.63 0.63
0.53 0.53
B3 For All Loads up to 5000 kW (at 11,33 kV) 0.63 0.53
0.53 0.63 0.63
114 For All Loads (st 66,132 kV & above) 0.53
C - SINGLE-POINT SUPPLY
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.61 and Qtrly
Adjustments
Re/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Its/kWh
C -1 Tor supply at 400/230 Volts 0.63 a) Sanctioned load less than 5 kW
0.53
b) Sanctioned load 5 kW & up to 500 kW 0.53 0.63
0.53 0.63
C -2W Tor supply at 11.33 kV rip to and including 6000 kW 0.53 C 3(a) For supply at 66 kV b above and sanctioned load above 6000 kW
0.63
Time Of Use Peak Off-Peak Peak Off-Peak
0.53 0.53
0.63
0.63 0.53
0.53
0.63 C -1(c) For supply at 400/230 Volts 5 kW & up to 500 kW
C -2(b) For supply at 11,33 kV up to and including 6000 kW 0.63
0.63 0.63 C -3(b) Tor supply at 66 kV & above and sanetioned load above 5000 kW
0.63 0.63
Page I of 2
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual 0.11 and Qtrly
Adjustments
Applicable Uniform Annual 13.61 and Qtrly
Adjustments
Railyway Traction Rs/kWh
0.53
Re/kWh
0.53
TARIFF CATEGORY / PARTICULARS Sr. No.
1 *sad Jammu a Krim& (AMC) 0.53
Off-Peak 0.53
Peek 0.63
0.53 Off-Peak
0.53
Peak 0.53
0.53
Time Of Use
2 *mat Lab
0.5 J SPECIAL CONTRACTS UNDER NEPRA (SUPPLY OF POWER) REGULATIONS 2015
Uniform Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual D.M and Qtrly
AdLluatments
Ra/kWh Rs/kWh
SCHEDULE OF ELECTRICITY TARIFFS
D - AGRICULTURE TARIFF
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.I4 and Qtrly
Adjustments
Its/kWh
Applicable Uniform Annual 0.11 and Qtrly
Adjustments
734(a)
13-2 (a)
13-1(b) 0-2 (b)
SCARP leas than 5 kW
Agricultural Tube Wells
SCARP 5 kW & above AgrievIturel 5 kW & above
0.53
0.53
Rs/kWh
0.53
0.63 Peak Off•Peak Off-Peak
0.53 0.53
0.63 0.53
Pe ak
0.63 0.63 0.63
E - TEMPORARY SUPPLY TARIFFS
0.63
Sr. No. TARRY CATEGORY / PARTICULARS Uniform Annual 0.31
and Qtrly Adjustments
Rs/kWh
Applicable Uniform Annual P.M and Qtrly
Adjustments
Lilt)
6.1(11)
E-2
Residential Supply
Commercial Supply
Laduatrial Supply
0.53
0.63
0.63
Rs/kWh
0.63
0.63
0.53
F - SEASONAL -INDITTRIAL SUPPLY TARIFF
125% of relevant industrial tariff
Uniform Annual D.M and Qtrly
Adjustment.
Applicable Uniform Annual MN and Qtrly
Adjustment.
Sr. No. TARIFF CATEGORY / PARTICULARS
Rs/kWh Street Lighting Rs/kWh
0.63 0.63 H - RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES
TARIFF CATEGORY / PARTICULARS Uniform Annual D.M
and Qtrly Adjustments
Applicable Uniform Annual DX and Qtrly
Adjustments
Sr. No.
Residential Colonies attached to industrial premises
I RAILWAY TRACTION
K - SPECIAL CONTRACTS
Sr. Are. TARIFF CATEGORY / PARTICULARS
For supply at 66 kV &
Uniform Annual 13.1f and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual 13.16 and Qtrly
Adjustment.
above and having sancUoned load of 20MW A above Rs/kWh 0.63 0.53
For supply at 11,33 kV (b) For supply at 66 kV h above 0.53 0.53
(a) For supply at 11,33 kV
0.53 0.63
(11) For supply at 66 kV A above 0.63 0.83 0.53 0.53
Time Of Use J -1(b) For supply at 66 kV A above and having saactioned load of 201(W A shove
Peak Off- Peek Peak Off-Peak J-2 (e) For supply at 11,33 kV 0.63 0.63 0.63 0.63 J-3 (di For supply at 66 kV & above 0.63 0.53 0.53 0.53 2.3 (e) For supply at 11,33 kV 0.63 0.53 0.63 0.53 ..1.3 (d) For supply at 66 kV A above 0.53 0.63 0.53 0.63
Note: Uniform Annual Distribution Margin (DM) and Quarterly adjustment (3rd and 4th0.5
Quarter of FY 2018-19) subsidy, for
3 0.53 0.53 0.53 maintaining uniform tariff
across consumers & XWDISCOs, will be calculated in accordance with the same parameters as has been notified vide SRO 11 (1) 2019 Dated 01-01.2019. In order to arrive at net subsidy, the figures will be worked out by subtracting S-I notifed vide this SRO from (( S-11B notified vide this SRO minus $11 notified vide SRO. 01-01-2019) plus (S-IIA notified vide this SRO)). r--
Page 2 of 2
Rs/kWh
RA/kWh
0.63 0.53
G eneral Services-A3 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
Public Lighting - Tariff G Residential Colonies attached to industrial premises Railway Traction
Tariff K - AJK Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Tariff 1( -Rawat Lab
(1.3449) (1.3449)
0.4709 0.4709 0.4709
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
01236 0.1236
0.1236 0.1236 0.1236
1.0291 1.0291
0.4794 0.4794
0.3204 0.3204
M2073 0.2073
0.1888 0.1888
0.2578 0.2578
0.2578 0.2578 0.2578 0.2578
0.5877 0.5877
0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
Agricultural Tube-wells - Tariff D Scarp
Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Agricullual Tube-wets Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
S-HA
Residential Up to 50 Units
For peak load requirement less than 5 kW 01-100 Units 101-200 Units 201-300 Units 301-7000nits Above 700 Units
For peak load requirement exceeding 5 kW) Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Temoorary Supply
0.2578 0.2578 0,2578 0.2578 0.2578
0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709
0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888
0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
(1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073
0.2073 0.2073 0.2073
0.1236 0,1236 0.1236 0.1236 0.1236
0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291
1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204
0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794
0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877
0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324
0.3324 0.3324 0.3324
Commercial - A2 0.2578
- 0.2578 0.2578 0.2578 0.2578
0.4709 -
0.4709 0.4709 0.4709 0.4709
0.1888 -
0,1888 0.1888 0.1888 0.1888
(1.3449) -
(1.3449) (1.3449) (1.3449) (1.3449)
0.2073
0.2073 0.2073 0.2073 0.2073
0,1236 -
0.1236 0.1236 0.1236 0.1236
1.0291 -
1.0291 1.0291 1.0291 1.0291
0.3204 -
0.3204 0.3204 .0.3204 0.3204
0.4794 -
0.4794 0.4794 0.4794 0.4794
0.5877 -
0.5877 0.5877 0.5877 0.5877
0.3324
0.3324 0.3324 0.3324 0.3324
For peak load requirement less than 5 kW For peak load requirement exceeding 5 kW
Regular Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Temporary Suoply
0.3324 Industrial 81
81 Peak B1 Off Peak B2 B2 -TOU (Peak) B2 - TOU (Off-peak) B3 - TOU (Peak) 03 -TOU (Off-peak) B4 - TOU (Peak) 134 - TOU (0ff-peak)
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 04709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1838 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.320.4 0.3204 0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
Temporary Supply
Single Point Supply for further distribution Cl(a) Supply at 400 Volts-less than 5 kW C1(b) Supply at 400 Volts-exceeding 5 kW
Time of Use (TOU) - Peak Time of Use (TOU) - 0ff-Peak
C2 Supply at 11 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
C3 Supply above 11 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
Uniform Qtrly Adjustment 3rd fa 4th Qtr FY 2018-19
Variable Charge
Variable Charge
Variable Charge
Variable Charge e. i ,..n.
Variable Charge
1..1 kWh
Variable Charge
lis.1 kWh
Variable Charge
Rs/ kINT
Variable Charge
Rs) kWh
Variable Charge
Rs/WM
Verbal)le Chonge
Rs., kWh
Variable Charge
RsitWAI
Unifrom Rate for the 3rd & 4t
0.3324
Description
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.1236 1.0291 Special Contract - Tariff- J-1 For Supply at 66 kV & above
Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
J-2 (a) For Supply at 11, 33 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
J-2 (b) For Supply at 66 kV & above Time of Use (TOU) - Peak Tune of Use (IOU) - Off-Peak
J-3 (a) For Supply at 11, 33 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
J-3 (b) For Supply at 66 kV & above Time of Use (TOU) - Peak
Note: the aforementioned Quarterly Adjustments shall remain applicable for a period o The Federal Gorernm•M while notifying the allowed unlfonn rate of Rs.0.3324/1AVh shat
Time of Use (TOU) - Off-Peak twelve (12) Months from the date of notification of the Instant decision. not adjust the same upwards for any consumer category.
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.34,19) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0,2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
-0.2073
0.5877' 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
a 1947
0.1947
0.1947
0.1947
0.1947
0.1947
0.1947
0.1947
4.00
13.85
15.86
18.83
1954
20.94
19.33
12.80
20.84
eral Services-A3 Istria:
.03 17.71 17.10 13.34 21.65 14.21 19.26 19.00 f 16.116. 21.40 17.56 0.1947
14/9
18.49
10.94
14.39
18.49
70.76
14.29
18.49
10.84
14.39
1949
10.76
14.29
18.49
10.64
11.88
18.71
11.73
14.21
18.71
11.83
14.11
18.71
11.73
1421
18,71
11.83
14.11
18.71
11.73
1492
10.20
13.10
15.02
19.20
13.20
14.92
19,20
13,10
15.02
19.20
13.20
1492
19.20
13,10
10.79
15.09
10.29
10.89
15.09
19.38 10.79
15.09
10.29
mes 15.09
10.39
10.79
15.09
10.29
25.50
29.40
23.49
25.60
29.40
23.69
25.50
29.40
23.49
25.80
29.40
23.89
25-50
10.74
15.54
9.74
10.84
16.54
9.84
10,74
16.54
9,74
15.8.4 16.54
984
10.74
16t54
9.74
2295 25.85
19.60
23.05
25.85
19.70
22.95
25.85
1980
23.05
25_85
19.70
22,95
25.85
19.60
17.93
21.33
15.23
18.03
21.33
1533
17.93
21.33
15.23
18.03
21.33
1533
17.93
21.33
15.23
ATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)
Identlal Up to 50 Units
oak load requirement less than 5 kW
01-100 Units
01-205 Units
:01-300 Units
101-700Units
Wove 700 Units
peak load requirement exceeding 5 kW)
lrne of Use (TOU) Peak
lme of Use (TOU) - Off-Peak
amporary Supply
irnercial - A2
Fixed Charge
IBC° LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
NEPRA Determined
Uniform Traiff
Notified w.e.f.
01-01-2019
5-11B Unifrom
Interim
Increase in
Tariff Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Change
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge Fixed ChargeJ Variable
Charge Variable Chmge
RsAVOW Rs) kWh Rs./ kWh RIM kWh RA/ kWh RsJ kWh Rs1 kWh Rill kWh Rs/ kWh 84.1 kWh Rai kWh Rs AMIN 141,1 OVA Raj kWh
Description
4.00
11.00
14.13
15.71
18.98
19.08
17.72
10.24
22.81
4.00
12.20
13.86
15.38
1702
19.35
18.92
12.61
18.26
4.00
13.48
16.85
17.60
11116
19.60
1923
13.43
20.25
4.00
10.25
12.41
13.43
13.87
14.75
14.75
10.25
14.75
4.00
10.15
20.80
22.20
2145
25.10
25.10
19.60
25.00
400
11.45
13.42
14.87
17.81
18.54
18.41
11.91
18.41
4.00
14.63
16.77
19.47
21,32
23.71
23.72
17.77
21.37
4.00
15.73
18.26
17.35
20.09
21.07
21.04
15.38
20.45
4.00
1742
19,87
20.32
21.32
2958
24.77
18.39
24.79
4.00
17.66
20.85
21.36
22.70
24.46
23.73
16.30
23.74
Millt ma requirement less than 5 kW 17.13 19.19 18.25 14.82 24.00 air load requirement exceeding 5 MN 17.41 23.54 1951 1548 23.73 1926 01947
!regular 400 14.13 16,92
in,. of Use (TOU) - Peak 18.03 19.29
18.00
19.25
12.52 22.00 13.91 21.52 17.87 1534 1920 400.00 1901 a 1947 'line of U.. (TOU)- Off-Peak 400 10.63 12.37 13.45
14,82
10.32
25.10
19.84
18.41 23.72 20.58 19.39 24.74 20.09 a 1947 >memory Supply
17.13 18.58 19.25 14.82 24.00
11.91
17.38
17,77
2162
1475
20.35
1/97
1939
15 50
23.74 400.00 1148 01947
18.39 0.1947
81 16.13 17.70 18.27
31 Peak 18.03 19.99 19.77
12.75
14.75
21.50
25.09
14.91 23.12 19.35 15.17 21.28 1932 a 1907 31 Off Peak
10.33 12.14 18.41 23.73 20.45 79.37 23.74 21214 0.1947
82 405 13.63 15.06
12.16
14.77
10.25
10.25
19.60 12.32 17.77 1475 1/93 15.19 1146 a 1947 82- TOU (Peak)
18.03 18A8 19.70 14.75
21.00
25.10
12.41 20.62 16.86 14.32 18.75 anew 1579 a 1947 82 - TOU (Off-peak) 400 10.43 12.75 13.33 10.05
15.41 23.72 20.45 1932 2174 1993 83 • TOU (Peak)
18.03 15_40 9.60 17.57 14.55 1/77 17.99 400.00 1123
0. 1947
01947 83 - TOU (Off-peak)
380 10.23
20.69
11.72
19.46
13.25
14.75
9.95
25.10
19.20
18.41 2173 20.92 19 37 23.30 20. 01947 D4 - TOU (Peak)
18.33 20.36 19.25 14.75 25.10
12.01 16.47 13.45 12.67 17.89 38000 1Z6
39
1 01947 84 - TOU (Off-peek)
360 10.83 12.11 13.15 9.55 18.41 23.72 20.45 1937 2174 20/7 0.1947
tmporary Sup*
18.33 14.87 17.73 19.10 11.51 17.37 14.35 12.57 18.26 mom 1125 0_1947 10.75 25.50 18.41 21.12 17.20 1937 1924 16.35 0.1947
u p y for further distribution
Cl(b) Supply at 400 Volts-exueding 5 kW
Time of Use (TOU)- Pak
Tint. of U., (TOU)- Off-Pak
C2 Supply at 11 kV
Time of Use (TOU)- Peak
Time of Use (TOU) - Off-Peek
03 Supply above 11 kV
Tune of Use (701J)- Peak
Time of Use (TOU)- Off-Peak
400
380
380
360
360
17.63
17.13
20.11
10.63
13.96
18.17
8.40
13.83
18.34
10.51
16.31
15.81
19.11
12.81
15.32
19.11
12.21
14.08
19.11
12.11
18.27
17.77
20.75
14.85
18.57
20.75
14.75
16.47
18.37
12.62
12.24
11.74
14.74
10.24
10.54
14.74
10.04
10.44
14.74
9.94
2102
22.50
25.10
19.60
21.30
25.10
19.40
21.20
25 .10
19.20
17.41
15.91
21.41
14.91
15.71
21.41
14.71
15.61
21.41
14.51
24.04
22.47
23.72
17.77
20.92
23.72
17.57
20.82
23.72
17.47
lees 18.35
21.38
13.19
16.30
18.43
14.40
3.15
20.45
14.35
18.37
1587
2037
12.97
1458
1937
1/77
1957
1937
1/67
21.75
21/5
23. 74
20.50
1905
24.58
17.99
18.95
2174
17.89
eoeno
4oaaa
nom
380.00
360.00
mono
21.32
20.13
2152
14.99
1561
1973
12.57
14.42
1849
11.59
0.1917
a 1447
0.1947
0.1947
0 1947
0.1947
a 1947
01947
0 1907
a 1907 - Tan
Scarp
Time of Use (TOU) - Peak
Time of Use (TOU)- Off-Peak
Agricuitual Tube-was
lime of Use (IOU) Pak
Time of Use (TOO) - Off-Peek
Ughting - Tariff G
*n al Colonia attached to industrial premises w Traction
riff K - AJK
Time of Use (TOU)- Peek
Time of Use (TOU) - Off-Peak f I( -Rawat Lab
:tat Contract - Tariff,' 7-1 For Supply at 66 Wa above
Time of Use (TOU). Pei*
Time of Use (TOU)- Off-Peek
1-2 (a) For Supply at 11. 33 kV
Time of Usa (TOU)- Peek
Time of Use (TOU) - Off-Peek
1-2 (b) F ot Sup* at 66 kV it above
Time of Use (TOU) - Peak
Tune of Use (TOU) - Off-Peak
13(a) For Supply at 11. 33 kV
Time of Use (TOU) - Peak
Time of Use (TOU) - Off-Peak
1-3 (b) For Supply at 66 kV & above
Time of Use (TOU) - Peak
Time of Use (TOU) - Off-Peak
200
200
200
360
360
360
380
390
380
360
6ao
380
380
380
360
16.08
1531
13,67
17.41
9.97
1537
18.03
2/39
1123
15.98
18.03
1123
19.69
20.50
16.01
19.21
22.11
12.13
19.21
20.61
13.57
15.45
1074
15.60
le 24
15.02
zazo
14,40
16.02
20.25
13.34
10.74
14,74
9941
10.24
14.74
9,94
25.89
25,10
19.20
21.00
25.10
19.20
16.71
21.21
14.41
15.71
21.21
14.37
22.56
23.57
17.32
19.62
23.57
16.22
18.40
20.95
15.12
16.90
20.03
1/50
15.12
19.93
13.17
1450
19.37
12.97
22.55
22,95
12.77
12.91
15.48
18.39
13.14
20.72
20.72
17.75
1918
14.04
19.85
18.84
24.45
12.14
1960
14.14
19:75
18.84
24.45
12.20
1970
14.04
1965
18.84
24.45
1/14
18.60
14.14
19.75
18.84
24.45
1/24
18.70
14.04
19.65
18.84
24.45
12.14
18.60
14.47
14.47
19.55
15.55
19.03
23.78
17.98
17.80
7174
17.04
17.90
23.74
17,04
200.00
200.00
200.00
360.00
360,00
360.00
360.00
380.00
380.00
360.00
360.00
380.00
380.00
360.00
36000
15.14
20.66
1433
16.46
20.66
14.44
16.36
20.66
14.33
16.46
2066
14.44
16.36
20.88 14.33
18.78
18.42
17.90
13.55
18.56
12.20
18.24
2117
20.87
14.03
14.56
20.27
13.04
0.7941
0.1947
0.1947
0.1947
0.7947
0.1947
0.1947
a 7547
0 1947
0.1947
0.1947
0.1947
0 1947
0 1947
0.1947
0 1547
a 947
0.1947
0.1947
0 1947
0.1947
0.1947
) 1947
0.'947
0.1947
0. 1947
0 1947
0 1947
The variable charges mentioned under each DISCO includes the Impact of Interim increase In tariff. ederal Government while notifying the allowed uniform rate of Rs.0.1947/kWh shall not adjust the same upwards for any consumer category.
r 4
SYED MATEE AHMED BUKHARI Section Officer
Government of Pakistan Ministry of Energy ******************
Islamabad, the 30thSeptember2019
NOTIFICATION
S.R.0.11 0) (1)/2019. -Pursuant to section 31(7) of the Regulation of
Generation, Transmission and Distribution of Electric Power Act, 1997, the Federal
Government notifies the adjustment in the approved tariff, on account of periodic
adjustments for 3rd and 4th Quarters of FY 2018-19 and annual
indexation/adjustment of distribution margin with immediate application as
determined and recommended by National Electricity Power Regulatory Authority
(NEPRA) vide decisions both dated September 27,2019 in respect of Lahore
Electric Supply Company> Limited (LESCO), as Schedule I, 11A & IIB by way of
amendment in its notification no. SRO. 05(1) 2019 dated January 1, 2019.
The above adjustments is being notified along with tariff differential subsidy for
lifeline, domestic consumer consuming up to 300 units and additional charge of Rs.
0.30 per unit for maintaining uniform tariff on all category of consumers (except for
lifeline and domestic consumer consuming up to 300 units) so that the consolidated
revenue requirement approved and determined by NEPRA on September 27,2019
is maintained. The said adjustment shall be shown separately in the consumers' bill
by the XWDISCOs and applicable for next twelve-monthly billing cycles effective
from October 1st 2019.
Page 1 of 2
Sr. No. TARIFF CATEGORY / PARTICULARS
Sr. No. Uniform Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual D.M and Qtrly
Adluatments
TARIFF CATEGORY / PARTICULARS
Rs/kWh
0.63
0.63
Rs/kWh
0.53
0.53
Sr. No. TARIFF CATEGORY / PARTICULARS
0.63 0.53
0.53
0.63 0.63
0.63
SCHEDULE OF ELECTRICITY TARIFFS
A-1 GENERAL SUPPLY TARIFF - RESIDENTIAL
Sr. No. TARIFF CATEGORY / PARTICULARS Uniform Annual 0.11
and Qtrly Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
a)
i
li
ill
le
v
oi
b)
For Sanctioned load less than 5 kW
Up to 60 Units
For Consumption exceeding 60 Units
001 - 100 Units
101 - 200 Units
201 - 300 Unita .
301 • 700 Units
Above 700 Units
Tor San Suctioned load 6 kW & above
Time WU.
0.53
0.53
0.63
0.63
0.53
Rs/kWh
.
-
.
•
0.53
0.53
Peak I Off-Peak Peak Off-Peak 0.53 0.63
I
IP tiblti61.7411Olit• • .m....•..mi 0.53 0.63
S-I
Uniform Annual DM and Qtrly
AdJnaticents
Applicable Uniform Annual 0.51 and Qtrly
AdNastsnents
Uniform Annual D.111 I Applicable Uniform and Qtrly Annual D.M and Qtrly
Adjustments Adjustments
Rs/kWh
0.63
TARIFF CATEGORY /PARTICULARS
B INDUSTRIAL SUPPLY TARIFFS
31
34
33 32(b) exceeding 26-500 kW fat 400 Volts)
31 f Up to 26 KW
112)a) Receding 25-500 kW (at 400 Volts)
Time Of Use
For AU Loads op to 5000 kW (.t 11,33 kV)
Upto 25 kW (at 400/230 Volts)
For Al! Loads (at 66,192 kV & above)
C - SINGLE-POINT SUPPLY
C -1 For supply at 400/230 Volta a) Sanctioned load less than 5 kW
b) Sanetioned load 5 kW & up to 600 kW C -2(a) For supply at 11,33 kV up to and including 5000 kW C -Nal For supply at 66 kV 8 above and sanctioned load above 6000 kW
Time Of Use
C -1(c) For supply at 400/230 Volts 5 kW dap to 500 kW C -2(b) For supply at 11,33 kV up to and Including 5000 kW C -3(b) Per supply at 66 kV & above and sanctioned load above 5000 kW
Uniform Annual D.91 Applicable Uniform and Qtrly Annual DM and Qtrly
Adjustments Adjustments
Rs/kWh Rs/kWh
0.53 0.53
Peak Off-Peak Peak Off-Peak
0.53 0.53 0.63
Rs/kWh Rs/kWh 0.63 0.53
For Suctioned load leas than 6 kW For Suctioned load S kW & above
0.53 I 0.53
0.53
0.63 I 0.53
e) Time Of Use Peak Off- Peak Peak Off-Peak
a) b)
0.53
a) General Services Rs/k011i
0.53
0.63 0.63 0.53
0.53 0.63 0.53
0.53 0.53 0.53
Peak
0.53
0.53
0.53
0.53
Off-Peak
0.53
0.53
0.63
0.63
0.63
0.53
0.63
0.63
0.53
0.53
0.63
0.53
Peak Off-Peak
Sr. No.
0.53
0.53
G- _PUBLIC LIGHTING
Uniform Annual Dag and Qtrly
Applicable Uniform Annual 13.1.1 and Qtrly
Sr. No. TARIFF CATEGORY / PARTICULARS Adjustments Adjustments
Re/kWh Rs/kWh
Street Lighting
I-1 - RES/DENTIAI,EOLEONIES ATTACHED 7'0 INDUSTRIAL PREMISES
Uniform Annual DAIL and Qtrly
Applicable Uniform Annual D.M and Qtrly
Sr. No. TARIFF CATEGORY / PARTICULARS Adjustments Adjustments
Rs/kWh Rs/kWh
0.63 Residential Colonies attached to industrial premises
0.63
SCHEDULE OF ELECTRICITY TARIFFS
D AGRICULTURE TARIFF
Sr. So. TARIFF CATEGORY I PARTICULARS
Uniform Annual 0.1d and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtriy
Adjustments
Rs/kWh 0.63 0.63
D-1(a) SCARP less thorn 5 kW 0.63 0.63
D-2 (a) Agricultural Tube Wells Peak Off-Peak Peak Off-Peak
0.63 0.63 0.63 0.53
11-1(b) SCARP 6 kW & above 0.63 0.63 0.53 0.63
13-3 (b) Agricultural 6 kW S above
- TEMPORARY SUPPLY TARIFFS
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual Did and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
11-1(1)
11-1(U)
Residential Supply
Commercial Supply
0.63
0.53
0.53
0.53
0.61
0.63
E-2 Industrial Supply
F - SEASONAL INDUSTRIAL SUPPLY TARIFF
1251t of relevant industrial tars!
I - RAILWAY TRACTION
Uniform Annual 0.31 and Qtriy
Applicable Uniform Annual 0.31 and Qtriy
Sr. So. TARIFF CATEGORY / PARTICULARS Adjustments Adjustments
Rs/kWh Rs/kWh
0.53
0.53
Railyway Traction
K - .SPECIAVCONTRACTS
Sr. Ro. TARIFF CATEGORY / PARTICULARS
Uniform Annual Dal and Qtriy
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh 0.63
1
2
Azad Jammu & ICashodr (AJK)
Time Of Use
Rawat Lab ............r.h ..• tar• t,ii.a.Tth *Mild *I 2)Zing.21-AriiiiiaiialaliaLiAaliiMailliMkIr322.111.111.1.1111.
0.63
Peak I Off-Peek Peak Off-Peak
0.6310.53 0.63 0.63
0.53 0.63
Uniform Annual 0.31 and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.rd and Qtrly
Adjustments
Rt/kWIt 0.53
TARIFF CATEGORY / PARTICULARS
load of 20Mal & above 0.53
0.63 0.53
0.53 0.53
0.53 0.53
0.53 0.63
Per supp y at 66 kV & above and having sanctioned
Tor supply at 11,33 kV Tor supply at 66 kV & above
/or supply at 11,33 kV Tor supply at 66 kV & above
Time Of Use
Tor supply at 66 kV & above and having sanctioned load of 2061W & above
For supply at 11,33 kV • For supply at 66 kV & above For supply at 11,33 kV For an at 66 kV & above - - - . - _ ,.. _.,..-.-....,, 3rd and 4th Quarter
Peak Off-peak Peak Off-Peak
0.53 0.53
0.53 0.53
0.53 0.63
0.53 0.53
0.63 0.53
of FY 2018-191
0.63 0.63
0.63 0.53
0.53 0.63
0.53 0.53
0.53 0.63
subsidy, for
S-I
Sr. No.
(a) (b)
Jd
(a)
(b)
.1 -1(b)
.1 -2 (e)
.1-2 (d)
.1-3 (e) J-3 (d) Note: Uniform Annual Distribution Margin an _
maintaining uniform tariff across consumers & XWDISCOs, will be calculated in accordance with the same parameters as has been
notified vide SRO 11 (1) 2019 Dated 01-01-2019. In order to arrive at net subsidy, the figures will be worked out by subtracting S-I
notifed vide this SRO from (( S-IIB notified vide this SRO minus SII notified vide SRO. 01-01-2019) plus (S-11A notified vide this SRO)).
Page 2 of 2
0.3324 I
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3.449) (1.3449)] (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1238 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0. 3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0, 3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 03324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
Unifrom Rate for the 3rd & 4th Qaurately Adjustment of FY 2018-19 S-IIA
Descriphon
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
Uniform Qtrly Adjustment
3rd & 4th Qtr FY 2018-19
Variable Charge
Variable Charge
Variable Charge
Varisble • Charge
Variable Charge
Verlaine Charge
Variable Charge
Variable Charge
Venable Charge
Variable Charge Variable Charge
Rs./ kWh Rs./ kWh Rs/ kWh its../ kWh RsJ kWh a. / mou. a- . ...- - - -- Residential
Rs-ItYWh
Up to 50 Units For peak load requirement less than 5 kW
01-100 Units 101-200 Units 201-300 Units 301.700UnIts Above 700 Units
For peak load requirement exceeding 5 kW) Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Temporary Supply
0.2578 0.2578 0.2578 0.2578 0.2578
0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709
0.4709 0.4709 0.4709
0.1888 0.1888
0.1888 0.1888 0.1888
0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
(1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073
0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236
0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291
1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204
0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794
0.4794 0.4794 0.4794
0.5877 0.5877 a 5877 0.5877 0,5877
0.5877 0.5877 a 5877
0.3324 0.3324 0.3324 0.3324 0.3324
0.3324 0.3324 0.3324
Commercial - A2 For peak load requirement less than 5 kW For peak Cad requirement exceeding 5 kW
Regular . Time of Use (TOU) - Peak
Time of Use (TOU) - Off-Peak Temporary Supply
0.2578 -
0.2578 0.2578 0.2578 0.2578
0.4709 -
0.4709 0.4709 0.4709 0.4709 _
0.1888 -
0.1888 0.1888 0.1888 0.1888
(1.3449) -
(1.3449) (1.3449) (1.3449) (1.3449)
0.2073
0.2073 0.2073 0.2073 0.2073
0.1236 -
0.1236 0.1236 0.1236 0.1236
1.0291 -
1.0291 1.0291 1.0291 1.0291
0.3204 -
0.3204 0.3204 0.3204 0.3204
0.4794 -
0.4794 0.4794 0.4794 0.4794
a 5877
0.5877 a 5877 0.5877 0.5877
0,3324
0.3324 0.3.324 0.3324 0.3324
JGeneral Services-Al 0.2578 I 0.4709 I 0.1888 I (1.344 )1 0.2073 1 0.1236 r 1A2911 0.3204 I 0.4794 I
Industrial
.5377
81 B1 Peak 81 Off Peak B2 132 - TOU (Peak) 82 TOU (Off-peak) B3 - TOU (Peak) 83 - TOU (Off-peak) 84 - TOU (Peak) B4 - TOU (Off-peak)
Temporary Supply
Single Point Supply for further distribution C1(a) Supply at 400 Volts-less than 5 kW C1(b) Supply at 400 Volts-exceeding 5 kW
Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
C2 Supply at 11 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
C3 Supply above 11 kV Time of Use (TOU) - Peak Tine of Use (TOU) - Off-Peak
Agricultural Tube-wells - Tariff D Scarp
Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Agricultual Tube-wells Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Pubic Lighting - Tariff G Residential Colonies attached to industrial premises Railway Traction
Tariff K AJK
Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Tariff K -Rawat Lab
Special Contract • Tariff-J
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0,3324 0.3324 0 3324
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
0.2578 0.2578
0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709
0.1888 0.1888
(1.3449) (1.3449)
0.2073 0.2073
0.1236 0.1236
0.1236 0.1236 0.1236
0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
0.3204 0.3204
0.4794 0.4794
0.5877 0.5877
0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449)• 0.2073 0.1236 1.0291 0.3204
0.2578 0.4709 0.1888 (1.3449)' 0.2073 • 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0,4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204
0.2578 0.4709 0.1888 (1.34491 .0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449j 11.'2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204
Note: die aforainentIoned Quarterly Adjustments shall remain applicable fora period of twelve (12) MoMhs front the dale of notlflution of the instant decision. The Federal Government while notifying the allowed unitomi rate of Rs.0.3324/kWh shall not adjust the woe upwards for any consumer category.
J-1 For Supply at 66 kV 8 above Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
J-2 (a) For Supply at 11, 33 kV Time of Use (TOU) - Peak Time of Use (IOU) - Off-Peak
.1-2 (b) For Supply at 66 kV 8 above Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
.1-3 (a) For Supply at 11, 33 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
.1-3 (b) For Supply at 66 kV 8 above Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Unifrom
Interim
Increase in
Tariff
Variable Charge
Fts.1 kWh
rot Services-A3 16.03 17.71 17.10 13.34 21.65 14.21 19.29 19.00 18.66 21.40
17.56
ITIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)
S-old
0.1947
Description Fixed
Charge
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
NEPRA Determined
Uniform Traiff
Notified w.e.f.
01-01-2019
Vimlabia Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Fixed Charge Variable Charge
- • ...- - - ..... e. i swe la. I simb Rai kWh Rai kNa Rs! kWh fts.1 km Rs./10011 RsJkWfM RsJ kWh 12..41701.1
dential 4.00
ip to 50 Units 4.00 4.00 4.00 4.00 410 4.00 4.00 4.00 4.00 4.00
peak load requirement less than 5 kW 17.88 13.85
1-100 Units 11.00 12.20 13.48 10.25 19.15 11.45 1483 15.73 17.42
20.65 1586
71-200 Units 14.13 13.65 16.85 12.41 20.80 13.42 1177 16.28 19.87 16.83
)1-300 Units 15.71 15.38 17.60 13.43 72.20 14.87 19.47 17.35 20.32 21.36 18.54
)1-7000nits 16.98 17.02 18.16 13.87 23.45 17.81 21.32 20.09 21.32 22.70 20.94
hove 700 Units 1908 19.35 19.60 14.75 25.10 18.94 23.71 21,07 24.56 24.48
seek load requirement exceeding 5 kW) 15.33 me of Use (TOU) - Peak 17.72 16.92 19.23 14.75 25.10 18.41 23.72 21.04 24.77 23.73
12.80 me of Use (TOU) - Off-Peak 10.24 12.61 13.43 10.25 19.60 11.91 17.77 1536 1819 16.30
20.84 rnporary Supply 22.91 18.26 20.25 14.75 25.00 1541 21.37 20.45 24.79 23.74
11947
0.1947
0.1947
0.1947
0 1947
11947
0.1947
0.1947
martial - A2 19.26 0.1947 air load requirement less than 5 kW 17.13 19.19 18.25 14.82 24.00 17.41 23.64 19.51 15.49 23.73
.6 load requirement exceeding 5 kW 0.1947
spier 400 14.13 1552 18.00 12.52 22.00 13.91 21.62 17.87 15.34 19.20 • 400.00 18.01
20.09 0.1947
me of Use (TOU) - Peak 18.03 19.29 19.25 14.82 25.10 , 18.41 23.72 20.68 19.35 24.74 13.48 a 1947
me of Use (TOO) - Off-Peak 400 1053 12.37 13.45 10.32 19.64 1 11.91 17.77 14.75 12.97 18.50 400.00
18.39 0.1947 mporary Supply 17.13 18.58 19.25 14.82 24.00 r 17.38 23.62 20.35 19.39 23,74
stria) 0.1947 )1 1513 17.70 18.27 12.75 21.50 14.91 23.12 19.35 16.17 21.26 18,32
0.1947 1 Peak 1503 19.99 19.77 14.75 25.0e 17.41 23.73 20.45 19.37 23.74 20.14
0.1947 1 Off Peak 1133 12.14 12.16 10.25 1560 12.32 17.77 14.75 1293 18.19 1346
0.1947 12 400 13.63 15.06 14.77 10.25 21.00 12.41 20.62 18.86 14.32 18.75 401100 15.79
19.93 a 1947 12- TOU (Peak) 18.03 18.46 19.70 14.75 25.10 18.41 23.72 20.45 19.32 23.74
0.1947 12 - TOO (O9-pesk) 400 10.43 12.75 13.33 10.05 19.40 9.60 17.57 14.55 12.77 17.90 400.00 1123
0 1947 13 - IOU (Peak) 18.03 20.69 19.46 14.75 25.10 10.41 23.73 2092 19.37 23.30 20.39
0,1947 13 - IOU (06-peak) 380 10.23 11.72 13.25 9.95 19.20 12.01 16.47 13.45 12.87 17.89 380.00 12.81
0.1947 14 - IOU (Peak) 1533 20.36 19.25 14.75 25.10 16.41 2172 20.45 19.37 23.74 20.27
0.1947 14 - TOU (Off-peak) 360 10.93 12.11 13.15 9.85 19.10 11.51 17.37 1e 35 12.57 18.28 360.00 1325
0.1947 nporary Supply 18.33 14.81 17.73 10.75 25.50 18.41 21.12 1720 19.37 19.24 16.36
e roust supply Tor runner onstriuutrun 01(s) Supply at 400 Volts-less than 5 kW 17,63 16.31 18.27 12.24 23.02 17.41 24.04 18.85 18.37 21.75 21.32 0_1947
01(b) Supply at 400 Volts-exceeding 5 kW 400 17.13 15.81 17,77 11.74 22.50 16.91 22.47 18_35 15.87 21.25 400.00 20.13 11947
Time of Use (TOU) - Peak 20.11 19.11 20.75 14.74 25.10 21.41 23.72 21.38 20. 37 23.74 21_52 0.1947
0.1947 Time of Use (TOU) - 091-Peak 400 10.83 12.61 14.85 10.24 19.60 14.91 17,77 13.19 12.97 20.50 400.00 14.99
0.1947 12 Supply at 11 kV 380 13.98 15.32 16.57 10.54 21.30 1571 20.92 16.30 14.68 19.05 380.00 15.61
0.1947 Time of Use (TOU) - Peak 18.17 19.11 20.75 14.74 25.10 21.41 2172 18.43 19.37 24.68 19.73
0.1947 Time of Use (IOU) - 06-Peak 390 540 12.21 14.75 10.04 19.40 14.71 17.57 14.40 12.77 17.99 380.00 1257
0 1947 3 Supply above 11 kV 380 1383 14.08 16.47 10.44 21.20 10.61 20.82 115 14.57 18.95 380.00 14.42
0.1947 Tone of Use (TOU) - Peak 18.34 19.11 18.37 14.74 25.10 21.41 23.72 20.45 1937. 2174 . 18.49
0 1947 Time of Use (TOU) - O6-Peak 360 10.51 12.11 12.62 094 1920 14.61 17.47 14.35 12.67 17.89 360.00 11.59
0.1947
0.1947
01547
0.1947
0.1947
0.1947
Ult1Jral I 111:10.W51111 - I drill 4.,
carp 18.03 19.21 18.02 10.74 25.69 16.71 22.66 18.40 15.12 17.60 23.17
Time of Use (TOU)- Peek 22.39 22.11 20.20 14.74 25.10 21.21 23.57 20.95 19.93 23.74 20.87
Time of Use (TOU)- Off-Peak 200 1123 12.13 14.40 9.94 19.20 14.41 17.32 15.12 13.17 17.04 200.00 14.03
14.56 gricultual Tuba-wells 200 15.98 1921 1502 1124 2150 15.71 1062 1590 14.50 17.90 200.00
Time of Use (TOU)- Peak 18.03 20.61 20.25 14.74 25.10 21.21 2157 20.03 1917 23.74 20.27
13.04 200 13.23 13.57 13.34 9.94 19.20 14.37 16.22 12.50 12.97 17.04 200.00
Time of Use (TOU) - Off-Peek
Lighting - Tariff G
teal Galante& attached to industrial premises
Traction
7 K - 74.11(
Tuna of Use (TOU) - Peak
Time of Use (TOU)- Off-Peak < •Rawat Lab
380
360
16.08
15.31
13.67
17.41
997
16.37
19.89
20.50
18.01
-
-
15.45
15.60
-
-
•
-
10.74
10.74
22.95
22.95
12.77
12.91
15.49
18.39
13.14
20.72
20.72
-
18.18
17.75 14.47
14.47
-
-
19.55
19.55
19.03
23.78
17.08
360.00
360.00
18.78
18.42
17.90
13.55
18.56
12.20
16.24
0.1947
0.1947
0.1947
11947
0.1947
0.1947
. . a 1947
0.1947
0.1947
a 1947
0.1947
0.1947
0.1947
0.1947
0.1947
0.1947
0.1947
11947
0,1947
0.1947
0.1947
0_1947
at contract - i arm...I 1 For Supply at 66 kV 5 above 360 14.29 11.88 14.02 10.79
_ 25.50 10.74 22.95 17.93 14.04 19.85 360.00 16.14
20.66 Time of Use (TOU) - Peak 18.49 18.71 19.20 15.09 29.40 16.54 25.85 21.33 18.84 24.45
14.33 Time of Use (TOU)- Off-Peak 360 1164 11.73 13.10 10.29 23.49 9.74 19.60 15.23 12.14 18.60 360.00
16.46 2 (a) For Supply at 11. 33 kV 380 14.39 14.21 15.02 10,89 25.60 10.84 23.05 18.03 14.14 16.75 380.00
20.66 Time of Use (TOU) - Peak 18.49 1571 19.20 15.09 29.40 16.54 2585 21.33 18.84 24.45
14.44 Time of Use (TOU) - Off-Peak 380 10.76 11.83 13.20 10.39 23.89 9.84 19.70 15.33 12.24 .18.70 380.00
16.38 2 (5) For Supply at 66 W d above 360 14:29 14.11 14.92 10.79 25.50 1024 22.95 17.93 14.04 19.15 360.00
2086 Time of Use (TOU) - Peak 18.49 18.71 10.20 1519 29.40 16 54 25.85 21.33 18.84 24.45
14.33 Time of Use (TOU)- 08-Peak 360 1064 11.73 13.10 10.29 23.49 9.74 19.60 15.23 12.14 16.50 38100
16.46 3 (.) For Supply at 11.33 kV 380 14.39 14.21 15.02 10.89 25.80 10.84 23.05 18.03 14.14 19.75 380.00
20.66 Time of Use (TOU) - Peek 18.49 18.71 19.20 15.09 29.40 16.54 25.85 21.33 18.84 24.45
14,44 Time of Use (TOU) • Off-Peak 380 10.76 11.83 13.20 10.39 23.69 9 84 19.70 15.33 12.24 14.70 380.00
16.36 3 (b) For Supply at 68 W 8. above 360 14.29 14.11 14.02 10.79 25.50 10.74 22.95 17.93 14.04 19.65 300.00
20.66 Time of Use (TOU) - Peak 18.49 18.71 10.20 15.09 29.40 1554 25.85 21 33 18184 24.45
14.33 360 to 64 11.73 13.10 10.29 23.49 9.74 19.60 15.23 12.14 10.60 36100
Time of Use (TOU) - Off-Peak
'he variable charges mentioned under each DISCO includes the Impact of Interim Increase In tariff. dare( Government while notifying the allowed uniform rate of Rs.0.1947/kWh shall not adjust the same upwards for any consumer category.
SYED MATEEN HMED SUM-IASI SectiOb Officer
Government of Pakistan Ministry of Energy ******************
Islamabad, the 30thSeptember2019
NOTIFICATION
S.R.0.1I' 69 (1)/2019. -Pursuant to section 31(7) of the Regulation of
Generation, Transmission and Distribution of Electric Power Act, 1997, the Federal
Government notifies the adjustment in the approved tariff, on account of periodic
adjustments for 3rd and 4th Quarters of FY 2018-19 and annual
indexation/adjustment of distribution margin with immediate application as
determined and recommended by National Electricity Power Regulatory Authority
(NEPRA) vide decisions both dated September 27,2019 in respect of Faisalabad
Electric Supply Company Limited (FESCO) , as Schedule I, 11A & IIB by way of amendment in its notification no. SRO. 03(1) 2019 dated January 1, 2019.
The above adjustments is being notified along with tariff differential subsidy for
lifeline, domestic consumer consuming up to 300 units and additional charge of Rs.
0.30 per unit for maintaining uniform tariff on all category of consumers (except for
lifeline and domestic consumer consuming up to 300 units) so that the consolidated
revenue requirement approved and determined by NEPRA on September 27,2019
is maintained. The said adjustment shall be shown separately in the consumers' bill
by the XWDISCOs and applicable for next twelve-monthly billing cycles effective from October 1st 2019.
A-2 GENERAL SUPPLY TARIFF COMMERCIAL
ii
UI
lv
•
vi
b)
Tor Sanctioned load less than 5 kW
Up to 60 Units
Tor Consumption exceeding 60 Unita
001 • 100 Units
101 - 200 Units
201 - 300 Units
301 - TOO Units
Above 100 Units
For Sanctioned load 5 kW & above
SCHEDULE OF ELECTRICITY TARIFFS
A-1 GENERAL SUPPLY TARIFF - RESIDENTIAL
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Re/kWh
TARIFF CATEGORY / PARTICULARS Sr. No.
Time Of Use
0.53
0.53
0.53
0.63
0.63
Peak I Off-Peak
0.63
0.63
Ptak I Off-Peak
al
0.63 0.53 0.53 0.53
S-I
TARIFF CATEGORY / PARTICULARS
Uniform Annual D.31 and Qtrly
Adjustments
Rr/ktlfh
''Applicable Uniform Annual D.M and Qtrly
Adjaatmenta
Rs/kWh Sr. No.
0.63 0.53
Off-Peak
0.63 0.53
Off-Peak a) For Sanctioned load lees than 6 kW
b) For Sanctioned load 5 kW k above Peak Peak
0.53
0.63 0.63
0.63 c) Time Of Use
A-3 GENERAL SERVICES
8r. No. TARIFF CATEGORY I PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual Dad and Qtrly
Adjustments
Rs/kWh 0.53
a) 0.53
General Services
B INDUSTRIAL SUPPLY TARIFFS
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Anneal D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
lia/kV/b
131
132(a)
B1 ( b)
132(b)
B3
84
Upto 26 kW (at 400/230 Volts)
exceeding 25-500 kW (at 400 Volts)
Time Of Use
Up to 25 KW
exceeding 25-500 kW (at 400 Volta)
For All Loads up to 6000 kW (at 11,33 kV)
For AU Loads (at 66,132 kV & above) .
0.53
0.53
0.63
0.63
Peak Off -Peak Peak f-P Off
0.63
0.53
0.53
0.63
0.53
• 0.63
0.53
0.63
0.63
0.63
0.63
0.53
0.53
0.53
0.63
0.63
. C SINGLE-POINT SUPPLY
Sr. No. TARIFF CATEGORY I YARTICIILARS
Uniform Annual D.11 and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
C -1 For supply at 400/230 Volts 0.53 a) Sanctioned load less than 6 kW
0.63
b) Sanctioned load 5 kW & up to 600 by 0.63 0.63
0.53 C -2(a) For supply at 11,33 kV up to and including 5000 kW
0.63 0.53
C -3(a) For supply at 66 kV ts above and sanctioned load above 5000 kW 0.53
Time Of Use Peak Off-Peak Plank Off-peak
0.53 0.53 0.63
0.53 0.53
0.63 0.63 C -1(c) For supply at 400/230 Volts 6 kW S up to 600 kW
C -2(b) For supply at 11,33 kV up to and Including 5000 kW 0.53
0.53 0.53 0.63 C -3(b) For supply at 66 kV & above and sanctioned load above 5000 kW
0.53
Page 1 of 2
SCHEDULE OF ELECTRICITY TARIFFS
D AGRICULTURE TARIFF
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.. and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual 0.1.1 and Qtrly
Adjustments
Re/kWh 0-1(a)
D-2 (a)
0-1(b) D-2 (b(
SCARP la. than 6 kW
Agricultural Tube Wells
SCARP 6 kW 8 abova Agricultural6 kW 8 above
0.63
0.63
0.53
0.63 Peak Off-Peak Peak Oft--Peak
0.63 0.63
0.63 0.63
0.53 0.53
0.53 0.53
E - TEMPORARY SUPPLY TARIFFS
Uniform Annual D.M Applicable Uniform Sr. No. TARDY CATEGORY / PARTICULARS and Qtrly Annual 0.11 and Qtrly
Adjustments Adjustments
Rs/kWh Rs/kWh E-1(i) Residential Supply
0.63 0.53 L-1(ii)
E-2
Commercial Supply
industrial Supply 0.63 0.53
0.53 0.53
F - SEASONAL INDUSTRIAL. SUPPLY TARIFF-
135% of relevant industrial tariff
G- PUBLIC LIGHTING
Sr. No. TARIFF CATEGORY / PARTICULARS Uniform Annual D..
and Qtrly Adjustments
Re/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh Street Lighting
0.63 0.63
H - RESIDENTIAL COLONIES ATTACHED TOINDUSTRIAL PREMISES
Sr. Re. TARIFF CATEGORY / PARTICULARS Uniform Annual D..
and Qtrly Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh Residential Colonies attached to industrial premises 0.63 0.63
I RAILWAY TRACTION
Sr. No. TARIFF CATEGORY/PARTICULARS Uniform Annual 13.11
and Qtrly Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh Railyway Traction
0.53 0.53
K SPECIAL CONTRACTS
s-I
Sr. Re.
1
TARIFF CATEGORY / PARTICULARS Uniform Annual D.M
and Qtrly Adjustments
Rs/kWh
Applicable Uniform Annual 0.1f and Qtrly
Adjustments
Rs/kWh
2
And Jammu 8 Kashmir (AIR)
Time Of Use
Ramat Lab
0.53 0.63 Peak Off-Peak Peak Off-Perk
0.53 0.53 0.53 0.63
0.63 0.53 J SPECIAL CONTRACTS UNDER NEPRA (SUPPLY OF POWER REGULATIONS 2015
Sr. No. TARIFF CATEGORY/ PARTICULARS
For
Uniform Annual 0.111 and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual Dill and Qtrly
Adjustments
RE/kWh .1 -1 .1-2
(a)
(b) J-3 -
(a) (b)
.7 -104 J-2 (c)
(d) J-3 (e)
(d)
supply .t 66 kV 8 above and having sanctioned load of 205fW 8 above
For supply at 11,33 kV For supply at 66 kV 8 above
For supply at 11,33 kV
For supply at 66 kV & above
Time Of Us.
For supply at 66 kV 8 above and having sanctioned load of 2061W 8 above For supply at 11,33 kV For supply et 66 kV & above For supply at 11,33 kV For supply at 66 kV & above
0.53
0.53 0.53
0.63 0.53
0.53
0.63 0.53
0.63 0.63
Peak Off-Peak Peek Off-Peak 0.63 0.53 0.63 0.63 0.63
0.63 0.63 0.53 0.63 0.63
0.53 0.53 0.53 0.63 0.63
0.63 0.63 0.63 0.63 0.63
Note: Uniform Annual Distribution Margin (1314) and Quarterly adjustment (3rd and 4th Quarter of FY 2018-19) subsidy, for maintaining uniform tariff across consumers & XWDISCOs, will be calculated in accordance with the same parameters as notified vide SRO 11 (1) 2019 Dated 01-01-2019. In order to arrive at net subsidy, the figures will be worked out by subtracting notifed vide this SRO from (( S-I1B notified vide this SRO minus Sli notified vide SRO. 01-01-2019) plus (S-11A notified vide r-
has been Si
this SRO)).
Page 2 of 2
Unifrom Rate for the 3rd & 4th Qaurately Adjustment of FY 2018-19
S-IIA
Description
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
Uniform Qtrly Adjustment 3rd to 4th Qtr FY 2018-19
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
- ...... e. , ..... e. i mi. Rs/ HMI RsJ ItINh RsJ kWh Rs/ ■Wh Rs./ kWh RsJ WO Rs./ kWh UAW%
Residential Up to 50 Units
For peak load requirement less than 5 kW 01-100 Units 101-200 Units 201-300 Units 301-7000nits Above 700 Units
For peak load requirement exceeding 5 kW) Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Temporary Supply
0.2578 0.2578 0.2578 0.2578 0.2578
0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709
0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888
0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
(1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073
0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236
0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291
1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204
0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794
0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877
0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324
0.3324 0.3324 0.3324
Commercial - A2 For peak load requirement less than 5 kW For peak load requirement exceeding 5 kW -
Regular Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Temporary Supply
0.2578
0.2578 0.2578 0.2578 0.2578
0.4709 -
0.4709 0.4709 0.4709 0.4709
0.1888 -
0.1888 0.1888 0.1888 0.1888
(1.3449)
(1.3449) (1.3449) (1.3449) (1.3449)
0.2073
0.2073 0.2073 0.2073 0.2073
0.1236 -
0.1236 0.1236 0.1236 0.1236
1.3291 -
1.0291 1.0291 1.0291 1.0291
0,3204 -
0.3204 0.3204 0.3204 0.3204
0.4794 -
0.4794 0.4794 0.4794 0.4794
0.5877 -
0.5877 0.5877 0.5877 0.5877
0.3324
0.3324 0.3324 0.3324 0.3324
General Services-A3 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 I 0.3204 I 0.4794 i 0.5877
0.3324
Industrial 0.3324 61 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.5877 0.3324 61 Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794
0.5877 0.3324 81 Off Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794
0.5877 0.3324 B2 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794
0.3324 32 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 B2 - TOU (Off-peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.5877 0.3324 B3 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794
0.3324 63 - TOU (Off-peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.5877 0.3324 84 -TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794
0.3324 84- TOU (Off-peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
Single Point Supply for further distribution 0.3324 C1(a) Supply at 400 Volts-less than 5 kW 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
.0.5877 0.3324 C1(b)Supply at 400 Volts-exceeding 5 kW 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0A794
0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0,1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 C2 Supply at 11 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU) - Peak 0.2578 ' 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU) - 0ff-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 C3 Supply above 11 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Tune of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
Agricultural Tube-wells - Tariff D 0.3324 Scarp 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.5877 0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794
0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.5877 0.3324 Agricultual Tube-wells 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794
0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU) - 0ff-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
Pubic Lighting - Tariff G 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.5877
0.3324 0.3324
Residential Colonies attached to industrial premises 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.3324
Railway Traction 0.4709 0.3324
Tariff K - AJK • 0.2578 - - 0.1236 - 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 - - 0.1236 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 - - 0.1236 0.5877 0.3324
Tariff K -Rawat Lab 0.2578
Special Contract - Taritf4 0.3324 .1-1 For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU)- Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 J-2 (a) For Supply at 11, 33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 .1-2(b) For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU) - 0ff-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 J-3 (a) For Supply at 11, 33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794
0.3324 .1-3(b) For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877
0.5877 0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794
0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794
Note: Ihe MOrementloned Quarterly Adjustments shall remain applicable for a period o Melva (12) Months from the date of notification of the Instant decision. The Federal Otwernment while notifying the allowed uniform rate of fts.0.1324iftW1s shall not adjust the same apwerds for any consumer ea egory.
ATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)
-J
NEPRA Determined
Uniform Traiff
Notified w.e.f.
01-01-2019
Unifrom
Interim
Increase in
Tariff
Fixed Charge Variable
Charge Variable Charge
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO Fixed Charge
Description
Variable
Charge Variable Variable
Charge Variable
Charge Variable Variable
Charge Variable VarMale Variable
Charge Variable Charge
Charge Charge Charge Charge
RsJ kWh RaJ kWh RsJ kWh RsJ kWh AL.( kWh Raj kWh RaJ kWh ItsJIMOM
RsJ kWh Ral Shalt dental Jp to 50 Units
peak bad requirement less than 5 kW
)1-100 Units
01-200 Units
01400 Units
01-700Units
Love 700 Units
peak load requirement exceeding 5 kW)
ifT14 of Use (TOO) - Peak
bus of Use (TOU) Off-P. 1k
imporary Supply
Rs/ kWh Rs./ kWh RaJkleilal Rs., kWh
4.00 4.00 +00 4.80 4.00 4,00
13.85 0.1947
15.86 0.1947
1693 0.1947
18.54 0.1947
2094 0 1947
19.33 0.1947
12.80 0 1947
20.84 0.'947
4.00 4.00 4.00 4.00 4.00
11.00
14.13
15.71
18.99
19.08
12.20
13.85
15.38
17.02
19.35
1148
18.85
17.80
11118 19.80
10.25
12.41
13.43
13.87
14.75
1115
20,80
22.20
23.45
25.10
11.45
13.42
14.87
17.81
18.94
14.83
16.77
19.47
21.32
1173
16.28
17.35
20.09
17.42
19.87
20.32
21.32
17.68
20.85
21.36
n 70 23.71 21.07 2+58 24.46
23 72 21,04 2477 23.73 17.77 15.36 18.30 16.30 21.37 2015 24.79 23.74
23.64 19.51 15.49 23.73
21,62 17.87 15,34 19.20
23.72 20.68 19.39 24.74
17.77 14.75 12.97 18,50
2162 20.35 19.38 23.74
19.28 1 19.00 18.66 21.40 17.56
17.72
10.24
22.81
18.92
12.61
18.28
19.23
13.43
20.25
11 75
10.25
14.75
25.10
1160
25.00
1441
11.91
18.41
Imercial - A2 tak bad requirement lass than 5 kW
tak bad requirement exceeding 5 kW
egular
irne of Use (TOU) - Peak
ime of Use (TOU) - Off-Peak
trnporary Supply
17.13 19,19 18.25 14.82 24.00 1126 a 1947
400.00 18.01 0 1947
20.09 0 1947
400.00 13.48 0 ,047
18.39 0 1947
17.41
400 14.13
1903
1063
17,13
16.92
19.29
12.37
18.58
18.00
19.25
13.45
19.25
12.82
14.82
10.32
14.82
2280
25.17
19.64
24.00
13.91
18.41
11.91
17.38
400
era, Services-A3 steal
3 1 17.71 17.10 13.34 21.85 14.21 18.
0,1947
81 16.13 17.70 18.27
31 Peak 18.03 19.99 19,77
12.75 21.50 14.91 23.12 1/35 16.17 21.26 18.32 3 194 31 Off Peak
10.33 12.14 12.16
14.75
10.25
25.09 18.41 23.73 00.41 1137 2174 20.14 0 1947
62 400 1313 15.06 14.77 10.25
1160 12.32 17.77 14.75 12.93 18.19 13.46 O. 1947 82 - TOU (Peak)
18.03 19.48 19.70 14.75
21,00 12.41 20.62 1686 19.32 18.75 40000 15 79 01947
82 - TOU (Off-peak) 400 10.43 12.75 13.33 10.05
25.10 18.41 23.72 2015 1132 23.74 1/93 0.1947 133 - TOU (Peak)
18.03 20.69 19.48 14.75
19.40 B.60 17.57 14.55 1177 17.99 400.00 13 23 a 1947 83 - TOU (Off-peak)
380 10.23 11.72 13.25 9.95
25.10 18.41 23.73 20.92 19.37 2130 20.39. 11947 B4 - TOU (Peak)
18.33 20.36 19.25 14,75
19.20 12.01 16.47 13.45 12.87. 17.89 380.00 1.2.61 3 1947 84 - IOU (Off-peak)
360 10.83 12.11 13.15 1.85
25.10 18.41 23.72 . 20,45 19.37 2174 2a27 • 0 1347 imporary Supply
18.33 14.81 17.73
19.10 11.51 17.37 14.35 1157 18.26 36000 13 25 a 1947
le
10.75 2.5.50 18.41 21.12 17.20 19.37 19.24 16.36 0.1947 Supply for further distribution
Cl(a) Supply et 400 Volts-less than 5 kW
Cl(b) Supply et 400 Volts-exceeding 5 kW
Time of Use (TOU)- Peak
Time of Use (TOU) - Off-Peak
7:2 Supply at 11 kV
Time of Use (TOU)- Peek
Time of Use (TOU)- Off-Peak
:a Supply above 11 kV
Ti,,,. of Use (TOU) - Peak
Time of Use (TOU) - Off-Peak
17.63
17.13
20.11
10.63
13.98
18.17
8.40
13.83
18.34
10.51
16.31
15.81
19.11
12.81
15.32
19.11
12.21
14.08
19.11
12.11
18.27
17.77
20.75
14.85
16.57
20.75
14.75
18.47
1137
12.62
12.24
11.74
14.74
10.24
10.94
14.74
10.94
10.44
14,74
9.94
23.02
22.50
25.10
1160
21.30
25.10
19.40
21.20
25.10
19.20
17.41
16.91
21.41
1+91
15.71
21.41
14.71
15.61
21.41
14,61
24.04 18.85 16.37 21.75 21.32 22.47 18.35 15.87 21,25 400.00 20.13 23.72 21.38 20.37 23.74 21.52 17.77 13.19 12,97 20,50 400.00 14 99 20.92 16.30 14.68 19.05 380.00 15.61 23.72 18.43 19.37 24.68 19.73 17.57 14.40 12.77 17.99 380.00 12.57 20.82 3.15 14.57 18.95 36000 14.42 23.72
17.47
20.45
14.35
19.37
12.67
23.74
1789
18.49
360.00 11.59
0.1947
0.1947
0.1947
0 1947
0.1947
0.1947
3.'947
3 1947
1947
D 1947
400
400
380
380
360
360
:ultural Tube-wells - Tariff D harp
Time of Use (TOU)- Peak
Tinge of Use (TOtJ)- Off-Peak
tgricultual Tuba-wells
Tim. of Use (TOU) -Peak
Pine of Use (TOU) - Off-Peak
200
200
200
18.03
22.39
13.23
15.98
18.03
13.23
19.21
22.11
12.13
19.21
20.61
13.57
18.02
20.20.
14.40
18.02
20.25
13.31
10.74
14.74
9.94
10.24
14.74
9.94
25,89
25.10
19.20
21.00
25.10
19.20
16.71
21.21
14.41
15.71
21.21
14.37
22.66
23.57
17.32
19.62
23.57
16.22
18.40
20.95
15.12
16.90
20.03
12.50
1912
1193
1117
14.50
19.37
1197
17.80
2174
17.04
17.90
2174
17.04
200.00
200.00
23 17
20.87
14.03
1+56
2027
Z. 17 I
0 '94 - 1
3 ;947
0 1941 i
0. i347]
200.00 13 04 0 1;157
18.08 19.89
20.50
18.01
26.72
20.72
17.75
18.18
14.47
1147
19.55
19.55
18.78
18 42
17.90
19.03 360.00 13.55
23 78 18.56
17.98 36800 12_20
16 24
22.95 17 93 14.04 19.65 36000 16.14 25.85 21.33 18 84 24.45 2066 19.60 15.23 12.14 18.80 360.00 14.33 23.05 18.03 14.14 19 75 380.00 16.46 2985 21.33 18.84 24.45 2066 19.70 15.33 12.24 18.70 380.00 14 44 22.95 17.93 14.04 19.85 360.00 1836 25.85 21.33 18.84 21.45 2066 1160 15.23 12.14 18.60 360.00 14.33 23.05 18.03 14.14 19.75 380.00 16.46 25.85 21.33 18.84 24.45 20.66 1170 15.33 12.24 1170 380.00 14 44 22.95 17.93 14.04 19.65 360.00 16.36 2985
19.60
21.33
15.23
18.84
12.14
24.45 2066
1160 36800 14.33
16.45 10.74 00.95 12.77 ntisi Colonies attacned to industrial premises
y Traction
iff K - AJK
Time of Us* (TOU) - Peak
Time of Use (TOU) -011-Pisait K -Rawat Lab
15.31 0 1947
0.1947
0 1947
0 1947 1
3 1947
0 197 01947'4
15.80 10.74 22.95 12.91
360 13.67
17.41
9,97
16.37
15.48
18.39
13.14 360
lei Contract - Tariff-J -1 For Supply at 66 kV & above
Time of Use (TOU). Peak
Time of Use (TOU) - Off-Peak
1 (a) For Supply at 11. 33 kV
Tana of Use (TOU) - Peak
Time of Use (TOO) - Off-Pink
(b) For Supply 01 86 kV 8 above
Time of Use (TOU)• Peak
Time of Use (TOU) • Off-Peak
.3 (a) For Supply at 11. 33 kV
Time of Use (TOU)- Peak
Tune of Use (TOU)- Oft-Peak
.3 (b) For Supply at 66 kV 8 above
Time of Use (TOU)- Peak
Time of Use (TOU)- Off-Peak
360 14.92 -
1910
13.10
15.02
19.20
13.20
1192
19.20
13.10
15.02
19.20
13.20
14.92
19.20
13.10
1129
18.49
10.64
14.39
18.49
10.76
14.29
18.49
10.84
14.39
18.48
10.76
14.29
18.49
10.84
11.88
18.71
11.73
14.21
1171
11.83
14.11
18.71
11.73
14.21
18.71
11.83
14.11
1171
11.73
10.79
15.09
10.29
10.89
15.09
10.39
10.79
15.09
10.29
10.89
15.09
10.39'
10.79
15.09
10.29
25.50
29.40
23.49
2160
29.40
23.89
25.50
29.40
23.49
25.60
2940
23.69
25.50
23.49
10.79
18.54
9.74
1014
1654
9.84
10.74
16.54
9.74
10.84
16.54
9.84
10.74
16.54
974
0 1947
0.7947
0 ;947
0 1947
0.1947
1947
0.1947
0 1947
3.1947
0 1947
0.1947
0.1947
0 1947
01947
0 1947
360
380
380
360
380
380
380
360
360
the variable charges mentioned under each DISCO Includes the Impact of Interim Increase in tariff.
deral Government while notifying the allowed uniform rate of Rs.0.1947/1(Wh shall not adjust the same upwards for any consumer category.
i) MATEEN HMO) IUKHARI Sectio Officer
Government of Pakistan Ministry of Energy
Islamabad, the 30thSeptember2019
NOTIFICATION
S.R.O. \\1°(1)12019. -Pursuant to section 31(7) of the Regulation of
Generation, Transmission and Distribution of Electric Power Act, 1997, the Federal
Government notifies the adjustment in the approved tariff, on account of periodic
adjustments for 3rd and 4th Quarters of FY 2018-19 and annual
indexation/adjustment of distribution margin with immediate application as
determined and recommended by National Electricity Power Regulatory Authority
(NEPRA) vide decisions both dated September 27,2019 in respect of Multan
Electric Supply Company Limited (MEPCO), as Schedule I, IIA & IIB by way of
amendment in its notification no. SRO. 07(1) 2019 dated January 1, 2019.
The above adjustments is being notified along with tariff differential subsidy for
lifeline, domestic consumer consuming up to 300 units and additional charge of Rs.
0.30 per unit for maintaining uniform tariff on all category of consumers (except for
lifeline and domestic consumer consuming up to 300 units) so that the consolidated
revenue requirement approved and determined by NEPRA on September 27,2019
is maintained. The said adjustment shall be shown separately in the consumers' bill
by the XWDISCOs and applicable for next twelve-monthly billing cycles effective
from October 1st 2019.
Uniform Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual D.M and Qtrly
Adjustments
TARIFF CATEGORY /PARTICULARS
Sr. No.
• General Services .
Uniform Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual D.M and Qtrly
Adjustments
TARIFF CATEGORY / PARTICULARS
B INDUSTRIAL SUPPLY TARIFFS
Rs/kWh 81
82(a)
81 ( b)
5304
B3
34
Rs/kWh
0.63
0.53
Upto 25 kW (at 400/230 Volts)
exceeding 25-600 kW (at 400 Volts)
Time Of Use
Up to 26 KW
exceeding 25-500 kW fat 400 Volta)
For All Loads up to 6000 kW (at 11,33 kV)
For All Loads (at 66,132 kV di above
0.53
0.53
Peak Off-Peak Peak Off-Peak
0.53 0.53 0.53 0.53
0.63 0.53 0.53 0.53
0.53 0.63 0.63 0.63
0.63 0.53 0.63 0.53
S-I SCHEDULE OF ELECTRICITY TARIFFS
A-1 GENERAL SUPPLY TARIFF - RESIDENTIAL
Sr. No. TARIFF CATEGORY / PARTICULARS Uniform Annual DM
and Qtrly Adjustments
Re/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWla a)
II
ill
iv
vi
h)
For Sanctioned load leas then 5 kW
Up to 60 Units
Tor Consamptien exceeding 50 Units
001 - 100 Units
101 • 200 Units
201 • 300 Units
301 • 700 Units
Above 700 Units
Tor Sanctioned load 5 kW & above
0.63
0.63
0.63
0.63
0.63 0.53
0.53
Peak Off-Peak Peak Off-Peak Time Of Use 0.63 0.63
0.63
0.63 A-2 GENERAL SUPPLY TARIFF - COMMERCIAL
Sr. No.
a)
TARIFF CATEGORY / PARTICULARS
For Sanctioned
Uniform Annual D.16 and Qtrly
Adjaztenents
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
b)
e)
load Use than 6 kW For Sanctioned load 5 kW A above
Time Of Use
0.63 0.63
Re/kWh
0.63 0.53
Peak 1 Off-Peak PeakOeak 0.63 0.53 0.63 Iff-P 0.53
C - SINGLE-POINT SUPPLY
Sr. No.
C -1
a)
b) C -2(e)
C -3(a)
C -1(c) C -2(b) C -3(b)
TARIFF CATEGORY / PARTICULARS
For supply at 400/230 Volts
Sanctioned load less than 5 kW
Sanctioned load 5 kW A up to 600 kW For supply at 11,33 kV up to and including 6000 kW For supply at 66 kV A above and sanctioned load above 6000 kW
Time Of Use
For supply at 400/230 Volts 5 kW A up to 500 kW For supply at 11,33 kV op to and including 5000 kW Tor supply at 66 kV A above and sanctioned load above 5000 kW
Uniform Annual D.11 and Qtrly
Adjustments
0.63
0.53 0.53
0.63
Off-Peak
0.53 0.53 0.63
Applicable Uniform Annual D.11 and Qtrly
Adjustments
Ra/kWit
0.63
0.63 0.63
0.53
Off-Peak
0.63 0.63 0.53
Peak
0.63 0.53 0.63
Ra/kWh
Peak
0.63 0.53 0.53
Page 1 of 2
Uniform Annual D.M and Qtly
Applicable Uniform Anneal P.M and Qtrly
Sr. No. TARIFF CATEGORY /PARTICULARS Adjustments Adjustments
Rs/kWh Rs/kWh
0.53 0.53 Street Lighting
H - RESIDENTIAL COLONIES ATTACLiEO:TO INDUSTRIAL PREMISES
SCHEDULE OF ELECTRICITY TARIFFS
D - AGRICULTURE TARIFF.'
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjuatments
Rs/kWh
D-1(a)
D-2 (a)
13-1(b) D-2 (b)
SCARP leas than 5 kW
Agricultural Tube Well.
SCARP 5 kW & above Agricultural 6 kW & above
0.63
0.53
0.63
0.53
Peak Off-Peak Peak Off-Peak
0.63 0.63
0.53 0.53
-.0.43 0.53
0.53 0.63
E - TEMPORARY SUPPLY TARIFFS
Br. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual P.M and Qtrly
Adjustments
Rs/kWb
Applicable Uniform Annual P.M and Qtrly
Adjustments
Re/kWh
E-1(i)
TA(R)
X-2
Residential Supply
Commercial Supply
Industrial Supply
0.63
0.53
0.53
0.63
0.63
0.63
F - SEASONAL INDUSTRIAL' SUPPLY 'TARIFF,
125% of relevant Md....trial tariff
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh 0.53 0.63
Residential Colonies attached to industrial premiam
I - RAILWAY ,TRACTION
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/1011.
Applicable Uniform Annual P.M and Qtrly
Adjustments
Rs/kWh
0.53 Railyway Traction
0.53
R -,SPECIAL CONTRACTS
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual P.M and Qtrly
Adjustments
Rs/kWh 0.53
Applicable Uniform Annual D.M And Qtrly
Adjustment.
Rs/kWh 0.63
1
2
And Jammu & Kashmir (AJIC)
Time Of Use
Ramat Lab . . - .. - - . Na.ai.rw...,a,m/i1,11 -,-., ai.i.,.i.f.aiL-iiiiiiill`selaiile1V054 '
Peak Of[ Peak Peak Off-Peak
0.63 0.53 0.53 0.63
. 0.53
I 0 ' illxkdLFaiLLLVia.dllIllIllIllIllIllg
0.63
Sr. No.
•
TARIFF CATEGORY / PARTICULARS
Uniform Annual P.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustment.
Rs/kWh
J -1 .1-2
(a) (b)
J-3 (a) (b)
.1 •1(b)
.1-2 (c)
.1.2 id) J-3 (e) .1-3 (d)
For supply at 66 kV & above and having sanctioned load of 20MW & above
For supply at 11,33 kV For supply at 66 kV & above
For supply at 11,33 kV For supply at 66 kV & above
Time Of Use For supply at 66 kV & above and having sanctioned load of 20MW & above
For supply at 11,33 kV Tor supply at 66 kV & above Tor supply at 11,33 kV For supply at 66 kV & above
0.53
0.53 0.53
0.63 0.53
0.63
0.53 0.53
0.53 0.53
Peak Off-Peak Peak Off-Peak
0.53 0.63 0.53 0.63 0.63
t r of FY
0.53 0.53 0.53 0.53 0.63
2018-19)
0.53
doh
0.53 0.63 0.63 0.53 0.63
6ubcidy for
0.63 0.53 0.63 0.63
Note: Uniform Annual Distribution Margin ano Quarterly
maintaining uniform tariff across consumers IL XWDISCOs, will be calculated in accordance with the same parameters as has been
notified vide SRO 11 (1) 2019 Dated 01-01-2019. In order to arrive at net subsidy, the figures will be worked out by subtracting S-1
noticed vide this SRO from () S-IIB notified vide this SRO minus SII notified vide SRO. 01-01-2019) plus (S-IIA notified vide this SRO)).
S-I
?age 2 of 2
0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291
0.2578 0.2578
0.4709 0.4709
0.1888 0.1888
(1.3449) (1.3449)
0.2073 0.2073
0.1236 0.1236
1.0291 1.0291
0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291
0.2678 I 0.4709 I 0.1888 I (1.3449)1 0.2073 I 0.1236 I 1.0291)
0.3204 0.4794
0.3204 0.4794 0.3204 0.4794 0.3204 0.4794 0.3204 0.4794
0.5877
0.5877 0.5877 0.5877 0.5877
0.3324
0.3324 0.3324 0.3324 0.3324
0.3204 I 0.4794 I 0.5877
ommercial - A2 For peak load requirement less than 5 kW For peak load requirement exceeding 5 kW
Regular Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Temporary Supply
(General Services-A3 Industrial
C1(a) Supply at 400 Volts-less than 5 kW C1(b) Supply at 400 Volts-exceeding 5 kW
Time of Use (IOU) - Peak Time of Use (TOU) - Off-Peak
C2 Supply at 11 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
C3 Supply above 11 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Agricultural Tube-wells - Tariff D
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
Scarp Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Agricultual Tube-wells Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Public LightIng - Tariff 0 Residential Colonies attached to industrial premises Railway Traction
Tariff K - AJK
Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Tariff I< -Rawat Lab
1.0291 1.0291 1.0291 1.0291 1. 0291 1.0291
1.0291 1.0291
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
0.1238 0.1236
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.4794 0.4794
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
0.1888 0.1888
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
0.3204 0.3204
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.2578 0.2578
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.5877 0.5877
0.5877 0.5877 0.5877
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.4709 0.4709 0.4709
(1.3449)1 0.2073 (1.3449) . 0.2073 (1.3449) 0.2073 (1.3449) 0.2073 (1.3449) 0.2073 (1.3449) 0.2073
0.2073 0.2073
(1.3449) (1.3449)
0.1236 0.1236 0.1236
0.2578 0.2578 0.2578 0.2578
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
Special Contract - Tariff-.)
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1388 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) -4'1E2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 Note:
the aionsmotiones Quarterly Adjushrients shall remain applicable for a period of twelve (12) Months from the date of notification of the Instant decision. The Federal Government while notifying the allowed unfform rate of Re.0.3324/kWh shall not adjust the same upwards for any
consumer category.
0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1,3449) 0.2073 0.1236 1.0291 0.3204 0.2578 0.4709 0.1888 (1.3449) 0.2073 a 1236 1.0291 0.3204
.1-1 For Supply at 66 kV & above Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
.1-2 (a) For Supply at 11, 33 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
• .1-2 (b) For Supply at 66 kV & above Time of Use (TOU) • Peak Time of Use (TOU) - Off-Peak
.1-3 (a) For Supply at 11, 33 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
J-3 (b) For Supply at 66 kV 8 above Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
0.3324
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 a 3324 0.3324 0.3324 0.3324 0.3324
B1 B1 Peak B1 Off Peak 82 B2 - TOU (Peak) B2 - TOU (Off-peak) 83 - TOU (Peak) 83 - TOU (Off-peak) 84 - TOU (Peak) 84 - TOU (Off-peak)
Temporary Supply
Single Point Supply for further distribution
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0,1236 0.1236 0.1236 0.1238 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
51ff 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0,5877 0.5877 0.5877 0.5877 0.5877
Unifrom Rate for the 3rd & 4th Qaurately Adjustment of FY 2018-19 S-HA
Description IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
Uniform Qtrly Adjustment
3rd & 4th Qtr FY 2018.19
Variable Charge
Variable Charge I
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge-
Variable Charge
Variable Charge .. Variable Charge
RsJ kWh Rs./ kWh RsJ kWh RIO kWh Cat was a. r tart. n- .......- - - - - Residential sJ kWh Rs./ kWh R.JkWg,
. Up to 50 Units For peak load requirement less than 5 kW
01-100 Units 101-200 Units 201-300 Units 301-700Units Above 700 Units
For peak load requirement exceeding 5 kW) Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Temporary Supply
0.2578 0.2578 0.2578 0.2578 0.2578
0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709
0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888
0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
(1.3449) (1.3449) (1.3449)
0.2073 0.2073
' , 0.2073 0.2073 0.2073
0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236
0.1236 0.1236 0.1238
1.0291 1.0291 1.0291 1.0291 1.0291
1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204
0.3204 0.3204 0.3204 _
0.4794 0.4794 0.4794 0.4794 0.4794
0.4794 0.4794 0.4794
a 5877 0.5877 0.5877 0.5877 0.5877
0.5877 0.5877 D5877
0.3324 a 3324 0.3324 0.3324 0.3324
0.3324 a 3324 0.3324
0.1947
11947
0.1947
0.1947
0.1947
11947
0,1947
0.1947
0.1947
0,1947
0,1947
0 1947
0.1947
IATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)
S-1113
Description
.
Fixed
Charge
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
NEPRA Determined
Uniform Traiff
Notified w.e.f.
01-01-2019
Unifrom
Interim
Increase in
Tariff
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
a-, .......
Variable Charge
o. I YAM
Variable Charge
oc 1 kwei
Variable Charge
RsJ kWh
Variable Charge
RsJIONII
Flood Charge Variable Charge
Variable Charge
RsillW151 RsJ kum Rs) 0041.
Rs./166/8 Rai kWh RalkWII its
sidential
Up to 50 Units
,f peak load requirement less than 5 kW
01-100 Units
101-200 Units
201-300 Units
301-700Units
Above 700 Units
f peak load requirement exceeding 5 kW)
Time of Use (TOU) - Peak
Time of Use (TOU)- Off-Peak
temporary Soppy
400
11.00
14.13
15.71
1618
1918
17.72
1124
2/ 61
400
12.20
13.65
15.38
17.02
19.35
1192
12.61
18.28
4.00
13.48
18.85
17.60
18.16
19.80
19.23
13.43
20.25
4,00
10.25
12.41
13.43
13.87
14.75
14.75
10.25
14.75
4.00
19.15
2010
22.20
23.45
25.10
25.10
19.60
25.00
4.00
11.45
13.42
14.87
17.81
18.94
18.41
11.91
1141
4.00
14.63
16.77
19.47
21.32
2171
23.72
17.77
21.37
4.00
15.73
16.28
17.35
20.09
21.07
21.04
15.36
29 45
4.00
17.42
19.87
20.32
21.32
24.56
24.77
18.39
24.79
4.00
17.86
20.85
21.36
22.70
24.48
23.73
18.30
23,74
4.00
13.85
15.86
16.83
18.54
20.94
1933
12.80
20.84
0.1947
0.1947
0.1947
0.1947
0.1947
11947
0.1947
0.1947
nmerclal - A2 19.26 11947
mak load requirement less than 5 kW
mak load requirement muscling 5 kW
17.13 19.19 18.25 14.82 24.00 17.41 2164 1951 15.49 23.73
400.00 18.01 0.1947
Regular 400 14.13 1192 18.00 12.82 22.00 13.91 21.62 17.67 15.34 19.20 20.09 0.1947
Time of Use (TOU) - Peak 1103 19.29 19.25 14.82 25.10 18.41 23.72 20.68 19.39 20.74
400.00 13.48 0.1947
Time of Use (TOU) - 0ff-Peak 400 1013 12.37 13.45 10.32 19.64 11.91 17.77 14.75 12.97 18.50 18.39 0.1947
empor80y Supply 17.13 1158 19.25 14.82 24.00 17.38 23.62 20.35 19.39 23.74
teral Services-A3
16.03
17.71 17.10
13.34 21.65 14.21 19.26] 19.00 1 18.88 21.40 17.56
sstrial 18.32 0.1947
B1 1113 17.70 18.27 12.75 21.50 14.91 23.12 19.35 16.17 21.28 20.14 0.1947
B1 Peak 1103 1999 19.77 14.75 25.09 1141 23.73 20.45 19.37 23.74 13.46 0.1947
131 Off Peak 1133 12.14 12.16 10.25 19.60 12.32 17.77 14.75 12.93 18.19
400.00 15.79 0.1947
B2 400 1163 1506 1477 10.25 21.00 12.41 20.62 16.86 14.32 18.75 19.93 0.1947
62 - TOU (Peak) 18.03 19.45 19.70 14.75 25.10 18.41 23.72 20.45 19.32 23.74
400.00 13.23 0.1947
62 - TOU (0ff-peak) 400 10.43 12.75 13.33 10.05 19,40 9 60 17.57 14.55 12.77 17.99 20.39 0.1947
63 - TOU (Peak) 18.03 20.69 19.46 14.75 25.10 18.41 23.73 20,92 19.37 23.30
380.00 12.61 0.1947
133 - TOU (08-9ea0) 380 10.23 11.72 13.25 9.95 19.20 12.01 16.47 13.45 12.87 17.89 20.27 0.1947
64 - TOU (Peak) 18.33 20.36 19.25 1475 25.10 18.41 23.72 20.45 19.37 23.74
360.00 13.25 0.1947
84 - TOU (Off-peak) 360 10.63 12.11 13.15 9.85 19.10 11.51 17.37 1435 12.57 18.20 16.36 0.1947
ernporary Supply t 1133 14.81 - 17.73 10.75 25.50. 18.41 21.12 17.20 19.37 19.24
;le Point Supply for further distribution 21.32 0.1947 C1(a) Supply at 400 Volts-less than 5 kW 17.63 16.31 18.27 12.24 23.02 17.41 24.04 1185 16.37 21.75
20.13 11947 C1(b) Supply at 400V065-080eed109 5 kW 400 17.13 15.81 17.77 11.74 72.50 16.91 22.47 1135 15.87 21.25 400.00
21.52 0.1947
Time of Use (TOU)- Peak 20.11 19.11 20.75 14.74 25.10 21.41 23.72 21.38 ;20.37 23.74
400.00 14.99 0.1947
Time of Use (TOU)-Off-Peak 400 10.63 12.61 1415 10.24 15.40 14.91 17.77 13.19 12.97 20.50
380.00 15.61 0.1947
C2 Supply at 11 kV 380 1396 15.32 16.57 10.54 21.30 15.71 20.92 16.30 14.68 19.05 19.73 11947
Time of Use (TOU) - Peak 1117 19.11 20.75 14.74 25.10 21,41 23.72 18.43 19.37 24.88
380.00 12.57 0.1947
Time of Use (TOU) - 099-59ea0 380 140 12.21 14.75 10.04 19 40 14.71 17.57 14.40 12.77 17.99
360.00 14.42 11947
C3 Supply above 11 kV 360 13.83 14.08 18.47 10.44 21.20 15.81 2092 3.15 14,57 18.95 18.49 0.1947
Time of Usa (TOU) - Peak 18.34 19.11 18.37 14.74 25.10 21.41 23.72 20.45 19.37 23.74 360.00 11.59 0.1947
Time of Use (TOU)- Off-Peak 360 1151 12.11 12.82 9.94 19.20 14.61 17.47 14.35 12.67 17.89
cultural Tube-wells - Tariff D
Scarp
Time of Use (TOO) - Peak
Time of Use (TOU) Off-Peak
Agricultual tube-wells
Time of Use (TOU) - Peek
Time of Use (TOO) - Off-Peak
c Ughting - Tariff G
e.ntial Colonies attached to industrial premises
oy Traction
riff K - AJK
Time of Use (TOU)- Peak
Time of Use (TOO) - Off-Peak
-Rawat Lab
23.17
20.87
1413
14.56
20.27
13.04
15.12
19.93
13.17
14.50
19.37
12.97
17.60
23.74
17.04
17.90.
23.74
17.04
22.66
23.57
17,32
19.52
23.57
1122
18.40
20.95
15.12
16.90
2103
12.50
200
200
18.03
22.39
13.23
15.98
18.03
13,23
19.21
2/11
12.13
19.21
20.61
1157
16.02
20.20
14.40
16.02
20.25
13.34
10.74
14.74
9.94
10.24
14.74
9.94
25.69
25.1C
19.20
21.00
25.10
19/0
16.71
21.21
14.41
15.71
21.21
14.37
mew
200.00
200.00 200
360
360
18.08
15.31
13.87
17.41
9.97
16.37
19.89
20.50
18.01
15.45
15.60
10.74
10.74
22.95
22.95
12.77
12.91
15.48
18.39
13.14
20.72
20.72
17.75
18.18
14.47
14.47
19.55
19.55
19.03
2176
17.98
360.00
360.00
18.74
18.42
17.90
13.55
18.58
12.20
16.24
:lei Contract - Tariff,' 16,94 0.1947
I-1 For Supply at 86 kV 8 above 360 14.29 11.88 14.92 10.79 25.50 10.74 22.95 17.93 14.04 15.65 360.00
20.66 0.1947
Time of Use (TOU) - Peak 18.49 18.71 19.20 15.09 2940 16.54 25.85 21.33 18.84 24.45 14.33 0.1147
Time of Use (Toll) - Off-Peak 380 10.64 11.73 13.10 10.29 23.49 9.74 19.60 15/3 12.14 18.60 360.00
16.46 11947
1-2 (a) For Supply at 11, 33 kV 380 14.39 14.21 15.02 10.89 25.60 10.84 23.05 16.03 14.14 19.75 380.00
20.66 /1947
Time of Use (TOU) - Peak 18.49 18,71 19.20 15.09 29.40 16.54 25.85 21.33 18.64 24.45 1444 11947
Time of Use (TOU) - Off-Peak 380 1176 11.83 13.20 10.30 23.69 9.84 19.70 15.33 12.24 18.70 380.00
36100 16.36 0 1947
1-2 (0) For Supply at 66 kV 8 above 360 14.29 14.11 14.92 10.79 25.50 10.74 22.95 1793 14.04 19.85 20.66 0.1947
Time of Use (TOU) - Peak 18,49 18.71 19.20 15.09 29,40 1154 25.85 21.33 18.84 24.45 14.33 0.1947
Time of Use (TOU)- Off-Peak 360 10.64 11.73 13.10 10.29 2149 9.74 19.60 15.23 12.14 18.80 360.00
16.46 0.1947
1-3 (a) For Supply at 11. 33 kV 380 14.39 14.21 15.02 10.89 25.80 10.84 23.05 18.03 14.14 19.75 nom
2086 0 1947
Time of Use (TOO) - Peak 18.49 18.71 19.20 15.09 29 40 15.54 25.55 21.33 18.84 24.45 14.44 0.1947
Time of Use (TOU) -Off-Peak 380 10.76 11.83 13.20 10.39 23.69 9.84 1970 15.33 12.24 16.70 380.00
16.36 0.1947
1-3 (b) For Supply at 66 kV & U40,
Time of Use (TOO) - Peak
360 14.29
1849
14.11
18.71
14.92
19.20
10.79
15.09
2651
29.40
10.74
16.54
22.95
25.85
17.93
21.33
14.04
18.84
19.65
24.45
360.00
20.66
14.33
0.1947
0.1947
Time of Use (TOU) - 09-59e00 380 10.64 11.73 1110 10.29 23.49 9.74 19.60 15.23 12.14 15.80 360.00
A ,
The variable charges mentioned under each DISCO Includes the impact of Interim increase In tariff.
sderal Government while notifying the allowed uniform rate of Rs.0.1947/kWh shall not adjust the same upwards for any consumer category.
SYED MATEEN AHM D BUKHARI -1"1111 Section Officer
0.1947
Government of Pakistan Ministry of Energy ******************
Islamabad, the 30thSeptember2019
NOTIFICATION
1 )I\ S.R.O. (1)/2019. -Pursuant to section 31(7) of the Regulation of
Generation, Transmission and Distribution of Electric Power Act, 1997, the Federal
Government notifies the adjustment in the approved tariff, on account of periodic adjustments for 3rd and 4th Quarters of FY 2018-19 and annual
indexation/adjustment of distribution margin with immediate application as
determined and recommended by National Electricity Power Regulatory Authority
(NEPRA) vide decisions both dated September 27,2019 in respect of Gujranwala
Electric Power Company Limited (GEPCO) , as Schedule I, IIA & 11B by way of
amendment in its notification no. SRO. 06(1) 2019 dated January 1, 2019.
The above adjustments is being notified along with tariff differential subsidy for
lifeline, domestic consumer consuming up to 300 units and additional charge of Rs.
0.30 per unit for maintaining uniform tariff on all category of consumers (except for
lifeline and domestic consumer consuming up to 300 units) so that the consolidated
revenue requirement approved and determined by NEPRA on September 27,2019
is maintained. The said adjustment shall be shown separately in the consumers' bill
by the XWDISCOs and applicable for next twelve-monthly billing cycles effective from October 1st 2019.
SCHEDULE OF ELECTRICITY TARIFFS
A-1 GENERAL SUPPLY TARIFF -. RESIDENTIAL
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.31 and Qtrly
Adjustments
Rs/kWh
Applicable 'Uniform Annual 13.M and Qtrly
Adjustments
Rs/kWh
.) For Sanction.ed load le. than 5 kW
i Up to 50 Units . •
For Consumption exceeding 50 Units
H 001 • 100 Units 0.53
- la 101. 200 Units
0.53 .
iv 201 - 300 Units 0.53
• 301 - 700 Units 0.53 0.53
vi
b)
Above 700 Units
For Sanctioned load 5 kW I above
0.53 0.53
Peak Off-Peak Peak Off-Pock
Time Of Use 0.63 0.13 0.63 0.53
711.43If9t.i WA% Of al giff4000*$ IFA
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform /maul MX and Qtrly
*dimes...am
Ra/klik
Applicable Uniform Annual D.NI and Qtrly
Adj...ammes
its/kWh
a) b)
e)
For Sanctioned load less than 6 kW For Sanctioned load 5 kW es above
Time Of Use
0.53 0.13
0.63 0.53
Peak Off-Peak Peak Off-Peak
0.53 0.13 0.63 0.53
A-3 GENERAL SERVICES
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annul DX and Qtsb,
Adjustments
Rs/kWh
Applicable Uniform Annual D.11 and Qtrly
Adjustments
Rs/kWh
a) 0.53
General Services 0.63
'B INDUSTRIAL SUPPLY TARIFFS
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Amaral DX and Qtrly
Adj....tomato
Rs/kWh
Applicable Uniform Amami D.bt and Qtrly
Adjustments
Rs/kWh
31 Upto 25 kW (at 400/230 Volts) 0.53 0.63
0.63 82(a) exceeding 25.500 kW (at 400 Volts)
0.53
Peak Off-Peek Peak Off-Peak
Ill ( b)
Tlme Of Use
Up to 26 KW 0.63 0.53 0.63
0.63
0.63
0.53 82(b( exceeding 25-500 kW at 400 Volts)
0.53 0.53
0.53 0.63 33 For All Loads up to 5000 kW (at 11,33 kV)
0.63 0.13 0.63 0.63
34 For All Loads (at 66,1:12 kV es above) 0.53 0.53
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Mutual DX and Qtrly
Its/kWh
Adjustments
Applicable Uniform
Annual D-31 and Qtrly Adjustments
Rs/kWh
C -1 Tor supply at 400/230 Volts 0.53 s) Sanctioned load less than 6 kW
0.63
Is) Sanctioned load 6 kW I up to 500 kW 0.53 0.53
0.53 C -2(o) For supply at 11,33 kV up to and including 6000 kW
0.13 0.53
C -3(a) For supply at 66 kV 8 above sad sanctioned load above 5000 kW 0.63
Time Of Use Peak Of5Peak Peak Off-Peak
0.63 0.53 0.63
0.63 0.53
0.63 0.63 C -1(c) For supply at 400/230 Volts 5 kW & up to 600 kW
C -2(b) For supply at 11,33 kV up to and including 5000 kW 0.53
0.113 0.63 0.63 C 4(1) For supply at 66 kV 8 above and seactioned load above 5000 kW 0.53
S-I
Page 1 or 2
Sr. No. TARIFF CATEGORY / PARTICULARS
SCHEDULE OF ELECTRICITY TARIFFS
D - AGRICULTURE TARIFF
Sr. No. TART!? CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjuesnonts
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjmtments
13-1(a)
11.2 (a)
D-1(b) 13-2 )b)
SCARP leas than 5 kW
Agricultmal Tube Wells
SCARP 5 kW & above Agricultural 6 kW & above
0.53
0.53
Ra/kWIt
0.53
0.53 P e.J. Off-Peak Peak Off-Peak
0.63 0.53
0.63 0.53
0.53 0.53 0.53
E TEMPORARY SUPPLY TARIFFS
0.53
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M Applimble Uniform and Qtrly Annual D.M and Qtriy
Adjustments Adjustments
Rs/kWh 11-1(1)
6-1(11)
E-2
Residential Supply
Commercial Supply
InduatrIal Supply
Rs/kWh
0.63 0.53
0.53 0.63 0.63 0.53
Sr. No. TARIFF CATEGORY / PARTICULARS
0.53 0.63
R./kWh Street Lighting Rs/kWh
H - RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PRE5IISES
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual 011t and Qtrly
Adjustments
lis/kWk
0.63
Applicable Uniform Annual D.M and Qtriy
Adjustments
R./kWh
0.63 Residential Colonies attached to Ludmtrial premises
F.-.SEASONAL INDUSTRIAL SUPPLY TARIFF
125% of ...levant Industrial tariff
I - RAILWAY TRACTION
Uniform Annual P.M and Qtrly
AdInstatents
Applicable Uniform Amoral D.M and Qtriy
Adjustment.
S-I
K SPECIAL CONTRACTS
Uniform Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual P.M and Qtrly
Adjustments
1 Asad Jammu & Kashmir (AJE)
Time Of Use
2 Ramat Lab 0.53 J
SPECIAL CONTRACTS UNDER NEPRA (SUPPLY OF POWER) REGULATIONS 2015
Sr. No.
J -1
TARIFF CATEGORY / PARTICULARS
For supply 66 kV
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual DX and Qtrly
Adjustments
Rs/kWh
(al (b)
.74
(a) (b)
-1.(b) .12 (c) .7-2 (d) .14 le)
(d)
Note: Uniform
at & above and having sanctioned load of 20tif9! & above
For supply at 11,33 kV For supply at 66 kV & above
For supply at 11,33 kV For supply at 66 kV & shove
Time Of Use
For supply at 66 kV & above and having sanctioned load of 20MW & above For supply at 11,33 kV For supply at 66 kV & shove For supply at 11,33 kV For supply at 66 kV & above
Annual Distribution Margin (DM)
0.53
0.53 0.53
0.63 0.53
0.53
0.53 0.53
0.63 0.63
Peak OR Peak Off-Paalr 0.53 0.53 0.63 0.53 0.53
0.53 0.53 0.53 .0.53 0.63
0.63 0.53 0.53 0.63 0.53
0.53 0.53 0.53 0.63 0.63
Page 2 of 2
and Quarter of FY 2018-19) subsidy, for
maintaining uniform tariff across consumers & XWDISCO5, will be calculated in accordance with the same parameters as has been notified vide SRO 11 (1) 2019 Dated 01-01-2019 In order to arrive at net subsidy, the figures will be worked out by subtracting S-I notifed vide this SRO from 8 S-118 notified vide this. SRO minus SII notified vide SRO. 01-01-2019) plus (S-11A notified vide this SRO)).
1---
Quarterly adjustment (3rd and 4th
Ra/kWh No/kWh 0.53
Off-Peak 0.63
0.53 Peak Peak OR
0.53 0.63 0.63
0.53
Sr. No.1
Railyway Traction
Uniform Annual D.M Applicable Uniform and Qtrly Annual D.M and Qtrly
Adjustments Adjustments
Rs/kWh
0.53
Rs/kWh
0.53
TARIFF CATEGORY / PARTICULARS
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204. 0.3204 0.3204 0.3204 0.3204
0.4794 0.479,4 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
Unifrom Rate for the 3rd & 4th Qaurately Adjustment of FY 2018-19
S4IA
Description
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
Uniform Qtrly Adjustment 3rd is 4th Qtr FY 2018-19
Variable Charge
Variabie Charge
Variable Charge
Variable Charge
-.-
Variable Chame
Variable Charge
Variable Charge
Variable Charlie
Venable Chine
Variable Charge
Variable Charge
e-...... .... / IN. Rs/ sm. RsJ WM Its.) kWh Rai b ftsJIMIth 51.4 MT 5.1 11./
Residential Up to 50 Units
For peak load requirement less than 5 kW 01-100 Units
101-200 Units 201-300 Units 301-7000nits Above 700 Units
For peak load requirement exceeding 5 kW) Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Temporary Supply
0.2578 0.2578 0.2578 0.2578 0.2578
0.2578 0.2578 0.2578
0.4709 0.4709 0.4739 0.4709 0.4709
0.4709 0.4709 0.4709
0.1888 0.1888 0.1388 0.1988 0.1888
0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
(1.3449) (1.3449) (1.3449)
02073 0.2073 0.2073 0.2073 0.2073
0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236
0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291
1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204
0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794
0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877
0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324
0.3324 0.3324 0.3324
0.3324 Commercial - A2 For peak load requirement less than 5 kW For peak load requirement exceeding 5 kW -
Regular Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
0.2578
0.2378 0.2578 0.2578 02578
0.4709 -
0.4730 0.4709 0.4709 0.4709
0.1888
0.1558 0.1888 0.1888 0.1888
(1.3449)
(1.3449) (1.3449) (1.3449) (1.3449)
0.2073
0.2073 0.2073 0.2073 0.2073
0.1236
0.1236 0.1236 0.1236 0.1236
1.0291
1.0291 1.0291 1.0291 1.0291
0.3204 -
0.3204 0.3204 0.3204 0.3204
0.4794 -
0.4794 0.4794 0.4794 0.4794
0.5877 -
0.5877 0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324
Supply Temporary
1113E31117.11/11111111
0.3324
1.0291
0.2578 0.4709 0.1888 0.2073 0.1236
General Services-A3
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
Industrial
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 3.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
61 91 Peak 91 Off Peak B2 82 - TOU (Peak) B2 - TOU (Off-peak) 83 - TOU (Peak) B3 - TOU (Off-peak) 94 - TOU (Peak) B4 - TOU (Off-peak)
Temporary Supply
0 2578 0 2578 0.2578 0 2578 0.2578 02578 0.2578 0.2578 0.2578 0.2578 0.2578
Single Point Supply for further distribution C1(a) Supply al 400 Volts-less than 5 kW C1(b) Supply at 400 Volts-exceeding 5 kW
Time of Use (TOU) - Peak lime of Use (TOU) - Off-Peak
C2 Supply at 11 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
C3 Supply above 11 kV Time of Use (TOU) - Peak
Off-Peak
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 02578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 01888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449 (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 ,
I 0.3.224 I 0.3324 0.3324 0.3324 0.3324
Time of Use (TOU) -
Agricultural Tube-wells - Tariff D Scarp
Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Agricultual Tube-wets Tune of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 3.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
Public Lighting - Tariff G Residential Colonies attached to industrial premises Railway Traction
Tariff K - AJK Time of Use (TOO) - Peak Time of Use (TOU) - Off-Peak
Tariff K -Rawat Lab
0.2578 0.2578 0.2578 (1.2578
0.2073 0.1236 1.0291 0.3204 0.2073 0.1236 1.0291 0.3204
0.1236 0.1236 0.1236
0.4794 0.4794
0.5877 0.5877
0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
Special Contract - Tariff-J (1.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 1).2578 0.2578 0.2578 0.2578 0.2578 0.2578
Note; the aforementioned Quarterly Adjustments shall remain applicable fora period o heels, (12) Months from the date of notification of the instant decision. The redaral Government while notifying the allowed uniform rate of Ra.0.3324/kWh steal not adjust the same upwards for any consumer category.
J-1 For Supply at 66 kV & aboye Time of Use (TOO) - Peak lime of Use (TOU) - Off-Peak
.1-2 (a) For Supply at 11, 33 kV Time of Use (TOU) - Peak Time of Use (TOO) - Off-Peak
J-2 (b) For Supply at 66 kV & above Time of Use (TOO) - Peak Time of Use (TOU) - Off-Peak
J-3 (a) For Supply at 11, 33 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
J-3 (b) For Supply al 66 kV & above Time of Use (TOU) - Peak Time of Use (TOU) - OH-Peak
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
4.00
17.66
20.85
21.36
22.70
24.46
23.73
16.30
23.74
4.00
13.85
15.88
16.83
18.54
2094
1013
12.80
2084
01947
0 1947
0. 1947
0.1847
0.1547
0.1947
1947
0.1547
17.75
1918
14.47
14.47
19.55
19.55
18.78
18,42
17.90
13.55
18.56
12.20
16.24
0.:947
0.1947
0.9347
0 1947
0 1947
0.1947
0.1847
19.03
2178
17.98
360.00
38000
18 85
16.37
21.75
21.32
947 18.35
1687
21.25
400.00
20.13
0.7947 21.38
20.37
2174
21.52
91947 13.19
12.97
20.50
400.00
14.99
0,1947 18.30
14.68
19.05
380.00
1561
0.1947 18.43
19.37
24.88
19.73
0.1947 14.40
12.77
17.99
maw
12.57
0.1947 3.15
14.57
18.95
360.00
14.42
3.1947 20.45
19.37
23.74
18,49
0.1041, 14.35
12.67
17.89
360.00
11.59
0.1147
SYED MATEENXAH Section cer
17.93
21.33
15.23
18.03
21.33
15.33
17.93
21.33
15.23
18.03
21.33
15.33
17.93
21.33
15.23
0.1947
01947
0.1947
01947
0.1947
0.1947
0.1947
0 1947
0.1947
0.1947
0.1547
0.1947
0 1947
0.1947
0.1947
16.14
20.66
14.33
18.46
20.66
14,44
16.36
20.66
14.33
16.46
20.86
14.44
16.36
20.66
14.33
19.55
24_45
18.60
19.75
24.45
18_70
19.65
24.45
18.60
1915
24.45
18.70
19.65
24_45
18.60
19.00 1 16.66 21.40 I I 17.56 0.1947 1
01947
0.1947
0 1947
0.1947
01947
0 1547
0.1947
019.67
0. 1 947
0.1947
0 1947
19.35
16.17
20.45
19,37
14.75
12.93
16.86
14.32
20.45
19.32
14.55
12.77
20.92
19.37
1145
12.67
20.45
19.37
14.35
12.57
17.20
19.37
21.26
23.74
18.19
18.75
23.74
17.99
2130
17.89
23.74-
18.26
19.24
400.00
400.00
380.00
360.00
1632
2014
13.46
15.79
19.93
13.23
20.35
12.81
20.27
13.25
16.36
14.04
18.84
12,14
1414
18.84
12.24
14.04
18_84
12.14
14.14
18.84
12.24
14.04
18.84
12.14
380.00
350.00
380.00
38a 00
380.00
360.00
380.00
380.00
360.00
360.00
18.40
20.95
15.12
16.90
20.03
1/50
15.12
19.93
1117
14.50
19.37
12.97
17.80
23.74
17.04
17.90
23.74
17.04
23.17
20.87
200.00
14.03
200.00
1458
2027
20a 00
13.04
0 1547
11947(
0 1947
0.1947 !
a 1947
0.194] I
1 1
19.51 15.49
1787
20.68
14.75
2035
15.34
19.39
12.97
19. 39
23.73
1926
0.1947
19.20
24.74
18.50
23.74
400.00
400.00
18.01
20.09
1148
18.39
0.1947
119,17
0.1947
0.1947
NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)
S-11E1
Description Fixed
Charge
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
Variable Charge
Variable Charge
Variable
Charge Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Re/ keV/1 ReAIWA. Rs/kWh Ref kVA Ref kWh Re) kWh Ref WA Ref law Residential Ref kWh Ref kWh Ref kWh
Up to 50 Units .
For peak load requirement less Ulan 5 kW
01-100 Units
101-200 U11/11
201-300 Units
301-7000ni1s
Above 700 Units
For peak load requirement exceeding 5 kW)
Time of Use (TOU) -Peak
Time of Use (TOU) - Off-Peak
Temporary Supply
4.00
11,00
14.13
15,71
16.98
19.08
17,72
10.24
22.81
4.00
12.20
13.65
15.38
17.02
19.35
18.92
12.61
18.28
4.00
13.48
16,85
17,80
18.18
19.60
19.23
13.43
20.25
4.00
10.25
12.41
13.43
13.87
14.75
14.75
10.25
14.75
4.00
19.15
20.80
72.20
23.45
25.10
25.10
19.60
25.00
400
11.45
13.42
14.87
17.81
18.94
18.41
11.91
18.41
4_00
14.83
16.77
19.47
21.32
2171
23.72
17.77
2117
&DO
15.73
16.28
17.35
2a09
21.07
2104
1516
20.45
400
17.42
19.87
20.32
21.32
2456
24.77
18.39
24.79
Commercial - A2
NEPRA Determined
Unifrom
Uniform Traiff
Interim
Notified w.e.f.
Increase in
01-01-2019
Tariff
Reed Charge Variable Charge Variable Charge
Rafk3V/M
Ref kWh Rs/ kWh
400
400
17.13
14.13
18.03
10.63
17.13
19.19
16.92
19.29
12.37
18.58
18.25
18.00
1915
13.45
1
19.25
14.82
1282
1482
10.32
14.82
2400 17.41
22.00 13.91
25.10 18.41
19.64 11.91
24.00 17.38
21134
21.62
23.72
/7.77
23.82
18.03 17.71 I 17.10 I 13.14 I 21.65 14.21 I 19.26 I
16.13 17.70 18.27 12.75 21.50 14.91 23,12 18.03 19.99 19.77 14.75 25.09 18.41 23.73 10.33 12.14 12.16 10.25 11160 12.32 17.77
400 13.63 15.06 14.77 10.25 21.00 1241 20.62 18.03 19.45 19.70 14.75 25.10 18.41 23.72
400 10.43 12.75 13.33 10.05 19,40 9.60 17.57 18.03 20.69 19.46 14.75 25.1D 18.41 23.73
380 10.23 11.72 13.25 9.95 19.20 12.01 1647 18.33 20.38 19.25 14.75 25.10 18.41 23.72
360 10.63 12,11 1115 085 19.10 11.51 17.37 18.33 14.81 17.73 10.75 25,50 18.41 21.12
17.63 16.31 18.27 12.24 23.02 17.41 24.04 400 17.13 15.81 17.77 11.74 22.50 18.91 22.47
20.11 19.11 20.75 14,74 25.10 21.41 23.72 400 10.63 12.61 14.85 10.24 19.60 1491 17.77 380 13.96 15.32 16.57 10.54 21.30 15.71 20.92
18.17 19.11 20.75 14.74 25.10 21.41 23.72 380 8.40 12.21 1475 10.04 1040 14.71 17.57 360 13.83 14.08 16.47 10.44 21,20 15.61 20.82
18.34 19.11 18.37 14.74 25.10 21.41 23.72 360 1051 12.11 1/62 9.94 19/0 14.61 17.47
18.03 19.21 16.02 10.74 25.69 18.71 22.86 22.39 22.11 20.20 14.74 2610 21.21 23.57
200 13.23 12.13 14.40 9.94 19.20 14.41 17.32 200 15.98 19.21 16,02 10.24 21.00 15.71 19.62
18.03 20 61 20.25 14.74 25.10 21.21 23.57 200 13.23 13.57 13.34 9.94 1620 14.37 16.22
16.08 1089 15,45 10.74 22.95 1277
12.91
2072
20.72 15.31 2.150 15.60 10 74 22.95
18.01 360 13.87
1648 17.41
18.39 360 9.97
13.14 18.37
360 14.29 11.88 14.92 10,79 25.50 1074 22.95 18.49 18.71 1020 15.09 2940 16.54 25.85
360 10.64 11.73 13.10 10.29 2249 9.74 15.80 380 14.39 1421 15,02 10.89 25.60 10_84 2105
18.49. 18.71 19.20 15.00 29.40 16.54 25.85 380 10.76 11.83 13.20 10.39 23.69 9.84 19.70 360 14.29 14.11 14.92 10.79 25.50 10.74 22.95
1649 1871 19.20 15.09 29.40 15.54 25.85 360 10,64 11,73 1110 10.29 23.49 9.74 19.60 380 14.39 14.21 15.02 10.89 2980 10.84 2205.
18.49 18,71 19.20 15.09 2940 16.54 2985 380 10.78 11.83 13.20 10.39 23.69 9.84 19.70 360 14.29 1411 14.92 10.79 25.50 10.74 22.95
18.49 18.71 19.20 15.09 29.40 16.54 25.65 360 10.84 11,73 13.10 10,29 23.49 9.74 19.60
lote: The variable charges mentioned under each DISCO includes the Impact of interim increue in tariff.
he Federal Government while notifying the allowed uniform rate of /4.0.1947/kWh shall not adjust the same upwards for arteonsumer category.
For peak load requirement less than 5 kW
For peak load niquirement exceeding 5 kW
Regular
Time of Use (TOU) - Peak
Time of Use (TOU) - OR-Peek
Temporary Supply
!General Services-A3
Industrial
81
81 Peak
B1 Ott Peak
B2
B2 - TOU (Peak)
B2 - TOU (00-peak)
83 - TOU (Peak)
B3 TOO (Off-peek)
134 - TOU (Peak)
B4 - TOU (08-peak)
Temporary Supply
Single Point Supply for further distribution
Cl(a) Supply at 400 Volts4ess than 5 kW
Cl(b) Supply at 400 Volls-exceeding 5 kW
Time of Use (TOU)- Ptak
Tune of Use (TOU)- OH-Peak
C2 Supply at 11 kV
Time of Use (TOO) - Peak
Time of Use (TOU) - Off-Peak
C3 Supply above 11 kV
Time of Use (TOO) - Peak
lime of Use (TOO) - Off-Peak
Agricultural Tube-wells - Tariff D Scarp
Time of Use (TOU) - Peak
Time of Use (TOU) - Off-Peak
Agficultual Tube-wells
Time of Use (TOW- Puk
Time of Use (TOU) - Off-Peek
Public Lighting - Tariff G
lesidential Colonies attached to industrial preens.,
laikvay Traction
Tariff II - ADC
Time of Use (TOU) - Peak
Time of Use (TOU)- Off-Peak Tariff N -Rawat Lab
Special Contract - Tariff*/
J-1 For Supply at 65 kV .1 above
Time of Use (TOU)- Peak
Tim. of Use (TOO) - OH-Peak
J-2 (a) For Supply at 11. 33 kV
Time of Use (TOU) - Peak
Time of Use (TOU) - Off-Peak
J-2 (0) For Supply at 68 kV & above
Time of Use (TOU) - Peak
lime of Use (TOU)- Off-Peak
J-3 (a) For Supply et 11. 33 kV
Time of Use-(TOU) - Peak
Time of Use (IOU). Off-Peak
J-3 (0) For Supply .t 66 kV d above
Time ot Use (TOU) - Peak
Time of Use (TOU) - Off-Peak
Government of Pakistan Ministry of Energy
******************
Islamabad, the 30thSeptember2019
NOTIFICATION
? S.R.O.1 I) (1)/2019. -Pursuant to section 31(7) of the Regulation of
Generation, Transmission and Distribution of Electric Power Act, 1997, the Federal
Government notifies the adjustment in the approved tariff, on account of periodic
adjustments for 3rd and 4th Quarters of FY 2018-19 and annual
indexation/adjustment of distribution margin with immediate application as
determined and recommended by National Electricity Power Regulatory Authority
(NEPRA) vide decisions both dated September 27,2019 in respect of Quetta
Electric Supply Company Limited (QESCO) , as Schedule I, 11A & IIB by way of
amendment in its notification no. SRO. 01(1) 2019 dated January 1, 2019.
The above adjustments is being notified along with tariff differential subsidy for
lifeline, domestic consumer consuming up to 300 units and additional charge of Rs.
0.30 per unit for maintaining uniform tariff on all category of consumers (except for
lifeline and domestic consumer consuming up to 300 units) so that the consolidated
revenue requirement approved and determined by NEPRA on September 27,2019
is maintained. The said adjustment shall be shown separately in the consumers' bill
by the XWDISCOs and applicable for next twelve-monthly billing cycles effective
from October 1st 2019.
S-I SCHEDULE OF ELECTRICITY TARIFFS
A-1 GENERAL SUPPLY TAVIFF RESIDENTIAL
Sr. No. TARIFF CATEGORY / PARTICULARS Uniform Annual D.Pd
and Qtrly Adjustments
Ra/kWh
Applicable Uniform Annual 13.61 and Qtrly
Adjustments
a:
lii
iv
•
b)
Tor Sanctioned load leas than 5 kW
Up to 50 Unita
For Conaumption exceedbig 50 Unita
001 • 100 Units
101 • 200 Unita
201 • 300 Units
301 - 700 Units
Above 700 Units
For Sanctioned load 5 kW A above
0.53
0.63
0.63
0.53
0.53
Rs/kWh
0.63
0.63
Time Of 12.4, Peak I Off-Peak
I
Peak Off•Peals 0.53 0.53 0.53 0.53
A-2 GENERAL SUPPLY TARIFF COMMERCIAL
Sr. No. TARIFF CATEGORY / PARTICULARS
For
Uniform Annual 13.M and Qtrly
Adjustmeom
Rs/kWh
Applicable Uniform Annual 1316 and Qtrly
Adjuatmestz
a) b)
ei
Sanctioned load less than 6 kV( For Sanctioned load 6 kW A above
Time Of Me
0.53 0.53
Rs/kWh 0.53 0.63
Peak I Off-Peak Peak Oft Peak 0.53 0.63 0.63 0.63
Sr. No.
a)
TARIFF CATEGORY / PARTICULARS
General tiorviees
Uniform Annual 0.51 and Qtrly
Adjustments
Ra/kWh
.Applicable Uniform Annual 0.61 and Qtrly
Adjustments
Rs/kWh
0.63
0.63
-B INDUSTRIAL SUPPLY. TARIFFS
Sr. No. TARIFF CATEGORY /PARTICULARS Uniform Annual D.ld
and Qtrly Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Upto 25 kW fat 400/230 Volts) 12(n) exceeding 25-500 kW (at 400 Volta)
Time Of Us. 11 ( b) Up to 26 KW 32(b) exceeding 25-500 kW (at 400 Volts) 13 For All Loads tip to 5000 kW (at 11,33 kV) 54 For AU Loads (at 66,132 kV A above)
0.53
0.63
Rs/kWh
0.53
0.63
Peak Off-Peak Peak Off-Peak 0.63
0.63
0.63
0.53
0.63
0.53
0.63
0.53
0.63
0.63
0.53
0.53
0.63
0.63 0.63 0.53
C - SINGLE-POINT SUPPLY
So. No.
C -1
al
b) C -2(a)
C -3(a)
C -1(e)
C .2(6) C -3(b)
TARIFF CATEGORY / PARTICULARS Uniform Annual D.51
and Qtrly Adjustments
Rs/kWh
Applicable Uniform Annual D.51 and Qtrly
Adjustments
ler supply at 400/230 Volts
Sanctioned load leas than 15 kW
Sanctioned load 6 kW A up to 500 kW Tor supply .t 11,33 kV op to and Including 5000 kW
!or supply it 66 kV & above and sanctioned load above 5000 kW
Time OTIhn
For supply .t 400/230 Volta 5 kW A up to 500 kW For supply at 11,33 kV up to and including 5000 kW Tor supply at 66 kV A above and sanctioned load above 6000 kW
0.63
0.63 0.63
0.53
Rs/kWh
0.61
0.63 0.53 0.53
Peak Off-Peak Peak Off-Peak
0.53 0.53
0.53 0.53
0.63 0.53
0.53 0.53
0.63 0.63
0.63 0.53
Page 1 of 2
SCHEDULE OF ELECTRICITY TARIFFS
D - AGRICULTURE TARIFF
Uniform Annual D.M Applimble Uniform and Qtrly Anmel P.M sad Qtri),
Sr. No. TARIFF CATEGORY / PARTICULARS Adjustments Adjuatiments
Rs/kWh Rs/kWh
0.63 0.53 D-1(a) SCARP lase than 6 kW
0.53 0.53 13-2 (a) Agricultural Tube Wells
Peak Off-Peak Peak Off.Peak
13-1(b) SCARP 5 kW & above 0.63 0.63
0.63 0.63 0.53
0.53 0.63
D-2 cultural 5 kW & above 0.53
E TEMPORARY ST:IPPLY"TARIFFS
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Ra/kWla
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
b1(i)
E-1(S)
E.-2
Residential Supply
Commercial Supply
Industrial Supply
0.53
0.63
0.53
0.53
0.63
0.63
- EASONAL lINDLISTRIA.Li'SLIPPLY 125% of relevant industrial tariff
PUBLIC LIGHTING •
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual 0.16 and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Ra/kWk
Street Lighting 0.53 0.63
' - RESIRERITi01;651.6NIESATTACHER:ToINDUStillAl, PREMISES
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual P.M and Qtrly
Adjustments
Ra /kWh
Applicable Uniform Annual P.M and Qtrly
Adjustments
Rs/kWh
Residential Colonies attached to industrial premises 0.53 0.53
••, I • RAILWAY .T,RACTION
Sr. No.
•
TARIFF CATEGORY /PARTICULARS
Uniform Anal P.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustnamts
Its/kWh
RailyWay Traction 0.53 0.53
K - SPKCIAL CONTRACTS_
Sr. No. TAROT CATEGORY / PARTICl/LARS
Uniform Annnel D.M and Qtrly
Adjmtments
Rs/kWh
Applicable Uniform Annual Dad land Qtrly
Adjustments
NS/kWh
Azad Jammu & Kashmir (AJIC) 0.53 0.63
1 Peak Off-Peak Peak Off-Peak
Use Time Of 0.63 0.53 0.53 0.53
2 Ramat Lab0.53 0.53
J- SPECIAL COST raellikillRiolaraii'lallit alliatil211bIlaiglili•IVISZliqaffinaarja1M111111111111.1.111111
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual P.M and Qtrly
Adjustments
Rs/kWh
Applleald• Uniform Annual DAR and Qtrly
Adjustments
Rs/IdIk
J -1 .1-2
(s) (b)
3-3 (a) (b)
.1 -1(b) J-3 (e) 3-2 (d) .1-3 (c) J-3 (d)
For supply at 66 kV & above and having muctioned load of 20MW 0 above
For supply at 11,33 kV For supply at 66 kV h above
For supply at 11,33 kV For supply at 66 kV & above
Time Of Use For supply of 66 kV h above and having sanctioned load of 20MW & above
For supply at 11,33 kV For supply at 66 kV is above For supply at 11,33 kV For supply at 66 kV & above
0.53
0.63 0.63
0.63 0.53
0.53
0.63 0.53
0.63 0.63
Peak Off-Peak Peak Off-Peak
00
00
0
0.53 0.53 0.53 0.53 0.53
0.53 0.53 0.53 0.53 0.53
0.63 0.53 0.53 0.53 0.63
Note: Uniform Annual Distribution Margin (DM) and Quarterly adjustment (3rd and 4th Quarter o r 12018-19) , for
maintaining uniform tariff across consumers & XWDISCOs, will be calculated in accordance with the same parameters as has been
notified vide SRO 11 (I) 2019 Dated 01-01-2019. In order to arrive at net subsidy, the figures will be worked out by subtracting S-1
noticed vide this SRO from (i S-IIB notified vidc this SRO minus Sll notified vide SRO. 01-01-2019) plus (S-11A notified vide this SRO)).
S-I
Page 2 of 2
0.2578 I 0.4709 I 0.1888 I (1.3449)I 0.2073 I 0.1236 I 1.0291 I 0.3204 I 0.4794 0.5877 General Services-A3 Industrial
C1(a) Supply at 400 Volts-less than 5 kW C1(b) Supply at 400 Volts-exceeding 5 kW
Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
C2 Supply at 11 kV Tme of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
C3 Supply above 11 kV Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291 1.0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
Unifrom Rate for the 3rd & 4th Qaurately Adjustment of FY 2018-19 S•HA
Description
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
Uniform Qtrly Adjustment
3rd Si 4th Qtr FY 2018-19
Veriable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge Variable Charge
aJ kWh Rs) kleM Residential
Up to 50 Units For peak load requirement less than 5 kW
01-100 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1238 1.0291 0.3204 0.4794 0.5877 0.3324 101-200 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 201-300 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 301-7000nits 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Above 700 Units For peak load requirement exceeding 5 kW)
0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Commercial - A2 For peak load requirement less than 5 kW 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 For peak load requirement exceeding 5 kW - - -- - - - - - Regular
Time Use 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 of (TOU) - Peak
Time 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
0.3324
91 91 Peak
0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
91 Off Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
82 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
92 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
B2 - TOU 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 (Off-peak)
93 - TOU 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 (Peak)
93 -TOU 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 (Off-peak)
94 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 03324
B4 - TOU (Off-peek) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 a 5877 0.3324
Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Single Point Supply for further distribution
Agricultural Tube-wells - Tariff D Scarp
Time of Use (TOU) - Peak Time of Use (TOU) - Off-Peak
Agricultual Tube-wells Time of Use (TOU) - Peak
• Time of Use (TOU) - Off-Peak
0.2578 0.2578 0.2578 0.2578 0.2578 0.2578
0.4709 0.4709 0.4709 0.4709 0.4709 0.4709
0.1888 0.1888 0.1888 0.1888 0.1888 0.1888
(1.3449) (1.3449) (1.3449) (1.3.449) (1.3449) (1.3449)
0.2073 0.2073 0.2073 0.2073 0.2073 0.2073
0.1236 0.1238 0.1238 0.1236 0.1236 0.1236
1.0291 1.0291 1.0291 1.0291 1.0291 1. 0291
0.3204 0.3204 0.3204 0.3204 0.3204 0.3204
a 4794 0.4794 0.4794 0.4794 0.4794 0.4794
0.5877 0.5877 0.5877 0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
Public Lighting - Tariff G Residential Colonies attached to industrial premises Railway Traction
Tariff K - AJK Time of Use (TOU) -Peak Time of Use (TOU) - Off-Peak
Tariff l< -Rawat Lab
0.2578 0.2578
0.2578 0.2578 0.2578- 0.2578
0.4709 0.4709 0.4709
-
-
0.1888 0.1888
- - - •
(1.3449) (1.3449)
0.2073 0.2073
0.1236 0.1236
0.1236 0.1236 0.1236
1.0291 1.0291
- - - -
0.3204 0.3204
0.4794 0.4794
0.5877 0.5877
0.5877 0.5877 0.5877
0.3324 0.3324 0.3324 0.3324 0.3324 0.3324 0.3324
Special Contract - Tarirki .1-1 For Supply at 68 kV 8 above
Time of Use Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 65877 0.3324 (TOU) -
Time of Use 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 (TOU) - Off-Peak
(a) For Supply .1-2 at 11, 33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 (TOU) -
Time of Use 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 a 3324 (TOU) - Off-Peak
J-2 (b) For Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 at 68 kV & above
Time of Use (TOU) Peak - 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 63324
Time of Ute (TOU) Off - -Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
.1-3 at 11, 33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 (a) For Supply
Time of Use Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 (TOU) -
Time Use 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 a 5877 0.3324 of (TOU) - Off-Peak
.1-3 at 66 kV 8 above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 (b) For Supply
Time of Use Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 (TOU) -
Time of Use 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 (TOU) • Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Note: the aforementioned Guerterly Adjustments shall remain applicable fora period of twelve (12) Menem from the date of notinution of the Instant decision. The Federal Government while notifying the allowed uniform rate of Ra.0.3324/1‘Wh shall not 14.1 the same upwerda forme consumer category.
21.85 I 14.21 19,26 I 19.00 16.86 i 21.40 3eneral Services-A3
16.03
17.71 17.10
13.34 17.58 0.1947
NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)
S-IIB
Description Fixed
Charge
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
NEPRA Determined Uniform Traiff Notified w.e.f.
01-01-2019
' Unifrom Interim
Increase in
Tariff
Variable Charge
Variable Charge
Varliable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Flied Charge
es Awn..
Vulabia Charge
RsJ kWh
Widthle Charge
RsJ kWh R6J8WIM
iesIclentlai
Up to 50 Units 4.00 e00 0.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00
For peak load requirement less than 5 kW
01-100 Units 11.00 12.20 13.48 10.25 19.15 11.45 14.63 15.73 17.42 17.86 13.06 0.1947
0.1947 101-200 Units 14.13 13.85 16.85 12.41 20.80 13.42 16.77 16.20 19.87 , 20.85 15.05
0.1947 201-300 Units 1571 15.38 1760 13.43 72.20 14.87 1947 17,35 20.32 21.36 16.03
0.1907 301-7000nits 16.98 17.02 10.16 13.87 23.45 17.81 21.32 20.09 21.32 22.70 18.54
0.1947 Above 700 Units 19.00 1935 19.60 14.75 25.10 18.94 23.71 21.07 24.56 24.46 20.94
For peak load requirement exceeding 5 kW) 0.1947
Time of Use (TOU)-Peak 17.72 18.92 19.23 14.75 25.10 18.41 23.72 21.04 24.77 23.73 19_33 0.1947
Time of Use (TOU)- Off-Peak 10.24 12.81 13.43 10.25 19.60 11.91 17.77 15.38 18.39 18.30 12.80 a 1947
Temporary Supply 22.81 18.26 20.25 14.75 25.00 10.41 21.37 20.45 24,79 23.74 20.84
;ommerciai - AZ
'or peak load requirement less than 5 kW 17.13 1119 18.25 14.82 24.00 17.41 23,64 19.51 ' 15.49 23.73 1926 0.1947
Mr peek load requirement exceeding 5 kW
Regular 400 14.13 16.92 18.00 12.82 22.00 13.91 21.62 17.87 15.34 .19.20 400.00 18.01 0.1947
0.1947 Time of Use (T011)- Peak 18.03 19.29 19.25 14.82 25.10 10.41 23.72 20.68 1139 24.74 20.09
0.1947 Time of Use (TOU) • Off-Peak 400 1083 12.37 13.45 10.32 19.64 11.91 17.77 14.75 12.97 18.50 400.00 13.48
0.1947 Temporary Supply 17.13 1888 18.25 14.82 24.00 17.38 23.62 20.35 19.39 23.74 18.39
naustnai
65 16.13 17.70 18.27 12.75 21.50 14.91 23.12 19.35 16.17 21.26 18.32 0.1447
91 Peak 18.03 19.99 19.77 14.75 25.09 18.41 23.73 20.45 19.37 23.10 20.14 0.1947
0 1947 131 Off Peak 10.33 12.14 12.16 1125 19.60 1732 17.77 14.75 1293 18.19 13.48
• 01947 82 400 13.63 15.06 14.77 10.25 21.00 12.41 2062 16.86 14.32 18.75 400.00. 15.79 •
1947 0 B2 - TOU (Peak) 18.03 19.46 19.70 14.75 25.10 18.41 23.72 20.45 19.32 23.74 19.93
0.1947 02 - TOU (Off-peak) 400 10.43 12.75 13.33 10.05 19.40 9.60 17.57 14.55 12.77 17.98 400.00 _13.23
B3 - IOU (Peak) 1813 20.69 19.46 14.75 25.10 16,41 2373 20.92 19.37 23.30 20.39 ... 0.1947
83 - TOU (06-peek) 380 10.23 11.72 13.25 9.95 19.20 12.01 16.47 13.45 12.67 17.89 380.00 12.61 0.1947
01947 B4 - 701.1 (Peak) 1133 20.36 19.25 14.75 25.10 18.41 23.72 2045 19.37 23.7* 20.27
a 1947 64 - TOU (08-peak) 360 10.63 12.11 13.15 5.85 19.10 11.51 17.37 14.35 12.57 1128 360.00 1126
Temporary Supply 1833 14.81 17.73 10.75 25.50 18.41 21.12 17.20 19.37 19.24 16.36 0.1947
tingle ruin! ouppry ror runner suarnounun
C1(a) Supply it 400 Volts4ess than 5 kW 17.63 16.31 18.27 12.24 23.02 17.41 24.04 18.35 16.37 21.75 21.32 0.1947
Cl(b) Supply a1400 Volts-wateding 5 kW 400 17.13 15.81 17.77 11.74 22.50 18.91 22.47 18.35 15.87 21.25 400.00 20.13 0.1947
Time of Use (TOU) - Peak 20.11 19.11 20.75 14.74 25.10 21.41 23.72 21.38 20.37 23.74 21.52 0.1947
Time of Use (TOU) - 06-Peek 400 10.63 12.61 14.85 10.24 19.60 14,91 17.77 1119 12.97 20.50 400.00 1e99 0.1947
02 Supply al 11 kV 380 13.96 15.32 16.57 10.54 21.30 15.71 20.92 16.30 14.88 19.05 38100 15.61 0.1947
Time of Use (104.1) - Peak 18.17 19.11 20.75 14.74 25.10 21.41 23.72 18.43 19.37 24.68 19.73 0.1947
Time of Use (TOU)- 0ff-Peak 380 840 12.21 14.75 10.04 19.40 14.71 17.57 14.40 12.77 17.99 380.00 72.57 0 1947
C3 Supply above II kV 360 13.83 14.06 18.47 10.44 21.20 1961 20.82 3.15 14.57. 18.95 - 380.00 14.42 0,7947
Time of Use (TOO)-Peak 18.34 1911 18.37 14.74 25.10 2141 23.72 2145 19.37 23.74 18.45 0.19.17
Time of Use (TOU)- O8-Peak 3613 10.51 1211 12.62 9.94 . 19.20 14 61 17.47 14.35 12.67 17.89. 360.00 11.59 0.1947
tyi we.... ei ...tr.-were - i w.f..
Scarp
Tens of Use (TOU)- Peak
Time of Use (TOU) • Off-Peak
696858.) Tube-wells
Time of Use (TOU) - Peak
Time of Use (TOU) - Off-Peak
200
200
200
1813
22.39
13.23
15.98
18.03
13.23
19.21
22.11
12.13
1911
20.81
13.57
16.02
20.20
14.40
18.02
20.25
13.34
13_74
14.74
9.44
1124
14.74
see
25.69
25.10
19.20
21.00
25.10
19.20
16.71
21.01
14.41
15.71
21.21
14.37
22.66
23.57
17.32
19.62
23.57
16.22
18.40
20. 95
15.12
16.90
20.03
1280
15.12
19.93
13.17
14.50
19.37
12.97
17.80
2274
17.04
17.00
23.74
17.04
' 200.00
200.00
200.00
23.17
2187
14.03
14.56
20.27
13.04
0. 16'47 1
11947 1
0.194? I
0.1907 I
0.1947
0, 1947
'ublic Lighting - Tariff G 18.08 1189 15.45 10.74 22.55 12.77 17.75
202017722
74.47 19.86 11578 0.1947
asidential Colonies attached to industrial premises 15.31 20.50 15.60 10.74 22.95 1291 1818 14.47 19.85 18.42 • 0.1047
aitivay Traction 18.01 - - 17.90 0.1947
Tariff 8 - MO 360 13.67 - 15.48 19.03 360.00 13.55 • 0.1947
Time of Use (TOU) • Peak 17.41 - - 18.39 23.78 18.56 0.1947
Time of Use (TOU)- Off-Peak 360 197 13.14 17.98 360.00 12.20 0.1947
rediff K -Rawat Lab 16.37 - ' 16.24 11947
..41 For Supply at 86 kV ,8 above 360 14.29 11.88 14.92 10.79 25.50 10.74 2296 17.93 14.04 1165 360.00 16.14 0.1947
Time of Use (TOU) - Peak 18.49 10.71 19.20 15.09 29.40 16.54 25.85 21.33 18.84 24.45 20.66 11947
Time of Use (TOU)- 06-Pwk 360 1964 11.73 13.10 10.29 23.49 9.74 19.60 15.23 12.14 16.60 360.00 14.33 0.1947
.1-2 (a) For Supply at 11. 33 kV 380 14.39 14.21 15.02 10.89 25.60 10.84 23.05 18.03 14.14 19.75 380.00 18.46 0.1947
Time of Use (TOU)- Peak 1649, 18.71 19.20 15.09 29.40 16.54 25.85 21.33 18.84 24.45 20.66 0.1947
Time of Use (TOU) - Off-Peak 380 10.76 11.83 13.20 10.39 23.69 9.84 19.70 15.33 12.24 18.70 380.00 14.44 0.1947
9.2 (b) For Supply at 66 kV 0. above 380 1429 14.11 14.92 10.79 25.50 10.74 22.95 17.93 14.04 19.65 360.00 16.36 0.1947
Time of Use (TOU) • Peak 18.49 18.71 19.20 15.08 29.40 16.54 25.85 21.33 18.84 24.45 20.58 0.1947
Time of Use (TOU)- Off-Peak 380 50.64 11.73 13.10 10.29 23.49 9.74 19.60 15.23 12.14 18.60 360.00 14.33 0.1147
J.3 (a) For Supply at 11, 33 kV 380 14.39 14.21 15.02 10.89 25.60 lam 23.05 18.03 14.14 19.75 380.00 16.46 ' 0.1947
Time 81 Use (T00) - Peak 18.49 1871 19.20 15.09 29.40 1954 25.85 21.33 18.84 24.45 2066 0.1947
Time &Use (100) - Off-Peak 380 10.76 1183 13.20 10.39 23.89 9.84 19.70 15.33 12.24 18.70 380.00 14.44 0.1947
..1-3 (b) For Supply at 66 kV 8 above 360 14.29 14.11 14.92 10.79 25.50 1074 22.95 17.93 14.04 19.65 360.00 16.36 0.1947
Time of Use (TOU)- Peak 1849 18.71 19.20 12.09 29.40 10 54 2585 21.33 18.84 24.45 2088 0.1947
Time of Use (TOU)- O6-Peak 360 10.64 11.73 13.10 10.29 23.49 9.71 19.60 15.23 12.14 18.60 360.00 14.33 0.1947
ne: The variable charges mentioned under each DISCO Includes the impact of interim increase In tariff.
le Federal Government while notifying the allowed uniform rate of R5.0.1947/kWh shall not adjust the same upwards for any consumer category.
YED MATEEN AHM SUKHARI Section Offi r
Government of Pakistan Ministry of Energy ******************
Islamabad, the 30thSeptember2019
NOTIFICATION
S.R.O.VC15 (1)/2019. -Pursuant to section 31(7) of the Regulation of
Generation, Transmission and Distribution of Electric Power Act, 1997, the Federal
Government notifies the adjustment in the approved tariff, on account of periodic
adjustments for 3rd and 4th Quarters of FY 2018-19 and annual
indexation/adjustment of distribution margin with immediate application as
determined and recommended by National Electricity Power Regulatory Authority
(NEPRA) vide decisions both dated September 27,2019 in respect of Hyderabad
Electric Supply Company Limited (HESCO) , as Schedule I, 11A & 11B by way of
amendment in its notification no. SRO. 02(1) 2019 dated January 1, 2019.
The above adjustments is being notified along with tariff differential subsidy for
lifeline, domestic consumer consuming up to 300 units and additional charge of Rs.
0.30 per unit for maintaining uniform tariff on all category of consumers (except for
lifeline and domestic consumer consuming up to 300 units) so that the consolidated
revenue requirement approved and determined by NEPRA on September 27,2019
is maintained. The said adjustment shall be shown separately in the consumers' bill
by the XWDISCOs and applicable for next twelve-monthly billing cycles effective
from October 1st 2019.
COMMERCIAL A-2 GENERALSIIPATWATHF
Time Of Use
Sr. No.
Uniform Annual MY and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.Id and Qtrly
Adjuatments
Rs/kWh
TARIFF CATEGORY / PARTICULARS
a) For Sanctioned load leas than 5 kW
i Up to 60 Units
For Consumption exceeding 50 Units
001 - 100 Units
101 - 200 Units
iv 201 - 300 Units
✓ 301 - 700 Units
vi Above 700 Anita
b) For Sanctioned load 6 kW & above
0.53
0.53
0.63
0.63
0.53
Peak Off-Peak Peak Off-Peak
0.63 0.53 0.53 0.53
0.53
0.53
SCHEDULE OF. ELECTRUCIT,Y. TARIFFS
A-1 GENERAL SUPPLY%TARIFE ;RESIDENTIAL
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Annual D.31 and Qtrly
Applicable Uniform
Adjustments
Rs/kWh a) b)
c)
For Sanctioned load leas than 6 kW For Sanctioned load 5 kW k above
Time Of Use
0.53 0.53
0.53 0.63
Peak Off-Peak Peak Off-Peak
0.53 0.53 0.63 0.53
A13.GENIUMEERVICES2',
Sr. No. and TARD,F CATEGORY / PARTICULARS
Uniform Annual D.M Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.2d and Qtrly
Adjustment:
Rs/kWh a) General Services 0.53 0.53 i
INDUSTRIAL-AUPFLVTARIFFS
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual D.31 Adjust *ad Qtrly
ments
Rs/kWh Rs/kWh 81 Upto 25 kW (at 400/230 Volts) 0.63 0.53 82(a) exceeding 26-500 kW (at 400 Volts) 0.63 0.53
Time Of Use Peak Off-Peak Peak Off-Peak 81 ( b) Up to 26 KW 0.53 0.63 0.53 0.53 32(b) exceeding 25-500 kW (at 400 Volts) 0.53 0.53 0.53 0.53 B3 For All Loads up to 5000 kW (at 11,33 kV) 0.53 0.53 0.53 0.53 84 For All Loads (at 66,132 kV as above) 0.53 0.63 0.53 0.53
SINGLE-PUHNTSUFTLy
Sr. No. TARDY CATEGORY / PARTICULARS
Uniform Annual D.1/ and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual 0.51 and Qtrly
Adjustments
Rs/kWh C •1 For supply at 400/230 Volts
a) Sanctioned load less than 6 kW 0.53 0.63 b) Sanctioned load 5 kW a. up to 500 kW 0.53 0.53
C -2(a) For supply at 11,33 kV up to and including 5000 kW 0.53 0.63 C -3(a) For supply at 66 kV & above and sanctioned load above 5000 kW 0.53 0.53
Time Of Use Peak Off-Peak Peak Off-Peak
C -1(c) For supply at 400/230 Volts 5 kW & up to 500 kW 0.53 0.63 0.53 0.53 C -2(b) For supply at 11,33 kV up to and Including 5000 kW 0.63 0.53 0.53 0.53 C -3(6) For supply at 66 kV & above and sanctioned load above 5000 kW 0.53 0.53 0.53 0.53
S-I
Page 1 of 2
SCHEDULE OF ELECTRICITY TARIFFS • . •
• D - AGRICULTURE:TARIFF. .
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual D.36 and Qtrly
Adjustments
Ra/kWls Rs/kWh
11-1(a) SCARP less than 6 kW 0.53 0.63
D-2 (a) Agricultural Tube Walla 0.53 0.63
Peak Off-Peak Peak Off-Peak 15-1(b) SCARP 5 kW & above 0.53 0.63 0.53 0.53 D-2 (b) Agricultural 5 kW S above 0.53 0.63 0.63 0.63
-•TEIcIPCHiARY:EUPPLYTARIFFS:7.
Uniform Annual D.M Applicable Uniform
Sr. No. TARIFF CATEGORY / PARTICULARS and Qtrly Annual D.M and Qtrly Adjustments Adjustments
Ita/kWh Rs/kWh
E-1(i) Residential Supply 0.53 0.53
E-1(ii) Commercial Supply 0.53 0.63
5-2 Industrial Supply 0.53 0.53
F L- SEASONAL INDUSTRIALSUPPLY TARIFF,
125% of relevant industrial tariff
LIGHTING:
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual 0.36 and Qtrly
Adjustment.
Ra/kWh
Annual D.M and Qtrly
Applicable Uniform
Adjustments
Rs/kWh
Street Lighting 0.53 0.53
H RESIDENTIAL COLONIES ATTACHED.TO INDUSTRIAL:PREMISES
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual 0.61 and Qtrly
Adjustments
Its/kWh
Annual 13.36 and Qtrly
Applicable Uniform.
Adjustments
Rs/kWh
Residential Colonies attached to industrial premises 0.53 0.63
I - RAILWAY•TRAcnort •
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Animal DM and Qtrly
Adjustments
Its/kWh
Annual DAM and Qtrly
Applicable Uniform
Adjustments
Rs/kWh
Railyway Traction 0.53 0.53
K .- , SPECIAL CONTRACTS"
St. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.11 and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
1
2
Azad Jammu & Kashmir (A.J1C)
Time Of Use
Ramat Lab
0.53 0.53 Peak Off-Peak Peak J Off-Peak
0.53 0.63 I
0.53 I 0.53
0.63 0.63 J - SPECIAL CONTRACTS UNDER NEPRA (SUPPLY OP POWER REGULATIONS 2015
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual 0.1f and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.61 and Qtrly
Adjustments
Rs/kWh J -1 For supply at 66 kV 5 above and having sanctioned load of 20MW & above 0.53 0.53 J-2
(a) For supply at 11,33 kV 0.53 0.53 (b( For supply at 66 kV 5 above 0.53 0.53
J-3 (a) For supply at 11,33 kV 0.53 0.53 (b( For supply at 66 kV & above 0.53 0.53
Time Of Use Peak Off-Peak Peak Off-Peak ..f -1(6) For supply at 66 kV & above and having sanctioned load of 20MW & above 0.53 0.53 0.53 0.53 J-2 (c( For supply at 11,33 kV 0.53 0.53 0.63 0.53 J-2 (d) For supply at 66 kV 5 above 0.53 0.63 0.63 0.53 J-3 (c) For supply at 11,33 kV 0.63 0.63 0.53 0.53 J-3 (d) For supply at 66 kV S above 0.53 0.53 0.53 0.53
Note: Uniform Annual Distribution Margin (DM) and Quarterly adjustment (3rd and 4th Quarter of FY 2018-19) subsidy, for
maintaining uniform tariff across consumers & XWDISCOs, will be calculated in accordance with the same parameters as has been notified vide SRO 11 (1) 2019 Dated 01-01-2019. In order to arrive at net subsidy, the figures will be worked out by subtracting S-1
floated vide this SRO from (( SAE notified vide this SRO minus $11 notified vide SRO. 01-01-2019) plus (S-11A notified vide this SRO)).
S-I
Page 2 of 2
Unifrom Rate for the 3rd & 4th Qaurately Adjustment of FY 2018-19
S-HA
Description
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
Uniform Qtrly
Adjustment 3rd & 4th Qtr FY 2018-19
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge Variable Charge
RsJ kwh RsJ kWh Rs.? kWh RsJ kWh RsJ kWh Rs./ kWh RsJ kWh RsJ kWh RsJ kWh RsJ kWh RsJkW/h Residential
Up to 50 Units For peak load requirement less than 5 kW
01-100 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 101-200 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 201-300 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 301-7000nits 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Above 700 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 For peak load requirement exceeding 5 kW)
Time of Use (TOO) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204. 0.4794 0.5877 0.3324
Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Commercial • A2
For peak load requirement less than 5 kW 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
For peak load requirement exceeding 5 kW - - - - - - - - - Regular 0.2578 D.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
General Services-A3
0.2678
0.4709
0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 9.6877 Industrial
81 B1 Peak
0.2578 0.2578
0.4709 0.4709
0.1888 0.1888
(1.3449) (1.3449)
0.2073
0.2073
0.1236
0.1236
1.0291
1.0291
0.3204 0.3204
0.4794 0.4794
0.5877 0.5877
0.3324 0.3324
01 Off Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 82 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 B2 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 B2 - TOO (Off-peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 B3 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 83 - TOU (Off-peak) 0.2578 114709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794* 0.5877 0.3324 84 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 84 - TOU (Off-peak) 0.2578 114709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 '0.5877 0.3324
Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Single Point Supplyfor further distribution C1(a) Supply at 400 Volts-less than 5 kW 0.2578 04709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 C1(b) Supply at 400 Volts-exceeding 5 kW 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOO) - Peak 0.2578 04709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 • 0.3324
C2 Supply at 11 kV 0.2578 (1.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794. 0.5877 0.3324 Time of Use (TOO) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
C3 Supply above 11 kV 0.2578 0.4709 0.1888 (1.34.49) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Agricultural Tube-wells - Tariff D Scarp 0.2578 0.4709 0.1888 1 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOO) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Agricultual Tube-wells 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0,4794 0.5877 . 0.3324 Time of Use (TOO) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0,1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Public Lighting - Tariff G 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Residential Colonies attached to industrial premises 0.2578 0.4709 0.1588 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 .0.5877 0.3324 Railway Traction 0.4709 - - , 0.3324
Tariff K - AJK 0.2578 - - 0.1236 0.5877 0.3324 Time of Use (TOO) - Peak 0.2578 - - 0.1236 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 - - 0.1236 0.5877 0.3324
Tariff K -Rawat Lab 0.2578 - - - 0.3324
Special Contract - Tartff-J
.1-1 For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
3-2 (a) For Supply at 11, 33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
3-2 (b) For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Off-Peak 0.2578 0.4709 0.1886 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
.1-3 (a) For Supply at 11, 33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Off-Peak 0.2578 0.4709 C.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
3-3 (b) For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOO) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Note; the aforementioned Quarterly Adjustments shall remain applicable for a period o twelve (12) Months from the date of notification of the instant decision. The Federal Government while notifying the allowed uniform ate of Rs.0.3324/kWh shall not adjust the same upwards for any consumer ca egory.
0.3324
NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)
S-1(8
. Description Fixed
Charge
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO ClESCO PESCO
NEPRA Determined
Uniform Traiff
Notified w.e.f.
01-01-2019
Unifrom
Interim
Increase in
Tariff
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
VaJiable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Fixed Charge Variable Charge
Variable Charge
Rs/WM Rs./ YWn Rs/kWh Rs./ kWh Rs./ k
--__Up to 50 Units 400 400 4.00 4.00 4.00 4.00 4.00 400 4.00 4.00 4.00
For peak load requirement less than 5 kW
01-100 Units 11.00 12.20 13.48 1025 19.15 11.45 14.63 15.73 17.42 17.66 13.85 0.1947
101-200 Units 14.13 13.65 16.85 12.41 20.80 13.42 16.77 16.28 19.87 20.85 1586 11947
201-300 Units 15.71 15.38 17.80 13.43 22.20 14.87 19.47 17.35 20.32 21.36 16.83 2.1947
301-700061t9 16.98 17.02 18.16 13.87 23.45 17.81 21.32 20:09 21.32 22.70 18.54 0 1947
Above 700 Units 19.08 18.35 19.60 14.75 25.10 18.94 23.71 21.07 24.56 24.46 20.94 11947
For peak load requirement exceeding 5 kW)
Time of Use (TOU)- Peak 17.72 18.92 19.23 14.75 25.10 18.41 23.72 21.04 24.77 23.73 1933 0 1947
Time of Use (TOU) - Off-Peak 10.24 12.61 13.43 10.25 . 19.60 11.91 11.77 15.36 18.39 16.30 1280 0.1947
Temporary Supply 22.81 18.28 20.25 14.75 25.00 18.41 21.37 20.45 21_79 23.74 20_81 0.1947
For peak load requirement lass then 5 kW 17.13 . 19.19 18.25 14.82 24.00 17.41 23.64 1951 15 49 23.73 19.26 11947
For peak load requirement exceeding 5 kW
Regular 400 14.13 16.92 18.00 12.82 22.00 13.91 21.62 17.87 15.34 1920 400.50 18.01 0 1947
Time of U. (TOO) - Peak 18.03 19.29 19.25 14.82 25.10 18.41 23.72 20.88 18.39 2474 20.09 0.1947
Time of Use (TOU)- 08-Peak 400 10,63 12.37 13.45 10.32 19.64 11.91 17.77 14.75 12.97 16.50 400.00 1148 2 1947
Temporary Supply 17.13 113.58 19.25 14.82 24.00 17.38 23.62 20.35 19.39 2174 18.39 0.1947
17.55 General Services-A3
18.03
17.71 17.10 13.34 21.65 14.21 19.26 19.00 1865 21.40
...__._. En 16.13 17.70 18.27 12.75 21.50 14,91 23.12 19.35 16.17 21.26 1632 31947
81 Peak 18.03 19.90 19.77 14.75 25.09 18.41 23.73 20.45 19.37 23.74 20.14 0 1947
B1 Off Peak 10.33 12.14 12.16 10.25 1960 ' 12.32 17.77 14.75 12.93 18.19 13.48 0.1947
B2 400 13.83 15.06 14.77 10.25 21.00 12.41 20.62 16.86 14.32 18.75 ' 400.00 15.79 3 1947 ,
B2 - TOU (Peak) 18,03 19.46 19.70 14.75 25.10 18.41 23.72 20_45 19.32 23.74 79.93 0.1947 i
52 - TOU (Off-peak) 400 10.13 12.75 13.33 10.05 19.40 9.60 17.57 14.55 ' 12.77 17.99 400.00 „13.23 0.1947 i
B3 - IOU (Peak) 18.03 20.69 19.46 14.75 25.10 18.41 23.73 20.92 19.37 23.30 20.39 0 1947
83 - TOU (Off-pea6) 380 10,23 11.72 13.25 9.95 19.20 12.01 16.47 1145 12.67 17.89 380.00 12.61 /1947
84 - TOU (Peak) 18.33 20.36 19.25 14.75 25.10 18.41 23.72 20.45 18.37 23.74- 20.27 0 1947
54 - TOU (08-peak) 360 10.63 12.11 13.15 9.85 19.10 11.51 17.37 1435 12.57 1826 360.00 13.25 11947
Temporary Supply 18.33 14.81 17.73 10.75 25.50 18.41 21.12 17.20 19.37 19.24 16.36 0 1947
C1(a) Supply at 100 Volts-less than 5 kW 17.83 16.31 18.27 12.24 23.02 17.41 24.04 18.85 16.37 21.75 21.32 0.1947
C1(b) Supply a1400 Vo8s-exceeding 5 kW 400 17.13 15.81 17.77 11.74 22.50 1691 22.47 18.35 15.87 21.25 40010 20.13 0.1947
Time of Use (TOU)- Peak . 20. 11 19.11 20.75 11.74 25.10 21.41 2172 21.38 20.37 23.74 21.52 11947
Time of Use (TOU)-Off-Peak 400 10.63 12.67 14,85 10.24 19.60 14.91 17.77 13.19 17_97 20.50 400.00 14.99 a 1947
C2 Supply at 11 kV 380 13.96 15.32 16.57 10.54 21.30 15.71 20.92 16.30 14.68 19.05 380.00 15.61 11947
Time of Use (TOU) - Peak 18.17 19.11 20.75 14.74 25.10 21.41 23.72 1843 19.37 24.68 19.73 0.1947
Time of Use (TOO) • Off-Peak 380 8.40 12.21 14.75 10.04 19.40 14.71 17.57 14.40 .12.77 17.99 380.00 12.57 G 1917
23 Supply above 11 kV 360 13.83 14.08 16.47 10.44 21.20 1861 20.82 3.15 1457 18.95 360.00 14.42 7_1947
Time of Use (TOU)- Peak 18.31 19.11 18.37 14.74 25.10 21.41 .23.72 20 45. 19.27 23.74 1849 1.1947
Time of Use (TOU)- Off-Peak 380 10.51 12.11 1262 9.94 . 19.20 1481 17.47 14.35 12.67 17.89 36000 11.59 0.191')
t _
Scarp 18.03 19.21 16.02 10.74 25.69 16.71 22.86 18.40 15.12 17.80 23.17 0.197:1
Time of Use (TOU) - Peak 72.39 22.11 20.20 14.74 25.10 21.21 23.57 20.95 19.93 23.74 20137 •115.17 i
Time of Use (TOU)- Off-Peak 200 13.23 12.73 14.40 9.94 19.20 14.41 17.32 15'12 1117 17.04 200.00 14.03 ' a 1947 1
Agricunual Tube-wells 200 15.98 18.21 16.02 10.24 21.00 1871 19 62 16.90 14.50 17.90 200.00 14.56 0 .047 1
Time of Use (TOL)) - Peek 18.03 20.61 20.25 14,74 25.10 .21.21 23.57 20.03 19.37 23.74 20.27 31917
Time of Use (TOU) - Off-Peak 200 13.23 13.57 13.34 9.94 19.20 14.37 16.22 12.50 12.97 17.04 200.00 13.04 0.1947
Public Lighting - Tariff G 16.08 19.89 15.45 10.74 2295 12.77 20.72 17.75 14.47 19.55 18.78 11941
tesidendal Colonies attached to industrial premises 15.31 20.50 15.60 10_74 22.95 12.91 20.72 18.78 14.47 19.55 18.42 17947
tailway Traction 18.01 - - - 17.90 11941
Tariff IS -ASS 380 13.67 -- 15.48 19 03 36100 13.55 a 1647
Time of Use (TOU) - Peak 17.41 - - ,18.39 2178 18.56 1)947
Tune of Use (TOW • Off-Peek 360 997 - 13_14 17.98 360.00 12.20 3 1947
Tariff 11 -Rawat Lab 16.37 16.24 0.1947
1-1 For Supply at 68 141;48. above 360 74.29 11.88 14.92 10.79. 25.50 10.74 • 22.95 17.93 14.09 19 65 36000 16.14 0 1947
Time of USA (TOU) - Peak 18.49 18.71 18.20 15.09 29.40 1854 25.85 21.33 18.84 24.45 20.66 0.1947
TIM. of Use (TOU) • 06,Pea6 360 10.64 11.73 13.10 70.29 23.49 9.74 19.60 15.23 12.14 18.60 360.00 14.33 0 1947
1-2 (a) For Supply at 11.33 kV 380 14.39 11,21 15.02 10.89 25.60 1064 23.05 18.03 14.14 19.75 380.00 16.46 0 19/7
Time of Use (TOO) - Peak 18.49, 18.71 19.20 15.09 29.40 16.54 25.85 21.33 18.84 24.45 20.68 0.1947
Time of Use (TOU) - Off-Peak 380 10.78 11.83 1120 10.39 23.69 9.84 19.70 15.33 12.24 18.70 38000 14.44 a 1947
1-2 (5) For Supply a166 kV & above 360 14.29 14.11 14.92 10.79 25.50 10.74 22.95 17.93 14.04 19.65 360.00 16.36 0 1947
Time of Use (106)) - Peak 18.49 18.71 19.20 15.09 29.40 . 16.54 25.135 . 21.33 1084 24.45 20.66 01947
Time of Use (TOU). 06-Peak 360 10.61 11.73 13.10 10.29 23.49 974 19.60 15.23 12.14 18.60 36100 14.33 0.1947
.1-3 (a) For Supply at 11. 33 kV 380 14.39 14.21 15.02 10.89 2860 10.84 23.05 18.03 14.14 1975 380.00 1646 0 1947
Time of Use (TOU)- Peak ' 18.49 18.71 19.20 15.09 29.40 46.54 25.85 21.33 18.84 24.45 20.66 0 1947
Time of Use (TOU) - Off-Peak 380 10.76 11.83 13.20 10.39 23.68 9.84 19.70 1533 12.24 18.70 380 00 14.44 0 194 7
1-3 (b) For Supply at 66 kV 8 above 360 , 14.29 14.11 14.92 10.79 .2840 10.74 22.95 17.93 14.04 19_65 360.00 1836 a 1947
Time of Use (TOU)- Peak 18.49 18.71 19.20 15.09 29.40 16.54 25.85 21.33 18.84 74.45 20.66 0.1947
Time of Use (TOU)- Off-Peak 360 10.69 11.73 13.10 10.29 23.49 9.74 10.60 15.23 12.14 18.60 1 \ 350.00 14.33 0.1947
lots: The variable charges mentioned under each DISCO Includes the Impact of interim Increase In tariff. Sr. Federal Government while notifying the allowed uniform rate of fts.0.1947/kWh shall not adjust the same upwards for any consumer category.
1YED MATEEN AHMED LIKHAR1 Section Officer
0.1947
Government of Pakistan Ministry of Energy
Islamabad, the 30thSeptember2019
NOTIFICATION
S.R.O. (i)/2019. -Pursuant to section 31(7) of the Regulation of
Generation, Transmission and Distribution of Electric Power Act, 1997, the Federal
Government notifies the adjustment, in the, approved tariff, on account of periodic
adjustments for 3rd and 4th Quarters of FY 2018-19 and annual
indexation/adjustment of distribution margin with immediate application as
determined and recommended by National Electricity Power Regulatory Authority
(NEPRA) vide decisions both dated September 27,2019 in respect of Sukkur
Electric Power Company Limited (SEPCO) , as Schedule I, IIA & IIB by way of
amendment in its notification no. SRO. 08(1) 2019 dated January 1, 2019.
The above adjustments is being notified along with tariff differential subsidy for
lifeline, domestic consumer consuming up to 300 units and additional charge of Rs.
0.30 per unit for maintaining uniform tariff on all category of consumers (except for
lifeline and domestic consumer consuming up to 300 units) so that the consolidated
revenue requirement approved and determined by NEPRA on September 27,2019
is maintained. The said adjustment shall be shown separately in the consumers' bill
by the XWDISCOs and applicable for next twelve-monthly billing cycles effective
from October 1st 2019.
0.53
0.53
a)
iii
Iv
•
vi
b)
Peak
Off-Peak Peak
Off-Peak
Time Of Use 0.63
0.53 0.63
0.53
Uniform Annual 0.15 and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.55 and Qtr.ly
Adjustments
Rs/kWh
Sr. No. TARDY CATEGORY / PARTICULARS
For Sanctioned load less than 5 kW
Up to 60 Units
For Consumption exceeding 30 Units
001 - 100 Units
101 - 200 Units
201. 300 Unita
301 - 700 Units
Above 700 Units
For Sanctioned load 6 kW 6 above
0.53
0.53
0.63
0.53
0.53
SCHEDULE OF ELECTRICITY TARIFFS
A-1 GENERAL SUPPLY TARIFF - RESIDENTIAL
A-2 GENERAL SUPPLY TARIFF - COMMERCIAL
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjuatzetea.
Rs/kWh
Applicable Uniform Annual Dad and Qtrly
Adjumtaxems.
Rs/kWh a) b)
c)
For Sanctioned load leas than 6 kW For Sanctioned load 5 kW 6 above
Time Of Use
0.63 0.53
0.53 0.53
Peak Off-Peak Peak Off-Peak
0.83 0.63 0.63 0.53
A-3 GENERAL SERVICES
Sr. No. TARDY CATEGORY / PARTICULARS
Uniform Annual 13.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual 13.M and Qtrly
Adjustments
Rs/kWh a) General Services 0.63 0.63
B INDUSTRIAL SUPPLY TARIFFS
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual D.M and Qtrly
Adjustments
Ra/kWh Rs/kWh
NI Upto 25 kW (at 400/230 Volts) 0.53 0.63 82(a) exceeding 25.600 kW (at 400 Volts) 0.53 0.53
Time Of Use Peak Off-Peak Peak Off-Peak 81 ( b) Up to 25 KW 0.63 0.53 0.63 0.53
B2(b) exceeding 25-500 kW (at 400 Volts) 0.53 0.63 0.53 0.53 83 For All Loads rip to 6000 kW (at 11,33 kV) 0.53 0.53 0.63 0.63 B4 For All Loads (at 66,132 kV & above) 0.53 0.53 0.53 0.53
C - SINGLE-POINT SUPPLY
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual 0.51 and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
C -1 For supply at 400/330 Volts
a) Sanctioned load less than 6 kW 0.63 0.63
b) Sanctioned load 5 kW di up to 500 kW 0.53 0.63 C -2(a) For supply at 11,33 kV up to and including 5000 kW 0.63 0.63 C -3(a) For supply at 66 kV ki above and sanctioned load above 5000 kW 0.63 0.53
Time Of Use Peak Off-Peak Peak Off-Peak C -1(c) For supply at 400/230 Volts 6 kW & up to 500 kW 0.53 0.63 0.53 0.63 C -2(b) For supply at 11,33 kV up to and including 6000 kW 0.63 0.63 0.53 0.63 C -3(b) For supply at 66 kV & above and sanctioned Iced sbovo 5000 kW 0.63 0.63 0.53 0.53
S-I
Page 1 of 2
SCHEDULE OF ELECTRICITY TARIFFS
AGRICULTURE TARIFF
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniforms Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual D.M and Qtrly
Adjustments
Ra/kWk Rs/kWh
D-1(a) SCARP leas than 5 kW 0.63 0.63
0-2 (a) Agricultural Tube Wells 0.63 0.53
Peak Off-Peak Peak Off-Peak
13-1(b) SCARP 5 kW 6 above 0.63 0.53 0.63 0.53 D-2 (b) Agricultural 5 kW 8 above 0.63 0.63 0.53 0.63
TEMPORARY''SUPPLY TARIFFS
Uniform Annual D.M Applicable Uniform
8r. No. TARIFF CATEGORY / PARTICULARS and Qtrly Annual D.M and Qtrly Adjustments Adjustments
Ra/kWli Rs/kWh
7L1(i) Residential Supply 0.63 0.53
r-l(lt) Commercial Supply 0.63 0.63
E-2 Industrial Supply 0.63 0.63
F - SEASONAL INDUSTRIAL SUPPLY TARIFF
125% of relevant industrial tariff
G- PUBLIC LIGHTING
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual Dal and Qtrly
Adjustments
Rs/kWh
Annual D.M and Qtrly
Applicable Uniform
Adjustments
Rs/kWh
Street Lighting 0.53 0.63
H - RES
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtly
Adjustments
Rs/kWh
Anneal D.M and Qtrly
Applicable Uniform
Adjustments
Re/kWh Residential C010121G1 attacked to industrial premises 0.53 0.63
I - RAILWAY TRACTION
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Annual D.M and Qtily
Applicable Uniform.
Adjustments
Rs/kWh Rally-way Traction 0.53 0.53
- SPECIAL 'CON'TRACTS
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual Dad and Qtrly
Adjustments
Re/kWh Rs/kWh 1 Asad Jammu as Kashmir (AJK) 0.63 0.53
Peak Off-Peak Peak Off-Peak Time Of Use 0.63 0.63 0.53 0.53
2 Ramat Lab 0.53 0.53
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.11 and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual Did and Qtrly
Adjustments
Re/kWh J .1 For supply at 66 kV & above and baviag sane load of 20MW ta above 0.53 0.53 .1.2
(a) For supply at 11,33 kV 0.53 0.63 (b) For supply at 66 kV & above 0.63 0.53
J-3
(a) For supply at 11,33 kV 0.53 0.53 (b) For supply at 66 kV & above 0.63 0.53
Time Of Use Peak Off-Peak Peak Off-Peak J -1(b) For supply at 66 kV & above and having sanctioned load of 20211/ & above 0.53 0.63 0.63 0.63 J-2 (c) For supply at 11,33 kV 0.63 0.53 0.53 0.53 .1-2 (d) For supply at 66 kV 4 above 0.53 0.53 0.63 0.53 .1.3 (e) For supply at 11,33 kV 0.53 0.63 0.63 0.53 J.3 (d) For supply at 66 kV & above
_ 0.63 0.53 0.63 0.53 Nate:Uniform Annual Distribution Margin (DM) and Quarterly adjustment (3rd and 4th Quarter of FY 2018-19) subsidy, for maintaining uniform tariff across consumers 86 XWDISCOs, will be calculated in accordance with the same parameters as has been notified vide SRO 11 (1) 2019 Dated 01-01-2019. In order to arrive at net subsidy, the figures will be worked out by subtracting S-1 notifed vide this SRO from (( S-IIB notified vide this SRO minus SII notified vide SRO. 01-01-2019) plus (S-IIA notified vide this SRO)).
S-I
•
Page 2 of 2
Unifrom Rate for the 3rd & 4th Qaurately Adjustment of FY 2018-19
5-11A
Description
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
Uniform Qtrly Adjustment 3rd Is 4th Qtr FY 2018-19
Variable Charge
Variable Chaim..
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variabie Charge Variable Charge
.._ -..,-
1,0141.11Jilt••••
Up to 50 Units For peak load requirement lass than 5 kW
01-100 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
101-200 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
201-300 Units 0.2578 0.4700 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
• 301-7000nits 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Above 700 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
For peak load requirement exceeding 5 kW) Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0,2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Temporal, Supply 0.2578 0.4709 0.1888 (1.344k) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5077) 0.3224
For peak load requirement less than 5 kW 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
For peak load requirement exceeding 5 kW - - - - - - - - - Regular 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - 0ff-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 .0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
General Services-A3 0.2678 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Industrial
81 B1 Peak
0.2578 0.2578
0.4709 0.4709
0.1888 0.1888
(1.3449) (1.3449)
0.2073 0.2073
0.1236 0.1236
1.0291 1.0291
0.3204 0.3204
0.4794 0.4794
0.5877 0.5877
0.3324 0.3324
81 Off Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
B2 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 82 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 82 - TOU (Off-peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 83 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
B3 - TOU (Off-peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 B4 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 B4 - TOU (Off-peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Single Point Supplyfor further distribution C1(a) Supply at 400 Volts-less than 5 kW 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 C1(b) Supply at 400 Volts-exceeding 5 kW 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3224
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 01888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 C2 Supply 9111 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709. ' 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
lime of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 C3 Supply above 11 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Agricultural Tube-wells - Tariff D Scarp 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
lime of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Agricultual Tube-wells 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Public Lighting - Tariff G 0.2578 0.4709 0.1888 (1.3449) :;.2273 0.1236 1.0291 0.3204 „ 0.4794 0.5877 0.3324 Residential Coloniei attached to industrial premises 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Railway Traction 0.4709 0.3324
Tariff k - AJK lime of Use (TOU) - Peak
0.2578 0.2578
- , -
- 0.1236 0.1236
- -
0.5877 0.5877
0.3324 0.3324
lime of Use (TOU) - Off-Peak 0.2578 - - 0.1236 - 0.5877 0.3324
Tariff K -Rawat Lab 0.2578 - - - 0.3324
• Tariff 2-1 For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
2-2 (a) For Supply at 11, 33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
2-2 (b) For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
2-3 (a) For Supply at 11, 33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
• Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
2-3 (b) For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Note: the aforementioned Quarterly Adjustments shall remain applicable for a period o twelve (12) Months from the date of notification of the instant decision. The Federal Government while notifying the allowed uniform rate of Rs.0.3.124/InNh shall not adjust the same upwards for any consumer ca egory.
NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)
Description Fixed
Charge
IESCO LESC 0 FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
NEPRA Determined Uniform Traiff Notified w.e.f.
01-01-2019
Unifrom
Interim Increase in
Tariff
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Verleble Charge
V.I.. Cherge
Fixed Charge Variable Charge
Variable Charge
RSJkWIM RSJ kWh RUJ kWh
Rs/ kWh Re) kWh
Rs/ kWh
RaJ kWh Re/ kWh
RalkW1M
RaJ kWh Rs/ kWh tesidentlal
Up to 50 Units 4.00 0.00 4.00 4.00 4.00 4.00 4.00 4.05 4.00 4.00 4.00 For peak load requirement less than 5 kW
01-100 Units 11.00 12.20 13.48 10.25 • . 15.15 11.45 14.63 15.73 17.42 17.66 13.85 0.1947 101.200 Units 14.13 13.60 18.85 12.41 70.80 13.42 1877 16.28 19.87 20.85 15.86 0.1947 201400 Units 15.71 15.38 17.60 13.43 22.25 14.87 , 19.47 17.35 20.32 21.38 16.83 0.1947 301-7000045 ,. 16.98 17.02 18.16 13.87 23.45 17.81 21.32 20.09 21.32 22.70 18.54 0.1947 Above 700 Units 19.08 19.35 19.60 14.75 25.10 18.94 23.71 21.07 24.56 24.46 20.94 0.1947
For peak load requirement exceeding 5 kW)
Time of Use (TOU) - Peak 17.72 10.92 19.23 14.75 2810 18.41 23.72 21.04 24.77 23.73 19.33 01947 Time of U. (TOL)) - Off-Peak 10.24 12.61 13.43 10.25 19.60 11.91 17.77 15.36 1,8.39 16.30 12.80 0.1947
Temporary Supply 22.81 18.26 25.25 14.75 25.30 18.41 21.37 20.45 24.79 23.74 20.84 0.1847
:ommercial - A2 Or peek load requirement less than 5 kW 17.13 19.19 18.25 14.82 24,00 17.4123.64 19.51 15.49 23.73 19.28 0.1947 i Or peak load requirement exceeding 5 kW
Regular 400 14.13 16.92 18.00 12.82 2100 13.91 2162 17,87 15.34 19_20 400.00 18.01 0.1947 13814 of Use (TOU) - Peak 18.03 1929 19.25 14.82 25.10 18.41 23.72 20.68 19.39 20.74 20.09 0.1947 Time of Use (TOU) - Off-Peak 400 10.63 12.37 13.45 10.32 19.64 11.91 17.77 14.75 12.97 16.50 gm 00 13.48 0.1947
Temporary Supply 17.13 18.58 13.25 14.82 24.00 17.38 23.62 20. 35 15.39 23.74 18.39 0.1947
16.03 17.711..._.17.10 1 13.34 1 21.65 14.21 1 19,28 I 19.00 I 16.66 1 21.40
81 16.13 17.70 16.27 12.75 21.50 14.91 2112 19.35 16.17 21.26 18.32 0.1947 91 Peak 18.03 19.99 10.77 14,75 25_09 19.41 23.73 20.45 19.37 23.74 20.14 0.1947 51 Ott Peak 10.33 12.14 12.16 10.25 19.60 12.32 17.77 14.75 1/93 16.19 13.46 0 1947 B2 400 13.63 15.08 14 77 10/5 21.00 12.41 20.62 16.86 14.32 19.75 400.00 15.79 0.1947 B2 - TOU (Peak) 18.03 19.46 19.70 .1075 2810 18.41 23.72 20.45 19.32 23.74 19.93 0.1947 92 - TOU (0ff-peak) 400 10.43 12.75 13.33 10.05 10.40 9.60 17.57 14.55 12.77 17.99 400.00 13.23 0.1947 B3 - IOU (Peak) 18.03 20.69 19.46 14.75 2.110 18 41 23.73 20.92 19.37 23.30 20.39 0.1947 B3 - TOU (051-peak) 380 ' 10.23 11.72 13/5 9.95 19.20 12.01 16.47 13.40 12.67 17.89 380.00 12.81 0.1947 04- TOU (Peak) 18.33 20.36 19.25 14.75 25.10 18.41 23.72 20.45 19.37 23.74- 20.27 0.1947 04 - IOU (05-6e0k) 360 10.63 12.11 13.15 9.85 19.10 11.51 17.37 14.35 12.57 19.26 360.00 13.25 0.1947
Temporary Supply 18.33 14.51 17.75 10.75 25.50 18.41 21.12 17.20 19.37 19.20 16.36 0.1947
iingle Point Supply for further distribution Cl).) Supply at 400 Votts-less than 5 kW 17.63 16.31 18.27 12.24 23.02 17.41 24.04 18.85 16.37 21.75 21.32 0.1947 Cl (5) Supply at 400 Vo6e-exceeding 5 kW 400 17.13 1521 17.77 11.74 22.50 16.91 22.47 18.35 15.87 21.25 400.00 20.13 0.1947
Time of Use (TOO) - Peak 20. 11 19.11 20.75 1074 25.10 21,41 23.72 21.38 20.37 23.74 21.52 01947 Time of Use (TOU)- 011-544k 400 10.63 1201 14.85 10.24 19.60 10.91 17.77 13.19 1/.97 20.50 400.00 14.99 0.1947
C2 Supply at 11 kV 380 13.96 15.32 16.17 10.54 21.30 15.71 20.92 16.30 14.88 19.05 380.00 15.81 0.1947 Time of Use (TOU) - Peak 18.17 19.11 20.75 14.74 20.10 21.41 23.72 18.43 19.37 24.68 19.73 a 1947 Time of Use (TOU) - Off-Peak 380 8.40 12.21 ,4.79 1004 1940 1471 17.57 14.40 12.77 17.99 380.00 12.57 5.1947
C3 Supply above 11 kV 360 13,83 14.08 18.47 10.44 21.20 15.61 20.82 3.15 14.57 18.96 = 360.00 14.42 0. 1347 Time of Use (TOU)- Peak 18.34 19.11 1517 14.74 25.10 21.41 23.72 20.45 19.37 23.74 18.49 0.1917 Time of Use (TOU)- 08-Peak 360 10.51 12.11 12.62 9.94 19.20 14.61 17.47 14.35 12.67 17.89 360.00 11.59 0.1947
kgricultural Tube-wells - Tariff D
Scarp 18.03 19,21 1602 10 74 25.69 16.71 2266 18.40 15.12 17.80 23.17 2.1947 Time of Use (TOU) - Peak 22.39 22.11 20 20 14.74 25.10 21.21 23.57 20.95 19,93 23.74 20.87 0.1547 Time of Use (TOU) - 09-Peak 260 13.23 12.13 14.40 9.94 19.20 14.91 17.32 15.12 13.17 17.04 200.00 14.03 0.1947
Agricultual Tube-wells 200 15.98 19.71 16.02 10.24 21.00 15.71 1962 16.90 14.50 1700 200.00 14.56 0.1947 Time of Use (TOO) - Peak 18.03 20.61 20.25 14.74 25.10 21.21 23.57 20.03 19.37' 23.74 20.27 0.1947 Time of Use (TOO) - Off-Peek 200 13.23 13.57 13.34 9.34 19.20 1037 16.22 1250 12.97 17.04 200.00 13.04 0,1947
iublic Lighting - Tariff G 16.08 19.89 15.40 1074 12,96 17_77 20.72 17.75 14.47 19.55 18.78 0 1947 :esidential Colonies attach.) to industrial premises 15.31 20.50 15.0 10.74 22.95 12.91 20.72 18.18 1047 19.55 18.42 0.1947 - ailway Traction 18.01 - _ 17.90 0.1947
Tariff K - AJK 360 13.67 - . - 15.43 - 19.03 360.00 13.65 0,1947 Time of Use (TOU)- Peak 17.41 - - 1839 23.78 18.56 Time of Use (TOU) - Off-Peak 360 9.97 - 13.14 - 17.88 360,00 12.20
0094110477
Tariff K -Rawat Lab 16.37 - - 1924 0.1547
;pedal Contract - Tariff-J
J-1 For Supply at 66 kV 8 above 360 14.29 11.811 14.92 10.79 25.50 10.74 22.95 17.93 14.04 19.65 360.00 16.14 0.1947 Time of Use (TOU) - Peak 18.49 18.71 19.20 15.00 29.40 16.54 25.85 21.33 18.54 24.45 20.86 0.1847 Time of Use (TOU)- O6-Peak 360 . 10.64 11.73 13.10 10.29 23,49 9.74 19.60 15.23 12.14 18.90 360.00 14.33 0.1947
J-2 (a) For Supply at 11. 33 kV 380 14.39 14.21 15.02 15.89 25.60 la 84 23.05 18.03 14.14 15.75 360.00 18.46 0.1947 Time of Use (TOU) - Peak 18.49, 18.71 19.20 15.09 29.40 16.54 25.85 21.33 18.84 24.45 20.66 01947
- Time of Use (700) - 08-Peak 380 10.76 11.82 1120 10.39 23.69 9.84 19.70 15.33 12.24 18.70 380.00 14.44 0.1947 3-2 (0) For Supply at 66 kV 8 above 360 14.29 14.11 14.92 10.75 25.50 10_74 22.95 17.93 i4.04 19.115 380.00 16.36 01947
T me of Use (TOU) - Peak 18.49 18.71 15.20 13.09 29.40 16,54 25.85 21.33 18.34 24.45 20.86 0.1947 Time of Use (TOU)- 011-Peak 360 10.64 11.72 13.10 10.29 23.49 9.74 19.60 15.23 12.14 19.90 36000 14.33 0.1947
2-3 (a) For Supply at 11. 33 kV 380 14.39 14.21 15.02 10.139 2580 10.80 23.05 18.03 14.14 19.75 380.00 16.46 0.1947 Time of Use (TOU)- Peak 18.49 18.71 19.20 15.09 29.90 16.54 28135 21.33 18.84 24.45 20.68 0.1947 Time of Use (TOU)- 01f-Peak 380 10.76 11.83 13.20 10.39 23.69 9.84 19.70 15.33 12.24 18.70 380.00 14.44 0.1947
J-3 (b) For Supply at 66 kV & above 360 14.29 14.11 14.92 10.79 25.50 10.74 2295 17.93 14.04 19.65 380.00 16.38 0.1947 Time of U. (TOU) - Peak 1949 19.71 19.20 15.09 2940 16.54 25.85 21.33 18.84 24.45 20.86 0.1947 Tine of Use (TOU) - Off-Peak 360 10.64 11.73 13.10 10.29 23.40 9.74 1980 1823 12.14 19.60 36000 10.33 0.1947
dote: The variable charges mentioned under each DISCO includes the Impact of interim Increase in tariff.
rile Federal Government while notifying the allowed uniform rate of Fts.0.1947/kWh shall not adjust the same upwards for any consumer category.
SPED MATEEN AHf BUKHAR! Section Otfic r
general Services-A3
ndustnal 17.56 0.1947 I
Government of Pakistan Ministry of Energy
Islamabad, the 30thSeptember2019
NOTIFICATION
S.R.O. 1-75(1)/2019. -Pursuant to section 31(7) of the Regulation of
Generation, Transmission and Distribution of Electric Power Act, 1997, the Federal
Government notifies the adjustment in the approved tariff, on account of periodic
adjustments for 3rd and 491 Quarters of FY 2018-19 and annual
indexation/adjustment of distribution. _ margjn with immediate application as
determined and recommended by National Electricity Power Regulatory Authority
(NEPRA) vide decisions both dated September 27,2019 in respect of Peshawar
Electric Supply Company Limited (PESCO) , as Schedule I, IIA & IIB by way of
amendment in its notification no. SRO. 09(1) 2019 dated January 1, 2019.
The above adjustments is being notified along with tariff differential subsidy for
lifeline, domestic consumer consuming up to 300 units and additional charge of Rs.
0.30 per unit for maintaining uniform tariff on all category of consumers (except for
lifeline and domestic consumer consuming up to 300 units) so that the consolidated
revenue requirement approved and determined by NEPRA on September 27,2019
is maintained. The said adjustment shall be shown separately in the consumers' bill
by the XWDISCOs and applicable for next twelve-monthly billing cycles effective
from October 1st 2019.
0.53
0.53
a)
Ili
iv
•
vi
b)
Peak
Off-Peak
Time Of MI. 0.53
0.63 0.63
0.53
Uniform Annual D.16 and Qtrly
Adjustment.
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Ra/kWh
Sr. No. TARIFF CATEGORY /PARTICULARS
For Sanctioned load less than 6 kW
Up to 50 Unita
For Consumption exceeding 50 Units
001 - 100 Units
101 - 200 Units
201 - 300 Units
301 - 700 Units
Above 700 Units
For Sanctioned load 5 kW S above
Peak
Off-Peak
0.53
0.63
0.53
0.53
0.53
SCHEDULE OF ELECTRICITY'.
l• -1 GENERAL SUPPLY TARIFF -'RESIDENTIAL :
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual DAN and Qtrly
AdJlastmentrs
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustment. Adjuatmenta
R./kWh
a) b)
c)
For Sanctioned load leas than 6 kW For Sanctioned load 6 kW S above
Time Of Use
0.63 0.53
0.53 0.53
Peak Off-Peak Peak Off-Peak
'0.53 0.53 0.53 0.53
,'A-3 GENERAL SERVICES
Sr. No. TARDY CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Ra/kWlo
Applicable Uniform Annual 0.11 and Qtrly
Adjustments
Rs/kWh
a) General Services 0.63 0.53
B 'INDUSTRIAL' SUPPLY TARIFFS '
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh Rs/kWh
El Upto 26 kW (at 400/230 Volts) 0.53 0.53
52(a) exceeding 25.500 kW (at 400 Volts) 0.63 0.53
Time Of Use Peak Off-Peak Peak Off-Peak
31 (h) Up to 25 KW 0.63 0.63 0.63 0.53
132(b) exceeding 25.500 kW (at 400 Volts) 0.53 0.63 0.63 0.53
33 For All Loads up to 6000 kW (at 11,33 kV) 0.53 0.53 0.63 0.63
B4 For All Loads (at 66,132 kV & above) 0.53 0.63 0.63 0.53
C - SINGLE-POINT SUPPLY
Sr. No. TARTFT CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual 0.61 and Qtrly
Adjustments
Rs/kWh
C -1 Tor supply at 400/230 Volts
a) Sanctioned load less than 5 kW 0.53 0.53
b) Sanctioned load 5 kW ts up to 600 kW 0.53 0.53 C -2.(a) For supply at 11,33 kV up to and inelading 5000 kW 0.53 0.53 C -3(a) For supply at 66 kV 5 above and sanctioned load above 6000 kW 0.53 0.53
Time Of Use Peak Off-Peak Peak Off-Peak C -l(e) For supply at 400/230 Volts 5 kW & up to 500 kW 0.53 0.63 0.53 0.53 C -2(b) For supply at 11,33 kV up to and including 6000 kW 0.53 0.53 0.53 0.53 C -3(b) For supply at 66 kV & above and s.actioned load above 5000 kW 0.63 0.63 0.63 0.53
S-I
Page 1 of 2
SCHEDULE OF ELECTRICITY TAIRIFFS-
D - AGRI tTURE TARIFF
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Applicable Uniform Annual Dad and Qtrly
Adjustments
Rs/kWh Rs/kWh 13-1(a) SCARP leas than 6 kW 0.63 0.53 /1-2 (a) Agricultural Tube Wells 0.63 0.53
Peak Off-Peak Peak Off-Peak D-1(b) SCARP 6 kW & above 0.63 0.63 0.63 0.53 0-2 (b) Agricultural 5 kW & above 0.53 0.63 0.63 0.63
TEMPORARY SUPPLY TARIFFS •
Uniform Annual D.M Applicable Uniform
Sr. No. TARIFF CATEGORY / PARTICULARS and Qtrly Annual D.M and Qtrly Adjustment. Adjustments
Rs/kWh Rs /kWh 5-Ili) Residential Supply 0.53 0.53 5-1(11) Commercial Supply 0.63 0.63 5-2 Industrial Supply 0.53 0.63
F - SEASONAL INDUSTRIAL SUPPLY TARIFF
12554 of relevant industrial tariff
G- PUBLIC LIGHTING
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
11,./kWh Street Lighting 0.53 0.53
H - RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustment.
Ra/kWh
Annual Dal and QUI:,
Applicable Uniform 1
Adjustments
Rs/kWh Residential Colonies attached to Industrial premises 0.63 0.63
I - RAILWAY TRACTION
Sr. No. and TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M Qtriy
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Ra/k1Vh Railyway Traction 0.53 0.53
R. -SPECIAL CON.TRAC_TS
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustment.
Applicable Uniform Annual D.M and Qtrly
Adjustment.
R./kWh Rs/kWh 1 Asad Jammu & Kashmir (AJ12)
0.6
0.63
Time Of 13.e Peak Off-Peak .1_ Peak I Off-Peak
0.63 0.63 0.63 I 0.63 1 Ravrat Lab
Semsimrsavasse. sJannv..._ 0.53 0.63
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjuatmenta
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh J .1 For supply at 66 kV di above and having sanctioned load of 20MW as above 0.53 0.63 J-2
(a) For supply at 11,33 kV 0.53 0.63 (b) For supply at 66 kV & above 0.63 0.63
J-3 (a) For supply at 11,33 kV 0.63 0.63 (b) For supply at 66 kV di above 0.63 0.63
Time Of Use Peak Off-Peale Peak Off-Peak J -1(b) For supply at 66 kV & above and having sanctioned load of 20MW ti above 0.63 0.53 0.63 0.63 J-2 (el For supply at 11,33 kV 0.53 0.53 0.63 0.53 J-2 (d) Fur supply at 66 kV & above 0.53 0.63 0.63 0.63 J-3 (el Tor supply at 11,33 kV 0.63 0.63 0.63 0.63 J-3 (d) For supply at 66 kV & above 0.63 0.53 0.63 0.63 Note: Uni form Annual Dtstnbu ton Margin and uarter y adjustment (3rd and 4th Quarter of lY 2018-19) subsidy, for maintaining uniform tariff across consumers 86 XWDISCOs, will be calculated in accordance with the same parameters as has been notified vide SRO 11 (I) 2019 Dated 01-01-2019. In order to arrive at net subsidy, the figures will be worked out by subtracting S-I notifed vide this SRO from (( S-IIB notified vide this SRO minus SII notified vide SRO. 01-01-2019) plus (S-IIA notified vide this SRO)).
Page 2 of 2
Unifrom Rate for the 3rd & 4th Qaurately Adjustment of FY 2018-19
S-HA
Description
IESCO LESCO FESCC TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
Uniform Qtrly Adjustment
3rd as 4th Qtr FY 2018-19
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
11.• lawn.
KEISIONflUai
Up to 50 Units For peak load requirement less than 5 kW
01-100 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
101-200 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
201-300 Units 0.2578 0.4709 0.1988 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
301-7000nits 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Above 700 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
For peak load requirement exceeding 5 kW) Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1688 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
For peak load requirement less than 5 kW 0.2578 0.4709 0.1836 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
For peak load requirement exceeding 5 kW - - - - - - - - - Regular 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
a
0.3324 ratTneral Services-A3
0.2578 I 0.4709 0.1888 (1.3449 0.2071 0.1236 11110DMICIESZIIIIME311111ThEil
...-... 81 0.2578 0.4709 0.18.08 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
B1 Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
B1 Off Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
B2 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
B2 -TOU (Peak) 0.2578 0.4709 0.1838 (1.3449) 0,2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
B2 - TOU (Off-peak) 0.2578 0.4709 0.1988 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
83 - TOU (Peak) 0.2578 0.4709 0.1388 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
B3 - TOU (Off-peak) 0.2578 0.4709 0.1688 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
B4 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0,3324
B4 - TOU(Off-peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1,0291 0.3204 0.4794 0.5877 0.3324
Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
C1(a) Supply at 400 Volts-less than 5 kW 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
C1(b) Supply at 400 Volts-exceeding 5 kW 0.2578 0.4709 0.1889 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1838 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
C2 Supply at 11 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1838 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.18E13 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
C3 Supply above 11 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
- Time of Use crow - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Scarp 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Agricultual Tube-wells 0.2578 0.4709 0.1886 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1838 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Public Lighting - Tariff G 0.2578 0.4709 0.1886 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Residential Colonies attached to industrial premises 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Railway Traction 0.4709 0.3324
Tariff K - AJK 0.2578 - 0.1236 - 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 - - 0.1236 - 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 - - 0.1236 0.5877 0.3324
Tariff K -Rawat Lab 0.2578 - - 0.3324
J-1 For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - 0ff-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
J-2 (a) For Supply at 11,33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (IOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
J-2 (b) For Supply at 66 kV & above 0.2578 0.4709 0.1388 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
J-3 (a) For Supply at 11, 33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
J-3 (b) For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1,0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Note: the aforementioned Quarterly Adjustments shell remain applicable for a period of twelve (12) Months from the date of notification of the Instant decision.
The Federal Government while notifying the allowed uniform rate of Rs.0.2224/kWit shall not ac4ust the same upwards for any consumer ca egory.
•
NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)
S-118
Description Fixed
Charge
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
NEPRA Determined
Uniform Traiff
Notified w.e.f.
01-01-2019
Unifrom
Interim
Increase in
Tariff
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
_ , ..._
Variable Charge
- ....-
Variable Charge
,.
Variable Charge
Variable Charge
Variable Charge
Fixed Charge Variable Charge
Variable Charge
x. , ,,wi, RaJkW11.4
Fla1 kWh s s s
lr3IUM Mal
Up to 50 Units 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00
For peak load requirement less than 5 kW
01-100 Units 11.00 12.20 13.46 10.25 19.15 11.45 14.63 15.73 17.42 17.66 13.85 0.1947
101-200 Units 14.13 13.65 16.85 12.41 20.80 13.42 16.77 16.28 19.87 20.85 1586 0.1947
201-300 Units 15.71 15.38 17.60 13.43 22.20 14.87 19.47 17.35 20.32 21.36 16.83 0.1947
301-7000nits 16.98 17.02 18.16 13.87 23.45 17.81 21.32 20.09 21.32 22.70 18.54 0.1947
Above 700 Units 19.08 19,35 19.60 14.75 25.10 18.94 23.71 21.07 24.56 24.46 2094 0.1947
For peak load requirement exceeding 5 kW)
Time of Use (TOU) - Peak 17,72 1592 19,23 14.75 25.10 18.41 23.72 21,04 24.77 23.73 19.33 0.1947
Time of Use (TOU) - Off-Peak 10.24 12.61 13.43 10.25 19.60 11.91 17.77 1536 18.39 16.30 12.80 0.1947
Temporary Supply 22.81 18 26 20.25 14.75 25.00 18,41 21.37 20.45 24.79 23.74 20.84 0 1947
•./IIIISCI 4.1 . M1,
or peak load requirement less than 5 kW
or peak load requirement exceeding 5 kW
17.13 19.19 18.25 14.82 24.00 17.41 23.64 19,51 15.49 23.73 19.26 61947
Regular 400 14.13 16.92 18.00 12,82 22.00 13.91 21.62 17.87 15.34 19.20 40060 18.01. 0.1947
Time of Use (TOU(- Peak ' 1503 19.29 19.25 14.32 2612 18,11 23.77 20.68 19.39 • 24.74 20.09 0.1947
Time of Use (200) . Off-Peak 400 10.63 12.37 13.45 10.32 19.64 11.91 17.77 14.75 1197 18.50 400.00 13.48 0,1047
Temporary Supply 17,13 1558 1625 14.82 24.00 17.38 23.62 20.35 19.39 23.74 1539 0.1947
16.03 1 17.71 17.10 1 13.34 I 21.65 14.21 I 19.26 19.00 1666 21.40 I 17.55
Seneral Services-A3 0.1947
11411,31.1114.1
01 16.13 17.70 18.27 12.75 21.50 14.91 23.12 19.35 16.17 21.26 18.32 0.1947
B1 Peak 18.03 19.99 19.77 14.75 25.09 18.41 23.73 20. 45 19.37 23,74 20.14 0.1947
B1 Off Peak 10.33 12.14 12.16 10.25 19.60 12.32 17.77 14.75 12.93 18.19 13.46 0.1947
B2 403 13.63 15.06 14.77 10.25 21.00 12.41 20.62 16.86 14.32 18.75 400.00 15.79 0.1947
B2 - TOU (Peak) 18.03 19.46 19.70 14.75 25.10 18.41 23.72 20.45 19.32 23.74 19.93 0.1947
02 - TOU (Off-peak) 400 10.43 12.75 13.33 10.05 19.40 9.60 - 17.57 14.55 12.77 17 99 400.00 13.23 0.1947
B3 - TOU (Peak) 18.03 20.69 19.46 14.75 25.10 18.41 23,73 20.92 19.37 23.30 20.39 0.1947
B3 - IOU (Oft-peak) 380 10.23 11.72 13.25 9.95 19.20 1101 16.47 1145 12.67 17.89 380.00 12.81 0.1947
134 - TOU (Peck) 18.33 20.36 19.25 14.75 25.10 18.41 23.72 20.45 1637 2174- 2017 0.1947
B4 - IOU (00-peak) 360 10.63 12.11 13.15 9.85 19.10 11.51 17.37 14.35 12.57 18.26 36060 1125 0 1947
Temporary Supply 18,33 14.81 17.73 10.75 25.50 18.41 21,12 17.20 19.37 19.24 16.36 0.1947
,...yic rums .suawvy iv. eu....s. va.a••••••••••••• C1(a) Supply al 400 Volts-less than 5 kW 17.63 16.31 18.27 12.24 23.02 17.41 24.04 18.85 16.37 21.75 21.32 0.1947
C1(0) Supply at 400 Volts-exceeding 5 kW 400 17.13 15.81 17.77 11.74 22.50 16.91 22.47 18.35 15.87 21.25 400.00 20.13 r 0 1947
Time of Use (TOU) - Peak 20.11 19.11 20.75 14,74 25.10 21,41 23.72 27.38 20.37 2174 . 21.52 0.1947
Time of Use (TOO) - Off-Peak 400 10.83 1161 14.85 10.24 1560 14.91 17.77 1119 12.97 20,50 400,00 1499 61947
CS Supply at 11 kV 350 13.96 15.32 16.57 10.54 21.30 15,71 20.92 16.30 14.68 19,05 380.00 15.61 0.1947
Time of Use (TOU)- Peak 18.17 19.11 20.75 14.74 25,10 21.41 23.72 18.43 1637 24.68 19.73 0.1947
Time of Use (TOW- Off-Peak 380 8.40 12.21 14.75 10.04 1640 14,71 17.57 14.40 12.77 17.99 maw 12.57 a 1947
C3 Supply above 11 kV 360 1183 14.08 16.47 10.44 21.20 15.61 20.62 115 14.57 18.95 0 360.00 14.42 0.1947
Time of Use (TOU) - Peak 18.34 19.11 18.37 14.74 25.10 21.41 23.72 20.45 19.37 23.74 18.49 0.1947
Time of Use (T041)- Off-Peak 360 10.51 12.11 12.62 694 19.20 14.61 17.47 14.35 12.57 17.89 360.00 11.56 0 1917
ty114141551•• I 1.5.0.11.• elle . .a.... 60
Scarp 18.03 19.21 16.02 10.74 25.69 16.71 22.66 1540 15.12 17,80 23.17 2.1947
Time of Use (TOU)- Peak 22.39 22.11 20.20 14.74 25.10 21.21 23.57 20.95 19.93 23.74 20.87 0.1947
Time of Use (TOU)- Off-Peak 200 13.23 12.13 14,40 9.94 19,20 14.41 17.32 15.12 13.17 1704 200.00 14.03 0.1947
Agricultual Tube-wells 200 15.98 19.21 16.02 - 10.24 21.00 15.71 1662 16.90 14.50 17.90 20000 14.56 0. 1947
Time of Use (TOU)- Peak 18.03 20.61 20.25 14.74 25.10 21.21 23.57 20.03 19.37 23.74 20.27 0. 1 947
Time of Use (TOO) - 00-Peak 200 13.23 13.57 13.34 9.94 19.20 14.37 16.22 12.50 12.97 17.04 200.00 13.04 0.1947
ublic Lighting - Tariff G 16.08 10.89 15.45 10.74 22.95 12.77 20. 72 17.75 14.47 1655 19.76 61947
esidential Colonies attached to Industrial premises 15.31 20.50 15.60 1014 22.95 12.91 20.72 18.18 14.47 19.55 1542 3 1947
ailway Traction 18.01 - - - 17.90 0.1947
Tariff It - 66( 380 13.67 -- - 15,48 - 19.03 360.00 13.55 0.1947
Time of Use (TOO) - Peak 17.41 18.39 23,78 18.56 0.1947
Time of Use (T01.1)- Off-Peak 360 9.97 13.14 17.98 360.00 12.20 0.1947
ranff It -Rawat Lab 16.37 - 18,24 0.1947
P.1-tei wwi rw et-a - a eiiii-Ai
1-1 For Supply at 66 kV 8 above 360 14,29 11.85 14.92 10.79 25.50 10.74 22.95 17.93 14.04 19.65 360.00 16.14 0.1947
Time of Use (TOU) - Peak 1549 1571 19.20 15.09 29.40 1554 25.85 21.33 18.84 24.45 20.65 0.1947
Time of Use (TOU) - 00-Peak 360 10.64 11.73 13.10 10.29 23.49 674 19.60 15.23 12.14 18.60 360.00 14.33 0.1947
J-2 (a) For Supply at 11, 33 kV 380 14.39 14,21 15.02 10.89 25,60 10.84 23.05 18.03 14.14 19.75 380.00 16.46 0,1947
Time of Use (TOU) - Peak 18.49 18.71 19.20 15.09 29.40 16.54 25.85 21.33 18.84 24.45 20.66 61947
Time of Use (TOU)- 081-Peak 380 10.76. 11.83 13.20 10.39 23.89 9.84- 19.70 15.33 12.24 18.70 38000 14.44 0.1947
J-2 (b) For Supply at 66 kV & above 360 14.29 14.11 14.92 10.79 25.50 10.74 22.95 17,93 14.04 19.65 360.00 16.36 a 1947
Time of Use (TOU) - Peak 18,49 18.71 19.20 15.09 29.40 16.54 25.85 21.33 1584 24.45 20.66 0.1947
Time of Use (TOU)- 06-Peak 360 10.64 11.73 13.10 10.29 23.49 9.74 19.60 15.23 12.14 18,60 36600 14.33 0.1947
1-3 (a) Far Supply al 11, 33 kV 380 14.39 14.21 15:02 10.89 25.80 10.84 23.05 18.03 14.14 19.75 380.00 16.48 0.1947
Time of Use (TOU)-Peak 18.49 18.71 19,20 15.09 29,40 16.54 25.85 21.33 18.84 24,45 20.66 0.1947
Time of Use (TOU) - 00-Peak 380 10.76 11.83 13.20 10.39 23.69 954 19.70 15.33 12.24 18.70 380.00 14.44 0.1947
1-3 (b) For Supply at 66 kV & above 360 14.29 14.11 14.92 10.79 25.50 10.74 22.95 17.53 14,04 19.65 360.00 1536 0.1947
Time of Use (TOU) - Peak 18,49 18.71 19.20 15.09 29.40 16.54 25.65 21.33 '18.84 24,45 20.66 0.1947
Time of Use (TOO) - 00-Peak 360 10,64 11.73 1110 10.29 23.49 9.74 19.60 15.23 12.14 18.60 36600 -
14.33
A
01047
ate: The variable charges mentioned under each DISCO Includes the Impact of Interim increase in tariff.
le Federal Government while notifying the allowed uniform rate of Rs.0.1947/kWh shall not adjust the same upwards for any consumer category.
-DYED MATEEN AH ED BUKHARI Section ices
Government of Pakistan Ministry of Energy
*************41***t
Islamabad, the 30thSeptember2019
NOTIFICATION
\11 S.R.O.1 (1)/2019. -Pursuant to section 31(7) of the Regulation of
Generation, Transmission and Distribution of Electric Power Act, 1997, the Federal
Government notifies the adjustment in the approved tariff, on account of' periodic
adjustments for 3rd and 4th Quarters of FY 2018-19 and annual
indexation/adjustment of distribution margin with immediate application as
determined and recommended by National Electricity Power Regulatory Authority
(NEPRA) vide decisions both dated September 27, 2019 in respect of Tribal Area
Electric Supply Company (TESCO) , as Schedule I, HA & IIB 'by way of amendment
in its notification no. SRO. 10(1) 2019 dated January 1, 2019.
The above adjustments is being notified along with tariff differential subsidy for
lifeline, domestic consumer consuming up to 300 units and additional charge of Rs.
0.30 per unit for maintaining uniform tariff on all category of consumers. (except for
lifeline and domestic consumer consuming up to 300 units) so that the consolidated
revenue requirement approved and determined by NEPRA on September 27,2019
is maintained. The said adjustment shall be shown separately in the consumers' bill
by the XWDISCOs and applicable for next twelve-monthly billing cycles effective
from October 1st 2019.
0.63
0.53
Peak
Ott Peak Peak
Off-Peak
0.63
0.63 0.63
0.63 Time Of Use
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual ON and Qtrly
Adjustments
Rs/kWh
Sr. No. TARIFF CATEGORY / PARTICULARS
a) For Sanctioned load leas than 5 kW
i Up to 50 Units
For Consumption exceeding 60 rinks
001. 100 Units
iLL 101 - 200 Units
tv 201 - 300 Units
301 - 700 Units
vi Above 700 Units
b) For Sanctioned load 5 kW & above
0.53
0.53
0.63
0.63
0.63
SCHEDULE OFELECTRICITY TARIFFS
A-1 GENERAL SUPPLY TARIFF - RESIDENTIAL
A-2 GENERAL'SUPPLY TARIFF`'-COMMERCIAL '
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustment+
Rs/kW1,
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
a)
b)
e)
For Sanctioned load less than 6 kW
For Sanctiened load 5 kW & above
Time Of Use
0.63
0.53
0.63
0.53
Peak Off-Peak Peak Off-Peak
0.53 0.53 0.63 0.63
A-3'GENERAL. SERVICES
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Annual ON and Qtrly
Applicable Uniform
Adjustments
Rs/kWh
) General Service. 0.53 0.53
• ,B INDUSTRIAL SUPPLY TARIFFS,
Sr. No. TARIFF CATEGORY / PARTICULARS
Unifoom Annual DM and Qtrly
Adjustments
AFill..,anie uniform Annual D.31 and Qtrly
Adjustments
Rs/kWh Rs/kWh
Ill Upto 26 kW (at 400/230 Volts) 0.53 0.53
82(a) exceeding 26-600 kW (at 400 Volts) 0.63 0.53
Time Of Use Peak Off-Peak Peak Off-Peak
Si (b) Up to 26 KW 0.63 0.63 0.53 0.53
32(b) exceeding 25-600 kW (at 400 Volts) 0.53 0.63 0.53 0.53
83 For All Loads up to 5000 kW fat 11,33 kV) 0.63 0.63 0.53 0.63
B4 For All Loads (at 66,132 kV & above) 0.63 0.53 0.53 0.63
C - SINGLE-POINT SUPPLY •
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual 13/4 and Qtrly
Adjustments
Rs/k1V1,
Applicable Uniform Annual D.61 and Qtrly
Adjustments
Rs/kWh
C .1 For supply at 400/230 Volta
a) Sanctioned load less than 5 kW 0.53 0.53
b) Sanctioned load 6 kW & up to 600 kW 0.63 0.63 C -2(a) For supply at 11,33 kV up to and including 5000 kW 0.63 0.53 C -3(a) For supply at 66 kV & above and sanctioned load above 6000 kW 0.53 0.53
Time Of Use Peek Off-Peak Peak Off-Peak C -1(c) For supply at 400/230 Volts 6 kW & up to 600 kW 0.63 0.63 0.63 0.63 C -2(b) For supply at 11,33 kV up to and including 5000 kV/ 0.53 0.63 0.53 0.53 C -3(b) For supply at 66 kV A above and sanctioned load above 5000 kW 0.53 0.63 0.63 0.63
•
Page 1 of 2
S-I
•
SCHEDULE OF ELECTRICITY TARIFFS
D - AGRICULTURE TARIFF •
Uniform Annual D.M Applicable Uniform
Sr. No. TARIFF CATEGORY / PARTICULARS and Qtrly
Adjustments Annual D.M and Qtrly
Adjustments
Rs/kWh Rs/kWh
D-1(a) SCARP less than 6 kW 0.63 0.63
D-2 (a) Agricultural Tube Wells 0.63 0.63
Peak Off-Peak Peak O0 Peak
13.1(b) SCARP 5 kW fa above 0.63 0.53 0.53 0.53
13-2 (b) Agricultural 5 kW es above 0.63 0.63 0.63 0.63
E - TEMPORARY.SUPPLY`TARIFFS
Uniform Annual D.M Applicable Uniform
Sr. No. TARIFF CATEGORY / PARTICULARS and Qtrly Annual D.M and Qtrly
Adjustments Adjustments
Rs/kWh Rs/kWh
E-1(i) Residential Supply 0.53 0.53
8-1(11) Commercial Supply 0.63 0.53
E-2 industrial Supply 0.53 0.53
F - SEASONAL INDLISTRIAL.EOPPLYTARIEr ••••
125% of relevant industrial tariff
G- PUBLIC LIGHTING
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments.
Rs/kWh
Guavas D.M and Qtrly
Applicable Uniform
Adjustments
Rs/kWh
Street Lighting 0.63 0.53
• H
IalLtGlZd.tdljajttlfI(ta"tillLtga.k.ltja2iad.v.tWAIMIIMIIIIIIIIIIIIIIItt •
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Re/kWh
Annual D.M and Qtrly
Applicable Uniform
Adjustments
Rs/kWh Residential Colonies attached to industrial premises 0.63 0.63
i - RAILWAY TRACTION
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh Rallyway Traction 0.53 0.53
K -SPECIAL CONTRACTS
Uniform Annual D.M Applicable Uniform
Sr. No. TARIFF CATEGORY / PARTICULARS and Qtrly Annual D.11 and Qtrly Adjuatments Adjuatments
Rs/kWh Rs/kWh 1 Asad Jammu S Kashmir (AYR) 0.63 0.63
Peak Off-Peak Palk Off-Peak Time Of Use 0.63 0.53 0.63 0.63
2 Rawat Lab 0.53 0.53 'Mr; • N: • aD Ysl;'fol;a);l •
Sr. No. TARIFF CATEGORY / PARTICULARS
Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh
Applicable Uniform Annual D.M and Qtrly
Adjustments
Rs/kWh J .1 For supply at 66 kV 5 above and having sanctioned toad of 20MW 6 above 0.63 0.53 .1-2
(a) For supply at 11,33 kV 0.63 0.63 (b) For supply at 66 kV Is above 0.63 0.53
J-3
(a) Par supply at 11,33 kV 0.63 0.63 (b) For supply at 66 kV a above 0.53 0.53
Time Of Use Peak Off-Peak Peek Off-Peak J -1(b) Tor supply at 66 kV 5 above and having sanctioned load of 20MW k above 0.63 0.53 0.63 0.53 J-2 fc) For supply at 11,33 kV 0.53 0.53 0.53 0.53 ..1-2 (d) For supply at 66 kV 6 above 0.63 0.53 0.53 0.63 J-3 (e) For supply at 11,33 kV 0.63 0.53 0.63 0.63 J.3 d For se I at 66 kV 8 above 0.63 0.53 0.63 0.53
Note: Uniform Annual Distribution Margin (DM) and Quarterly adjustment (3rd and 4th Quarter of FY 2018-19) subsidy, for maintaining uniform tariff across consumers & XWDISCOs, will be calculated in accordance with the same parameters as has been notified vide SRO 11 (1) 2019 Dated 01-01-2019. In order to arriv,: lo!rteidy, the figures will be worked out by subtracting S-1 notifed vide this SRO from (( S-11B notified vide this SRO minus Sll notified vide SRO. 01-01-2019) plus (S-IIA notified vide this SRO)).
Page 2 of 2
Unifrom Rate for the 3rd & 4th Qaurately Adjustment of FY 2018-19 S-IIA
Description
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
Uniform Qtrly Adjustment 3rd 8s 4th Qtr FY 2018.19
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge Variable Charge
eJ kWh Rs.I kWh Rs/ kWh Re.l kWh Re./ kWh asAven Residential
Up to 50 Units For peak load requirement less than 5 kW
01.100 Units 02578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 101-200 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 201-300 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 301-700Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Above 700 Units 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0_3324
For peak load requirement exceeding 5 kW) Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0_5877 0.3324 lime of Use (TOU) - 0ff-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Temporary Supply 0.2578 0.4709 0,1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Commercial - A2 For peak load requirement less than 5 kW For peak load requirement exceeding 5 kW -
0.2578 •
0.4709 0.1888 -
(1.3449) -
0.2073 0.1236 -
1.0291 -
0.3204 -
0.4794 -
0.5877 .
0.3324
. Regular 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0,3204 0.4794 0,5877 0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
General Services-A3 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Industrial
B1 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 81 Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 B1 Off Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 B2 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 B2 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 82 - TOU (Off-peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 B3 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 83 - TOU (0ff-peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 B4 - TOU (Peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 B4 - TOU (Off-peak) 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Temporary Supply 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204' 0.4794 0.5877 0.3324
Single Point Supplyfor further distribution C1(a) Supply at 400 Volts-less than 5 kW 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 C1(b) Supply at 400 Volts-exceeding 5 kW 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0,5877 0.3324 Time of Use (TOU) - 0ff-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0,5877 0.3324
C2 Supply at 11 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0,4794 0.5877 0.3324 lime of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0,5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0,4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
C3 Supply above 11 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1,0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0,5877 0.3324 lime of Use (TOU) - 0ff-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1,0291 0.3204 0.4794 0.5877 0,3324
Agricultural Tube-wells - Tariff D Scarp 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0,3204 0.4794 0.5877 0.3324
Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Agricultual Tube-wells 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1,0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Peak 0,2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 lime of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0,3324
Public Lighting - Tariff G 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Residential Colonies attached to industrial premises 0.2578 0,4709 0.1888 (1.3449) 0.2073 0.1236 1,0291 0.3204 0.4794 0.5877 0.3324 Railway Traction 0,4709 - - 0.3324
Tariff k - AJK 0.2578 - 0.1236 0.5877 0.3324 Time of Use (TOU) - Peak 0.2578 0.1236 0.5877 0,3324 lime of Use (TOU) - Off-Peak 0.2578 - 0.1236 - 0,5877 0.3324
Tariff K -Rawat Lab 0.2578 - - 0.3324
Special Contract - Tariff-J J-1 For Supply at 66 kV 8 above 0.2578 0.4709 0.1888 (1.3449)- 0.2073 0.1236 1.0291 0,3204 0,4794 0.5877 0,3324
lime of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - 0ff-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
J-2 (a) For Supply at 11, 33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0,4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
J-2 (b) For Supp'y at 66 kV & above 0.2578 0.4709 0.1898 (1.a.44G) 0.20/3 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
J-3 (a) For Supply at 11, 33 kV 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0,2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - 0ff-Peak 0.2578 0.4709 0,1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
J-3 (b) For Supply at 66 kV & above 0.2578 0.4709 0.1888 (1,3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0,5877 0.3324 Time of Use (TOU) - Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324 Time of Use (TOU) - Off-Peak 0.2578 0.4709 0.1888 (1.3449) 0.2073 0.1236 1.0291 0.3204 0.4794 0.5877 0.3324
Note: the aforementioned Quarterly Adjustments shall remain applicable fora period of twelve 112) Months from the date of notification of the instant decision. Tne itodonti Govonwnont whit* notifying the allowed uniform rate of Rs.0.3324/kWh shall not adjust the same upwards for any consumer ea allay.
66
NATIONAL ELECTRIC POWER REGULATORY AUTHORITY (NEPRA)
S-11E1
Descri tion p Fixed Charge
IESCO LESCO FESCO TESCO HESCO GEPCO SEPCO MEPCO QESCO PESCO
NEPRA Determined.
Uniform Traiff Notified w.e.f.
01-01-2019
Unifrom
Interim Increase M
Tariff
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Variable Charge
Fixed Charge Variable Charge
Variable Charge
RsAWIM
Rs./ kWh Rs/ kWh RA/kWh Rs.1 kWh
S. klVn Rsl s
.--.--.....-. ,
Up to 50 Units 4.00 4.00 4.00 4.00 4.50 4.00 4.00 400 4.00 4.00 4.00
For peak load requirement less than 5 kW
01-100 Units 11.00 12.20 13.48 10.25 19.15 11.45 1463 15.73 17.42 17.66 13.65 0.1947
101-250 Units 14.13 1165 16.85 12.41 20.80 13.42 16.77 16.28 19.87 20.85 15.86 0.1947 .
201-300 Units 15.71 15.38 17.80 13.43 22.20 14,87 19.47 17.35 2132 21.36 16.83 0.1947
301-7000nits 16.98 17.02 18.18 13.87 23.45 17.87 21.32 20.09 21.32 22.70 18.54 0.1947
Above 700 Units 19.08 19.35 19.60 14,75 25.10 18.94 23.71 21.07 24.56 24.46 20.94 0,1947
For peak load requirement exceeding 5 kW) .
Time of Use (TOU)-Peak 17.72 18.92 19.23 14.75 2510 18.41 23.72 21.04 24.77 • 23.73 19.33 0.1947
Time a! Use (TOU) - Off-Peak 10.24 12.61 13.43 10.25 19.60 11.91 17.77 15.36 111.39 16.30 12.80 0.1947
Temporary Supply 22.81 18.26 20.25 14.75 25.00 18.41 21.37 20.45 24.79 23.74 20.84 0.1147
__......_. _._. .._
or peak load requirement less than 5 kW 17.13 19.19 18.25 14.82 24.00 17.41 23.64 19.51 , • 15.49 23.73 19.26 0.1947
'or peak load requirement exceeding 5 kW
Regular 400 1413 16.712 18.00 . 12.82 22.00 13.91 21.82 17.87 15.34 - 19.20 400.00 18.01 0.1947
Time of Use (TOU) - Peak 18.03 1529 19.25 14.82 25.10 1941 2172 20.68 19.39 24.74 20.09 0.1941
Time of Use (TOU) - 06-Peak 400 10.63 12.37 13.45 10.32 19.64 11.91 17.77 14.75 12.97 18.50 400.00 13.48 5.1347
Temporary Supply 17.13 18.58 19.25 14.82 24.00 17.38 23.62 20.35 19.39 23.74 18.39 a 1947
l'eneral Services-A3
16.03 17.71 17.10 1 .13.34 21.65 14.21 I 19.26 19.00 16.66 21.40 17.56 1.1947
..___..._. ei 16.13 17.70 18.27 12.75 21.50 14.91 23.12 19,35 16.17 21 26 18.32 0.1947
B1 Peak 18.03 19.99 19.77 14.75 25.09 18.41 23.73 20.45 19.37 23.74 20.14 , 0,1947
81 011 Peak 10.33 12.14 12.15 10.25 19.60 12.32 17.77 14.75 12.93 18.19 13.48 0.1947
82 400 1163 15.06 14.77 10.25 21.00 12.41 20.62 18.86 14.32 18.75 400.00 15.79 11947
82 - 701) (Peak) 18.03 19.46 19.70 14.75 25.10 18.41 23.72 20.45 19.32 23.74 19.93 11947
82- TOU (Off-peak) 400 1143 12.75 13,33 10.05 19.45 9.60 17.57 14.55 12777 17.99 400.00 13.23 0_1947
63 - IOU (Peak) 18.03 20.69 19.46 14.75 25.10 18.41 2173 20.92 19.37 23.30 2019 0.197
53 - TOU (Off-peak) 380 1123 11.72 13,25 9.95 19.20 12.01 16.47 13,45 1267 17.89 380.00 12.61 0.1947
94 - TOU (Peak) 18.33 20.36 19.25 14.75 25.10 1541 23.72 20,45 1E1.37 23.74- 20.27 0.1947
84 - TOU (00-peak) 360 1163 12.11 13.15 185 19.10 11.51 17.37 14.35 12.57 18.26 360.00 13.25 0.1947
Temporary Supply 18.33 14.81 17.73 10.75 25.50 18.41 21.12 17.20 1E1.37 19.24 16.38 0.1947
Cl(a) Supply at 400 VoOs-less than 5 kW 17.53 16.31 18.27 12.24 23.02 17.41 24.04 18.85 16.37 21.75 21.32 0.1947 -
C1(b) Supply at 400 Volts-excee4ing 5 kW 400 17.13 15.111 17.77 11.74 22.50 16.91 22.47 18.35 15.87 21.25 400.00 20.13 0.1947
Time cf Use (TOU)- Peak 20.11 11"1 20.75 14.74 25.10 21.41 23.72 21.38 20.37 23.74 21.52 0.1347
Time of Use (IOU) - Oft-Peak 400 10.63 12.81 14.85 1014 19.60 14.91 17.77 13.19 12.97 20.50 40000 14.99 0.1947
02 Supply at 11 kV 380 13.96 15.32 1657 10.54 21.30 15.71 20.82 16.30 141_68 19.75 380.10 15.61 0,1647
Time 01 Use (TOU) - Peak 18.17 19. ' 1 20.75 14.74 25_10 21.41 23.72 18.43 19.37 24.68 19.73 ' 1.1947
Time of Use (TOU) - 0f1-Peak 380 8.40 1211 14.75 10.04 19.40 14.71 17.57 14.40 12.77 17.99 380.00 12.57 0.194!
CZ Supply above 11 kV 360 13.83 14.00 16.47 10.44 21.20 15.61 20.82 . 3.15 14.57 18.95 360.00 14.42 0.104;
Time of Use (TOU)- Peak 18.34 19.11 18.37 74.74 25.10 21.41 23.72 20. 45 11117 23.74 18.49 0.1047
Time of Use (TOU)-Off-Peak 360 10.51 12.11 12.62 9.94 1920 14.61 17.47 14.35 12.67 17.89 36000 11.59 0.1947
Scarp 1503 15.21 16.02 10.74 25.69 16.71 22.66 18.40 15.12 17.80 23.17 0.1947
Time of Use (TOU) - Peak 2139 22.11 20.20 1474 25.10 21.21 23.57 20.15 11.93 23.74 20.87 0.1947
Time of Use (TOU)- 00-Peak 200 13.23 12.13 14 40 994 - 1520 14.41 17.32 15.12 13.17 17.04 200_00 14.03 0 1947
A.gricultual Tube-wells 200 15.98 1121 1602 10.24 71.00 15.71 19.62 16.90 14.50 17.90 200.00 14.58 0 1947
Time of Use (TOU) - Peak 18.03 20,61 20.25 14.74 25.10 21.21 23.57 2103 1137 23.74 20.27 17347
Time of Use (TOU)-Off-Peak 200 13.23 12,1.7 13.34 9.94 19.20 14.37 16.22 12,50 12.97 17.04 200.00 13.04 11947
7ubiic Lighting - Tariff G 16.08 19.89 15.45 la 74 22.95 12.77 20.72 17.75 14.47 19.55 18.78 0.1947
esidentia7Coloni. attached to industrial premises 15.31 20.50 15.430 10.74 22.95 12.91 20.72 1118 14.47 19.55 18.42 3_1947
ailway Traction 1501 - - 17.90 11947
Tang 18 -.AJK 360 13.67 - - 15.48 - 19.03 360.00 13.55 0.1147
Time of Use (TOU) - Peak 17.41 18.39 23.78 18.56 a 1647 Time of Use (TOU) . Ott-Peak 360 9.97 13.14 17.99 360.00 12.20 0 447
Tariff 14 .Rawat Lab 1137 - 16.24 0.1947
ecial Contract - Ta ff-
.1-1 For Supply at 66 kV 8 above 360 14.29 11.88 14 92 10.79 25.50 10.74 22.95 17.93 14.04 19.65 360.00 18.14 0.1947
Time of Use (Toll) - Peak 1549 18.71 19.20 15.09 29.40 16.54 25.85 21.33 18.84 24,45 20.66 0.1947
Time of Use (7017) - Off-Peak 360 15.54 11,73 13.10 1129 23.49 9.74 19.60 1.5.23 12.14 18.60 360.00 14.33 11947
4-2 (a) For Supply al 11, 33 kV 380 14.39 14.21 15.02 10.89 25.60 10.84 23.05 18.03 14,14 19.75 380.00 16.46 0.1947
TIrr.e of Use (TOU)- Peak 18.49 16.71 19_20 15.09 29.40 16.54 25.85 21.33 1584 24.45 20.66 0.1947
Time of Use (TOU)- O8.Peak 380 10.76 11.83 73.20 10.39 23.69 9.84 19.70 15.33 12.24 1570 380.00 14.44 0.1947
4-2 (b) For Supply at 66 kV & above 365 14.29 14.11 14.92 10.79 25.50 10_74 22.95 17.93 14.04 19.63 max 16.36 0.'947
Time of Use (TOU)- Peak 18.49 18.71 19.20 15.09 29.40 16.54 25.85 21.33 18.84 24.45 20.66 0.1947
Time of Use (TOU)- 06-Peal, 360 10.64 11.73 13.10 10.29 23.49 9.74 19.60 15.23 12.14 18.60 360.00 14.33 0.1947
4-3 (a) For Supply at 11. 33 kV 380 14.39 14.21 15.02 10.89 25.60 10.84 23.05 18.03 14.14 19.75 380.00 16.48 a 1947
Time of Use (TOU)-Peak 1549 18.71 79.20 15.09 • 29.40 16.54 25.85 21.33 18.134 24.45 20.86 0.7947
Time of Use (TOU) - 09-Peak 380 10.75 11_83 13.20 10.39 23.69 9.84 19.70 15,33 12..24 18.70 380.00 14.44 0.1947
J-3 (b) For Supply al 66 kV 8 above 360 14.29 14.11 14.92 10 .79 25.50 10.74 22.95 17.93 14.04 19.65 360 00 16.36 0.1947
Time of Use (TOU) - Peak 18.49 18.71 19.20 15.09 29.40 16.54 25_81 21.33 18.84 24.45 20.68 5.1947
Time of Use (TOU). Off-Peak 360 10.64 11.713 13.10 10.29 23.49 9.74 19.60 15.23 12.14 ULM 360.00 14.33 5.1947
ate: The variable charges mentioned under each DISCO Includes the Impact of Interim Increase In tariff.
he Federal Government while notifying the allowed uniform rate of Rs.0.1947/kWh shall not adjust the same upwards for any consumer category.
SYED MATEEN A MED BUKHARi Section Qfficer