GOVERNMENT OF ODISHA DEPARTMENT OF WATER RESOURCES
ANNUAL REPORT OF JARAKA IRRIGATION DIVISION JARAKA FOR THE YEAR 2016-17
EXECUTIVE ENGINEER, JARAKA IRR. DIVISION,
JARAKA
BRIEF NOTE ON JARAKA IRRIGATION DIVISION
Jaraka Irrigation Division was created in the year 1992. There are three Sub-divisions under this
Division namely:-
(1) Jaraka Irrigation Sub-Division, Jaraka.
(2) Bari Irrigation Sub-Division, Bari.
(3) Chandikhole Irrigation Sub-Division, Chandikhole.
Jurisdiction:- This Division looks after the River Embankments of Brahmani left & right of
Kharasuan, Kelua left & right, Birupa left, Tantighai right, Dudhei left & right. The length of Capital
Embankment, OAE & T.R.E under this Division are 53.20 Km., 121.281 Km. and 170.605 Km.
respectively. Beside this Division also looks after the canal system of High Level Canal Range-I from
RD.10.49 Km. to 53.09 Km. with Distributary and Minors. The total C.C. is 9074 Ha. 22 Nos. of
Panachayat have already been formed alongwith Two(2) Distributary Committee. Water Taxes are being
collected by this Division from Industries / Mines of Jajpur District.
During last year flood season, the flood water reached the Level of 62.60 Feet at
Jenapur in the river Brahmani on 5.8.16 against the danger level of 67.00 feet. The flood water received
in the river Baitarani, Kharasrota, Brahmani, Tantighai, Dudhei & Kelua caused damaged to the river
embankments. At some other places damages were made to the embankments which have been restored
and both the breaches have been closed.
Embankment:- The flood protection embankment as per list enclosed are protecting the villages
in Brahmani Delta from flood havoc in Sukinda, Danagadi, Korei, Rasulpur, Jajpur, Dharmasala,
Barachana & Bari Block.
Irrigation:- The Canal System of High Level Canal Range-I and System from RD.10.41 Km.
to tail is catering irrigation to C.C.A. of 9074 Ha.in Cuttack and Jajpur District. The canal system was
constructed more than 125 years. The main canal was silted-up. The tail ayacut of Distributaries and
Minors are deprived of getting required water being defunct. The Renovation, Extention, Modernization
of Canal System is being taken-up in Six(6) Nos. of packages and the work are under progress. After
renovation it is proposed to catter irrigation to design ayacut. The District / Block / Tahasil wise ayacut
area are furnished in separate sheet.
District Block C.C.A. in Ha Design
Ayacut in
Ha.
Programme
for 16-17
in Ha.
Achievement
for 16-17
in Ha.
CUTTACK Tangi 755.42 697.61 697.61 697.61
Mahanga 39.31 39.31 32.61 3490.00
JAJPUR Dharmasala 3579.70 3568.58 3224.05 3277.13
Barachana 4699.57 4634.47 4334.47 4374.74
TOTAL:- 9074.00 8939.97 8288.74 8384.11
Total length of the Canal System are as follows:-
Main Canal ------- 42.604 Km.
Distributary ------- 92.36 Km.
Minor ------- 4.166 Km.
Sub-Minor ------- 24.517 Km.
Executive Engineer, Jaraka Irr. Division.
ORGANIZATIONAL SET-UP
EXECUTIVE ENGINEER, JARAKA IRRIGATION DIVISION, JARAJA
Jaraka Irrigation Sub-Division Bari Irrigation Sub-Division Chandikhole Irrigation Sub-Division
Jaraka Irr. Section
Jenapur Irr.
Section
Kotapur Irr.
Section
Jokadia Irr.
Section Bari Irr. Section
Rudrapur Irr.
Section
Ratnagiri Irr.
Section Baruan Irr.
Section Chandikhole Irr. Section
Kaima Irr. Section
Saudia Irr. Section
Byree Irr. Section
Jurisdiction of Jaraka Irrigation Division with Sub-divisions & Sections after Restructuring Sl. No.
Name of Sub
Division
Name of Section
Type of River
Embankment/ Canal
Name of River Embankment/Canal Length (in Km)
1 2 3 4 5 6 1 Jaraka Irr.
Sub- Division,
Jaraka
Jokadia (J.E)
C.E C.E. No.13A on Ganda Left 4.900 C.E.No.17A on Patia Right. 4.500
O.A.E Chakua Marthapur OAE on Patia left. 5.050 H.L.C.Range-II on Kharasuan left 10.800 Pahanga OAE on Kharasuan left. 0.804
Sribantapur Khanditar OAE on Kharasuan Right 10.470 T.R.E Bhotaka Masudpur TRE on Chhinda Kharasuan left 10.000
Routrapur Gherry on Brahmani Left 1.600 Pankapal TRE on Brahmani left 1.219 Kaitha TRE on Brahmani Left 1.600 Santarapur TRE on Brahmani left 0.402 Hatibari TRE on Brahmani left 1.700 53.045
Jenapur (J.E)
C.E C.E.No.27A on Brahmani Right from Manjuripada to Jenapur 16.890 Marginal Embankment on Brahmani Right from Jenapur to
Immamnagar 12.070
T.R.E Jenapur College Gherry on Brahmani right. 0.333 Kabatabandha Gherry on Brahmani Right 0.400 Baunsa Nallah TRE 0.850 Biribati T.R.E on Kuanria Nallah 2.100 Khapara Nallah TRE on Brahmani Right 2.000
Canal H.L.C.Range-I from RD 41.100 Km to to 53.094 Km. 11.994 Disty. No.14 1/2 1.170
Disty. No.15 1.038 Disty. No.16 1.845 Disty. No.17 1.386
52.076 Jaraka (A.E)
C.E C.E.No.26A on Brahmani Right from Gokarneswar to Mundamal 9.580 O.A.E O.A.E 18B on Brahmani left from Jabra Escape to Gopalpur 16.000
Jabara Escape embankment on Brahmani left 1.200 Khanditar O.A.E 0.990
T.R.E Gopalpur Gherry TRE on Brahamani left 2.100 Naguan Santrilochanpur TRE on Chhinda Kharasuan Right 10.890 Paikarapur Gherry on Brahmani left 2.000 Sialia Bhagirathipur TRE on Brahmani left 3.372
Khanditar Gherry on Kharasuan Right 1.000 47.132
Kotapur (A.E)
C.E C.E.No.26A on Kelua Right from Mundamal to Brudhalinga 5.260 O.A.E Brudhalinga Majhipada OAE 9.400
Patilo Mundamal OAE 2.560 Mandaghai OAE 24B 4.800 Rahapada Mohanpur OAE 24B 5.497 Serapur OAE 22 B 3.400
T.R.E Bhagabanpur Gherry TRE on Kelua Right 7.000 Nasidpur Hamzadpur TRE 2.500 Alishapatna Rahapada TRE on Kelua Left 3.800 Bedapur Serapur TRE Brahmani Right 5.400
49.617
Jurisdiction of Jaraka Irrigation Division with Sub-divisions & Sections after Restructuring Sl. No.
Name of Sub
Division
Name of Section
Type of River
Embankment/ Canal
Name of River Embankment/Canal Length (in Km)
1 2 3 4 5 6 2 Bari Irr.
Sub- Division,
Bari
Baruan (J.E)
O.A.E O.A.E.16B on Kharasuan Right 3.530
O.A.E.15B on Kharasuan Right 7.740 O.A.E.13B on Kharasuan Right including Tantighai Escape 3.670 T.R.E Karasahi Gherry on OAE 16B on Kharasuan Right 1.000 Kacherigaon Gherry on OAE 15B on Kharsuan Right. 1.870 Tantighai TRE on Tantighai Right 5.020 19.300 Bari
(A.E) O.A.E OAE 19 ABC on Brahmani left 5.140
OAE 20B on Brahmani left 2.000 OAE 21B on Brahmani left 2.000 Chandrasekharpur -Anyashpur OAE on Brahmani left 6.160 T.R.E Sangadeipur Bhanra TRE on Tantighai Right 4.450 Erada TRE on Tantighai right. 3.000 Badudipadia TRE on Dudhei left 1.530 Bainsiria Kadikama TRE on Dudhei Right 5.680 Phulpur TRE on Balungapatia Right 2.600 Bandhapada Rajapur TRE on Dudhei left 2.000 Karanjamal TRE on Dudhei Right 2.100 Baliapal Bodua TRE on Dudhei left. 2.000 Kadambinipal College Gherry on Brahmani Left. 0.900 39.560 Rudrapur
at Attira. (J.E)
O.A.E Udayapur OAE on Brahmani left 2.000
O.A.E. No.18B on Brahmani left from Gopalpur to Birbhanpur 8.000 T.R.E Hata Sahi Ganeshpatna Gherry on Brahmani Left 2.250 Samantarapur Gherry TRE on Brahmani Left 0.820 Birabhanapur Kakudikuda TRE on Brahmani Left 6.338 Kakudikuda Rudrapur TRE on Brahmani left 6.230 Udayapur Arual TRE on Brahmani left 6.120 Baripal Gherry on Brahmani left 2.000 33.758 Ratnagiri
(J.E) O.A.E Sahapada OAE 23 B 2.820
Serapur-Mahakalapada OAE. 7.250 T.R.E Serapur Sahapada TRE on Brahmani Right 3.860 Bandhadiha Gherry on Brahmani Right 1.500 Jaharighai TRE on Brahmani Right 2.239 Kharipadia Mayapada TRE on Brahmani Right 3.000 Mandari Serapur TRE on Brahmani Right 4.000 Mayapada Mirzapur TRE on Brahmani Right 8.000 Mendha Sunia TRE on Brahmani Right 3.000 Mirjapur Rampur TRE on Brahmani Right 2.000 37.669
Jurisdiction of Jaraka Irrigation Division with Sub-divisions & Sections after Restructuring
Sl. No.
Name of Sub
Division
Name of Section
Type of River
Embankment/ Canal
Name of River Embankment/Canal Length (in Km)
1 2 3 4 5 6 3 Chandikhol
e Irr. Sub-Division,
Chandikhole
Byree (J.E)
Canal H.L.C.Range-I from RD 10.49 Km to to 20.96 Km. 10.47
Disty. No.5 10.235 Disty. No.5(A) 4.255 Disty. No.5 1/2 1.255 Disty. No.6 5.205 Disty. No.6(A) 7.480 Disty. No.6(A)1 2.370 Damaka S/M 1.500 Magura S/M 1.300 Chhatia S/M 1.300 45.370 Chandikh
ole (A.E)
Canal H.L.C.Range-I from RD 20.96 Km to to 35.60 Km. 14.640
Disty. No.7 1.216 Disty. No.7(A) 2.524 Barimula S/M 1.243 Disty. No. 7 1/4 5.470 Disty. No.7 1/4(A) 5.131 Ubuka S/M 0.360 Disty. No.7 1/2 1.097 Disty. No.7 1/2(A) 1.190 Disty. No.8 1.425 Disty. No.8(A) 0.379 Disty. No.9 2.552 Disty. No.10 3.019 Disty. No.11 4.530 Disty. No.11(A) 1.500 46.276 Kaima
(A.E) Canal H.L.C.Range-I from RD 35.60 Km to to 41.100 Km. 5.500
Disty. No.12 4.012 Disty. No.12(A) 3.456 Kantigadia S/M 1.150 Disty. No.13 2.213 Rathia Minor 1.612 Sendhapur Minor 2.554 Arjunpur Minor 2.560 Disty. No.14 16.134 Talabana S/M 2.106 Derabara S/M 4.502 Bhubana S/M 4.170 Patapur S/M 2.193
Sl. No.
Name of Sub
Division
Name of Section
Type of River
Embankment/ Canal
Name of River Embankment/Canal Length (in Km)
1 2 3 4 5 6 Mundamala S/M 1.373 Bhabilo S/M 0.760 54.295 Saudia
(J.E) T.R.E Mohanpur Balikuda TRE on Kelua Left 3.713
Balikuda Niali TRE on Kelua Left 2.239 Niali Haladharpur TRE on Kelua Left 8.000 Kampagarh Palatpur TRE on Birupa Left 12.880 26.832
Details of Panipanchayats in the ayacut of H.L.C. Range – I and its system (from RD 10.49 Km. to 53.094 Km.) under Jaraka Irrigation Division.
Sl. No.
Name of Canal Name of Pani Panchayat Ayacut Area in Ha.
1 HLC R-I Dist. No. 5 & 5A
P.P. No. 1
Shree Jagannath Pani Panchayat
At - Kanakapada, Tani Block, Cuttack
545.29
2 HLC R-I Dist. No. 5 & 5 1/2
P.P. No. 2
Amarabati Pani Panchayat
At - Kadei, Block - Tangi-Choudwar, Cuttack
536.98
3 HLC R-I Dist. No. 6
P.P. No. 3
Bajarangi Pani Panchayat
At - Solar, Block - Barachana, Dist.Jajpur
450.78
4 Distributary No. 6A P.P. No. 4
Maa Mangala Pani Panchayat
At - Solar, Block - Barachana, Dist.Jajpur
517.31
5 Distributary No. 6A & 6A1
P.P. No. 5
Sri Sri Kumareswar Pani Panchayat
At - Solar, Block - Barachana, Dist.Jajpur
416.31
6 HLC Range - I, Distributary No. 6 & 7A
P.P. No. 6
Maa Dayasuni Pani Panchayat
At - Solar, Block - Barachana, Dist.Jajpur
234.04
7 HLC Range - I, Distributary No. 7 1/2
P.P. No. 7
Maa Bhagabati Pani Panchayat
At - Kadei, PO - Barachana, Dist. Jajpur
682.79
8 Distributary 7 1/4A P.P. No. 8
Maa Narayani Pani Panchayat
At - Sakuntalapur, PO - Badaghumuri, Dist. Jajpur
482.92
9 HLC R-I, Ubuka S/M, Disty. No. 7 1/2
P.P. No. 9
Maa Brahmanidevi Pani Panchayat
At/PO - Bantala, Dist. Jajpur
298.36
10 HLC Range - I, Disty. No. 8, 8A & 9
P.P. No. 10
Nahakani Pani Panchayat
At/PO- Barachana, Dist. Jajpur
473.98
11 HLC Range - I Dist. No. 10
P.P. No. 11
Maa Tarini Pani Panchayat
At/PO- Dhanamandal, Dist. Jajpur
311.18
12 HLC R-I, Disty. No. 11& 11A
P.P. No. 12
Maa Naluasuni Pani Panchayat
At - Nisimala, PO- Sunguda Dist. Jajpur
477.37
13 HLC R-I, Dist. 12, Sendhapur Minor
P.P. No. 13
Sri Raghunath Jew Pani Panchayat
At/PO- Neulpur, Dist. Jajpur
364.94
14 Dist. No. 12A, Kantigadia S/M
P.P. No. 14
Maa Sundurai Pani Panchayat
AT/PO- Gopalpur, Dist. Jajpur
478.90
15 HLC R-I, Disty. No. 13 & Rathia Minor
P.P. No. 15
Maa Durga Chudakhai Pani Panchayat
At - Rathia, PO - Neulpur, Dist. Jajpur
382.32
16 HLC R-I, Dist. No. 14 1/2 & 15
P.P. No. 16
Maa Samalai Pani Panchayat
AT/PO- Immamnagar, Dist. Jajpur
304.82
17 HLC R-I, Disty. No. 16 & 17
P.P. No. 17
Maa Soluasuni Pani Panchayat
At/PO- Jenapur, Dist. Jajpur
345.47
18 Disty. No. 14 & Talaban S/M
P.P. No. 18
Amareswari Pani Panchayat
At - Utarsasan, PO - Dharmasala, Dist. Jajpur
291.57
19 Derabar S/M Patapur S/M
P.P. No. 19
Maa Chandi Pani Panchayat
At - Patapur, PO - Mirzapur, Dist. Jajpur
412.83
20 Bhuban S/M P.P. No. 20
Maa Bhubaneswari Pani Panchayat
At - Bhuban, PO - Dharmasala, Dist. Jajpur
225.95
21 Distributary No. 14 P.P. No. 21
Maa Gogolei Pani Panchayat
At/PO- Kaima Dist. Jajpur
441.13
22 Dist. No. 14, Mundamal S/M Bhabilo S/M
P.P. No. 22
ShyamSundar Jew Pani Panchayat
At - Mundamal PO- Mirzapur, Dist. Jajpur
264.73
Grand Total 8939.97
ABSTRACT OF PROJECTS ON DIFFERENT SCHEME UNDER JARAKA IRRIGATION DIVISION FOR THE YEAR 2016-17
Sl. No. Name of Scheme No. Of works Expenditure (Rs. In Lakhs)
1 NABARD 18 2224.38
2 ADB 5 499.19
3 Completion of incomplete Project 4 458.16
4 IRC & IS 2 248.72
5 Flood Control 36 670.00
6 Special Restoration 18 524.13
7 Lump (R/E) 16 295.00
8 Non-Residential Building 4 10.00
9 R.E.(Road) 10 133.00
10 Canal (Road) 3 17.00
11 Lump (Canal) 29 150.00
STATUS OF NABARD WORKS
Sl.No.
Name of the work Name of the agency
Estimated
Amount
Agreement No.
Agreement amount
/ Deviation amount
Stipulated date of
commencement
Stipulated date of
completion
E.O.T. sanctioned upto
Upto expenditure Total Exp. Status of the work
103 789
1 Construction of HL bridge over Ganda Nallah near
village Jokadia
Laxmidhar Mishra
515.04 842F2/08-09
493.88 2.3.09 2.9.10 747558 747558 Completed
2 Improvement to Pankapala TRE on Brahmani left from NH-200 to chakua ( RIDF-
XVIII )
M/S Asutosh
Construction
580.55 110P1/14-15
511.71 26.2.15 25.8.16 2681479 4166452 6847931 Under progress
3 Restoration to Nasidpur - Hamzadpur TRE &
Badanatta TRE on Sagadia Nallah under (RIDF XVIII)
M/S Gourav
Construction
456.76 641F2/13-14
474.05/ 460.79
3.3.14 2.9.15 31.03.16 10913045 10913045 Completed
4 Construction of Drainage sluice at the out fall point
of Chhinda Kharsuan at RD 10.410 Km. of Sribantpur
Khanditar OAE. (RIDF-XVIII)
M/S Gourav
Construction
482.41 261F2/12-13
502.93/ 493.00
26.11.12 25.10.13 15.04.15 6086690 6086690 Completed
5 Protection to Scoured Bank on Kelua right near Village Mirjapur & Gelhei (RIDF-
XX)
Raghunath Sahoo
248.51 115P1/15-16
209.17 30.9.15 29.7.16 5731586 7499931 13231517 Completed
6 Scoured Bank protection to OAE 15(B) on Kharasuan right near Kacherigaon
(RIDF-XX)
Narayan Pradhan
197.00 113P1/15-16
167.21 1.11.15 31.8.16 1608295 1608295 Completed
7 Improvement to Kelua left embankment from
Narasinghpur to Niraghat and protection to
Rahapada to Mohanpur (RIDF-XX)
M/S H.L. Infra
Struction
619.90 130P1/15-16
545.02 25.1.16 24.4.17 5291584 5291584 Under progress
8 Restoration to Scoured Bank at Kustira, Berhampur
and Immamnagar
M/R Rout Imfra
struction Pvt. Ltd.
769.30 206P1/15-16
647.51 11.3.16 10.6.17 17698120 17698120 Under progress
9 Restoration to right bank of HLC Range-II on Kharasuan left from RD 00 to 11020 M
M/S OCC Ltd.
720.00 MOU1/15-16
658.11 11.5.15 10.7.16 07.11.16 53350022 53350022 Completed
10 Restoration to C.E.No.27A on Brahmani right from
Manjuripada to Malahata (RIDF-XX)
M/S BRS Constructi
on
296.85 111P1/15-16
249.86 1.10.15 31.7.16 7964431 7964431 Completed
11 Construction of 4 Nos. of spurs alongwith launching appron on OAE 13(B) on Kharasuan right near up
stream at Tantighai Escape.
Laxmi Narayan
Mallik
205.59 112P1/15-16
178.89 1.10.15 31.7.17 8382963 8382963 Completed
12 Restoration to Scoured Bank at Malahata,
Kantapatana on Brahmani right Kalana, Sulia &
Daneipur to Brahmani left .
Santilata Khuntia
131.90 119P1/15-16
111.02 18.11.15 17.9.16 9672788 9672788 Completed
13 Protection to Scoured Bank on Kelua right near village Bhuban & Kaima (RIDF-XX)
Santilata Khuntia
246.75 118P1/15-16
207.68 18.11.15 17.9.16 2964583 2964583 Completed
14 Scoured Bank protection to Erada village on Chhandua & Tantighai river (RIDF-XXI)
Nihar Ranjan
Mandhata
272.17 117P1/15-16
229.08 30.10.15 29.8.16 30.12.16 3434312 4337294 7771606 Completed
15 Flood protection to Dudhei right from Chhatar to Kalamatia (RIDF-XXI)
M/S Classic Super
Construction
697.73 43P1/16-17
588.72 22.9.16 21.9.17 21193921 2399678 23593599 Under progress
16 Protection to Bhagabanpur gherry on Kelua right
(RIDF-XXI)
M/S Gourav
Construction
385.49 57P1/16-17
381.8 22.11.16 21.2.18 17393411 17393411 Under progress
17 Protection to scoured bank and spur on Brahmani right
embankment at Bandhadiha Kusabata &
Sankarikula under NABARD assistance (RIDF-XXI)
Siba Prasad Parida
368.39 127P1/16-17
310.07/331.66
15.12.16 14.2.18 26702936 26702936 Under progress
18 Scoured Bank protection to Rahapada Mohanpur TRE near Bankasahi & Arabal
under NABARD assistance (RIDF-XXII)
Ulash Ch. Biswal
196.17 95P1/16-17
165.11 7.12.16 6.11.17 2216921 2216921 Under progress
Total:- 165442000 56996000 222438000
DETAILED INFORMATION OF ADB WORKS
NAME OF THE DIVISION:- JARAKA IRRIGATION DIVISION, JARAKA
Sl. No. Name of the work Agt. No. Agency Date of
commencement Date of
completion Agreement
value in Lakhs Satus of works
1 2 3 4 5 6 7 8 1 REM of HLC Range - I Main Canal from RD
10.41 Km. to 26.585 Km. and renovation and construction of associated structures under (Package No. 2)
ADB-01/ 16-17 Sri Amulya Ku. Das 20.05.16 19.04.18
646.29 Work on progress
2 REM of HLC Range - I Main Canal from RD 26.858 Km. to 41.072 Km. and renovation and construction of associated structures under (Package No. 3)
ADB-02/16-17 Sri Raj Kishore Rout 20.05.16 19.04.18
607.32 Work on progress
3 Renovation and modernisation of Distributary No. 14 from RD 00 Km. to 16.134 Km.under )Package No. 6)
ADB-04/16-17 M/S
Ashutosh Construction
27.03.17 26.09.18 827.45
Work on progress
4 Renovation and modernisation of Distributary No. 5, 5A, 5 1/2, 6A, 7, 7A, 7 1/4A and 8 under (Package No. 8)
ADB-05/16-17 Sri Raj Kishore Rout 27.03.17 26.06.18
608.64 Work on progress
5 Renovation and modernisation of Distributary No. 9, 10, 11, 12, 12A, 13, 16 and 17 under (Package No.9)
ADB-03/16-17 M/S
Ashutosh Construction
23.12.16 22.06.18 590.52
Work on progress
Sl.No. Description of Works Allotment
(in Lakhs)
Expenditure (Rs. In Lakhs)
Remarks
1 2 3 4 5 Completion of incomplete projects for the year 2016-17.
1 Flood protection to Brahamani kelua Birupa DOAB of Brahamani System(Kelua left embankment from Mohanpur to Talua Package-II.
84.94 84.94
Completed
2 Protection to Tantighai right embankment from Risipur to Kalashpur project approved in supplimentary budget.
74.92 74.92 Under Progress
3 Construction of HL Bridge over Pandara Nalla near Atta 198.23 198.23
4 Construction of HL Bridge over River Tantighai at RD 600m near Risipur 100.07 100.07
458.16 458.16
Detailed expenditure IRC & IS of Jaraka Irrigation Division, Jaraka
Sl.No. Name of the work Agree
ment No.
Amount Alloted (Rs. In Lakh)
Expenditure (Rs. In Lakh)
Remarks
1 2 3 4 5 6 1 Improvement to inspection road of HLC
Range-I from 34.40 Km. to 41.00 Km. including Distributary No.14 from 00 Km. to NH-5 at Jaraka
134P1/15-16
124.38 124.38 Work completed
2 Improvement to road on OAE Chandrasekharpur Anyashpur and OAE 20B on Brahmani Left from Ramachandrapur to Kaipada
138P1/15-16
124.34 124.34 -do-
Total 248.72 248.72
Sl.No. Name of Works Agt. No. Amount
alloted (in Lakhs)
Expenditure (Rs. in Lakhs)
Remarks
1 2 3 4 5 6 List of works under Demand No. 20-4711-01-103-0101-37107 & 20-4711-01-789-0101-37107 (Flood
Control) 1 Scoured bank to Tantighai right embankment
near Nalgoriganda 135P1/15-16 128P1/15-16
28.56 28.56 Completed
2 Scoured bank to Tantighai right embankment near Gopaghai
148P1/15-16 19.82 19.82 Completed
3 Scoured bank protection on Brahmani Right embankment near Matiapada, Isanpur, Gokhasahi on Mayapada Mirzapur TRE
178P1/15-16 36.89 36.89 Completed
4 Restoration to Brahmani right embankment from Matiapada to Tinimuhani Bridge (RD.4.630 Km. to 6.750 Km)
28P1/16-17 7.30 7.30 Completed
5 Restoration to Baripala Gherry 150P1/15-16 17.22 17.22 Completed
6 Scoured Bank protection on U/S of Rajapur Bridge on Dudhei left
163P1/15-16 14.25 14.25 Completed
7 Restoration to Embankment on Dudhei left on D/S of Rajapur Bridge
226P1/15-16 15.29 15.29 Completed
8 Scoured Bank protection on Charmania Nallah near Udaynathpur.
243P1/15-16 15.82 15.82 Completed
9 Scoured Bank protecton to Sangadeipur - Bhaunra TRE near Bhaunra
02P1/16-17 19.94 19.94 Completed
10 Scoured Bank protection to Kharasuan right embankment near Mirapatana
139P1/15-16 20.81 20.81 Completed
11 Scoured Bank protection to Kharasuan right embankment near Sarifabad.
06P1/16-17 16.06 16.06 Completed
12 Scoured Bank protecton to Jaharighai TRE near Mirzapur on Brahmani right
164P1/15-16 17.63 17.63 Completed
13 Scoured Bank protection to Brahmani left embankment near Samantarapur
234P1/15-16 133P1/15-16
28.51 28.51 Completed
14 Scoured Bank protection near Arual Hanuman Mandir on Brahmani left.
175P1/15-16 20.11 20.11 Completed
15 Scoured Bank protection to embankment on Brahmani left on Udayapur Arual TRE near Balikanthia
249P1/15-16 16.86 16.86 Completed
16 Scoured bank protecton on Udayapur Arual TRE near Kimiripal Pani Sahi
05P1/16-17 18.52 18.52 Completed
17 Restoration to Paikarapur Gherry near Malishai 230P1/15-16 18.93 18.93 Completed
18 Scoured Bank protection to Kharasuan right on Khanditar OAE near village Jaleswarpatna
166P1/15-16 17.30 17.30 Completed
19 Scoured bank protection to Khanditar village on Kharasuan right (working RD.7800 M to 9100 M)
33p1/16-17 66P1/15-16
41.01 41.01 Completed
Sl.No. Name of Works Agt. No. Amount
alloted (in Lakhs)
Expenditure (Rs. in Lakhs)
Remarks
1 2 3 4 5 6 20 Restoration to Naguan Sanatrilochanpur TRE
from RD 6.30 Km. to 7.10 Km. 177P1/15-16 8.64 8.64 Completed
21 Repair of spur near Chaka Gopalpur 237P1/15-16 13.68 13.68 Completed
22 Restoration to scoured bank on Brahmani left at Kumudi to Mangarajpur
199P1/15-16 34.39 34.39 Completed
23 Restoration to Scoured bank on Kharasuan left at Badatrilochanpur
07P1/16-17 32.00 32.00 Completed
24 Restoration to scoured bank on Jamra Nadi left at Bartanda
30P1/15-16 16.92 16.92 Completed
25 Scoured bank protection near Kantapatna on Brahmani right
149P1/15-16 12.71 12.71 Completed
26 Scoured bank protection near Kabatabandha on Brahmani right
152P1/15-16 8.30 8.30 Completed
27 Scoured bank protection near Marjitapur on Brahmani right
171P1/15-16 13.46 13.46 Completed
28 Scoured bank protection near Ersanda on Brahmani right
200P1/15-16 14.75 14.75 Completed
29 Scoured bank protection to Kotapur Gopal Sahi on Kelua right
140P1/15-16 19.31 19.31 Completed
30 Scoured bank protection to Brahmani right near village Deoda
181P1/15-16 15.23 15.23 Completed
31 Protection to scoured bank on Balikuda Niali TRE near Bada-Balikuda.
221P1/15-16 14.23 14.23 Completed
32 Protection to scoured bank on Mohanpur Balikuda TRE near Balikuda Jena Sahi.
174P1/15-16 6.05 6.05 Completed
33 Protection to scoured bank on Niali Haladharpur TRE near Barapada
219P1/15-16 122P1/15-16
24.05 24.05 Completed
34 Protection to scoured bank on Niali Haladharpur TRE near Saudia.
236P1/15-16 15.60 15.60 Completed
35 Protection to scoured Bank on Kampagarh Paltpur TRE near Amathapur School.
220P1/15-16 20.12 20.12 Completed
36 Protection to scoured bank on Kampagarh Haladharpur TRE near Haladharpur
01P1/16-17 9.73 9.73 Completed
670.00 670.00
Sl.No. Name of Works Agt. No. Amount
alloted (in Lakhs)
Expenditure (Rs. in Lakhs)
Remarks
1 2 3 4 5 6
List of works under SPECIAL RESTORATION - 20 - 4711 - 01 - 103 - 0101 - 37217 & 20 - 4711 - 01 - 789 - 0101 - 37217 for the Year 2016-17
1 Construction of H.L. Bridge across Ganda Nallah at RD 70 M of C.E. No.13 A on Ganda Nallah near Jokadia (Balance work)
63P1/16-17 15.21 15.21 Completed
2 Restoration to left bank of Chandua near village Erada
244P1/15-16 32.47 32.47 Completed
3 Restoration to Kharasuan right bank near village Bhubanpur
228P1/15-16 31.59 31.59 Completed
4 Restoration to Spur No. 5, 6, & 7 on Tantighai right near village Rishipur
203P1/15-16 38.47 38.47 Completed
5 Restoration to Phulapur TRE 248P1/15-16 26.29 26.29 Completed
6 Restoration to Right Bank of Tantighai near village Erada
232P1/15-16 14.47 14.47 Completed
7 Restoration to Balikuda Niali TRE near village Niali
231P1/15-16 22.95 22.95 Completed
8 Restoration to Right approach (Kumudi side) of Pandara High Level Bridge over Pandara Nalla
179P1/15-16 25.54 25.54 Completed
9 Restoration to Brahmani left from Chakua to Railway Station
222P1/15-16 22.02 22.02 Completed
10 Restoration to CE 17(A) on Patia Right RD 00 to 1200 Mtr.
201P1/15-16 26.56 26.56 Completed
11 Restoration to CE 13(A) on Ganda left near Jokadia
241P1/15-16 20.55 20.55 Completed
12 Restoration to Pahanga OAE on Kharasuan left from RD 00 to 800 M
04P1/16-17 22.08 22.08 Completed
13 Restoration to 6 Nos. Spur on Kelua right of Budhalinga Majhipada OAE near village Nosta.
162P1/15-16 38.96 38.96 Completed
14 Restoration to Scoured Bank on Kharasuan Right near Gopalpatna
229P1/15-16 21.24 21.24 Completed
15 Restoration to Scoured Bank on Kharasuan Right from Tikarapada to Kujibara
217P1/15-16 18.47 18.47 Completed
16 Restoration to pile bridge on Chhinda Kharasuan near village Votaka
31P1/16-17 5.74 5.74 Completed
17 Improvement to Brahmani left embankment near village Banka sahi.
52P1/16-17 130.11 130.11 Under progress
18 Restoration to 21(B) on Brahmani Left ( RD.00 Km. to 2.00 Km.)
139P1/16-17 11.41 11.41 Completed
524.13 524.13
LIST OF WORKS UNDER DIFFERENT SCHEMES OF JARAKA IRRIGATION DIVISION FOR
THE YEAR 2016-17
Sl.No. Name of Works Agt. No. Amount alloted
(in Lakhs)
Expenditure (Rs. in Lakhs)
Remarks
1 2 3 4 5 6 List of works under Lump (RE) (Under Demand No. 20-2711-01-800-1214-21087-000-0-1-0)
1 Restoration to Bainsuria Kadikama TRE
224P1/15-16 22.83 22.83 Completed
2 Restoration to Sangadeipur Bhaunra TRE
212P1/15-16 23.21 23.21 Completed
3 Restoration and development of OAE 19 abc.
235P1/15-16 36.21 36.21 Completed
4 Restoration to OAE 16 B near Keutigaon.
227P1/15-16 10.53 10.53 Completed
5 Restoration to Tantighai HL Bridge approach Rishipur side.
165P1/15-16 20.23 20.23 Completed
6 Restoration to Udayapur Arual TRE near village Balikanthia on Brahmani left
03P1/16-17 12.96 12.96 Completed
7 Repair to Spur near Bankasahi on Brahmani left
239P1/15-16 14.05 14.05 Completed
8 Scoured Bank Protection to Brahmani left embankment near village Birabhanapur
238P1/15-16 18.34 18.34 Completed
9 Improvement to OAE No. 13B from Kalashpur to Rishipur
242P1/15-16 18.81 18.81 Completed
10 Improvement to Sherapur Sahapada TRE from RD 1.00 Km. to 2.60 Km.
144P1/15-16 21.27 21.27 Completed
11 Improvement to Sahapada OAE from RD 00 to 2.62 Km.
145P1/15-16 16.68 16.68 Completed
12 Improvement to Karipadia Mayapada TRE
136P1/15-16 16.82 16.82 Completed
13 Construction of Section Office at Kaima 204P1/15-16 13.41 13.41 Completed
14 Renovation to 12 Nos. Gada from Barabati to Jabra on Brahmani left
137P1/15-16 15.05 15.05 Completed
15 Raising & Strengthening to Patilo Mundamal OAE
180P1/15-16 17.41 17.41 Completed
16 Raising and strengthening to Brudhalinga Majhipada OAE
225P1/15-16 17.19 17.19 Completed
295.00 295.00
Sl.No
. Name of Works Agt. No. Amount
alloted (in
Lakhs)
Expenditure (Rs. In Lakhs)
Remarks
1 2 3 4 5 6 List of works under Non-residential Building for the year 2016-17 (Demand No. 20-2059-80-
053-2448-21033) 1 Repair and restoration to temporary
office building of SE, EC-II, Chandikhole at Neulapur.
44P1/16-17 3.00 3.00 Completed
2 Repair and Restoration to Office Building of Chandikhole Irrigation Sub-Division.
35P1/16-17 1.17 1.17 Completed
3 Improvement of Baruan Section Office.
110P1/15-16 3.18 3.18 Completed
4 Improvement to section office at Saudia
34P1/16-17 2.65 2.65 Completed
10.00 10.00
Sl.No. Name of Works Agt. No. Amount
alloted (in Lakhs)
Expenditure (Rs. In Lakhs)
Remarks
1 2 3 4 5 6 List of works under R.E. (Road) for the year 2016-17 (Demand No. 20-3054-80-800-2450-21033-000-0-1-0)
1 Repair & restoration to road on Jabra escape embankment on Brahmani left
172P1/15016 16.37 16.37 Completed
2 Restoration to CE No. 17A on Patia right from Manapur to Bhandaripada
170P1/15-16 19.1 19.1 Completed
3 Restoration to Gada on CE No. 17A from Malahat to Raichhanda.
146P1/15-16 16.20 16.20 Completed
4 Improvement to 14 Nos. Gada on OAE 26A from Sanaraipada to Brudhalinga.
250P1/15-16 16.61 16.61 Completed
5 Restoration to Khanditar OAE 218P1/15-16 13.57 13.57 Completed
6 Restoration to CE No. 27A on Patia right near Sribantapur
223P1/15-16 22.68 22.68 Completed
7 C.C. Road on CE No. 27A near Chausathipada
210P1/15-16 5.55 5.55 Completed
8 Improvement to road on Bhagabanpur Gherry from Kotapur Gopal Sahi to Bhagabanpur Bridge.
176P1/15-16 19.75 19.75 Completed
9 Construction of CC Road on Karanjamala TRE
119P1/16-17 3.17 3.17 Completed
133.00 133.00
Sl.No. Name of Works Agt. No. Amount
alloted (in
Lakhs)
Expenditure (Rs. in Lakhs)
Remarks
1 2 3 4 5 6
List of works under Canal (Road) for the year 2016-17 (Demand No. 20-2700-80-800-1730-21028-000-0-1-0)
1 Improvement to right side inspection road from RD 1.47 Km. to 2.00 Km. of Bhuban Sub-Minor with Linning from RD 100 to 300 Mtr.
08P1/16-17 7.17 7.17 Completed
2 Construction of VRB at RD 1.15 Km. of distributary No. 12 of HLC Range - I
147P1/15-16 4.91 4.91 Completed
3 Improvement to right bank of 5(A) Disty. From Raghunathpur to Champapur
12P1/15-16 4.92 4.92 Completed
17.00 17.00
LIST OF WORKS UNDER DIFFERENT SCHEMES OF JARAKA IRRIGATION DIVISION FOR THE YEAR 2016-17 Sl.No. Name of Works Agt. No. Amount
alloted (in Lakhs)
Expenditure (Rs. in Lakhs)
Remarks
1 2 3 4 5 6
List of works under Critical Lump (Canals) (Demand No. 20-2700-80-800-1848-21033-000-0-1-0) 1 Improvement to Distributary No. 10 207P1/15-16 5.43 5.43 Work completed
2 Improvement to Distributary No. 7 1/4 240P1/15-16 5.74 5.74 Work completed
3 Improvement to distributary No. 7A, 7 1/4 A,
Barimula Sub-Minor and Ubuka SubMinor 202P1/15-16 5.86 5.86 Work completed
4 Improvement to Distributary No. 7 and 9 209P1/15-16 5.46 5.46 Work completed
5 Improvement to Distributary No. 7 1/2 and 8 233P1/15-16 6.04 6.04 Work completed
6 Improvement to Distributary No. 11 and 2 Nos. direct O/L of HLC (58R, 59 R)
167P1/15-16 6.19 6.19 Work completed
7 Improvement to Distributary No. 5, RD 3.00 Km. to 10.00 Km.
20P1/16-17 6.26 6.26 Work completed
8 Renovation of HLC and Patrol House at Byree
151P1/15-16 6.03 6.03 work completed
9 Improvement to Distributary No. 6 5.59 5.59 work completed
10 Improvement to Distributary No. 5 1/2. 173P1/15-16 1.91 1.91 work completed
11 Improvement to Distributary No. 6A 208P1/15-16 6.16 6.16 work completed
12 Construction of guard wall within RD 700 M to 900 M with repair of H.R. of Distriburary No. 12A
205P1/15-16 5.44 5.44 Work completed
13 Construction of 4 Nos. of O/L within RD 1.00
Km. to 2.00 Km. of Distributary No. 13 with lining
29P1/16-17 4.82 4.82 Work completed
14 Improvement to Sendhapur Minor with
Syphon & lining within RD 150 M to 700 M. 141P1/15-16 4.87 4.87 Work completed
15 Construction of culvert with guard wall
within RD 1260 M to 1700 M of Talaban sub-minor.
245P1/15-16 5.29 5.29 Work completed
16 Improvement to Derabar Sub-Minor with
culvert at RD 2840 M of distributary No. 14. 168P1/15-16 6.13 6.13 Work completed
17 Improvement to distributary No. 14 with
extension of Pipe line of O/L 20L, 31 L, 39R, 47R & 48R of HLC Range - I
197P1/15-16 6.05 6.05 Work completed
18 Improvement to Patapur Sub-Minor with
lining within RD 60 M to 600 M. 214P1/15-16 5.33 5.33 Work completed
19 Improvement to Mundamal Sub-Minor and
Bhabilo Sub-Minor of distributary No. 14 27P1/16-17 4.78 4.78 Work completed
20 Repair & restoration to Distributary No. 14 1/2
of HLC Range - I 169P1/15-16 4.70 4.70 Work completed
21 Repair & restoration to Distributary No. 15 of
HLC Range - I 247P1/15-16 4.79 4.79 Work completed
22 Repair & restoration to distributary No. 16 of
HLC Range - I 246P1/15-16 6.20 6.20 Work completed
23 Repair & restoration to distributary No. 17 of
HLC Range - I 142P1/15-16 5.44 5.44 Work completed
24 C.C.linging to Gopalpur Minor with
costruction of outlets from 00 M. to 765 M. of Disty. No.12A
117P1/16-17 4.11 4.11 Work completed
25 C.C.linging to Magura S/M Ex.- Disty.No.5A 108P1/16-17 11.42 11.42 Work completed
26 Improvement of Distributary No.7 1/2(A) 114P1/16-17 3.56 3.56 Work completed
27 Improvement to Bhuban S/M, Derabar S/M,
Patapur S/M, Mundamal S/M & Bhabilo S/M of Disty. No.14
85P1/16-17 4.88 4.88 Work completed
28 Improvement to Disty. No. 14 1/2 of HLC R-I &
Disty. No.15 of HLC Range-I 73P1/16-17 1.52 1.52 Work completed
150.00 150.00