GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-01-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other
means : 1st 50 meter
EQUIPMENT
Carriage Charges #1 59.50 1.000 59.50 Rs/50mRs/50m 1
TOTAL EQUIPMENT 59.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 72.59
13.09
72.59Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
1
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-01-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other
means : 2nd 50 meter
EQUIPMENT
Carriage Charges #2 12.75 1.000 12.75 Rs/50mRs/50m 1
TOTAL EQUIPMENT 12.75 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 15.56
2.81
15.56Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
2
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-01-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other
means : 3rd to 5th 50 meter
EQUIPMENT
Carriage Charges #3 8.50 1.000 8.50 Rs/50mRs/50m 1
TOTAL EQUIPMENT 8.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 10.37
1.87
10.37Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
3
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-01-d
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 250 Meter
Spec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other
means : 250 to 1000 meter
EQUIPMENT
Carriage Charges #4 42.50 1.000 42.50 Rs/250mRs/250m 1
TOTAL EQUIPMENT 42.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 250 m: 51.85
9.35
51.85Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 250 m: 0.00
250 Meter
250 Meter
%
4
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-01-e
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other
means : 1st kilometer
EQUIPMENT
Carriage Charges #5 127.50 1.000 127.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 127.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 155.55
28.05
155.55Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
5
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-01-f
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other
means : 2nd - 5th kilometer
EQUIPMENT
Carriage Charges #6 51.00 1.000 51.00 Rs/KmRs/Km 1
TOTAL EQUIPMENT 51.00 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 62.22
11.22
62.22Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
6
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-01-g
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other
means : 6th to 10th kilometer
EQUIPMENT
Carriage Charges #7 42.50 1.000 42.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 42.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 51.85
9.35
51.85Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
7
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-01-h
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 100 cft / 5 tonne of all materials by truck or other
means : 11th & subsequent kilometer
EQUIPMENT
Carriage Charges #8 25.50 1.000 25.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 25.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 31.11
5.61
31.11Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
8
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-02-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :
1st 50 meter
EQUIPMENT
Carriage Charges #1 37.49 0.630 59.50 Rs/50mRs/50m 1
TOTAL EQUIPMENT 37.49 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 45.73
8.25
45.73Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
9
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-02-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :
2nd 50 meter
EQUIPMENT
Carriage Charges #2 8.03 0.630 12.75 Rs/50mRs/50m 1
TOTAL EQUIPMENT 8.03 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 9.80
1.77
9.80Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
10
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-02-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :
3rd to 5th 50 meter
EQUIPMENT
Carriage Charges #3 5.36 0.630 8.50 Rs/50mRs/50m 1
TOTAL EQUIPMENT 5.36 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 6.53
1.18
6.53Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
11
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-02-d
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :
250 - 1000 meter
EQUIPMENT
Carriage Charges #4 26.77 0.630 42.50 Rs/250mRs/250m 1
TOTAL EQUIPMENT 26.77 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 250 m: 32.67
5.89
32.67Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 250 m: 0.00
50 Meter
50 Meter
%
12
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-02-e
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :
1st kilometer
EQUIPMENT
Carriage Charges #5 80.32 0.630 127.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 80.32 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 98.00
17.67
98.00Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
13
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-02-f
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :
2nd - 5th kilometer
EQUIPMENT
Carriage Charges #6 32.13 0.630 51.00 Rs/KmRs/Km 1
TOTAL EQUIPMENT 32.13 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 39.20
7.07
39.20Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
14
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-02-g
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :
6th - 10th kilometer
EQUIPMENT
Carriage Charges #7 26.77 0.630 42.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 26.77 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 32.67
5.89
32.67Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
15
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-02-h
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc :
11th & subsequent kilometer
EQUIPMENT
Carriage Charges #8 16.07 0.630 25.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 16.07 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 19.60
3.53
19.60Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
16
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-03-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Tonne/50 Met
Spec. No :
Carriage of cement(bag), bitumen/lubricants (drum) by truck or
other means : 1st 50 meter
EQUIPMENT
Carriage Charges #1 11.90 0.200 59.50 Rs/50mRs/50m 1
TOTAL EQUIPMENT 11.90 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per tonne/50m: 14.52
2.62
14.52Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per tonne/50m: 0.00
Tonne/50 M
Tonne/50 M
%
17
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-03-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Tonne/50 Met
Spec. No :
Carriage of cement (bag) bitumen/lubricant (drum) by truck or other
means : 2nd 50 meter
EQUIPMENT
Carriage Charges #2 2.55 0.200 12.75 Rs/50mRs/50m 1
TOTAL EQUIPMENT 2.55 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per tonne/50m: 3.11
0.56
3.11Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per tonne/50m: 0.00
Tonne/50 M
Tonne/50 M
%
18
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-03-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Tonne/50 Met
Spec. No :
Carriage of cement (bag), bitumen/lubricant (drum) by truck or
other means : 3rd to 5th 50 meter
EQUIPMENT
Carriage Charges #3 1.70 0.200 8.50 Rs/50mRs/50m 1
TOTAL EQUIPMENT 1.70 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per tonne/50m: 2.07
0.37
2.07Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per tonne/50m: 0.00
Tonne/50 M
Tonne/50 M
%
19
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-03-d
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Tonne/250 Me
Spec. No :
Carriage of cement(bag), bitumen/lubricant (drum) by truck or other
means : 250 to 1000 meter
EQUIPMENT
Carriage Charges #4 8.50 0.200 42.50 Rs/250mRs/250m 1
TOTAL EQUIPMENT 8.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per t/250m: 10.37
1.87
10.37Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per t/250m: 0.00
Tonne/250
Tonne/250
%
20
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-03-e
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Tonne/1 Km
Spec. No :
Carriage of cement(bags), bitumen/lubricant (drum) by truck or
other means : 1st kilometer
EQUIPMENT
Carriage Charges #5 25.50 0.200 127.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 25.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per tonne/km: 31.11
5.61
31.11Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per tonne/km: 0.00
Tonne/1 K
Tonne/1 K
%
21
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-03-f
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Tonne/1 Km
Spec. No :
Carriage of cement(bag), bitumen/lubricant (drum) by truck or other
means : 2nd - 5th kilometer
EQUIPMENT
Carriage Charges #6 10.20 0.200 51.00 Rs/KmRs/Km 1
TOTAL EQUIPMENT 10.20 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per tonne/km: 12.44
2.24
12.44Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per tonne/km: 0.00
Tonne/1 K
Tonne/1 K
%
22
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-03-g
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Tonne/1 Km
Spec. No :
Carriage of cement(bag), bitumen/lubricant (drum) by truck or other
means : 6th - 10th kilometer
EQUIPMENT
Carriage Charges #7 8.50 0.200 42.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 8.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per tonne/km: 10.37
1.87
10.37Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per tonne/km: 0.00
Tonne/1 K
Tonne/1 K
%
23
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-03-h
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Tonne/1 Km
Spec. No :
Carriage of cement(bag), bitumen/lubricant (drum) by truck or other
means : 11th & subsequent km
EQUIPMENT
Carriage Charges #8 5.10 0.200 25.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 5.10 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per tonne/km: 6.22
1.12
6.22Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per tonne/km: 0.00
Tonne/1 K
Tonne/1 K
%
24
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-04-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :
1st 50 meter
EQUIPMENT
Carriage Charges #1 35.70 0.600 59.50 Rs/50mRs/50m 1
TOTAL EQUIPMENT 35.70 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 43.55
7.85
43.55Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
25
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-04-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :
2nd 50 meter
EQUIPMENT
Carriage Charges #2 7.65 0.600 12.75 Rs/50mRs/50m 1
TOTAL EQUIPMENT 7.65 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 9.33
1.68
9.33Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
26
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-04-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of 100cft of sarkanda, pichi, frash etc by road or boat :
3rd to 5th kilometer
EQUIPMENT
Carriage Charges #3 5.10 0.600 8.50 Rs/50mRs/50m 1
TOTAL EQUIPMENT 5.10 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 6.22
1.12
6.22Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
27
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-04-d
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 250 Meter
Spec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :
250 to 1000 meter
EQUIPMENT
Carriage Charges #4 25.50 0.600 42.50 Rs/250mRs/250m 1
TOTAL EQUIPMENT 25.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 250 m: 31.11
5.61
31.11Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 250 m: 0.00
250 Meter
250 Meter
%
28
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-04-e
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 100cft of sarkanda, pichi, frash etc by road or boat :
1st kilometer
EQUIPMENT
Carriage Charges #5 76.50 0.600 127.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 76.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 93.33
16.83
93.33Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
29
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-04-f
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :
2nd - 5th kilometer
EQUIPMENT
Carriage Charges #6 30.60 0.600 51.00 Rs/KmRs/Km 1
TOTAL EQUIPMENT 30.60 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 37.33
6.73
37.33Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
30
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-04-g
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :
6th - 10th kilometer
EQUIPMENT
Carriage Charges #7 25.50 0.600 42.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 25.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 31.11
5.61
31.11Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
31
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-04-h
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat :
11th & subsequent kilometer
EQUIPMENT
Carriage Charges #8 15.30 0.600 25.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 15.30 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 18.67
3.37
18.67Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
32
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-05-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of small consignments upto 250kg 1st 50 meter
EQUIPMENT
Carriage Charges #1 2.98 0.050 59.50 Rs/50mRs/50m 1
TOTAL EQUIPMENT 2.98 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 3.63
0.65
3.63Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
33
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-05-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of small consigmnments upto 250 kg 2nd 50 meter
EQUIPMENT
Carriage Charges #2 0.64 0.050 12.75 Rs/50mRs/50m 1
TOTAL EQUIPMENT 0.64 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 0.78
0.14
0.78Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
34
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-05-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 50 Meter
Spec. No :
Carriage of small consignments upto 250 kg 3rd to 5th 50 meters
EQUIPMENT
Carriage Charges #3 0.43 0.050 8.50 Rs/50mRs/50m 1
TOTAL EQUIPMENT 0.43 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 50 m: 0.52
0.09
0.52Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 50 m: 0.00
50 Meter
50 Meter
%
35
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-05-d
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 250 Meter
Spec. No :
Carriage of small consignments upto 250 kg 250 - 1000 meter
EQUIPMENT
Carriage Charges #4 2.13 0.050 42.50 Rs/250mRs/250m 1
TOTAL EQUIPMENT 2.13 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 250 m: 2.59
0.47
2.59Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 250 m: 0.00
250 Meter
250 Meter
%
36
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-05-e
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of small consignments upto 250 kg 1st kilometer
EQUIPMENT
Carriage Charges #5 6.38 0.050 127.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 6.38 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 7.78
1.40
7.78Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
37
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-05-f
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of small consignments upto 250 kg 2nd to 5th kilometer
EQUIPMENT
Carriage Charges #6 2.55 0.050 51.00 Rs/KmRs/Km 1
TOTAL EQUIPMENT 2.55 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 3.11
0.56
3.11Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
38
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-05-g
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of small consignments upto 250 kg 6th to 10th kilometer
EQUIPMENT
Carriage Charges #7 2.13 0.050 42.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 2.13 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 2.59
0.47
2.59Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
39
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-05-h
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of small consignments upto 250 kg 11th & subsequent
kilometer
EQUIPMENT
Carriage Charges #8 1.27 0.050 25.50 Rs/KmRs/Km 1
TOTAL EQUIPMENT 1.27 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 1.56
0.28
1.56Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
40
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-06-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of consignments (odd job) Coolie load
LABOUR
Coolie 45.00 0.100 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 1.35
46.35 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 56.25
9.90
56.25Composite Rates Per
Labour Rates Per
Rs.
Rs. 56.25 Cost Per km: 56.25
km
km
%
41
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-06-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of consignments (odd job) Donkey load
EQUIPMENT
Donkey 25.50 0.075 340.00 DayDay 1
TOTAL EQUIPMENT 25.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 31.11
5.61
31.11Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
42
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-06-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of consignments (odd job) Cart Load
EQUIPMENT
Bullock Cart 22.31 0.038 595.00 DayDay 1
TOTAL EQUIPMENT 22.31 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 27.22
4.91
27.22Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
43
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-06-d
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit km
Spec. No :
Carriage of consignments (odd job) Camel load
EQUIPMENT
Camel 51.00 0.075 680.00 DayDay 1
TOTAL EQUIPMENT 51.00 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per km: 62.22
11.22
62.22Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per km: 0.00
km
km
%
44
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-07-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Day
Spec. No :
Hire Charges of Truck
EQUIPMENT
Truck (10ton) 6,570.05 7.729 850.00 HourHour 1
TOTAL EQUIPMENT 6,570.05 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Day: 8,015.46
1,445.41
8,015.46Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per Day: 0.00
Day
Day
%
45
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-07-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Day
Spec. No :
Hire charges of Tractor with trolley
EQUIPMENT
Tractor With Trolly 6,570.50 7.730 850.00 HourHour 1
TOTAL EQUIPMENT 6,570.50 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Day: 8,016.01
1,445.51
8,016.01Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per Day: 0.00
Day
Day
%
46
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-07-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Day
Spec. No :
Hire charges of Tractor without trolley
EQUIPMENT
Tractor Without Trolly 80 HP 4,311.37 7.246 595.00 DayDay 1
TOTAL EQUIPMENT 4,311.37 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Day: 5,259.87
948.50
5,259.87Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per Day: 0.00
Day
Day
%
47
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-08-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Each
Spec. No :
Hand shunting loaded railway wagons Upto 500 meter
LABOUR
Coolie 675.00 1.500 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 20.25
695.25 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Each: 843.75
148.50
843.75Composite Rates Per
Labour Rates Per
Rs.
Rs. 843.75 Cost Per Each: 843.75
Each
Each
%
48
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-08-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Each
Spec. No :
Hand shunting loaded railway wagons Upto 1 kilometer
LABOUR
Coolie 1,012.50 2.250 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 30.38
1,042.88 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Each: 1,265.63
222.75
1,265.63Composite Rates Per
Labour Rates Per
Rs.
Rs. 1,265.63 Cost Per Each: 1,265.63
Each
Each
%
49
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-08-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Each
Spec. No :
Hand shunting loaded railway wagons Upto 2 kilometer
LABOUR
Coolie 1,237.50 2.750 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 37.13
1,274.63 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Each: 1,546.88
272.25
1,546.88Composite Rates Per
Labour Rates Per
Rs.
Rs. 1,546.88 Cost Per Each: 1,546.88
Each
Each
%
50
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-08-d
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Each
Spec. No :
Hand shunting loaded railway wagons 3rd & subsequent kilometer
LABOUR
Coolie 562.50 1.250 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 16.88
579.38 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Each: 703.13
123.75
703.13Composite Rates Per
Labour Rates Per
Rs.
Rs. 703.13 Cost Per Each: 703.13
Each
Each
%
51
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-09-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Each
Spec. No :
Hand shunting empty railway wagons Upto 500 meter
LABOUR
Coolie 337.50 0.750 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 10.13
347.63 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Each: 421.88
74.25
421.88Composite Rates Per
Labour Rates Per
Rs.
Rs. 421.88 Cost Per Each: 421.88
Each
Each
%
52
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-09-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Each
Spec. No :
Hand shunting empty railway wagons Upto 1 kilometer
LABOUR
Coolie 506.25 1.125 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 15.19
521.44 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Each: 632.81
111.38
632.81Composite Rates Per
Labour Rates Per
Rs.
Rs. 632.81 Cost Per Each: 632.81
Each
Each
%
53
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-09-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Each
Spec. No :
Hand shunting empty railway wagons Upto 2 kilometer
LABOUR
Coolie 618.75 1.375 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 18.56
637.31 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Each: 773.44
136.13
773.44Composite Rates Per
Labour Rates Per
Rs.
Rs. 773.44 Cost Per Each: 773.44
Each
Each
%
54
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 01 , CARRIAGE
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
01-09-d
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Each
Spec. No :
Hand shunting empty railway wagons 3rd & subsequent kilometer
LABOUR
Coolie 281.25 0.625 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 8.44
289.69 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Each: 351.56
61.88
351.56Composite Rates Per
Labour Rates Per
Rs.
Rs. 351.56 Cost Per Each: 351.56
Each
Each
%
55
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-01
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 cft
Spec. No :
Load into or unload from railway wagons within 50m shingle, sand,
ballast, tiles, etc, laid & stacked
(British) :
LABOUR
Coolie 450.00 1.000 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 13.50
463.50 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 198.65
99.00
562.50Composite Rates Per
Labour Rates Per
Rs.
Rs. 562.50 Per CUM : Rs 198.65
100 cft
100 cft
%
56
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-02-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 No.
Spec. No :
Load into or unload from railway wagons within 50m laid & stacked :
Bricks 10" size
(British) :
LABOUR
Coolie 562.50 1.250 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 16.88
579.38 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 1000 No.: 703.13
123.75
703.13Composite Rates Per
Labour Rates Per
Rs.
Rs. 703.13 Cost Per 1000 No.: 703.13
1000 No.
1000 No.
%
57
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-02-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 No.
Spec. No :
Load into or unload from railway wagons within 50m laid & stacked :
Bricks 9" or smaller size
(British) :
LABOUR
Coolie 450.00 1.000 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 13.50
463.50 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 1000 No.: 562.50
99.00
562.50Composite Rates Per
Labour Rates Per
Rs.
Rs. 562.50 Cost Per 1000 No.: 562.50
1000 No.
1000 No.
%
58
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-03
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Load into or unload from railway wagons, cement in bags and
stacking within 50m.
(British) :
LABOUR
Coolie 562.50 1.250 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 16.88
579.38 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 703.13
123.75
703.13Composite Rates Per
Labour Rates Per
Rs.
Rs. 703.13 Cost Per 100 No.: 703.13
100 No.
100 No.
%
59
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-04
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 No.
Spec. No :
Load into or unload from railway wagons, empty cement bags and
stacking
(British) :
LABOUR
Coolie 504.00 1.120 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 15.12
519.12 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 1000 No.: 630.00
110.88
630.00Composite Rates Per
Labour Rates Per
Rs.
Rs. 630.00 Cost Per 1000 No.: 630.00
1000 No.
1000 No.
%
60
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-05
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit tonne
Spec. No :
Load into or unload from railway wagons and stacking white lime in
bags
(British) :
LABOUR
Coolie 112.50 0.250 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 3.38
115.88 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per Tonne : Rs 140.63
24.75
140.63Composite Rates Per
Labour Rates Per
Rs.
Rs. 140.63 Per Tonne : Rs 140.63
tonne
tonne
%
61
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-06
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit tonne
Spec. No :
Load into or unload from railway wagons structural steel, RS
joists, rails, rail fastenings etc
(British) :
LABOUR
Coolie 270.00 0.600 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 8.10
278.10 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per Tonne : Rs 337.50
59.40
337.50Composite Rates Per
Labour Rates Per
Rs.
Rs. 337.50 Per Tonne : Rs 337.50
tonne
tonne
%
62
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-07
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Each
Spec. No :
Load into or unload from 45 gallon drums full, into or from railway
wagons,lead upto 50m
(British) :
LABOUR
Coolie 36.00 0.080 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 1.08
37.08 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Each: 45.00
7.92
45.00Composite Rates Per
Labour Rates Per
Rs.
Rs. 45.00 Cost Per Each: 45.00
Each
Each
%
63
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-08
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Each
Spec. No :
Loading or unloading packages of all sorts upto 50 kg.
(British) :
LABOUR
Coolie 31.50 0.070 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 0.95
32.45 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Each: 39.38
6.93
39.38Composite Rates Per
Labour Rates Per
Rs.
Rs. 39.38 Cost Per Each: 39.38
Each
Each
%
64
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-09-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Load or unload sleepers other than wooden, incl stacking, lead upto
50 m : Broad gauge
(British) :
LABOUR
Coolie 1,125.00 2.500 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 33.75
1,158.75 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 1,406.25
247.50
1,406.25Composite Rates Per
Labour Rates Per
Rs.
Rs. 1,406.25 Cost Per 100 No.: 1,406.25
100 No.
100 No.
%
65
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-09-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Load or unload sleepers other than wooden, including stacking, lead
upto 50 m : Metre gauge &
(British) :
LABOUR
Coolie 562.50 1.250 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 16.88
579.38 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 703.13
123.75
703.13Composite Rates Per
Labour Rates Per
Rs.
Rs. 703.13 Cost Per 100 No.: 703.13
100 No.
100 No.
%
66
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-10
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit tonne
Spec. No :
Load or unload timber logs or shuttering into or from railway
wagons, including stacking within 50m
(British) :
LABOUR
Coolie 148.50 0.330 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 4.46
152.96 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per Tonne : Rs 185.63
32.67
185.63Composite Rates Per
Labour Rates Per
Rs.
Rs. 185.63 Per Tonne : Rs 185.63
tonne
tonne
%
67
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-11
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit tonne
Spec. No :
Loading or unloading bhoosa in railway wagons lead upto 50 m.
(British) :
LABOUR
Coolie 337.50 0.750 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 10.13
347.63 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per Tonne : Rs 421.88
74.25
421.88Composite Rates Per
Labour Rates Per
Rs.
Rs. 421.88 Per Tonne : Rs 421.88
tonne
tonne
%
68
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-12
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit tonne
Spec. No :
Load or unload timber scrap or wooden plugs into or from railway
wagons & stacking within 50m
(British) :
LABOUR
Coolie 225.00 0.500 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 6.75
231.75 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per Tonne : Rs 281.25
49.50
281.25Composite Rates Per
Labour Rates Per
Rs.
Rs. 281.25 Per Tonne : Rs 281.25
tonne
tonne
%
69
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-13
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 cft
Spec. No :
Load or unload pitching stone/spawl from railway wagons of any
guage including clearing 1.5m away
(British) :
LABOUR
Coolie 166.50 0.370 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 5.00
171.50 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 73.50
36.63
208.13Composite Rates Per
Labour Rates Per
Rs.
Rs. 208.13 Per CUM : Rs 73.50
100 cft
100 cft
%
70
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-14
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 cft
Spec. No :
Loading or unloading building stone including clearing away 1.5m
from rails
(British) :
LABOUR
Coolie 216.00 0.480 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 6.48
222.48 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 95.35
47.52
270.00Composite Rates Per
Labour Rates Per
Rs.
Rs. 270.00 Per CUM : Rs 95.35
100 cft
100 cft
%
71
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-15-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 ltr
Spec. No :
Unloading oil,bitumen or tar etc : Crude Oil (to be pumped from
tank wagon into tank)
(British) :
LABOUR
Coolie 135.00 0.300 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 4.05
139.05 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 1000 ltr: 168.75
29.70
168.75Composite Rates Per
Labour Rates Per
Rs.
Rs. 168.75 Cost Per 1000 ltr: 168.75
1000 ltr
1000 ltr
%
72
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-15-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 ltr
Spec. No :
Unloading oil,bitumen or tar etc Crude oil (drained by gravity)
(British) :
LABOUR
Coolie 135.00 0.300 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 4.05
139.05 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 1000 ltr: 168.75
29.70
168.75Composite Rates Per
Labour Rates Per
Rs.
Rs. 168.75 Cost Per 1000 ltr: 168.75
1000 ltr
1000 ltr
%
73
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-15-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit Ton
Spec. No :
Unloading oil,bitumen or tar etc Crude oil materials from railway
wagons
(British) :
LABOUR
Coolie 25.65 0.057 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 0.77
26.42 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per Ton: 32.06
5.64
32.06Composite Rates Per
Labour Rates Per
Rs.
Rs. 32.06 Cost Per Ton: 32.06
Ton
Ton
%
74
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-15-d
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit tonne
Spec. No :
Unloading oil, bitumen or tar etc : Fuel Oil from tank into empty
drums including stacking within 50 m
(British) :
LABOUR
Coolie 225.00 0.500 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 6.75
231.75 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per Tonne : Rs 281.25
49.50
281.25Composite Rates Per
Labour Rates Per
Rs.
Rs. 281.25 Per Tonne : Rs 281.25
tonne
tonne
%
75
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-15-e
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Unloading oil,bitumen or tar etc Petrol (2 gallon tin)
(British) :
LABOUR
Coolie 283.50 0.630 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 8.51
292.01 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 354.38
62.37
354.38Composite Rates Per
Labour Rates Per
Rs.
Rs. 354.38 Cost Per 100 No.: 354.38
100 No.
100 No.
%
76
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-15-f
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Unloading oil, bitumen or tar etc Kerosine oil (4 gallon tin)
(British) :
LABOUR
Coolie 562.50 1.250 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 16.88
579.38 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 703.13
123.75
703.13Composite Rates Per
Labour Rates Per
Rs.
Rs. 703.13 Cost Per 100 No.: 703.13
100 No.
100 No.
%
77
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-15-g
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Unloading oil,bitumen or tar etc Tar & Bitumen in drums with
carriage upto 1 km
(British) :
EQUIPMENT
Bullock Cart 148.75 0.250 595.00 DayDay 1
TOTAL EQUIPMENT 148.75 75.00 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 181.48
32.73
181.48Composite Rates Per
Labour Rates Per
Rs.
Rs. 0.00 Cost Per 100 No.: 0.00
100 No.
100 No.
%
78
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-16-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 cft
Spec. No :
Removing and stacking within 50m. lead Stone, spawl, brick bats,
shingle, sand, lime etc
(British) :
LABOUR
Coolie 225.00 0.500 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 6.75
231.75 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 99.32
49.50
281.25Composite Rates Per
Labour Rates Per
Rs.
Rs. 281.25 Per CUM : Rs 99.32
100 cft
100 cft
%
79
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-16-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 No.
Spec. No :
Removing and stacking within 50m. lead Bricks
(British) :
LABOUR
Coolie 652.50 1.450 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 19.58
672.08 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 1000 No.: 815.63
143.55
815.63Composite Rates Per
Labour Rates Per
Rs.
Rs. 815.63 Cost Per 1000 No.: 815.63
1000 No.
1000 No.
%
80
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-16-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Removing and stacking within 50m. lead Broad gauge wooden sleepers
(British) :
LABOUR
Coolie 360.00 0.800 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 10.80
370.80 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 450.00
79.20
450.00Composite Rates Per
Labour Rates Per
Rs.
Rs. 450.00 Cost Per 100 No.: 450.00
100 No.
100 No.
%
81
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-16-d
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Removing and stacking within 50m. lead Metre gauge or narrow guage
wooden sleepers
(British) :
LABOUR
Coolie 205.65 0.457 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 6.17
211.82 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 257.06
45.24
257.06Composite Rates Per
Labour Rates Per
Rs.
Rs. 257.06 Cost Per 100 No.: 257.06
100 No.
100 No.
%
82
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-16-e
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit tonne
Spec. No :
Removing and stacking within 50m. lead Rails, girders, pipes,
cement etc.
(British) :
LABOUR
Coolie 103.50 0.230 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 3.11
106.61 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per Tonne : Rs 129.38
22.77
129.38Composite Rates Per
Labour Rates Per
Rs.
Rs. 129.38 Per Tonne : Rs 129.38
tonne
tonne
%
83
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-16-f
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Removing and stacking within 50m. lead Bridge and crossing timbers,
etc.
(British) :
LABOUR
Coolie 1,201.50 2.670 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 36.05
1,237.55 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 1,501.88
264.33
1,501.88Composite Rates Per
Labour Rates Per
Rs.
Rs. 1,501.88 Cost Per 100 No.: 1,501.88
100 No.
100 No.
%
84
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-17
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit tonne
Spec. No :
Load into wagons girders, rails, MS bars, pipes etc. including 50m
lead & stacking inside wagons
(British) :
LABOUR
Coolie 288.00 0.640 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 8.64
296.64 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per Tonne : Rs 360.00
63.36
360.00Composite Rates Per
Labour Rates Per
Rs.
Rs. 360.00 Per Tonne : Rs 360.00
tonne
tonne
%
85
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-18
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit tonne
Spec. No :
Unload from wagons girders, rails, MS bars, girder etc. including
50m lead but excluding stacking
(British) :
LABOUR
Coolie 112.50 0.250 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 3.38
115.88 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per Tonne : Rs 140.63
24.75
140.63Composite Rates Per
Labour Rates Per
Rs.
Rs. 140.63 Per Tonne : Rs 140.63
tonne
tonne
%
86
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-19
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Load into wagons wooden baord guage sleepers including 50m lead &
stacking
(British) :
LABOUR
Coolie 900.00 2.000 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 27.00
927.00 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 1,125.00
198.00
1,125.00Composite Rates Per
Labour Rates Per
Rs.
Rs. 1,125.00 Cost Per 100 No.: 1,125.00
100 No.
100 No.
%
87
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-20
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Unload wooden broad gauge sleepers from wagons including 50m lead
and stacking
(British) :
LABOUR
Coolie 450.00 1.000 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 13.50
463.50 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 562.50
99.00
562.50Composite Rates Per
Labour Rates Per
Rs.
Rs. 562.50 Cost Per 100 No.: 562.50
100 No.
100 No.
%
88
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-21
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Loading metre gauge or narrow guage wooden sleepers including 50m
lead & stack inside wagons
(British) :
LABOUR
Coolie 495.00 1.100 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 14.85
509.85 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 618.75
108.90
618.75Composite Rates Per
Labour Rates Per
Rs.
Rs. 618.75 Cost Per 100 No.: 618.75
100 No.
100 No.
%
89
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-22
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Unloading metre gauge or narrow guage wooden sleepers including 50m
lead but excluding stacking
(British) :
LABOUR
Coolie 238.50 0.530 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 7.15
245.65 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 298.12
52.47
298.12Composite Rates Per
Labour Rates Per
Rs.
Rs. 298.12 Cost Per 100 No.: 298.12
100 No.
100 No.
%
90
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-23
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Loading bridge and crossing timber including 50m lead & stacking
(British) :
LABOUR
Coolie 450.00 1.000 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 13.50
463.50 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 562.50
99.00
562.50Composite Rates Per
Labour Rates Per
Rs.
Rs. 562.50 Cost Per 100 No.: 562.50
100 No.
100 No.
%
91
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-24
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 100 No.
Spec. No :
Unloading bridge and crossing timbers including 50m lead but
excluding stacking
(British) :
LABOUR
Coolie 225.00 0.500 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 6.75
231.75 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Cost Per 100 No.: 281.25
49.50
281.25Composite Rates Per
Labour Rates Per
Rs.
Rs. 281.25 Cost Per 100 No.: 281.25
100 No.
100 No.
%
92
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 02 , LOADING, UNLOADING AND STACKING
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
02-25
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit tonne
Spec. No :
Load or unload bitumen, asphalt, tar in drums, into or from
railway wagons, lead upto 50m
(British) :
LABOUR
Coolie 225.00 0.500 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 6.75
231.75 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per Tonne : Rs 281.25
49.50
281.25Composite Rates Per
Labour Rates Per
Rs.
Rs. 281.25 Per Tonne : Rs 281.25
tonne
tonne
%
93
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-01-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Earth excavation undressed upto single throw of kassi phaorah or
shovel etc : in ashes, sand, soft soil or silt clearance
(British) :
LABOUR
Coolie 1,687.50 3.750 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 50.63
1,738.13 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 74.49
371.25
2,109.38Composite Rates Per
Labour Rates Per
Rs.
Rs. 2,109.38 Per CUM : Rs 74.49
1000 Cft
1000 Cft
%
94
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-01-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Earth excavation undressed upto single throw of kassi phaorah or
shove etc : in ordinary soil,
(British) :
LABOUR
Coolie 2,025.00 4.500 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 60.75
2,085.75 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 89.39
445.50
2,531.25Composite Rates Per
Labour Rates Per
Rs.
Rs. 2,531.25 Per CUM : Rs 89.39
1000 Cft
1000 Cft
%
95
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-02
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Earth excavation in ashes, sand & soft soil or silt clearance,
undressed lead upto 25m.
(British) :
LABOUR
Coolie 2,475.00 5.500 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 74.25
2,549.25 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 109.25
544.50
3,093.75Composite Rates Per
Labour Rates Per
Rs.
Rs. 3,093.75 Per CUM : Rs 109.25
1000 Cft
1000 Cft
%
96
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-03-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Bed clearance and dressing slopes of drains including removing of
weeds and roots etc. Excavated material undressed within 25m
(British) :
LABOUR
Coolie 3,150.00 7.000 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 94.50
3,244.50 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 139.05
693.00
3,937.50Composite Rates Per
Labour Rates Per
Rs.
Rs. 3,937.50 Per CUM : Rs 139.05
1000 Cft
1000 Cft
%
97
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-03-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Bed clearance and dressing slopes of drains including removing of
weeds and roots etc. Excavated material dressed within 25m lead
(British) :
LABOUR
Coolie 3,483.00 7.740 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 104.49
3,587.49 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 153.75
766.26
4,353.75Composite Rates Per
Labour Rates Per
Rs.
Rs. 4,353.75 Per CUM : Rs 153.75
1000 Cft
1000 Cft
%
98
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-04-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Borrowpit excavation undressed lead upto 50m in Ordinary soil
(British) :
LABOUR
Coolie 3,150.00 7.000 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 94.50
3,244.50 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 139.05
693.00
3,937.50Composite Rates Per
Labour Rates Per
Rs.
Rs. 3,937.50 Per CUM : Rs 139.05
1000 Cft
1000 Cft
%
99
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-04-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Borrowpit excavation undressed lead upto 50m in Hard soil
(British) :
LABOUR
Coolie 3,870.00 8.600 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 116.10
3,986.10 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 170.83
851.40
4,837.50Composite Rates Per
Labour Rates Per
Rs.
Rs. 4,837.50 Per CUM : Rs 170.83
1000 Cft
1000 Cft
%
100
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-04-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Borrowpit excavation undressed lead upto 50m in shingle/gravel
formation
(British) :
LABOUR
Coolie 7,650.00 17.000 450.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 229.50
7,879.50 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 337.70
1,683.00
9,562.50Composite Rates Per
Labour Rates Per
Rs.
Rs. 9,562.50 Per CUM : Rs 337.70
1000 Cft
1000 Cft
%
101
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-05-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Embankment formation in ordinary soil & compaction by mechanical
means at optimum moistures content to 95% to 100% max. modified.
AASHTO dry density (borrow area)
(British) :
LABOUR
Coolie 562.50 1.250 450.00 DayDay 1
Dresser 270.00 0.500 540.00 DayDay 1
Water Sprinkler 48.60 0.090 540.00 DayDay 1
Water Carrier 50.40 0.080 630.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 27.95
959.45 11.70 %
%
EQUIPMENT
Tractor With Trolly 612.00 0.720 850.00 HourHour 1
Comp Roller 864.00 0.720 1,200.00 HourHour 1
Grader 165 HP 5,440.00 1.600 3,400.00 HourHour 1
Rammer Mech 136.00 0.320 425.00 HourHour 1
Lab Test 47.60 0.080 595.00 NoNo 1
TOTAL EQUIPMENT 7,099.60 66.30 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 347.00
1,766.84
9,825.89Composite Rates Per
Labour Rates Per
Rs.
Rs. 1,164.38 Per CUM : Rs 41.12
1000 Cft
1000 Cft
%
102
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-05-b
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Embankment formation in ordinary soil & compaction by mechanical
means at optimum moistures content to 90% max. modified AASHTO dry
density (borrow area)
(British) :
LABOUR
Coolie 562.50 1.250 450.00 DayDay 1
Dresser 270.00 0.500 540.00 DayDay 1
Water Sprinkler 43.20 0.080 540.00 DayDay 1
Water Carrier 44.10 0.070 630.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 27.59
947.39 11.71 %
%
EQUIPMENT
Tractor With Trolly 612.00 0.720 850.00 HourHour 1
Comp Roller 768.00 0.640 1,200.00 HourHour 1
Grader 165 HP 5,440.00 1.600 3,400.00 HourHour 1
Rammer Mech 136.00 0.320 425.00 HourHour 1
Lab Test 47.60 0.080 595.00 NoNo 1
TOTAL EQUIPMENT 7,003.60 66.29 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 342.35
1,743.15
9,694.14Composite Rates Per
Labour Rates Per
Rs.
Rs. 1,149.75 Per CUM : Rs 40.60
1000 Cft
1000 Cft
%
103
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-05-c
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Embankment formation in ordinary soil & compaction by mechanical
means at optimum moistures content to 85% max. modified AASHTO dry
density (borrow area)
(British) :
LABOUR
Coolie 562.50 1.250 450.00 DayDay 1
Dresser 270.00 0.500 540.00 DayDay 1
Water Sprinkler 37.80 0.070 540.00 DayDay 1
Water Carrier 37.80 0.060 630.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 27.24
935.34 11.71 %
%
EQUIPMENT
Tractor With Trolly 612.00 0.720 850.00 HourHour 1
Comp Roller 672.00 0.560 1,200.00 HourHour 1
Grader 165 HP 5,440.00 1.600 3,400.00 HourHour 1
Rammer Mech 136.00 0.320 425.00 HourHour 1
Lab Test 47.60 0.080 595.00 NoNo 1
TOTAL EQUIPMENT 6,907.60 66.29 %
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 337.69
1,719.45
9,562.40Composite Rates Per
Labour Rates Per
Rs.
Rs. 1,135.12 Per CUM : Rs 40.09
1000 Cft
1000 Cft
%
104
GOVERNMENT OF KHYBER PAKHTUNKHWA
MARKET RATE SYSTEM
CHAPTER NO. 03 , EARTHWORK (EXCAVATION AND EMBANKMENT)
As on Jan-Mar (Qtr-1) 2017
CSR CELL FINANCE DEPARTMENT
2017
03-06-a
DESCRIPTION OF ITEM :
Item Code :
Item Name :
Detail Qty Amount Rate (Rs)Unit
Unit 1000 Cft
Spec. No :
Earth fill in lawns including dressing & compaction with earth
available from cutting/excavation
(British) :
LABOUR
Coolie 675.00 1.500 450.00 DayDay 1
Bhishti 225.00 0.500 450.00 DayDay 1
Dresser 540.00 1.000 540.00 DayDay 1
Carrier 720.00 2.000 360.00 DayDay 1
TOTAL LABOUR
Sundries (Labour Only): 3 64.80
2,224.80 78.00 %
%
Cont. Profit + Over Heads (Material+Labour+Equipment) : 22
Per CUM : Rs 95.35
475.20
2,700.00Composite Rates Per