GOVERNMENT OF JHARKHAND,DRINKING WATER & SANITATION DEPARTMENT
DEPARTMENT
AT
A
GLANCE
OVERVIEW
• No of Hand Pumps – 3.79807 Lakh
• No of Rural Piped Water Supply Schemes – 348
• Ongoing Rural Piped Water Supply Schemes - 53
• No of Scheme in Quality Affected - 237
• No of Individual Household Latrine - 16.17264 Lakh
• Present coverage by Rural Piped Water Supply Schemes - 3.7%
• Present coverage by Individual House Hold toilets - 8%
OVERVIEW
• Sanitary Complex - 260
• Toilets in Anganbari - 7006
• Toilets in Schools - 38912
• RSM / PC - 750
• Number of Revenue Villages - 29826
• Number of VWSC Formed – 22453
• Number of Bank A/c Opened – 18004
Financial Year wise Opening Balance under NRDWP Central Share
Opening Balance, Allotment & Expenditure under NRDWP Central Fund Year wise (In Crore)
NRDWP (2012-13)
• Earmarked Amount – 178.00 Crore
• 1st Installment Received - 39.00 Crore
• 2nd Installment Received – 54.00 Crore
• 3rd Installment Received – 64.66 Crore
• Total- Amount Received – 157.66 Crore
• Expenditure till date - 101.00 Crore
• % Expenditure - 64%
NRDWP(Notable Achievement)
foÙkh; o"kZ
Hkkjr ljdkj }kjk izkIr izFke fd'r dh
jkf'k
Hkkjr ljdkj }kjk izkIr f}rh; fd'r dh
jkf'k
vkcaVu dh frfFk
2009-10 73.15 29.69 30-03-2010
2010-11 78.81 27.13 31-03-2011
2011-12 82.0321.37 28-02-2012
36.22 29-03-2012
2012-13 84.00 64.66 31-12-2012
uksV& foxr 3 o"kksZ esa igyh ckj 60 izfr’kr jkf’k O;; dj mi;ksfxrk izek.k&i= Hkkjr ljdkj dks Hkst nh xbZ gS ,oa
f}rh; fdLr foeqDr gks pqdh gSA
NRDWP(Notable Achievement)
NRDWP(Notable Achievement)
ftykokj is;ty ds vkWadM+s ¼2011&12½
/kuck
n
jkex
<+
cksd
kjks
xqey
k
jkW
aph
fxfjM
hg
gtkjh
ckx
[kW
awVh
xksM
~M
k
tker
kM+k
iyke
w
dksM
jek
lkgsc
xat
nso?k
j
fleMsx
k
yksg
jnxk
i0 fl
agHkw
e
ljk;d
syk
ykrs
gkj
x<+ok
ikdqM
+prj
k
iwoh
Z flag
Hkw
e
nqedk
0
5
10
15
20
25
30
2422
20
98 8 8
7 76 6 6
5 5 54 4 4 4 4
3 3 32jkT; vkSlr
% 7
2012&13 esa yh xbZ ubZ xzkeh.k tykiwfÙkZ ;kstuk
laHkkfor ftykokj iss;ty ds vkWadM+s ¼2012&14 rd½
lkgsc
xat
/kuck
n
cksd
kjks
iyke
w
jkex
<+
yksg
jnxk
iwoh
Z flag
Hkw
e
fleMsx
k
[kW
awVh
ljk;d
syk
jkW
aph
xqey
k
nqedk
tker
kM+k
gtkjh
ckx
fxfjM
hg
xksM
~M
k
ykrs
gkj
nso?k
j
i0 fl
agHkw
eprj
k
dksM
jek
x<+ok
ikdqM
+
0
5
10
15
20
25
30
35
4038
3533
31 3028
2724 24 24 23 23
21 20 2018
17 16 16 15 15 14 14 13
jkT; vkSlr % 22
Cumulative Performance (Nirmal Bharat Abhiyan)
Component Objective Performance Percentage
IHHL 37.29495 Lakh 16.17264 Lakh 43.36%
SCHOOL TOILET 42687 38912 91.16%
ANGANWADI TOILET 11471 7006 61.07%
COMMUNITY TOILET 1203 261 21.7%
World Bank aided Water Supply and Sanitation Project under NRDWP
Four States selected for World Bank Project including Jharkhand.
Allocation of Rs 950 crores spanning 6 years (2013-2014 to 2018-19).
Outline programme is under preparation.
Approximately 13.5 lakh population benefitted.
Integrated water supply and sanitation through CLTS Approach (Community led total sanitation)