Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
(Results-Framework Document)for
R F D
Department of Telecommunications
(2013-2014)
Government of India
18/04/2013 11.23 AMGenerated on
Section 1:Vision, Mission, Objectives and Functions
Results-Framework Document (RFD) for Department of Telecommunications-(2013-2014)
To provide secure, reliable, affordable and high quality coverged telecommunication services anytime, anywhere for anaccelarated inclusive socio-economic development
Mission
1. To develop a robust and secure state-of-the-art telecommunication network providing seamless coverage with
special focus on rural and remote areas for bridging the digital divide and thereby facilitate socio-economic development.
2. To create an inclusive knowledge society through proliferation of affordable and high quality broadband services
across the nation. 3. To reposition the mobile device as an instrument of socio-economic empowerment of citizens.
4. To make India a global hub for telecom equipment manufacturing and a centre for converged communication
services. 5. To promote Research and Development, Design in cutting edge ICTE technologies, products and
services for meeting the infrastructure needs of domestic and global markets with focus on security and green
technologies. 6. To promote development of new standards to meet national requirements, generation of IPRs and
participation in international standardization bodies to contribute in formation of global standards, thereby making India a
leading nation in the area of telecom standardization. 7. To attract investment, both domestic and foreign. 8. To
promote creation of jobs through all of the above
Objectives
1 Rapid Expansion of Telecom Infrastructure for Voice, data & Broadband with Special emphasis on rural areas
2 Promotion of indigenous R&D; and Manufacturing
3 Skill development in Telecom Sector
4 Adequate Telecom Network Security
5 Strengthening of PSUs/Autonomous Organisations
6 Formulation of Policy on Licensing Framework and Spectrum Management
7 Infrastructure Development and promotion of Green Telecom
8 Empowerment of consumers of Telecom Services
9 Streamlining of Spectrum Allocation
10 Implementation of IPv6
Functions
Vision
18/04/2013 11.23 AMGenerated on
Page : 2 of 43
Section 1:Vision, Mission, Objectives and Functions
Results-Framework Document (RFD) for Department of Telecommunications-(2013-2014)
Policy, Licensing and coordination matters relating to Telegraphs, Telephones, Wireless, Data , Fascimile, Telematic services and other
like forms of communications1
International cooperation in matters connected with telecommunications including matters relating to all international bodies dealing with
telecommunications such as International Telecommunication Union (ITU), its Radio Regulation Board (RRB), Radio Communication
Sector (ITU-R), Telecommunication Standardization Sector (ITU-T), Development Sector (ITU-D), International Telecommunication
Satellite Organization (INTELSAT), International Mobile Satellite Organization (INMARSAT), Asia Pacific Telecommunication (APT).
2
Promotion of standardization, research and development in telecommunications3
Promotion of private investment in telecommunications4
Financial assistance for the furtherance of research and study in telecommunications technology and for building up adequately trained
manpower for telecom program programme, including- (a) assistance to institutions, assistance to scientific institutions and to universities
for advanced scientific study and research; and (b) grant of scholarships to students in educational institutions and other forms of
financial aid to individuals including those going abroad for studies in the field of telecommunications.
5
Procurement of stores and equipment required by the Department of Telecommunications.6
Telecom Commission.7
Telecom Regulatory Authority of India.8
Telecom Disputes Settlement and Appellate Tribunal.9
Administration of laws with respect to any of the matters specified in this list, namely:- (a) The Indian Telegraph Act, 1885 (13 of 1885);
(b) The Indian Wireless Telegraphy Act, 1933 (17 of 1933); and (c) The Telecom Regulatory Authority of India Act, 1997 (24 of 1997).10
Indian Telephone Industries Limited.11
Post disinvestment matters relating to M/s Hindustan Teleprinters Limited.12
Bharat Sanchar Nigam Limited.13
Mahanagar Telephone Nigam Limited14
Videsh Sanchar Nigam Limited and Telecommunications Consultants (India) Limited.15
All matters relating to Centre for Development of Telematics (C-DOT).16
Residual work relating to the erstwhile Department of Telecom Services and Department of Telecom Operations, including matters
relating to- (a) cadre control functions of Group ‘A’ and other categories of personnel till their absorption in Bharat Sanchar Nigam
Limited; (b) administration and payment of terminal benefits.
17
Execution of works, purchase and acquisition of land debitable to the capital Budget pertaining to telecommunications.18
18/04/2013 11.23 AMGenerated on
Page : 3 of 43
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Rapid Expansion of Telecom Infrastructurefor Voice, data & Broadband with Specialemphasis on rural areas
20.00 Facilitating increase in ruralteledensity
Increased ruralteledensity
% 45 43 4244463.00[1] [1.1] [1.1.1]
Receipt of C-DOTproject report forproviding mobileconnectivity to57000 villages
Date 31/07/2013 30/09/2013 31/10/201331/08/201330/06/20131.00[1.1.2]
Obtaining Cabinetapproval forinvestment fromUSO Fund forproviding mobileconnectivity to the57000 villages
Date 14/01/2014 15/03/2014 31/03/201414/02/201413/12/20131.00[1.1.3]
Improving Broadbandconnectivity in Rural andRemote areas
Provision of WirelineBroadbandconnections ofUSOF fundedschemes
Nos 200000 150000 1250001750002250002.00[1.2] [1.2.1]
Facilitating theestablishment of NationalOptic Fibre Network(NOFN) up to VillagePanchayats
Award of work inDistricts for layingOptical Fibre Cable
Nos ofDistricts
575 525 5005506002.00[1.3] [1.3.1]
Number of Kms ofOptical Fibre Cable(OFC) laid
Kms 180000 140000 1200001600002000003.00[1.3.2]
Number of GramPanchayats covered
Nos 90000 70000 60000800001000003.00[1.3.3]
18/04/2013 11.23 AMGenerated on
Page : 4 of 43
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Improving connectivity inremote areas in North-Eastand rest of the country
Providing VPT inNorth East Region(Total Villages-2590)
% 99 97 96981001.00[1.4] [1.4.1]
Providing VPT inrest of the country(Total Villages-9401)
% 90 70 60801001.00[1.4.2]
Provision of 175 millionbroadband connections in12th Plan
Finalization of abroad framework forbroadbandconnectivity
Date 28/02/2014 20/03/2014 31/03/201410/03/201431/01/20143.00[1.5] [1.5.1]
Promotion of indigenous R&D andManufacturing
9.00 Implementation of policy forIndigenous Manufacturingof Telecom Equipment
Issue of PMAGuidelines forsecurity sensitiveTelecomEquipments
Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20132.00[2] [2.1] [2.1.1]
Creation of fund forpromoting R&D andManufacturing
Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20132.00[2.1.2]
Setting up ofTelecommunicationStandardDevelopmentOrganisation(TSDO)
Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20132.00[2.1.3]
Introduction of IndianStandard for TelecomEquipment
Approval ofStandards
No. 9 7 68102.00[2.2] [2.2.1]
Organisation of IndiaTelecom 2013
On time completion Date -- -- -- --31/12/20130.50[2.3] [2.3.1]
Independent impactassesment
Date 14/02/2014 20/03/2014 31/03/201410/03/201414/01/20140.50[2.3.2]
18/04/2013 11.23 AMGenerated on
Page : 5 of 43
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Skill development in Telecom Sector 3.00 Formation of advisoryGroups on CapacityBuilding & 'Content, Quality& Examination Framework'
On time set up Date 30/09/2013 30/11/2013 31/12/201331/10/201330/06/20131.00[3] [3.1] [3.1.1]
Commissioning of Skill gapStudy for the TelecomSector
On timeCommissioning ofStudy
Date 31/12/2013 28/02/2014 31/03/201431/01/201430/09/20131.00[3.2] [3.2.1]
Finalisation of technical set-up required for telecomdomain KnowledgeRepository
On time finalisationof proposal
Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20131.00[3.3] [3.3.1]
Adequate Telecom Network Security 7.00 Issue comprehensiveNetwork Security Policy
On time issue Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20132.00[4] [4.1] [4.1.1]
Subscriber verification Number ofsubscribers verifiedon PIA basis
% 0.095 0.075 0.0600.0850.11.00[4.2] [4.2.1]
Electromagnetic radiationverification
Verification of BTSswith respect toprescribed radiationnorms
Nos 28500 22500 2100025500300002.00[4.3] [4.3.1]
Amendment of Rules 419Aand 419B in the IndianTelegraph Rules for lawfulinterception and collecting,storing and analyzingmessage relatedinfromation
Publication of theIndian Telegraph(Amendment ) Rulesin the Gazette ofIndia
Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20131.00[4.4] [4.4.1]
Introduction of Rules 528-538 in the Indian TelegraphRules for mandatoryTesting of Telecomequipment for
Publication of theIndian Telegraph(Amendment ) Rulesin the Gazette ofIndia
Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20131.00[4.5] [4.5.1]
18/04/2013 11.23 AMGenerated on
Page : 6 of 43
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
use in Indian TelecomNetwork by Licensee
Strengthening of PSUs/AutonomousOrganisations
8.00 Extension of ReservationQuota for ITI Limited
Submission toCCEA
Date 31/12/2013 28/02/2014 31/03/201431/01/201430/09/20132.00[5] [5.1] [5.1.1]
Revival Plan for ITI Limited Submission toCabinet
Date 31/12/2013 28/02/2014 31/03/201431/01/201430/09/20132.00[5.2] [5.2.1]
Financial assistance toBSNL & MTNL for excessSpectrum in 2G
Proposal to Cabinet Date 30/06/2013 31/08/2013 30/09/201331/07/201331/05/20132.00[5.3] [5.3.1]
Consent to BSNL & MTNLfor surrender of BWAspectrum and refundthereof
Submission ofproposal to Cabinet
Date 31/12/2013 28/02/2014 31/03/201431/01/201430/11/20131.00[5.4] [5.4.1]
Creation of commonpension fund in the form oftrust for all catagories ofabsorbed employees inMTNL
Approval byGovernment
Date 31/07/2013 30/09/2013 31/10/201331/08/201330/06/20131.00[5.5] [5.5.1]
Formulation of Policy on LicensingFramework and Spectrum Management
12.00 Formulation and approvalof Policy on Spectrumassignment and pricing
On time approval Date 30/09/2013 28/02/2014 31/03/201431/12/201330/06/20135.00[6] [6.1] [6.1.1]
Finalisation and approval of2nd phase of UnifiedLicensing Regime
On time reference toTRAI
Date 31/05/2013 15/07/2013 31/07/201330/06/201330/04/20131.50[6.2] [6.2.1]
issue of guidelinesfor the regime
Date 31/01/2014 15/03/2014 31/03/201428/02/201415/01/20141.50[6.2.2]
Finalisation and approval ofM&A Guidelines in respectof Telecom Licences
On time approval Date 31/07/2013 31/08/2013 15/09/201315/08/201330/06/20132.00[6.3] [6.3.1]
18/04/2013 11.23 AMGenerated on
Page : 7 of 43
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Finalisation of Guidelinesfor Spectrum Sharing
on time approval Date 31/07/2013 31/08/2013 15/09/201315/08/201330/06/20132.00[6.4] [6.4.1]
Infrastructure Development and promotion ofGreen Telecom
4.00 Creation of TelecomFinance Corporation
Submission to anddecision on proposalby TelecomCommission.Preparation andsubmission ofCabinet Note
Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20132.00[7] [7.1] [7.1.1]
Formulation of sectorspecific schemes andtargets for promotion ofgreen technologies inconsultation with Ministry ofNew and RenewableEnergy (MNRE) and otherstakeholders
Submission to anddecision on proposalby TelecomCommission
Date 15/01/2014 28/02/2014 31/03/201431/01/201431/12/20132.00[7.2] [7.2.1]
Empowerment of consumers of TelecomServices
6.00 To make mandatoryprovisions for web baseddisclosure of wirelesscoverage by TelecomService Providers
On time notification Date 31/01/2014 28/02/2014 31/03/201415/02/201431/12/20131.00[8] [8.1] [8.1.1]
Introduction of Inter-circleMobile Number Portability
On time notification Date 15/02/2014 15/03/2014 31/03/201428/02/201431/01/20143.00[8.2] [8.2.1]
Amendment of TRAI Act Circulation of DraftCabinet Note forInter MinisterialConsultation
Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20132.00[8.3] [8.3.1]
Streamlining of Spectrum Allocation 11.00 Notification of DefenceBand
On time notification Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20132.00[9] [9.1] [9.1.1]
18/04/2013 11.23 AMGenerated on
Page : 8 of 43
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Conducting Auction ofSpectrum after receipt ofGovernment approval
Issue of Auctionguidelines based onGovernementapproval
Date 02/05/2013 16/05/2013 23/05/201309/05/201325/04/20131.00[9.2] [9.2.1]
Finalisation andissue of NoticeInviting Application(NIA).
Date 27/05/2013 10/06/2013 17/06/201303/06/201320/05/20131.00[9.2.2]
start of Auction Date 15/07/2013 29/07/2013 05/08/201322/07/201308/07/20131.00[9.2.3]
Receipt of UpfrontPayments
Date 08/08/2013 22/08/2013 29/08/201315/08/201301/08/20131.00[9.2.4]
Review Standing AdvisoryCommittee on FrequencyAllocation (SACFA)clearance process
Completion ofreview
Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20131.00[9.3] [9.3.1]
Prepare Roadmap foravailablity of additonalSpectrum
Preparation ofRoadmap
Date 31/01/2014 15/03/2014 31/03/201428/02/201431/12/20133.00[9.4] [9.4.1]
Identification of frequencybands for delicensing
On time approval Date 30/09/2013 28/02/2014 31/03/201431/12/201330/06/20131.00[9.5] [9.5.1]
Implementation of IPv6 5.00 IPv6 workshops for thebenefit of stakeholders
Successful conductof 20 workshops
Date 28/02/2014 25/03/2014 31/03/201410/03/201431/01/20141.00[10] [10.1] [10.1.1]
Compendium on IPv6basedsolutions/architecture/casestudies for different industryverticals
Approval ofCompendium &publication
Date 10/03/2014 25/03/2014 31/03/201420/03/201428/02/20141.00[10.2] [10.2.1]
Centre of Innovation forIPv6
Approval of Centreof
Date 10/03/2014 25/03/2014 31/03/201420/03/201428/02/20141.00[10.3] [10.3.1]
18/04/2013 11.23 AMGenerated on
Page : 9 of 43
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Efficient Functioning of the RFD System 3.00 Timely submission of Draft RFD2014-15 for Approval
On-time submission Date 06/03/2014 08/03/2014 11/03/201407/03/201405/03/20142.0*
Timely submission of Results for2012-13
On-time submission Date 02/05/2013 06/05/2013 07/05/201303/05/201301/05/20131.0
Improving InternalEfficiency/Responsiveness/Transparency/Service delivery ofMinistry/Department
6.00 Independent Audit ofimplementation ofCitizens’/Clients’ Charter (CCC)
% of implementation % 95 85 80901002.0*
Independent Audit ofimplementation of PublicGrievance Redressal System
% of implementation % 95 85 90901002.0
Update departmental strategy toalign with 12th Plan priorities
Timely updation of thestrategy
Date 17/09/2013 01/10/2013 08/10/201324/09/201310/09/20132.0
Administrative Reforms 6.00 Implement mitigating strategiesfor reducing potential risk ofcorruption
% of implementation % 95 85 80901001.0*
Implement ISO 9001 as per theapproved action plan
% of implementation % 95 85 80901002.0
* Mandatory Objective(s)
Innovation
Certified course on IPv6 forall stakeholders in PPPmode
Empanelment oftrainingOrganisations toprovide IPv6Certified training
Date 28/02/2014 25/03/2014 31/03/201420/03/201431/01/20141.00[10.4] [10.4.1]
Cloud Policy for TelecomSector
Submission of theproposal to theTelecomCommission
Date 10/03/2014 25/03/2014 31/03/201420/03/201428/02/20141.00[10.5] [10.5.1]
18/04/2013 11.23 AMGenerated on
Page : 10 of 43
Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Objective Weight Action Unit
Target / Criteria Value
Weight
80%100% 70% 60%90%
Very Good Fair PoorExcellent GoodSuccessIndicator
Implement Innovation ActionPlan (IAP)
% of milestones achieved % 95 85 80901002.0
Identification of core and non-core activities of theMinistry/Department as per 2ndARC recommendations
Timely submission Date 15/10/2013 10/11/2013 20/11/201330/10/201301/10/20131.0
* Mandatory Objective(s)
18/04/2013 11.23 AMGenerated on
Page : 11 of 43
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 11/12
Unit
FY 13/14FY 12/13 FY 14/15
Actual Valuefor
Actual Valuefor
FY 15/16
38 45%Increased ruralteledensity
Rapid Expansion of TelecomInfrastructure for Voice, data &Broadband with Special emphasis onrural areas
Facilitating increase inrural teledensity
50 5541[1] [1.1] [1.1.1]
-- 31/07/2013DateReceipt of C-DOTproject report forproviding mobileconnectivity to 57000villages
-- -- --[1.1.2]
-- 14/01/2014DateObtaining Cabinetapproval forinvestment from USOFund for providingmobile connectivity tothe 57000 villages
-- -- --[1.1.3]
93037 200000NosProvision of WirelineBroadbandconnections of USOFfunded schemes
Improving Broadbandconnectivity in Rural andRemote areas
220000 --110000[1.2] [1.2.1]
-- 575Nos ofDistricts
Award of work inDistricts for layingOptical Fibre Cable
Facilitating theestablishment of NationalOptic Fibre Network(NOFN) up to VillagePanchayats
-- -- --[1.3] [1.3.1]
-- 180000KmsNumber of Kms ofOptical Fibre Cable(OFC) laid
320000 --166[1.3.2]
-- 90000NosNumber of GramPanchayats covered
160000 --58[1.3.3]
93.08 99%Providing VPT inNorth East Region(Total Villages-
Improving connectivity inremote areas in
-- --95[1.4] [1.4.1]
18/04/2013 11.23 AMGenerated on
Page : 12 of 43
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 11/12
Unit
FY 13/14FY 12/13 FY 14/15
Actual Valuefor
Actual Valuefor
FY 15/16
2590)North-East and rest ofthe country
-- 90%Providing VPT in restof the country (TotalVillages-9401)
-- -- --[1.4.2]
-- 28/02/2014DateFinalization of a broadframework forbroadband connectivity
Provision of 175 millionbroadband connectionsin 12th Plan
-- -- --[1.5] [1.5.1]
-- 31/01/2014DateIssue of PMAGuidelines for securitysensitive TelecomEquipments
Promotion of indigenous R&D andManufacturing
Implementation of policyfor IndigenousManufacturing ofTelecom Equipment
-- -- --[2] [2.1] [2.1.1]
-- 31/01/2014DateCreation of fund forpromoting R&D andManufacturing
-- -- --[2.1.2]
-- 31/01/2014DateSetting up ofTelecommunicationStandard DevelopmentOrganisation (TSDO)
-- -- --[2.1.3]
-- 9No.Approval of StandardsIntroduction of IndianStandard for TelecomEquipment
10 108[2.2] [2.2.1]
-- --DateOn time completionOrganisation of IndiaTelecom 2013
-- -- --[2.3] [2.3.1]
-- 14/02/2014DateIndependent impactassesment
-- -- --[2.3.2]
-- 30/09/2013DateOn time set upSkill development in Telecom Sector Formation of advisoryGroups on Capacity
-- -- --[3] [3.1] [3.1.1]
18/04/2013 11.23 AMGenerated on
Page : 13 of 43
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 11/12
Unit
FY 13/14FY 12/13 FY 14/15
Actual Valuefor
Actual Valuefor
FY 15/16
Building & 'Content,Quality & ExaminationFramework'
-- 31/12/2013DateOn timeCommissioning ofStudy
Commissioning of Skillgap Study for theTelecom Sector
-- -- --[3.2] [3.2.1]
-- 31/01/2014DateOn time finalisation ofproposal
Finalisation of technicalset-up required fortelecom domainKnowledge Repository
-- -- --[3.3] [3.3.1]
-- 31/01/2014DateOn time issueAdequate Telecom Network Security Issue comprehensiveNetwork Security Policy
-- -- --[4] [4.1] [4.1.1]
-- 0.095%Number of subscribersverified on PIA basis
Subscriber verification -- -- --[4.2] [4.2.1]
-- 28500NosVerification of BTSswith respect toprescribed radiationnorms
Electromagnetic radiationverification
-- -- --[4.3] [4.3.1]
-- 31/01/2014DatePublication of theIndian Telegraph(Amendment ) Rules inthe Gazette of India
Amendment of Rules419A and 419B in theIndian Telegraph Rulesfor lawful interceptionand collecting, storingand analyzing messagerelated infromation
-- -- --[4.4] [4.4.1]
-- 31/01/2014DatePublication of theIndian Telegraph
Introduction of Rules528-538 in the
-- -- --[4.5] [4.5.1]
18/04/2013 11.23 AMGenerated on
Page : 14 of 43
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 11/12
Unit
FY 13/14FY 12/13 FY 14/15
Actual Valuefor
Actual Valuefor
FY 15/16
(Amendment ) Rules inthe Gazette of India
Indian Telegraph Rulesfor mandatory Testing ofTelecom equipment foruse in Indian TelecomNetwork by Licensee
-- 31/12/2013DateSubmission to CCEAStrengthening of PSUs/AutonomousOrganisations
Extension of ReservationQuota for ITI Limited
-- -- --[5] [5.1] [5.1.1]
-- 31/12/2013DateSubmission to CabinetRevival Plan for ITILimited
-- -- --[5.2] [5.2.1]
-- 30/06/2013DateProposal to CabinetFinancial assistance toBSNL & MTNL forexcess Spectrum in 2G
-- -- --[5.3] [5.3.1]
-- 31/12/2013DateSubmission ofproposal to Cabinet
Consent to BSNL &MTNL for surrender ofBWA spectrum andrefund thereof
-- -- --[5.4] [5.4.1]
-- 31/01/2014DateApproval byGovernment
Creation of commonpension fund in the formof trust for all catagoriesof absorbed employeesin MTNL
-- -- --[5.5] [5.5.1]
-- 30/09/2013DateOn time approvalFormulation of Policy on LicensingFramework and SpectrumManagement
Formulation and approvalof Policy on Spectrumassignment and pricing
-- -- --[6] [6.1] [6.1.1]
-- 31/05/2013DateOn time reference toTRAI
Finalisation and approvalof 2nd phase of UnifiedLicensing Regime
-- -- --[6.2] [6.2.1]
18/04/2013 11.23 AMGenerated on
Page : 15 of 43
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 11/12
Unit
FY 13/14FY 12/13 FY 14/15
Actual Valuefor
Actual Valuefor
FY 15/16
-- 31/01/2014Dateissue of guidelines forthe regime
-- -- --[6.2.2]
-- 31/07/2013DateOn time approvalFinalisation and approvalof M&A Guidelines inrespect of TelecomLicences
-- -- --[6.3] [6.3.1]
-- 31/07/2013Dateon time approvalFinalisation of Guidelinesfor Spectrum Sharing
-- -- --[6.4] [6.4.1]
-- 31/01/2014DateSubmission to anddecision on proposalby TelecomCommission.Preparation andsubmission of CabinetNote
Infrastructure Development andpromotion of Green Telecom
Creation of TelecomFinance Corporation
-- -- --[7] [7.1] [7.1.1]
-- 15/01/2014DateSubmission to anddecision on proposalby TelecomCommission
Formulation of sectorspecific schemes andtargets for promotion ofgreen technologies inconsultation with Ministryof New and RenewableEnergy (MNRE) andother stakeholders
-- -- --[7.2] [7.2.1]
-- 31/01/2014DateOn time notificationEmpowerment of consumers ofTelecom Services
To make mandatoryprovisions for web baseddisclosure of wirelesscoverage by TelecomService Providers
-- -- --[8] [8.1] [8.1.1]
-- 15/02/2014DateOn time notificationIntroduction of Inter-circleMobile NumberPortability
-- -- --[8.2] [8.2.1]
18/04/2013 11.23 AMGenerated on
Page : 16 of 43
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 11/12
Unit
FY 13/14FY 12/13 FY 14/15
Actual Valuefor
Actual Valuefor
FY 15/16
-- 31/01/2014DateCirculation of DraftCabinet Note for InterMinisterial Consultation
Amendment of TRAI Act -- -- --[8.3] [8.3.1]
-- 31/01/2014DateOn time notificationStreamlining of Spectrum Allocation Notification of DefenceBand
-- -- --[9] [9.1] [9.1.1]
-- 22/04/2013DateIssue of Auctionguidelines based onGovernement approval
Conducting Auction ofSpectrum after receipt ofGovernment approval
-- --03/07/2012[9.2] [9.2.1]
-- 07/05/2013DateFinalisation and issueof Notice InvitingApplication (NIA).
-- --28/09/2012[9.2.2]
-- 22/06/2013Datestart of Auction -- --11/03/2013[9.2.3]
-- 08/07/2013DateReceipt of UpfrontPayments
-- -- --[9.2.4]
-- 31/01/2014DateCompletion of reviewReview StandingAdvisory Committee onFrequency Allocation(SACFA) clearanceprocess
-- -- --[9.3] [9.3.1]
-- 31/01/2014DatePreparation ofRoadmap
Prepare Roadmap foravailablity of additonalSpectrum
-- -- --[9.4] [9.4.1]
-- 30/09/2013DateOn time approvalIdentification offrequency bands fordelicensing
-- -- --[9.5] [9.5.1]
-- 28/02/2014DateSuccessful conduct of20 workshops
Implementation of IPv6 IPv6 workshops for thebenefit of stakeholders
-- -- --[10] [10.1] [10.1.1]
18/04/2013 11.23 AMGenerated on
Page : 17 of 43
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 11/12
Unit
FY 13/14FY 12/13 FY 14/15
Actual Valuefor
Actual Valuefor
FY 15/16
-- 06/03/2014DateOn-time submissionEfficient Functioning of the RFDSystem
Timely submission of DraftRFD 2014-15 for Approval
-- -- --*
-- 02/05/2014DateOn-time submissionTimely submission of Resultsfor 2012-13
-- -- --
-- 95%% of implementationImproving InternalEfficiency/Responsiveness/Transparency/Service delivery ofMinistry/Department
Independent Audit ofimplementation ofCitizens’/Clients’ Charter(CCC)
-- -- --*
-- 95%% of implementationIndependent Audit ofimplementation of PublicGrievance Redressal System
-- -- --
* Mandatory Objective(s)
-- 10/03/2014DateApproval ofCompendium &publication
Compendium on IPv6basedsolutions/architecture/case studies for differentindustry verticals
-- -- --[10.2] [10.2.1]
-- 10/03/2014DateApproval of Centre ofInnovation
Centre of Innovation forIPv6
-- -- --[10.3] [10.3.1]
-- 28/02/2014DateEmpanelment oftraining Organisationsto provide IPv6Certified training
Certified course on IPv6for all stakeholders inPPP mode
-- -- --[10.4] [10.4.1]
-- 10/03/2014DateSubmission of theproposal to theTelecom Commission
Cloud Policy for TelecomSector
-- -- --[10.5] [10.5.1]
18/04/2013 11.23 AMGenerated on
Page : 18 of 43
Section 3:Trend Values of the Success Indicators
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Target Valuefor
ProjectedValue for
Objective ProjectedValue for
Action Success Indicator
FY 11/12
Unit
FY 13/14FY 12/13 FY 14/15
Actual Valuefor
Actual Valuefor
FY 15/16
-- 17/09/2013DateTimely updation of thestrategy
Update departmental strategyto align with 12th Plan priorities
-- -- --
-- 95%% of implementationAdministrative Reforms Implement mitigating strategiesfor reducing potential risk ofcorruption
-- -- --*
-- 95%% of implementationImplement ISO 9001 as perthe approved action plan
-- -- --
-- 95%% of milestones achievedImplement Innovation ActionPlan (IAP)
-- -- --
-- 15/10/2013DateTimely submissionIdentification of core and non-core activities of theMinistry/Department as per2nd ARC recommendations
-- -- --
* Mandatory Objective(s)
18/04/2013 11.23 AMGenerated on
Page : 19 of 43
Section 4:Acronym
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
AcronymSI.No Description
Bharat Sanchar Nigam Limited1 BSNL
Base Transceiver Station2 BTS
Broadband Wireless Access3 BWA
Cabinet Committee on Economic Affairs4 CCEA
Department of Electronics and Information Technology5 DeitY
Expression of Interest6 EoI
Page : 20 of 43
Section 4:Acronym
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
AcronymSI.No Description
Intellectual Property Rights7 IPR
Internet Protocol version 68 IPv6
Indian Telephone Industries Limited9 ITI Ltd
Merger and Acquisition10 M&A
Ministry of New and Renewable Energy11 MNRE
Mahanagar Telephone Nigam Limited12 MTNL
Page : 21 of 43
Section 4:Acronym
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
AcronymSI.No Description
North Eastern Region13 NER
Notice Inviting Applications14 NIA
National Optical Fibre Network15 NOFN
Optical Fibre Cable16 OFC
Photo Identity Address17 PIA
Preferential Market Access18 PMA
Page : 22 of 43
Section 4:Acronym
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
AcronymSI.No Description
Public Private Partnership19 PPP
Research and Development20 R&D
Standing Advisory Committee on Frequency Allocation21 SACFA
Telecom Regulatory Authority of India22 TRAI
Telecom Standard Development Organisation23 TSDO
Page : 23 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
Financial support has beenextended by USOF for
provisioning of various telecomservices (DELs, VPTs, mobileservices, broadband services,
OFC network etc) and many suchschemes to be carried out bylicensed/registered ServiceProviders through financial
support from USO Fund are eitherunder the implementation stage or
under the planning stage &expected to be launched soon.
Facilitating provisioning oftelecom services in rural &remote areas and therebyfacilitating increase in rural
tele-density.
This success indicator is meant tomonitor the penetration of various
telecom services by ServiceProviders in rural & remote areas of
the country and facilitating increase inrural tele-density.
1 It is measured as number ofTelephones per hundred
inhabitants.
[1.1.1] Increased rural teledensity
A scheme is being envisaged toextend financial support for
provisioning of mobilecommunication services in about
57,000 uncovered villages incountry. USOF has signed an
MOU with C-DOT on 1stNovember, 2012 for preparationof mobile network to be used forbenchmarking of USOF subsidy.
USOF will undertake furtheractivities after submission of
report by C-DOT. Benchamarking,financial approvals, tendering and
award of work
a Scheme is being envisagedwith financial support fromUSOF for provisioning of
mobile services in 57, 000uncovered villages of
country. It is targeted thatreport for the scheme will be
received from C-DOT(thetechnical consultant for the
scheme) by July, 2013.
This success indicator is meant tomonitor that the works for providing
mobile services in 57,000 uncoveredvillages of country with financial
support from USOF is completed intimely manner.
2 [1.1.2] Receipt of C-DOT project report forproviding mobile connectivity to 57000 villages
18/04/2013 11.23 AMGenerated on
Page : 24 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
is expected to be completed by28th Feb. 2014.
a Scheme is being envisagedwith financial support fromUSOF for provisioning of
mobile services in 57, 000uncovered villages of
country. It is targeted thatreport for the scheme will be
received from C-DOT(thetechnical consultant for the
scheme) by July, 2013.
This success indicator is meant tomonitor that the works for providing
mobile services in 57,000 uncoveredvillages of country with financial
support from USOF is completed intimely manner.
2 [1.1.2] Receipt of C-DOT project report forproviding mobile connectivity to 57000 villages
A scheme is being envisaged toextend financial support for
provisioning of mobilecommunication services in about
57,000 uncovered villages incountry. USOF has signed an
MOU with C-DOT on 1stNovember, 2012 for preparationof mobile network to be used forbenchmarking of USOF subsidy.
USOF will undertake furtheractivities after submission of
report by C-DOTon 1stNovember, 2012 for preparationof mobile network to be used for
Benchmarking, of USOF subsidy.USOF will
A Scheme is beingenvisaged with financialsupport from USOF forprovisioning of mobile
services in 57, 000uncovered villages of
country. It is targeted thatapproval of the Cabinet for
investment from USOF Fundfor providing mobileconnectivity in these
uncovered will be obtainedby January, 2014.
This success indicator is meant tomonitor that the works for providing
mobile services in 57,000 uncoveredvillages of country with financial
support from USOF is completed intimely manner.
3 [1.1.3] Obtaining Cabinet approval for investmentfrom USO Fund for providing mobile connectivity tothe 57000 villages
18/04/2013 11.23 AMGenerated on
Page : 25 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
undertake further activities aftersubmission of by C-DOT.
Benchmarking, financial approval,tendering and award of work isexpected to be completed by
28th Feb. 2014.
A Scheme is beingenvisaged with financialsupport from USOF forprovisioning of mobile
services in 57, 000uncovered villages of
country. It is targeted thatapproval of the Cabinet for
investment from USOF Fundfor providing mobileconnectivity in these
uncovered will be obtainedby January, 2014.
This success indicator is meant tomonitor that the works for providing
mobile services in 57,000 uncoveredvillages of country with financial
support from USOF is completed intimely manner.
3 [1.1.3] Obtaining Cabinet approval for investmentfrom USO Fund for providing mobile connectivity tothe 57000 villages
For providing broadbandconnectivity to rural & remoteareas, USOF has signed an
Agreement with BSNL on January20, 2009 under the Rural Wireline
Broadband Scheme to providewire-line broadband connectivity
to rural & remote areas byleveraging the existing rural
exchanges infrastructure andcopper wirelines.
Facilitate provisioning ofwireline broadband
connections in rural andremote areas.
This success indicator is meant tomonitor that about 2,00,000 WirelineBroadband connections are providedin rural & remote areas of the countryduring the year under USOF funded
scheme.
4 It is the numbers of WirelineBroadband connections
provided under the USOFfunded schemes.
[1.2.1] Provision of Wireline Broadbandconnections of USOF funded schemes
18/04/2013 11.23 AMGenerated on
Page : 26 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
The project is being executed by aSpecial Purpose Vehicle (SPV)
namely Bharat BroadbandNetwork Limited (BBNL), which
has been incorporated on25.02.2012 under Indian
Companies Act, 1956
Facilitating the establishmentof National Optical Fibre
Network (NOFN) up to GramPanchayats.
This success indicator is meant tomonitor the award of work for
establishing National Optical FibreNetwork (NOFN) in timely manner. It
is targeted to award the work forlaying the OFC under the project in
575 districts of the country during thefinancial year 2013-14.
5 The measurement is thenumber of districts awarded
work for laying of Optical FibreCable during the year.
[1.3.1] Award of work in Districts for laying OpticalFibre Cable
National Optical Fibre Network(NOFN) project is planned to
connect all the 2,50,000 GramPanahcyats in the country throughoptical fibre utilizing existing fibersof PSUs viz. BSNL, Rail Tel and
Power Grid and layingincrementatl fiber wherenecessary to bridge the
connectivity gap between GramPanchayats and blocks, for
providing broandbandconnectivity. The project will be
funded by USOF and initialestimated cost of project is Rs.20,000 Crore in 2 years. Length of
the incremental network is approx.5 lakh Km. Dark Fiber network
thus created.
Facilitating the establishmentof National Optical Fibre
Network (NOFN) to GramPanchayats.
This success indicator is meant tomonitor the award of work for
establishing National Optical FibreNetwork (NOFN) in timely manner. Itis targeted that about 1.8 Lakh Kms.
of OFC would be laid under theproject during the financial year 2013-
14.
6 It is to be measured in numberof Kms of Optical Fibre Cable
laid.
[1.3.2] Number of Kms of Optical Fibre Cable(OFC) laid
18/04/2013 11.23 AMGenerated on
Page : 27 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
National Optical Fibre Network(NOFN) project is palnned to
connect all the 2,50,000 GramPanchyayats in the countrythrough optical fibre utilizing
existing fibers of PSUs viz. BSNL,RailTel and Power Grid and laying
incremental fiber wherevernecessary to bridge the
connectivity gap between GramPanchayats and Blocks, for
providing broadband connectivity.The project will be funded by
USOF and initial estimated cost ofproject is Rs.20,000 Corore in 2years. Lenght of the incremental
network is approx.5 lakh Km. Darkfiber netwrk thus created will be lit
by appropriate technology toensure a bandwidth of at least
100 Mbps at each GramPanchayat. Non-discriminatory
access to the network will beprovided to all categories of
service providers. These accessproviders/service providers like
mobile operators,
Facilitating the establishmentof National Optical Fibre
Network (NOFN) up to GramPanchayats.
This success indicator is meant tomonitor the award of work for
establishing National Optical FibreNetwork (NOFN) in timely manner. Itis targeted that about 90,000 Gram
Panchayats.
7 It is would be measured in thenumber of Gram Panchayats
covered
[1.3.3] Number of Gram Panchayats covered
18/04/2013 11.23 AMGenerated on
Page : 28 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
Internet Service Providers(ISPs)cable TV operators, contentproviders can lauch various
services in rural areas. Variousapplications for e-health,
education, e-governance etc. willbe provided. The project is beingexecuted by a Special PurposeVehicle (SPV) namely BharatBroadband Network Limited
(BBNL), which has beenincorporated on 25.02.2012 under
Indian Companies Act, 1956.
Facilitating the establishmentof National Optical Fibre
Network (NOFN) up to GramPanchayats.
This success indicator is meant tomonitor the award of work for
establishing National Optical FibreNetwork (NOFN) in timely manner. Itis targeted that about 90,000 Gram
Panchayats.
7 It is would be measured in thenumber of Gram Panchayats
covered
[1.3.3] Number of Gram Panchayats covered
Village Public Telephone isthe first Public Telephone ina village where there is no
such facility or PCOs existedbefore.
Access of telecom services in theremote areas of the country,
especially in NER
8 Numbers of VPTs[1.4.1] Providing VPT in North East Region (TotalVillages-2590)
Reconciliation of VPTs working inthe inhabited villages as perCensus 2001 was carried out
taking into account the existingVPT and those provided under
Bharat Nirman. All the remaininginhabited villages as on 1.10.2007as per Census 2001 irrespective
of criteria of
Facilitate provisioning ofVillage Public Telephone(VPT) facility in inhabited
villages in NER and rest ofthe country which do not
have any telecomconnectivity.
This success indicator is meant tomonitor that Village Public Telephone
facility is provided in all inhabitedvillages in the NER and rest of the
country which do not have anytelecommunication connectivity at
present.
9 Monthly MIS statements arebeing received from BSNL,who is executing the USOFfunded VPT scheme. Theconcerned Controller of
Communications Accounts(CCAs) check the claims
thoroughly as per the termsand conditions of
[1.4.2] Providing VPT in rest of the country (TotalVillages-9401)
18/04/2013 11.23 AMGenerated on
Page : 29 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
populatin, remoteness,accessibility and law & order
situations have been inducded forprovision of VPTs with subsidysupoort from USOF Fund underthis schme. Agreements in this
regard were signed with BSNL on27.02.2009. 5,81,610 villagesout of the 5,93,501 (i.e. 97.97%)inhabited revenue villages as perCensus 2001 have been coveredwith VPTs. It has been targeted
that VPT facility will be provided inthe balance inhabited villages in
NER and rest of the countryduring financial year 2013-14.
Facilitate provisioning ofVillage Public Telephone(VPT) facility in inhabited
villages in NER and rest ofthe country which do not
have any telecomconnectivity.
This success indicator is meant tomonitor that Village Public Telephone
facility is provided in all inhabitedvillages in the NER and rest of the
country which do not have anytelecommunication connectivity at
present.
9 the Agreement andsubsequent clarifications
issued by USOF HQ from time-to-time. The subsidy isdisbursed after making
specified checks and makingdeductions from subsidy
thereof.
[1.4.2] Providing VPT in rest of the country (TotalVillages-9401)
It is a requirement forprovision of 175 million
broadband connection in12th Plan.
To incorporate enabling provisions inthe current regulatory framework for
extending high quality broadbandservices in rural areas also.
10 [1.5.1] Finalization of a broad framework forbroadband connectivity
It is requirement for Implementation ofPolicy for indigenous Manufacturing
of Telecom Equipment.
11 date[2.1.1] Issue of PMA Guidelines for securitysensitive Telecom Equipments
18/04/2013 11.23 AMGenerated on
Page : 30 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
It is a requirement forimplementation of policy forindigenous Manufacturing of
Telecom Equipment.
National Telecom Policy 2012envisages to create a corpus topromote indigenous R&D, IPR
creation, entrepreneurship,manufacturing, commercialisation and
deployment of state-of-the-arttelecom products and services during
the 12th five year plan period.
12 Date[2.1.2] Creation of fund for promoting R&D andManufacturing
It is a requirement forimplementation of policy forindigenous Manufacturing ofTelecom Equipment.It is a
requirement forimplementation of policy forindigenous Manufacturing of
Telecom Equipment.
To promote setting up ofTelecommunications Standard
Development Organisation (TSDO)as an autonomous body with effective
participation of the government,industry, R&D centres, service
providers, and academia to driveconsensus regarding standards to
meet national requirements includingsecurity needs. It will facilitate access
for all the stakeholders in theInternational Standards DevelopmentOrganisations and act as an advisory
body for preparation of nationalcontributions for incorporation of
Indian requirement/IPRs/standards inthe international standards.
13 date[2.1.3] Setting up of Telecommunication StandardDevelopment Organisation (TSDO)
18/04/2013 11.23 AMGenerated on
Page : 31 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
Promoting Indian standarddevelopment and IPR creations
14 Numbers[2.2.1] Approval of Standards
The event also laysemphasis on promotion of
indigenous manufacturing inthe Telecom Sector.
India Telecom is held annually withan objective sow case the Indian
Telecom industry and also provide abusiness platform to the participating
companies both via deliberationsduring the Conference and product
showcase during the exhibition.
15 date[2.3.1] On time completion
It is requirement to assess the impactorganisation of India Telecom has onthe promotion of indigenous R&D and
Manufacturing.
16 Date.[2.3.2] Independent impact assesment
To set up advisor Groups onCapacity Building & Content,
Quality & ExaminationFramework.
A requirement for empowerment ofTelecom Sector in India through Skill
Development
17 By due Date[3.1.1] On time set up
A requirement forempowerment of Telecom
Sector in India through SkillDevelopment
Commissioning of skill gap study fortelecom sector
18 Date[3.2.1] On time Commissioning of Study
18/04/2013 11.23 AMGenerated on
Page : 32 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
To finalize technical set-uprequired for telecom domain
Knowledge.
Telecom domain KnwledgeRepository is a requirement for
empowerment of Telecom Sector inIndia through Skill Development
19 Date[3.3.1] On time finalisation of proposal
It helps to providecommunication assistance toLaw Enforcement Agencies
through regulatory measuresin tune with the extant licenseguidelines and in conformity
with Indian Telegraph Actkeeping in view individual
privacy and followinginternational practices.
Issue of comprehensive NetworkSecurity Policy is a requirement for
stakeholders planning
20 by due Date[4.1.1] On time issue
Verification of subscribers onthe basis of Photo, identity
and address.
Ensuring telecom network security21 On the basis of the percent ofthe total subscribers.
[4.2.1] Number of subscribers verified on PIA basis
To implement adoptedInternational Commission on
Non-lionizing RadiationProtection (ICNIRP)
guidelines forElectromagnetic radiation
from mobile
To address environmental and healthrelated concerns.
22 Numbers[4.3.1] Verification of BTSs with respect toprescribed radiation norms
18/04/2013 11.23 AMGenerated on
Page : 33 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
towers,To address environmental and healthrelated concerns.
22 Numbers[4.3.1] Verification of BTSs with respect toprescribed radiation norms
Ensuring telecom networksecurity by lawful interception
and collecting, storing andanalyzing message relatedinformation by amendingRules 419A and 419B ofIndian Telegraph Rules.
Ensuring telecom network security bylawful interception and collecting,storing and analyzing message
related information.
23 Date[4.4.1] Publication of the Indian Telegraph(Amendment ) Rules in the Gazette of India
Amendment of Rules 528 to538 of the Indian Telegraph
Rules for mandatory Testingof Telecom equipments.
To mandate standards in the areas offunctional requirements, safety and
security in all possible building blocksof the communication network.
24 Date[4.5.1] Publication of the Indian Telegraph(Amendment ) Rules in the Gazette of India
To exploit individualstrengths of organisationsunder DoT to their mutualbenefits for ensuring theseorganisations to effectivelyflourish in the competitive
telecom market whileadequately supporting the
security needs of the nation.
Extension of Reservation Quota forITI is a requirement for proper
working of telecom services sector.
25 Date[5.1.1] Submission to CCEA
18/04/2013 11.23 AMGenerated on
Page : 34 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
To consider the restructuringof Public Sector Undertaking
in terms of management,manpower and equity.
Revival Plan for ITI for efficient andsmooth functioning of PSUs
26 Date[5.2.1] Submission to Cabinet
To recognise the strategicimportance of telecom PSUs.
Financial assistance to BSNL &MTNL for excess Spectrum in 2G forefficient and smooth functioning of
PSUs
27 Date[5.3.1] Proposal to Cabinet
It is for achieving theobjective of strengthening of
PSUs.
It is a requirement for grantingconsent to BSNL & MTNL for
surrender of BWA spectrum andrefund thereof.
28 date[5.4.1] Submission of proposal to Cabinet
It relates to the absorption ofofficers in MTNL
To consider the restructuring of PublicSector Undertaking in terms of
management, manpower and equity.
29 Date[5.5.1] Approval by Government
To enable optimal utilisationof spectrum.
Formulationand approval of Policy onSpectrum assignment and pricing is a
requirement for proper working oftelecom services sector
30 Date[6.1.1] On time approval
18/04/2013 11.23 AMGenerated on
Page : 35 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
To enable optimal utilisationof Spectrum through
appropriate Regulatoryframework.
Finalisation and approval of 2ndphase of Unified Licensing regime isa requirement for proper working of
telecom services sector
31 Date[6.2.1] On time reference to TRAI
To enable optimal utilisationof Spectrum through
appropriate Regulatoryframework.
A requirement for proper working oftelecom services sector
32 Date[6.2.2] issue of guidelines for the regime
To put in place a liberalisedmerger and acquisition policy
with necessary thresholds,while ensuring adequate
competition.
Finalisationa dna approval of M&AGuidelines in respect of Telecom
Licences is a requirement for properworking of telecom services sector
33 Date[6.3.1] On time approval
To put in place a liberalisedmerger and acquisition policy
with necessary thresholds,while ensuring adequate
competition.
Finalisation of Guidelines forSpectrum sharing is a requirement
for proper working of telecomservices sector.
34 Date[6.4.1] on time approval
A requirement for mobilizingand channelize financing fortelecom projects in order tofacilitate investment in the
telecom sector.
To create a Telecom FinanceCorporation as a vehicle to mobilizeand channelize financing for telecom
projects in order to facilitateinvestment in the telecom sector.
35 Date[7.1.1] Submission to and decision on proposal byTelecom Commission. Preparation and submissionof Cabinet Note
18/04/2013 11.23 AMGenerated on
Page : 36 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
To facilitate increased use ofalternative sources(Renewable Energy
Technologies) of energy forpowering telecom networks
through active participation ofall the stakeholders
A requirement for development ofgreen tecnology in telecom services
sector
36 Date[7.2.1] Submission to and decision on proposal byTelecom Commission
To enhance consumerawareness.
Mandatory provisions for web baseddisclosure of wireless coverage by
Telecom Service Providers is arequirement for empowerment ofconsumers of telecom services
sector
37 Date[8.1.1] On time notification
A requirement forempowerment of consumersof telecom services sector.
To extend Intra-circle mobile numberportability facility on nationwide basis
so that the users can retain theirmobile number while shifting from oneservice area to another, irrespective
of the service provider.
38 Date[8.2.1] On time notification
It is a requirement to amend the TRAIAct for empowering the consumers of
Telecom services
39 Date[8.3.1] Circulation of Draft Cabinet Note for InterMinisterial Consultation
18/04/2013 11.23 AMGenerated on
Page : 37 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
A requirement for streamliningtelecom services across various
telecom sectors
40 Date[9.1.1] On time notification
A requirement for proper working oftelecom services sector
41 Date[9.2.1] Issue of Auction guidelines based onGovernement approval
A requirement for conducting Auctionof Spectrum after receipt of
Government approval.
42 Date[9.2.2] Finalisation and issue of Notice InvitingApplication (NIA).
A requirement for properworking of telecom services
sector
A requirement for conducting Auctionof Spectrum after receipt of
Government approval.
43 Date[9.2.3] start of Auction
It is a requirement for completion ofprocess of Auction of Spectrum.
44 Date[9.2.4] Receipt of Upfront Payments
18/04/2013 11.23 AMGenerated on
Page : 38 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
A requirement for properworking of telecom services
sector
To review Standing AdvisoryCommittee on Frequency Allocation
(SACFA) clearance process for fasterand simplified site clearances.
45 Date[9.3.1] Completion of review
A requirement for properworking of telecom services
sector
To prepare a roadmap for availabilityof additional spectrum every 5 years
46 Date[9.4.1] Preparation of Roadmap
A requirement for properworking of telecom services
sector
To identify additional frequency bandsperiodically, for exempting them fromlicensing requirements for operationof low power devices for public use.
47 Date[9.5.1] On time approval
IPv6 workshops/seminars etcfor the benefit of key decision
makers across allstakeholders are required to
be conducted.
A requirement for smooth andseamless transition to IPv6 across allstakeholders including Governmentsector. The workshops, to be held atdifferent locations in the country to
target focus groups, will be incollaboration the differentstakeholders(Government
Organisations, Service Providers,Content & Applications Providers,
Equipment Manufacturer etc.)
48 %[11.1.1] Successful conduct of 20 workshops
18/04/2013 11.23 AMGenerated on
Page : 39 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
A compendium to show caseIPv6 based
Solutions/Architecture/Casestudies for different industry
verticals is required tofacilitate smooth transition.
A requirement for smooth andseamless transition to IPv6 across allstakehoders including Governemtn
Sector.
49 Date[11.5.1] Approval of Compendium & publication
A Centre of Innovation forIPv6 is required to be
established as per NTP2012, with the vision to
provide an environment ofend to end IPv6 servicesunder a single umbrella.
A requirement for smooth andseamless transition to IPv6 across allstakeholders including Government
sector. To implement IPv6 based pilotproject, to develop model
Experimental IPv6 Network,Technical support to Central and
State Government units, etc.
50 Date[11.6.1] Approval of Centre of Innovation
An in country standardTraining and Certification
program on IPv6 is requiredto be developed to build a
talent pool on IPv6 skill set.
A requirement for smooth andseamless transition to IPv6 across allstakeholders including Government
sector. To build an industryrecognized IPv6 certification program,
to empanel organisations for IPv6training, to build a talent pool on IPv6
skill set in the country etc.
51 Date[11.7.1] Empanelment of training Organisations toprovide IPv6 Certified training
18/04/2013 11.23 AMGenerated on
Page : 40 of 43
Section 4:Description and Definition of Success Indicators and Proposed Measurement Methodology
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Success indicator Description Definition MeasurementSI.No General Comments
A Cloud Policy for telecomsector is required to beformulated for smoothdevelopment of Cloud
services ecosystem in thecountry.
A requirement to ensure for smoothdevelopment of Cloud Services.
52 Date[11.8.1] Submission of the proposal to the TelecomCommission
Page : 41 of 43
Section 5 :Specific Performance Requirements from other Departments
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Organisation TypeRelevant Success
Indicator
What is yourrequirement fromthis organisation
Justification for thisrequirement
LocationType
Please quantify yourrequirement fromthis Organisation
What happens ifyour requirement is
not met.State Organisation Name
Formulation of scheme willbe delayed
Specific Inputs[7.2.1] Submission toand decision onproposal by TelecomCommission
Scheme to be formulated inconsultation with MNRE
CentralGovernment
NAMinistry of New andRenewable Energy
Ministry
Page : 42 of 43
Section 6:Outcome/Impact of Department/Ministry
Results-Framework Document (RFD) for Department of Telecommunications -(2013-2014)
Outcome/Impact ofDepartment/Ministry
Jointly responsible forinfluencing this outcome /impact with the following
department (s) / ministry(ies)
SuccessIndicator
FY 11/12 FY 13/14FY 12/13 FY 14/15 FY 15/16Unit
38 45% increase in rural tele-densityFacilitating increase in ruraltele-density
50 55411 %
78.66 90% increase in overall tele-density
Facilitating increase in overalltele-density
100 110802 %
14 60Number of broadbandconnections provided (inmillions)
Penetration of broadband DeitY, Department of Expenditure,Planning Commission, StateGovernments
90 120163 Numbers
52000 53000Facilitating indigenousmanufacturing of telecomequipment (Rs. in crore)
Indigenous manufacturing oftelecom equipment
Departmant of IP&P, Ministry of Finance 54500 56000525004 Rs. (incrore)
100% of Telecom ServiceProviders whose compliance tosecurity guidelines has beenensured through audit etc.
Enhanced Security of theTelecom Network
MHA, NSCS, DeitY 100 1001005 %
40000Number of Base TerminalStations (BTSs) operating onRenewable Energy
Reduction ofPollution/Consumption offossil fuels
MNRE, Ministry of Power, Stateelectricity Boards, Planning Commission,Department of Expenditure
60000 10000035006 Numbers
18/04/2013 11.23 AMGenerated on
Page : 43 of 43