Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
\ Government of Himachal PradeshDepartment of Irrigation & Public Health
No.IPH-A(B)2-18/20 19 Dated: Shimla-171002 the ill January 2020
NOTIFICATION
The Governor, Himachal Pradesh is pleased to order the
placement of the following Junior Engineers (Civil) to the post of Assistant
Engineer (Civil) in the Irrigation and Public Health Department on stop gap
arrangement in their existing pay scale without any extra remuneration, with
immediate effect, in the public interest:-
Sr. No. Name of officials1 Mast Ram2 Dwijesh Kant3 Kanwar Singh4 Dinesh Kumar5 Maan Singh Sharma6 Mahesh Kumar7 Jitender Kumar8 Noor Ahmad9 Dinesh Singh10 Rajeshwar Sharma11 Pradeep Kumar12 Jaswant Singh13 Sanjay Kaushal14 Rajesh Kumar15 Ram Kumar16 Pawan Kumar17 Rohit Gupta18 Dutt Ram19 Biri Singh20 Jitender Kumar21 Roshan Lal22 Vijay Gupta23 Pradeep Kumar24 Paramjeet Singh25 Narinder Kumar26 Narinder Singh27 Prakash Chand28 Hans Raj Kaushal29 Rakesh Kumar30 Sanju Bodh
The above placement orders are purely as a stop gap
arrangement and shall not confer any right to the officers to continue on the post
and the officers are liable to be reverted to the lower post any time without any
prior notice or assigning any reasons thereof. Further, the above placement shall
also not confer any right to the officers for seeking any seniority as Assistant
Engineers. It is categorically stated that the above placement orders are subject to
the final outcome of the pending CWPOA No. 15/2019 titled Rakesh Kumar
Guleria and Ors. and any other similar situated case pending, if any, before the
Hon'ble High Court.
The petitioners/applicants have also been considered and
all of them have been found junior to the above mentioned officials in the
seniority list of Junior Engineer (Civil) in the IPH Department.
The Governor, Himachal Pradesh is further pleased to
order the posting of the newly placed Assistant Engineers as under:-
SN Name On placement ToS/Shri. basis from
1 Mast Ram IPH Divn., Nerwa IPH S/Divn., Chandolagainst vacant post.
2 Dwijesh Kant SNP Divn.No.l 0/0 E-in-C (Project)Sansarpur Terrace Mandi against vacant
post...,
Kanwar Singh IPH Divn., Nerwa IPH S/Divn. Ronhat-'against vacant post.
4 Dinesh Kumar IPH Divn., Nerwa 010 E-in-C (Project)Mandi against vacantpost.
S Maan Singh IPH Divn., Kaza IPH S/Divn., SunniSharma against vacant post.
6 Mahesh Kumar IPH Divn. Dharampur IPH S/Divn., Darlaghatat Bharari against vacant post.
7 Jitender Kumar IPH Divn., Thunag IPH S/Divn., BagaChanogi against vacantpost.
8 Noor Ahmad IPH Divn., IPH S/Division, GoharSundernagar against vacant post.
9 Dinesh Singh IPH Divn. D/shala 010 Chief Engineer PMUMandi against vacancy.
Contd ..2/-
f
-3-10 Rajeshwar IPH Divn., Dalhusie IPH S/Divn. Sihunta
Sharma against vacant post11 Pradeep Kumar IPH Divn. IPH S/Divn. Dadahu
Nahan against vacant post.12 Jaswant Singh IPH Divn., Keylong 010 Chief Engineer PMU
Mandi against vacantpost.
13 Sanjay Kaushal IPH Divn., D/Shala IPH S/Divn. Tissa againstvacant post
14 Rajesh Kumar IPH Divn., Hamirpur IPH S/Divn., Dhamiagainst vacant post.
15 Ram Kumar IPH Divn., Jawali IPH Sub-Division, Jalogagainst vacancy.
16 Pawan Kumar IPH Divn. IPH S/Divn., MandapDharampur at Bharari against vacant post
17 Rohit Gupta IPH Divn., Mandi 010 C.E IPH Zone, Mandiagainst vacancy.
18 Dutt Ram IPH Divn., SlNagar IPH S/Divn., Kotluagainst vacancy
19 Biri Singh IPH Divn., Sunder IPH Division, Thunag asNagar AE to EE against vacant
post.20 Jitender Kumar IPH Divn., Mandi IPH Zone, Mandi against
vacant post.21 Roshan Lal IPH Divn., Palampur IPH Circle, Una against
vacant post.22 Vijay Gupta IPH Divn., Padhar Tube Well S/Divn.,
Nalagarh against vacantpost.
23 Pradeep Kumar IPH Divn. Chauntra IPH S/Division.Jogindernagar againstvacant post.
24 Paramjeet Singh IPH Divn., Indora. IPH S/Divn., Sandholeagainst vacancy.
25 Narinder Kumar IPH Divn., Jubbal IPH HQ, Shimla againstvacant post.
26 Narinder Singh IPH Circle, Rohroo IPH S/Divn. Shillaiagainst vacant post.
27 Prakash Chand IPH Divn., Palampur 010 E-in-C IPH HQ,Shimla against vacancy.
28 Hans Raj Kaushal IPH Divn., Mandi IPH Division, Sarkaghatagainst vacant post.
29 Rakesh Kumar IPH Divn. Rampur IPH S/Divn., Akpa againstvacant post.
Contd ..3/-
-4-
30 Sanju Bodh IPH Divn.No.I Kullu IPH S/Divn. Neethera ainst vacant ost.
,4. The transfer order of Sh. Ranjeet Singh, Assistant Engineer
appearing at Sl. No. 23 is being issued separately.
5. The above officers are directed to join at their new place of
po stings within three days positively failing which the placement orders shall be
withdrawn without any further notice.
BY ORDER
Dr R.N.BattaSecretary (lPH) to the
Government of Himachal Pradesh
Endst. No. IPH-A(B)2-18/2019 Dated: ih January 2020
Copy forwarded for information and necessary action to the:-1. The Principal Accountant General, (HP) Shimla-03.2. The Senior DAG, (A&E), (HP), Shimla.3. The Engineer in Chief, IPH Department, Jal Shakti Bhawan, Shimla-OS.4. The Engineer in Chief (Project), IPH Department Mandi.5. All the Chief Engineers in HP IPH Department.6. The Superintending Engineer, IPH Circle, Hamirpur/Bilaspur.7. The Executive Engineer IPH Division in Himachal Pradesh.8. All concerned officers.9. Personal files of the officers.10. Guard file.
1Y1~rW.(Ma'hi~al Verm~
Under Secretary (lPH) to theGovernment of Himachal PradeshPhone No.O 177-2880484