1 DEPARTMENT OF WATER RESOURCES GOVERNMENT OF ODISHA ANNUAL REPORT: 2018-19 QUALITY CONTROL DIVISION, BHADRAK

GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

1

DEPARTMENT OF WATER RESOURCES

GOVERNMENT OF ODISHA

ANNUAL REPORT: 2018-19

QUALITY CONTROL DIVISION, BHADRAK

Page 2: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

2

ANNUAL REPORT: 2018-19

GOVERNMENT OF ODISHA

DEPATMENT OF WATER RESOURCES

ANNUAL REPORT: 2018-19 OF

QUALITY CONTROL DIVISION, BHADRAK

Executive Engineer, Quality Control division,

Bhadrak

Page 3: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

3

ANNUAL REPORT: 2018-19 QUALITY CONTROL DIVISION, BHADRAK

Engineer-in- Chief, WR Department,

Government of Odisha, BBSR

Chief Engineer, Quality Control & Research,

WR Department, Unit-8, BBSR

Director, Research & Quality Control.BBSR

Executive Engineer,

Quality control Division,

Bhadrak

GOVERNMENT OF ODISHA

DEPATMENT OF WATER RESOURCES QUALITY CONTROL DIVISION, BHADRAK

Page 4: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

4

contents

SL No. Description Page No.

1 Introduction 5

2 Jurdiction of this

Division

5

3 The work

Distribution of AEE

6

4 Inspection Verhicle 6

5 Present staff position

of Quality Control

Division,bhadrak

7

6 List of Equipments 8-11

7 List of works visited

by Quality Control

Inspection authorities

12-33

8 List of works visited

by Quality Control

Authorities (Higher

Authorities/SQM)

34-37

9 Photo gallery(

Inpected by Quality

Control Officers)

38-45

Page 5: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

5

INTRODUCTION

The Quality Control Division, Bhadrak with Headquarter at Bhadrak was created vide Govt. notification no. 5417 dt. 27-02-2012 and started functioning in the year 2015 restructuring of Water Resources Department. This office was temporarily functioning with FA/3(F type) quarter in 1st floor of block A having two rooms of size about 10ft x 12ft in the premises of Salandi Canal Division, bypass, Bhadrak.

Newly constructed Bhadrak Sub –division office building of

Salandi Canal Division, Bhadrak situated infront of Salandi IB is transferred to the Executive Engineer, Quality Control Division for the office and laboratory purpose vide office order No. 5412 dtd 28.11.2018 of Executive Engineer, Salandi Canal Division, Bhadrak and the same was occupied by the Executive Engineer, Quality Control Division, Bhadrak on 25.3.2019 after complete construction of the said building.

JURISDICTION OF THIS DIVISION

Jurisdiction of this division is as follows-

1. Aul Embankment Division, Aul

2. CAD Division no-3, Bhadrak

3. Drainage Division, Bhadrak

4. Drainage Division, jajpur

5. Jajpur irrigation Division, jajpur

6. Minor Irrigation Division, Jajpur

7. Soro Canal Division, Soro

Page 6: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

6

THE WORK DISTRIBUTION OF AEE(C) HAVE BEEN MADE AS FOLLOWS

1. Prasanna Kumar Dash, AEE(C)-

i) Aul Embankment Division, Aul

ii) Soro Canal Division, Soro

2. Sumanta Kumar Madhei,AEE(C)- i) Drainage Division, Jajpur ii) Jajpur Irrigation Division, Jajpur

iii) Minor Irrigation Division, jajpur

3. Swapna Priyadarsini Acharya, AEE(C) –

i) Drainage Division, Bhadrak

ii)Cad Division No-3, Bhadrak

INSPECTION VEHICLE

Two numbers of vehicles have been provided to this division on hiring basis for inspection of ongoing worksof above 7 (Seven) Numbers of Divisions.

The undersigned has been requested to the Director, Research and Quality Control, Bhubaneswar to provide one more private vehicle on hiring basis to this Division.

Page 7: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

7

PRESENT STAFF POSITION OF QUALITY CONTROL DIVISION,BHADRAK as on 31-03-2019

SI

No

Name of

Sanctioned Post

No

of

Posts

Name of Staff in Position

No

of

Staff

Vacant Remarks

GRADE –A

1 Executive

Engineer 1

Sri Pravat Chandra

Pattnaik 1 Joined on dt.

29.06.2018

2 Asst. Executive

Engineer 1 Sri Prasanna Kumar Dash 1

Joined on

dt.20.06.2016

3 Asst. Executive

Engineer 1

Sri Sumanta Kumar

Madhei 1

Joined on

dt.16.06.2016

4 Asst. Executive

Engineer 1

Er. Swapna Priyadarsini

Acharya 1 Joined on

dt.06.06.2018

GRADE-B

5 Asst. Engineer 1 Sri Prasant Kumar

Mohanty 1

Joined on

dt. 09.05.2018 and

Deputated to

EE,QCD,Cuttack

on dt.26.06.2018 6 Asst. Engineer 1 ........................ Nil Vacant

7 Junior Engineer 1 Miss Monalisa Panda Nil Vacant

(Deputated from

Markona Canal

Division,Markona

from

dt.10.01.2017)

8 Junior Engineer 1 Tusharkant Mohapatra 1 Joined on

dt.13.01.2019

9 Embankment

Inspector 1 ........................ Nil Vacant

GRADE-C

10 Senior Clerk 1 Sri Himanshu Sekhar

Jena 1

Joined on

dt.13.02.2018

11 Junior Clerk 2 ........................ Nil Vacant

12 Asst. Embankment

Inspector 1 ........................ Nil Vacant

13 Laboratory

Assistant 1 ........................ Nil Vacant

GRADE –D

14 Laboratory

Attendant 1 Sri Kailash Chandra Rout Nil Vacant

Deputated from

EE,QCD,Cuttack

from dt.16.03.2016

15 Peon 5 Lochan Sahoo 1 4 Vacant Joined on

dt.01.03.2019

16 Night Watchman-

cum Sweeper 1 ........................ Nil Vacant

Total 21 8

LISTS OF EQUIPMENTS :-

Page 8: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

8

SI. No Name of the Equipments Quantity in

(Nos/Set)

Year of

Purchase

1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016

2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016

3 Sieve G.I Frame 30 cm DiaX40mm 3 Nos 2016

4 Sieve G.I Frame 30 cm DiaX20mm 3 Nos 2016

5 Sieve G.I Frame 30 cm DiaX16mm 3 Nos 2016

6 Sieve G.I Frame 30 cm DiaX12.5mm 3 Nos 2016

7 Sieve G.I Frame 30 cm DiaX10mm 3 Nos 2016

8 Sieve G.I Frame 30 cm DiaX4.75mm 3 Nos 2016

9 Sieve G.I Frame 30 cm DiaX2.36mm 3 Nos 2016

10 Sieve Brass Fram 20 cm DiaX10mm 3 Nos 2016

11 Sieve Brass Frame 20 cm DiaX2.36mm 3 Nos 2016

12 Sieve Brass Frame 20 cm DiaX1.18mm 3 Nos 2016

13 Sieve Brass Frame 20cm Dia X600 micron 3 Nos 2016

14 Sieve Brass Frame 20 cm DiaX300 micron 3 Nos 2016

15 Sieve Brass Frame 20 cm DiaX150 micron 3 Nos 2016

16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

17 Pan Balance (Capacity 10 Kg) 3 Nos 2016

18 Electronic Balance(Capacity 10KGX.5Gm) 3 Nos 2016

19 Electronic Balance(Capacity 300GmX.01Gm) 3 Nos 2016

20 MouldCast Iron for 150mm Cube with ISI Certified 29 Nos. 2016

21 Tamping Rod,Steel,16mm DiaX600mm length with ISI

Certification Mark,IS:10086 3 Nos 2016

22 Sample Tray(Enamel) SIZE 660X560X80mm 3 Nos 2016

23 Sample Tray(Enamel) SIZE 660X460X50mm 3 Nos 2016

24 Sample Tray(Enamel) SIZE 450X300X40mm 3 Nos 2016

25 Sample Tray(Enamel) SIZE300X250X40mm 3 Nos 2016

26 Sample Tray(Enamel) SIZE200X150X30mm 3 Nos 2016

27 Sample Tray(Enamel) SIZE 450X450X50mm 3 Nos 2016

28 Gauge Trowel,100 to 150mm long blade with Straight

edge weight 210+10Gm 3 Nos 2016

29 Thickness Gauge with ISI Certification Mark Is:2386 3 Nos 2016

30 Length Gauge with ISI Certification Mark IS:2386 3 Nos 2016

31 Speed Moisture meter,Range 0-25% Gauge Division

.05% with Digital Weighing Nalance 3 Nos 2016

32 Core Cutter 3 Nos 2016

33 Dolly for AIM-16106,Core Cutter 3 Nos 2016

Page 9: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

9

34 Rammer for Cylindrical Core Cutter 150mm

DiaX300mm Long,Core Cutter 3 Nos 2016

35 Bulk Density measure Set of Two 3 Nos 2016

36 Steel Scale,300mm 3 Nos 2016

37 P Measuring Cylinder

Graduated,Polycarbonate,Capacity 1000ml 3 Nos 2016

38 Concrete Test Hammer with NCCBM Calibrated 1 Nos 2017

39

Supplying Analogue Compression Testing Machine,

Capacity 1000KN,Electrically Operated, Single

Gauge(As per IS:14858(2000)BS 1881)

1 Nos 2018

40 Supplying of Vibrating Table 75X75 cm size for 6

Mould of 150mm Compaction of Cement Concrete. 1 Nos 2018

41 Supplying of Sieve Shaker motorised with Built in

Digital Timer. 1 Nos 2018

42 Supplying of Compaction Test Apparatus for Light

Compaction. 1 Nos 2018

43 Pan and Cover for 20cm dia sieve (conforming to ISI

specification) 1 Nos 2018

44 Sieve Brass Frame 20 cm dia x 1.18mm (

conforming to ISI specification) 1 Nos 2018

45 Sieve Brass Frame 20 cm dia x 2.36 mm (

conforming to ISI specification) 1 Nos 2018

46 Sieve Brass Frame 20 cm dia x4.75mm

(conforming to ISI specification) 1 Nos 2018

47 Sieve Brass Frame 20 cm dia x150micron

(conforming to ISI specification) 1 Nos 2018

48 Sieve Brass Frame 20 cm dia x300 micron

(conforming to ISI specification) 1 Nos 2018

49 Sieve Brass Frame 20 cm dia x600micron

(conforming to ISI specification) 1 Nos 2018

50 Adopter for 30 cm dia sieve(conforming to ISI

specification) 1 Nos 2018

51 Pan and Cover for 30 cm dia sieve(conforming to ISI

specification) 1 Nos 2018

52 Sieve GI frame 30 cm dia X 63mm

(conforming to ISI specification) 1 Nos 2018

53 Sieve GI frame 30 cm dia X 40 mm

(conforming to ISI specification) 1 Nos 2018

54 Sieve GI frame 30 cm dia X 31.5mm

(conforming to ISI specification) 1 Nos 2018

55 Sieve GI frame 30 cm dia X 20mm

(conforming to ISI specification) 1 Nos 2018

56 Sieve GI frame 30 cm dia X 12.5mm

(conforming to ISI specification) 1 Nos 2018

57 Sieve GI frame 30 cm dia X 6.3mm

(conforming to ISI specification) 1 Nos 2018

Page 10: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

10

58 Sieve GI frame 30 cm dia X 2.36 mm

(conforming to ISI specification) 1 Nos 2018

59 Air Permeability Apparatus (Blaine Type) with ISI

Certification mark IS:5516,fitted in Aluminium Box 1 Nos 2018

60 Pycnometer 1 Nos 2018

61 Evaporating Dish,Flat Bottom with Porout,Size

150X80mm 1 Nos 2018

62 Stop Watch 'Mechanical' 1/5 sec 1 Nos 2018

63 Weight Box (10mg to 5 kg) 1 Set 2018

64 Plastic Limit set comprising of glass plate,Brass

rod,Spatula,Moisture Tin & Porcelein Dish 1 Nos 2018

65 Steel Tape 3 meter 1 Nos 2018

66 Steel Tape 5 meter 1 Nos 2018

67 Steel Tape 15 meter 1 Nos 2018

68 Metallic Tape 15 meter 1 Nos 2018

69 Metalic Tape 30 meter 1 Nos 2018

70 Compaction Factor Apparatus (As per Ref: Standard

IS:5515) 1 Nos 2019

71 Air Entrainment Meter Capacity 0.005 m(5 Litres) 1 Nos 2019

72 Laboratory Permeability Apparatus with overhead tank

and rammer (As per Ref: Standard IS:2720 (Part-17),

IS:11209)

1 Nos 2019

73 Vicat Apparatus with ISI Certification Mark,IS:5513 1 Nos 2019

74 Density Basket (As per Ref: Standard IS:2386 (Part-

3)) 1 Nos 2019

75 Concrete Mixer, Drum Type, Capacity 1 Cubic Feet 1 Nos 2019

76 Los Angeles Abrasion testing machine with Counter

(Drum with RPM 30-33,Abrasion Charge 48 mm dia.-

12 No, Conforming to IS:10070)

1 Nos 2019

77 Aggregate Crushing Value Apparatus (As per reference

standard IS:9376) 1 Nos 2019

78

Aggregate Impact Tester (Coarse Aggr-Cylindrical cup

metal measure tempering to with ISI mark Automatic

blow counter all confirming to IS:9377) 1 Nos 2019

79 Electronic Balance, Capacity 100Kg X 10g 1 Nos 2019

80

Liquid Limit Device Consists of: -Motorized. Brass

cup, Rubber base ASTM Grooving Tool (Type B of IS :

9259) 1 Nos 2019

81 Le Chatelier Apparatus 1 Nos 2019

82 Weight Box ( 1mg to 5 Kg) 1 Set 2019

Page 11: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

11

83

Hand Operated Soil Sample Extractor for 38 mm.

Consists of :Sample exctractor frame jarring

link,adopter with locking screw-38mm dia sampling

tube,Split mould-38mm diaX76mm long Sampling tube

asx per IS specification.

1 Set 2019

84 Electronics Balance

Capacity 600gm X 0.01g 1 Nos 2019

85 Sand pouring ctylinder apparatus,100mm 3 Set 2019

86 Lid and Pan 30cm dia G.I 3 Set 2019

87 C.I Mould,Size 50mmX50mmX50mm 24Nos 2019

88 M.S Mould,Size 70.6mmX70.6mmX70.6mm 24 Nos 2019

89 Hygro meter 3 Nos 2019

90 Electronics Balance

Capacity 15 Kg X 1 gm 1 Nos 2019

91 Electronics Balance

Capacity 30 Kg X 5 gm 1 Nos 2019

92 Accelerated Curing Tank suitable for 12/24 cubes of

150mm/70.6mm 1 Nos 2019

93 Swelling pressure apparatus with proving ring-205 KN

,Dial gauge -0.01 X 25mm 1 Set 2019

94 Laboratory Electronics Oven 1 Nos 2019

95 Grooved MS Plate 45 cm X45 cm X25 cm 1 Nos 2019

96 Plate Bearing apparatus,as per specification 1 Nos 2019

97 Integral type Compression provinh ring 5 KN 1 Nos 2019

98 High Speed stirrer 1 Nos 2019

99 Desiccator Non Vaccum type 200 mm glass 1 Nos 2019

Executive Engineer

Quality Control Division

Bhadrak

Page 12: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

12

LIST OF WORKS VISITED BY QUALITY CONTROL INSPECTION AUTHORITIES Name of the Division:-QUALITY CONTROL DIVISION,BHADRAK

SI

No

Date of

Visit

Name of

Inspecting

Authorities

Name of the

Division Name of the Work Agt. No.

Observation &

Remarks

1

20.03.201

8

Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Protection to scoured

bank of jamboo Baulakani

Mahakalapada chhapali

saline gherry.

01 P1

/2017-18

i) interstics should be

filled up properly with

required stone.

ii) Test of stone to be

done in Govt.

laboratory. Akhadasahi creek

irrigation project.

1417 F2/

13-14

i) Wave breakers to be

provided.

ii) Honey combs of

sluice needs

rectification.

2

19.04.201

8

Sri Sumanta

Kumar

Madhei,AEE

M.I.Division,

Anandapur

Check Dam Mudrabeda -I

over Badapaka nallah

near village Mudrabeda in

Ghatagoan Block for the

year 2017-18.

66 P1

/2017-18

i) Use vibrator regular

interval as 0.3m depth.

ii)Adopt covering

curing by Gunny

bags/Hessian clothes.

Check Dam Kantibeda

over Hanumatia nallah

near village Penthadihi in

Harichandan Pur Block

for the year 2017-18.

17

P1/2017-

18.

i) Use vibrator regular

interval as 0.3m depth.

ii) Adopt covering

curing by Gunny

bags/Hessian clothes.

Check Dam Ganjeidhara

over Hanumatia nallah

near village Penthadihi in

Harichandan Pur Block

for the year 2017-18.

32

P1/2017-18

The work is completed

which looks

satisfactory.

Improvement of

Distribution system of

Kureijodi M.I.P under

State Plan in Harichandan

Pur Block for the year

2017-18

110

P1/2017-18

i) Use vibrator regular

interval as 0.3m depth.

ii) Adopt covering

curing by Gunny

bags/Hessian clothes.

3

20.04.201

8

Sri Sumanta

Kumar

Madhei,AEE

M.I.Division,

Anandapur

Renovation and

Improvement to Ganda

M.I.P in Ghasipura Block

under CLSRP Scheme for

the year 2017-18.

80

P1/2017-18

i) Alignment of Lining

should be proper.

ii) Adopt covering

curing by Gunny

bags/Hessian clothes.

4

24.04.218

Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Bank protection work to

scoured bank at

Mahadeidia.

124

P1/2017-18

It is instructed to

remove other stones

visible at site except

hard granite stones as

per agreement

Restoration to

Chhachinadia- Deuli-

Bajapur saline

embankment

100 P1

/2017-18

Work is in completed

stage

restoration to

parinuapada-

Parimukundapur TRE 0 to

5.20 km.

Instructed to maintain

Activity register, site

order book and QC

related register.

Page 13: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

13

Bank protection to

scoured bank at

Mahurigaon on Bajarpur

saline embankment.

85 P1/ 18-

19

It is instructed to

remove the skinned

stones as well as

Quartz types of stone

visible at site

5

9.5.2018

Sri Sumanta

Kumar

Madhei,AEE

M.I.Division,

Anandapur

Renovation and

Improvement to Ganda

M.I.P in Ghasipura Block

under CLSRP Scheme for

the year 2017-18.

80

P1/2017-18

i) Alignment of Lining

should be proper.

ii) Adopt covering

curing by Gunny

bags/Hessian clothes.

Check Dam Gonda-8 on

Gonda nallah near village

Nanikabahali in

Ghasipura Block for the

year 2016-17.

109

P1/2016-17

i) It is instructed to

remove the weather

skinned stones from

site.

Renovation and

Improvement to Ganda

M.I.P in Ghasipura Block

under CLSRP Scheme for

the year 2017-18(Reach-

II)

81

P1/2017-18

i) Use vibrator regular

interval as 0.3m depth.

ii)Adopt covering

curing by Gunny

bags/Hessian clothes.

6

11.7.2018

Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Protection to scoured

bank of Brahmani left

embankment near

Gopalpur kandia

13P1/18-19 i) Stone packing work

is in progress.

ii) No QC testing

report is available at

site.

Protection to scoured

bank on K.K right near

Tunga.

08P1/18-19 i) Stone packing work

is in progress.

Protection to scoured bank on

K.K. right near Kalanada.

96P1/17-18 It is instructed to

remove other stones

visible at site except

hard granite stones as

per agreement

Protection to K. k. right

embankment near Sana

arka and Kalanada.

Bank protection work and

construction of spur near

Sanagiri of Kharasuan

right.

14P1/18-19

26P1/18-19

It is instructed to

remove other stones

visible at site except

hard granite stones and

maintain the slope

properly as per

agreement.

i) Stone packing work

is in progress.

ii) No QC testing

report is available at

site.

7 20.7.218 Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Protection to scoured

bank on jamboo

Baulakani saline

embankment on Gobri

right

16P1/18-19 i) It is instructed to

remove the skinned

stones visible at site as

per agreement.

ii) No QC testing

report is available at

site. Protection to scoured

bank of Mahakalapada

01P1/

NCB/RIDF

Packing should be

done properly and

Page 14: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

14

chhapali saline gherry

with construction of new

saline embankment.

/17-18 interstices

Should be filled up by

small stones.

protection to scoured

bank of river Gobri in

Mahakalapadablock of

Kendrapara Dist.

54P1/

NCB/RIDF

/17-18

i) i) Stone packing

work is in progress.

ii) No QC testing

report is available at

site.

8 21.7.218 Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Slope protection to

Patasala right on Satagaon

saline embankment

93P1/2017-

18

NO Quality Control

register is available at

site during inspection.

Raising and strenghtening

of Satagaon saline

Embankment.

127P1/201

7-18

Work is in completed

stage.

Slope protection to

Patasala right

embankment.

110P1/201

7-18

Work is in completed

stage.

9 14.12.201

8

Er.Swapna

priyadarsini

Acharya

AEE

CAD

DIVISION

NO-3,

Bhadrak

Field Channel at Sunguda

of Bhadrak sub division

under Salandi Left

Comman

d.

K2 158-

159/2018-

19

The work is completed

which looks

satisfactory.

Field Channel at

Sanamaitapur-III of

Bhadrak sub division

under Salandi Left

Command.

K2 137-

138/2018-

19

The work is completed

which looks

satisfactory.

Field Channel at Bari-

II(Part-III) of Bhadrak

sub division under

Salandi Left Command.

K2 111-

112/26.5.18

The work is completed

which looks

satisfactory.

Field Channel at

Barinayada of Bhadrak

sub division under

Salandi Left Command.

K2119/26.5

.2018

The work is completed

which looks

satisfactory.

Field Channel at Kutari of

Bhadrak sub division

under Salandi Left

Command.

K2 139-

140/26.5.20

18

The work is completed

which looks

satisfactory.

Field Channel at

Dianpurusottampur of

Bhadrak sub division

under Salandi Left

Command.

K2141-

142/26.5.20

18

The work is completed

which looks

satisfactory.

10 20.1218

Er.Swapna

priyadarsini

Acharya AEE

Drainage

Division,

Bhadrak

Construction of Two nos

of foot over bridge over

rebo drainage channel at

Kalyani, Kadimahara

&Breach closing at

Hatanagar

12P1/2018-

19

It is observed that 10%

of work done has been

completed. It is

instructed to replace

the coarse

agreegets(oversized) at

site being used by the

agency before

commencement of

further concrete wok

and Lafarge cement

must not be

used.Gradation test of

Page 15: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

15

20mm down graded is

not satisfing IS 383 at

site.

11 26.12.201

8

Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Protection to scoured

bank of Brahmani right

near Lokanath prasad

with launching apron in

Rajnagar Block.

40/

NCB/RIDF

/P1/18-19

It is instructed to

remove the skinned

stones at site before

executing of earthwork

and the borrow earth

must be tested.

Protection to scoured

bank of river Patasala

near Junagadi

71P1/18-19

It is instructed to

remove the skinned

stones as well as

Quartz types of stone

visible at site

12 27.12.201

8

Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Protection to scoured

bank of Gobri left near

Badadanua of Radhia

kansara saline gherry in

Mahakalapada block.

35/

NCB/RIDF

/P1/18-19

It is instructed to

remove other stones

visible at site except

hard granite stones as

per agreement

protection to scoured

bank of Gobri left near

Olia of Orta Sahabajpur

saline gherry

Mahakalapada block.

73P1/18-19

It is instructed to

remove other stones

visible at site except

hard granite stones and

maintain the slope

properly as per

agreement. Protection to scoured

bank at Barunadiha,

Badhajhar, Panki and

Mahurigaon on river

Kharasuan.

76/

NCB/RIDF

/P1/18-19

It is instructed to

remove the skinned

stones visible at site as

per agreement

13 3.01.2019

Sri Sumanta

Kumar

Madhei,AEE

M.I.Division,

Jajpur

Renovation to Kalakala

M.I.P in Badachana Block

under DPIW Scheme for

the year 2018-19.

12P1/2018-

19

It is instructed to

remove the weather

skinned stones and

some Quartz type

stones being used for

the work as well as

uproot bushes before

packing work.

Renovation to Gopal Sahu

Bandha M.I.P in

Badachana Block under

Critical grant for the year

2018-19.

16P1/2018-

19

It is instructed to

rectify the honey comb

part.

14 04.1.19

Er.Swapna

priyadarsini

Acharya AEE

Drainage

Division,

Bhadrak

Improvement to Drainage

cum creek system of

Bahupokhari creek/

Kalidaspur creek of

Andola,Balimed,Rajgharp

okhari and Birasa GPS of

Basudevpur block in

Kansabansa-mantei Doab

no-XI

08P1/2018-

19

It is observed that 10%

of work done has been

completed. It is

instructed to replace

the coarse

agreegets(oversized)

and fine agreegate at

site being used by the

agency before

commencement of

further concrete

wok.Gradation test of

Page 16: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

16

20mm down graded

and gradation of FA

are not satisfying IS

383 at site.The

moisture content found

2% at site.an dthe

compaction is 78.4%

15 05.01.201

8

Er.Swapna

priyadarsini

Acharya

AEE

CAD

DIVISION

NO-3,

Bhadrak

Field Channel at

Susiladeipur-2 of Bhadrak

sub division under

Salandi Left Command.

K2 103-

104/26.5.18

The work is completed

which looks

satisfactory.

Field Channel at Erada-3

of Bhadrak sub division

under Salandi Left

Command.

K2

56/17.5.18

The work is completed

which looks

satisfactory.

Field Channel at

Dianpurusottampur of

Bhadrak sub division

under Salandi Left

Command.

K260-

61/17.5.18

The work is completed

which looks

satisfactory.

16 11.01.201

9

Er.Swapna

priyadarsini

Acharya

AEE

Drainage

Division,

Bhadrak

Improvement to storm

water Drainage Channel (

Concrete Drain in

Bhadrak Muncipality in

Salandi-Baitarani Doab

No-XIII)

02P1/2018-

19

It is observed that 25%

of work done has been

completed.It is

instructed to replace

the coarse

agreegets(oversized)an

d fine aggregate at site

being used by the

agency before

commencement of

further concrete work.

Gradation test of

20mm down graded

and fine aggregate are

not satisfing IS 383 at

site.

17 16.1.2019 Er.Swapna

priyadarsini

Acharya

AEE

Drainage

Division,

Bhadrak

Improvement to storm

water Drainage Channel

(Concrete Drain in

bhadrak Muncipality in

Salandi –baitarani Doab

No- XIII)

02P1/2018-

19

It is observed that 30%

of work done has been

completed. It is

instructed to replace

the coarse

agreegets(oversized)an

d fine aggregate at site

being used by the

agency before

commencement of

further concrete work.

Gradation test of

20mm down graded

and fine aggregate are

not satisfing IS 383 at

site.

Page 17: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

17

Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Protection to scoured

bank of Gobri left near

Badadanua of Radhia

kansara saline gherry in

Mahakalapada block.

35/

NCB/RIDF

/P1/18-19

It is instructed to remove the

weather skinned stones.

protection to scoured

bank of Gobri left near

Olia of Orta Sahabajpur

saline gherry

Mahakalapada block.

73P1/18-19 interstices to be filled

up by small stones

with proper

hammering as per

Agreement

18 18.1.2019

Er.Swapna

priyadarsini

Acharya

AEE

Drainage

Division,

Bhadrak

Improvement to storm

water Drainage Channel

(Concrete Drain in

bhadrak Muncipality in

Salandi –baitarani Doab

No- XIII)

02P1/2018-

19

Accompanied with Er

Satrughana Das,

Consultant Advisor.

He advised to test Fine

and Coarse aggregates

stacked at site later

and again instructed to

remove flacky

aggregates.

19 21.1.2019

Er.Swapna

priyadarsini

Acharya

AEE

Drainage

Division,

Bhadrak

Improvement to storm

water Drainage Channel

(Concrete Drain in

bhadrak Muncipality in

Salandi –baitarani Doab

No- XIII)

02P1/2018-

19

It is observed that 30%

of work done has been

completed.. Gradation

test of 20mm down

graded and fine

aggregate are

satisfiing IS 383 at

site.

Sri Sumanta

Kumar

Madhei,AEE

Jajpur

Irrigation

Division,

Jajpur

296

P1(E.E) of

2015-16

It is instructed to

remove the weather

skinned stones and

interstices to be filled

up by small stones

with proper

hammering as per

Agreement.

Protection to Kachila left

Embankment from

Athagharia to Pangata

under NABARD

Assistance (RIDF-XX).

Renovation to Baikunthi

Sluice on Baitarani left

for the year 2018-19.

102

P1(E.E) of

2017-18

The work is completed

which looks

satisfactory.

Renovation to Sendhapur

Sluice on Baitarani left

for the year 2018-19.

26 P1(E.E)

of 2017-18

The work is completed

which looks

satisfactory.

Page 18: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

18

22.01.201

8

Er.Swapna

priyadarsini

Acharya

AEE

CAD

DIVISION

NO-3,

Bhadrak

Protection to Scoured

bank on OAE No-12

(abcd) B on Baitarani left

near village Dasandhikula

to Dasandhikula Ghery

under NABARD

Assistance (RIDF-XX).

200

P1(E.E) of

2015-16

It is instructed to

remove the weather

skinned stones and

interstices to be filled

up by small stones

with proper

hammering as per

Agreement.

Protection to Scoured

bank on Baitarani left

from Anandapur to

Gaurangapur Escape

under NABARD

Assistance (RIDF-XX).

02 P1(E.E)

of 2016-17

The work is completed

which looks

satisfactory.

Protection to Scoured

bank on OAE No-12

(abcd) B on Baitarani left

near village Mishrapur for

the year 2018-19.

14 P1(E.E)

of 2018-19

It is instructed to

remove the weather

skinned stones and

interstices to be filled

up by small stones

with proper

hammering as per

Agreement.

Field Channel at

Sahupada-1 of Bhadrak

sub division under

Salandi Left Command.

K2 153-

154/26.5.18

The work is completed

which looks

satisfactory.

Field Channel at

Sahupada-2 of Bhadrak

sub division under

Salandi Left Command.

K2 70-

71/17.5.201

8

The work is

completed which looks

satisfactory.

Field Channel at

Balikanaof Bhadrak sub

division under Salandi

Left Command.

K2 67-

68/17.5.18

The work is completed

which looks

satisfactory.

Field Channel at Telnati

of Bhadrak sub division

under Salandi Left

Command.

K2 73-

74/17.5.18

The work is completed

which looks

satisfactory.

Field Channel at Aliha of

Bhadrak sub division

under Salandi Left

Command.

K2 34-

35/17.5.201

8

The work is completed

which looks

satisfactory.

Page 19: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

19

Field Channel at Aptira

Sarangi of Bhadrak sub

division under Salandi

Left Command.

K2 209-

210/2.11.18

The work is completed

which looks

satisfactory.

21 25.01.201

9

Sri Sumanta

Kumar

Madhei,AEE

Jajpur

Irrigation

Division,

Jajpur

Raising,Strengthening and

Protection to leftbank of

river Baitarani from

Balighai to Dehudi

Ananadapur under

NABARD Assistance

(RIDF-XXII)

04 P1(E.E)

of 2018-19

It is instructed to

compact the earth

properly as well as

watering properly.

Renovation of Distry No-

02 of Jajpur Main Canal

under CLSRP (Working

from RD 0.00Km to

8.925Km)

03 P1(E.E)

of 2018-19

i) It is instructed to

compact the slope area

properly by watering.

ii) Adopt covering

curing on slope area

and ponding on Bed.

22 30.01.201

9

Er.Swapna

priyadarsini

Acharya

AEE

CAD

DIVISION

NO-3,

Bhadrak

Field Channel at

Nimapada(AIBP) of

Bhadrak sub division

under Salandi Right

Command.

K2 417-

418/26.9.20

18

The work is 70%

completed which is

seen satisfactory.

Field Channel at

Brundabanpur (AIBP) of

Bhadrak sub division

under Salandi Right

Command.

K2408-

409/18.9.18

The work is 90%

completed which is

seen satisfactory.

Field Channel at

Solpata(AIBP) of

Bhadrak sub division

under Salandi Right

Command.

K2 422-

425/26.10.1

8

The work is 30%

completed which is

seen satisfactory.

Field Channel at

Rampur(E.O.M) of

Bhadrak sub division

under Salandi Right

Command.

K2

217/13.11.1

8

The work is 95%

completed which is

seen satisfactory.

Field Channel at

Salania(E.O.M.) of

Bhadrak sub division

under Salandi Right

Command.

K2

218/13.11.1

8

The work is 99%

completed which is

seen satisfactory.

Field Channel at

Dhoniojha(E.O.M.) of

Bhadrak sub division

under Salandi Right

Command.

K2

214/13.11.1

8

The work is 90%

completed which is

seen satisfactory.

23. 5.2.2019 Er.Swapna

priyadarsini

Acharya

AEE

CAD

DIVISION

NO-3,

Bhadrak

Field Channel work at

Bati-2(part-2)(EOM) of

Bhadrak sub division

under Salandi left

Command.

K2120&12

1/26.5.2018

It is seen that concrete

work is in progress. It

is instructed to remove

flacky aggregates. The

work done is 90%

completed.

Page 20: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

20

Drainage

Division,

Bhadrak

Improvement to link

drains of river

Kansabansa and

construction of VRB with

protection wall over

Kansabasna drainage

channel near village

Jadibanka of kabirpur of

G.P. in Simulia Block in

Kansabansa-Manteidoab

No-XI

55p1/2018-

19

It is observed that 10%

of work done has been

completed. It is seen

that piling work is in

progress. F.A

deposited at site are

seen satisfactory. CA

are not satisfactory. It

is instructed to

remove flacky coarse

aggregates.

Improvement to drainage

channels and construction

of Guard wall with stone

packing in Sabaranga GP

under Simulia

constituency of Balasore

district in kansabansa-

Mantei Doab No-XI

1P1/2018-

19

It is observed that 50%

of work done has been

completed. It is seen

that stone packing

work is in progress

and concrete work

done has been

completed completely

which was seen

satisfactory.

24. 6.2.2019 Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Bank protection work to

scoured bank at

Mahurigaon on Baitarani

69P1/18-19 i) Stone packing work

is in progress.

Protection to scoured

bank at Barunadiha,

Badhajhar, Panki and

Mahurigaon on river

Kharasuan.

76/

NCB/RIDF

/P1/18-19

i) Stone packing work

is in progress.

ii) No QC testing

report is available at

site.

Protection to scoured

bank from Dahianta to

sahira village on

Brahmani left.

106/

NCB/RIDF

/P1/18-19

i) Stone packing work

is in progress.

ii) Instructed to

remove the skinned

stones at site. Protection to scoured

bank from Sorisada to

Patrapur village on

Brahmani left.

108/

NCB/RIDF

/P1/18-19

i) Stone packing work

is in progress.

ii) Instructed to

remove the skinned

stones at site

ii) No QC testing

report is available at

site.

25

7.2.2019

Er.Swapna

priyadarsini

Acharya

AEE

Drainage

Division,

Bhadrak

Construction of protection

wall over link drain to

Baitarani River near

village Khaparapada

&construction of FB over

Ankira DC ( Link Drain

to Baitarani River ) near

village Amritpur.

11P1/2018-

19

It is observed that 10%

of work done has been

completed. It is seen

that FA and CA are

satisfying IS:383. It is

instructed to remove

the flacky coarse

aggregate.

Page 21: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

21

Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Restoration to Satagaon

saline gherry with

construction of 5 nos

sluice.

78/

NCB/RIDF

/P1/18-19

i) Earthwork is under

progress.

ii) Instructed to

remove all kinds of

dedris from earth soil.

iii) Q.C testing report

yet not received from

Govt. laboratory.

Protection to scoured

bank on Keredagada

Alatanga S/E on river

Hansua right near

Jagannathpur, Badkote &

Koilpur.

112/

NCB/RIDF

/P1/18-19

i) The dumping work

is in progress.

ii) No QC testing

report is available at

site.

Restoration to Rajnagar

gopalpur saline

embankment Hansua left

at Rajnagar, Bijulia &

Praharajpur.

113/

NCB/RIDF

/P1/18-19

i) Raising of

embankment

earthwork is in

progress.

ii) No QC testing

report is available at

site.

iii) Compaction shuld

be done properly.

Protection to scoured

bank on Brahmani right

near Sathapada.

110/

NCB/RIDF

/P1/18-19

i) The dumping work

is in progress.

ii) The weight of used

stone should be

measured as per

agreement.

Protection to scoured

bank of Gobri left near

Chandipali of Orta

sahabajpur saline ghery in

Mahakalapada block of

Kendrapara Dist.

104/

NCB/RIDF

/P1/18-19

i) Dumping work is

under progress.

ii) Instructed to

remove the skinned

stones at site.

iii) No QC testing

report is available at

site.

Protection to scoured

bank of river Nuna near

Gopalpur.

109/

NCB/RIDF

/P1/18-19

i) The dumping work

is in progress.

ii) The packing should

be done properly by

minimizing interstices

using small stones.

iii) No QC testing

report is available at

site.

26 08.02.201

9

Sri Sumanta

Kumar

Madhei,AEE

Drainage

Division,

Jajpur

Renovation tof Gagarpatia

nallah with its link drain

of Jajpur District in

Brahmani-Baitarani

DOAB No -XIV.

41

P1/2017-18

Some area Small and

Quartz type stone

should be removed and

interstices filled by

small stone with

Page 22: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

22

proper hammering.

Renovation of Belpal

nallah of Jajpur District in

Brahmani-Baitarani

DOAB No -XIV.

50

P1/2017-18

Alignment of

protection wall should

be proper and to do

proper curing on wall.

Water supply to Tail end

of 1 A 1 distributary and

Talia minor of Japur canal

system for stabilization of

lost ayacut.

27 11.02.201

9

Sri Sumanta

Kumar

Madhei,AEE

Jajpur

Irrigation

Division,

Jajpur

28 P1(E.E)

of 2018-19

It is instructed to

i) Use plate vibrator in

bed concreting.

ii) Curing should be

proper and regular

interval.

Renovation of 1 D and 1

Main Extension

distributary of Jajpur

canal system

Protection of Baitarani

Right Embankment near

Kuanrsahi

26 P1(E.E)

of 2018-19

It is instructed to

proper sectioning of

the Embankment and

proper watering and

compaction.

Protection of Baitarani

Right Embankment near

Kuanrsahi

18 P1(E.E)

of 2018-19

It is instructed to filled

the intersticesby small

stone with proper

hammering.

28 12.02.201

9

Sri Sumanta

Kumar

Madhei,AEE

Jajpur

Irrigation

Division,

Jajpur

Renovation and

Comunication facility to

Nuamahara left TRE from

RD 0.00 Km to 20.00 Km

from Nuabanka to

Gahiapal (Construction of

5 No. Sluice) under

NABARD Assistance

(RIDF-XIX).

29 P1(E.E)

of 2018-19

During visit only

foundation excavation

was under progress.

Instructed to test earth

before construction.

Restoration and

Protection to left Saline

Embankment over river

Baitarani from Bodak to

Tintarghat under

NABARD Assistance

(RIDF-XXII).

09 P1(E.E)

of 2017-18

It is instructed to

maintain the slope

properly as well as

compact the spreading

earth properly.

29 13.2.2019 Er.Swapna

priyadarsini

Acharya

AEE

Drainage

Division,

Bhadrak

Constuction of Sluice

cum Foot Bridge over

Sarusagar Nallah near

village Gopalpur RD

6660 MTR

50P1/2018-

19

It is observed that 60%

of work done has been

completed. It is seen

that FA gradation is

satisfying IS:383 and

CA gradation is not

satisfying IS:383.

cement is satisfying IS

norms. Slump test

report came 75mm. It

Page 23: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

23

is instructed to remove

the flacky coarse

aggregate deposited at

site.

Construction of Check

Dam over Khandia Nallah

(Khandakosi) near Village

Goramati.

52P1/2018-

19

It is observed that 30%

of work done has

completed. It is seen

that FA gradation and

CA gradation are seen

satisfying IS:383.

cement is satisfying IS

norms. Plate vibrater is

using for PCC. No

quality control testing

report is available with

the field officer of the

concerned field

division at site.

30 14.2.2019 Er.Swapna

priyadarsini

Acharya

AEE

Drainage

Division,

Bhadrak

Construction of

Checkdam over DC from

Ghohadabandha to

Balichaturi Nallaa via

Satuk House

13P1/2018-

19

It is observed that 35%

of work done has been

completed. It is seen

that FA gradation and

CA gradation are

satisfying IS:383.

It is instructed to use

SAIL 16mm dia bars

instead of local brands.

It is also instructed to

remove flacky coarse

aggregates from work

site.

Construction of Check

dam over DC Kathapaka

Nallah near village

Talabandha of Saya G.P.

14P1/2018-

19

It is observed that 35%

of work done has been

completed. It is seen

that FA gradation and

CA gradation are

satisfying IS:383.

It is instructed to use

SAIL 16mm dia bars

instead of local brands.

It is also instructed to

remove flacky coarse

aggregates from work

site.

31 18.2.19 Er.Swapna

priyadarsini

Acharya

AEE

CAD

DIVISION

NO-3,

Bhadrak

Field Channel at

Kargola(AIBP) of

Bhadrak sub division

under Salandi Right

Command.

K2436-

440/2.11.18

It is observed that the

work done is 80 %

completed. It is

instructed to rectify the

honey Comb found in

some places of FC

Field Channel at K2432- It is observed that the

Page 24: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

24

Sankho(AIBP) of

Bhadrak sub division

under Salandi Right

Command.

435/2.11.18 work done is 80 %

completed. It is

instructed to rectify the

honey Comb found in

some places of FC

Field Channel at

Inchol(AIBP) of Bhadrak

Sub Division under

Salandi Right Command.

K2 460-

462/13.11.1

8

It is observed that the

work done is 15 %

completed. Earth

work Excavation work

is in progress and the

work done is seen

satisfactory

Field Channel at

Nilok(AIBP) of Bhadrak

Sub Division under

Salandi Right Command.

K2 399-

401/18.09.1

8

It is observed that the

work done is 10 %

completed. Earth

work Excavation work

is in progress and the

work done is seen

satisfactory Field Channel at

Radhanagar(EOM) of

Bhadrak sub division

under Salandi Right

Command.

K2

215/13.11.2

018

It is observed that the

work done is 80 %

completed. The work

done is seen

satisfactory.

Field Channel at Village

Kumbaria (AIBP) of

Bhadrak sub division

under Salandi Right

Command.

K2

215/26.10.2

018

It is observed that the

work done is 10 %

completed. Earth

work Excavation work

is in progress and the

work done is seen

satisfactory

Field Channel at Village

Gharapada (AIBP) of

Bhadrak sub division

under Salandi Right

Command.

K2 392-

395/18.9.20

18

It is observed that the

work done is 10 %

completed. Earth

work Excavation work

is in progress and the

work done is seen

satisfactory

Field Channel at

Khetuali(AIBP) of

Bhadrak sub division

under Salandi Right

Command.

K2 413-

416/18.9.20

18

It is observed that the

work done is 100 %

completed. It is

instructed to rectify the

honey Comb found in

some places of FC

32 19.2.19

Er.Swapna

priyadarsini

Acharya

AEE

Drainage

Division,

Bhadrak

Improvement to storm

water Drainage Channel

(Concrete Drain in

bhadrak Muncipality in

Salandi –baitarani Doab

No- XIII)

02P1/2018-

19

It is observed that 30%

of work done has been

completed. It is

instructed to replace

the coarse

aggregates(oversized)a

nd fine aggregate at

site being used by the

agency before

commencement of

Page 25: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

25

further concrete work.

Gradation test of

20mm down graded

CA and gradation test

of fine aggregate are

not satisfying IS 383 at

site. It is instructed to

provide minimum

clear cover of 40 mm

to the reinforcement.

Slump test report came

105mm. It is instructed

to maintain W/C ratio

as per IS codes. Improvement to Kapali

DC near village

Ansarapur, Tankuni,

Balabhadrapur,

Baburigaon and Kasimpur

in Doab no-XIII.

61P1/2017-

18

The work done is seen

not satisfactory. It is

instructed to proceed

with stone packing

work properly.

Sri Sumanta

Kumar

Madhei,AEE

Jajpur

Irrigation

Division,

Jajpur

Raising,Strengthening and

Protection to left bank of

river Baitarani from

Balighai to Dehudi

Ananadapur under

NABARD Assistance

(RIDF-XXII)

04 P1(E.E)

of 2018-19

It is instructed to

compact the earth

properly as well as

watering properly.

Repair and Restoration of

Flood protective

Embankment on Baitarani

right from Raghupur to

Mathurapur

03 P1(E.E)

of 2018-19

It is instructed to

i) Finishing of the

packing work should

be uniform.

ii) Stones other than

H.G stones should be

removed.

iii) Interstices to be

filled up by small

stones with proper

hammering as per

agreement.

Raising,Strengthening and

Protection to left flood of

river Balungapatia from

Madhiali to Dihasahi

under NABARD

Assistance (RIDF-XXII)

02 P1(E.E)

of 2018-19

It is instructed to

i) Execute the work in

layer with proper

watering and

compaction.

ii) Test the suitability

of soil being used in

work.

iii) Maintain proper

profile for the work.

Page 26: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

26

33 20.2.2019 Er.Swapna

priyadarsini

Acharya

AEE

Drainage

Division,

Bhadrak Improvement to Drainage

cum creek system of

Bahupokhari creek/

Kalidaspur creek of

Andola,Balimed,Rajgharp

okhari and Birasa GPS of

Basudevpur block in

Kansabansa-mantei Doab

no-XI

08P1/2018-

19

It is observed that 20%

of work done has been

completed..Gradation

test of 20mm down

graded and gradation

of FA are satisfying IS

383 at site.It is

instructed to use

mobile during

shuttering to get

smooth finishing of

RCC works.

Improvement to drainage

channels and construction

of Guard wall with stone

packing in Sabaranga GP

under Simulia

constituency of Balasore

district in kansabansa-

Mantei Doab No-XI

1P1/2018-

19

It is observed that 52%

of work done has been

completed. It is seen

that stone packing

work is in progress. It

is instructed to fill up

moorum layer below

stone packing.

Construction of protection

wall over link drain to

Baitarani River near

village Khaparapada

&construction of FB over

Ankira DC ( Link Drain

to Baitarani River ) near

village Amritpur.

11P1/2018-

19

It is observed that 12%

of work done has been

completed. It is

instructed to provide

wipe hole in zig zag

manner..

34 22.2.2019 Sri Sumanta

Kumar

Madhei,AEE

Drainage

Division,

Jajpur

Renovation of Gadagadi

mahahra with its link

drain of Jajpur District in

Brahmani-Baitarani

DOAB No-XIV under

D.I.P.

18P1/2018-

19

It is instructed to

i) Replace the Sand

which is not coming

under

IS: 383.

ii) Curing should be

done by covering

Hessian clothes/Gunny

bags.

35 01.3.2019 Sri Sumanta

Kumar

Madhei,AEE

M.I.

Division,

Jajpur

Renovation to Right Main

Canal of Kalakala M.I.P

in Badachana Block under

State Plan .

41 P1 of

2018-19

It is instructed to

i) Maintain w/c ratio.

ii) Adopt covering

curing on wall and

ponding on Bed. Renovation to

Baitalukencha M.I.P in

Danagadi Block under

Critical Scheme.

26 P1 of

2018-19

It is instructed to

i) Maintain w/c ratio.

ii) Adopt covering

curing on wall and

ponding on Bed.

Page 27: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

27

36

7.3.2019

Er.Swapna

priyadarsini

Acharya

AEE

Drainage

Division,

Bhadrak

Construction of

Checkdam at RD 100m

over Simulia Jore Drain

near village Badabazar

under Chandabali Block.

35P1/2018-

19

It is observed that 20%

of work done has been

completed .It is

instructed to remove

oversized and Flacky

CA from work site. It

is instructed to use

SAIL bars for

reinforcement instead

of bars from local

brands

Construction of

Checkdam at RD 100m

over Sialapada Drain

near village

Sialapadaunder

Chandabali Block.

33P1/2018-

19

It is observed that 75%

of work done has been

completed . It is

instructed to use SAIL

bars for reinforcement

instead of bars from

local brands.

Gradation test of

20mm down graded

and gradation of FA

are satisfying IS 383 at

site. It is instructed to

use proper w/c ratio

according to code.

Construction of

Checkdam cum Sluice at

RD 100m over

Panchapada Drain near

village Panchapada

Chandabali Block.

34P1/2018-

19

It is observed that 70%

of work done has been

completed. It is

instructed to use SAIL

bars for reinforcement

instead of bars from

local brands.

Gradation test of

20mm down graded is

not satisfying IS 383 at

site. It is instructed to

replace CA deposited

at site. It is instructed

to maintain proper w/c

ratio according to IS

code. It is instructed to

provide wipe holes in

zig zag manner.

Gradation of FA is

satisfying IS:383.

Page 28: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

28

Construction of

Checkdam cum Sluice at

RD 100m over Ghusura

Drain near village

Kuanarasara Chandabali

Block

32P1/2018-

19

It is observed that 60%

of work done has been

completed . It is

instructed to use SAIL

bars for reinforcement

instead of bars from

local brands. It is

instructed to provide

wipe holes in zig zag

manner. It is instructed

to use proper w/c ratio

according to IS

code.The gradation of

FA and CA are

satisfying IS:383.

Construction of

Checkdam cum Sluice at

RD 100m over

Badaharipur to Begunia

Jore at RD 4300m near

village Nichinta

Chandabali Block

56P1/2018-

19

It is observed that 15%

of work done has

beencompleted .

It is instructed to use

SAIL bars for

reinforcement instead

of bars from local

brands. The gradation

of FA is satisfying

IS:383. It is instructed

to use CA as per

IS:383.

Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Restoration to Balarampur

saline gherry with

construction of 4 nos

drainage sluice.

77/

NCB/RIDF

/P1/18-19

Work is not started.

Only materials have

been stacked at site.

Protection to scoured

bank on Baitarani right

near Padmanabhpur.

114/

NCB/RIDF

/P1/18-19

i) The dumping nd

packing works are in

progress.

ii) The packing should

be done properly and

interstices to be

properly filled up.

iii) Materials for

testing have been sent

to Q.C. Div. cuttack

but test result yet not

received

Page 29: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

29

Protection to scoured

bank of Brahmani right

near Jharakata with

launching apron in

Rajnagar block.

111/

NCB/RIDF

/P1/18-19

i) The dumping and

packing work are in

progress.

ii) Stones other than

H.G. stone must be

removed.

Protection to scoured

bank of Gobri left near

Chandipali of Orta

sahabajpur saline ghery in

Mahakalapada block of

Kendrapara Dist.

104/

NCB/RIDF

/P1/18-19

Work is not started,

only materials have

been stacked at site.

Protection to scoured

bank of Gobri left near

Chandipali of Orta

sahabajpur saline ghery in

Mahakalapada block of

Kendrapara Dist.

MOU NO.

01/18-19.

i) The dumping and

packing work are in

progress ii) Packing

should be done

properly.

Protection to scoured

bank of river Nuna near

Gopalpur.

109/

NCB/RIDF

/P1/18-19

i) The dumping and

packing work are in

progress ii) Packing

should be done

properly. iii) materials

for testing have been

sent to cuttack but test

result yet not received.

Iv) Stone other than

hard granite should be

removed.

37. 8.3.2019 Er.Swapna

priyadarsini

Acharya

AEE

CAD

DIVISION

NO-3,

Bhadrak

Field Channel at Kusan

Nagar of Bhadrak sub

division under Salandi

Right Command.

K2 547-

549/27.02.1

9

It is observed that the

work done is 70 % .It

is instructed to

maintain proper w/c

ratio as per IS codes.

And it is further

instructed to maintain

proper alignment as

per estimate and

drawing.

Field Channel at

Bankatira-II of Bhadrak

sub division under

Salandi Right Command.

K2 522-

524/21.02.1

9

It is observed that the

work done is 65 % .It

is instructed to

maintain proper w/c

Page 30: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

30

ratio as per IS codes.

And it is further

instructed to maintain

proper alignment as

per estimate and

drawing.

Field Channel at

Paramanandapur of

Bhadrak sub division

under Salandi Right

Command.

K2 544-

546/27.02.1

9

It is observed that the

work done is 85 % .It

is instructed to

maintain proper w/c

ratio as per IS codes.

And it is further

instructed to remove

flaky and oversized

coarse aggregates from

work site.

38

12.3.2019

Er.Swapna

priyadarsini

Acharya

AEE

Drainage

Division,

Bhadrak

Improvement to drainage

channels and construction

of Guard wall with stone

packing in Sabaranga GP

under Simulia

constituency of Balasore

district in kansabansa-

Mantei Doab No-XI

1P1/2018-

19

It is observed that 73%

of work done has been

completed. It is

instructed to maintain

slope of stone packing

work properly as per

drawing and maintain

proper alignment of

guard wall as per

drawing and

agreement.

Improvement to

DSrainage Channels,

construction of FB and

Guard wall with stone

packing in Kanchpada

Andheri,

Shyamasundarpur,

Khirkona,Jamojhadi and

Bati GPs of Simulia

Block in Kansabannsa-

Mantei Doab No-XI

4p1/2017-

18

It is observed that 80%

of work done has

completed. It is

instructed to use SAIL

bars for reinforcement

instead of bars from

local brands. It is

instructed to use

proper w/c ratio

according to IS

code. It is instructed to

use FA and CA as per

IS:383.

Improvement to link

drains of river

Kansabansa and

construction of VRB with

protection wall over

Kansabasna drainage

channel near village

Jadibanka of kabirpur of

G.P. in Simulia Block in

Kansabansa-Manteidoab

No-XI

55p1/2018-

19

It is observed that 27%

of work done has

completed. It is

instructed to use CA

as per IS:383 and

reinforcement rod as

per agreement. It is

also instructed to use

mobile during centring

and shuttering.

Page 31: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

31

39

12.03.201

9

Sri Sumanta

Ku. Madhei

(AEE)

Jajpur

Irrigation

Division,

Jajpur

Renovation of Distry No-

02 of Jajpur Main Canal

under CLSRP (Working

from RD 17.500 Km to

24.180 Km)

23 P1(E.E)

of 2018-19

It is instructed to

i) Curing the Bed part

by ponding and slope

part by covering

Hessian clothes/Gunny

bags.

ii) Weep holes should

be provided at regular

interval.

Improvement to Right

side Flood Embankment

of river Kharasua fron

village Banilo to Mallipur

under NABARD

Assistance (RIDF-XXIV).

33 P1(E.E)

of 2018-19

It is instructed to

i) Execute the work in

layer with proper

watering and

compaction.

ii) Test the suitability

of soil being used in

work.

iii) Maintain proper

profile for the work.

Repair and Restoration of

Flood protective

Embankment on Baitarani

right from Raghupur to

Mathurapur

03 P1(E.E)

of 2018-19

It is instructed to

i) Finishing of the

packing work should

be uniform.

ii) Stones other than

H.G stones should be

removed.

iii) Interstices to be

filled up by small

stones with proper

hammering as per

agreement.

39

15.3.2019

Sri Sumanta

Kumar

Madhei,AEE

Jajpur

Irrigation

Division,

Jajpur

Renovation of Distry No-

4 of HLC Range -III for

the year 2018-19.

25 P1(E.E)

of 2018-19

The work is completed

which looks

satisfactory.

Restoration and

Protection to Scoured

bank on Genguti right

from Dehudi Anandapur

to Nandipur under

NABARD Assistance

(RIDF-XXIV).

31 P1(E.E)

of 2018-19

It is instructed to

remove debrishes and

roots from the work

sites.

Page 32: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

32

40 19.03.201

9

Sri Prasanna

Kumar

Dash,AEE

Aul

Embankment

Division, Aul

Protection to scoured

bank on Keredagada

Alatanga S/E on river

Hansua right near

Jagannathpur, Badkote &

Koilpur.

112/

NCB/RIDF

/P1/18-19

i) The dumping work

is in progress.

ii) No quality control

testing report is at site

during inspection.

Restoration to Rajnagar

gopalpur saline

embankment Hansua left

at Rajnagar, Bijulia &

Praharajpur.

113/

NCB/RIDF

/P1/18-19

i) The dumping and

launching work are in

progress.

ii) Small stones should

be removed and

surface packing should

be done properly and

provide wave baker.

iii) The edge of slope

should be in line.

Bank protection to

scoured bank of

kharasuan right near

Rathsahi.

126P1/18-

19

i) It is instructed to

remove quartz types of

stone other than H.G.

stone.

ii) Interstices should

be filled up and

hammer properly.

Bank protection of

kharasuan right near

Madhuban Harijan sahi.

130P1/18-

19

i) Work is not started

on the date of

inspection.

ii) Some amount of

stone sample have

been stacked. Protection to scoured

bank on K.K. right near

Bhuinpur Balisahi.

82P1/18-19 i) Berm of the

embankment must be

done properly as per

approved drawing.

Page 33: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

33

LIST OF WORKS VISITED BY QUALITY CONTROL INSPECTION AUTHORITIES

(HIGHER AUTHORITIES/SQM)

Name of the Division:-QUALITY CONTROL DIVISION,BHADRAK

SI

No

Date of

Visit

Name of

Inspecting

Authorities

Name of

the

Division

Name of the Work Agt. No.

Observation

&

Remarks

1 26.11.20

18

To

27.11.20

18

Er.

Birendra

Kumar

Ray(SQM)

Aul

Embankm

ent

Division,

Aul

Protection to

scoured bank of

Jamboo Baulakani

Mahakalapada

chhapali saline

gherry with

construction of

new saline

embankment i)

Badatubi to

Nipania (12 km)

ii) Bagagahana to

Tarapadaghata(13

km) iii) Fishery jet

to Alekhanahakani

(1.1 km) iv)

Kandarapatia to

sunity (4 km) v)

Paschimakhanda

saline gherry.

01NCB/RID

F/P1/2017-18

i) No site laboratory

is established.

ii) As large quantity

of stones used in site,

why only 3 samples

have been tested

iii) Why borrow area

soil used in

embankment has not

benn tested.

iv) Quality control

testing reports is not

available at site.

Protection to

scoured bank on

Gobindpur hadua

madhuban samal

sahi to sanagiri,

construction and

restoration of bed

bars and one no.

of control slice at

Maharakul.

30NCB/RID

F/P1/2017-18

2 29.12.20

18

Er.

Surendra

Kumar

Sahu (CE)

Aul

Embankm

ent

Division,

Aul

Protection to sea

side slope of

retard

embankment of

rajnagar gopalpur

saline

embankment from

Geo-tube near

Petha.

i) The launching &

dumping work is in

progress.

ii) Embankment shall

be formed

conforming to clause

6.6.1 and 6.6.2 of IS

code code

iii) The agreement of

all work should be

available to the EE,

QC division for

necessary correction

before execution of

agreement.

Protection to

scoured bank of

river Brahmani

right near

Lokanathprasad

with launching

apron in Rajnagar

block.

40NCB/RID

F/P1/2018-19

Protection to

scoured bank on

Brahmani left near

13P1/2018-

19

Page 34: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

34

Gopalpur

Protection to

scoured bank near

village

Jagannathpur.

31NCB/RID

F/P1/2018-19

3

09.01.20

19

Sri Khirod

Kumar

Mohanty,

S.Q.M

M.I.Divisi

on,

Jajpur

Renovation to

Kalakala M.I.P in

Badachana Block

under DPIW

scheme for the

year 2018-19.

Renovation to

Gopal Sahu

Bandha M.I.P in

Badachana Block

under Critical

grant for the year

2018-19.

Renovation to

Dholapathar M.I.P

in Sukinda Block

under State Plan

Scheme.

Renovation to

Patapur M.I.P in

Sukinda Block

under DMF grant

for the year 2018-

19

12P1/

2018-19

16 P1/

2018-19

32 P1/

2018-19

118 P1/

2018-19

On visual

observation and from

QC reports concrete

and U/S rip rap

packing seems good.

It is instructed to

remove as stone

packing is depressed.

The said work needs

more inspection as

work for this season

has just started.

4 15.01.20

19 to

16.01.20

19

Er. S.S.

Bhagat(SQ

M)

Aul

Embankm

ent

Division,

Aul

Bank protection

work and

construction of

spurs near sanagiri

to kharasuan right.

26P1/18-19

Bank protection to

scoured bank of

river Kani right

near village

kusumi Shiva

temple.

65P1/18-19

Protection to

scoured bank of

Brahmani right

near

Lokanathprasad

with launching

aprons in rajnagar

40NCB/RID

F/P1/2018-19

Page 35: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

35

block

Protection to

scoured bank

Gobri near village

Badadanua of

Radhia kansara

saline gherry in

Mahakalapada

block.

35NCB/RID

F/P1/2018-19

Protection to scoured

bank of Gobri left

near village Olia of Orta sahabajpur

saline gherry in

Mahakalapada block

73P1/2018-

19

5

19.02.20

19

Er.

K.C.Bali,

S.Q.M

Drainage

Division,

Bhadrak

02P1/

2018-19

I)Form work should

be leak proof and

properly placed.

II) Proper blending

of 20mm and 10mm

aggregates should be

done as per

specification as it

does not satisfy the

gradation test.

8 23.02.20

19

Sri K.K.

Mohanty,

S.Q.M

Drainage

Division,

Jajpur

Renovation of

Chhota Genguti

Drainage channel

and its link drain.

33 P1/

2017-18

Renovation of

Matagunjar

Drainage channel

and its link drains

in Jajpur District

under DOAB No -

IV.

17 P1/

2018-19

Page 36: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

36

Renovation of

Gadagadi Mahara

with its link drain

of Jajpur District

in Brahmani-

Baitarani DOAB

No-IV under

D.I.P.

18 P1/

2018-19

9.

26.03.20

19

Er.

H.K.Mishra

,

Director, R

&QC,BBS

R

Drainage

Division,

Bhadrak

Improvement to

storm water

Drainage Channel

( Concrete Drain

in Bhadrak

Muncipality in

Salandi-Baitarani

Doab No-XIII)

02P1/2018-

19

I) It is noticed that

there is no agreement

of curing of concrete

which leads to satisfy

lower strength of

concrete as required.

II) The

reinforcement by

using Sritist steel has

not been tested by

any QC laboratory .

III) As learnt by QC

staff that W/C ratio

is not being

maintained

IV) Approximately

1100 cum of

concrete has been

executed without

any specimen cube

tested by the Q.C.

The site incharge is

instructed to intimate

E.E., QC to collect

sample cube for

getting 7/28 day

strength of concrete.

V) Centring and

shuttering should be

rigid and of approved

quantity.

Photo Gallery (Inspected by Quality Control Officers)

Page 37: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

37

Name of the work-Field Channel at Erada-3 of Bhadrak sub division under Salandi Left Command.

Visited the work site of CAD Division no-3 by AEE, QCD along with EE, QCD,Bhadrak and LA, QCD, Bhadrak in

presence of AEE and JE of Concerned field sub division i.e.Bhadrak CAD Sub-division, Bhadrak

Name of the work-Improvement to Kapali DC near village Ansarapur, Tankuni, Balabhadrapur, Baburigaon and

Kasimpur in Doab no-XIII.Visited the work site of Drainage Division ,Bhadrak by Er. Satrughana Das, Advisior of

DOWR, Odisha along with EE, AEEs and LA, QCD, Bhadrak in presence of SE, EE ,AEEs and JEs of Concerned

field Division.

Page 38: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

38

Name of the work-Construction of Check Dam over Khandia Nallah (Khandakosi) near Village Goramati..Visited

the work site of Drainage Division, Bhadrak by AEE, QCD along with EE, QCD,Bhadrak in presence of JE of

Concerned field sub division i.eDrainage Sub-division no-3, Bhadrak

Name of the work- Improvement to Drainage cum creek system of Bahupokhari creek/ Kalidaspur creek of

Andola,Balimed,Rajgharpokhari and Birasa GPS of Basudevpur block in Kansabansa-mantei Doab no-XI .Visited

the work site of Drainage Division, Bhadrak by Er. K.C.Bali ,SQM, along with EE, AEE and LA of QCD,Bhadrak

in presence of EE, AEE and JE of Concerned field sub division i.eDrainage Sub-division no-4, Markona

Page 39: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

39

Name of the Work: -Raising,Strengthening and Protection to leftbank of river Baitarani from Balighai to Dehudi

Ananadapur under NABARD Assistance (RIDF-XXII)along with EE, AEE and LA of QCD, Bhadrak in presence

of AEE and JE of Concerned field sub division .

Name of the Work:-Renovation of Distry No-02 of Jajpur Main Canal under CLSRP (Working from RD 0.00Km to

8.925Km)along with EE, AEE and LA of QCD, Bhadrak in presence of AEE and JE of Concerned field sub-

division .

Page 40: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

40

Name of the Work:-Water supply to Tail end of 1 A 1 distributary and Talia minor of Japur canal system for

stabilization of lost ayacut along with EE, AEE and LA of QCD, Bhadrak in presence of AEE and JE of

Concerned field sub division .

Name of the Work:-Protection of Baitarani Right Embankment near Kuanrsahialong with EE, AEE and LA of

QCD, Bhadrak in presence of AEE and JE of Concerned field sub division .

Page 41: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

41

Name of the Work:-Repair and Restoration of Flood protective Embankment on Baitarani right from Raghupur to

Mathurapuralong with EE, AEE and LA of QCD, Bhadrak in presence of AEE and JE of Concerned field sub

division .

Name of the Work:-Repair and Restoration of Flood protective Embankment on Baitarani right from Raghupur to

Mathurapuralong with EE, AEE and LA of QCD, Bhadrak in presence of AEE and JE of Concerned field sub

division .

Page 42: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

42

Name of the Work:-Renovation of Chhota Genguti Drainage channel and its link drain Inspected byEr. Khirod

Kumar Mohanty ,SQM, along with EE, AEE and LA of QCD,Bhadrak in presence of EE, AEE and JE of

Concerned field sub division i.eDrainage Sub-division no-2, Chandikhol

Name of the Work:-Renovation of Gadagadi Mahara with its link drain of Jajpur District in Brahmani-Baitarani

DOAB No-IV under D.I.P Inspected by Er. K.K Mohanty ,SQM, along with EE, AEE and LA of QCD, Bhadrak in

presence of EE, AEE and JE of Concerned field sub division i.eDrainage Sub-division no-3, Binjharpur.

Page 43: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

43

Name of Work: Restoration to Satagaon saline gherry with construction of 5 nos sluice along with

Executive Engineer, QC Division, Bhadrak.

Name of Work: Protection to scoured bank of river Nuna near Gopalpur. in Mahakalapada block alongwith Executive Engineer, QC Division, Bhadrak.

Page 44: GOVERNMENT OF ODISHA1 Sieve G.I Frame 30 cm DiaX125mm 3 Nos 2016 2 Sieve G.I Frame 30 cm DiaX80mm 3 Nos 2016 ... 16 Slump test Apparatus with Tamping Rod and Base Plate 3 Nos 2016

44

Name of Work: Protection to scoured bank at Barunadiha, Badhajhar, Panki and Mahurigaon on river Kharasuan.left

along with Executive Engineer, QC Division, Bhadrak.

Name of Work: protection to scoured bank from Sorisada to Patrapur village on Brahmani left along with

Executive Engineer, QC Division, Bhadrak.