17
Got Migration? Exploring the Migration Project Tool in the Context of an Oracle Cloud Hosted Environment www.egiusa.com

Got Migration? - Oracle Transportation Managementotmsig.communities.oaug.org/multisites/otm/images/... ·  · 2016-01-15Got Migration? Exploring the ... 2 9/1/2015 AGENDA Introduction

  • Upload
    vanhanh

  • View
    217

  • Download
    3

Embed Size (px)

Citation preview

Got Migration?Exploring the Migration Project Tool in the Context of an Oracle

Cloud Hosted Environment

www.egiusa.com

2 9/1/2015

A G E N D A

Introduction

Overview

Why Migrate?

Advantages/Disadvantages

Migration in the Cloud

3 9/1/2015

O V E RV I E W

AKA Promote to Prod

Configure in Dev.. How do we get this to Production?

How do we reduce the time needed to move around data?

4 9/1/2015

W H Y M I G R AT E ?

New Project Implementation

New Configuration

Master Data/Rate migration

5 9/1/2015

P R O M O T I O N PAT H

Dev Test Prod

Master Domain

• Can use a “Master Domain” to hold all approved configuration

• This can be on separate server

Dev

• Use for new configuration

• Can have multiple projects

Test

• Test new Configuration that was approved in Dev

• User acceptance testing

• Full end to end with Integration testing

Prod

• Only fully tested and approved configuration moved to Production

6 9/1/2015

W H AT M I G R AT I O N D O E S W E L L

Ease of Use

Migration Project Logging

Clear the Cache

Clear Results

Format Correction

Send Project to other Parties

Supported by Oracle

7 9/1/2015

S H O RT C O M I N G S

Download Issues

Additional Scripts Needed

Manager Layouts

Sequencing

Customizations

UI Limited to 1000 objects

8 9/1/2015

M I G R AT I O N I N T H E C L O U D

Initial Move to Production

Monthly Patches

Upgrades

9 9/1/2015

M I G R AT I O N I N T H E C L O U D

Initial Move to Production

Migration Project is Best Option

Lets You Move from Non-Cloud to the Production Cloud Environment

Limited Number of Projects for total Migration

10 9/1/2015

M I G R AT I O N I N T H E C L O U D

Upgrades and Monthly Patches

Upgrades Occurs Every 4 Months

Scheduled by Oracle

Regression testing

Any Configuration Associated with Upgrade/Patches Need to be Migrated

11 9/1/2015

C R E AT I N G A M I G R AT I O N P R O J E C T

Header

Project ID

Name

Description

Type

Manual Sequence

Commit Scope

Refresh Cache

Raise Lifetime Event

12 9/1/2015

C R E AT I N G A M I G R AT I O N P R O J E C T

Detail

Screen set ID

Transaction Code

Object

13 9/1/2015

E X P O RT I N GMigration Project Export

Notify Type

FTP

Email

Contact Notification

File Format (.zop)

14 9/1/2015

I M P O RT I N G

Migration Project Import

File Format (.zip)

Tie to Import Migration Project

Action on Error (Stop/Continue)

Schedule

15 9/1/2015

O B J E C T S N O T H A N D L E D

Additional CSV’s Required

Regions

Equipment

Contacts

Business Monitors

ACR Role and Role Grants

User Access

16 9/1/2015

C O N C L U S I O N

Migration project offers a strong solution for moving data between environments

Ease of Use, Issue Identification and Correction

Not all Objects Supported

Room For Improvement

17 9/1/2015