7
 Find Jobs Find Resumes Employers Post a Job  what where Find Resumes  Advanced Search Chukwuemeka Akaniro RF Planning and Optimization Engineer Harcourt, IA • To be a team player in pursuing excellence at work. • To work in a challenging environ ment that would enhance creativity and contribution t o organizational growth. • To build a professional career in a dynamic organization. Personal Qualities • Creative and motivated at work. • Good interpersonal skills. • Good team player. Work Experience RF Planning and Optimizati on En gineer MTN Communications Nig Ltd September 2012 to July 2013 Port Harcourt, Rivers Niger ia Work Description: • Site Survey and Selection • Use of ASSET Planning Tool for site database management • Carrying Out of Technical Site Survey • Loading of Cell data to t he MSC before site integration using Winfiol tool • RF Parameter Planning (Plann ing of MA IO, HSN, TCH and BCCH for MBC Implementation) • Planning of Neighbour List for new sites • Monitoring of new sites Performances using ZTE EMS and F.A.C.T.S tools Save Resume Forward Resume Email Chukwue meka Download Resume Updated: October 8, 2014 Sign in Do you need professional PDFs? Try PDFmyURL fully for free!

Good CV http___=0

Embed Size (px)

DESCRIPTION

JFJHRTYURT

Citation preview

  • Find Jobs Find Resumes Employers Post a Job

    what whereFind Resumes

    Advanced Search

    Chukwuemeka AkaniroRF Planning and Optimization EngineerHarcourt, IA To be a team player in pursuing excellence at work. To work in a challenging environment that would enhance creativity and contribution toorganizational growth. To build a professional career in a dynamic organization. Personal Qualities Creative and motivated at work. Good interpersonal skills. Good team player.

    Work Experience

    RF Planning and Optimization EngineerMTN Communications Nig LtdSeptember 2012 to July 2013Port Harcourt, Rivers Nigeria Work Description: Site Survey and Selection Use of ASSET Planning Tool for site database management Carrying Out of Technical Site Survey Loading of Cell data to the MSC before site integration using Winfiol tool RF Parameter Planning (Planning of MAIO, HSN, TCH and BCCH for MBC Implementation) Planning of Neighbour List for new sites Monitoring of new sites Performances using ZTE EMS and F.A.C.T.S tools

    Save Resume

    Forward Resume

    Email Chukwuemeka

    Download Resume

    Updated: October 8, 2014

    Sign in

    Do you need professional PDFs? Try PDFmyURL fully for free!

  • Planner2G RFMay 2012 to August 2012MTN/Aircom Project, Ojota Switch Ojota, Lagos Nigeria Work Description: Site Survey and Selection RF Detailed Design and Configuration of Sites in Asset Planning Tool Produce Coverage Prediction and Traffic Analysis Carry Out Technical Site Survey (TSS)

    2G Optimization EngineerLM Ericsson Nigeria Ltd - LagosJuly 2011 to March 2012Account, 6TH Floor, Golden Gate Plaza 25B Glover Rd, Ikoyi, Lagos, Nigeria Work Description: Coordination of SSV and Tuning of new sites (Including Swap detections and suggestions forcorrections) RF Optimization (Analysis of Drive Test Data and Optimization Recommendations: NeighborAdditions and Antenna Adjustments) Analysis and Reporting of Competitive Benchmarking Drive Tests Drive Test Coordination ( Including Customer Complaint Drive Test, Benchmarking Drive Test,Routine Drive Test, Cluster Drive Test and SSVD) Site Candidate Selection from TSS Reports Cell Planning (Including determination of Antenna Azimuths, Antenna Tilts and Heights) Coverage Predictions (Including validation of newly planned sites and existing sites) Provision of 2nd Cuts Knowledge Area: 3G Cluster Tuning Activities (Including Swap Detections and Corrections, Antenna Adjustments forCoverage Enhancements, and Reduction of Pilot Pollutions) Use of TEMS Route Analysis in Analysis of 3G SSVD Drive Test Data Preparation of a 3G Tuning DT Report Showing Ec/No, RSCP and PSC Primary Scrambling Code Planning Using MapInfo in conjunction with Excel

    EngineerRF&DT - LagosApril 2010 to July 2011GTL International Nig. Ltd. (NSN/Etisalat project, Alcatel-Lucent/Globacom, Alcatel-Lucent/Etisalat project&Huawei/MTN project) Plot 900 Balarabe Musa Crescent, Victoria Island, Lagos, Nigeria.

    Do you need professional PDFs? Try PDFmyURL fully for free!

  • Work Description: Analysis and Reporting of Drive test Data Pre-launch Drive Test Optimization (Including CSSR test, EDGE/GPRS test, Coverage test andHandover test) Cluster optimization Drive Test Benchmarking Site Investigation Drive Test (Including Swap Check) WIMAX Data Test Site Audit

    Senior RF EngineerMerit Telecoms Nig. Ltd - LagosDecember 2009 to March 201015 Adepegba Street, Coker Road, Ilupeju, Lagos, Nigeria. Work Description: 2G and 3G RF Optimization (Addition of Neighbors Cells and Antenna Adjustments) Network KPI Optimization (Parameter Adjustment) Monitoring and Analysis of Network Traffic Statistic Data (Including CSSR, HOSR and CDR ) Monitoring and Analysis of BSS Alarm Worst Cell Analysis and Reporting Preparation of Network Daily and Weekly Performance Reports for the Customer Response to Trouble Tickets Call Tracing Single Site Verification Drive Test (Including Coverage tests, Soft/Softer Handoff tests and CSSRtest) Cluster Drive Test Drive Test Analysis and Reporting Physical Optimization (Antenna Adjustments)

    2G/3G Drive Test EngineerQuantum-Basics Nigeria Ltd - LagosSeptember 2009 to November 2009Zain/MSI Project & Etisalat/NSN/Aircom Project) 4, FolaJinadu Crescent, Gbagada G.R.A Phase 1, Lagos, Nigeria Work Description: Pre-launch Drive Test (Including CSSR test, EDGE/GPRS test, Coverage test and Handover test ) Cluster Optimization Drive Test Troubleshooting Drive Test RF Site Audit

    Do you need professional PDFs? Try PDFmyURL fully for free!

  • Radio Network Planning and Optimization EngineerHuawei Technologies Co - LagosAugust 2008 to April 2009Visafone Project) Floor 9th, Plot 98 Adeola Odeku Street, South Atlantic Petroleum Tower, Victoria Island, Lagos, Nigeria. Work Description: Nominal Cell Planning LAC and Frame Planning PN planning Neighbor Planning Coverage Prediction and Simulations Network KPI Monitoring and KPI Optimization Analysis of Network Traffic Statistic Data Preparation of KPI Optimization Reports Query of BSS Alarm Status Single Site Verification Drive Test (Including Drive Test of EV-DO sites using CAIT) Drive Test Analysis and Reporting

    Transmission EngineerEricsson - LagosNovember 2007 to August 2008MTN Project), Plot 52, Morrison Crescent, Oregun Industrial Estate, Ikeja, Lagos, Nigeria. Work Description: Ericsson 3G WCDMA Radio Base Stations (RBS 3216 and RBS 3116) Site Material Logistics. Installation of Ericsson 3G WCDMA RBS Provisional Acceptance Test of Ericsson 3G WCDMA RBS Sites in Conjunction with the Customer Troubleshooting of Feeder to Antenna Fault Conditions after 3G RBS Site Implementations. VSWR and DTF tests for newly installed Ericsson 3G WCDMA Radio Base Stations. Supervision of Ericsson 3G WCDMA RBS site Implementations. Swap out of Ericsson 2G RBS 2202 Equipment for RBS 2216. Provisional Acceptance Test of Ericsson 3G WCDMA RBS Sites in Conjunction with the Customer Ericsson Mini-Link Microwave Transmission Equipment Installation, Setup and Commissioning. Microwave Transmission Link Alignment. Site Engineer Feb - August 2006LM Ericsson Nig. Ltd. (Vmobile/Celtel Project), 17 Walter Carrington Crescent, Victoria Island, Lagos

    Do you need professional PDFs? Try PDFmyURL fully for free!

  • Work Description: Supervision of RBS Site Installations Integration of Ericsson RBS [] Sites to BSCs Use of TEMS pocket for Inter-cell and Intra-cell Handover Test and Call Test after Site Integration Loading of RBS [] configuration data during Site Integration Performance of Loop-Back Test when troubleshooting Ericsson Mini-Link Microwave links Trouble shooting of RBS fault conditions Ericsson RBS Site Engineering and Documentation Ericsson RBS site-build material logistics Preparation of RBS Site Material Request Forms Preparation of RBS sites for Site Acceptance with the customer

    Installation EngineerEricsson - LagosDecember 2005 to February 2006Work Description: RBS Site Installation Ericsson Mini-Link Microwave Equipment Installation and Transmission Link Setup Site Commissioning

    Industrial TraineeLM Ericsson Nig. Ltd - LagosJanuary 2004 to October 2004Celtel Accounts & Customer Solutions Department) 17 Walter Carrington Crescent, Victoria Island, Lagos, Nigeria Work Description: Knowledge in Ericsson Core Network and Access Network products Integration of Ericsson RBS 2202 sites into customer's BSC

    Industrial TraineeABB Power-lines Nig. Ltd - LagosJuly 2004 to July 2004Mtel Nigeria Project) 1 Awosika Street, Ikeja Industrial Estate, Lagos, Nigeria Work Description: Installation and configuration of Ericsson Mini-Link

    Do you need professional PDFs? Try PDFmyURL fully for free!

  • Microwave radio equipment for back-haul of GSM radio traffic towards the Base Station Controller(BSC) Setting up of Ericsson Mini-Link Microwave radio link.

    Industrial TraineeRANC LtdJuly 2002 to October 2002Shell Petroleum Contractor), Shell Industrial Area, Port Harcourt, Nigeria Work Description: Installation of Ericsson MOBITEX VHF Radios, Maintenance of NERA 34 Mbits Microwave Radios, and Ericsson PDH Multiplexer systems, Maintenance of battery backup system, Maintenance of Cable TV installations and subscriptions for Shell Petroleum Residential Area.

    Education

    B.Eng. in Electronic and Computer EngineeringFederal University of Technology Owerri2000 to 2005

    CertificateCollege of the Immaculate Conception1994 to 1998

    Urban Boys Secondary School1991 to 1994

    Certificate in Planning and Optimization TrainingArtisan and Primary School1988 to 1991

    Additional Information

    Skills

    Do you need professional PDFs? Try PDFmyURL fully for free!

  • 2015 Indeed

    Use of Ericsson OSS System and Winfiol tool Nexplore Use of TEMS Investigation and RouteAnalysis for cluster tuning activities Use of MapInfo and MCOM for creation of Thematic maps, WINSCP 4.2.2 beta, Nokia Flexi Kit, Mentum(TCPU) Cell Planner, Genex-Unet, Genex Nastar, Genex Probe, Pilot Panorama, Pilot Pioneer, Genex Apus, Huawei LMT, Ericsson OMT, I-Manager M2000, F.A.C.T.S and ZTE EMS Monitoring tools, Performance Monitoring System(PMS), TEKTRONIK Interference Analyzer, Anritsu SiteMaster, RF Planning, PN Planning, LAC Planning, Neighbour List Planning, Coverage Predictions and Simulations, Network KPIMonitoring and KPI Optimization, 2G and 3G RF Optimization, Monitoring and Analysis of NetworkTraffic Statistic Data, Response to Trouble Tickets, Call Tracing, Query of BSS Alarm, SiteSurvey, Site Audit, Physical Optimization, Frequency Scanning, Drive Test, Edge, GPRS andWIMAX Data Test, Drive Test Analysis, Preparation of Drive Test Reports, Benchmarking, BTS Installation, Site Integration and Commissioning, Feeder Line Sweep Test andTroubleshooting, Loop-back Test, Transmission link Alignment and Commissioning, Site MaterialLogistics, Site Survey, MS Word, MS Excel, MS Power Point, Programming in Q basiclanguage Language English Hausa Igbo

    Do you need professional PDFs? Try PDFmyURL fully for free!