2
GOLDEN GATE BRIDGE The 75th Anniversary is a program of the Golden Gate Bridge, Highway and Transportation District and Golden Gate National Parks Conservancy in cooperation with the National Park Service and the Presidio Trust. TEMPORARY CLOSURES AND DETOURS (see map on reverse side) For your safety, sections of the Golden Gate Bridge Plaza and Battery East parking lots and the Battery East Bay Trail (see map on reverse) will be temporarily closed during construction. Specific closures will vary over the 9 month construction period. You may monitor closures and construction progress at www.goldengate.org/news/bridge/Construction-Alerts.php. To safely allow visitors access to the Bridge visitor area, we strongly encourage the use of alternative transportation. For more information, please see map on the reverse side or visit www.transit.511.org and www.goldengatetransit.org/schedules. For project related questions, please call (415) 561-3054 or email [email protected]. To learn more about the Golden Gate Bridge 75th anniversary and plaza improvements, please visit www.goldengatebridge75.org and www.parkplanning.nps.gov/GGB75th or email [email protected]. This information is available in alternate formats. TDDY at (415) 556-2766. Ver 9.14.11 AUGUST 2011 - APRIL 2012 May 27, 2012 marks the 75th anniversary of the Golden Gate Bridge. To improve the Bridge’s southeast side visitor area for this major milestone, several construction projects will be underway from August 2011 through April 2012. The following improvements will be made to enhance the visitor experience, improve interpretation and visitor programs, and improve visitor safety and parking efficiency: Construct the Golden Gate Bridge Pavilion to welcome visitors, provide information, and sell commemorative merchandise Renovate the historic Round House Gift Shop as a meeting place for visitor programs and tours Revitalize visitor plaza by restoring historic views of the Bridge and surrounding areas, improving signage, and providing improved accessibility Artist rendering of the Golden Gate Bridge Pavilion

GOLDEN GATE BRIDGE · 2017. 10. 29. · GOLDEN GATE BRIDGE The 75th Anniversary is a program of the Golden Gate Bridge, Highway and Transportation District and Golden Gate National

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

  • GOLDEN GATE BRIDGE

    The 75th Anniversary is a program of the Golden Gate Bridge, Highway and Transportation District and Golden Gate National Parks Conservancy in cooperation with the National Park Service and the Presidio Trust.

    TEMPORARY CLOSURES AND DETOURS (see map on reverse side) For your safety, sections of the Golden Gate Bridge Plaza and Battery East parking lots and the Battery East Bay Trail (see map on reverse) will be temporarily closed during construction. Specific closures will vary over the 9 month construction period. You may monitor closures and construction progress at www.goldengate.org/news/bridge/Construction-Alerts.php.

    To safely allow visitors access to the Bridge visitor area, we strongly encourage the use of alternative transportation. For more information, please see map on the reverse side or visit www.transit.511.org and www.goldengatetransit.org/schedules.

    For project related questions, please call (415) 561-3054 or email [email protected].

    To learn more about the Golden Gate Bridge 75th anniversary and plaza improvements, please visit www.goldengatebridge75.org and www.parkplanning.nps.gov/GGB75th or email [email protected].

    This information is available in alternate formats. TDDY at (415) 556-2766.

    Ver 9.14.11

    AUGUST 2011 - APRIL 2012

    May 27, 2012 marks the 75th anniversary of the Golden Gate Bridge. To improve the Bridge’s southeast side visitor area for this major milestone, several construction projects will be underway from August 2011 through April 2012. The following improvements will be made to enhance the visitor experience, improve interpretation and visitor programs, and improve visitor safety and parking efficiency:

    • Construct the Golden Gate Bridge Pavilion to welcome visitors, provide information, and sell commemorative merchandise

    • Renovate the historic Round House Gift Shop as a meeting place for visitor programs and tours

    • Revitalize visitor plaza by restoring historic views of the Bridge and surrounding areas, improving signage, and providing improved accessibility

    Artist rendering of the Golden Gate Bridge Pavilion

  • Doyle Drive

    Torp

    edo W

    harf

    Coas

    t Gua

    rd Pi

    er

    BatteryCranston

    BatteryMarcusMiller

    BatteryGodfrey

    BatteryBoutelle

    Battery East

    Future GoldenGate Overlook

    G O L D E N G A T E P RO M E N A

    D E ( B AY T R A

    I L )

    Warming Hut

    (weekends)

    (weekends)BatteryLancaster

    Fort Point

    Golden GateBridge

    Log CabinBall Field

    Tunn

    el

    Crissy Field

    Hamilton St .

    Hoffman St.

    Armistead Rd.

    Lendrum Ct.

    Ramsell

    (weekends)

    (weekends)

    Battery East / Bay Trail

    Mason Street Bike Path

    Crissy Field Promenade

    Airstrip Trail

    Presidio Bluffs Trail

    Andrews Road Trail

    Anza Trail

    Battery

    Eas

    t Tr a

    il

    Bowm

    an R

    oad

    Crissy Field Promenade

    Fort Point Trail

    Batt. E

    ast / B

    ay Trail

    Anza T rail

    Mer

    chan

    t Tra

    il

    Pres

    idio

    Pro

    men

    ade

    Crissy Field Promenade

    Presidio Promenade / Bay Trail

    Amphitheater Trail

    Coastal Trail

    Gol

    den

    Gat

    e Br

    idge

    Pilots Row Trail

    Battery East Trail

    Mason Street Bike Path

    West Bluff Picnic Area Trail

    Pres

    idio

    Blu

    ffs T

    rail

    Presidio Promenade

    Presidio Promenade

    Presidio Promenade

    GGT

    GGT

    76

    76

    28

    28

    0 150 M

    5000 FTNorth

    Parking Area

    Additional Parking Area (Weekends)

    San Francisco Muniwww.sfmta.comDaily: Route 28Sundays and Holidays: Route 76

    Golden Gate Transitwww.goldengate.org Daily: Routes 10, 70, 80, 101Weekdays (except holidays):Routes 2, 4, 8, 18, 24, 27, 38, 44, 54, 56, 58, 72, 74, 76, 92, 93, 97

    PresidiGo Free Shuttlewww.presidio.gov/directions/presidigoshuttle

    PresidiGo (Weekend Route)

    Trails Food Restrooms

    Overlook Viewing Location

    GGT

    M. N

    orel

    li

    00

    August 1, 2011

    (weekends)

    (weekends)

    Storey Ave.

    Mer

    chan

    t R

    d.

    Linc

    oln

    Blv

    d.

    Lincoln Blvd.

    Marine

    Drive

    Long Ave.

    Mason St.

    Crissy FieldOverlook

    Crissy Field Ave.

    101

    1

    Toll

    Plaza

    GOLDEN GATE BRIDGEACCESS, PARKING, AND TRANSIT