GNL3Z PJ PIPING INSPEC-TION
2010. JUL.28th
QA/QC TEAM
◈ Inspection Sequence
NoInspection
ActivityApplication
Code
Inspection Authority
REMARKSDW SAIPEMSONATR
AHARH
1Receiving In-
spectionRelevant QCP ● ●
2Fit-UP Inspec-
tionRelevant WPS ● ● ●
3Ferrite Con-
tentsRelevant Pro-
cedure● ● ●
Only Stain-less
4Visual In-spection
ASME B31.3● ● ●
5 RTASME B31.3
● ● ● After PWHT
6Hardness
Check
Relevant Pro-cedure ● ● ●
After PWHT
7 PMIRelevant Pro-
cedure ● ● ●Only Stain-
less
8 Hydro TestRelevant Pro-
cedure ● ● ● ●
1. Receiving Inspection1.1 Check Point - Dimension Check - Direction Check(Flange, Elbow, Blanch) - Damage Check(Dent, Painting, Welding Bevel, Flange Face etc) - Color Coding Check - Preservation Check
1.2 Authorized Personnel - Material Team - Construction Team - Saipem Authorized Personnel - DW QC : Preparation of NCR( 자재 팀 , 공사 팀 부적합 사항 보고 시 )
1.3 Report - Overage, Shortage & Damage Report
2. Fit-Up Inspection1. Check Point - Root Gap(WPS) - Bevel Angle(WPS) - Misalignment(1.59mm-API 1104) - Tapered Angle(ASME B31.3) - Foreign Material(Scale, Paint, Oil, Grease etc)
2. Authorized Personnel - Construction Team : Preparation & Requisition of Inspection(RFI) - DW QC : Implement of Inspection - Saipem & Sonatrach Inspector
3. Report Pre-Welding Visual Inspection Report(Form code:
MDT.WL.CDQ.0150)
3. Ferrite Content Measurement1. Check Point - Fe Content Measure : Root Pass of Stainless Steel - Carbon Wire 사용 금지
2. Authorized Personnel - Construction Team : Preparation & Requisition of Inspection(RFI) - DW QC : Implement of Inspection - Saipem & Sonatrach Inspector
3. Device(Refer to Photograph)
4. Report : Non Destructive Examination Report(Form code: MDT.WL.CDQ.0140)
4. Visual Inspection1. Check Point(ASME B31.3 Para 344.1) - Surface Imperfection of Weld Crack : No Permitted Lack of Fusion : No Permitted Incomplete Penetration : No Permitted External Porosity : No Permitted Surface Roughness : ≤500 min Ra Under bead : No Permitted Undercut : 0.79mm 이하 Height of Reinforcement Base Metal Thickness(mm) Max Height of
Reinforcement(mm) T ≤ 6 ≤ 1.5 6 < T ≤ 13 ≤ 3.0 13 < T ≤ 25 ≤ 4.0 T > 25 ≤ 5.0
2. Authorized Personnel - Construction Team : Preparation & Requisition of Inspection(RFI) - DW QC : Implement of Inspection - Saipem & Sonatrach Inspector
3. Device
4. Type of Imperfection
5. Report :
5. Radiographic Test1. Application Code : ASME B31.3(High Pressure Piping)
2. Check Point - Internal & External Welding Defect
3. Authorized Personnel - Construction Team : Preparation & Requisition of RT - QA/QC Team : RFI Issue, RT Result input in WICS & Notification of RT Result
to Construction Team - NDE Subcontractor : Implement of NDE - SAIPEM * SONATRACH Inspector : RT Film Review
4. Device : Ir-192 Radiation Equipment & Developing Facility.
5. NDE Application (Piping Class Summary)
6. Report : Radiographic Examination Report(Form code: MDT.WL.CDQ.0141)
5.Piping Class Summary
Welding Class Piping Class NDE Application (%) Remarks
Class Ⅰ
A10K/1 A10N/1 A10U/1 A20K/11.Butt Weld: RT (100%),Ferrite Content(Diameter 별 , SAIPEM Inspec-tor 지정 )
2.Fillet Weld(Seal Welding) : PT or MT(100%), Root Pass 10% PT
3. Hardness Test: After PWHT
1.Stainless Pipe: PT
2. Carbon Pipe : MT(After PWHT)A32A/1 A34A/1 A90K/0 B10K/1
B10N/1 B20K/1 B90K/0 D10K/1
D10N/1 D11A/1 D12A/1 D20K/1
D32A/B D41A/1 D42A/1 D90K/0
D91A/1 D92A/1 E10K/1 E10N/1
E11A/1 E32A/1 E41A/1
Class Ⅱ
A10V/B A11A/1 A12A/1 A15A/A 1.Butt Weld: RT (10%),Ferrite Content(Diameter 별 , SAIPEM Inspec-tor 지정 )2.Fillet Weld(Seal Welding) : PT or MT(10%), Root Pass 10% PT3. Hardness Test: After PWHT
1.Stainless Pipe: PT
2. Carbon Pipe : MT(After PWHT)3. RT 10% : Welder, Line 별4. 최초 5 Point RT
A41A/1 A92A/1 B11A/1 B12A/1
B41A/1 B42A/B B91A/0
Class Ⅲ A80K/1 A80R/1 A82A/1Branch Line : PT
10%Fabrication
6. Hardness Test1. Application Code : ASME B31.3(High Pressure Piping)
2. Check Point - Measurement of Hardness Value by BHN/RC Method after PWHT. Carbon Steel : Max 238 BHN/RC
3. Authorized Personnel - Construction Team : Preparation & Requisition of Hardness Test - QA/QC Team : RFI Issue, Result input in WICS & Notification of Re-
sult to Construction Team - NDE Subcontractor : Implement of Hardness Test - SAIPEM * SONATRACH Inspector : Witness
4. Device(Refer to Photograph)
5. Report : Hardness Examination Report(Form code: MDT.WL.CDQ.0431)
7. PMI1. Application Code : ASTM & ASME section Ⅱ
2. Check Point : Stainless Steel Pipe 용접부 Alloy 함량 Check.
3. Authorized Personnel - Construction Team : Preparation & Requisition of PMI - QA/QC Team : RFI Issue, Result input in WICS & Notification of Result
to Construction Team - NDE Subcontractor : Implement of PMI - SAIPEM * SONATRACH Inspector : Witness
4. Device(Refer to Photograph)
5. Report: PMI Report(Form code: MDT.WL.CDQ.0102)
Electrode Cr Ni Mo
A312 TP304/304L
18.0 ~ 22.0 9.0 ~ 11.0 -
A312 TP316/316L
17.0 ~ 20.0 11.0 ~ 14.0 2.0 ~ 3.0
8. Hydrostatic Test1. Application Code: ASME B31.3(High Pressure Piping)
2. Check Point - Preparation of QC Document & AS Built DWG - Confirmation of Piping Work
3. Authorized Personnel - Construction Team : Preparation & Requisition of Hydro Test - QA/QC Team : RFI Issue, Result input in WICS & Notification of Re-
sult to Construction Team - SAIPEM & SONATRACH Inspector : Witness - ARH : Witness
4. Device : High Pressure Pump, Record, Temperature, Certificate of Water
5. Report : Inspection of Erected Line before Pressure Test(CDQ 0104) Piping Pressure Test(CDQ 0195)
9. Follow Chart
Fit-Up Inspection
Receiving Inspec-tion
Pre-Heating<25mm : 10℃, 대기온도 -
5℃ 이하 : 50℃ 이상 ≥25mm: 100~150℃
Tag Weld: ≤2 ½: 3Point2 ½~14: 4Point14 Over ; 6Point
In Process Inspection(Random-Report)
Ferrite Content Check(Stainless Steel-1’st Pass
Post Heat TreatmentLTCS & C.S: 30mm
Over(250℃, 30min Mini-
mum)
Design Temp(Lower than -20℃) : 32.mm
까지 용접봉 사용
Welding
Visual Inspection
Post Weld Heat Treat-ment
NDT
Hardness & PMI Check
Repair : Up to 2 회
Hydro Test
Amin Line : 100%LTCS & C.S : 20mm
Over