18
GMD CONSULTANTS COMPANY PROFILE 2015 TRAFFIC AND TRANSPORTATION ROADS AND HIGHWAYS BRIDGES AND STRUCTURES 2, Park View, Park Avenue, Sector-17, Nerul (E), Navi Mumbai-400706 www.gmdconsultants.in +91-022-27700991, 233 QUALITY ASSURANCE & QUALITY CONTROL

GMD Company Profile_January 2015

  • Upload
    rajesh

  • View
    19

  • Download
    5

Embed Size (px)

DESCRIPTION

company information about my company GMD

Citation preview

Page 1: GMD Company Profile_January 2015

GMD CONSULTANTS COMPANY PROFILE

2015

TRAFFIC AND

TRANSPORTATION

ROADS AND

HIGHWAYS

BRIDGES AND

STRUCTURES

2, Park View, Park Avenue, Sector-17, Nerul (E), Navi Mumbai-400706

www.gmdconsultants.in +91-022-27700991, 233

QUALITY ASSURANCE &

QUALITY CONTROL

Page 2: GMD Company Profile_January 2015

Company Profile P a g e | 2

GMD Consultants

Highways & Roads

Structures & Bridges

Traffic & Transportation

Quality Assurance &

Control

GMD Consultantsprovidesvalue added solutions for Engineering, Design and Project Management

requirements of infrastructure Industry. Company has its head office in Mumbai and regional office for

northern region at Panchkula, Haryana. The company was established in 2010 as GMD Consultants.

Our main area of expertise includes Traffic & Transportation, Roads, Highways, and Bridges,

Township& Industrial Premises (Infrastructure-Roads, Storm Water Drainage), Detail Engineering,

Pre-Tender Studyand Traffic& Transportation Study of infrastructure projects. Latest state of the art

software for design and modeling provide us cutting edge in terms of accuracy, conformity to

requirement, quality of output and efficiency.

We have successfully completed many Detail Engineering projects including National Highways, State

Highways and other dedicated roads, Pre-Bid assignments for DBFOT projects, Infrastructure Detail

Design for Township, Transportation Planning Assignment and Traffic Impact Studies.

We are empanelled with following government agencies / authorities for providing consultancy

services for infrastructure projects

Ministry of Road Transport & Highways, (MoRT&H)-Category-V

Haryana State Roads & Bridges Development Corporation Ltd (HSRDC)– Category – I

Haryana State Roads & Bridges Development Corporation Ltd (HSRDC)– Category – II

Haryana State Roads & Bridges Development Corporation Ltd – (E-Traffic Census)

Municipal Corporation of Greater Mumbai (MCGM)

City and Industrial Development Corporation of Maharashtra Limited (CIDCO)

Goa Industrial Development Corporation

Mussoorie Dehradun Develoment Authority, Dehradun (MDDA)

WHAT WE DO

Our core area of functionality remains as Design & Project Management for infrastructure projects:

Detail Engineering Design (DPR) of highways, bridges, flyovers and other infrastructure

elements;

Detail Engineering Design of

Infrastructure of Township &

Industrial Premises– Roads,

Storm Water Drainage,

Transportation Planning and

Traffic Studies for Highways,

Townships and Parking;

Pre-Bid services for DFBOT

(NHAI & State Highway

Projects) and other BOT

infrastructure projects like

terminals, logistic parks etc including costing, revenue and financial model;

Project Management Services to Infrastructure Projects;

Traffic & Transportation Studies;

Quality Assurance & /Quality Control (QA / QC)

Traffic Simulation & Modeling(Vehicular & Pedestrian)

Value Engineering

INFRASTRUCTURE DESIGN & PROJECT MANAGEMENT

Page 3: GMD Company Profile_January 2015

Company Profile P a g e | 3

GMD Consultants

HOW WE DO

We use latest state of the art technology in terms of

software; best practices and sound engineering to arrive

at optimized design solution. We develop 3-D models for

design evaluations and analysis

GMD is a process based organization which have inbuilt

quality systems for all activities. It has three tier quality

systems with checks and audits at interfaces of

designer, manager and external expert. At GMD we

thrive for value based design solutions.

Designs are checked through 3-D modeling and simulation techniques for visualization and clash

detection. This approach not only enhances optimization and accuracy of design but also helps in

looking at “big picture”.

INFRASTRUCTURE

Technology is our forte. We possess latest software and tool for design and analysis. We are

equipped with Civil Infrastructure Design Suite (Auto

Desk) which includes CIVIL-3D and Infra Modeler.

STAAD Pro and Midas are used for structure designs.

For traffic analysis and simulation we work with VISSIM,

PARAMICS, VISSUM, Auto TRACK.

CIVIL LABORATORY

We have established a full-fledged Civil Testing Laboratory which is equipped with all moderns testing

equipment for testing. This in-house capability provides us cutting edges in terms of accuracy and

confidence in test results and also time advantage. We

have In-House capabilities for soil, materials, concrete,

asphalt testing and analysis.

Page 4: GMD Company Profile_January 2015

Company Profile P a g e | 4

GMD Consultants

HUMAN RESOURSE

We are close-knit organized team comprising of young, driving, dynamic and talented achievers.

Amongus are highly experienced and skilled professionals in field ofhighways and roadstraffic

structures and transportation, wet infrastructure as Team Leaders. Their experience ranges from 20 to

30+ years. We have a talented and dedicated team of more than 20 Engineers and CAD

professionals to supporting these team leaders.

At a glance profile of Vertical Leaders with GMD is tabled as below:

Sr.

No Name Designation Qualification Field of Experience

Years of

Experience

1 Rajesh Gajjar Managing Director M. Tech

(IITB)

Civil Engineering, Traffic &

Transportation

24

2 Shailendra

Mohan

Director M. Tech

(IIT,BHU)

Civil Engineering, Roads,

Highways Expert

22

3 Vinay Kapur Director & Head-

Regional Office

North

B.E. Civil Engineering,

Infrastructure Construction

and Project Management

38

4 M. N. Sawant Head -Structures B. Tech

(IITB)

Civil Engineering,

Structures (Bridges,

Flyovers, ROBs)

33

These key professionals are ably supported by senior engineers, junior engineers and CAD

professionals.

We constantly upgrade skills and knowledge base of our team by conducting regular training of

software and best practices.

Page 5: GMD Company Profile_January 2015

Company Profile P a g e | 5

GMD Consultants

CLIENTS

We have privilege of successfully working with some of the market leaders as our clients. The scope

of work for included Detail Engineering of Highways & Bridges, Detail Design of Infrastructure of

Townships, Pre-Bid Study of NH, SH and other Infrastructure Projects, Traffic & Transportation

Studies and Advisory Consultancy. Our success manifests in form of repeat orders from our clients

and their referrals. Following are some of our major clients.

Page 6: GMD Company Profile_January 2015

Company Profile P a g e | 6

GMD Consultants

PROJECTS

We have successfully completed a large number of projects (more than 100) in infra sector pertaining

to Roads, Traffic & Transportation, Bridges and Buildings. List of key projects is given under followed

by salient features of some flagship projects:

A. Traffic & Transportation Projects

Sr. No.

Project Name Client Description Scope Status

1 Traffic

Management

Consultancy for

Lodha Exellencia

Lodha Group Residential Township of

multi-storey apartments

in Mumbai

Traffic Impact Study Completed

2 Parking Study,

Oberoi Oasis,

Mumbai

I Ven realty Ltd Residential Township of

multi-storey apartments

Parking & Traffic

Demand Study

Completed

3 Traffic Planning

Study for ISBT at

Wadala

Pratibha

Industries

Interstate Bus Terminus

for 100 buses with

commercial component

on BOT basis

Traffic Planning Study Completed

4 Traffic study for

Satna-

Chitrakoot SH-

11 for MPRDC

on BOT Basis

Topworth Infra

Pvt Ltd

75 km of state highway Traffic survey, analysis,

growth, forecast &

Revenue modeling,

sensitivity analysis

Completed

5 Traffic study for

Ujjain-Jaora SH-

27 for MPRDC

on BOT Basis

Topworth Infra

Pvt Ltd

95 km of state highway Traffic survey, analysis,

growth, forecast &

Revenue modeling,

sensitivity analysis

Completed

6 Prebid Traffic

Study for

Walahajpet to

Poonamallee on

NH-46 in state

of Tamilnadu

IRB

Infrastructure

Developers LTD

93 km National Highway Traffic survey, analysis,

growth, forecast &

Revenue modeling,

sensitivity analysis

Completed

7 Prebid Traffic

Study for Jaipur

Ring Road

IRB, Jaipur

Development

Authority

60 km of Green field ring

road

Traffic survey, analysis,

growth, forecast &

Revenue modeling,

sensitivity analysis

Completed

Page 7: GMD Company Profile_January 2015

Company Profile P a g e | 7

GMD Consultants

8 Pre- Bid Study

of Ahmadabad -

Vadodara (NH-8

& NE-1)

IRB

Infrastructure

Developers LTD

95 km of NH Expressway Traffic survey, analysis,

growth, forecast &

Revenue modeling,

sensitivity analysis

Completed

. IRB won

the project

9 Pre- Bid Study

of Udaipur -

Kishangarh -

Ahmadabad

section of NH-8

IRB

Infrastructure

Developers LTD

300 Km of National

Highway

Traffic survey, analysis,

growth, forecast &

Revenue modeling,

sensitivity analysis

Completed

10 Prebid Traffic

Study for Devas

- Shivpuri -

Gwalior section

of NH-3

IRB

Infrastructure

Developers LTD

Four Laning of 455 km of

national highway in MP

Traffic survey, analysis,

growth, forecast &

Revenue modeling,

sensitivity analysis

Completed

11 Traffic Study for

Palais Royale,

Worli, Mumbai

Shriram Urban

Infrastructure P

Ltd

High rise premium

apartment residential

scheme of 80 storey in

Mumbai

Traffic Planning Study

for Residential Project

On-going

12 Traffic Study for

Golf Estate,

Gurgaon

M3M 75 acre, Residential

Township of multi-storey

apartments in Gurgaon

Traffic Planning Study

for Residential Project

Completed

13 Traffic Study for

Cosmopolitan,

Gurgaon

M3M 11 acre, retail and

commercial complex in

Gurgaon

Traffic Planning Study

for Commercial cum

Retail Project

Completed

14 Traffic Study for

Urbana,

Gurgaon

M3M 12 acre, Retail,

Commercial and Multi-

storey SA apartments in

Gurgaon

Traffic Planning Study

for Commercial cum

Retail cum SA Project

Completed

15 Traffic Study for

Merlin, Gurgaon

M3M 14 acre, Residential

Township of multi-storey

apartments in Gurgaon

Traffic Planning Study

for Residential Project

Completed

16 Traffic Study for

Shopping Mall,

Commercial and

Retail Project,

Gurgaon

Tata Reality and

Infrastructure

14 acre, Mix use project

consisting, residential &

commercial component

in Gurgaon

Traffic Planning Study

for Mixed Use Project

Ongoing

17 Traffic Study for

Multi level car

park at Mumbai

Airport

GVK Multi-level car park of

1200 capacity at Airport

at Mumbai

Traffic Planning Study

for Taxi Staging and

Visitor Car Park Project

Ongoing

Page 8: GMD Company Profile_January 2015

Company Profile P a g e | 8

GMD Consultants

18 Traffic Study for

Mumbai Trans

Harbour Link,

Mumbai

SRUIL 22 Km sea link project

having integration of all

links of major

transportation network

Traffic Study and

Feasibility Report

Completed

19 Traffic Study for

Grand Hyatt

Hotel at Noida

Vision Town

Planners and

Developers

7 acre, 5 star Hotel

Complex at NOIDA

Traffic Planning Study

for Hotel, Service

Apartment,

Commercial, Banquet

and Retail Project

Ongoing

20 Prebid Traffic

and toll study

for Dhule to

Amravati

section of NH6

in Maharashtra

IRB

Infrastructure

Developers LTD

480 km of four Laning of

National Highway

Traffic survey, analysis,

growth, forecast &

Revenue modeling,

sensitivity analysis

Completed

21 Traffic Study for

Exhibition

Centre at GIFT,

Ahmedabad

ITME 73 acre of International

Exhibition Centre at GIFT

City Ahmedabad, Gujrat

Traffic Study for 1 lac

sqm International

Exhibition Centre

Facility with all

amenities

Ongoing

22 Prebid Traffic

and toll study

for Eastern

Peripheral

Expressway

(EPE) Delhi

IRB

Infrastructure

Developers LTD

135 km of green field

expressway on eastern

side of Delhi, NHAI

project

Traffic survey, analysis,

growth, forecast &

Revenue modeling,

sensitivity analysis

Completed

23 Parking study at

Matunga

Premises

Birla

Infrastructure

Pvt ltd

Residential Township of

multi-storey apartments

in Mumbai

Traffic Impact Study Completed

24 Traffic study

One M3M,

Gurgaon

M3M 6 acre, Commercial

Complex + Multiplex

Traffic Planning Study On going

25 Mahim Traffic

Study

Sudarshan

Consultant

Residential Township of

multi-storey apartments

in Mumbai

Traffic Impact Study Completed

26 Pre-bid traffic

study of

Karnataka, Goa

border section

of NH 4A in

state of

IRB

Infrastructure

Developers LTD

70 km of four Laning

NHAI project

Traffic survey, analysis,

growth, forecast &

Revenue modeling,

sensitivity analysis

Completed

Page 9: GMD Company Profile_January 2015

Company Profile P a g e | 9

GMD Consultants

Karnataka / Goa

27 Pre-bid traffic

study of

Vijayawada –

Gondugalanu

section of NH-5

in the state of

Andhra Pradesh

IRB

Infrastructure

Developers LTD

104 km of six Laning of

NHAI project

Traffic survey, analysis,

growth, forecast &

Revenue modeling,

sensitivity analysis

Completed

28 Traffic Study

Township

Kharghar, Navi

Mumbai

Adhiraj

developers

50 acre, Residential

Township of multi-storey

apartments in Navi

Mumbai

Traffic Planning Study

and external

circulation design

On going

29 Namaste Traffic

Study, Parel,

Mumbai

Jaguar Buildcon

+ W Hotel

Group

12 acre, 5 Star luxury

Hotel, 363 keys + retail +

commercial Mumbai

Traffic Planning Study

and circulation design

On going

30 Traffic Study

Faridabad

HP Limited 8 acre, mixed use project

in Faridabad

Traffic Impact Study Completed

31 Traffic Study

Bangalore on

Airport Road

Sobha

Developers

30 acre, Commercial and

retail establishment

(Mall, Offices, Multiplex

etc)

Traffic Impact Study

and circulation design

On going

32 Traffic TCS

Indore

TCS / Somaya &

Kalappa

Consultants Pvt

Ltd

100 acre, IT Park (SEZ)

with 15000 employee

capacity at Indore

Traffic Impact Study

and circulation design

On going

33 Diversion Plan

Mumbai Metro-

III

MMRDA /

Shrikhande

Consultants

26 km of metro along

Mumbai Transportation

Network

Traffic diversion plan On going

34 Traffic Study

Rivali Park,

Borivali

CCI Developers 28 acre, Residential

Township of High rise

multi-storey apartments

in Mumbai

Traffic Study of

external & internal

road, Western Express

Highway

On going

35 Traffic Study-

Acme Project -

Andheri

Acme Builders 17 acre, Residential

Township of multi storey

apartments in Andheri,

Traffic Study of

external & internal

road

On going

Page 10: GMD Company Profile_January 2015

Company Profile P a g e | 10

GMD Consultants

Mumbai

36 Traffic Study-

Acme Project -

Thane

Acme Builders 27 acre, Residential

Township of multi-storey

apartments in Thane,

Mumbai

Traffic Study of

external & internal

road

On going

37 Traffic Study

imperial Tower

4

S D Corps Premium Residential

High-rise apartments,

Tardeo, Mumbai

Traffic Study of

external & internal

road

On going

38 Traffic Study

World Towers

Lodha Group Residential High Rise

apartments, Mumbai

Traffic Study of

external & internal

road

Completed

39 Traffic Study

Hotel Four

Seasons Phase-II

Magus Estate &

Hotels Limited

High rise premium

apartment expansion of

five star hotel with 800

new rooms at Worli,

Mumbai

Traffic Study of

external & internal

road. Dr. E Moses Road

and Worli Naka,

Mumbai

On going

40 Traffic Study for

The Address,

Ghatkopar

Wadhwa

Residency

Private Limited

Residential High rise

apartments, Ghatkopar,

Mumbai

Traffic Study of

external & internal

roads

On going

41 Traffic Impact

Study Balkum

Thane

Kalpataru /

Enviro Analyst

and Engineers

Ltd

75 acre, Residential

Township of multi-storey

apartments in Thane,

Mumbai

Traffic Study of

external & internal

roads

On going

42 Traffic Impact

Study Panvel

Saket

Developers

7.5 acre, Residential

Township of multi-storey

apartments in Panvel,

Mumbai

Traffic Study of

external & internal

roads

On going

43 Traffic Impact

Study Mulund

Project

Ariisto

Developer

38 acre, Residential

Township of multi-storey

apartments in Mulund,

Mumbai

Traffic Study of

external & internal

roads

On going

44 Traffic Study JJ

Hospital

GES / JJ Hospital

Trust

Expansion of JJ Hospital

with New 800 bed super

specialist Hospital,

Mumbai

Traffic Study of

external & internal

roads

On going

Page 11: GMD Company Profile_January 2015

Company Profile P a g e | 11

GMD Consultants

45 Traffic Study of

Ariisto Harmony

Project at

Kandivali

Ariisto

Developer

42 floors - High rise

Multi- Storey apartments

at Kandivali, Mumbai

Traffic Study of

external & internal

roads

Completed

46 Traffic Study SA

and Residential

at NOIDA,

BOP / Design

Plus Architects

4.7 Acre mixed use,

Retail + multi storey

residential project with

1030 apartments at

NOIDA

Traffic Study of

external & internal

roads

On going

47 Traffic Study

Raheja

Reflection

Raheja

Universal

9 acre residential

township with more

than 900 apartments at

Kandivali, Mumbai

Traffic Study of

external & internal

roads

Completed

48 Traffic Study

Samara Nagar

Shapoorji

Pallonji

53 acre residential

township at Samtanagar,

Kandivali, Mumbai

Traffic Study of

external & internal

roads

On going

49 Traffic Study for

Kanakia Levels,

Malad

Kanakia Group 1100 apartments 33

storey High Rise

residential project at

Malad, Mumbai

Traffic Study of

external & internal

roads

On going

50 Traffic Study for

Hotel Trident at

Ghansoli, Navi

Mumbai

Reliance /

Trident Group

165 keys 5 star hotel

with banquet hall (1500

pax)

Traffic Study of

external & internal

roads

Completed

51 Traffic study

Aman Shanti

Project at

Goregaon

Indu

Constructions

14 acre, 52 floors High

Rise apartments

Traffic Study of

external & internal

roads

completed

52 Traffic study

Mangal Bhuvan

Project at Parel

Apex

Constructions

12 acre, 61 floors High

Rise apartments

Traffic Study of

external & internal

roads

completed

53 Traffic study

Raheja Mix

Development

Complex, Navi

Mumbai RICC I

Raheja

Universal

68 acre, 8 High Rise

apartments, 8 IT

Commercial towers,

12000 parking spaces

Traffic Study of

external & internal

roads

On going

54 Traffic study

Raheja

commercial

Development

Raheja

Universal

38 acre, Commercial

spaces, 1000 parking

spaces

Traffic Study of

external & internal

roads

On going

Page 12: GMD Company Profile_January 2015

Company Profile P a g e | 12

GMD Consultants

Complex, Navi

Mumbai RICC II

55 Traffic study

Northern

Heights, Dahisar

NRose

Constructions

22 acre, 32 floors 4

towers High Rise

apartments

Traffic Study of

external & internal

roads

On going

56 Traffic study

High Rise

Residential at

Borivali

Mighty Group 9 acre, 24 floors 2

towers High Rise

apartments

Traffic Study of

external & internal

roads

On going

57 Traffic study

Mixed use

development at

Andheri

L & T Realty 13.5 acre, 32 floors 6

towers High Rise

apartments +

Commercial + Retail

Traffic Study of

external & internal

roads

On going

58 5 Star + 3 Star

hotel project

Kamala Group Star hotel + retail +

commercial at Lower

Parel

Traffic Impact Study On going

59 Premium High

Rise Residential

Project – Sumer

concorde

Sumer Group Premium Apartments

tower at Prabhadevi

Traffic Impact Study Completed

60 5 Star Hotel Vishwagreen

Group

250 keys Star Hotel at

Nerul, MIDC

Traffic Impact Study On going

61 Traffic Study for

Four Laning of

Panchkula –

Yamunanagar

section of NH-

73

National

Highways

Authority of

India (NHAI)-PIU

Chandigarh

104 km of national

highway

Traffic survey, Analysis

and forecast

Completed

62 Traffic Study for

Six Laning of

Chandigarh-

Ludhiana

section of NH-

21 and NH-95

National

Highways

Authority of

India (NHAI)-PIU

Chandigarh

87 km of national

highway

Traffic survey, Analysis

and forecast

Completed

63 Traffic Study for

Four Laning of

Ambala- Kaithal

section of NH-

NH-65

National

Highways

Authority of

India (NHAI)-PIU

Ambala

Traffic Study of 70 km of

national highway

Traffic survey, Analysis

and forecast

On going

Page 13: GMD Company Profile_January 2015

Company Profile P a g e | 13

GMD Consultants

B. Infrastructure Design Project

Sr. No. Project Name Client Project

Specification

Service Scope Remarks

1 DPR for Satna-

Chitrakoot SH-11

for MPRDC on BOT

Basis

Topworth Infra

Limited, MPRDC

Four / Two

Laning of 75 km

of State

Highway on

DBOT

Detail design, plan-

profile pavement,

bridges, culverts,

junctions, toll plaza,

bus bays, truck lay

byes, drainage etc

Completed

2 Pre-bid study for

Kolhapur - Sangli

M.S.H.3, Govt of

Maharashtra

Pratibha

Industries Limited

2/4 Lane MDR Engineering design

and estimation of 51

km of 2-laning Major

Roads in

Maharashtra,

Revenue, Financial

Modeling

Completed

3 Detail design of

structures

including major

bridges and

flyovers of Panvel -

Indapur NH-17

Supreme/ CES Major Structure-

Kharpada Bridge

(813 m),

Vadkhal Flyover

(1092m)

Detail Design of

foundation,

substructure and

superstructure

Completed

4 DPR for Ujjain-

Jaora SH-27 for

MPRDC on BOT

Basis

Topworth Infra

Limited, MPRDC

Four / Two

Laning of 95 km

of State

Highway on

DBOT

Detail design, plan-

profile pavement,

bridges, culverts,

junctions, toll plaza,

bus bays, truck lay

byes, drainage etc

Completed

5 Detail Design

Pavement- BMC

Road

MCGM, Mumbai City roads of

Mumbai

Detail pavement

design of more than

15 lakh SQM of of

BMC roads

On going

6 Detailed Design

Project

Management of

Roads and Traffic

Study

Kyan Resorts 2 km of arterial

road for hilly

township along

with retaining

structures

Kyan Resort

township – 22 acres

at Karjat

Completed

7 Detail Design of

Culverts for Jammu

- Udhampur

Project

AFCONS, Mumbai 4 Laning of

Jammu-

Udhampur NH

23 No’s culvert (Box,

Slab)

Completed

Page 14: GMD Company Profile_January 2015

Company Profile P a g e | 14

GMD Consultants

8 Detail Design of

Road from SH-10

to Vedanta

Aluminum Plant,

Jharsuguda, Orissa

AFCONS, Mumbai Green field four

/ two lane road

with elevated

portion of 2 km

viaduct and

truck terminal

About 5 km of four

lane & two lane road

for industrial traffic

Completed

9 Detail Design of 6

Km long elevated

viaduct and

stations for Delhi

MRTS

AFCONS, Mumbai 6 km of metro

rail viaduct and

three stations

6 km elevated

corridor

Completed

10 Infrastructure

design of 150 acre

"Empyrean"

Residential

Township, Nagpur

Fire Arcor,

Nagpur

Four lane and

two lane roads

with footpath,

cycle track and

other facilities

Over 7 km of arterial,

sub arterial and

collector roads,

Parking

Completed

11 Infrastructure

design of 200 acre

"Empyrean"

Residential

Township,

Bangalore

Fire Luxur,

Bangalore

Four lane and

two lane roads

with footpath,

cycle track and

other facilities

Over 25 km of

arterial, sub arterial

and collector roads,

Lake front

development,

Parking

Completed

12 Infrastructure

design of 23 acre

"Grande 101" G

Corps Borivali,

Mumbai

CCI, Mumbai Internal roads of

township

Over 5 km of arterial,

sub arterial and

collector roads,

Pedestrian High

Streets

Completed

13 Al Khor Bypass

(Qatar)

Urban planning

and Development

Authority, Qatar

6/8 lane rural

expressway

Concept design of 16

Km Rural Expressway

Completed

14 Mkeines-UMM Bab

Link Road UPDA

(Qatar)

Urban planning

and Development

Authority, Qatar

6/8 lane rural

expressway

Concept design of38

Km Rural Expressway

Completed

15 Due Diligence &

Technical Audit of

Bangalore to

Mulbagal NH-4

TRIL Roads &

AIIDPL

80 km of 4-

laning of NHAI

Road

Technical audit,

design review of

geometric, pavement

quality assessment,

estimate,

maintenance

Completed

Page 15: GMD Company Profile_January 2015

Company Profile P a g e | 15

GMD Consultants

16 Due Diligence &

Technical Audit of

Nelmangala to

Devihalli NH-48

TRIL Roads &

AIIDPL

80 km of 4-

laning of NHAI

Road

Technical audit,

design review of

geometric, pavement

quality assessment,

estimate,

maintenance

Completed

17 Pre-bid study of

Hyderabad Metro

AFCONS, Mumbai Metro rail

viaduct design

and estimation

7.75 km of elevated

corridor for

Hyderabad Metro

including station

viaduct

Completed

18 Prebid study for

Ropar to Doraha

road on DBFOT

Topworth, PIDB 2 Lane state

highway along

bank of Canal

Engineering design

and estimation of 53

km of 2-laning State

Highway in Punjab

Completed

19 Pre-bid for two

Laning of NH-66

from Tindivanam

to Krishnagiri.

Gammon India

ltd, NHAI

182 km of 2

Lane NHAI road

project

Engineering design

and estimation of

182 km of 2-laning

with paved shoulder

of NH in Tamilnadu

Completed

20 Prebid for Bhopal

By-pass for MPRDC

under BOT Basis

Topworth Infra

Limited

52 km of four

lane green field

project of NHAI

Engineering design

and estimation of 52

km of 4 lane

greenfield Bhopal

bypass by MPRDC

Completed

21 Pre bid for 4 -

Laning of Panvel -

Indapur section of

NH-17 from KM 0.0

to 84.0 KM on

DBFOT Basis

TRIL Roads P Ltd

(Tata)

84 km of four

Laning project,

NHAI

Engineering design

and estimation of 84

km of 4 lane

greenfield Bhopal

bypass by MPRDC

Completed

22 Detail Design of

Delhi Gate Flyover

at Surat

Surat

Municipality /

CES

1020 m flyover

with varying

span (42 m Max)

GAD, Detail Design,

BOQ, Construction

drawings

On going

23 Detail Design of

Moorva Creek

Bridge

Pentacle 35 m RCC

integral bridge

on MMRDA

Road

GAD, Detail Design,

BOQ, Construction

drawings

On going

24 Omalur –

Namakkal Due

diligence

TRIL Roads P Ltd

(Tata)

68 Km of NHAI

four lane road

Technical audit,

design review of

geometric, pavement

quality assessment,

Completed

Page 16: GMD Company Profile_January 2015

Company Profile P a g e | 16

GMD Consultants

estimate,

maintenance

25 CIDCO Shed design CIDCO 70000 SQFT of

steel frame shed

at Navi Mumbai

Detail design, BOQ &

Estimates,

construction

drawings

Completed

26 Detailed design of

Pen ROB at NH-17

near Mumbai

CES 135m long ROB

on NH-17 at Pen

(Raigarh)

GAD, Detail Design,

BOQ, Construction

drawings

On going

27 MTHL Project Sriram Urban 22 km sea link

connecting

Sewri to Nava

Sheva in

Mumbai

Pre-bid advisory

Services

Completed

28 Pre-bid study for

Nashik - Sinnar

section of NH-50 in

Maharashtra

Pratibha

Industries Limited

4 Laning of NHAI Engineering design

and estimation of 25

km of 4-laning NH

road in Maharashtra,

Revenue, Financial

Modeling

Completed

29 Pre-Bid For Metro

Depot

Supreme

Infrastructures

Metro depot for

Navi Mumbai

Metro Rail

Tender designs, BOQ

and estimates

Completed

30 Road Design Kochi

Township

Kochi Info Park

Limited /

Shrikhande

Consultants

5 Km of internal

road of SEZ- info

park at Kochi

Roads design

including pavement,

geometrics, signage,

tender documents

etc

On going

31 Detail Design of

external and

internal road-

Chembur Project

Wadhwa Group

Developers

4 Km of external

road on tunnel

and internal

roads of 40 acre

township in

Mumbai

Traffic study, detail

design of geometrics,

pavement,

estimates, tender

documents etc

On going

32 Pre- Concept

Design Logistic

Road Bangalore

Agri Gold Projects

Ltd

Concept design

of 210 km of 6/8

lane road for

logistic corridor

at Bangalore

Concept design,

estimates, typical

sections, walk thru

Completed

Page 17: GMD Company Profile_January 2015

Company Profile P a g e | 17

GMD Consultants

33 Concept Design of

Improvement of

Shivaji Chowk

Junction at

Panjarpole,

Chembur, Mumbai

Mumbai

Metropolitan

Region

Development

Authority

Improvement of

6 legged

complicated

high traffic

junction at

Chembur,

Mumbai

Traffic Survey, Topo

survey, Concept

design of various

options and 3 D

Modeling

Completed

34 Concept Design of

Approach Road

Panvel Project

Wadhwa Group 1500 Acre

redevelopment

township

Concept Design of

access road including

railway crossing /

ROB / RUP

On going

35 Design of city

Roads

Municipal

Corporation of

Greater Mumbai

(MCGM)

Area of South

Mumbai – 9

wards (A to G).

Total Km 120 km

approx

Design of flexible and

rigid (CC) roads

including traffic

study, geometry, soil

investigations and

topo survey

On going

36 Third Party Quality

Audit of Rural

Roads in Haryana

about 400 km

State Agriculture

Marketing Board

(HSAMB)

Rural roads of

six districts

approximately

1000 roads

Third party quality

inspection

On going

C. Integrated Township Projects

Sr. No.

Project Name Client Scope Remarks

1 UPDA Qatar Road Packages – Drainage

UPDA, Qatar Design of Roads including Junctions, Flyovers, Interchanges and Drainage 300 acres

Completed

2 Detail design of roads, drainage and protection works of Kyan Club & Resorts, Karjat

Srinathji Construction

Detail Design of road network, junctions, street furniture, utility corridor, drainage and protection works and conducting traffic study for township – 21 acres

In- Progress

3 Detail design of roads, drainage and protection works of IgatPuri Township

Vaibhav Reality Detail Design of road network, junctions, street furniture, utility corridor, drainage and protection works and conducting traffic study for township – 25 acres

In- Progress

4 Detail Infrastructure Design of Empyrean - Phase II, Bangalore.

Fire Luxur Developers Ltd

200 acre township. Detail Design of road network, junctions, street furniture, utility corridor, water supply, drainage, sewerage network and plants, solid waste management, electrical systems for township

Completed

Page 18: GMD Company Profile_January 2015

Company Profile P a g e | 18

GMD Consultants

5 The Empyrean Vista, Nagpur.

Fire Arcor 150 acre township. Detail Design of road network, junctions, street furniture, utility corridor, water supply, drainage, sewerage network and plants, solid waste management, electrical systems for township.

Completed

6 "Grande 101” Township, Mumbai

G Corp Properties

23 acre high rise township. Design of road network, circulation, parking, water supply, drainage, sewerage network and plants, solid waste management, electrical systems and other related infrastructure works for 23 acre plus township at Mumbai, India

Completed

7 Raipur - Water Supply and Sewerage system Design

Naya Raipur Development Authority / Buildcraft

Detail Design of 1600 acres city level Water & Sewerage Infrastructure including Pumping main from WTP to Reservoirs, water distribution network, reservoirs, water pumping stations, sewerage collection network, sewage pumping stations, Sewage Treatment Plants, Treated Sewage Effluent Network etc

Completed

8 Infrastructure Design - Township at Khopoli

Neel Siddhi Developers

Detail Design of road network, junctions, street furniture, utility corridor, and conducting traffic study for township – 30 acres

On-going

9 Traffic and Road design for Bharatiya City, Bangalore

Bharatiya City Developers

126 acre township with mixed use development incl 5 star hotel, retail, convention centre, school, hospital and residential units. Scope includes traffic study and road design – geometry, specs, BoQ and estimate

On going

10 Road Design and Realignment Study

Department of Transport – Abu Dhabi

Realignment of Corniche road (5km) to enhance urban public realm, parking spaces and social facilities, utility diversion, roads, urban planning

On going

DIRECTORS Rajesh Gajjar

(+91 9920519933)

Shailendra Mohan

(+91 9967014586)

CONTACT

Head Office:

2, Park View Society,

Sector-17, Nerul (East),

Navi Mumbai - 400706.

Phones - +91 22 27700991/233

Email: [email protected]

Web: www.gmdconsultants.in

CONTACT

Regional Office (North): Vinay Kapur (Head & Director) House N0. 1041, Sector-11,

Panchkula -134109 (Haryana)

Phones - +91 172 4010255

Mobile - +91 7837257246

Email: [email protected]

Web: www.gmdconsultants.in