Page 1 of 14 Glynwed Pipe Systems Ltd t/a Durapipe UK Unit 1, Swaffield Park Hyssop Close Cannock Staffordshire WS11 7FU Tel: +44 (0) 1543 471680 Fax: +44 (0) 1543 471682 Agrément Certificate e-mail: [email protected] 19/5644 website: www.durapipe.co.uk Product Sheet 1 VULCATHENE DRAINAGE SYSTEMS VULCATHENE MECHANICAL AND ENFUSION LABORATORY DRAINAGE SYSTEMS, PIPES, COUPLINGS AND FITTINGS This Agrément Certificate Product Sheet (1) replaces Certificate 92/2805 (Product Sheet 1) and relates to Vulcathene Mechanical and Enfusion Laboratory Drainage Systems, Pipes, Couplings and Fittings, comprising chemical-resistant polypropylene suitable to convey the envisaged effluent including laboratory drainage systems. (1) Hereinafter referred to as ‘Certificate’. CERTIFICATION INCLUDES: factors relating to compliance with Building Regulations where applicable factors relating to additional non-regulatory information where applicable independently verified technical specification assessment criteria and technical investigations design considerations installation guidance regular surveillance of production formal three-yearly review. KEY FACTORS ASSESSED Strength — the systems components will resist the likely loadings in service and during installation (see section 6). Performance of joints — joints between components will remain watertight under movement and temperature (see section 7). Resistance to chemicals — the component material will be unaffected by the types and quantities of chemicals likely to be found in wastewater (see section 9). Durability — the systems components are durable (see section 13). The BBA has awarded this Certificate to the company named above for the systems described herein. These systems have been assessed by the BBA as being fit for their intended use provided they are installed, used and maintained as set out in this Certificate. On behalf of the British Board of Agrément Date of First issue: 5 July 2019 Paul Valentine Technical Excellence Director Claire Curtis-Thomas Chief Executive The BBA is a UKAS accredited certification body – Number 113. The schedule of the current scope of accreditation for product certification is available in pdf format via the UKAS link on the BBA website at www.bbacerts.co.uk Readers are advised to check the validity and latest issue number of this Agrément Certificate by either referring to the BBA website or contacting the BBA direct. Any photographs are for illustrative purposes only, do not constitute advice and should not be relied upon. British Board of Agrément Bucknalls Lane Watford Herts WD25 9BA ©2019 tel: 01923 665300 [email protected] www.bbacerts.co.uk

Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 1 of 14

Glynwed Pipe Systems Ltd t/a Durapipe UK

Unit 1, Swaffield Park Hyssop Close Cannock Staffordshire WS11 7FU Tel: +44 (0) 1543 471680 Fax: +44 (0) 1543 471682 Agrément Certificate e-mail: [email protected] 19/5644 website: www.durapipe.co.uk Product Sheet 1

VULCATHENE DRAINAGE SYSTEMS VULCATHENE MECHANICAL AND ENFUSION LABORATORY DRAINAGE SYSTEMS, PIPES,

COUPLINGS AND FITTINGS

This Agrément Certificate Product Sheet(1) replaces Certificate 92/2805 (Product Sheet 1) and relates to Vulcathene Mechanical and Enfusion Laboratory Drainage Systems, Pipes, Couplings and Fittings, comprising chemical-resistant polypropylene suitable to convey the envisaged effluent including laboratory drainage systems.

(1) Hereinafter referred to as ‘Certificate’.

CERTIFICATION INCLUDES:

• factors relating to compliance with Building Regulations where applicable

• factors relating to additional non-regulatory information where applicable

• independently verified technical specification • assessment criteria and technical investigations • design considerations • installation guidance • regular surveillance of production • formal three-yearly review.

KEY FACTORS ASSESSED

Strength — the systems components will resist the likely loadings in service and during installation (see section 6). Performance of joints — joints between components will remain watertight under movement and temperature (see section 7). Resistance to chemicals — the component material will be unaffected by the types and quantities of chemicals likely to be found in wastewater (see section 9). Durability — the systems components are durable (see section 13).

The BBA has awarded this Certificate to the company named above for the systems described herein. These systems have been assessed by the BBA as being fit for their intended use provided they are installed, used and maintained as set out in this Certificate.

On behalf of the British Board of Agrément

Date of First issue: 5 July 2019

Paul Valentine Technical Excellence Director

Claire Curtis-Thomas Chief Executive

The BBA is a UKAS accredited certification body – Number 113. The schedule of the current scope of accreditation for product certification is available in pdf format via the UKAS link on the BBA website at www.bbacerts.co.uk Readers are advised to check the validity and latest issue number of this Agrément Certificate by either referring to the BBA website or contacting the BBA direct.

Any photographs are for illustrative purposes only, do not constitute advice and should not be relied upon.

British Board of Agrément Bucknalls Lane Watford Herts WD25 9BA

©2019

tel: 01923 665300

[email protected] www.bbacerts.co.uk

Page 2: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 2 of 14

Regulations

In the opinion of the BBA, Vulcathene Mechanical and Enfusion Laboratory Drainage Systems, Pipes, Couplings and Fittings, if installed, used and maintained in accordance with the provisions of this Certificate, can satisfy or contribute to satisfying the relevant requirements of the following Building Regulations (the presence of a UK map indicates that the subject is related to the Building Regulations in the region or regions of the UK depicted):

The Building Regulations 2010 (England and Wales) (as amended)

Requirement: H1(1) Foul water drainage Comment: The systems components will convey the flow of foul or surface water and

minimise the risk of blockages or leakage. See sections 6, 7, 8, 9 of this Certificate.

Regulation: Regulation:

7 7(1)

Materials and workmanship (applicable to Wales only) Materials and workmanship (applicable to England only)

Comment: Regulation: Comment:

7(2)

The systems components are acceptable. See section 13.1 and the Installation part of this Certificate. Materials and workmanship (applicable to England only) The systems components passing through a fire rated wall or floor should not be used on buildings in England that have a storey at least 18 m above ground level and contain: one or more dwellings, an institution, a room for residential purposes (excluding any room in a hostel, hotel or boarding house), student accommodation, care homes, sheltered housing, hospitals or dormitories in boarding schools. See section 11 of this Certificate.

The Building (Scotland) Regulations 2004 (as amended)

Regulation: 8(1)(2) Durability, workmanship and fitness of materials Comment: The systems components are acceptable. See section 13.1 and the Installation

part of this Certificate.

Regulation: 9 Building standards applicable to construction Standard: 3.7 Wastewater drainage Comment: The systems components will satisfy the relevant requirements of this Standard,

with reference to clauses 3.7.10(1) and 3.7.11(2). See sections 6, 7, 8 and 9 of this Certificate.

(1) Technical Handbook (Domestic).

(2) Technical Handbook (Non-Domestic).

The Building Regulations (Northern Ireland) 2012 (as amended)

Regulation: 23(a)(i)(iii)(b)(i) Fitness of materials and workmanship Comment: The systems components are acceptable. See section 13.1 and the Installation

part of this Certificate.

Regulation: 80 Sanitary pipework Comment: The systems components will satisfy the requirements of this Regulation. See

sections 6, 7, 8 and 9 of this Certificate.

Construction (Design and Management) Regulations 2015 Construction (Design and Management) Regulations (Northern Ireland) 2016 Information in this Certificate may assist the client, designer (including Principal Designer) and contractor (including Principal Contractor) to address their obligations under these Regulations. See section: 16 Procedure (16.2, 16.6 and 16.17) of this Certificate.

Page 3: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 3 of 14

Technical Specification

1 Description 1.1 The Vulcathene Mechanical and Enfusion Laboratory Drainage Systems, Pipes, Couplings and Fittings comprise polypropylene pipes, couplings, fittings and other accessories. The dimensions of the pipes are given in Table 1 and are supplied in standard 4 m lengths. The range of fittings is shown in Figure 1.

Table 1 Dimensions of pipes Size

(mm) Outside diameter

(mm) Wall thickness

(mm)

38 48.18 to 48.44 2.79 to 3.29 51 60.20 to 60.45 3.17 to 3.67 76 88.57 to 89.20 4.75 to 5.25 102 113.94 to 114.68 4.75 to 5.25 152(1) 167.99 to 168.52 7.11 to 7.97

(1) Available in Enfusion only.

1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist chemical drainage pipe, potentially carrying either acid and/or other chemical waste.

Figure 1 Mechanical fittings (all dimensions in millimetres except threads) 92.5° bends 92.5° loose nut sweep bends 135° slow bends

Cat No W181 W182 W183 W184 Cat No W291 W292 W293 W294 Cat No W191 W192 W193 W194

Nom size

38 51 76 102 Nom size

38 51 76 102 Nom size

38 51 76 102

A 54 62 74 98 A 54 62 74 98 A 15 17 41 45

B 76 93 133 167

135° loose nut sweep bends 92.5° equal sweep tees 45° single/double wyes

Cat No W211 W212 W213 W214 Cat No W201 W202 W2021 W203 W204 Cat No W371 W372 W373 W374

Nom size 38 51 76 102 Nom size

38 51 51 76 102 Cat No W381 W382 W383 W384

A 44 48 102 102 A 51 71 51 90 130 Nom size

38 51 76 102

B 15 17 41 45 B 60 52 51 75 95 A 86 105 177 222

C 111 123 102 165 285 B 64 76 146 171

C 10 13 41 41

Page 4: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 4 of 14

Figure 1 Mechanical fittings (all dimensions in millimetres except threads) (continued) line couplers reducing couplers

Cat No W161 W162 W163 W164 Cat No W3921 W3931 W3932 W3941 W3942 W3943

Nom size 38 51 76 102 Nom size 51 x 38 76 x 38 76 x 51 102 x 38 102 x 51 102 x 76

B 3 3 6 6 A 40 60 57 70 91 73

M1 to pipe couplers 1.25” F1 x 1.5” M1 reducer F1 to pipe couplers

Cat No W141 W142 Cat No W121 Cat No W151 W152

Nom size 38 51 Nom size 38 Nom size 38 51

A 1.5” BSP 2” BSP A 32 A 1.5” BSP 2” BSP

B 6 6 B 3 3

1.75” F1 to pipe coupler nuts pipe clips

Cat No W271 Cat No W231 W232 W233 W234 Cat No 91101 91201 91301 91401

Nom size 38 Nom size

38 51 76 102 Nom size

38 51 76 102

A 1.75” BSP A 67 83 134 162 A 38 44 67 89

B 5 B 21 25 33 35 B 60 76 111 140

C 19 19 32 32

flanges

Table ‘D’ Cat No W101TD W102TD W103TD W104TD

Nom size 38 51 76 102

A 30 30 41 41

B 133 152 187 216

C 16 16 19 19

Page 5: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 5 of 14

Figure 1 Mechanical fittings (all dimensions in millimetres except threads) (continued) Thermal stress relief units

Cat No W801 W802 Cat No W803 W804

Nom size 38 51 Nom size 76 102

A min 70 149 A 198 215

A max 108 203 B 117.2 114.5

C 110 141

D 101.7 129

E 89.7 115

1.3 The Enfusion fitting sockets are moulded with an integral resistance wire, encapsulated in a polypropylene jointing compound. The dimensions of the pipes are given in Table 1. The range of fittings is shown in Figure 2.

Figure 2 Enfusion fittings (all dimensions in millimetres except threads) single socket long sweep bend single socket short sweep bend loose/nut socket short

sweep bend

Cat No L281 L282 L283 L284 L286 Cat No L291 L292 Cat No L291A

Nom size

38 51 76 102 152 Nom size 38 51 Nom size 38

A 89 102 128 155 197 A 43 57 A 87

B 117 136 171 203 247 B 75 94 B 114

double socket long sweep bend double socket short

sweep bend 45° double socket slow bend

Cat No L171 L172 L173 L174 L176 Cat No L181 L182 Cat No L191 L192 L193 L184 L196

Nom size

38 51 76 102 152 Nom size

38 51 Nom size

38 51 76 102 152

A 89 102 130 155 198 A 43 64 A 28 38 51 51 43

Page 6: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 6 of 14

Figure 2 Enfusion fittings (all dimensions in millimetres except threads) (continued) 45° single socket slow bend 92.5° equal sweep tees 92.5° reducing sweep tees

Cat No

L211 L212 L213 L214 L216 Cat No

L201 L202 L203 L204 Cat No

L2021 L2031 L2032 L2042

Nom size

38 51 76 102 152 Nom size

38 51 76 102 Nom size

51x 51x38

76x 76x38

76 x 76x51

102x 102x

51 A 28 38 51 51 43 A 57 57 79 98 A 57 114 83 117

B 38 76 95 100 114 B 70 70 102 84 B 70 90 89 95

C 51 51 66 106 C 51 65 66 39

D 121 121 168 190 D 120 155 155 133

45° single wye 45° reducing wye

Cat No L371 L372 L373 L374 L376 Cat No L3721 L3732 L3742 L3743 L3763 L3764

Nom size

38 51 76 102 152 Nom size

51x51 x38 76x76 x51 102x 102x51

102x 102x 76

152x 152x76

152x 152x 106

A 83 92 168 212 241 A 84 144 165 211 184 184

B 29 36 38 46 44 B 27 22 10 41 10 10

C 83 92 168 187 241 C 87 146 165 235 248 196

92.5° double branch coupling

Cat No L352 L353 L354 Cat No L161 L162 L163 L164 L165

Nom size 51 76 102 Nom size 38 51 76 102 152

A 71 86 98 A 6 8 11 11 13

B 105 79 84

C 48 54 88

D 153 133 172

Page 7: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 7 of 14

Figure 2 Enfusion fittings (all dimensions in millimetres except threads) (continued) Reducing coupler M1 to pipe coupler F1 to pipe coupler

Cat No L3912 L3923 L3924 L3934 L3946 Cat No L141 L142 Cat No L151 L152

Nom size 51x38 76x51 102x51 102x76 152x102 Nom size 38 51 Nom size 38 51

A 32 42 51 47 64 A 6 6 A 8 8

Thermal stress relief units

Cat No L801 Cat No L802 Cat No L803 L804 L806

Nom size 38 Nom size 51 Nom size 76 102 152

A min 70 A min 149 A 198 215 198

A max 108 A max 203 B 117.2 114.5 200.5

C 110 141 196

D 101.7 129 184.5

E 89.7 115 169.5

Page 8: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 8 of 14

1.4 Thermal Stress Relief Units (SRUs) are ancillary items used in conjunction with the systems (see section 10.2), but are outside the scope of this Certificate.

2 Manufacture 2.1 The systems components are manufactured by extrusion or injection moulding polypropylene. The olives for the mechanical fitting joints are moulded in a thermoplastic elastomer material. 2.2 As part of the assessment and ongoing surveillance of product quality, the BBA has:

• agreed with the manufacturer the quality control procedures and product testing to be undertaken

• assessed and agreed the quality control operated over batches of incoming materials

• monitored the production process and verified that it is in accordance with the documented process

• evaluated the process for management of nonconformities

• checked that equipment has been properly tested and calibrated

• undertaken to carry out the above measures on a regular basis through a surveillance process, to verify that the specifications and quality control operated by the manufacturer are being maintained.

2.3 The management system of Glynwed Pipe Systems Ltd has been assessed and registered as meeting the requirements of BS EN ISO 9001 : 2015 by BSI Quality Assurance (Certificate FM 34819).

3 Delivery and site handling 3.1 Each pipe length is marked at one metre intervals with the manufacturer’s registered trademark, the nominal internal diameter and a code traceable to the date of manufacture. Fittings are marked with the manufacturer’s trademark and nominal internal diameter. 3.2 The systems components should be protected from impacts, for example, from heavy vehicles (such as fork-lift trucks) used on commercial premises.

Assessment and Technical Investigations The following is a summary of the assessment and technical investigations carried out on Vulcathene Mechanical and Enfusion Laboratory Drainage Systems, Pipes, Couplings and Fittings.

Design Considerations

4 Use 4.1 Vulcathene Mechanical and Enfusion Laboratory Drainage Systems, Pipes, Couplings and Fittings are satisfactory for use in domestic, commercial and public buildings in accordance with ISO TR 10358 : 1993 and BS EN 12056-2 : 2000 for the conveyance of domestic drainage and sewage as is permitted to be discharged into public sewers by the Water Industry Act, 1991 (England and Wales), and sewage as is permitted and defined by the Sewerage (Scotland) Act 1968 and the Water and Sewerage Services (Northern Ireland) Order 2006. 4.2 Where the systems are to be used in a laboratory application with chemical effluents not suitable for discharge into a public sewer, the building drainage should run to a holding tank. The local Water Authority should be consulted regarding details of the effluents likely to be discharged into the systems.

5 Practicability of installation The systems are designed to be installed by a competent general plumber, or a contractor, experienced with these types of systems.

Page 9: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 9 of 14

6 Strength

Vulcathene Mechanical and Enfusion Pipes, Couplings and Fittings will have adequate resistance to the forms of loading associated with installation.

7 Performance of joints

7.1 The joints will not be adversely affected by thermal movement when correctly made. 7.2 When correctly made, the joints will remain watertight under conditions of pipeline movement in excess of those expected to occur in normal good drainage practice.

8 Flow characteristics

8.1 A drainage system comprising Vulcathene Mechanical and Enfusion Laboratory Drainage Systems, Pipes, Couplings and Fittings will have satisfactory flow characteristics. Non-swept branch connections are restricted in accordance with BS EN 12056-2 : 2000.

8.2 Offsets in the wet portion of a discharge stack should be avoided. However, if the S-bend offsets are to be fitted in this position, large radius bends should be used (in accordance with BS EN 12056-2 : 2000). A ventilation stack may be necessary above and below the offset (see Figure 3).

Figure 3 Offsets in discharge stacks

9 Resistance to chemicals

9.1 The systems are resistant to a wide range of noxious chemicals for laboratory applications. The suitability of the systems for a particular application can be determined using ISO TR 10358 : 1993. The advice of the Certificate holder should be sought for resistance to chemicals not covered by this document.

Page 10: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 10 of 14

9.2 The systems will be unaffected by the types and quantities of chemicals likely to be found in drainage and sewage effluents (see section 4).

10 Resistance to elevated temperatures 10.1 The systems have adequate resistance to the temperatures likely to occur in drainage and sewage effluents. 10.2 Where temperatures above 20°C are expected, Thermal Stress Relief Units (SRUs) should be installed. SRUs should be installed in accordance with the manufacturer’s recommendations. Vertical SRUs should be installed at every floor level where a stack connection exists; where no stack connection exists, one SRU every two floors is sufficient.

11 Properties in relation to fire

The Regulations concerning the prevention of fire spread by fire-stopping must be taken into account if the systems pass through a fire rated wall or floor.

12 Maintenance 12.1 Typically, maintenance of the systems components will not be necessary. 12.2 Sections of the system can be removed and replaced. Access must be provided in accordance with BS EN 12056-2 : 2000.

13 Durability

13.1 When used within the conditions and recommendations given in this Certificate, the systems will have a serviceable life equivalent to conventional domestic plastics drainage systems.

13.2 Prolonged exposure to strong oxidising agents in a laboratory application may reduce the serviceable life of the systems.

14 Reuse and recyclability The polypropylene material of the components is fully recyclable.

Installation

15 General Installation of Vulcathene Mechanical and Enfusion Laboratory Drainage Systems, Pipes, Couplings and Fittings should be in accordance with BS EN 12056-2 : 2000 and the Certificate holder’s Technical Guide.

16 Procedure 16.1 To make a joint, the pipe is cut to the required length using a cutter designed for plastic pipe. The pipe ends should be square and smooth. A handsaw and mitre block can be used as an alternative, but care should be taken to ensure that cut pipe ends are square and free from burrs.

Mechanical joints 16.2 To cut a groove in the pipe, the Vulcathene W26 series cutting tool is used, with one tool for each size of pipe. The full depth of cut is achieved in two stages obtained by adjusting the cutting tool for ‘half depth’ and then ‘full depth’, using the control provided. The blade is retracted before withdrawing the tool from the pipe. The groove is checked to ensure the absence of swarf.

Page 11: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 11 of 14

16.3 To assemble the joint, a Vulcathene W23 series nut is placed on the pipe followed by an olive. The olive is pushed over the pipe until it seats into the groove. Before making the joint to a fitting, the olive and fitting should be checked to ensure they are clean and free from dirt. The thread of the fitting is smeared with petroleum jelly, pushed over the olive and the nut tightened by hand. 16.4 For the connecting pipe to be jointed, the procedure described in sections 16.2 and 16.3 is repeated. 16.5 The Vulcathene W23 series nuts are tightened using the Vulcathene W36 series spanners. 16.6 It is important that the nuts are tightened as the installation progresses and not left until the job is complete.

Enfusion joints 16.7 A pipe scraper is used to scrape the end of the pipe equivalent to the depth of the socket plus 50%. Removal of the slick or ‘skin’ on the surface of the pipe is imperative to obtain a good fusion joint. Once prepared, this area must not be handled or allow the ingress of dirt. 16.8 The pipe is inserted all the way to the stop at the bottom of the socket. 16.9 It should be decided whether the joint is to be welded singly or in series. If multiple joints are to be made, the maximum number of joints relative to the pipe size are given in Table 2.

Table 2 Multiple point fusion chart Pipe size (mm)

38 51 76 102 152

Maximum number of joints 8 6 4 3 2

16.10 The appropriate-sized clamp(s) should be loosely fitted over the hub(s) of the socket(s) to be joined and positioned flush with the socket opening. 16.11 The clamp(s) should be tightened round the hub(s) of the socket(s). It is important that the clamp(s) are fully tightened to obtain a homogeneous joint. 16.12 Before using the Enfusion Control Unit all cables must be unwound from the protective frame. 16.13 When the Enfusion Control Unit is turned on it will self-test and should display a ‘copyright’ message. 16.14 The instruction on the display to ‘connect output lead’ should be followed. If fusing a single joint, the output leads should be connected to one joint or if multiple joints, the link leads should be utilised as required. 16.15 The start button is pressed and the Enfusion Control Unit displays the temperature and the welding time. 16.16 When completed, the Enfusion Control Unit emits an audible alarm and displays the message ‘disconnect output lead’. During this period, the Enfusion Control Unit counts down to zero. 16.17 The joints should be allowed to cool (30 seconds), before carefully disconnecting the leads from the joints. 16.18 The joint should be left undisturbed for at least five minutes before the clamp(s) are removed.

Multiple Enfusion joints 16.19 The number of joints which can be fused at any one time utilising additional link leads in series is given in Table 2 and shown in Figure 4. This only applies to joints of the same size. The use of the multiple jointing method for connecting joints of differing sizes should not be attempted.

Page 12: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 12 of 14

Figure 4 Typical multiple jointing configuration

Supporting pipes 16.20 Pipe clip fixing centres are detailed in Table 3.

Table 3 Pipe clip fixing centres(1) Nominal ID (mm)

38 51 76 102 152

Horizontal installation (mm) Vertical installation

1220 1370 1520 1830 1830

(1) It is recommended that where high sustained temperatures of effluent are expected, horizontal pipe runs are continuously supported using Vulcathene galvanized support channels.

Waste pipe falls 16.21 Waste pipe runs should be installed to provide a natural fall of at least 2°.

Jointing to cast iron or stoneware 16.22 The end of the polypropylene pipe to be jointed should be scored. The socket is packed half full with rope and is then caulked with acid-resistant cement (or proprietary brand of sealing compound) until level with the bead of the collar.

Technical Investigations

17 Tests Tests were carried out to determine:

• dimensional accuracy

• impact resistance of pipes

• impact resistance of fittings

• resistance to elevated temperature cycling

• tensile test

• watertightness

• airtightness

• ring stiffness

Page 13: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 13 of 14

• strength of pipe supports

• practicability of installation.

18 Investigations 18.1 An evaluation of data was made to assess:

• heat reversion of pipe

• stress relief behaviour of fittings

• resistance to short-term hydrostatic pressure

• resistance to long-term hydrostatic pressure

• system design

• resistance to chemicals

• suitability of materials

• effect of cross flow. 18.2 The manufacturing process was evaluated, including the methods adopted for quality control, and details were obtained of the quality and composition of the materials used. 18.3 A survey was conducted of existing users of the systems to establish the performance in use. 18.4 A site visit was conducted to establish the ease of installation.

Bibliography BS EN 12056-2 : 2000 Gravity Drainage Systems inside Buildings — Sanitary pipework, layout and calculation BS EN ISO 9001 : 2015 Quality systems — Requirements ISO TR 10358 : 1993 Plastics pipes and fittings — Combined chemical-resistance classification table

Page 14: Glynwed Pipe Systems Ltd Agrément Certificate 19/5644 ... · 1.2 Vulcathene pipes are supplied with four violet coloured stripes which will clearly identify the pipe as a specialist

Page 14 of 14

Conditions of Certification

19 Conditions 19.1 This Certificate:

• relates only to the product/system that is named and described on the front page

• is issued only to the company, firm, organisation or person named on the front page – no other company, firm, organisation or person may hold or claim that this Certificate has been issued to them

• is valid only within the UK

• has to be read, considered and used as a whole document – it may be misleading and will be incomplete to be selective

• is copyright of the BBA

• is subject to English Law. 19.2 Publications, documents, specifications, legislation, regulations, standards and the like referenced in this Certificate are those that were current and/or deemed relevant by the BBA at the date of issue or reissue of this Certificate. 19.3 This Certificate will remain valid for an unlimited period provided that the product/system and its manufacture and/or fabrication, including all related and relevant parts and processes thereof:

• are maintained at or above the levels which have been assessed and found to be satisfactory by the BBA

• continue to be checked as and when deemed appropriate by the BBA under arrangements that it will determine

• are reviewed by the BBA as and when it considers appropriate. 19.4 The BBA has used due skill, care and diligence in preparing this Certificate, but no warranty is provided. 19.5 In issuing this Certificate the BBA is not responsible and is excluded from any liability to any company, firm, organisation or person, for any matters arising directly or indirectly from:

• the presence or absence of any patent, intellectual property or similar rights subsisting in the product/system or any other product/system

• the right of the Certificate holder to manufacture, supply, install, maintain or market the product/system

• actual installations of the product/system, including their nature, design, methods, performance, workmanship and maintenance

• any works and constructions in which the product/system is installed, including their nature, design, methods, performance, workmanship and maintenance

• any loss or damage, including personal injury, howsoever caused by the product/system, including its manufacture, supply, installation, use, maintenance and removal

• any claims by the manufacturer relating to CE marking. 19.6 Any information relating to the manufacture, supply, installation, use, maintenance and removal of this product/system which is contained or referred to in this Certificate is the minimum required to be met when the product/system is manufactured, supplied, installed, used, maintained and removed. It does not purport in any way to restate the requirements of the Health and Safety at Work etc. Act 1974, or of any other statutory, common law or other duty which may exist at the date of issue or reissue of this Certificate; nor is conformity with such information to be taken as satisfying the requirements of the 1974 Act or of any statutory, common law or other duty of care.

British Board of Agrément Bucknalls Lane Watford Herts WD25 9BA

©2019

tel: 01923 665300

[email protected] www.bbacerts.co.uk