Upload
dolien
View
215
Download
0
Embed Size (px)
Citation preview
| 2
Table of Contents
Administration ....................................................................................................................................... 4
Administration Plan Overview ...................................................................................... 4
Evaluation of Staffing ................................................................................................... 4
Administration Vision Statement .................................................................................. 8
Accomplishing the Vision through 2030 ....................................................................... 9
Communication ................................................................................................................................... 20
Communication Plan Overview .................................................................................. 20
Evaluation of Communication (GCM) ........................................................................ 20
Communication of Nehemiah Team .......................................................................... 29
Communication Vision Statement .............................................................................. 34
Accomplishing the Vision through 2030 ..................................................................... 34
Facilities ............................................................................................................................................... 36
Facilities Plan Overview ............................................................................................. 36
Evaluation of Facilities ............................................................................................... 36
Current Care of Facilities ........................................................................................... 39
Facilities Vision Statement ......................................................................................... 39
Accomplishing the Vision through 2030 ..................................................................... 40
Building Program Overview: The Call and Considerations of a Building Program for Grace Church of Mentor ............................................................................................ 40
The Call: An Invitation to Obey .................................................................................. 40
The Call: An Invitation to Prepare .............................................................................. 43
The Considerations: ................................................................................................... 44
Funding ................................................................................................................................................ 56
Funding Plan Overview .............................................................................................. 56
Funding as is evaluation ............................................................................................ 56
Summary ................................................................................................................... 59
Funding Vision Statement .......................................................................................... 60
Accomplishing the Vision through 2030 ..................................................................... 60
Appendix .............................................................................................................................................. 63
Appendix A: Administration Evaluation Outline .......................................................... 63
Appendix B: Choose a Style of Leadership ............................................................... 71
Appendix C: Worship Planning .................................................................................. 74
| 3
Appendix D: 8 Simple Ways to improve Church Communication .............................. 75
Appendix E: Communication Priorities ....................................................................... 77
Appendix F: Average Growth Rate ............................................................................ 79
Appendix G: Facilities Assessment Report 2014-15 Budget Year ............................. 80
Facilities Assessment Project Report ................................................................................................. 80
Table of Contents ...................................................................................................... 81
Introduction ................................................................................................................ 82
Findings ..................................................................................................................... 85
Appendix H: Property Card Report ............................................................................ 94
Administration Administration Plan Overview
Planning for Worship We have reviewed and documented the planning of worship, the staffing of those who plan worship, execution of the ordinances, and logistics such as auditorium capacity and auxiliary seating.
Physical Resources Grace Church has enjoyed utilizing the tools of technology. Investment in these tools is proving to be critical in accomplishing our mission in our culture. We continue to make strides in our facilities but a thorough evaluation by the facilities team has objectified the need for more space to accomplish our mission.
Staffing A brief evaluation of staffing structure is below. Recommendations for staffing needs is in the high-level plan.
Evaluation of Staffing
Understaffed vs. Unilaterally staffed The problem of church staffing is not a light one. Our Church staffing structure will either allow for growth in an organized way or stifle growth and cause organizational issues affecting souls.
Perception: understaffed Staff feel the work load. Staff’s plates are full. Administrative staff feels that they are not making progress job description and ministry needs. There are multiple staff doing the same ministry functions. There are many ministry functions that are not “owned” by a particular staff person. Ministry functions may sometimes fall through the cracks. As a result staff are concerned trying to avoid “stepping on one-another’s toes,” unsure of who to go to for certain ministry functions, and are not clear as to what ministry functions they are responsible. Often these “unowned,” unassigned and even personally responsible ministry functions (like ordering books) ends up in the default, catch-all role of the office (Ronda and Donna). Many churches comparable to our size (but perhaps not growth rate) have the same amount of staff or fewer.
Administration
| 5
Problem: unilaterally staffed While it may be true that there are certain additional staffing needs (namely an Executive Assistant for Pastor Tim and secondarily Facilities/IT), hiring additional headcount will not alleviate the problems above. Effectively, the administrative (not pastoral) staffing chart looks like this:
In reality Pastor Tim’s ministry demands (as head pastor) do not allow for him to serve
as an Office manager/ Administrator in addition to preaching, counseling, vision-casting, etc. The administrative structure is more adequately represented like this: Conclusion: While in a small to small-medium sized church (see Choose a Style of Leadership;
number 2. “The one man operator”) having a general, default, catch all administrative setup would be a practical staffing
structure (that’s why it worked for GCM up until now) restructuring the staff to accommodate: 1) Additional Church members and attenders; 2) Additional oversight of events/activities; 3) Additional staff and ministry functions will be necessary to grow.
Solution: Restructure staff assigning ownership of every ministry function of GCM Positive outcomes of restructuring:
Ownership of ministry functions: All ministry functions of GCM will be assigned to a
staff member. This staff member will be responsible for the success or failure of this
ministry (from an administrative standpoint). This will allow miscellaneous ministry
functions that are sometime forgotten about and “juggled” by multiple people to
“relate” directly to a staff member.
Reduce ministry confusion internally (staff) and externally (members, community) of
who does what. Often time is wasted and people grow frustrated because those outside
the office staff do not know who to go to. This will always be a “problem,” but
restructuring and defining roles will help alleviate this ministry confusion and help
facilitate funneling the “problem” to the correct person more efficiently.
Reduce duplicating ministry efforts. Currently multiple staff will start working on a
solution to a “problem” only to find that another staff member has been working the
same “problem.” This will only compound as we gain additional staff, membership, and
attenders and our community relationships grow.
One clear direction. There are often multiple ways to efficiently and within GCM’s
Mission to accomplish the same “task,” Have one clear person oversee various tasks
Pastor Tim
Ronda Donna PK Steve
Ronda Donna PK Steve
Administration
| 6
assures a clear, cohesive direction. We must be careful, however, to keep from having
ministry silos.
Maximize ministry impact. Assigning ownership to staff members allows them to be
creative and expend as much energy as possible in their ministry function. Not sure if
one will step on another’s toes or duplicate ministry effort consequently hinders the
staff’s “working” of ministry functions. Restructuring will provide an environment
where staff can minister to their full potential.
Streamline ministry functions with staff. Restructuring to put similar ministry functions
under one staff member will provide for greater efficiency, clarity, and effectiveness.
Accountability. Accountability is necessary for growth. Whether there is an area of
ministry that is going quite well or an area of ministry that needs to be shored up, to
have someone directly “attached” to those ministry functions is necessary for continued
growth.
Define how staff relate. Should the office perform this function or is it the staff
member’s personal ministry responsibility? “Should I do this function or let them know
that this will interfere with my ministry responsibilities?” These are questions that do
not always have clear answers, restructuring will help answer them.
“Change” pains of restructuring Takes time. Restructuring will not answer the email in our inboxes.
Takes growth. Restructuring means things will change.
Will not be easy.
Administration
| 7
Will require a
different
hierarchal
structure.
Restructuring should necessarily alleviate Pastor Tim from overseeing the administration of the church while providing a definite overseer of the necessary administration. *In our current setup we either have an overseer (Pastor Tim) or we don’t (another
staff member or no one at all, but not the same person). * Note: This is day to day ministry. Elders superseded this structure. The leader’s task is to say, “Here’s where we are, and there’s where we ought to go.” The administration’s task is to determine how to get there.1 Proposal (Steps to get there)
1. [next 1-3 months] Aside from current individuals/titles determine the best
administrative structure for GCM (proposed above).
2. [2-4 months] Take the administrative structure and fill in current staff
a. If holes exist, propose additional staff and time table
b. Give six months to a year to see how structure “fits” with each staff member
1 Smith, F. (1986). Vol. 5: Learning to lead: Bringing out the best in people. The Leadership Library (39). Carol Stream, IL: CTi.
Senior Pastor
Director of Admin
Office
Facilities
Tech
Associate Pastor
Asst. Pastors
Deacons
Director of Outreach
Arch GLBI
Executive Assistant
501c3 Assitant
Strategic Develop.
Treasure
Administration
| 8
3. [8-16 months] Make practical and/or necessary adjustments with the goal of moving
towards as clean a structure as possible
4. [8-16 months] Internal and external assessment.
5. Yearly reviews to Head Pastor.
Philosophy of staffing: Staffing the Structure 3 biblical models for the primacy of structure vs. staffing (giftedness). Jethro’s Advice. In Exodus 18 Jethro advises Moses to delegate some of his judicial responsibilities in order to not over exhaust himself or unduly frustrate the people. Moses was charged with finding men capable (cf. Deut 1:13,15) of filling the delegated role. These roles were structured by importance and rank (not by the men to fill them) (cf. Exodus 18:21). They were then filled by capable men (in both character and ability). Paul’s Illustration of the Body. Paul expresses several key truths with the illustration of the Church as Christ’s Body. 1) Christ is the head. 2) The church, as body, is a strategic part in displaying and serving Christ, the head. 3) Distinctly different functions are necessary within the body. 4) While there are different functions there is definite unity. 5) That every distinct yet unified member is necessary for bodily function and growth. For the Body to work, it is evident that there must be a head and that the members must perform different but essential roles for growth to take place (Eph 4). The hand and feet functions are different, distinct and essential for normal operation. The Priority of Roles over Giftedness. New Testament Church leadership is defined by roles (Elder and Deacon). These roles are further defined by specific Greek words Elder as a Bishop/Overseer/Administrator, Shepherd, Preacher, Teacher and Deacon as Servant. The office of Elder and Deacon are defined by these roles (not by giftedness). Giftedness defines who can fill those roles. Giftedness is given to each leader by the grace of God to fill specific roles; roles are not given to men primarily to fulfill giftedness. While it is true that a man cannot fill the role without God-given giftedness (and character), the priority is evident that the church must have these positions and cannot exist without them and can only be filled by those that have been suited to do so through their giftedness and experience. See Appendix B for a Helpful excerpt describing staffing and leadership.
Administration Vision Statement
Administration
| 9
GCM envisions a New Testament church that orderly, purposefully and reverently worships God, efficiently and excellently organizes the pastoral and support staff (both paid and unpaid2), provides excellent tools and training to its staff, leadership and congregation to accomplish her mission.
Accomplishing the Vision through 2030
2015
Staffing Questions to answer: How do we continue with the philosophy of “Nothing by Chance & Excellence in all Aspects of Worship”? How can manage the staffing needs of Grace Church? What will the staffing look like as we increase in numbers and space? As we address the staff needs, we have to address both the paid and volunteer staff that the church uses on a weekly basis. We need to provide the necessary training, support and documentation of these individuals.
1. Create an organizational chart for all employees and volunteers. 2. Survey of what staff and volunteers are doing currently in ministry
o Draw from survey all items pertaining to administration o Evaluate results of administrative activities o Determine “activities” to be addressed, then provide a job description o Establish an organizational chart o Document other repeated “activities” found in survey
3. Create a job task analysis for all current employees and unpaid. 4. Restructure staff (see below) 5. Determine when paid /unpaid staff is to be added and who they report to 6. Provide written risk management, safety procedure and evaluation documentation. 7. Determine administrative staffing needs
a. To determine administrative staffing needs, these factors are necessary for any staffing additions to GCM:
Need
Work load
Funding
Restructure Staffing Restructuring should necessarily alleviate Pastor Tim from overseeing the administration of the church while providing a definite overseer of the necessary administration. *In our current setup we either have an overseer (Pastor Tim) or we don’t (another staff member or no one at all, but not the same person).
2 Unpaid staff designated as a critical responsibility and commitment.
Administration
| 10
* The leader’s task is to say, “Here’s where we are, and there’s where we ought to go.” The administration’s task is to determine how to get there.3
Proposal (Steps to get there) 1. [next 1-3 months] Aside from current individuals/titles determine the best administrative
structure for GCM (proposed above). 2. [2-4 months] Take the administrative structure and fill in current staff 3. If holes exist, propose additional staff and time table 4. Give six months to a year to see how structure “fits” with each staff member 5. [8-16 months] Make practical and/or necessary adjustments with the goal of moving towards as
clean a structure as possible 6. [8-16 months] Internal and external assessment. 7. Yearly reviews to Head Pastor.
Worship Planning Questions to answer:
1. How do we continue with the philosophy of “Nothing by Chance & Excellence in all Aspects of
Worship”?
2. When is the worship planning to be handed over to another?
3. How can all aspects of worship be incorporated?
3 Smith, F. (1986). Vol. 5: Learning to lead: Bringing out the best in people. The Leadership Library (39). Carol Stream, IL: CTi.
Senior Pastor
Director of Admin
Office
Facilities
Tech
Associate Pastor
Asst. Pastors
Deacons
Director of Outreach
Arch GLBI
Executive Assistant
501c3 Assitant
Strategic Develop.
Treasure
Administration
| 11
Currently all aspects of worship are planned based on the theme presented by the Senior Pastor. Who is
involved and how can we continue to see the philosophy of worship be strengthened?
1. Determine if the current individual planning the worship should begin training another pastor to
take over this task.
As more definitive administrative roles are assessed for the pastoral (assoc. & asst.) staff, all
worship planning would be delegated to one staff member.
2. How to communicate all aspects of worship including Scripture, song, prayer and giving.
This designated staff member would then be responsible to cascade the “theme” from the Sr.
Pastor to potential future designated worship heads that would be responsible for the content
of each segment of the worship service.
3. Develop a written worship planning document that incorporates all items from item #2 above.
With a prescribed time line to allow for effective worship planning, the worship heads would
submit their proposal to the designated Admin Pastor for his placement in the order of worship.
4. Who needs to be included for support staff and documentation of ordinances?
Planning for, and timing of services with any ordinance would also be coordinated by the
designated Admin. Pastor, with approval by the Sr. Pastor. Records of these would be kept by
the church secretary for later use and compilation.
Worship Logistics Questions to answer:
1. Should the theme developed by the Senior Pastor be consistent across all worship services?
2. How do we continue with the philosophy of “Nothing by Chance & Excellence in all Aspects of
Worship”?
3. How can we maintain worship in multiple areas?
4. How do we honor God in the Ordinances of the Church?
5. How do we maintain God-honoring worship practices in a day when those practices are being
exchanged for entertainment driven choices?
6. Is there value in reversing the order of services on Sunday morning, where the corporate
worship would precede the SS classes? In light of this question you raise, could the SS classes
then be a continuation/development/application of the morning sermon?
As we delve into the logistics of worship, we need to consider all areas of the church that will be used
for worship, the Ordinances of the Church, the music and instruments, and special services.
Recommendations
1. What areas will be used for overflow and how do we maintain a “standard of Worship” that is
consistent with the sanctuary?
a. Additional hymnals and Bibles for these areas b. Rotate leadership into room to facilitate worship
Administration
| 12
c. Provide bulletins for these areas & new visitor packs (?) d. Musical accompaniment to these areas, to match auditorium (piano) e. Add soundproofing insulation to walls and possibly ceiling space f. Ushers need to be aware of individuals in this area and leadership should have
method to contact nurse on call/security/ushers
2. How can the Ordinances be handled for all areas of worship?
a. Develop policy & procedure checklists for baptisms b. Train additional set up/facilitators/greeters/assistants in room c. Budget for backup heater for baptistery d. Develop database for all baptism records – start with new and add past. e. Train additional Lord’s Table prep teams f. Purchase serving equipment to accommodate overflow areas g. Provide additional servers for Lord’s Table in overflow areas.
Technology Questions to answer:
1. How do we continue with the philosophy of “Nothing by Chance & Excellence in all Aspects of
Worship”?
2. How can we maintain worship in multiple areas through technology?
3. How do we meet the needs of congregation with advances in technology?
As we delve into technology, we need to realize that this is an ever changing item and what is current
and new today, will be considered outdated in the future. What the future holds for this area of
worship there is no telling. As with all areas of Grace Church, we need to look at this in light of how it
glorifies God.
Update and improve current technology in overflow areas. Modify seating in Berean Room (See Nick Bair). TV in nursing room (& hymnals). Expand wiring. Smaller mounted TV should do. Expand Overflow areas as needed. Expand Wiring. Purchase TV for additional Overflow room. $1K-$1.2K.
Review current computers and website for ease of use and compliance with needs. Modify website to do searches for sermons and/or content based on different categories (i.e. topic, speaker, kids, etc.) App for church website Already done. See Quan Hoang (1st 5 yrs). Maintain current quality.
Administration
| 13
How can we use Skype, FaceTime, Podcasts and live broadcast to meet the needs of our members who can’t make it to church? Bi-weekly Skype sessions with shut-ins, etc.. Designated member w/ skype/computer experience to visit shut-in’s residence to assist with Skype call if distance does not prohibit.
Develop an integrated plan to use current technology to honor God in our worship. More rigidity, training, culture shift (See Question 1 at top of page)(See Nick Bair for further explanation and planning) Rehearsals Sound checks Assigned Roles Running camera Two microphones and two people running microphones Choose next person to speak while first is still speaking.
2020
Staffing 1. Visit and revise present risk management and safety document 2. Establish job descriptions for elders, deacons and ministry leaders (i.e. Nursery Director).
Formal Job Description (Position) 1. --critical competencies 2. --secondary competencies 3. --responsibilities 4. --supervisor 5. –hourly commitment.
3. Establish Interview criteria for competencies related to job description (to be included in interview process).
4. Develop a packet is needed to address staff expectations, benefits, technology credentials, any necessary training, keys, codes, etc as appropriate. Other Orientation procedures.
5. Some suggestions:
Air/Temp Settings
Key Access
Building Codes and Alarms
IT Access including second screen, mouse, keyboard, email, SharePoint, OneDrive, NLT access, microsoft updates (let them know about the 5 free copies for home use as well)
GCMoffice and GCM online. Quick overview. Credentials. Etc.
Yearly evaluation processes/performance reviews
Parking
Dress
Office Culture Expectations
Discipleship
Voicemail
Administration
| 14
Organizational chart 6. Provide written evaluation for each paid/unpaid staff member based on their job description 7. Visit and evaluate to find any continual need(s) with the ministry 8. Provide continual education/training for all staff
Below is a staffing blueprint that outlines the tasks to be completed between the Equip and Glory Team. The Staffing goals for this year increment 2015-2020 for the glory team our outlined in the glory team column
Staffing Blueprint The below serves as a guide for the Glory and Equip Team to address the specific staffing scope for their team.
Administration
| 15
Hiring
sequence Document(s) EQUIP TEAM GLORY TEAM
1 Leadership Development Track
List of Leadership Development candidates, derived from those who have advanced along the lines of the Leadership Development Track here at GCM.
2 Job Description Template
Individual Job descriptions for current staff.
Formal Job Description (Position) --critical competencies --secondary competencies --responsibilities --supervisor --FTE status
3 Standardized Interview part 1 Leadership Criteria
Leadership Interview Character Criteria for staff position at GCM.
3 Standardized Interview part 2 Competency Criteria
Competency Interview Criteria for staff position at GCM
4 Interview Follow-up Leadership Assessment Review
If a candidate for a staff position at GCM does not meet the Leadership Criteria, what discipleship steps can be put in place to help that candidate? Will that candidate be hired? Will there be a probationary period?
4 Interview Follow-up Competency Assessment Review
If the candidate does not have all the necessary competencies will he/she be hired? What training is
Administration
| 16
This hiring blueprint addresses the character and skill of the staff member as well as the process of hiring (or not hiring).
Training
Document(s) EQUIP TEAM GLORY TEAM
Leadership Development Training Schedule
Leadership Development (Individual specific)
Staff Training Schedule
Competency Develop (Staff Wide)
Staff Training Schedule
Competency Development (Individual/Job specific)
Structure Staffing Structure see above
Worship 1. Investigate what role technology can play in planning worship and collaboration (see technology
plan)
2. Develop and train teachers & assistants and also provide a rotation for them.
a. Develop organizational chart to best utilize current staff (see Pastor Steve’s “Staffing 2013” document to start)
b. Develop written job description for all positions c. Develop procedures to train paid staff to best utilize their skill set
Technology
Update and improve current technology in overflow areas. Upgrading Camera for better quality will make Overflow expansion easier. (See item 4).
Review current computers and website for ease of use and compliance with needs. Ability as a staff to synchronize list of people on GCM Online with contact system. Exchange Environment software. (See Nick Bair for further explanation)
available for remedial action?
5 Human Resources Welcome Packet/Orientation
A packet is needed to address staff expectations, benefits, technology credentials, any necessary training, keys, codes, etc as appropriate. Other Orientation procedures.
Administration
| 17
How can we use Skype, FaceTime, Podcasts and live broadcast to meet the needs of our members who can’t make it to church? Live streaming of sermons & Sunday School for shut-ins through GCM Online Requirements: NOTE: Many difficulties with live streaming would be overcome if developing a technology plan (see below) is achieved. Compelling reasons to offset the risks/challenges. Members who are prevented from worshiping the Lord in a corporate environment and who’s souls may be malnourished. In short: The care of the flock. Dedicated server to handle influx of streaming data. Increased upstream bandwidth Person or “team” to oversee and support streaming Dedicated network link (T-1 $300/mo) Hardware (developing a technology plan (see below)) Live-stream-capable HD video switcher/mixer ($8k-$10k) Please see Nick Bair for clarification and correction on any of the points listed above.
Develop an integrated plan to use current technology to honor God in our worship. Purchase and implement: Broadcast-quality HD non-cam-corder camera $1K-$1.5K Digital video wiring (converter boxes HDMI to Twisted Pair) to overflow areas. $5k Better lighting. Two smaller screens on sides of rear wall of auditorium. Two smaller projectors. $5K The smaller screens and projectors as well as their position and lighting would allow for better viewing of projected material. Church Presentation Software Proclaim, Media Shout, ProPresenter Made specifically for running church services. Would replace Power Point. $50/mo or $400/yr Already paying $150/yr for current Power Point. Replacing Power Point would offset the price of Presentation Software
2025
Staffing
1. Develop objectives and goals for training of volunteers 2. Revise risk management & safety procedures 3. Continue to pray/study to determine if more paid staff is needed
Worship 1. Determine what is acceptable media delivery for those who cannot worship in the building.
Administration
| 18
2. Begin identifying a potential staff pastor to lead, plan and train others for worship according to the mission of GCM
3. Can the nursing home ministry be formalized in structure, messages, meeting the needs of the residents?
Technology 1. Live streaming of sermons & Sunday School for shut-ins through GCM Online
Requirements: Compelling reasons to offset the risks/challenges.
Members who are prevented from worshiping the Lord in a corporate environment and
who’s souls may be malnourished. In short: The care of the flock.
Stationary cameras in each classroom w/ audio.
1 or 2 mobile cameras w/ audio for non-traditional or mobile classrooms.
Connected through wi-fi or Bluetooth to designated computer.
Dedicated server to handle influx of streaming data.
Increased upstream bandwidth
Person or “team” to oversee and support streaming
Dedicated network link (T-1 $300/mo)
Hardware to digitize video from Auditorium and possibly Sunday School cameras
Live-stream-capable HD video switcher/mixer ($8k-$10k)
2030
Staffing
1. Act on developing plans for changes in leadership on many levels (This activity should be visited yearly as needs are being determined from 2015 & on.)
2. 2015-2029: As outlined, this loop should be a constant activity so as to keep in motion the ministry, always moving forward with “nothing by chance and excellence in all aspects of worship.
Worship
1. Have a designated Pastor lead, plan and train another pastor for worship according to the mission of GCM
2. How can we provide better excellence in special services? 3. Develop policy for what is allowed/desired in special services 4. Flowers, pens, books, etc 5. Who handing out 6. Develop overflow plan for members to allow more visitors in auditorium to include: 7. Who will sit in overflow areas 8. Additional ushers, parking lot staff, greeters 9. Additional visitor’s packs 10. Develop protocol for outside groups involved in service
Administration
| 19
Technology Develop matrix to assess GCM’s technology, review church’s best practices in technology,
and implement according to GCM’s mission statement.
Communication
| 20
Communication Communication Plan Overview
1. Assess and recommend a plan for the communication of the Nehemiah Team
2. Assess and recommend a plan for the communication of Grace Church of Mentor
Define Communication in the church
Evaluation of Communication (GCM)
Mission, Ministry Values and Principle of Grace Church of Mentor
Mission Statement Glorify God by evangelizing the lost and equipping the saints with the goal of Christlikeness. How do we define biblical success in the above mentioned areas? We define success by seeking the Glory of God in all things. God’s glory is defined in this Word. As we do the task of evangelism and discipleship we seek the Glory of God as we value those things that he has communicated in His Word that He values.
Ministry values
1. Bible centered (Psalm 19; 2 Timothy 3:16.)
We value the Bible as our sole rule of faith and practice.
Principle 1: Every ministry of this church will conduct itself within the
parameters of the Bible
Principle 2: The goal of every ministry will be to propagate memory of and
meditation on the Bible.
Principle 3: Accuracy in the translation and interpretation of the text will
outweigh other factors in translation or communication of the text.
2. Preaching (Romans 10)
Principle 1: The sole subject matter of all preaching events will be the Bible.
Principle 2: Preaching will never be supplanted by a “more relevant” way of
communicating the truth.
Communication
| 21
Principle 3: It will be a growing expectation that people will progressively
respond more and more to the pulpit ministry and need less and less one-on-
one spiritual instruction.
3. Evangelizing “Work of an evangelist”
Principle 1: Doing the “work of an evangelist” will be the expectation for all
leadership.
Principle 2: One will not be considered for leadership who has not
demonstrated
progressive growth in the area evangelism.
Principle 3: The goal of our evangelistic efforts is progressive discipleship and
transition into our church family life. It is our conviction that there is no “look”
that monopolizes what a Christian should aspire to looking or being like. The
believer should progressively abound in love still more and more in all
knowledge and discernment so that he can approve excellence. Every day
the disciple of Jesus Christ’s asks how much more can I seek to be and look
like what Jesus Christ would want.
4. Discipling (Matthew 28:19-20)
Principle 1: Discipleship not profession is the fruit of the gospel (Matt 28;
Rom1-12)
Principle 2: We value spending time/being with new and maturing believers
(Mark 3:14).
Principle 3: One-on-one discipleship is the normative pattern of NT local
church life. We value everyone advancing in their spiritual growth and
development in order to become a discipler (2Cor 1):
o Baranabas with Paul (Acts 9:26ff)
o Aquila/Priscilla with Apollos (Acts 18:24ff)
o Paul with Timothy (1 Tim. 1:2)
o Timothy with faithful men (2 Tim. 2:1-2)
Communication
| 22
5. Church Planting/Missions
Principle 1: Church planting is the natural end of the Great Commission.
Principle 2: This Church will seek to maintain a leadership position in
stateside and foreign church planting.
Principle 3: The word missions can only apply to ministries that directly impact
or are participating in church planting.
6. Gift-based Ministry
Principle 1: The power of the Holy Spirit is known in the church today by
individual’s ministering to the church family in the realm of their giftedness.
Principle 2: God has gifted every believer to serve the church.
Principle 3: Service in this church is a means of determining the authenticity
of faith in individual members and attendees. We will continue to be cautious
of those who continue to attend and do not get involved. The question that
looms is do they have the Holy Spirit?
7. Leadership Training
Principle 1: This church will not surrender its responsibility to train future
leadership for church work to any institution. We certainly may partner with
them, but it is our conviction that the local church is God’s ordained training
ground for His servants.
Principle 2: The primary and initial quality that is to be looked for in potential
leaders for the future is simple faithfulness. Although personality may
certainly be beneficial in the gift set of a man for leadership it is by no means
the leading quality.
Principle 3: This church will seek to maintain a leadership position in the
development of Leaders for future generations.
8. Segregated Ministry (Male/Female) Titus 2; 1 Corinthians 12:25
Principle 1: It is the expectation of this church that our older Women will grow
to a point and have the necessary character to teach our younger women,
Communication
| 23
This church will provide annual events in which the intended purpose will be
for our older women to teach our younger women.
Principle 2: It is the expectation of this church that our older Men will grow to
a point and have the necessary character to teach younger men. This church
will provide annual events in which the intended purpose will be for our older
men to teach our younger men.
Principle 3: It is the expectation of this church that we will reach out to those
in special situations (physically challenged, mentally challenged etc.) as God
brings into our church family those who are gifted to reach out in such ways.
9. Spiritual Maturity Levels and Age Appropriate Teaching (2 Peter 1:5-15; 2
Timothy 3:15-17; 1 Peter 2:2)
Principle 1: It is the understanding of this Church from Scripture that
sanctification in the life of a believer is progressive. All policies and
expectations formulated by this church will conform to this primary truth
concerning the nature of the progress of disciples. In addition, discipleship will
be designed with recognition that within our church at any given time Spiritual
maturity levels vary widely.
Principle 2: It is the understanding of this church that God gifts teachers who
are able to teach Bible truth on a level that children can understand. As such
we will endeavor as soon as the child is able to begin to use the Scriptures to
“make them wise unto salvation.”
10. God-honoring Music Psalm 40:3; Ephesians 5:18-20; 1 Corinthians 10:31
a. Principle 1 Music is one of the most influential forms of communication.
Both in its words and in its sound and style. The world clearly understands
this, but it is a principle that the CCMI seems to be willfully ignorant. As
such there is over a billion dollar industry that seeks to sell to the church
alone an idea that musical sound and style is morally unaccountable.
b. Principle 2: Musical sounds and styles are subject to moral determinations
as either good God-honoring music or bad world promoting music. This is
true both in our church’s corporate life as well as the individual personal
lives of our people.
Communication
| 24
c. Principle 3: Saved and unsaved (insofar as they reflect the image likeness
of God in their music composition) can produce good God
honoring/reflecting music. In Worship however, we will choose God
honoring music produced by Bible believing Christians. In our
discretionary time we can enjoy and appreciate either.
11. Physical Plant Genesis 1:31; Ecclesiastes 9:10; 1 Corinthians 10: 31,
Philippians 4:8; Colossians 3:23-24; Matthew 5:14-16
a. Principle 1 Excellence is the governing principle for which we shoot in the
presentation of our Physical Plant.
b. Principle 2 Our physical plant is the first and most prominent display we
have in our community of what the Glory of God means to us. This does
not mean that inordinate amounts will be spent on its construction,
however it does mean that within the means God has allotted to us we will
steward our facilities in a manner that expresses His Glory.
GCM Communications Inventory The goal of this document is to provide a listing of Grace Church of Mentor's primary methods of communication. For the purposes of this document, a primary method of communication can be defined as any method of communication which is formalized, regular and intended for a wide audience.
Communication Methods The table below lists all primary methods of communication, the parties responsible for them, and their intended audience.
Method Coordinator(s) Community Visitors Church Family
Bulletin Ronda Yes Yes
Announcements (PowerPoint)
Ronda Yes Yes
Announcements (Pulpit) Ronda, Donna, PT Yes Yes
Announcements (Email) Donna Yes
Bulletin Board Ronda, Donna Yes
Paper Calendar Ronda Yes
Website Pastor Steve, Nick Bair
Yes Yes Yes
GCM Online Pastor Steve Yes
Social Media (Twitter, Facebook)
Ronda, Karen Smitko
Yes Yes Yes
TV Commercials Pastor Tim Yes
Outreach Events Mike Hixson Yes
Communication
| 25
Church-Wide Literature Ronda Yes Yes
Welcome Packets Ronda Yes
Church Signage Yes Yes Yes
Event/Ministry-Specific Literature
Various Yes Yes Yes
Event/Ministry-Specific Signage
Various Yes Yes Yes
Event/Ministry-Specific Email
Various Yes
Notifications (Email) Various Yes
Print Advertisements Pastor Steve Yes
Policy Manuals Various Yes
Annual Meeting/Report Pastor Tim, Ronda Yes
Relationships How do our primary methods of communication relate to one another? What steps, if any, are taken to coordinate efforts and provide a consistent image, message, and branding for Grace Church of Mentor?
Artwork
The bulletin and announcement PowerPoint often share some artwork with each
other.
Bulletin board items are generally not coordinated with each other.
The TV commercials do not include our church artwork.
Church bulletins, literature and welcome packets do not share a consistent
appearance.
Our signage does not match our printed artwork.
Event-specific and ministry-specific literature and signage, while often self-
consistent, do not share the church’s branding or artwork.
Coordination/Synchronization
The bulletin and PowerPoint announcements usually emphasize the same
information.
Pulpit announcements are planned and coordinated with the bulletin.
Extemporaneous announcements are occasionally added at Pastor Tim’s
discretion.
The GCM Online calendar is populated based on the most recent paper
calendar. The church website, in turn, gathers event-related information from
GCM Online.
Church email communication is generally funneled through GCM Online.
Social media posts are not tightly coordinated with any other communications.
Analysis Our coordination efforts regarding our church family communication are relatively consistent. But our communication to visitors and the community are poorly
Communication
| 26
coordinated. From a visitor’s perspective, Grace Church of Mentor has no consistent image.
How Grace Church of Mentor can best use Social Media Social Media has changed rapidly in the past ten years, and will continue to evolve in the coming years. New social networks and platforms will be invented, some platforms will reinvent themselves and be used by new audience, and others may disappear entirely in the next 10 years. Currently for GCM, the main objective in using social media is to communicate to our church members and regular attendees. We might want to instead consider making the main objective to share who we are to those looking for a church family. The look and feel of our Facebook page should mirror that of our website. In that spirit, we offer the following recommendations on how to use the social platforms that our church families are actively using: Facebook, Twitter and Google+.
Facebook 1. News Feed posts
a. Content
i. FB updates shouldn’t feature weekly or monthly announcements –
for example, it should not be announcements for young mom’s
fellowship.
ii. Special invitations to veterans’ dinner, Christmas play, etc. are a
good idea and should be accompanied by a relevant image (if there
is an image already on the website, use the same image.)
iii. Users might also expect a church to share weekly mediations, key
sermon points, sermon notes, link to audio from services.
iv. We should also add the community events that we participate in so
visitors see our heart for the community – Heart & Hands, Mentor
CityFest, etc.
v. Sharing blog post from youth, children’s or other GCM ministries is
a great way to help others find our website content.
b. Format
i. Facebook updates should be engaging, asking questions, sharing
devotional thoughts/verses,
ii. Punctuation should not include double exclamation points or double
questions marks. Should follow the rules of English grammar and
punctuation to be professional.
iii. You have some 3,000 characters and lots of space per post. Use
numbered lists, paragraphs and break up copy to make it easier to
read in a scrolling news feed.
c. Images
i. Images should be personal – people from our church who have
consented to using their photo, photos from events, or graphic
design images representing an upcoming event
Communication
| 27
ii. When you use photo of church members or attendees, tag them in
the photo. It notifies them that their image has been used online,
and it allows them to share it on their news feed and talk about their
church.
iii. Should not include stock photos, clip art or ancient works of art –
which set a very impersonal, cheap or museum-like tone. All photos
that are stock photos, clip art or ancient works of art should be
removed.
2. Cover photos
a. Use one cover photo per sermon series, e.g. Genesis should keep the
same cover photo for the entire series. This allows us to gain consistency
and make it easily recognizable. For each new series that Pastor Tim
starts, a designer should create a cover image to use throughout the
sermon series.
b. Our Facebook icon should always be our logo so as to clearly set it apart
as a church/organization.
c. Cover photo can also mirror one of the banner images on the homepage
of the website. We should strive to communicate the same message or
special event invitation as we are promoting on the website.
3. Ideas to increase user engagement
a. If the communication team would like to increase user/visitor engagement
on the GCM Facebook page, here are a few ideas that work well on
Facebook.
i. Giveaways – have a drawing or ask a question with the first to
answer receiving Bibles, devotional books, children’s books, or
some other creative item
ii. Albums of photos from events
iii. Videos of events, families, testimonies, pastors, etc.
iv. Feature a different family each week (or month), ask them for
photos and things they are thankful for that you can share on our
FB page.
b. One final thought – to make interacting with an organization enjoyable on
Facebook, it has to be totally people-centered (not announcement
centered, not church centered)
Twitter When using Twitter, you have 140 characters to share your thoughts. Whoever is tweeting on behalf of GCM needs to understand Twitter is conversations, concise announcements, and short hyperlinks. Best practices:
Try to @mention as often as you can to start conversations. For example, if you
are quoting Pastor Tim, mention him using handle @PastorTimPotter. That
includes him in the conversation.
Communication
| 28
Use hashtags but no more than five.
Add images as often as possible. (Follow image guidelines listed in Facebook
section above)
Keep it concise, but don’t use text lingo like “IDK” & “LOL” because you’ll sound
like a teenager.
Life on Twitter happens in seconds. Don’t be afraid to repeat invitations or links
to blog posts at different times in the day throughout the week. You’ll catch
different users on Twitter at different times.
Tweet announcements, sermon links, devotional thoughts, content from
gracechurchmentor.org, invitations to special events, verses and the gospel.
Google+ The reason to use Google+ is mainly to share new content from our website and ultimately build credibility with Google Search. If we choose to use Google+ for the search benefits, then follow same guidelines as Facebook (above).
YouTube After watching one innocent video on YouTube, sometimes it offers “suggestions” of other less innocent videos. For this reason, many Christian organizations have instead chosen to share their videos on Vimeo. If however, the decision is made to post GCM videos on to YouTube, then write careful descriptions of each uploaded video to provide better searchability. Types of church leadership-approved videos might be Pastor Tim messages, youth events or GBDC promotional videos, testimonies or baptisms, church-wide promotional videos.
Other Social Media networks I don't see Instagram, LinkedIn or Pinterest being very relevant for our church family or visitors at this point. The communication team may want to reconsider these social media platforms on a yearly basis. Tumblr and SnapChat have reputations for being full of sensuality; I would avoid them altogether.
Recommendations for the GCM social media manager Whoever is posting to social platforms on behalf of GCM is the social media manager (SMM). The SMM can make the best use their time with a social media management tool like Hootsuite or Buffer. Both have basic levels that are free. From either app you can tweet, post on Facebook, schedule posts ahead of time, coordinate your content, read responses and conversations. That means you only have to go to one place to manage your social media accounts.
Best Practices for Communication 2015 – GCM needs an administrative assistant or communication manager to handle all communication to church family. What is the purpose for each? Website- Causal Window shopper of GCM, Drill down ability to “know” GCM, portal for membership, communication of calendar and events, electronic place to view past events. Bulletin board – current events Emails—current events, reminders, blessings, greater care should be taken to communicate to the right audience at the right time with the right information.
Communication
| 29
Sermon review—posted on website “pulled” by users Announcements—important info from the pulpit. Is there too much or too little? Future dates 2020 and beyond: We recommend an outside firm to assess and develop the tools necessary for Communication (design, organizational communication, web development, print).
Communication of Nehemiah Team
Biblical Virtues Nehemiah Leadership Team - Grace Church of Mentor
What does the Bible say about planning ahead? The prudent sees the evil and hides himself, But the naive go on, and are punished for it.
Proverbs 22:3 God's Word teaches us that there is value in planning ahead, and that there are consequences for not doing so.
“For which one of you, when he wants to build a tower, does not first sit down and calculate the cost to see if he has enough to complete it? Otherwise, when he has laid a foundation and is not able to finish, all who observe it begin to ridicule him, saying, ‘This man began to build and was not able to finish.’ Or what king, when he sets out to meet another king in battle, will not first sit down and consider whether he is strong enough with ten thousand men to encounter the one coming against him with twenty thousand? Or else, while the other is still far away, he sends a delegation and asks for terms of peace.
Luke 14:28-32
Instruct those who are rich in this present world not to be conceited or to fix their hope on the uncertainty of riches, but on God, who richly supplies us with all things to enjoy. Instruct them to do good, to be rich in good works, to be generous and ready to share, storing up for themselves the treasure of a good foundation for the future, so that they may take hold of that which is life indeed.
1 Timothy 6:17-19
Nehemiah 1-3
1. He saw the need.
2. He prayed for God's blessing on his work.
3. He inspected the walls.
4. He enlisted help.
5. They developed a plan.
Communication
| 30
6. They began to build.
Nehemiah Team Structure
Glo
ry T
eam
[Pas
tor
Stev
e/R
alp
h D
ole
s]
Facility
[Duane Seelinger]
Communication
[Bob Gray]
Fund Raising
[Dave Hixson]
Administration
[Nick Mastropietro]
Rea
ch T
eam
[Pas
tor
Mik
e/ J
im D
ahlh
ause
n]
Lake County
[Kay Baier]
Ohio/US [ARCH]
[Jeff Ashdown, Karie Bair]
World [Missions]
[Karie Bair ]
SteveSindelar
[Course Title]
[Teacher’s Name]
Communication
| 31
Nehemiah Working Communication plan
to WHO? WHAT & WHY? from WHO? WHEN? HOW?
GCM Status-share All Neh. Constant Informal, one on one.
GCM Status-share Communication team
Always available, updated monthly
GCMonline members only; “pulled from cloud”
Equ
ip T
eam
[Pas
tor
Ken
t/ S
cott
An
der
son
] Discipleship
[Jeff Battig]
Serving
[Greg Nagle]
Leadership/Staff/Volunteer
[Pastor Kent]
Communication
| 32
GCM Q & A regarding the status
Pastor Tim
and others Every quarter, at business meeting
Every month, table for Q& A?
Town hall type family discussion of the status as part of each quarterly meeting
Champions
TASKS-get things done
Harry Dodd Every month after the Core Team meeting
Two-way by email/personal meeting.
Neh. Team Status of IT deliverables
Champions Monthly during Neh. Core team meeting.
MIRs
GCM MEETING-share (final PowerPoints)
Neh Team Neh Meeting View meeting
Nehemiah Vision Casting Communication Matrix Communicating the findings, progress and results of the Nehemiah Team
Goals: Develop a plan to present the “what and when” to the congregation of the initial
Nehemiah Team vision.
Plan to communicate ongoing results in the short and long term.
Encourage more participation and buy in to help with the results.
Package the Nehemiah team work for future generations.
“Communicate the right things at the right time to the right people”
Communication
| 33
Matrix Develop a plan to communicate results. This plan addresses what should be communicated? When should it be communicated? Who should be the audience? And what is the purpose/desired outcome? For the purposes of this document we will limit our audience to Membership and Congregation (we did not include the communication to the Elders (working approval). This matrix assumes that the Elders will review and approve the initial Nehemiah Team Document and review and approve the Matrix Communication table below.
The Factors of the Matrix
The Who Factor Congregation is defined as all GCM attendees Membership is defined and the member role of GCM.
The Why Factor Share is defined as communicating vision Gather is defined as moving people from vision (what) to mission (doing). Praise is defined as encouraging others to praise God for what he is doing.
What and When Factor Matrix defines each.
What When Who Why
Reoccurring
Initial Communication:
presentation
Sunday Evening Congregation 1) Share 2) Gather
Initial Summary Document
Sunday Evening and GCMonline
Congregation 1) Share
Initial Document Emailed and posted in GCMonline Hard copies available in office
membership 1) Share
Capture and chart Needs to
accomplish vision
Sunday Evening presentation and paper/electronic available/ bulletin board (Where can I help at Grace)
Congregation 1) Gather
What? When?
Who? Why?
Communication
| 34
Annual Focus on 1 item within each category (Glory,
Equip, Reach)
Annual Meeting Membership 1) Praise 2) Gather
5 year vision and review
Sunday Evening Congregation 1) Share 2) Gather
5 year vision summary document
Sunday Evening and GCMonline, emailed to membership
Congregation 1) Share 2) Gather
Special
Announce vision and need
TBD pulpit, email, etc
Congregation 1) Gather
Testimony TBD Pulpit, email, news article on website
Congregation 2) Praise
Special Meeting TBD Membership 1) Share 2) Gather
TO DO: 1) Finalized Nehemiah Document
2) Secure Approval from Elders
3) Summarized Nehemiah Document
4) Chart Next Steps, and places people can help
Communication Vision Statement
Communicate the right information to the right people at the right time.
Accomplishing the Vision through 2030
2015 Begin researching and budgeting for an outside firm reevaluate our
communication materials and provide a cohesive communication plan.
Have a trained staff member who is able to focus on coordinating and executing
the communication plan on a part-time basis (i.e. administrative assistant).
Organize and define the purpose of Social Media (see evaluation above)
2020
Have an outside firm reevaluate our communication materials and provide a
cohesive communication plan.
A dedicated, full-time communications coordinator on staff to execute the
communication plan.
Communication
| 35
2025 Reevaluate our communication plan with the help of an outside firm.
Consider in-house graphic design staff for print & web.
Consider additional staff for a communication team if necessary.
2030
GCM to be in a position to provide communication helps to Arch network
churches.
Facilities
| 36
Facilities Facilities Plan Overview
1. Prepare a plan that manages our current facilities and growth according to our mission statement.
2. Prepare a plan to design and build spaces that utilize our existing site and potential adjacent
properties according to each spaces purpose in support of our mission statement.
3. Explore potential properties and the sale of our current property.
4. Prepare a plan that accommodates for a social-political hostile environment.
Evaluation of Facilities The facilities team seeks to develop a conceptual plan for the future of our facilities at Grace Church of
Mentor. The first step in the facilities plan will be to manage our current facilities to accommodate
growth.
To this end, the team has gathered all available data on church attendance. Based on this data we have
extrapolated possible growth trends and adopted an average growth rate of 5-6% per year.4
Using this baseline for growth at GCM, we have identified the aspects of our facility that will require the
most attention as we grow.
They are, in order of priority:
1. Auditorium Seating
2. Childcare
3. Parking
4. Classrooms, Bathrooms, Storage Areas
Because the timing and nature of future construction and/or land purchases is unpredictable, our goal is
to plan as much as possible to provide for continued growth using only the currently-available land and
structures while we design more space according to our missions statement, review potential properties
and prepare for a ecclesiastically hostile environment.
Auditorium Seating Based on our past attendance growth trends, we estimate a 6% growth rate through 2030. This means,
without taking measures, we will exhaust our existing auditorium and overflow space by 2016.
Year 4% Growth 6% Growth 10% Growth
2015 416 424 440
2016 433 449 484
4 See Appendix
Facilities
| 37
2017 450 476 (exceeds current space) 532
2020 506 567 709
2030 749 1016 1838
Attendance growth projections through 2030. The full data set is available in the NLT SharePoint site.
Childcare The childcare space at GCM is already nearing a critical point. As we grow we will need to continually
evaluate our usage of the space and determine if steps may be taken to improve the situation such as
shuffling room assignments, repurposing existing childcare common areas, or using other classroom
space outside of the childcare wing.
The Children’s Ministries average a population that is equal to roughly 38% of the population in the
sanctuary at any given time. Approximately 56% of the persons in the Children’s Ministries are in the
Nursery (5yrs. and below) with the remaining 44% in Junior Church. The current set up of the Nursery
by fire code can accommodate 105.
Growth Projection
Growth Rate %
Location 2015 2016 2017 2020 2030
4% Auditorium
416 433 450 506 749
Children’s Ministries
159 165 171 193 285
Nursery
89 92 96 109 160
6% Auditorium
424 449 476 567 1016
Children’s Ministries
162 171 181 216 387
Nursery
91 96 102 121 216
10% Auditorium
440 484 532 709 1838
Children’s Ministries
168 184 203 270 699
Nursery
95 104 114 152 392
Parking The facilities team could not find much reliable data on parking space usage. More data needs to be
gathered before accurate assessments may be made. Once data is gathered, several possibilities exist to
increase our parking capacity.
Facilities
| 38
Off-site parking, such as nearby Bellflower Elementary, may be used contingent on agreements with the
property owners. Shuttle transportation to and from off-site parking areas is also an option.
Some of our existing wooded property may be cleared and gravel or asphalt laid down, but the costs and
long-term impact of these options would have to be assessed. This cannot be done until a definitive
long-term master plan is developed.
All parking options have associated risks and potential legal/zoning ramifications which need to be
carefully explored.
Current parking capacity:
Marked – 272 Duplex – 30 Valet – 15
Future Space Concerns In addition to the auditorium and childcare wing, other areas will likely face space issues as we continue
to grow. For example, bathrooms, classrooms, storage areas and the kitchen all may face the need for
expansion.
On-Site Construction (New Auditorium) Eventually, funds permitting, we will need to build a new auditorium. Once we determine the trigger
point for building we will need to determine the size and capacity of the new auditorium and the costs
of building, including soft costs such as permits, fees, and the impact on our property appearance.
A new auditorium will take up more space on the property so we will need to plan in such a way as to
minimize its effect on parking space and traffic flow as well as other potential effects. We will also need
to consider all design options, and if possible, design the new auditorium with further future expansion
in mind. We will also need to plan how to most efficiently manage the existing space for optimal
utilization during construction.
Land Purchases As the Lord allows, we may choose to continue expansion at our current location by acquiring adjacent
properties. We should consider how this will affect our testimony with our neighbors, the risks and
costs, and legal/zoning concerns, including the city’s concerns. We must also carefully evaluate our
purchasing strategy to minimize costs and prevent overpaying.
The Lord may also direct us to purchase new land at another location. In this case we must carefully
evaluate our needs, including acreage, the suitability of existing structures, accessibility, visibility,
surrounding neighborhood, cost, parking and site development options. We must also consider our long
SIZE OF
AUDITORIUM -
# OF PEOPLE
AVG. ON
PROPERTY
TOTAL
PARKING
CAPACITY
AVG. TOTAL
CARS ON
PROPERTY USAGE
CURRENT PROPERTY 490 519 317 242 76%
Facilities
| 39
term plan for retaining the current property and whether it is financially and logistically practical to
maintain both locations.
Unfavorable Political Climate It is also possible that the political landscape might change in such a way as to affect our ability to meet
for worship. The nature of such political change may be as mild as a change in the tax code which forces
us to sell our property, or as extreme as outright persecution, scattering the people of Grace Church of
Mentor and forcing us to meet covertly in smaller groups. While we cannot know if or when such change
may come, it is wise to take steps to ensure that the souls of Grace Church of Mentor are equipped to
worship regardless of the political climate.
GCM already goes to great lengths to train its leadership (pastors, elders, deacons, and other lay-
leaders), and this should continue, as this will help ensure that local leaders are well-prepared to lead
small groups of believers should that need arise. We should also consider how the congregation might
be divided geographically and demographically. We already do this to a degree with our cottage prayer
meetings. In an unfavorable climate that allows corporate worship, we might choose to meet in rented
space, so we should consider that option as well.
If major political change occurs, especially persecution, we should anticipate that many current
members and regular attenders would opt to stop attending church altogether. We might also see an
increase of new members, as spiritual persecution often strengthens faith.
Finally, we would need to develop a communication plan to enable GCM leaders to stay in touch
without raising suspicion.
Current Care of Facilities There is a detailed assessment of the current facility prepared by the Facilities Staff. It is provided in
Appendix G. Both short and long term planning are facilitated through this document. Capital funds are
proposed yearly to accommodate for short and long term anticipated expenses.
Facilities Vision Statement We envision a plan that 1) maximizes and enhances the ministry purposes of our existing buildings and property in 5 years or less 2) maximizes and enhances the design of new building and property uses according to ministry purposes in 5 years or greater and 3) prepares a contingency for the church to function in the event of possible hostile social-political environment.
Facilities
| 40
Accomplishing the Vision through 2030
Building Program Overview: The Call and Considerations of a Building
Program for Grace Church of Mentor
The Call: An Invitation to Obey
Faithful is He who calls you, and He also will bring it to pass.
—1 Thessalonians 5:24
How does the vision of Grace Church of Mentor necessitate that we build? Grace Church of Mentor, by God’s grace will be a church that sees new birth and additional souls. As we continue to grow consider the following.
Current Capacity We are nearly at or over 70% capacity in every room for Sunday School and at 80% and utilizing 1 overflow room for Worship.5
Current Facilities Effort We spend much effort trying to make our spaces work throughout the week and accommodate continued growth. Consider that these effort hours can be invested into souls rather than facilities. Much of the Glory Team focus has been expended on managing growth with our current inadequate facilities and outdoor spaces. The Administration Team has considered the necessary auxiliary support and materials for overflow spaces, the Financial Team has prepared a plan and dashboard for capital funding of new facilities, and the facilities spent much time trying to manage our current situation as we prepare to build. We’ve invested in the short term with a tent during the warmer months to displace the teens and we utilize a small Sunday School room as a gymnasium for our Children’s ministries.
Church Planting As we grow in our desire to plant churches, we need to remember we are currently planting 2.5 church plants. We should be weary in planting additional churches until these churches mature. God has given us a season to prepare. As we mature we will be able to plant churches at a greater pace. It is a time for us to put our facilities in order and focus on our growth as we anticipate replicating ourselves in the area of church planting.
What has God provided by way of finances; how can we pay for the building(s)? In considering what God has provided we should have an idea of our maximum budget potential. We may not have assets or decide to take out bonds, but knowing our potential maximum preliminary building budget for the next phase of building is helpful to begin counting the cost and preparing for the call to build.
5 We need to develop a burning platform that highlights how we may soon restrict the ministry of GCM!
Facilities
| 41
Cash on hand
Cash raised by end of construction
Cash from sale of assets
Credit from loan/bonds6
------------------------------------------ = Total maximum building budget In preparing to build, we should seriously consider cutting costs where ever possible and allocating those line items in the previous budget to the building program line item. We should also seriously consider a singularly focused, comprehensive effort to the capital campaign. This would entail postponing or repurposing the Partners with Grace and Christmas Offering to align with the capital focus. Ecclesiastes 3:1 — There is an appointed time for everything. And there is a time for every event under heaven Proverbs 6:8 — [the ant] Prepares her food in the summer And gathers her provision in the harvest.
“Retiring debt is more expensive than avoiding it.”7
How does the mission of GCM impact the design of the building(s)? Our buildings should maximize the mission and vision of GCM. Key concepts that should be included in some or all of the building design are:
God’s Glory. Buildings excellent in aesthetic and community appeal.
Family. Spaces should be inviting and familiar, warm and cozy. Size is
important. We do not want a “house” too big or too small for the family. Flex size
is ideal. A place that is comfortable to stay is a place where families feel at home.
Discipleship. We need to accommodate for more intimate discipleship without
overly partitioning off the space (multi use). But there needs to be an intimate feel
and privacy for our discipleship and small group bible study.
Growth. We need to design spaces that will grow with our family. Flex space is
important. Multi use space without the multi-use feel.
Volunteer friendly. We need to incorporate into our design volunteer friendly
spaces that are easily maintained; while still considering aesthetic issues. Places
to hide mops, snow shovels, salt bins hoses and the ability to easily clean up
main ingress/egress. As well as many other considerations should be
incorporated into the design of the buildings.
6 Mr. Dodd would like us to take this out, but this would not be a true reflection of total maximum budget. Pastor Tim, please advise. 7 Anderson. Preparing to Build
Facilities
| 42
Reverent. Our space should be welcoming, but our auditorium should be
appropriately reverent. It is the only place we absolutely need to gather together
to appropriately worship God.
Purpose. As we progress through our building to the auditorium our building
should reflect a purposeful progression from more casual discipleship to
intentional reverent worship of God.
Youthful. These spaces should be designated as such. We should consider the
Children’s and Youth spaces as appropriately sized, designed and furnished.
Noise considerations etc. We need to be careful however, not to make the youth
spaces too youthful. We want to teach our children and youth what is God’s best
and what is appropriate to worship him.
Transparent. Office spaces, counseling rooms, Nursery-Youth rooms should be
relatively transparent and welcoming.
Light. Our building should incorporate as much natural light as cost effective. For
spiritual and North East Ohio reasons!
Our buildings should consider the broader evangelical trend and be careful that our design does not automatically pick up design ideas contrary to our mission. This does not mean that we cannot incorporate elements that are incorporated in the broader evangelical community (we all need light switches), but we must be intentional about what we build and why we are building it; all of it aligning to our mission statement. Key concepts that we should avoid if there is no missional reason to incorporate them into the building design are:
Entertainment. Theatre and concert style auditorium and stages. This is not our
purpose and by God’s grace never will be.
Institutional. We should avoid the institutional feel and size. This does not mean
small. Institutions are not where families gather and stay. Our design should be a
place where family stays.
Religious. We want to communicate to the community that we are a church;
however we are not a religious system and should be careful to avoid looking like
a religious institution.
Urban, industrial. This is not appropriate for our purpose in our area.
Rewards for Obeying A building project can demonstrate God’s power and grow our faith in substantial ways. Consider the historic workings of God in previous building projects. A Building project may energize and excite those in our congregation that have not seen the vision or the ability to achieve the vision of the Leadership. A great deal of investment in GCM occurs through the unified efforts of prayer, sacrificial giving and work. To God’s glory, a testimony of vibrant life to our neighbors, Mentor and Lake County.
Facilities
| 43
Potential Risks for our mitigation There is a great deal of urgency once you decide to build. We must not rush at the risk of poor planning. Also we must consider the best model and people to execute the plan once developed. We must not stretch our leadership too thin and execute our plans poorly. Building programs tend to be the focus of church life and finances when you are implementing them. We must not put an unbiblical strain on our people or leadership.
The Call: An Invitation to Prepare
Failure to plan is planning to fail.
“You must plan well in order to build well.”8
Luke 14:28-30
Importance of Planning Taking time to plan properly considering the cost, time and direction is critical for a successful building project. The outcomes of poor planning are costly. The risk to the leadership and people is greater than even the potential waste of money or an inadequate build. We should 1) pray 2) assess our ability to build 3) understand the importance of planning 4) and consider outside expert counsel.
Results of Poor Planning 1. Increased Cost and effort
2. Increased risk of wasted space or improper design
3. Increased stress on church
4. Damage to confidence in leadership
Consider the charts below in regard to project cost and control during the planning, design and construction phases.9
8 Anderson. Preparing to Build 9 ibid
Facilities
| 44
Are we prepared to build? 1. Do we have an objective basis for needing to build and communicate that clearly
to the congregation? …YES
2. Do we understand the cost both financially and otherwise? …growing in
understanding
3. What is our ability financially to build? …TBD
4. Do we have the land to build? …phase 1 yes, next phases no
Keep in mind the potential financial costs to build:10
Consulting fees (architect, engineer etc.)
Architectural and engineering drawings
Surveyors and environmental reports
Inspections
Land preparation
Storm water considerations
Building construction
Interest
Fire and occupancy safety
Utilities
Furniture, fixtures and interior design
10% contingency
Broad Building Program steps 1. Plan for the future
2. Prepare financially to build
3. Secure necessary land.
4. Design a conceptual master plan
5. Raise/secure funding
6. Design spaces according to the mission of GCM
7. Raise/secure funding
8. Build
The Considerations:
The need for wisdom and experience. Design, planning and Building takes skill and time. The Leadership of GCM does not have the expertise, license or time to design a plan and implement it—alone. The Leadership must be involved, but we should must hire the right help. Consider that even Solomon, with extraordinary wisdom, invested in the experience and skill of others to
10 adapted from Anderson’s Preparing to Build.
Facilities
| 45
build the temple (2 Chronicles 2:6-8). We should consider a firm that understand the church. We need to determine the best design-construction method.
Building Balanced Spaces in Phases Conceptual Master Plan
“If you have a God-given vision that exceeds
your ability, the vision will most likely be
realized in phases as the church grows and has
the ability to support the growth.”11
At Grace, we need to build for the future, but accommodate the present needs. We should understand that unlike almost anything else materially we consider as a church, the building(s) we design and build today are just as much for future generations as they are for the current generation. We need to provide balance spaces with the ability for future expansion to accommodate growth.
Master plan revision As a church we should expect to spend the majority of our time planning with only a fraction of the time actually building what we planned. With the 2000 master plan we planned for future auditorium educational and recreational needs as well as parking for the facility. However the Lord provided beyond the capabilities of the current 2030 vision and current space utilization. For example, the 2000 MasterPlan planned for the amount of parking spaces that we currently have on the property and we have not even realize or auditorium build yet. In light of these realities we have begun revising the 2000 master plan. 12The MasterPlan phasing is as follows. 1. Continue to pursue property acquisitions for the 18 total acres. 2. Design a campus master plan incorporating the immediately owned acres as well as the potential 18 acres as a whole. With building
11 Anderson. Preparing to Build 12 Floor plan courtesy of Jack Berry, Midwest Church Design and Construction
Facilities
| 46
proximity as close to the current owned property. 3. Design and build an auditorium to seat 1,300. Frist phase should seat 600-700 that has nursery space (or other classroom space) that will eventually be removed to expand the auditorium to seat 900-1000 on the main floor and then additional 200-300 on the balcony. The balcony should be designed for immediate classroom space and then be able to be repurposed as a balcony once the auditorium need is present. The youth ministry and or college and career or other groups can move into the balcony spaces. This will free up additional classroom space in the current educational wing. *Note on design multiple layers of drywall and insulation should be utilized for sound barrier between auditorium and educational spaces *note on design zoning should be utilized in all areas with ecobee or similar thermostats 4. Repurpose existing nursery space to Office needs this is assuming the house needs to be relocated and/or removed. Or repurpose existing nursery for additional secondary ministries such as children or youth ministries. 5. Repurpose existing auditorium to multipurpose room and or new kitchen area. The next phases should be triggered depending on the most critical need.
6. In order to expand the auditorium we would need to remove the nursery and any other classroom spaces. Nursery could be repurposed in the current auditorium which would be the existing fellowship hall space/multipurpose room 7. A new gymnasium and youth center could be built to house both the children's and Teen ministries.
Items to keep in consideration.
Parking will need to grow
Recreation/ green space is currently in adequate and will need to grow.
We can utilize spaces like basketball courts pavement underneath outside pavilions etc. for valet parking. There also alternatives besides hard surfaces such as pavement and concrete that can be played on and the part done these are engineered surfaces. They also require less money spent underground for drainage and run off.
Facilities
| 47
Current Land Situation At present we have almost 8 acres. Our current property will hold enough parking for a 1,400 seat auditorium. There would be no green space or room for additional expansion.
We need to give priority and focus to the current adjacent available properties, while keeping our pulse on other locations.
1. Adjacent properties 2. Other potential properties in Mentor.
Adjacent properties There is roughly 10 additional acres around the
church that would be advantageous for us to
purchase (18 acres total).The most beneficial
strategy is to acquire property as they naturally
become available on the real estate market since
there is a greater chance of fair market value for
each property acquired.
However as we progress through the building phases of the master plan it may require us to approach and pay above market value for certain properties. There is potential to providing additional egress and ingress off of Bellflower or Texas Ave., Bellflower to the North or Texas Ave. to the south Preliminary studies suggest that the city would be more agreeable to a Bellflower egress and ingress that currently has through traffic as well as other church traffic and a traffic light. The south option off of Texas Ave. is a no outlet street that does not have any other traffic and does not have a traffic light. We suggest that any property within the 18 acre footprint that comes available should be purchased by the church regardless of the immediate location (i.e. not currently adjacent to the church). Potential adjacent property cost
acreage auditor value cost per acre
7410 Bellflower 0.65 $ 142,130.00 $ 218,661.54
7404 Bellflower 0.65 $ 147,530.00 $ 226,969.23
7398 Bellflower 0.65 $ 114,250.00 $ 175,769.23
Facilities
| 48
7388 Bellflower 0.65 $ 137,760.00 $ 211,938.46
7370 Bellflower 0.66 $ 99,700.00 $ 151,060.61
7360 Bellflower 0.875 $ 185,120.00 $ 211,565.71
Corner
6813 Reynolds 0.617 $ 110,150.00 $ 178,525.12
6825 Reynolds 1.634 $ 126,010.00 $ 77,117.50
6831 Reynolds 2.219 $ -
6859 (6883) Reynolds 4.526 $ -
6885 Reynolds 1.637 $ 124,470.00 $ 76,035.43
6905 Reynolds 1.577 $ 88,900.00 $ 56,372.86
6915 Reynolds 1.602 $ 117,410.00 $ 73,289.64
17.947 $ 1,393,430.00
See Appendix H for property card information.
*Yellow highlight reflects lowest cost and phasing priority. All of these properties have houses on them and may have other benefits besides dwellings.
Potential housing uses are as follows 1. Short-term CPI or other internship programs. 2. Short and or long-term missionary housing 3. Parsonage-like housing to those in their second half that would live in a house owned by the church and work as part of their "retirement" 4. Other options such as church member purchase, etc. *note: we need to investigate the ability to rent out properties and our tax exempt status. There are some properties that have little house value but extend the depths of the current church property these properties offer the most value and resources for future church growth and should be high-priority acquisitions (see chart above). Every property acquisition will be different however the current model of cash payments with zero interest is a proven one however both of those circumstances to date have most likely been the exception rather than the rule. Other potential properties in Mentor. 1. Adkins and 306 (high visibility) 2. Lost nation airport parcels ( potential acreage) 3. Business park (Tyler, Heisley. Etc). 4. Church/school acquisition.
Facilities
| 49
Adjacent properties versus other properties Unless God clearly direct us to other properties we need to give priority to the adjacent properties in recognition of the property that God has already given and provided us. The pros of working with the 18 acre footprint is that we already have an established presence, have invested on the current property, and there is no sale needed to finance other property and building expenses.
The advantages of additional acreage from other locations is that we can start and form a new master plan. Depending on the location it may be more visible and we would be able to have a larger footprint if the property was available. It also may be cheaper per acre. The cons of other properties is that we
2015 Steps to complete by end of 2015:
1. Determine the number of individuals that we want to house in the auditorium, for
services. This would include individuals that are currently worshiping in the overflow
areas.
2. Determine the approximate costs for building construction, based on the chart below.
Construction costs are based on construction cost data found in R.S. Means 2005
($95.12/SF), 2009 ($130.00/SF) and approximated for 2013 ($163.80). Current trend for
costs is 6% escalation per year.
3. Determine if new construction or addition/renovations is the better path.
4. Determine the timeframe for the construction and funding availability.
5. Determine architectural firm, building committee and conceptual design drawings.
Attendance in Sanctuary SF/Pe
rson
Total
SF
neede
d
Budget
2005 Cost
Budget
2009 Cost
Budget 2013
Cost
Addition to South
490+190 2875 $273,470 $373,750 $470925
Addition to South &
North
580+190 5750 $546,940 $747,500 $$941850
New Auditorium
605 28 16940 $1,611,333 $2,202,200 $2,774,772
974 28 27272 $2,594,113 $3,545,360 $4,467,154
Facilities
| 50
Auditorium Seating13 Overflow This is the earliest and least-disruptive option to ease the space problem in the auditorium. GCM currently has an overflow procedure in place, but more may be done to make the process more efficient and less disruptive. First, we must determine the attendance levels at which a change in overflow procedures is necessary. When one of these trigger levels is reached, we will need to list all areas available for overflow, determine the order in which these areas should be implemented, consider the potential risks of using overflow, and determine any technological/logistical considerations (i.e. audiovisual setups).
Two Services Based on our baseline growth track, given the existing auditorium space, we are likely to reach a breaking point well before we are able to construct a new auditorium. At this point we must consider splitting the morning worship service into two services. This is a difficult decision which will impact many other areas of ministry, including childcare, parking/traffic control, choir/music, ushers, nurse-on-call, security, Bible study hour (Sunday school), children’s church, youth group, leadership oversight, administrative support, and corporate fellowship (pot lucks, etc.). The risks and potential impacts need to be fully evaluated and addressed before two services can be implemented.
1. Determine the trigger attendance values that will drive the implementation of this plan. For
example, identify when (based on attendance) we open up additional overflow, consider two
services and/or start on-side auditorium construction. Suggestions are provided in this report.
2. Approve a list & assess readiness of all available overflow seating. This sub-team identified the
following areas:
Family Room (60 people, current overflow) - best-suited in appearance and technically
1. 13 For 2015 start by writing a 2015 Facility Project Definition document to:
a. Define needs in the form of specification, & deliverables for 15 year
master plan. Make a list of all the assumptions used to develop the facility
plan. This will relieve the “we don’t know what is going to happen, so we
can’t do anything now” issue. As the plan develops and assumptions
change, it will be readily visible.
b. Define metrics to evaluate alternative options. Define metrics for
evaluation (for example: capital cost, effort hours, change in capacity, and
cost per person)?
c. Brainstorm and explore options with a scenario analysis.
d. Develop the best set of options based on the metrics defined. Conduct
scenario analysis. With all the options that will be considered.
e. Propose an implementation plan. The funding team is asking for a graph
showing the capital needed as a function of time. This should also show
the capacity change as a function of time.
Facilities
| 51
Berean Room (50 people, current backup overflow) - location of first floor is optimal, but
room appearance is not conducive to worship; room size/layout creates technical
challenge with placement of TV cart
Life Builders’ Classroom (60 people)- second floor location not optimal, however, room
size and appearance is appropriate for worship. Room capacity is good, yet there are not
enough auditorium style chairs to maximize overflow capacity in this space. This room is
not technically-ready for overflow.
Youth Room (50 people) - Second floor location not optimal and room appearance is not
conducive to worship. This room’s capacity is good, but there are metal folding chairs for
seating. This room is not technically-ready for overflow. Question to answer: Could we
relocate the youth to a trailer when we utilize this space?
3. Determine the order of implementation. The list above reflects the order suggested by the
facilities team. In addition, the team suggests opening a new overflow space when the
auditorium reaches 70% capacity (350 people).
4. Determine cost of fitting remaining overflow options with technical/audiovisual capabilities
and appropriate seating/aesthetics.
5. When combined worship attendance reaches 424 people:
Make plans to open our 3rd overflow area.
We anticipate needing the 3rd overflow area in 2016 when total combined worship
attendance is 449 people.
This exhausts our current overflow capacity.
6. When combined worship attendance reaches 476 people:
Make plans to open the 4th overflow area.
We anticipate needing the 4th overflow area in 2018 when total combined worship
attendance is 505 people.
7. Utilizing all overflow areas suggested provides seating for an additional 220 people, giving us a
total seating capacity of 570 based on our 70% rule. We estimate running out of overflow by
2020. We should have a new auditorium or additional overflow structure by this time. If not,
we may consider a plan for two-services.
If considering two services, what are the risks? What technical/logistical considerations
exist? What are the residual effects of two services on the following areas:
i) Nursery
ii) Parking/Traffic control/Valet
iii) Choir/Musicians
iv) Ushers
v) Nurse on Call
vi) Security
vii) Sunday School
viii) Children/Youth Classes
ix) Leadership responsibilities
x) Administrative support
Facilities
| 52
xi) Corporate fellowships (i.e. potlucks)
Develop a service schedule for two services. The facilities team came up with three basic
schedule ideas. The details and pros/cons of each are available upon request:
i) Sunday School after First Service
ii) Sunday School during Evening Service
iii) No Sunday School
Develop a plan to minimize fragmentation/division among our congregation as a result of
two separate meeting groups. The facilities team has devised a suggested plan for
assigned attendance on a rotating basis. Details are available upon request.
Simultaneously develop a plan for on-site auditorium construction. If two services is NOT
an option, this will need to be significantly accelerated to allow time to make on-site
construction plans and prepare financially. A new auditorium/overflow structure will be
needed by 2020 if two services are not implemented.
The facilities team strongly recommends beginning the planning phase for new
construction in tandem with—or before—the implementation of two services, in order to
minimize the time and negative effect of the two-service arrangement.
Nursery Questions to answer:
1. How can we make more room using available space? 2. When will we run out of space? 3. What are our potential risks?
Steps to complete by end of 2015: 1. Evaluate classrooms by demographics and capacity, then move and shuffle as
necessary. 2. At 80% capacity (84 persons) we need to assess whether or not we should open
playroom. 3. If the population is evenly distributed we can accommodate 121 persons with the
conversion of the playroom leaving us set until 2020. Because it is not we have to have options to add new rooms, upstairs if we must.
4. Risks include traffic jams, change in patterns of pick up and drop off, overall safety and security of children.
Discipleship/Classroom Temporary Structures If classroom space becomes an issue, we may decide to “buy time” by using semi-permanent structures
outside the main building for classroom space. We will have to determine the costs, effects on parking,
risks, aesthetic concerns, and legal/zoning issues.
GCM has precedence for this in the past. The city has allowed the use of temporary educational
structures on our site before.
Parking Questions to answer: What is the current parking capacity?
Facilities
| 53
Can we manage our current capacity differently? What are immediate alternatives in response to growth? How do we respond to increased parking needs at expansion?
There are two immediate options to increase capacity of the current parking lot: Relocate/remove the storage sheds Remove snow completely during winter There are two immediate options in response to continued growth: Offsite parking at Bellflower Elementary using shuttle service Encourage congregation to carpool within families; one car per family
Continued growth would require an expansion of the parking lot into the unused portion of the property. What are costs to expand parking lot on current property?
2020
Facilities Addition or New Construction Questions to answer:
4. What are the potential avenues of expansion and construction?
5. What are the costs anticipated for construction?
6. What is our timetable for expansion and construction?
7. When will we outgrow current property?
There are currently three avenues to increase our facilities: additions/renovations, new
construction and off-site construction. Depending on the number of individuals we are
ministering to, the timeframe for construction and costs can change dramatically.
Auditorium
Questions to answer: 1. Have we constructed a new auditorium yet?
2. What is our attendance growth trend for the past 5 years? Are we still holding at
6%?
3. Has our property/acreage changed?
Steps to complete by end of 2020: TBD by a future planning/implementation team.
SIZE OF
AUDITORIUM -
# OF PEOPLE
AVG. ON
PROPERTY
TOTAL
PARKING
CAPACITY
AVG. TOTAL
CARS ON
PROPERTY USAGE
ADD'L
PARKING
NEEDS
SIZE OF
PARKING
SPOT - 10 X
30 - 300 SF
TOTAL SF
ADD'L
SF TO
ACRES
ASPHALT
COST - $ / SF
TOTAL BUDGET
COST
ADD TO
EXISTING 680 891 544 427 78% 227 300 68,127.51 1.56 2.85$ 194,163.42$
Facilities
| 54
Parking Questions to answer:
1. What are costs at a new location?
Steps to complete by end of 2020: TBD by a future planning/implementation team.
2025
Facilities Addition or New Construction Questions to answer:
1. Have we constructed a new auditorium yet or simply do additions & renovations?
2. What is our attendance growth trend for the past 5 years? Are we still holding at 6%?
3. Has our property/acreage changed?
4. Has the need to construct off current property materialized?
5. What are costs for off-site construction
Attendance in
Sanctuary
SF/Person Total
SF
needed
Budget
2005 Cost
Budget
2009 Cost
Budget
2013 Cost
1569 28 43,932 $4,178,812 $5,711,160 $7,196,062
Match Existing
Building
25,387 $2,414,811 $3,300,310 $4,158,392
Site Development
($20,25,30)
52,659 $1,386,380 $1,732,975 $2,079,570
TOTAL $7,980,003 $10,744,445 $13,434,024
2527 28 70,756 $6,730,311 $9,198,280 $11,589,833
Match Existing
Building
25,387 $2,414,811 $3,300,310 $4,158,391
Site Development
($20, 25, 30)
96,756 $1,935,120 $2,418,900 $2,902,680
TOTAL $11,080,242 $14,917,490 $18,650,904
SIZE OF
AUDITORIUM -
# OF PEOPLE
AVG. ON
PROPERTY
TOTAL
PARKING
CAPACITY
AVG. TOTAL
CARS ON
PROPERTY USAGE
ADD'L
PARKING
NEEDS
SIZE OF
PARKING
SPOT - 10 X
30 - 300 SF
TOTAL SF
ADD'L
SF TO
ACRES
ASPHALT
COST - $ / SF
TOTAL BUDGET
COST 6.5% ANNUAL
INCREASE
NEW SITE 605 793 484 380 78% 300 145,224.48 3.33 3.04$ 440,792.60$
974 1276 779 611 78% 300 233,799.41 5.37 3.23$ 755,766.24$
1569 2055 1255 985 78% 300 376,623.49 8.65 3.44$ 1,296,585.26$
2527 3310 2022 1586 78% 300 606,582.25 13.93 3.67$ 2,223,990.81$
Facilities
| 55
2030
Hostile social-political environment considerations
Define leadership structure?
How do we approach financing of future structures?
Up-size/Down-size?
Liquidation of assets in the event of a financial crisis.
Identify possible meeting locations based on geographic patterns.
Funding
| 56
Funding14
Funding Plan Overview 1. Consider and evaluate our operational funding (General Budgeting philosophy and
practice). 2. Consider and evaluate our Capital Campaigns (philosophy and practice).
Funding as is evaluation
Operating Funding The current structure and processes in place at GCM include engaging the Budget Committee to
develop a plan based on defined goals, in line with GCM’s mission statement for Glory (facilities),
Evangelism an Equipping the Saints.
14 Harry Dodd: Capital funding sources: God’s people or the World?
1. Page 55 graph with “Borrowing Capacity” does not aligned with what we preach,
teach, sing & with the Word of God.
a. El Shadi: Per PH 11/16/14 The God who supplies. God all sufficient. God
who supplies all our needs. 7 times in OT
b. Hymn Red book 109 Great is thy Faithfulness: All I have needed thy hand
has provided.
c. Hymn Black book 90: My Shepherd will supply my need.
d. M&M SS 11/16/14: Food for thought: We can face the impossible because
we know God is in control. God is not limited by the fact that things don’t
make sense to us. Sarah judged Him faithful who promised.
e. Prov. 3:5-6: Trust in the Lord & lean not to your own understanding.
2. Biblical Principles:
a. God owns everything. Therefore, He is not short of resources.
b. The Lord promised to provide where He leads.
c. The Lord is in control.
d. Our part is to faithfully manage what He provides & follow Him. Full of
faith
e. He has already provided. We have it. WILL WE USE IT AS THE Lord
planned?
3. Do we trust God or just say we trust God? LB
4. We can change the world with giving heart. For example (5) UNMARRIED
COUPLES IMPACTED.
5. Do you want to be a part of what God is doing?
How many new ideas where proposed? We need more ideas to increase funding!
Funding
| 57
Also, GCM has an Administrative Advisory Committee which review and monitors staff salaries
and benefits to ensure they are adequate and appropriate. Recommendations are submitted to
the Sr. Pastor and then in total to the Budget Committee.
As a result of the above, GCM’s leadership has a clear picture of the needs of the ministry for the
fiscal year and the general fund giving required to meet those needs. Two other versions of the
annual budget are prepared in advance to reflect areas that can be reduced if giving falls short of
Blessing budget and areas that would be increased if giving exceeds budget. This eliminates the
making difficult decisions under the stress of the situation and assures maintaining a balance in
line with GCM’s vision statement.
Currently, quarterly business meetings are held with the members and a graph is presented
showing the state of giving and expenditures relative to the approved budgets. The
Administrative Deacons and Elders are briefed at least bi-monthly on the financial status of the
church and the Budget Committee also meets at least quarterly or as necessary.
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000Annual Budget vs Building Fund
Annual Budget Building Funding
5.0% Annual Budget Growth Projection Assumed
10.0% Budget Allocated to Building Fund
Funding
| 58
15
Capital Funding Projection
Assumptions
Year 1 Budget 1,103,000
Budget Growth Projection 5.0%
Building Fund Allocation 10.0%
Down Payment % Required 20.0%
Term of Loan in Years 30
Annual Interest Rate 5.0%
Capital Campaigns Where are we now and how are we (GCM) doing in this scope of ministry?
Capital campaigns separate from GF giving
o PWG,
o Sacrifice Sunday,
o Building Fund designations -
General Fund budget line item for Building Fund. However there is no specific goal or
required amount established at this time
Current budget includes $90k for debt retirement and $30k for building fund
15 Harry Dodd would like to remove the debt part of this chart per footnote above
-
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000Cummulative Building Fund and Borrowing
Capacity
Cummulative Building Fund Borrowing capacity
20.0% Down Payment Required
Borrowing Capacity
Building Fund
Funding
| 59
Summary Where are the gaps?
How much do we need
When do we need it – timetable?
GCM is Currently not meeting GF budget
Amount in GF for capital $7,500 / mo) will not be available for new program until 6/2015
Congregation is unaware of the scope of the need and amount
Lack of experienced individual / team in developing and leading a major capital campaign
Unaware of outside consultants to assist in developing campaign
Proposed Solutions
Lack of Biblical education / understanding / conviction by the majority of the congregation
Means of motivating individual members to seek training
Inconsistency in giving from Month to Month
Limited methods / means to facilitate giving by individuals
2015 Operating Fund Proposal
I would propose the following, to develop and implement processes for raising undesignated
operating funding by 25% during 2015 with sustainable growth to continue in subsequent years:
Life-long personal financial discipleship process.
If we help our people be what God wants for them, they will be able to give generously.
A process for inspiring our people to give.
Vision casting on a repeated basis.
Remind people of the importance of the GCM mission.
2 minute giving talks at least once a month.
Giving testimonies
Consistent givers process
To encourage consistent givers to continue to grow in the grace of giving.
First time giver process
An intentional follow-up process to encourage their step of faith.
High capacity giver discipleship process
Develop an intentional process to disciple people with the gift of giving.
Digital giving process
Goal to raise electronic giving to 40% in 2015 and increase by 10% a year till we get to more than
90%.
Intentional process for year-end giving.
To develop these systems, I would suggest:
A special day in Jan., set aside to engage selected staff and leaders to develop processes to
increase income by 25% in the next physical year. The outcome of the day would be to create an
action plan with delivery dates and the individual responsible for each items.
Identify one person (a staff member or elder) who is responsible for owning, leading and
executing the funding plan.
Operating fundraising: The Let God Lead budget process is good for planning and managing
expenditures, however there is an opportunity to develop an intentional, comprehensive process
for raising funding to support the budget. We have the beginning of a process to disciple our
people in biblical financial management.
Funding
| 60
Do we need a more comprehensive funding plan as well as a spending plan?
Funding Vision Statement
GCM will biblically/missionally present the need for financial resources, teach stewardship and disciple its
membership to worship God through giving. This church will have a clear, simple and appropriately
detailed metric of giving for specific leadership levels and membership.
Vision Statement for GCM’ Giving Ministry
GCM will be a church who, by God’s grace,
As individual members, give Biblically and sacrificially to the Lord’s work (100% participation)
As individual members, continue to grow in our understanding and application of scripture on the
topic of financial management
As individual members, conscientiously and scripturally evaluate our own personal stewardship
with the goal of increasing the amount given each year
As individual members, welcome and / or seek pastoral care if we don’t grow in our stewardship
As a church, increase each year in the proportion of individual members who give at least 10% of
their gross income
As a church, meet or exceed our Blessing budget giving each year
As a church, increase in our general fund giving every year
As a church, give above and beyond general fund giving to meet unexpected immediate needs
and/or planned future needs (i.e. contingency reserve, capital campaign, etc)
Accomplishing the Vision through 2030
2015
Operating Fund
Communicate the vision for 100% member participation in the grace of giving
Encourage individual to establish personal giving goals each year
Series of messages (AM services) on stewardship to enhance congregational understanding and
convictions
Additional metrics for congregation, leadership and Sr Pastor to track progress towards vision
goals
Add an accountability segment to the Stewardship courses (voluntary)
Expand the Discipleship program to include a more extensive stewardship segment (Is this in The
Walk ?)
Expand venues for giving (GCM-online, kiosk, ccb (GCMonline), smartphone email / texting,
digital giving)
I would propose the following, to develop and implement processes for raising undesignated
operating funding by 25% during 2015 with sustainable growth to continue in subsequent years:
Life-long personal financial discipleship process.
If we help our people be what God wants for them, they will be able to give generously.
Funding
| 61
A process for inspiring our people to give.
Vision casting on a repeated basis.
Remind people of the importance of the GCM mission.
2 minute giving talks at least once a month.
Giving testimonies
Consistent givers process
To encourage consistent givers to continue to grow in the grace of giving.
First time giver process
An intentional follow-up process to encourage their step of faith.
High capacity giver discipleship process
Develop an intentional process to disciple people with the gift of giving.
Digital giving process
Goal to raise electronic giving to 40% in 2015 and increase by 10% a year till we get to more than
90%.
Intentional process for year-end giving.
To develop these systems, I would suggest:
A special day in Jan., set aside to engage selected staff and leaders to develop processes to
increase income by 25% in the next physical year. The outcome of the day would be to create an
action plan with delivery dates and the individual responsible for each items.
Identify one person (a staff member or elder) who is responsible for owning, leading and
executing the funding plan.
Capital Campaigns Where are the opportunities to be more excellent and Christ-like?
Once the need is determined, begin communication to the congregation
o Physical need
o Projected cost
o Time frame for project - start to completion
o Communication plan
Determine sources of funding
Research and evaluate fund raising programs, techniques, and if they are appropriate
o Leverage Arch network for experience
o Educational institutions
Educate congregation on various means of participation (estate planning, appreciated
investment contributions, qualified charitable distribution, etc)
Identify and disciple “gift of giving”
Improve performance in operating funding
Expand GF capital / debt line item in the budget
Capital Funding Resource Evaluation Resource Reviewed by General Subject /
Topic Consideration for use by GCM
Positive - Favorable Negative - Unfavorable
Midwest Church Design and Construction, Funding Consultant
Pastor Steve A Design-Build and Capital Campaign Coaching firm for churches
Biblical World View
Firm understand the “A-Z” of a building program process
Emphasis on prayer
Cost
Broader Evangelical client-base
Funding
| 62
One firm for design, build, and coaching
One firm for Design, Build, and coaching (also a pro)
Injoy Stewardship Solutions - injoystewardship.com
DL Hixson Consulting and Training: operational funding and capital campaigns
Training and approach individually customized
Webinars offered
Capital Campaign University
CCU Cost: $2500
We may not agree with the corporate approach
Compass Seminar – 6/27/14 “5 Step s to a Successful Stewardship Ministry” by Pete McQuillen
DL Hixson Stewardship ministry planning and development
Collaboration on methods and approach to stewardship ministry
Identified various resources that are available for individual / church use
The Rocket Company DL Hixson Advisors on how-to coaching to enhance giving
A few practical suggestions
Very new evangelical approach to giving
strategic and manipulative
New Innovations in Online Giving
Jayme Knutson
One Vision – One Goal
Mike Filippo
Shift Your Ministry Momentum
Shawn Anthony
Summary What do we need to do to get to the vision? (Implementation Phase)
Prepare an orderly, prioritized plan to approach each of the opportunities above
Work with the Equip IT to establish a life-long discipleship plan
Explore how best to absorb individuals entering “2nd Half” ministry to accomplish the vision and
the associated savings of financial and staff resources
2020-2030 Review and continue to teach, model and grow our congregation.
Appendix
Appendix A: Administration Evaluation Outline Worship Planning information
(1) Pastor Tim gives Pastor Mike Theme of messages (2) Pastor Mike chooses music thematically to support messages (3) Goal of all is to teach & instruct
(a) Frequency of music chosen depends on goal (b) Attempting to learn new piece (c) Want congregation to think on music during week
(4) Hymns & specials chosen that week (a) Special music individual/group chosen by PM (b) Song to be used chosen by PM (c) Goal is to reinforce message and minister (d) Ben choses choir pieces and on own volition provides scripture reference
(5) At what point does PM need train an individual for this? (a) Does size of congregation determine (b) Does his outreach ministry determine (c) Possible choices include Ben Richards, CIM individual, (d) PM has taken personal ownership of this (e) Philosophy is “Nothing by Chance & Excellence in All Aspects of Worship”
Other aspects of worship to consider (f) Giving
(i) Who should be making announcements – All pastors & leadership when asked (ii) Ways to give – To be handled by Glory - Financial
1. Offering boxes 2. On-line giving (bank website) 3. On-line giving (debit/credit card) 4. GCM-Online giving button
(g) announcements
Logistics
Seating a) Reset of Auditorium needs to occur using seating templates b) Realistic maximum seating in auditorium is 500 without loft (70%=350) c) Accommodations in sanctuary for additional wheelchairs, walkers special needs d) Overflow e) Mandatory for members only based on predetermined list – as proposed by Glory
Facilities team f) Should include all age groups (worshipping together i.e. Titus group) g) Need added Hymnals & Bibles for these areas h) Will additional ushers be needed to service these areas i) Put leadership (One Elders/deacons) in each room to facilitate worship
Appendix A: Administration Overview Outline
| 64
i) Keep atmosphere spiritual ii) Eliminate the “living room” service iii) Try to mirror the main aud. (ie. Piano in aud. Don’t use guitar)
j) Family room (approximately 57 persons) i) Sound insulation in corridor walls ii) Electric piano adds feel of worshiping with auditorium iii) Need updated & improved IT
(1) Audio & Video feeds (2) Fiber optics (3) Screens/monitors
k) Berean Room (approximately 56 persons) (1) Not Ideal for 1st choice
(a) Too hot (b) Too noisy from above (c) Too noisy from restroom & corridor (d) Uncomfortable chairs (e) not decorated well (f) Lighting (bulbs) not same & not all lit
(2) Need updated & improved IT (a) Audio & Video feeds (b) Fiber optics (c) Screens/monitors
l) What accommodations will be needed for wheelchairs, walkers, special needs
Music Selection - Nothing by Chance & Excellence in All Aspects of Worship” m) Music requirements
i) Music standards (1) Who develops (2) Who communicates (3) Who documents
ii) Music materials (1) Sheet music
(a) Choir (b) Groups (c) Cantata
(2) Hymnals (a) Main (b) Supplemental (c) Added sheets
iii) Funding for Purchase iv) Resources to acquire
(1) Borrow (2) On-line (3) Another church/school
v) Storage location (1) Sheet music – choir (2) Sheet music – groups
Appendix A: Administration Overview Outline
| 65
(3) Sheet music – cantata (4) Hymnals
vi) Instruments (1) Current owned (2) Anticipated purchases (3) Special music needs
(a) Bagpipes (b) Trumpet (Taps) (c) Bells
Choir / Orchestra n) Who makes determination whether choir remains in loft? o) Who makes determination whether we have orchestra or not p) If choir does not stay in loft do they go to designated area – overflow q) As choir grows to over 40 – need to maximize loft
i) Remove Deacon benches and put chairs on main level of platform ii) Relocate one of the instruments off platform iii) Remove electric piano from use
r) Designated Music rehearsal and storage area.
Support Staff to facilitate worship s) Ushers & Greeters t) Traffic control, parking attendants and security u) Nurse on call
i) Review nurse response policy regarding overflow ii) Added individuals
Special Services – Easter, Mother’s Day, Memorial Day, Father’s Day, Thanksgiving, Christmas Cantata, Christmas
v) Safety concern with open flames – consider use of battery candles w) Kids & Jr. Church participation handing out items – sanctuary & overflow x) Junior Church singing in services – what does this do to occupancy y) If visitors are part of service (Color Guard), need to have following
i) Church designated Liaison to interact with group ii) Itinerary for group with consideration of Order of Service iii) Chairs & beverage needs iv) Designated seating in auditorium v) Tangible gift for them – GCM challenge coin, GCM monogrammed pen, etc.
Communion z) Preparation Staffing & scheduling – Deacons currently on yearly rotation aa) Service equipment
i) Wafer trays ii) Cup trays iii) Cups iv) Funnels v) Linens (tablecloths and napkins) vi) Storage totes
Appendix A: Administration Overview Outline
| 66
vii) Juice & wafers bb) Storage & preparation location cc) Facilitators
i) Main auditorium ii) Overflow
dd) Servers i) Elders & Pastors ii) Deacons (as needed basis) iii) Full auditorium & choir loft, need 6 to serve iv) Family room overflow (approximately 57 persons)
(1) Facilitator (2) Servers - 2
v) Berean room overflow (approximately 56 persons) (1) Facilitator (2) Servers - 2
Baptism ee) Set up baptistery – Personnel ff) Backup heater for water gg) Facilitators of baptism – Pastors hh) Special seating for family & guests ii) Special greeter for Baptism candidate & family jj) Dressing Rooms
i) Assistance in room ii) Confirmation and verification of attendance iii) Clothing racks iv) Seating v) Privacy vi) Audio/video (for church & individuals) vii) Record keeping & certificates of baptism viii) Database storage
Need updated & improved IT
i) Audio & Video feeds ii) Fiber optics iii) Screens/monitors iv) Computers & website
(1) Possible to create App for church website? (2) Easier way to perform self-search for sermon audio (topical, date, speaker) (3) Pod-cast of sermons (4) Live streaming of services—elder policy??? Ramifications, benefits? (5) Bandwidth constraints (6) Old cassette tapes of sermons – have these all been converted? (7) Technology involvement & improvements
(a) Education of all congregation on any of these have to happen before changes – settle the sheep
(b) Pod-cast & direct Broadcast
Appendix A: Administration Overview Outline
| 67
(c) FaceTime PM Sunday school class for Peter Grenier (d) FaceTime with Missionaries during Evening services (e) Who would benefit from this?
(i) In our ministry (students, homebound, missionaries) (ii) Nursing homes (iii) community
Multiple Services needs v) Multiple services at current facility vi) Simultaneous services at multiple locations
(1) Satellite locations in cities located around GCM (a) Will this be Video/Audio link to GCM (b) Will Pastor and/or Elder be there with live service (c) Eliminate the “living room” service
(2) Satellite locations within short distance (1-2 miles) of GCM (a) Will this be Video/Audio link to GCM (b) Will Pastor and/or Elder be there with live service (c) Eliminate the “living room” service
Paid Staff vii) Pastors
(1) Currently 5 Pastors to handle 450 regular attendees (2) Current load is 1 Pastor to 90 – 100 attendees – Is this adequate
(a) Why do people identify more with Pastors than with Elders that have oversight with them?
(b) Will this be same case as we grow (c) Should different process be used to handle this
(i) Need to have following items defined 1. Structure of Responsibility 2. Accountability 3. Communication 4. Risk Management
(d) What should the structure be (e) Current structure is Care Team – comprised of Ministry Deacons, Elders, then
Pastors (i) People do not seem to be fully engaged in this structure (ii) Communication of this structure is not consistent (iii) Care Team Meetings and interaction almost non-existent
(3) How do we obtain Pastors? (a) GLBI (b) Internship (c) Growth from within (d) Outside sources – BJU, Arch, etc.
Administrative Support Staff (4) Administrative Assistants
(a) Risk Management (b) Safety Procedures (c) Job Task Analysis (JTA)
Appendix A: Administration Overview Outline
| 68
(5) Receptionists (a) Risk Management (b) Safety Procedures (c) Job Task Analysis (JTA)
(6) Misc. office needs (a) Risk Management (b) Safety Procedures (c) Job Task Analysis (JTA)
(7) Risk Management Personnel (a) Risk Management (b) Safety Procedures (c) Job Task Analysis (JTA)
Facilities & building care (d) Volunteer vs. hired staff (e) Predictive maintenance undertaken
(i) Risk Management (ii) Safety Procedures (iii) Job Task Analysis (JTA)
(f) Facilities management – current property (i) Risk Management (ii) Safety Procedures (iii) Job Task Analysis (JTA)
(g) Facilities management – future satellite locations (i) Maintenance (ii) Equipment necessary
Cleaning (h) GCM building
(i) Risk Management (ii) Safety Procedures (iii) Job Task Analysis (JTA)
(i) GCM offices (i) Risk Management (ii) Safety Procedures (iii) Job Task Analysis (JTA)
(j) Future satellite locations (i) Risk Management (ii) Safety Procedures (iii) Job Task Analysis (JTA)
(k)
Receptionists (a) Risk Management (b) Safety Procedures (c) Job Task Analysis (JTA)
Misc. office needs (d) Risk Management (e) Safety Procedures
Appendix A: Administration Overview Outline
| 69
(f) Job Task Analysis (JTA)
Risk Management Personnel (g) Risk Management (h) Safety Procedures (i) Job Task Analysis (JTA)
Facilities & building care (j) Volunteer staff (k) Work party
Cleaning (l) GCM building
(i) Risk Management (ii) Safety Procedures (iii) Job Task Analysis (JTA)
(m) GCM offices (i) Risk Management (ii) Safety Procedures (iii) Job Task Analysis (JTA)
6) Elders (a) Currently have (4) elders
(i) Risk Management (ii) Safety Procedures (iii) Job Task Analysis (JTA)
(b) Most have outside full time employment (c) As they reach retirement age how are these questions answered
(i) How do we integrate them into the church? (ii) Will they buy into the integration
(d) Why are there not more elders (i) How do we identify those things that hinder growth of Elder roles
1. Age 2. Gifted to teach 3. Ordination
(e) Determine what needs to be done to redefine how we approach Elder Development (i) Possibly redesign the expectations of Elders (ii) Can we develop “Intern” program for Elders (tent maker while learning) (iii) Can Deacons be encouraged or cultivated to be Elders (iv) Can a mentoring program for Deacons to Elder be started
1. Define a purposeful path 2. Process with clear cut milestones & path 3. Clear cut end goals in mind 4. Team approach to mentoring
a. (2) Elders to Deacon b. (1) Elder to group of Deacons – on a monthly rotation c. Clear outline of what topics to cover d. Open discussions e. Biblically based
Appendix A: Administration Overview Outline
| 70
Deacons (f) Process document for identifying future Deacons
(i) Risk Management (ii) Safety Procedures (iii) Job Task Analysis (JTA)
(g) Traits desires (h) Prescribed training
(i) Year-long Deacon in training – (ii) Do we have documentation of what this is (iii) Who is responsible to complete
(i) How can we “Harvest” more deacons (i) Elder interactions (ii) Sunday School class interaction (iii) Membership at large
Appendix B: Choose a Style of Leadership
Since there are different ways to lead, it’s important to make a very clear selection. Unfortunately, great numbers of people try to be Mr. In-Between. They refuse to select any one chair and end up sitting on the floor. The eclectic approach doesn’t work.
Followers have an amazing ability to accommodate themselves to leadership styles. They want to “please the boss.” But if the style is constantly changing, they withdraw, become inactive.
They will make gradual adjustments so long as they don’t have to make major adjustments. If you will select your style, implement it, and stay consistent, you can almost use any style you want.
Here are some typical styles of leadership: 1. The benevolent dictator. I spoke recently to a group of young pastors who were very
interested in seeing their churches grow. When I described the traits of a benevolent dictator, they immediately said, “That’s who we are. We know where we’re going. We know what we want people to do to help us get there. Yes, we want to be pleasant about it, but we think the way we’re headed is right, and we really are not interested in other people’s ideas for this church.” They were interested in results, a great many of which could be expressed numerically (size of church, size of budget, growth rate).
I have occasionally run into preachers who were tyrannical dictators, but these weed themselves out pretty quickly. They develop what has to be called a cult. Even though it may be theologically sound, it is still a personal cult.
Tyrannical dictators rarely last in any organization. Their very meanness undermines them. By operating from a motivation of fear, they sow the seeds of rebellion, which erupt only when the people sense weakness. That, of course, is the very time the leader can’t afford to have a rebellion. That’s why tyrants don’t last.
But the benevolent dictator is a common leadership form among pastors. 2. The one-man operator. Actually, this is more often a one-couple operation that runs the
church like a mom-and-pop grocery store. Mom plays the organ, heads the missionary society, and makes calls with Dad, who does the preaching, the greeting, the supervising, and even the grass cutting. If they have children, the kids work in the choir or the Sunday school, and it’s a family business.
A great many churches are like this. Many of them are small, of course, but some of them grow to be sizable, depending on the energy and talent of the pastor. As the church grows beyond what one man or family can do, it starts to wilt. Somebody else’s Sunday school class starts to grow, and that’s threatening to the pastor, so along comes a new policy that no class will have more than ten students.…
If this kind of church is located in a growing suburb, it may expand simply because of its environment, in which case the one-man operator may have to move on because he just can’t keep his arms around it all.
3. The team player. Think about a football quarterback. He listens to everybody. He has a coach, but he knows his responsibility to call the play in a given number of seconds.
Appendix B: Leadership Style
| 72
I saw an interview with Jim Zorn when he was still with the Seattle Seahawks, a couple of years after he had lost his number-one quarterback position to Dave Krieg. He said, “Football is a team sport, and if Dave Krieg can get more wins for this team than I can, then he should be the quarterback, and I will back him up. I will support him. I will watch every play and try to see things he can’t see. I’ll talk to him. We’ll be friends. And I will support the coaches’ decision to make him the quarterback.”
The interviewer noted that this kind of attitude resulted from Jim Zorn’s vibrant Christian faith. It was a great testimony.
In the church, I think the team philosophy ought to be common practice. If somebody else can do a job better than I can, I want him to do it. A true spiritual quarterback plays for the good of the team and isn’t just trying to be a star; he’s trying to win the objective for which the organization exists.
Now a dictator can’t become a quarterback/team player any more than he can fly. He may adopt the jargon, but his style will remain untouched. I have to say this: I’ve seen limited success in people trying to change their style. For some reason adults develop reflexes, reasoning powers, and success patterns that seem to lock them in.
I tend to be a team player, and when I was forty years old, I was asked to be president of a national corporation. I met with the board and did some background study. They had had a dictator for the previous forty years. I turned the offer down, because I’m too lazy to be a dictator. If I had gone in there and called those executives together and said, “Make your own decision,” they’d have looked at me and said, “Who? Us? We haven’t made a decision in years.” I would have hurt the organization. It would have taken me too long to change systems. What they needed was a young dictator whom people could respond to in a habitual sort of way.
Quarterbacks can’t make decisions as quickly as dictators. A dictator is a broken-field runner, a punt returner. A team player is more of a Franco Harris, who keeps hitting the line consistently and making first downs. The two are different skills.
In a church, you can tell a quarterback by whether people feel their suggestions will be acted on. With a dictator, people do not feel individual responsibility. They may feel responsible to him, to give him information or even make suggestions, but they feel no personal responsibility for the organization. In a team operation, people feel responsible for the decisions.
4. Leading by compromise. I realize the word compromise has a very bad name. But life is not all black and white.
It is possible to lead by compromise. Lyndon Johnson was a master at it. He had a real sense in Congress of what was doable with the people he had, and he’d get people to bend. Many times this is wiser than stopping the total program for an all-out debate.
Now as president, I didn’t think LBJ was as effective as he was in Congress, because his skills as a compromiser were not as suited. He was no longer among equals. He needed to lead more strongly.
A compromiser has a clever way of getting everybody to give something. I’ve seen a lot of people, both in industry and ministry, who are basically achievers of compromise. They don’t go very fast. They don’t generally go very far. But they go pleasantly. Rarely will you see an achiever of compromise split an organization. He’ll find some way to bring the sides together.
Appendix B: Leadership Style
| 73
5. The consensus taker. You can spot this person immediately, because he’s always sending up balloons, raising a flag to see who salutes. If the balloon doesn’t get shot down, this establishes his path for the future.
I don’t want to gainsay the consensus-taker style. The Quakers, for example, use it effectively, but they have a clerk who states the sense of the meeting. Through this individual they accomplish leadership by consensus.
Ray Stedman, of course, has had an amazing system at Peninsula Bible Church in California of not doing anything until it’s unanimous. He believes that is the scriptural way. On the other hand, I have known two churches just recently that ran into real trouble trying to institute that system. Ray’s advantage in Palo Alto was that he got to set the pattern from the beginning of the church.
In such an atmosphere, a subconscious kind of politics evolves over a number of years through which people edge along smoothly toward consensus. If you tried to institute this in a big Baptist church in my part of the country, it would be chaos. Everything would come to a screaming stop.
Whatever your leadership style, it is important to know who you are when you start employing people. If you’re a dictator and hire some strong eager beavers, you’re going to keep them only a short time—or else face a revolution in the organization. You want to hire people with hinges in their backs, and keep them oiled.
Similar forethought is important for the one-man operator, the team player, the achiever of compromise, and the consensus taker as well.
These, then, are some of the functions of leadership. The rest of this book deals with the areas where leadership and administration overlap—directing yourself, guiding your coworkers, and leading the congregation.16
16 Smith, F. (1986). Vol. 5: Learning to lead: Bringing out the best in people. The Leadership Library (40–44). Carol Stream, IL: CTi.
Appendix D: 8 Simple Ways to improve Church Communication
1) Don’t say too much – If you are trying to say everything, you’ll end up communicating
nothing. Consider the typical church bulletin. Over time they’ve accumulated so much
information in them each week that people don’t bother to even try to sort through it all. So you
end up communicating nothing. The same goes for emails or letters you send out. If they contain
so much information nobody bothers to read them, they aren’t doing any good. Say less and
you’ll communicate more. (Here are 7 other reasons your members won’t subscribe to you.)
2) Respect everyone’s time – Whether they are listening to announcements on Sunday, reading
your bulletin or surfing your website, don’t waste their time. Make sure that what you are
bothering to say is important to your people (not just to you). And try not to broadcast to
everyone the things that only a small group of people need or want to hear. Eventually, they will
just tune you out completely.
3) Have an up-to-date web presence – This means everywhere you’re on the web. Your
website, Facebook, Twitter, whatever. When people visit your website or Facebook page, they
are wanting to communicate with you. They are wanting to build a relationship with you. If they
get to your website and can’t find up-to-date info, it’s a missed opportunity. And if they find out-
dated info, it communicates to them that there must not be anything going on here. And they
move on.
4) Don’t waste opportunities to connect – When somebody visits your website (or your church
for that matter), what are you doing to continue the relationship? Don’t let them leave without
connecting. Get some information from them. Give them an action item. Something to do. An
event to attend. A way to take a next step in their faith walk. Get them on your emailing list and
immediately plugged in to your active ministries (something Flocknote is made to do). Don’t
waste an opportunity to connect.
5) Use a proper emailing service – The #1 (and easiest) way to keep your members up to date
this day and age is through email. Almost everyone uses it. It’s cheap, fast and easy. But it’s a
good idea to use a proper emailing service if you’re sending large amounts of email. It will
improve deliverability (i.e. avoid spam filters), keep your own web server off of blacklists, make
sure you’re legally compliant (like giving people easy, immediate ways to subscribe and
unsubscribe), make your newsletters beautiful and – if you use Flocknote – empower all of your
ministry leaders to manage their distribution lists as a team and communicate professionally and
effectively. How are you continuing your relationship in between Sundays? This is one of the
easiest and essential ways you can expand and bolster your social network. It’s more than worth
the costs, too.
6) Consider your audience – Too many churches get caught only listening and catering to the
vocal minority or the already engaged. So they shouldn’t be surprised when they don’t seem to
reach anyone else. If you want to engage the unengaged, you need to consider that particular
audience. Don’t just say things that are interesting to you. Say things that are interesting to them
and in a way that they will understand and be intrigued.
Appendix D: 8 Simple Ways to improve Church Communication
| 76
7) Remember that communication goes both ways – Communication is as much (or more)
about listening as it is about talking. What are you doing to listen first to your people? Find out
where they are and what they’re thinking. Then you’ll know where to meet them with the
message you’d like to ultimately communicate.
8) Don’t be scared – Many churches are scared to communicate. They’re either intimidated by
the latest technologies or frozen in fear of breaking burdensome guidelines and making mistakes.
So they do little or nothing. There is really no such thing as not communicating. Not
communicating is still communicating something. It communicates fear. It communicates
apathy. It communicates maybe we don’t have something worth communicating. And since we
work for the Church, none of these could be further from the truth.
http://flocknote.com/blog/8-simple-ways-improve-your-parish-communication
Appendix E: Communication Priorities Communication material
Who should implement Priority Noted Problems
Welcome packets Admin/Communication coordinator High
coordinating the brand (do we need the bridge tract?)
Bulletin Admin/Communication coordinator High coordinating the brand
Bulletin Board Admin/Communication coordinator Low coordinating the brand
announcements (PowerPoint)
Admin/Communication coordinator High
coordinating the brand, match with bulletin, emphasis on specific
announcements (Pulpit) Admin/Communication coordinator Low
fewer announcements - only church-wide announcements
Announcements (email) Admin/Communication coordinator Low need training
Church-wide literature Admin/Communication coordinator High no consistent branding
church signage Admin/Communication coordinator High
soccer camp, GBDC, GraceYouth, church
event/ministry-specific literature
Admin/Communication coordinator High coordinating the brand
event/ministry-specific signage
Admin/Communication coordinator High coordinating the brand
event/ministry-specific email
Admin/Communication coordinator High
coordinating the brand; one who sending the email GCMonline training
Paper Calendar Admin/Communication coordinator High
Multiple coordinators; needs to be published before year-end;
GCMOnline/Website calendar
Admin/Communication coordinator High
Multiple coordinators; needs to be published before year-end;
Website Admin/Communication coordinator High analytics/traffic not a high priority
Social Media Admin/Communication coordinator High sermon preview, events, functions,
GCMonline Admin/Communication coordinator Medium need training for leaders
GCM App Admin/Communication coordinator Medium app just loads the website
email notifications Admin/Communication coordinator Medium need training for leaders with emails
Sermon Review Admin/Communication coordinator Medium who should be sending it
TV Commercials Admin/Communication coordinator Low branding, look and feel of Grace
print ads Admin/Communication coordinator Medium branding, look and feel of Grace
Appendix G:Facilities Assessment Report
| 78
Digital ads Admin/Communication coordinator Low more budget
policy manuals Admin/Communication coordinator Low
rewrite and rebranding: usher manual, wedding manual, leadership manual
annual meeting/report Admin/Communication coordinator Low does this need to be printed?
idea follow-through Admin/Communication coordinator High
our Nehemiah survey - got low marks for communication and follow-through
Appendix F: Average Growth Rate
400 Average Sunday morning worship service attendance in 2014
Average Growth
Rate
Year 1% 2% 4% 5% 6% 8% 10% 13% 15% 20%
1 404 408 416 420 424 432 440 450 460 480
2 408 416 433 441 449 467 484 506 529 576
3 412 424 450 463 476 504 532 570 608 691
4 416 433 468 486 505 544 586 641 700 829
5 420 442 487 511 535 588 644 721 805 995
6 425 450 506 536 567 635 709 811 925 1194
7 429 459 526 563 601 686 779 912 1064 1433
8 433 469 547 591 638 740 857 1026 1224 1720
9 437 478 569 621 676 800 943 1155 1407 2064
10 442 488 592 652 716 864 1037 1299 1618 2477
11 446 497 616 684 759 933 1141 1461 1861 2972
12 451 507 640 718 805 1007 1255 1644 2140 3566
13 455 517 666 754 853 1088 1381 1849 2461 4280
14 460 528 693 792 904 1175 1519 2081 2830 5136
15 464 538 720 832 959 1269 1671 2341 3255 6163
16 469 549 749 873 1016 1370 1838 2633 3743 7395
1.31
Total number of people on
church property,
infant thru adult
614 719 981 1144 1331 1795 2408 3450 4903 9688
Appendix G: Facilities Assessment Report 2014-15 Budget Year
Facilities Assessment Project Report Grace Church of Mentor
2014-2015 Budget Year
Appendix G:Facilities Assessment Report
| 81
Table of Contents Table of Contents Introduction
Inventory Criteria
General Information Graded Criteria Letter Grades
Data Collection & Analysis Findings
Auditorium Fellowship Hall Education Wing Grace House North Grace House South Courtyard Front Lawn Paths & Walkways Main Parking Lot Grace House Parking Back Driveway Garage Parking Lot East Barn Parking Lot West Barn Grace House South Barn Grace House North Barn
Appendix G:Facilities Assessment Report
| 82
Introduction
Grace Church of Mentor exists to glorify God by evangelizing the lost and
equipping the saints with the goal of Christ-likeness. Grace Church of Mentor Mission Statement
In keeping with Grace Church of Mentor’s mission statement, our goal is to exercise good stewardship in maintaining the safety, security, appearance, and proper function of all
facilities. By doing so, we maintain our testimony in the community, minimize distractions to
worship, and free up our time and resources for the cause of Christ. To this end, we developed
the Facilities Assessment Project to establish a centralized, comprehensive and objective
evaluation of all of our properties. The Facilities Assessment Project involved three key steps, as outlined below:
1. Establish an inventory of the Grace Church of Mentor property.
2. Establish the criteria for the assessment, organized by category.
3. Collect and analyze the data and summarize the results as objectively and
concisely as possible.
The purpose of this report is to provide the Grace Church of Mentor Board of Elders, Facilities Team and Budget Committee with a summary of the findings and recommendations of the Facilities Assessment Project. This is an ongoing project; since the condition of our facilities is constantly changing, our goal will be to provide an updated report on an annual basis at or near the start of the annual budgeting process. This report does not establish priorities or cost estimates. This report was prepared by Pastor Steve Sindelar, Administrative Director; and Nick Bair, Facilities & Technology Coordinator.
Appendix G:Facilities Assessment Report
| 83
Inventory Before any assessment could be made we first had to establish which areas would be assessed. Below is the finalized inventory used for this assessment. Church Building
● Auditorium
● Fellowship Hall
● Education Wing
Grace House
● Grace House North
● Grace House South
Green Space
● Courtyard
● Front Lawn
Parking
● Paths & Walkways
● Main Parking Lot
● Grace House Parking
● Back Driveway
Storage & Utility
● Garage
● Parking Lot East Barn
● Parking Lot West Barn
● Grace House South Barn
● Grace House North Barn
Criteria
Our intent in establishing the criteria for the assessment was to remain as objective as possible. We took great care to avoid criteria which were overly opinion-based. For example, chipped or scuffed paint would affect the impression score, whereas paint color would not. There were two primary data groups used in the assessment: General Information and Graded Critera.
General Information This information did not directly affect the final grade, but may be useful in tandem with graded criteria in establishing maintenance priorities.
● Date of Origin (Age)
● Date of Last Major Renovation
Appendix G:Facilities Assessment Report
| 84
● Description of Use
Graded Criteria These criteria were used to compile an overall grade for each area. Not all criteria applied to all areas, so grades for each area were calculated based only on applicable criteria. The three primary categories were graded individually and weighted by importance to produce an overall score which reflected all criteria.
● Safety (40% of Overall Score)
The safety of the building or area, including any physical features, lighting issues,
or outside forces which present a risk of personal injury, destruction of property,
or any material/financial loss (other than theft or criminal intent).
● Condition & Appearance (30% of Overall Score)
An aggregate of the scores of any and all applicable data from the following:
○ State of Repair
The condition of the building or area as assessed by a detailed inspection,
including any minor cosmetic issues which are not immediately apparent
but which affect the area’s overall condition and/or appearance.
○ Impression
The condition of the building or area as assessed by a cursory observer
such as a first-time visitor, including major cosmetic issues which are
readily visible and which negatively impact a visitor’s first impression of
the church.
○ Fitness for Intended Purpose
Based on the Description of Use, this refers to the suitability of the building
or area for the way we use it.
○ Security
Features of the building or area which affect the security of people and/or
assets or the church as a whole, specifically in terms of burglary, theft, or
other criminal activity.
● Mechanical & Systems (30% of Overall Score)
An aggregate score based on the condition and proper function of the following
systems (where applicable):
○ Plumbing
○ Electrical
○ HVAC
○ Roof
○ Structure
○ Water Heater
Appendix G:Facilities Assessment Report
| 85
Letter Grades
Letter grades for each area were assigned per category as well as for the area’s overall score. The grading scale was based on 10% increments (A for a score of 90% or better, B for 80% or better, and so on).
Data Collection & Analysis As we collected data for each area, we took notes to aid in explaining our results. We’ve compiled these notes to provide a summary for each area in this report. Generally, our notes focused on low-scoring areas, since high scores require less explanation. Some summaries include recommendations for improvement where appropriate, although recommendations were generally outside the scope of this report. Photos are included where necessary to document problems where descriptions fall short.
Findings
Group Name Safety Condition & Appearance
Mechanical & Systems
Weighted Average Overall Grade
Church Building Auditorium A B A 88% B Church Building Fellowship Hall A A B 96% A Church Building Education Wing B B A 85% B
Grace House Grace House North B D B 78% C Grace House Grace House South A B A 93% A Green Space Courtyard D D D 62% D Green Space Front Lawn D B B 72% C
Parking Paths & Walkways F F 29% F Parking Main Parking Lot C C A 79% C Parking Grace House Parking D D B 68% D
Parking Back Driveway B F 69% D Storage & Utility Garage A B D 84% B Storage & Utility Parking Lot East Barn A B A 93% A Storage & Utility Parking Lot West Barn A B A 93% A Storage & Utility Grace House South Barn A F F 70% C Storage & Utility Grace House North Barn A F F 72% C
Total 81% 72% 79% 75% C
Appendix G:Facilities Assessment Report
| 86
Auditorium
Group: Church Building
Date of Origin: 1995 Date of Last Major Renovation: 2006 Description of Use: The main meeting space for worship services. Overall Grade: B The Auditorium serves as the primary meeting space for worship services, and as such is one of the areas of highest visibility and priority. We’ve identified a handful of minor issues in each of the three categories (mostly related to the most recent Auditorium expansion), but overall the space is in good shape. Safety: A The carpet in the front two-thirds of the Auditorium is old, loose, and worn in spots. This presents a minor trip hazard. The exit door nearest to the organ is very hard to open. Condition & Appearance: B The loose carpet is unattractive. There are large cracks along the walls and ceiling corresponding to the last Auditorium expansion. We are running out of space for Sunday morning services and there is no more room for expansion. Hanging lighting is outdated and current recessed bulbs are larger than the cans were designed for. Mechanical & Systems: A HVAC. The HVAC systems in the auditorium are noisy. It is difficult to maintain consistent temperatures throughout the space. Roof. The roof is beginning to show signs of age and will likely need to be replaced within the next 10 years.
Fellowship Hall
Group: Church Building
Date of Origin: 1975 Date of Last Major Renovation: 2013 Description of Use: Discipleship; potlucks & fellowships; informal meeting space. Overall Grade: A Thanks to the recent renovation, the Fellowship Hall scored high marks all around. Safety: A The new tall tables and hard tile floors represent minor safety issues where small children are involved. This is primarily an issue with the Young Moms’ Fellowship, and we have taken steps to reduce this risk during that event. Condition & Appearance: A New lighting and windows make the new space feel open and inviting. Mechanical & Systems: B Plumbing. Several years ago we installed a circulating hot water pump to address the problem of pipes freezing servicing the kitchen. The system works well but has no failsafe; in the event of a winter power outage the pipes could freeze and break, requiring expensive repairs. At minimum, we should consider installing a voltage sensor to indicate and notify when problems occur. Electrical. the wiring is safe, but several
Appendix G:Facilities Assessment Report
| 87
areas would benefit from additional outlets to accommodate new seating and increased usage as a one-on-one meeting place. HVAC. The Fellowship Hall contains 4 separate HVAC units; one only works for cooling; two others have required repairs in the past year; the fourth was recently replaced. At this point the HVAC is in good working order and is adequate to control the space.
Education Wing
Group: Church Building
Date of Origin: 2005 Date of Last Major Renovation: 2007 Description of Use: Sunday School classrooms, GLBI, childcare. Overall Grade: B Due to heavy traffic from children and normal wear & tear, the Education Wing requires regular upkeep to maintain a good impression. We've recently fallen behind in this regard due to the focus on the Fellowship Hall renovation. Overall, however, the area scored well. Safety: B The stairway and tile floors present slip hazards in snowy weather. Despite the addition of the courtyard entrance, hallway congestion in the Education Wing is still an issue at times. Condition & Appearance: B Due to heavy use for children’s ministries, the walls in the Education Wing require regular patching and repainting on both floors. The carpeting in several classrooms is worn out and loose. It is due for replacement. The lighting appears outdated and institutional. The wall sconces were originally donated. Mechanical & Systems: A Electrical. Some classrooms have outlets that are loose because during construction the electricians did not account for double-thick drywall. Some of these have been fixed by adding spacers, but several still remain loose. Water Heater. The downstairs water heater thermostat intermittently defaults back to vacation mode.
Grace House North
Group: Grace House
Date of Origin: - Date of Last Major Renovation: 2013 Description of Use: Primary staff office space. Overall Grade: C The north side of the Grace House has become the primary office space for church staff. It provides limited space and its split-level layout presents a few challenges, but there are no urgent problems with the space at this time. Safety: B Condition & Appearance: D The room adjacent to kitchen (formerly a garage) is unfinished. The carpeting throughout the house is in poor condition and is not designed for heavy commercial traffic. The house does not provide enough space or the proper facilities for the entire
Appendix G:Facilities Assessment Report
| 88
staff. The house also lacks accessibility features as required for a place of business by the Americans with Disabilities Act. The city may also require installation of a fence. Mechanical & Systems: B The plumbing, electrical and HVAC systems were thouroughly checked as part of the office renovation and move. Upgrades were made where necessary. The main drain line has a root problem that will require regular snaking/rooting, either by a plumber or in-house if we purchase a commercial-grade drain auger.
Grace House South
Group: Grace House
Date of Origin: - Date of Last Major Renovation: - Description of Use: Tenant occupancy. Overall Grade: A The south side of the Grace House is currently occupied by our tenant, the former owner. As such, it was unnecessary to perform a detailed assessment at this time. Safety: A Condition & Appearance: B Nothing to report. Mechanical & Systems: A The water heater failed this year. We replaced it with a circulating hot water pump tied into the North House water heater. The feed line goes through the attic. There is no failsafe against freezing, though, so we should consider a monitoring system.
Courtyard
Group: Green Space
Date of Origin: 2005 Date of Last Major Renovation: 2013 Description of Use: Alternative ingress/egress; warm-weather discipleship space. Overall Grade: D The Courtyard was opened up as an entrance/exit pathway and discipleship space following the Fellowship Hall renovation. It was intended to relieve some of the congestion in the Education Wing hallway before and after services by providing an alternative means of ingress/egress. Because the renovation project took longer than expected, we did not have time to complete all the work we wanted to in the Courtyard. By necessity, the space was left mostly unfinished until the Spring. Safety: D Snow and ice buildup are problematic in the winter. The space is too narrow to fit a plow. The space is too large for shoveling to be practical. We should invest in a snowblower and install new gutter tapes. Condition & Appearance: D
Appendix G:Facilities Assessment Report
| 89
The landscaping is unfinished. The adjacent property to the south is unattractive. Some minor exterior repairs to the soffit are necessary. The aforementioned safety issues and inaccessibility to the parking lot result in underutilization. Security is a problem because the doors are hidden from view from the front of the building and the street. The entrance door doesn't always close properly. Mechanical & Systems: D The plumbing and electrical were left unfinished for the winter.
Front Lawn
Group: Green Space
Date of Origin: - Date of Last Major Renovation: - Description of Use: Outdoor games & special events. Overall Grade: C The Front Lawn serves as an area for outdoor games during children and youth events. It has also become a favorite play area for children after services. Safety: D The lawn’s proximity to the parking lot and main drive has been a perennial safety issue. Many attempts have been made to address this by asking parents and children to be mindful of car traffic, but these behavior changes are always temporary. Condition & Appearance: B The catch basin in the northeast corner is too low, making it hard to mow around. The ground is uneven, so care must be taken when mowing not to cut the grass too short, and to collect grass clippings. We should consider a mower that is better-suited to our space and which can collect clippings. Mechanical & Systems: B We should consider the addition of permanent water and electrical receptacles to avoid hoses and extension cords across main drive during special events.
Paths & Walkways
Group: Parking
Date of Origin: - Date of Last Major Renovation: - Description of Use: Ease of access between properties. Overall Grade: F This is the area of broadest scope in this assessment. It refers to any and all areas on the property which receive regular foot traffic. This includes unpaved paths which have become common "cut-throughs" for our staff between the Church Building and the Grace House. The sidewalk provides the only paved path between the properties but is impractical for daily use. This area's low marks reflect the need to add more direct paths. Safety: F
Appendix G:Facilities Assessment Report
| 90
The lack of paved paths is a problem in the snowy weather. The city of Mentor does plow the sidewalk when new snow falls, but snowdrifts and street plows often leave the sidewalk blocked, leaving no safe walking path between properties. Condition & Appearance: F The common cut-through areas are hard to traverse, especially in dress shoes or when wet or muddy. There is a major drainage problem behind the Education Wing next to the sidewalk leading to the Courtyard. Mechanical & Systems: Lighting will need to be considered when adding walking paths between buildings.
Main Parking Lot
Group: Parking
Date of Origin: - Date of Last Major Renovation: - Description of Use: General parking. Overall Grade: C The parking lot serves its purpose well but we are quickly outgrowing the space it provides. Safety: C Some points of intersection offer limited visibility, and right-of-way is unclear. Some lights towards the back of the lot are burnt out. Replacing these requires rental of a boom or scissor lift, or outsourcing. The small lampposts around the handicapped parking area provide insufficient light. Condition & Appearance: C Several new cracks have formed since the last sealcoating treatment. The areas around light poles are unfinished and prone to overgrowth. The poles need to be repainted. The number of open parking spots on Sunday mornings is critically low, indicating the need to expand our parking space. Mechanical & Systems: A Nothing to report.
Grace House Parking
Group: Parking
Date of Origin: - Date of Last Major Renovation: - Description of Use: Parking for staff & volunteer helpers. Overall Grade: D The parking outside the Grace House provides limited space, particularly while the south side of the house is occupied by a tenant. Some minor safety issues and an inefficient layout need to be resolved as well. Safety: D
Appendix G:Facilities Assessment Report
| 91
The single-width drive and limited visibility due to tall trees present a moderate collision risk. The lighting should be put on a timer. Condition & Appearance: D There is not enough parking space during office hours, particularly when volunteers come in to help Donna. The lack of parking markers exacerbates the issue because the space is used inefficiently. Mechanical & Systems: B Electrical needs to be installed for lighting, timers, and office signage.
Back Driveway
Group: Parking
Date of Origin: - Date of Last Major Renovation: - Description of Use: Ease of access between buildings. Overall Grade: D The driveway through the wooded area behind the Grace House was never intended for the volume of traffic it has had since we moved offices. It needs to be regraded. Backfilling or paving may be the only way to permanently solve the issue. Safety: B Several dead trees were removed during the last work party but fallen branches and debris are still a minor risk. The parking lot side is surrounded by trees which limit visibility for oncoming cars. Condition & Appearance: F The gravel base has been displaced due to heavy use when wet, and should be reinforced and/or paved. Standing water, mud, dead plant life and debris make the area unattractive. The uneven ground makes passage difficult for vehicles with low ground clearance, especially when snowy or muddy. Mechanical & Systems: Not applicable.
Garage
Group: Storage & Utility
Date of Origin: - Date of Last Major Renovation: - Description of Use: Storage & workshop. Overall Grade: B The garage offers great potential as a workshop and storage area, but its appearance, structure, and systems need a good bit of attention. Safety: A Nothing to report. Condition & Appearance: B
Appendix G:Facilities Assessment Report
| 92
The aging roof and siding are unattractive and due for replacement and/or repainting. Some structural flaws are externally visible. Mechanical & Systems: D The wiring is old and should be checked and/or replaced. The lighting is insufficient. The roof is due for replacement. The framing is in disrepair in several areas. The peak of the roof sags significantly.
Parking Lot East Barn
Group: Storage & Utility
Date of Origin: - Date of Last Major Renovation: - Description of Use: General storage. Overall Grade: A The barn serves its purpose well but its location presents some problems. Safety: A Nothing to report. Condition & Appearance: B The barn's current location is prone to flooding and takes up parking spaces. We should consider moving both barns to a slab on the north property. Mechanical & Systems: A Nothing to report.
Parking Lot West Barn
Group: Storage & Utility
Date of Origin: - Date of Last Major Renovation: - Description of Use: Christmas decorations. Overall Grade: A The barn serves its purpose well but its location presents some problems. Safety: A Nothing to report. Condition & Appearance: B See notes on East Barn. Mechanical & Systems: A Nothing to report.
Appendix G:Facilities Assessment Report
| 93
Grace House South Barn
Group: Storage & Utility
Date of Origin: - Date of Last Major Renovation: - Description of Use: Tenant occupancy. Overall Grade: C This barn is currently occupied by our tenant. Both its in poor condition both structurally and aesthetically. Once it becomes vacant, we should consider removing or replacing it altogether. Safety: A Nothing to report. Condition & Appearance: F The barn is unattractive, even from far away. Mechanical & Systems: F The entire structure is in visibly poor condition. The roof needs replaced.
Grace House North Barn
Group: Storage & Utility
Date of Origin: - Date of Last Major Renovation: - Description of Use: Christmas & Grace Bible Day Camp supplies & decorations. Overall Grade: C This barn provides good space for storing large, seldom-used items, but its appearance and structure need to be improved. Safety: A Nothing to report. Condition & Appearance: F The barn needs patched and painted. The surrounding area needs to be cleaned up. We should add a lock to the doors. Mechanical & Systems: F The floor is rotting out and sagging. The roof needs replaced. The doors do not clear the ground in front of them while opening.