SERVICES: WE ADD VALUE Our quality is evidenced in our projects, where we have consistently delivered an average cost savings of 35% compared to market FOB rates. At GM we focus on services/products where we can add the greatest value to our partners and clients. – Detailing – Fabrication – Finish – Custom Manufacturing – Freight Management GM BY THE NUMBERS: HONING OUR CRAFT 5,000 annum : Tons Fabricated 85,000 : SF Facility 35% : Average % Cost Savings 8 : Years in Business 50+ : Certified Iron Workers < 1 Hour Drive : Distance from GM Baja Facility to U.S. Border 70 : Projects Completed $8 MM Est : MM of Dollars Saved RECENT PROJECTS: EXPERIENCE THAT MATTERS Terminal 2 Expansions, San Diego International Airport Sandy Hurricane Beachfront Renovations, DDC / City of NY Heath Care Center, Veteran Affairs INDUSTRY EXPERIENCE – Federal – C&I – Public Works – Custom / Spec Manufacturing – Energy / Solar STRUCTURAL STEEL & MISCELLANEOUS METALS FABRICATOR QUALITY CAPACITY COST EFFICIENCY

Global.Metals.Summary

Embed Size (px)

Citation preview

SERVICES: WE ADD VALUE

Our quality is evidenced in our projects, where we have consistently delivered an average cost savings of 35% compared to market FOB rates. At GM we focus on services/products where we can add the greatest value to our partners and clients. – Detailing– Fabrication– Finish– Custom Manufacturing– Freight Management

GM BY THE NUMBERS: HONING OUR CRAFT

5,000 annum : Tons Fabricated85,000 : SF Facility35% : Average % Cost Savings8 : Years in Business50+ : Certified Iron Workers< 1 Hour Drive : Distance from GM Baja Facility to U.S. Border70 : Projects Completed$8 MM Est : MM of Dollars Saved

RECENT PROJECTS: EXPERIENCE THAT MATTERS

Terminal 2 Expansions, San Diego International Airport

Sandy Hurricane Beachfront Renovations, DDC / City of NY

Heath Care Center, Veteran Affairs

INDUSTRY EXPERIENCE – Federal– C&I– Public Works– Custom / Spec Manufacturing– Energy / Solar

STRUCTURAL STEEL & MISCELLANEOUS METALS FABRICATOR

QUALITY CAPACITY COST EFFICIENCY

CERTIFICATIONS: A NOTEWORTHY DIFFERENCEGM’s Baja Facility is the only steel manufacturing plant

certified by AISC, L.A. City, AWS and Clark County, Nevada. GM delivers quality steel solutions from the smallest detail in miscellaneous metals to the largest

load bearing structural steel.

COSTS YOU CAN CONTROL: SAVINGS IMPACTGM has a unique advantage that allows us to deliver the highest quality at an average cost saving of 35%. In fact, GM has the lowest certified fabrication rates in North America. From our 85,000 SF licensed facility in Baja, California, located less than an hour from San Diego, California, we are able to produce a variety of steel with a low cost, highly skilled workforce of certified iron workers.

The GM facility is part of the Manufacturing, Maquiladora and Export Service Industry (IMMEX Decree) that allows North American companies to transport domestic materials into and from Mexico and Canada; duty free under NAFTA.

TIME IS MONEY: SCHEDULE IMPACTOur ability to manufacture far exceeds the capacity of most U.S. based manufacturers; what we can do in 24 hours, takes most U.S. crews several work days. Our facility has the capability – space, ironworkers, tooling, etc. and pro-manufacturing environment that allows us operate at pace that ensures we deliver our projects not only on average of 35% less in cost, but within the necessary schedule.

The quality and cost advantage of products are currently evidenced at the VA Loma Linda Project. GM fabricated over 2,000 tons of structural steel and misc. metals on the project, at a significant cost and time savings to the VA.

11403 W. Bernardo Ct. Suite 100San Diego, CA 92127

Ph: (619) 660-0100; Fax: (619) 330-2111www.globalmetalscorp.com