gLendaL~’~P california CITY OF GLENDALE, CALIFORNIA REPORT TO THE: Joint fl City Council ~ Housing Authority U Successor Agency ~ Oversight Board U September 18, 2018 AGENDA ITEM Report: Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study 1. Motion authorizing the City Manager or her designee to execute a Professional Service Agreement with ARUP North America, Ltd. for the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study. 2. Resolution of Appropriation. COUNCIL ACTION ADMINISTRATIVE ACTION Submitted by: Philip Lanzafame, Director of Community Development Prepared by: Fred Zohrehvand, Sr. Planner- Transportation Approved by: Yasmiri K. Beers , City Manager -. Reviewed by: Roubik R. Golanian, Assistant City Manager Bradley Calved, Assistant Director of Community Development Michael J. Garcia, City Attorney Robert Elliot, Director of Finance re ‘~Th~ 8A~ Public Hearing U Ordinance El Consent Calendar U Action Item ~ Report Only U Approved for September 18, 2018 calendar

gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

gLendaL~’~Pcalifornia

CITY OF GLENDALE, CALIFORNIAREPORT TO THE:

Joint fl City Council ~ Housing Authority U Successor Agency ~ Oversight Board U

September 18, 2018

AGENDA ITEM

Report: Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

1. Motion authorizing the City Manager or her designee to execute a Professional ServiceAgreement with ARUP North America, Ltd. for the Space 134 Freeway Ramps/Space134 Preliminary Engineering Study.

2. Resolution of Appropriation.

COUNCIL ACTION

ADMINISTRATIVE ACTION

Submitted by:Philip Lanzafame, Director of Community Development

Prepared by:Fred Zohrehvand, Sr. Planner- Transportation

Approved by:Yasmiri K. Beers , City Manager -.

Reviewed by:Roubik R. Golanian, Assistant City Manager

Bradley Calved, Assistant Director of Community Development

Michael J. Garcia, City Attorney

Robert Elliot, Director of Finance

re

‘~Th~

8A~

Public Hearing U Ordinance El Consent Calendar U Action Item ~ Report Only U

Approved for September 18, 2018 calendar

Page 2: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

RECOMMENDATION

Staff respectfully recommends the City Council:

1. Approve the attached Motion awarding a contract to ARUP North America, Ltd. andauthorize the City Manager or her designee to execute a Professional ServiceAgreement with ARUP North America, Ltd. in the amount of $500,000 for the Space134 Freeway Ramps/Space 134 Preliminary Engineering Study.

2. Adopt a Resolution of Appropriation appropriating $500,000 for the Caltrans STPLTransportation Grant from State Grant Revenue to 409-1 80-G52242 and $100,000as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for usein conducting the Space 134 Freeway Ramps/Space 134 Preliminary EngineeringStudy.

BACKGROUNDIANALYSIS

SUMMARYIn 2006, the City Council and the Redevelopment Agency adopted the Glendale DowntownSpecific Plan (DSP), a proactive urban design strategy to promote a mixed-use, transit- andpedestrian-oriented downtown. One element of the DSP — also identified in the 2007 GlendaleDowntown Mobility Study — is a “freeway cap park” that spans over the 134 Freeway betweenBrand Boulevard and Central Avenue, creating public open space with a transportation hub atthis important junction between local and regional transit.

Similar “freeway cap parks” have been built around the country, including:

• Freeway Park over 1-5 in Seattle;• Hance Park over 1-10 in Phoenix;• Leif Erikson Tunnel over 1-35 in Duluth, Minnesota;• Teralta Park over I-IS in San Diego;• Memorial Park over 1-210 in La Canada Flintridge and; most recently,• Klyde Warren Park over the Woodall Rodgers Freeway in Dallas.

Additionally, a number of new “freeway cap parks” are under study around the nation andCalifornia, including:

• Hollywood Central Park over SR-i 01 in Hollywood• Park 101 over SR-ioi in Downtown Los Angeles• SR-94 Cap Park in San Diego• The Stitch over the Downtown Connector in Atlanta, Georgia• The Grand Connection over 1-406 in Bellevue, Washington

As cities grow the amount of available land for public open space continues to diminish.Simultaneously the demand for open space has increased. Freeway cap parks have served asa means to create much needed iconic and signature public spaces that serve as defining

2

Page 3: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

features to cities. They have also assisted in mitigating the negative impacts of freeways suchas noise, air pollution, and rainwater capture, serving to improve the surrounding environment.

In 2012, the Southern California Association of Governments (SCAG) awarded Glendale aCompass Blueprint grant to prepare concept plans and a cost benefit analysis for the 134Freeway Cap Park project, named “Space 134”. Through a competitive RFP process the City,with participation by SCAG, selected a team led by Melendrez to prepare a vision for the Space134 Cap Park, including a conceptual master plan, preliminary structural analysis, a preliminarycost estimate, and a description of potential funding sources and strategies. This effortculminated in City Council approval of the Space 134 Vision Plan in June 2013 (“2013 VisionPlan”), and is available online at www.Space134.net.

In 2014, the City was awarded a second SCAG Compass Blueprint grant to refine the visionplan through community outreach and economic analysis. Melendrez was again selectedthrough a competitive RFP process to lead this effort. The result of this work is the updated andrefined Space 134 Vision Plan (“2016 Vision Plan Update”), (Exhibit 1).

Space 134 Study Area

The Space 134 project area as defined in the 2013 Vision Plan is an approximately 1.25 miTe-long portion of the 134 Freeway between Pacific Avenue and Glendale Avenue. While amajority of the city of Glendale is located north of the 134 Freeway, the downtown core, which islocated in the southern part of the city, is bisected almost in two by the freeway itself.Completed in 1971,the freeway vastly improved regional connectivity, but severed theneighborhoods to the north from the downtown core and neighborhoods to the south — acondition that the introduction of the Space 134 Cap Park seeks to begin addessing.

Space 134 Cap Park

As described in the 2016 Vision Plan Update (Exhibit 1), Space 134 is conceived as a multipurpose “freeway cap park” built over the 134 freeway between Pacific Avenue and GlendaleAvenue that provides passive and active open space; programmed community and civicbuildings; pedestrian- and bike-friendly paths; and convenient access to transit, includingMetro’s proposed BRT line between North Hollywood and Pasadena.

Space 134 is envisioned to relink the well-established residential neighborhoods north of thefreeway to downtown Glendale and its civic, cultural, and business offerings to the south;revitalize Downtown’s highway-adjacent neighborhoods; catalyze new development andinvestment in the city; and allow downtown Glendale to increase its density while maintainingample space for people to relax, exercise, gather, and participate in events. As outlined by the2016 Vision Plan Update, Space 134 is comprised of two parts:

• A Downtown Park (The “Heart”), located in the north end of downtown between CentralAvenue and Louise Street, is more metropolitan in character, integrating and expandingthe vibrancy of downtown with a regional meeting center and concertlevent spaces;restaurant/café spaces, coffee kiosks, a “food truck court,” and a farmers market;walking trails and a nature park; as well as a mobility hub and associated transitfacilities, including a BRT station or bus stops. The park design also proposes to createa more pedestrian-friendly experience along the western side of the Central Avenueoverpass by widening the sidewalk to cantilever from the existing bridge structure and

3

Page 4: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

introducing gateway signage, art work, and/or a new fence along the freeway-facingedge of the bridge. This portion of the project is imagined to be Phase One.

A Neighborhood Park (The “Soul”), located between the residential neighborhoods to thenorth and to the south of the 134 Freeway between Louise Street and Balboa Avenue, ismore local in character, serving the needs of the surrounding residential community witha small community center; community gardens; sports courts and fitness equipment;children’s play areas; a dog park; as well as walking trails and a nature park. BalboaAvenue, which currently does not cross the 134 Freeway, is extended across with a newbridge to provide better connectivity between the neighborhoods on either side of thefreeway, offering an alternative to Geneva Street for students walking to R.D.WhiteElementary School. Similar to the Central Avenue overpass, the eastern-facing side ofthe bridge could accommodate gateway signage and/or art work. This portion of Space134 is envisioned as Phase Two.

Space 134 is en’Qisioned to be built in multiple phases, beginning with the “Heart.” Depending onMetro’s final North Hollywood — Pasadena BRT route, this first phase may include theconstruction of a BRT station and platform and other bus stop facilities (Exhibit 2). Constructionand operation funding is anticipated to be obtained from both public and private sources, as hasoccurred on similar projects in other North American cities. These projects have used innovativetechniques to combine grants from multiple levels of government and jurisdictions, incombination with private and local funding.

The 2016 Vision Plan Update reflects preferences and opinions received during threecommunity outreach events:

• May11,2015EarthDay~134;• June 24, 2015 Business Mixer at the Alex Theatre; and• September 26, 2015 Workshop at R.D.White Elementary.

As a park design, the Vision Plan Update reflects community preferences for relatively passiveopen space features, such as nature trails, playgrounds, and community gardens, with a fewactive uses, such as community centers, cafes, and sports courts. This current design, however,is a representation of possibilities and not a final design, as it is expected the park design willcontinue to evolve as the project reflects greater level of technical study and public input.

Although the Space 134 project has broad support as evidenced in the outreach summaries, anumber of relevant questions have been raised about the proposal. This include concerns aboutparking supply/demand for a new central park; construction sequencing and timing, air qualityand noise impacts, and traffic. In order to address these issues, staff recommends engaging atechnically-focused engineering and environmental planning team to evaluate the current Space134 proposal and recommend necessary refinements to the Vision Plan.

Space 134 Freeway RampslSpace 134 Preliminary Engineering Study: Request forProposals

In August 2017, City Council authorized staff to issue a Request for Proposals (RFP) to obtainthe services of a well-qualified firm or team of firms, specializing in environmental planning,

4

Page 5: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

traffic and parking analysis, civil engineering, and structural engineering, to study and developthe road and transportation network surrounding a proposed Space 134 “freeway cap park” as itpasses through downtown Glendale (Exhibit 1). Focusing on traffic and structural engineering,this project is intend to study the complex relationship between the Space 134 Cap Park; the134 Freeway; the city’s street, bicycle, pedestrian, and bus network, City Streetcar study; and anumber of Bus Rapid Transit (BRT) route alternatives currently being studied by the LosAngeles County Metropolitan Transit Authority (Metro). The scope intends to cover the entirelength of the Space 134 vision. Key elements of the scope of work include:

• Design Alternatives. Generate up to six alternative designs alternatives for both two-wayand one-way frontage roads parallel to the freeway, connections to the existing freewayon/off ramps and the surrounding surface street network, and integrations to Metro’sproposed BRT transit facilities.

• Traffic, Noise, and Air Quality Study. Analyze the effects on traffic flow and congestionalong the 134 Freeway and along Glendale’s surface streets, utilizing the City’s updatedtraffic model. Specific attention and analysis will be given to the impacts the various designalternatives have on the freeway on/off ramps. Also study the effects on noise and air qualitygenerated by traffic on the 134 Freeway both with and without the 134 freeway Cap Park.

• BRT/LRT Alignments and Station / Bus stops / Streetcar? Transit Hub. Subject to thestatus of the alternatives being studied in Metro’s North Hollywood to Pasadena ARTTechnical Study and Glendale-Burbank Regional Streetcar Feasibility Study, investigatehow the potential BRT Station, Streetcar, and/or bus stops are accommodated. Alsoconsider how a Light Rail Transit (LRT) station could be accommodated to incorporate atransit hub that accommodates Metro and Glendale Beeline bus lines, as well as future bikeamenities, into the alternatives.

• Parking Study. Analyze the amount of existing parking, especially on-street parking, andestimate impacted parking spaces that will be lost by the construction of Space 134. Proposethe number of parking spaces needed by Space 134.

• StructuralAnalysis. Assess the structural design requirements required to accomplish theproposed freeway and roadway improvements associated with the Space 134 Cap Park.

• Phasing, Construction Schedule and Staging. Study the sequence, timing, and schedulein which the proposed freeway and road improvements would be built. Also provide anopinion of probable costs for the freeway and roadway improvements and update asnecessary the cost estimates generated during previous phases of the Space 134 project.

• Conceptual Engineering Cost Estimate. Provide an engineering cost estimate for thefreeway and roadway improvements.

• Geotechnical Engineering. Conduct Preliminary site investigations to determine thegeotechnical issues, assess potential impacts, and provide preliminary design andconstruction recommendations for the project. The investigations will support the preliminarydesign and assist in advancing additional planning studies and refinement.

5

Page 6: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

• Preferred and Final Alternative. Produce an update to the Vision Plan to reflect the mostfeasible traffic alignments, and a final report that summarizes the associated technicalfindings and recommendations in terms of traffic, noise, air quality, parking and parkingmanagement strategies, structural design, and utilities infrastructure; provides a final opinionof probable costs; and describes phasing, construction schedule and staging considerations.Any necessary updates to the funding sources and strategies identified in previous phasesof this Space 134 project may also be updated.

• Participation in Meetings. Participate in one community workshop, two City Councilmeetings, and meetings with related agencies such as Metro and Caltrans.

CONSULTANT SELECTION PROCESSThe RFP was advertised on January 26, 2018; (Exhibit 3), a pre-proposal meeting was held onFebruary 21, 2018; and proposals were due on April 10, 2018. The following responsiveproposals were received prior to the due date on April 10, 2018:

• Perkins Eastman Architects DPC/AECOM;• ARUP North America, Ltd; and• KPFF Consulting Engineers

One additional proposal was received from TN’ LN International which was disqualified andconsidered non-responsive to the Request for Proposal requirements and compliance with thefederally funded project.

A panel consisting of representatives from the State of Californian Department of Transportation(Caltrans), Los Angeles Department of Public Works, City of Glendale Community Developmentand Public Works Departments formed and scored responsive proposals. On June 21, 2018 thepanel interviewed all three firms and after careful scoring of the three firms, the panel rankedARUP North America. Ltd. as the top candidate to conduct the Space 134 Freeway Cap:Preliminary Engineering/Technical Study.

ARUP North America, Ltd was selected through a competitive evaluation process to conduct theengineering study. Proposers were evaluated on written and oral submittals as detailed in theREP and listed below.

a. Written Proposal (100 points)a. Project Understandingb. Clarity of Proposal/Organizationc. Thoroughness in Addressing Requirementsd. Technical Expertise/Experience of Team, including Personnele. Technical Ability to Performf. Experience with Similar Projectsg. Experience working with Caltrans and/or Metroh. Schedulei. Creativity in Approach

b. Oral Presentation (60 points)a. Presentationb. Organization

6

Page 7: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

c. Clarityd. Communication Skillse. Technical Understandingf. Responses to Questions

Arup North America, LTD. Rose to the top for the following reasons:

As a professional engineering firm, and in accordance with California Government Code Section4526, ARUP North America, Ltd was chosen primarily for its demonstrated competence andprofessional qualifications. While all three responsive firms that submitted proposalsdemonstrated the minimum qualifications and experience to undertake the tasks required for thefeasibility study, the panel’s evaluation and scoring of the proposals shows that ARUP NorthAmerica, Ltd is the firm most compatible with the defined scope of services given the ratingscriteria and scoring, as shown in the table below:

CumulativeProposal &

Proposal Interview Interview Ranking

ARUP 369 275 671 1

PerkinsEastman/AECOM 409 256 665 2

KPFF 271 157 428 3

ARUP North America, Ltd also provided a reasonable cost for the services requested in theRFP, and the costs proposed are commensurate with the proposed scope of work. The totalbudget for this project is $600,000, including $100,000 from TDA Article 3. In an effort to betterunderstand the true costs of this project in today’s environment, and compliance with federallyfunded project, the total budgeted amount was not initially made clear to proposers.

ARUP North America, Ltd has agreed to a revised base fee of $500,000 based on the City’savailable budget, desired scope of work and outcomes, and project schedule. This provides fora 8.3 percent contingency in the amount of $50,000 and $50,000 for staff time to manage theproject.

ARUP North America, Ltd a global engineering firm with over 85 offices in 35 countries hasassembled a project team of planners, designers, and engineers to deliver a sound engineeringstudy for this project. The project team will be led by Anthony Kirby, project manager, andproject director Gail Farber, who have both demonstrated considerable and competitive recent,local, and relevant experience on projects of similar scope and scale. The proposed ARUPproject team for this project understands the interrelationship between design and constructionand has a proven record in delivering complex, multidisciplinary, civil engineering projectsincluding Santa Monica Airport Park Expansion, North Shore Park, Mecca California, GeraldDesmond Bridge, Long Beach California; bridge, geotechnical engineering for California HighSpeed Rail Palmdale to Los Angeles section, 1-405 Improvement Design Build Project, andOrange County California and Airport Metro Connector (AMC) Transit Station in Los Angeles,California.

7

Page 8: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

Their key personnel, including Gail Farber, former Los Angeles County Director of Public WorksSameer Deo and Russell Fortmeyer have extensive experience working with Caltrans onhighways and bridges projects in Los Angeles and Orange Counties.

The Planning and design team include JK A, Sapphos Inc., and Studio —MLA which havedemonstrated significant experiences in urban design, landscape and environmental servicesthroughout California including for the Los Angeles River Revitalization Master Plan, LosAngeles + Glendale Recycled Water Plant and Space 134 Park Vision & Strategy.

As part of the City’s due diligence, Staff called ARUP’s references, and remains confident thattheir project team is capable of performing to the level of quality and professionalism suggestedin their proposal.

FISCAL IMPACT

There is no impact to the General Fund associated with the Space 134 Phase 3 (PreliminaryEngineering/Technical Study). Funding for this scope of work is allocated through CaltransSTPL Transportation Grant and TDA Article 3. Staff is requesting that the City Council adopt aResolution of Appropriation appropriating $500,000 for the Caltrans STPL Transportation Grantfrom State Grant Revenue to 409-180-G52242 and $100,000 from County Grants to TDA3-Article 3 Fund 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space134 Preliminary Engineering Study. This will fund the contract, a contingency, and staff time tocoordinate the contract.

ALTERNATIVES

Alternative 1: Approve the attached Motion awarding a contract to ARUP North America, Ltdand authorizing the City Manager or her designee to execute a Professional ServicesAgreement with ARUP North America, Ltd in the amount of $500,000 plus $50,000 incontingency for the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study;and, approve a Resolution of Appropriation to appropriate $500,000 for the CaltransSTPL Transportation Grant from State Grant Revenue and $100,000 TDA Article 3 fundsfrom the County Grants. These actions will allow the study to proceed, providingengineering analysis and information the City Council may use in considering next steps.

Alternative 2: Do not approve the attached Motion awarding contract to ARUP North America,Ltd and authorizing the City Manager or her designee to execute a Professional ServicesAgreement with that company; and do not approve the Resolution of Appropriation toappropriate $500,000 for the Caltrans STPL Transportation Grant from State Grant Revenueand $100,000 TDA Article 3 funds from the County Grants. This would require selecting anotherfirm, conducting another REP process, or otherwise declining the funds. Should the CityCouncil choose to decline the funds grant, staff will inform Caltrans accordingly, and locallybudgeted funds will remain inthe FY2017- 18 Community Development Department UrbanDesign & Mobility budget for purposes to be determined

Alternative 3: The City Council may consider any other alternative not proposed by staff.

CAMPAIGN DISCLOSURE

In accordance with the City Campaign Finance Ordinance, are the names and businessaddresses of the members of the board of directors, the chairperson, CEO, COO, CFO,

8

Page 9: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

Subcontractors and any person or entity with 10% interest or more in the companyproposed for contract in this Agenda Item Report as applicable are included as Exhibit 4.

EXHIBITS

Exhibit 1: Space 134 Vision PlanExhibit 2: Space 134 Final Transit Recommendations MemorandumExhibit 3: Request for ProposalsExhibit 4: Campaign DisclosureExhibit 5: Project Schedule

9

Page 10: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

MOTION

Moved by Council Member ______________________________________, seconded

by Council Member _________________________________________, that the City Council of

the City of Glendale hereby approves the award of a contract to ARUP North America, Ltd.,

in the amount of $500,000 for a Space 134 Freeway Ramps/Space 134 Preliminary

Engineering Study, and further authorizes the City Manager, or a designee, to execute a

Professional Services Agreement with ARUP North America, Ltd., for the above-described

services and subject to the review and approval as to form by the City Attorney.

Vote as Follows:

Ayes:

Noes:

Absent:

Abstain:

gAlj:\files\docfiles’mtn\space 134- psa w arup for engineering - mtn.doo

Page 11: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study

RESOLUTION NO.

RESOLUTION OF THE COUNCIL OF THE CITY OF GLENDALEMAKING AN APPROPRIATION

BE IT RESOLVED BY THE COUNCIL OF THE CITY OF GLENDALE:

SECTION 1: That the sum of $600,000 is hereby appropriated and/or transferred from the followingaccounts to the following accounts:

ACCOUNTS DESCRIPTION FROM TO32610-409-180 State Grants, CIP Reimbursement Fund, CDD Projects $500,000

43110-409-180- Contractual Services, CIP Reimbursement Fund, CDD $500,000G52242 Projects, Space 134

34050-409-501 County Grants, CIP Reimbursement Fund, Public-Works $100,000Projects,

43110-409-501- Contractual Services, CIP Reimbursement Fund, Public $100,000G52050 Works Projects, TDA3 Project

To appropriate funding for Space 134 Freeway Ramps and Preliminary Engineering Study

SECTION 2: The Director of Finance is authorized to make such otherappropriation line-items, changes in summaries, fund totals, grand totals, andbudget document as necessary to reflect and implement the changes specified in this resolution.

SECTION 3: The City Clerk shall certify to the adoption of this Resolution.

Adopted this ________ day of ________________, 2018.

City Clerk

STATE OF CALIFORNIA)COUNTY OF LOS ANGELES)CITY OF GLENDALE)

CITY OF GLENI~AIJEDATE 9/11/18APPROVED AS TO FINANCIALPROVISION FOR $ 600,000

/~edorof’nce

I, Ardashes Kassakhian, City Clerk of the City of Glendale, do hereby certify that the foregoingResolution No.__________ was adopted by the Council of the City of Glendale, California, at a regular

following vote:

Ayes:

day of

Noes:Absent:

~EF SSIS ANT fl AHORiAbstain:

DATED 97/3//K

revisions, individualother portions of the

ATTEST:Mayor

SS

meeting held on the 2018, and that the same was adopted by the

City Clerk

Page 12: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 13: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 14: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 15: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 16: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 17: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 18: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 19: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 20: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 21: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 22: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 23: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 24: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 25: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 26: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 27: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 28: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 29: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 30: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 31: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 32: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 33: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 34: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 35: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 36: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 37: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 38: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 39: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 40: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 41: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 42: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 43: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 44: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 45: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 46: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 47: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 48: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 49: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 50: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 51: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 52: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 53: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 54: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 55: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 56: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 57: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 58: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 59: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 60: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 61: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 62: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 63: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 64: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 65: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 66: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 67: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 68: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 69: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 70: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 71: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 72: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 73: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 74: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 75: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 76: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 77: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 78: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 79: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 80: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 81: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 82: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 83: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 84: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 85: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 86: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 87: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 88: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 89: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 90: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 91: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 92: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 93: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 94: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 95: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 96: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 97: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 98: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 99: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 100: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 101: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 102: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 103: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 104: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 105: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 106: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 107: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 108: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 109: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 110: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 111: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 112: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 113: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 114: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 115: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 116: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 117: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study
Page 118: gLendaL~’~P...as contingency from County Grants to TDA3-Article 3 Fund, 409-501-G52050 for use in conducting the Space 134 Freeway Ramps/Space 134 Preliminary Engineering Study