GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 1
Instrument Operations Center (IOC)Instrument Operations Center (IOC)andand
Science Analysis Software (SAS)Science Analysis Software (SAS)
Scott WilliamsHanson Experimental Physics Laboratory (HEPL)
Stanford [email protected]
R.DuboisStanford Linear Accelerator Center
Stanford [email protected]
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 2
IOC and Science Analysis SoftwareIOC and Science Analysis Software
IOC & SAS functions
Organization
Short and Longer Term Work Plans
Cost Summary
Issues
Outline
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 3
Mission Operations ArchitectureMission Operations Architecture
Mission Operations
Center
Science Support Center
Guest Observer Facility
Raw Data
Commands
Spacecraft Data for Archival
Schedules
Standard Products Schedules Processing Algorithms Data for Archival
Science Housekeeping Commands
AlertsLoads
Instrument Table, S/W Loads Instrument Housekeeping
LAT Instrument Operations
Center
GBM IOC
GBM Data
LAT Data
GCNAlerts
LATInstrumentOperations
Center* From the GLAST Operations Concept Document
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 4
GLAST Mission Operations FunctionsGLAST Mission Operations Functions
Summarized from Ground Systems Functional Allocation Team Study
Mission Operations Center (MOC)
Spacecraft & GBM Level 0 Processing Spacecraft Health & Safety Instrument Safety Commanding Alert Data Handling Ground Station & TDRSS Scheduling Acquisition Data Generation
LAT Instrument Operations & Science Data Processing
GBM Intrument Operations Center
Instrument Operations & Monitoring Instrument Calibration Operations Software Production & Maintenance Data Analysis Software Development Low Level Standard Product Production Flight Data Verification Instrument Team Data Processing
Science Support Center (SSC)
Higher Level Data Processing Science Data Distribution Data Archiving Observation Scheduling Target of Opportunity Selection Guest Observer Support
S/C Data Instrument Procedures & Uploads
Schedules S/C data for archiving
Level 0 & S/C Data Instrument Procedures & Uploads
Raw LAT Data
S/C, LAT HSK and GBM Data Commands
Level 0, Level 1, Higher Level Products, IOC Data Products
Level 0, Higher Level Products, IOC Data Products, Instrument Schedules
Space and Ground Segments
Instrument Operations S. Williams, SU-HEPL • LAT Level 0 Processing • Instrument Health & Safety Monitoring • Instrument Commanding • Test & Calibration Data Acquisition • Validating & Maintaining Flight Software • Alert Processing
Science Analysis Software R. Dubois, SU-SLAC • Science Data Processing • Optimizing Analysis & Processing Algorithms • Instrument Calibration • Instrument Performance Assessment • Data Distribution • Analysis Software • Mirror Sites
Instrument Schedules
Level 0 Science & Hsk Data
Performance & Calibration Data
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 5
IOC Formulation ScheduleIOC Formulation Schedule
Design
Balloon Flight
IOC Requirements Development
Mission Operations Planning
Develop IOC Plan for Flight Instrument
COTS/NDI H/W and S/W Trade Studies
INSTRUMENT OPERATIONS CENTER
GLAST Project Phases
Project Milestones
LARGE AREA TELESCOPE
Instrument Milestones
Engineering Model Development
IOC Independent Review
LOF and SAS Specification Development
GLASTGamma-ray Large Area Space Telescope
2000 2001
J F M A M J J A S O N D J F M A M J J A S O N
Calendar Year
Formulation
IPDR
SRR PDR NARIA
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 6
Science Data ProcessingScience Data Processing
– Receive Level 0 data from IOC
– Automatically process Level 0 data to Level 1
– Facilitate LAT monitoring and updates of calibrations
– Feed back high level monitoring info to IOC
– Generate Monte Carlo for instrument simulation, algorithm development etc
– Allow for data reprocessing
– Generate high level data products
– Develop analysis tools and platforms
– Deliver data products and algorithms to SSC
– Protect via archive all data, at SLAC and HEASARC
~ 3GB of data arrives per day~ 3GB of data arrives per day
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 7
The Critical AreasThe Critical Areas
• Simulation/reconstruction software
– Instrument simulation and reconstruction
– PSF, Aeff, background rejection
Supports instrument design and science studies
• Infrastructure
– Code framework
– Code/release management
– DocumentationGood practices and the glue
that holds the software together
• Level 1 Data Processing
– Production data and MC processing
– Near real-time feedback to IOC
Supports detailed performance tracking; Mock Data Challenges; input to Science
• Science Analysis tools
– High level utilitiesSupports extraction of Science
from the data
– Event database technologyExtraction of science/sharing with SSC
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 8
TimelineTimeline
2001 2002 2003 2004 2005 2006
GlastSim/G4Event Display
Balloon
Science Tools, Analysis Platforms
Calibrations
Performance Tuning,Tracking
Data Production Facility ………. near real-time monitoring
Polishing & maintenance + post-launch panic
CY
Event DB Technology & Design
Release Manage
MDC
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 9
Group CommunicationsGroup Communications
software team is integratedsubsystem folks are matrixed between subsystem and software group
part of same development process as other components of software
software team is integratedsubsystem folks are matrixed between subsystem and software group
part of same development process as other components of software
use cvs for distributed code developmentRepository at SLAC
use web conferencing tools for meetingsWeekly General, Core & CAL; soon TKR
Used for impromptu discussions
use instant messenger tool for quicky discussions
Use MS NetMeeting for point-to-point discussionsand Windows remote debugging via desktop sharing
Software Weeks every4 months
Core working meetingbetween Software Wks
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 10
IOC WBS OrganizationIOC WBS Organization
Instrument Operations Center
WBS 4.1.B S. WIlliams, SU-HEPL
GLAST IPO SU-SLAC
Mission & Ops Planning
WBS 4.1.B.3 S. Williams, SU-HEPL
1 Ops Concept Dev 2 I&T Planning 3 Mission Ops Planning
LAT Operations Facility
WBS 4.1.B.4 TBD2, SU-HEPL
1 System Conceptual Design 2 Data Acq S/W Dev 3 Operations S/W Dev 4 Command & Telemetry Dev 5 IOC System Dev
LOF Test WBS 4.1.B.5
TBD1, SU-HEPL
1 Test Planning 2 Test Dev 3 Verification Test 4 Interface Tests 5 Travel
Calibration Support WBS 4.1.B.6
D. Lauben, SU-HEPL
1 Calibration Support
LAT I&T Support WBS 4.1.B.7
TBD1, SU-HEPL
1 Qual Unit Test Support 2 Flight Unit Test Support 3 Travel
MSI&T Support WBS 4.1.B.8
TBD1, SU-HEPL
1 Observatory Test Support 2 Ground Systems Test 3 Training Sims 4 Launch & Early Orbit Support 5 Travel
MO&DA WBS 4.1.B.9
S. Williams, SU-HEPL
1 Science Operations 2 LAT Operations 3 IOC Systems 4 LAT Simulator 5 Engineering Support
Performance Assurance
WBS 4.1.B.2 TBD1, SU-HEPL
1 Quality Assurance 2 Verification
IOC Management WBS 4.1.B.1
S. WIlliams, SU-HEPL
1 Project Admin 2 Meetings & Reviews 3 Logistics 4 Travel 5 Project Support
EGSE Integrated Product Team S. Williams, IOC, SU-HEPL D. Nelson, TKR, SU-SLAC
E. Grove, CAL, NRL B. Schaeffer, ACD, GSFC
M. Lovellette, E&DA, NRL J.J. Russell, FSW, SU-SLAC M. Nordby, I&T, SU_SLAC
Operations Integrated Product Team S. Williams, IOC, SU-HEPL R. Dubois, SAS, SU-SLAC D. Thompson, ACD, GSFC
D. Bertsch, ACD, GSFC S. Digel, SAS, GSFC
C. Meetre, SSC, GSFC E. Grove, CAL, NRL
M. Lovellette, E&DA, NRL D. Lauben, IOC, SU-HEPL
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 11
SAS WBS OrganizationSAS WBS Organization
H .K e llyA C D
4 .1 .D .2 .4G S F C
E .G ro ve , A .D ja nn atti -A ta iC A L
4 .1 .D .2 .5N R L , Fra n ce
T .U sh erT K R
4 .1 .D .2 .6S L A C, U C S C, Ita ly
T .B u rne ttS im /R econ
4 .1 .D .2U W
J.B og a rtG eo m e try
4 .1 .D .1S L A C , Ita ly
Y .F uka za w aS o urces4 .1 .D .3
H irosh im a, S ta n fo rd
J .B og a rtC o n sta n ts
4 .1 .D .7S L A C
T .B u rne ttA rch ite ct
U W
E .do C o uto e S i lvaC alib ra tio ns
4 .1 .D .ES L A C
S .D ig e l, J .No r r isS c ien ce T o o ls
4 .1 .D .BG S F C
H .K e llyA na lys is T oo ls
4 .1 .D .8G S F C
K .Y o ungIn fra s tru ctu re
4 .1 .D .DS L A C
T rig ger S im u la tion4 .1 .D .4
B a ckgro un d R eje ction4 .1 .D .5
P e rfo rm an ce T un e & M on4 .1 .D .6
P e rfo rm an ceM etr ics
in co n ju nc tio n w ithS .R itz G S FC
R .D ub o isM an ag er
4 .1 .DS L A C
In s tru m e n t P ro je ct O ffice
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 12
LAT Simulation & Recon Software –LAT Simulation & Recon Software –Flight Proposal BaselineFlight Proposal Baseline
100 MeV
15 GeV proton
2, 25, 40 GeV e-
0.1, 7 GeV
TKR
CAL
Well-developed photon recon, background rejection algorithms - part of the project effort since ’93.
Well-developed photon recon, background rejection algorithms - part of the project effort since ’93.
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 13
StatusStatus
• IOC is in formulation phase through FY’01
• Improving Simulation and Reconstruction
• Addressed infrastructure issues in 2000/2001 – support for the long run
• Providing balloon flight and PDR preparation support through summer ’01
• Continuing with requirements and specifications for science tools and calibrations, with first prototypes this year
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 14
SAS IssuesSAS Issues
• Heavy load on team to support both the balloon flight and PDR prep– Need additional 2-3 FTE for core and DPF work– Toby Burnett has pending NSF request
• Extremely important to our effort that it succeed!!– European & Japanese collaborators have committed to supporting
the core effort
• Want major Sim/Recon release by late 2001 to let us shift focus to Calibrations and analysis issues
• Need to get started on Data Processing Facility– Balloon & PDR support as early prototyping opportunities– Mock Data Challenge in mid 2002
• Technology for event, photon & exposure databases and techniques for indexing the photons (time, spatial tessellations)– Studies underway to evaluate technologies
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 15
IOC MilestonesIOC Milestones
• Instrument Operations Center (IOC) Requirements Review 04/18/01• LAT Instrument PDR 08/06/01• IOC PDR 08/22/01• LAT Instrument CDR 08/05/02• IOC S/W Release 1 07/28/03• IOC CDR (TBR) 08/04/03• IOC S/W Release 2 12/18/03• Calibration Unit Beam Test Complete 02/05/04• LAT Ops Facility Validation & Verification Complete 06/21/04• LAT TV Test Complete 08/26/04• Ground Systems Compatibility Test (TBR) 11/21/04• Mission Sequence Test (TBR) 03/21/05• End-to-end Test (TBR) 06/21/05• Launch 09/05• LAT Checkout Complete + 30 days (TBR)
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 16
4.1.B LAT Instrument Operations Center4.1.B LAT Instrument Operations Center
ActivityID
ActivityDescription
OrigDur
RemDur
EarlyStart
EarlyFinish
Gamma Ray Large Area Space Telescope4.1.B LAT INSTRUMENT OPERATIONS CENTER
Subtotal 1,241 10/02/00 09/30/05
+ 4.1.B.1 MANAGEMENT
1,241 10/02/00 09/30/05+ 4.1.B.2 PERFORMANCE ASSURANCE
727 10/03/02 09/07/05+ 4.1.B.3 MISSION & OPERATIONS PLANNING
1,199 11/29/00 09/28/05+ 4.1.B.4 INSTRUMENT OPERATIONS CENTER
1,074 06/07/01 09/30/05+ 4.1.B.5 IOC TEST
480 07/24/02 06/29/04+ 4.1.B.6 LAT CALIBRATION
909 10/01/01 06/01/05+ 4.1.B.7 LAT INTEGRATION & TEST
385 06/12/03 12/24/04+ 4.1.B.8 MISSION SYSTEMS INTEGRATION & TEST
239 10/15/04 09/30/05
FY00 FY01 FY02 FY03 FY04 FY05 FY06
DRAFT
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 17
Interim IOC Cost Estimate*Interim IOC Cost Estimate*
(Escalated K$)
*DOE/NASA funding.
4.1.B Instrument Operations Center
FY00 FY01 FY02 FY03 FY04 FY05 Total
HEPL (NASA) 24.4 24.0 224.4 349.1 850.0 630.0 2102.0
Total 24.4 24.0 224.4 349.1 850.0 630.0 2102.0
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 18
Science Analysis Software MilestonesScience Analysis Software Milestones
• Science Analysis Software (SAS) Requirements Review 04/25/01• Instrument Simulation/Event Recon Release (to support PDR); Management
& Verification in place 06/01/01• LAT Instrument PDR 08/06/01• Science Analysis Software PDR 09/05/01• Complete Mock Data Challenge – CDR run-up 07/15/02• LAT Instrument CDR 08/05/02• Science Analysis Software CDR 09/04/02• Implement production version of Data Production Facility 06/01/04• End-to-end testing, final Mock Data Challenge complete 06/01/05
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 19
4.1.D Science Analysis Software4.1.D Science Analysis Software
ActivityID
ActivityDescription
OrigDur
RemDur
EarlyStart
EarlyFinish
Gamma Ray Large Area Space Telescope4.1.D SCIENCE ANALYSIS SOFTWARE
Subtotal 1,043 04/03/00 06/14/04
+ D
270 04/03/00 05/02/01+ 4.1.D.1 GEOMETRY
186 11/27/00 08/27/01+ 4.1.D.2 GLAST SIMULATION
318 09/25/00 01/10/02+ 4.1.D.3 SOURCES
60 09/25/00 12/19/00+ 4.1.D.4 TRIGGER SIMULATION
60 02/01/01 04/26/01+ 4.1.D.5 BACKGROUND REJECTION
58 05/01/01 07/23/01+ 4.1.D.6 PSF/EFFECTIVE AREA MONITORING AND OPTIM
39 02/01/01 03/28/01+ 4.1.D.7 STATIC CONSTANTS HANDLING
99 09/25/00 02/22/01+ 4.1.D.8 ANALYSIS TOOLS
40 01/10/01 03/08/01+ 4.1.D.9 TEST BEAM 99
25 10/09/00 11/10/00+ 4.1.D.A BALLOON FLIGHT
146 09/25/00 04/30/01+ 4.1.D.B SCIENCE SOFTWARE
729 09/25/00 09/03/03+ 4.1.D.C DATA PRODUCTION FACILITY
151 04/02/01 11/01/01+ 4.1.D.D CODE & RELEASE MANAGEMENT
112 10/02/00 03/20/01+ 4.1.D.E CALIBRATION
412 03/01/01 10/21/02+ 4.1.D.F MANAGEMENT
921 09/25/00 06/14/04
FY00 FY01 FY02 FY03 FY04 FY05 FY06
DRAFT
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 20
Interim Science Analysis Software Cost Estimate*Interim Science Analysis Software Cost Estimate*
(Escalated K$)
*DOE/NASA funding.
4.1.D Science Analysis Software
FY00 FY01 FY02 FY03 FY04 FY05 Total
GSFC (NASA) 128.6 191.3 329.5 355.7 241.3 186.5 1433.0
HEPL (NASA) 46.5 81.5 294.6 300.7 281.4 280.7 1285.4
Total 175.1 272.8 624.2 656.4 522.7 467.2 2718.4
GLAST LAT Project DOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001
IOC – S.Williams SAS - R.Dubois 21
SummarySummary
• Simulation and reconstruction are in excellent shape for this stage of the project
– Needed infrastructure improvements for long-term support and development are well underway
– Will be a challenge to support the balloon and PDR
• Plan for required science analysis calibration and high level tools
– In progress
• Workplan in place – in process of loading into PMCS
• Requirements, initial QA/QC this summer
• Mock Data Challenge in mid 2002
– Prototype IOC, Processing Facility and Event DB