34
EMI/EMC 1 GLAST LAT Project June 9, EMI/EMC TRR GLAST Large Area GLAST Large Area Telescope Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL June 9, 2006 @ 1300 EDT NRL, HESE Conference Room - B209, Rm 321A Gamma-ray Large Gamma-ray Large Area Space Area Space Telescope Telescope

GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

  • Upload
    wallis

  • View
    53

  • Download
    0

Embed Size (px)

DESCRIPTION

Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL June 9, 2006 @ 1300 EDT NRL, HESE Conference Room - B209, Rm 321A. Purpose / Contents. - PowerPoint PPT Presentation

Citation preview

Page 1: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 1

GLAST LAT Project June 9, EMI/EMC TRR

GLAST Large Area TelescopeGLAST Large Area Telescope

EMI/EMC Test Readiness Review

Michael Lovellette, Test DirectorNRL

June 9, 2006 @ 1300 EDTNRL, HESE Conference Room - B209, Rm 321A

Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope

Page 2: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 2

GLAST LAT Project June 9, EMI/EMC TRR

Purpose / ContentsPurpose / Contents

Demonstrate readiness to proceed with EMI/EMC testing of the integrated flight instrument, i.e. the LAT:– Test requirements are complete– LAT has been appropriately tested at lower levels of

assembly– Passes comprehensive systems test– EMI/EMC test plans and procedures complete– Facilities readiness and certification verified– STE and MGSE complete, fabricated, and ready for use– Manpower is sufficient to cover all planned for activities

Page 3: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 3

GLAST LAT Project June 9, EMI/EMC TRR

Requirements completeRequirements complete All flight system design analyses and unit testing have been

successfully completed– Mission System Spec 433-SPEC-0005

• EMI Environments– LAT Environmental Requirements Spec LAT-SS-00778

• EMI Environments– LAT Performance Verification Plan LAT-MD-00408-04c

• Verification test definition– EMI Test Plan LAT-MD-02726-01

LAT EMI-specific operating modes have been defined– LICOS scripts and supporting displays are complete

LAT subsystem support for susceptibility data review has been obtained

Page 4: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 4

GLAST LAT Project June 9, EMI/EMC TRR

RE101 RE102 CE101 CECM CS102 CS06 RS101 RS103 St. MagTKR

ProtoFlight X X X X X X X X X 0Flight (Acpt) X X 0

CALProtoFlight X X X X X X X X X 0Flight (Acpt) X X 0

ACDQual BEA X X X X X X X X XProtoFlight (a)

T&DFQual X X X X X X X X X 3(b)Flight (Acpt) X X 0

Mech (Radiators)ProtoFlight X (c )

(c ) Radiator subsystem test of VCHP heater power source deferred to LAT level configuration

(a) ACD Subsystem EMI testing Waivered - LAT-XR-06733(b) Qual TEM/TPS, GASU exceeded radiated emissions spec (RE102) in S band, GPS notch; HCB exceeded CECM spec

Subsystem EMI/EMC Test SummarySubsystem EMI/EMC Test Summary

Page 5: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 5

GLAST LAT Project June 9, EMI/EMC TRR

Radiator Subsystem EMI/EMC TestRadiator Subsystem EMI/EMC Test VCHP heater Radiated Emissions testing

– S/C power source for LAT VCHP heaters is an unfiltered DC-DC converter.

– Concern is the conducted noise for this power source will become radiated emission issue for LAT system test.

– This issue shall be resolved by special subsystem (Radiator) test – RE102 – using simulated S/C power source.

– The test will be performed just prior to LAT system EMI/EMC test.

– Preliminary testing of this at SLAC gives reasonable confidence that there is no significant issue here.

Not formally part of the LAT level EMI test, performed on an STR

Page 6: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 6

GLAST LAT Project June 9, EMI/EMC TRR

LAT EMI TestLAT EMI Test

LAT test levels derived from LAT-SS-0778 Test Suite:

– CE102 Conducted Emissions, Power Leads, 10 kHz to 10 MHz, MIL-STD-462, CE03

– CECM & CEDM Conducted Emissions, Time Domain, 150 MHz Bandwidth– CS102 Conducted Susceptibility, Power Leads, 10 kHz to 10 MHz, MIL-STD-

462, CS02– CSCM Conducted Susceptibility, Common Mode, 30 Hz to 150 MHz, MIL-STD-

462, CS02– CS06 Conducted Susceptibility, Spike, Power Leads, MIL-STD-462– RE101 Radiated Emissions, Magnetic Field, 20 Hz to 50 kHz– RE102 Radiated Emissions, Electric Field, 10 kHz to 18 GHz, MIL-STD-461E– RS101 Radiated Susceptibility, Magnetic Field, 20 Hz to 50 kHz– RS103 Radiated Susceptibility, Electric Field, 30 MHz to 18 GHz

Verify by Analysis:– RS103 Radiated Susceptibility, Electric Field, 18 GHz to 40 GHz– Static Magnetic Field

Page 7: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 7

GLAST LAT Project June 9, EMI/EMC TRR

LAT Power InterfacesLAT Power Interfaces SC-LAT Power Interfaces

– SC PRU (P) - LAT PDU– SC PRU (R) - LAT PDU– SC PRU (P) - LAT SIU (P)– SC PRU (R) - LAT SIU (R)– SC PRU (P) - LAT VCHP +Y Heaters– SC PRU (P) - LAT VCHP –Y Heaters– SC PRU (R) - LAT VCHP +Y Heaters– SC PRU (R) - LAT VCHP –Y Heaters– SC PDU (P) - LAT Makeup Heaters (Survival)– SC PDU (R) - LAT Makeup Heaters (Survival)

Makeup circuit power interfaces are not tested.

VCHP heater testing limited to RE102

Page 8: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 8

GLAST LAT Project June 9, EMI/EMC TRR

Test LimitationsTest Limitations RS103 upper limit of 18GHz (40GHz)

– 18 – 40 GHz addressed by analysis. Limited area of RS101 test

– Requires scanning each 10cm x 10cm area, ~16min/scan– ~1450 scans for the LAT, another ~1200 for the radiators (~29 days)– Scan selected locations around connectors, PMTs, BEA

Redundant side testing limited to Conducted Emissions (CE102) and Conducted Susceptibility (CS102)

Page 9: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 9

GLAST LAT Project June 9, EMI/EMC TRR

Nominal Test SequenceNominal Test Sequence Radiator EMI test Radiated Emissions Radiated Susceptibility

– Allows maximum time to evaluate data off line before EMI complete Primary side Conducted Emissions and Susceptibility

– Organized to minimize required LAT power cycles Redundant side Conducted Emissions and Susceptibility

– Organized to minimize required LAT power cycles Time for power cycle is important

– Non-optimized CE/CS testing requires 32 LAT power on/off cycles

Option: Begin with CE/CS (redundant side) in tent to accommodate delayed radiator installation

Page 10: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 10

GLAST LAT Project June 9, EMI/EMC TRR

CE & CS TestsCE & CS Tests

Test System Primary Red. BandsPower cycles

CE102 SIU +28, Ret. +28, Ret. 1 4CE102 DAQ +28, Ret. +28, Ret. 1 4CECM SIU +28-Ret. 1 1CECM DAQ +28-Ret. 1 1CEDM SIU +28-Ret. 1 1CEDM DAQ +28-Ret. 1 1CS102 SIU +28, Ret. +28, Ret. 2 8CS102 DAQ +28, Ret. +28, Ret. 2 8CS06 SIU +28-Ret. 1 1CS06 DAQ +28-Ret. 1 1CSCM SIU +28-Ret. 1 1CSCM DAQ +28-Ret. 1 1Total 16 8 32

Page 11: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 11

GLAST LAT Project June 9, EMI/EMC TRR

Test DurationsTest Durations Times include test time includes EMI facility set up and calibration,

overhead for LAT ops is estimated separately– Schedule allows 11 days or 132 hours

TestDuration

(hrs)# of cable configs.

LAT overhead

Total test time (hrs)

CE102 6 2 25% + 0.5 hr/pwr cycle

19CECM 6 1 “ 7CEDM 6 1 “ 7CS102 8 2 50% + 0.5 h 32CSCM 6 1 “ 10CS06 6 1 “ 10

RE101& 103 6 1 25% + 0.5 h 8RS101& 103 16 1 50% + 0.5 h 24

Rad Test 12 1 0% 12Total 129

Page 12: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 12

GLAST LAT Project June 9, EMI/EMC TRR

EMI Test ConfigurationEMI Test Configuration Performed in NRL anechoic

chamber– ESD coverings will be

removed from sides during active radiated testing. Bags in place for conducted tests, transport and inactive periods. The top of the LAT will remain covered at all times.

– GN2 purge to control humidity

– Active cooling w/ LAT chiller system

– Portable HEPA filters running in non-test periods

Path finder of LAT instrument on the test stand in NRL’s anechoic chamber

Page 13: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 13

GLAST LAT Project June 9, EMI/EMC TRR

Test LayoutTest Layout

LAT Chiller Connection

Page 14: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 14

GLAST LAT Project June 9, EMI/EMC TRR

Conducted Test ConsiderationsConducted Test Considerations Fully test Primary:

– SC PRU (P) - LAT PDU (P)– SC PRU (P) - LAT SIU (P)

Limited test of Redundant: (CE102, CS102)– SC PRU (R) - LAT PDU (R)– SC PRU (R) - LAT SIU (R)

No plan to test PDU - LAT Survival Heaters– Thermostatic control, open circuit at LAT operating temp– Not active with LAT operating in Mission

No plan to test PRU - VCHP Heaters

Page 15: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 15

GLAST LAT Project June 9, EMI/EMC TRR

Test HarnessesTest Harnesses Radiated testing will used nominal EGSE cables

– Harness is fully shielded• Includes all connector savers• All test ports are closed out

– Fly away test harnesses are shielded • Accelerometers• TCs & thermistors

Breakout cables required for conducted emissions testing– LAT-DS-06531 LSC to RF shield, SIU power– LAT-DS-06530 BPU PNL to LSC, SIU power– LAT-DS-06528 BPU PNL to LSC, LSC to DAQ, DAQ power

Page 16: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 16

GLAST LAT Project June 9, EMI/EMC TRR

LAT configurationLAT configuration Instrument configuration for EMI/EMC tests

– Principle: want flight-like output and sensitivity• Use flight thresholds, trigger logic, gains, readouts, …• Use same configuration for emissions (LAT17x) and

susceptibility (LAT18x) tests– LAT17x, 18x configuration

• Same as on-orbit configuration, except– Periodic triggers read out at 50 Hz rather than 10 Hz

» Gives faster measurement of pedestal width, centroid– Gamma filter is disabled

» Allows sea-level muons to pass• Gives similar LAT data throughput as on orbit

Page 17: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 17

GLAST LAT Project June 9, EMI/EMC TRR

Test SoftwareTest Software Emissions Testing – Script # LAT-171

– LAT configured to collect muons with additional periodic trigger to appropriately populate the T&DF data flow and science data stream to the VSC.

Susceptibility Testing – Script # LAT-181:– LAT configured to collect muons with CAL triggers (flight level) and

ACD vetos enabled.– Susceptibility monitoring

• TKR event occupancy• CAL pedestal widths (noise) and trigger rates• ACD pedestal widths (noise) and veto rates• T&DF commanding and data flow errors

– Real time monitoring• Strip chart of LAT trigger rate and deadtime• Diagnostic error messages

– Post processing• Global TKR occupancy vs time• Global CAL, ACD pedestal widths vs time• Correlate post processing events with log of frequency vs time

Page 18: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 18

GLAST LAT Project June 9, EMI/EMC TRR

Realtime displaysRealtime displays Realtime monitoring of diagnostic hsk

– Strip charts of LRS counters and summary• Typical rates and rms derived from baseline runs• Low-Rate Science (LRS) counters

– GEM: trigger “sent” rate– ACD: 2 counters, multiplexed, of veto requests– CAL: 16 counters of trigger requests– TKR: 16 counters of trigger requests

• Summary page– Number of counters exceeding

nominal + 5 sigma

Page 19: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 19

GLAST LAT Project June 9, EMI/EMC TRR

Offline analysisOffline analysis Susceptibility pass criteria

– No reproducible increase in transport errors, noise triggers– Detectors meet noise occupancy or noise floor specs

Offline analysis– Performed with offline data products, available ~1-3 hr after

acquisition• Analyst from each subsystem on East and West coasts

– Offline reports for each run• Transport error count• Trigger rate summary and strip chart• ACD strip charts

– Pedestal centroid and width (= noise floor)– Hit and veto occupancy

• CAL strip charts– Pedestal centroid and width (= noise floor)– CAL-LO and CAL-HI trig request rate, by Tower

• TKR strip charts– Hit occupancy and trig request rate, by Tower

Page 20: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 20

GLAST LAT Project June 9, EMI/EMC TRR

Sample strip chartsSample strip charts

One example per subsystem– Pass criteria derived from Level III specs– ACD

• Pedestal rms < 30 bins, single chan– CAL

• Pedestal rms < 30 bins, single chan– TKR

• Noise occupancy < 10-4 Reference: extensive trending history and

baseline runs

ACD

CAL

TKR

Page 21: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 21

GLAST LAT Project June 9, EMI/EMC TRR

PersonnelPersonnel EMI/EMC Test Director - Michael Lovellette EMI/EMC Facility Operations

– Mike Obara - Test Conductor– Tony Grey - Test Conductor

LAT Instrument Operations– Brian Grist – Operations Lead– Standard LAT I&T Operators and Online analysis support– Anders Borgland – Offline instrument analysis lead– Elliott Bloom – LAT181 analysis lead

Page 22: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 22

GLAST LAT Project June 9, EMI/EMC TRR

RE101 – All LAT EquipmentRE101 – All LAT Equipment

40

50

60

70

80

90

100

110

120

130

1.E+01 1.E+02 1.E+03 1.E+04 1.E+05

Frequency (Hz)

Mag

netic

Fie

ld (d

BpT)

(20, 120)

(50K, 52)

Page 23: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 23

GLAST LAT Project June 9, EMI/EMC TRR

RE102 - Integrated LATRE102 - Integrated LAT

10

20

30

40

50

60

70

80

90

1.E+04 1.E+05 1.E+06 1.E+07 1.E+08 1.E+09 1.E+10 1.E+11

Frequency (Hz)

Lim

it Le

vel

(dBu

v/m

)

Notch Freq dB Freq dB UHF 408M 70 408M 36 430M 36 430M 70GPS 1.55G 70 1.55G 14 1.60G 14 1.60G 70S-band 1.77G 70 1.77G 25 2.30G 25 2.30G 70

Page 24: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 24

GLAST LAT Project June 9, EMI/EMC TRR

CE102 Spacecraft PRU – LAT DAQCE102 Spacecraft PRU – LAT DAQ

50

60

70

80

90

1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08

Frequency (Hz)

Lim

it Le

vel

(dB

uA)

(350K,80)

(10M,60)

(10K,80)

(1.7M, 82)

(5.5M, 60)

(450K, 86) (1M, 86)

Page 25: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 25

GLAST LAT Project June 9, EMI/EMC TRR

CE102 Spacecraft PRU – LAT SIU, VCHP HtrsCE102 Spacecraft PRU – LAT SIU, VCHP Htrs

40

50

60

70

80

90

1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08

Frequency (Hz)

Lim

it Le

vel

(dB

uA)

(350K,68)

(10M,48)

(10K,68)

(1.7M, 75)

(5.5M, 53)

(450K, 80) (1M, 80)

Page 26: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 26

GLAST LAT Project June 9, EMI/EMC TRRConducted Emissions Common Mode – All Conducted Emissions Common Mode – All

LAT EquipmentLAT Equipment

0

50

100

150

200

250

1.E+00 1.E+01 1.E+02 1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08 1.E+09

Frequency (Hz)

Lim

it Le

vel

(mV

peak

-pea

k)(DC,200) (150M,200)

Page 27: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 27

GLAST LAT Project June 9, EMI/EMC TRR

RS101 Perform – LATRS101 Perform – LAT

60

70

80

90

100

110

120

130

140

150

160

1.E+01 1.E+02 1.E+03 1.E+04 1.E+05

Frequency (Hz)

Mag

netic

Fie

ld (d

BpT)

(20, 142)

(50K,76)

Page 28: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 28

GLAST LAT Project June 9, EMI/EMC TRR

RS103 Perform – LATRS103 Perform – LAT

10

15

20

25

30

35

40

45

50

55

60

1.E+07 1.E+08 1.E+09 1.E+10 1.E+11

Frequency (Hz)

Lim

it Le

vel

(V/m

)

(40G, 20)(30M, 20)

Freq V/m2.2825G - 2.2925G 38

14.9634 - 15043.4G 40

Page 29: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 29

GLAST LAT Project June 9, EMI/EMC TRR

CS102 Spacecraft PRU – LAT DAQCS102 Spacecraft PRU – LAT DAQ

50

60

70

80

90

1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08

Frequency (Hz)

Lim

it Le

vel

(dB

uA)

(350K, 74)

(10M, 54)

(10K, 74)

(1.7M, 81)

(5.5M, 59)

(450K, 86) (1M, 86)

Page 30: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 30

GLAST LAT Project June 9, EMI/EMC TRR

CS102 Spacecraft PRU – LAT SIU, VCHP HtrsCS102 Spacecraft PRU – LAT SIU, VCHP Htrs

50

60

70

80

90

1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08

Frequency (Hz)

Lim

it Le

vel

(dB

uA)

(350K, 74)

(10M, 54)

(10K, 74)

(1.7M, 81)

(5.5M, 59)

(450K, 86) (1M, 86)

Page 31: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 31

GLAST LAT Project June 9, EMI/EMC TRRConducted Susceptibility Common Mode – Conducted Susceptibility Common Mode –

All LAT EquipmentAll LAT Equipment

0

100

200

300

400

500

1.E+00 1.E+01 1.E+02 1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08 1.E+09

Frequency (Hz)

Lim

it Le

vel

(mV

peak

-pea

k)

(DC,400) (150M,400)

Page 32: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 32

GLAST LAT Project June 9, EMI/EMC TRR

CS06 Operate – All LAT EquipmentCS06 Operate – All LAT Equipment

Time (usec)

Tran

sien

t im

pose

d on

inst

rum

ent p

ower

fe

ed (V

olts

)

t1

E1

0.5E

1

E1 = 20 Voltst1 = 10 usec +/- 20%

Page 33: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 33

GLAST LAT Project June 9, EMI/EMC TRR

CS06 Perform – All LAT EquipmentCS06 Perform – All LAT Equipment

Time (usec)

Tran

sien

t im

pose

d on

inst

rum

ent p

ower

fe

ed (V

olts

)

t1

E1

0.5E

1

E1 = 5 Voltst1 = 10 usec +/- 20%

Page 34: GLAST Large Area Telescope EMI/EMC Test Readiness Review Michael Lovellette, Test Director NRL

EMI/EMC 34

GLAST LAT Project June 9, EMI/EMC TRR

EMI/EMC Test SummaryEMI/EMC Test Summary Ready to test

– Facility ready to support test– No outstanding issues with subsystem testing except

completion of radiator VCHP heater CS / RE verification– Supporting analyses for static magnetic field have been

accepted by Blanchette for GLAST project – Supporting analysis for RS103 18 – 40 GHz performance is in

release.