Glass Mountain Pipeline
David Minielly VP Operations- Rose Rock Midstream
1
Presentation Topics
I. Background II. Granite Wash III. Mississippi Lime IV. System Overview V. System Construction VI. System Operation VII. Quality Specification & Rates VIII.Conclusion
Platt's Conference- September 20, 2012
2
3
Structure of the Business
Glass Mountain Pipeline, LLC Ownership – Chesapeake Midstream Operating, LLC (Chesapeake) – Gavilon Energy Holdings II, LLC (Gavilon) – Glass Mountain Holding, LLC (SemGroup)
Partnership – Chesapeake – Committed shipper – Gavilon – Marketing and Cushing destination tanks – SemGroup – Construction and operation
Platt's Conference- September 20, 2012
Glass Mountain?
Northwestern Oklahoma – Major county Selenite crystals
Platt's Conference- September 20, 2012
4
Granite Wash
Large area spanning the Northern Texas Panhandle through Western Oklahoma and into Southwest Kansas
Oil and natural gas found in multiple zones at depths between 11,000 and 13,000 feet, with some natural gas as deep as 17,000 feet
The thickness and deposition may vary from 1,500 to 3,000 feet There are currently 3,600 Granite Wash wells and 922 Granite Wash
oil producers Current field prices yielding high rate of returns on production Well-known independent companies with stake in Granite Wash
– Chesapeake Energy – Apache Corp – Forest Oil Corp – St. Mary’s Land and Exploration – Penn Virginia
Platt's Conference- September 20, 2012
5
Granite Wash and Chesapeake
Chesapeake is the largest leasehold owner, producer, and most active driller in the Granite Wash – Chesapeake owns significant leasehold acres in the following
plays of the Granite Wash: – Cleveland and Tonkawa Tight Sand (Western Oklahoma,
Texas Panhandle) – Hogshooter Formation (Western Oklahoma, Texas Panhandle)
6
Platt's Conference- September 20, 2012
Granite Wash and Chesapeake
Cleveland and Tonkawa Tight Sands – Chesapeake owns approx. 525,000 net acres of leasehold in the
Cleveland play and 285,000 net acres in the Tonkawa play in western Oklahoma and Texas Panhandle
– Currently operating 13 rigs in the two plays
Hogshooter Wash – Chesapeake owns approx. 30,000 net acres in the Texas
Panhandle with 3 active wells in production – Currently drilling 2 wells with 11 scheduled to spud by end of 2012 – Chesapeake has identified approx. 60 potential drilling locations
in this play.
Platt's Conference- September 20, 2012
7
Granite Wash Takeaway Capacity
Platt's Conference- September 20, 2012
8
Mississippi Lime
More than 100 years ago, formation was referred to as the Burbank Field For 50 years, saw commercial production from thousands of vertical wells Due to limitations of traditional vertical drilling, these wells ran dry Advanced horizontal and hydraulic drilling styles that revolutionized
America’s shale formation are now being applied to limestone rock New technique allows drilling past the “chat” layer of rock and into the
tight lime below Due to its hard and porous nature, limestone is well suited for fracking The rock contains natural fissures and fractures that hold pockets of oil Horizontal drilling increases odds of hitting such a pocket Oil producing strata in the Mississippi Lime is just 4,000-6,000 feet deep
Platt's Conference- September 20, 2012
9
Mississippi Lime and Chesapeake
Chesapeake’s approx. 2.0 million net acres of leasehold is the industry’s largest position in the Mississippi Lime play in northern Oklahoma and southern Kansas
Since 2009, the company has drilled 158 horizontal producing wells
Currently operating 18 rigs in the play
Platt's Conference- September 20, 2012
10
Mississippi Lime Takeaway Capacity
Platt's Conference- September 20, 2012
11
Pipeline System Overview
GMPL will be a ~210 mile intrastate joint venture pipeline system. – North Segment - 28 miles of 12-inch Alva to Cleo Springs, OK – Western Segment – 79 miles of 12-inch Arnett to Cleo Springs, OK – 103 miles of 18-inch Cleo Springs to Cushing, OK – Design Capacity
– Operated as a batch system with 1480 psig MOP
Platt's Conference- September 20, 2012
12
Initial Maximum Northern Segment ~70 MBPD ~90 MBPD Western Segment ~77 MBPD ~85 MBPD Cleo Springs to Cushing ~147 MBPD ~175 MBPD
Pipeline System Overview (cont.)
Origination Tankage – 55Mbbl tank at Alva and Arnett – Two 150Mbbl breakout tanks at Cleo Springs – Two 10Mbbl injection tanks Western segment – One 10Mbbl injection tank Northern segment
Destination Tankage – Gavilon Terminal – 1.0 MMbbl (4X250Mbbl) – Direct connections to:
Enterprise Plains Rose Rock Midstream Magellan Coffeyville Resources
Platt's Conference- September 20, 2012
13
Pipeline System Map Platt's Conference- September 20, 2012
14
Pipeline System Construction
Glass Mountain Holdings LLC (SemGroup) Construction Manager
Schedule – Pipeline Formed May 2012 – Estimated construction schedule 18 months – To date:
■ Final route selection complete ■ 40% ROW purchased ■ Initial permitting and assessments complete ■ Pipe ordered ■ 75% design engineering complete ■ Major electrical and rotating equipment ordered ■ Construction January 2013 (3 to 4 spreads)
Platt's Conference- September 20, 2012
15
16
ROW & Permitting
ROW – Enid field office, 8 agents – 4 survey crews – Origination station land purchased – Block valve locations identified
Permitting – Archaeological and environmental permitting assessment complete – Submitted Air Permit Applications to ODEQ for station tankage – Evaluating Corp of Engineers Nationwide 12 Permit
Platt's Conference- September 20, 2012
Engineering
Construction – EPC contract with Select Engineering (Tulsa) – 75% complete with design engineering – Tank construction out to bid – Pipe Ordered 1/3 delivered October – Pumps and Motors ordered – 3 to 4 spreads (18” into 2 spreads) – On schedule for 4th QTR 2013
Platt's Conference- September 20, 2012
17
System Operation
Rose Rock Midstream – Pipeline Operator Gavilon – Cushing Tankage
– 4.1 MMbbl of existing shell capacity – Space to build another 3.0 MMbbl (civil work done) – 1.0 MMbbl of this existing capacity dedicated to GMPL.
Platt's Conference- September 20, 2012
18
19
Quality Specifications & Rates
Separate Quality Specifications – Western segment – Granite Wash – Northern segment – Mississippi Lime
Agreements & Rates – Long Term T&D with Chesapeake – Negotiating additional T&Ds – Walk-up rate as space allows
Platt's Conference- September 20, 2012
Conclusion
Pipeline System is well-positioned to benefit from supply/demand fundamentals and expansion opportunities
GMPL will provide producers with new and significant take away capacity and flow assurance for two exciting plays
Cushing provides multiple market opportunities for shippers Cushing should continue to strengthen with increased
capacity to Gulf Coast Pipeline Construction is on schedule
Platt's Conference- September 20, 2012
20