Methods of Erecting Girder
Citation preview
5/22/2018 Girder Erection Methodology
1/19
5/22/2018 Girder Erection Methodology
2/19
2ND FLOOR LEVEL
NAIA SKYWAY ERECTIION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
3/19
2ND FLOOR LEVEL
NAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
LIFTING SEQUENCE @ RAMP 1 BRIDGE 1
R1-8 TO R1-9 KEY PLAN
ERECTION: JUNE 14, 2006
(WEDNESDAY)
ERECTION: JUNE 12, 2006
(MONDAY)
ERECTION: JUNE 10, 2006(SATURDAY)
ERECTION: JUNE 5, 2006(MONDAY)
ERECTION: JUNE 8, 2006(THURSDAY)
ERECTION: MAY 23, 2006
(TUESDAY)
ERECTION: MAY 24, 2006(WEDNESDAY) CONSTRUCT RMD SUPPORT
NOTE:
AND FOUNDATION AFTER
SEQUENCE 1 IS INSTALLED
R1-11
J7
J6
R1-9R1-8
R1-12
SEQUENCE 7LIFTING
SEQUENCE 6LIFTING
SEQUENCE 5
LIFTING
SEQUENCE 4LIFTINGSEQUENCE 1
LIFTINGSEQUENCE 2
LIFTING
SEQUENCE 3LIFTING
RAMP
1BRIGE
1
R1-10
J13
J11
5/22/2018 Girder Erection Methodology
4/19
J6
R1-8 R1-9 R1-10
G1
G2
4 5
GIRDER ERECTION @ R1-9 TO J6 (G2)
2ND FLOOR LEVEL
NAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
5/19
R1-8R1-9 R1-10
G1
G2
45
J6
GIRDER ERECTION @ R1-9 TO J6 (G1)
2ND FLOOR LEVEL
NAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
6/19
G2
R1-9 R1-10
J6
BOOMLENGHT=48.OOM
BOOMLENGHT=34
.OOM
EL.49813
EL.35425
94.906 TONS
6 PART LINES
SWL = 72.0 TONS CAP.
6 PART LINES
SWL = 72.0 TONS CAP
LIFTING ELEVATION OF GIRDER 2 (R1-9 TO J6)
2ND FLOOR LEVEL
NAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
7/19
TOPOFSKYWAY
FIGURE1
1.LIFTINGOF GIRDER1 BYTANDEMLIFTUPWARDTODESIREDHEIGHT (BOTTOMOFSKYWAY)@NORTHEND
FIGURE2
1.LIFTINGOF GIRDER1 @SOUTHENDBY360TONERDEMAGCRANE(GUZENT) UPWARDABOVETHECOPING
FIGURE3
1.360 TONER CRANE(GUZENT)SHALLREMAINATEASE.2.DEMAG300 TONER CRANE(AALTAFIL)SHALLRAISE
THENORTHENDLOAD TODESIREDDISTANCEABOVE
PIER(R1-9)
2.DEMAG360 TONER CRANE(GUZENT)SHALLBOOMUPWARDABOVETHECOPINGPIERTO DESIREDDISTANCE
THECOPINGPIER(R1-10)
FIGURE4
1.BOTHCRANESSHALL SET THEGIRDERTOITS FINALLOCATION.
TOPOFSKYWAY
TOPOFSKYWAY
TOPOFSKYWAY
R1-9 R1-10
R1-9 R1-10
R1-9 R1-10
R1-9 R1-10
LIFTING SEQUENCE OF GIRER 2 (R1-9 TO J6)
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
8/19
NORTH BOUND
EDGE OFEXISTING SKYWAY
EDGE OFNEW SKYWAY RAMP
G-3
G-2
G-1
R1-8 R1-9
GIRDER ERECTION @ R1-8 TO R1-9
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
9/19
DEMAG 360
TONER CRANE
G3G2G1
LIFTING ELEVATION R1-8 TO R1-9
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
10/19ERECTION OF STEEL TRUSS BEAM
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
AREA
BACKFILLED
AREABACKFILLED
27.0MSET PT.
T.
TRUSS BEAM
TRUSS BEAM
R1-10
J11
4
ASSEMBLY AREA
R1-11
G2G1
5/22/2018 Girder Erection Methodology
11/19
J11C2
0
4
G2 (20.849 T)
G1 (18.303 T)
5
J11
J7
J4
R1-10
J6
GIRDER ERECTION OF J6 TO J7 OF RAMP 1
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
12/19
G1/G2TRUSSBEAM
J4
J6 J7
R1-10
LIFTING ELEVATION OF GIRDER 1 & 2, J6 TO J7
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
13/19
TONER CRANE
KATO 160
TONER CRANE
DEMAG 360
J-5
R1-10
J13
c23
J11
J-5
4
J-7
G2
65.453TONS
15.0M @ G2
17.0M @ G2
ASSEMBLY AREA
R1-11
G2G1
15.0M @ G2
FINAL PICK PT.
INITIAL SET PT.
6.5M @ G2FINAL PICK PT.
FINAL SET PT.
11.0M @ G2FINAL SET PT.
18.0M @ G2
INITIAL PICK PT.
GIRDER ERECTION @ J7 TO J13 (G2)
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
14/19
8.0M @ G1FINAL PICK PT.
FINAL PICK PT.
INITIAL PICK PT.
G1
ASSEMBLY AREA
DEMAG 300
TONER CRANE
AALTAFIL
R1-11
TONER CRANE
KATO 160
TONER CRANE
DEMAG 360
17.5M @ G1
15.0M @ G1
17.0M @ G1
J-5
R1-10
c23
J11
J-5
4
J-7
G2
G1
65.453TONS
62.127TONS
INITIAL SET PT.
16.0M @ G1FINAL SET PT.
FINAL PICK PT.18.0M @ G1
10.0M @ G1FINAL SET PT.
GIRDER ERECTION @ J7 TO J13 (G1)
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
15/19
G1/G2
J7
J11
LIFTING ELEVATION @ J7 TO J13
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
16/19
R1-11
R1-12
SOUTH SUPER HIGHWAY
R1-11a
J-13
G2-53.844T
ASSEMBLY AREA
G2
GIRDER ERECTION @ J7 TO J13 (G1)
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
5/22/2018 Girder Erection Methodology
17/19
G1-53.947T
ASSEMBLY AREA
G2G1
R1-11
R1-12
SOUTH SUPER HIGHWAY
J13
GIRDER ERECTION @ J13 TO R1-12 (G1)
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
NAIA SKYWAY ERECTION PROCEDURE
5/22/2018 Girder Erection Methodology
18/19
J13
G2
R1-12
R1-11
LIFTING ELEVATION GIRDER 1 & 2 OF J13 TO R1-12
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865
NAIA SKYWAY ERECTION PROCEDURE
5/22/2018 Girder Erection Methodology
19/19
2ND FLOOR LEVELNAIA SKYWAY ERECTION PROCEDURE
HIGHLIGHTS J# 6865