8
GIF++ TECHNICAL SPECIFICATIONS Dorothea Pfeiffer IF++ Users Meeting 9.06.2012

GIF++ Technical specifications

  • Upload
    toki

  • View
    42

  • Download
    0

Embed Size (px)

DESCRIPTION

GIF++ Technical specifications. Dorothea Pfeiffer. GIF++ Users Meeting 29.06.2012. Technical Specifications Facility. Radiation field Irradiation source: 137 Cs of 7 – 10 TBq, front and rear irradiation field (Talk by R. Fortin) - PowerPoint PPT Presentation

Citation preview

Page 1: GIF++ Technical specifications

GIF++ TECHNICAL SPECIFICATIONS

Dorothea PfeifferGIF++ Users Meeting29.06.2012

Page 2: GIF++ Technical specifications

2

Technical Specifications Facility

Radiation field Irradiation source: 137Cs of 7 – 10 TBq, front and rear

irradiation field (Talk by R. Fortin) Particle beam: 100 GeV muons, 104 muons per spill in 10 x

10 cm2

Area layout Bunker (enough space for detectors 3 m wide and 4 m high) Detector preparation area Short term storage area Control room/barracks

Control and logging system Hard-wired common control system (source, beam, gas) Web based monitoring and logging

29.06.2012Dorothea Pfeiffer

Source: http://cdsweb.cern.ch/record/1207380/files/SPSC-P-339.pdf

Page 3: GIF++ Technical specifications

3

GIF++ on H4 beamline in EHN1

Dorothea Pfeiffer

Control rooms

Courtesy S. Girod

Courtesy M. Jeckel

Page 4: GIF++ Technical specifications

4

Facility Design

Dorothea Pfeiffer

Courtesy S. Girod

Roof protects against radiation, allows ventilation, can be opened

Sliding door for detectorsDownstream

“PAD”

Dump

Downstream

Upstream Dump

Page 5: GIF++ Technical specifications

5

Technical Specifications Infrastructure

Peripheral infrastructure and services Electricity, Ethernet, compressed air, chilled water Cable and pipe trays Crane access Gas supply, distribution and detection Safety systems (beam, access, interlocks)

Infrastructure inside radiation area Scanning system/shuttle (scan equipment across the beam) [to

be discussed] Temperature controlled environment (20° C, 30-50% humidity) Trigger setup Dose rate monitoring Beam instrumentation

Neutral gases: Ar, N2, CO2, He, Xe at > 5 barFlammable gases: iC4H10, CH4, Ar/H2

Special gases: C2H2F4, SF6, CF4

Mixers, consumption monitors, analysis

29.06.2012Dorothea Pfeiffer

Source: http://cdsweb.cern.ch/record/1207380/files/SPSC-P-339.pdf

Page 6: GIF++ Technical specifications

6

GIF++ Use Case

29.06.2012Dorothea Pfeiffer

Arrival of detector through door on

Salève side

Lift detector with crane into

short time storage/waiting

area

Move detector to preparation

area

Validation tests of detector in

preparation area

Connect gas lines, power and control cables,

DAQ

Move detector into bunker

through sliding door

Mount detector on scanning

system

Start long term irradiation test

Control and monitor from control room (unattended mode also possible)

Page 7: GIF++ Technical specifications

7

Infrastructure Issues

Access system: Single Person Access System (SAS) is required due to source activity

Temperature and humidity control of bunker: required values, admissible fluctuations, implementation (tent)?

Space for racks in bunker really needed? Scanning device needed? How to implement it?

Others will come as we advance with the detailed design of the facility….

29.06.2012Dorothea Pfeiffer

Page 8: GIF++ Technical specifications

8

EN-MEF Team for GIF++

Overall management/physicist in charge: I. Efthymiopoulos

Project Engineer during construction: D. Pfeiffer Design and integration: S. Girod Technical support area and infrastructure: M.

Jeckel

1st milestone: provide a functional specification for GIF++ and a final design report by October 2012 Combined effort with PH & User Feedback

29.06.2012Dorothea Pfeiffer