Case Study Success Story: Water Efficiency, Energy Efficiency, top Health and Safety Giant Hypermarket, Kota Padawan (10 th Mile) The Clean CT01 Intelligent System for Condenser Water Treatment using Rainwater Harves?ng at 15 June 2012 1

Giant Case Study v2 - glwcasia.comglwcasia.com/casestudy/Giant Case Study.pdf · Giant Case Study v2.pptx Author: Bertram Created Date: 5/17/2013 4:46:22 AM

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Giant Case Study v2 - glwcasia.comglwcasia.com/casestudy/Giant Case Study.pdf · Giant Case Study v2.pptx Author: Bertram Created Date: 5/17/2013 4:46:22 AM

Case  Study  Success  Story:  

Water  Efficiency,  Energy  Efficiency,  top  Health  and  Safety      

Giant  Hypermarket,    Kota  Padawan  (10th  Mile)  

The  Clean  CT-­‐01™  Intelligent  System  for  Condenser  Water  Treatment  using  Rainwater  Harves?ng  

at  

15  June  2012  

1  

Page 2: Giant Case Study v2 - glwcasia.comglwcasia.com/casestudy/Giant Case Study.pdf · Giant Case Study v2.pptx Author: Bertram Created Date: 5/17/2013 4:46:22 AM

0.0  

1.0  

2.0  

3.0  

4.0  

5.0  

6.0  

7.0  

8.0  

9.0  

10.0  

6-­‐Oct-­‐11  

13-­‐Oct-­‐11  

20-­‐Oct-­‐11  

27-­‐Oct-­‐11  

3-­‐Nov-­‐11  

10-­‐Nov-­‐11  

17-­‐Nov-­‐11  

24-­‐Nov-­‐11  

1-­‐De

c-­‐11  

8-­‐De

c-­‐11  

15-­‐Dec-­‐11  

22-­‐Dec-­‐11  

29-­‐Dec-­‐11  

5-­‐Jan-­‐12  

12-­‐Ja

n-­‐12  

19-­‐Ja

n-­‐12  

26-­‐Ja

n-­‐12  

2-­‐Feb-­‐12  

9-­‐Feb-­‐12  

16-­‐Feb

-­‐12  

23-­‐Feb

-­‐12  

1-­‐Mar-­‐12  

8-­‐Mar-­‐12  

15-­‐M

ar-­‐12  

22-­‐M

ar-­‐12  

29-­‐M

ar-­‐12  

5-­‐Ap

r-­‐12  

12-­‐Apr-­‐12  

19-­‐Apr-­‐12  

26-­‐Apr-­‐12  

3-­‐May-­‐12  

10-­‐M

ay-­‐12  

17-­‐M

ay-­‐12  

24-­‐M

ay-­‐12  

31-­‐M

ay-­‐12  

Tempe

rature  (°F)  

Approach  Temperature  vs  Time  (Chiller  1)  

Evaporator   Condenser  

2  

Key  Benefit  #1:    Efficient  Chiller  Performance  

The  Great  LiUle  Water  Company  

24  Oct  2011   3  Feb  2012  

Page 3: Giant Case Study v2 - glwcasia.comglwcasia.com/casestudy/Giant Case Study.pdf · Giant Case Study v2.pptx Author: Bertram Created Date: 5/17/2013 4:46:22 AM

7  Feb  2012  24  Oct  2011  

3  The  Great  LiUle  Water  Company  

Key  Benefit  #1:    Efficient  Chiller  Performance  (cont.)  

0.0  

1.0  

2.0  

3.0  

4.0  

5.0  

6.0  

7.0  

8.0  

9.0  

10.0  

6-­‐Oct-­‐11  

13-­‐Oct-­‐11  

20-­‐Oct-­‐11  

27-­‐Oct-­‐11  

3-­‐Nov-­‐11  

10-­‐Nov-­‐11  

17-­‐Nov-­‐11  

24-­‐Nov-­‐11  

1-­‐De

c-­‐11  

8-­‐De

c-­‐11  

15-­‐Dec-­‐11  

22-­‐Dec-­‐11  

29-­‐Dec-­‐11  

5-­‐Jan-­‐12  

12-­‐Ja

n-­‐12  

19-­‐Ja

n-­‐12  

26-­‐Ja

n-­‐12  

2-­‐Feb-­‐12  

9-­‐Feb-­‐12  

16-­‐Feb

-­‐12  

23-­‐Feb

-­‐12  

1-­‐Mar-­‐12  

8-­‐Mar-­‐12  

15-­‐M

ar-­‐12  

22-­‐M

ar-­‐12  

29-­‐M

ar-­‐12  

5-­‐Ap

r-­‐12  

12-­‐Apr-­‐12  

19-­‐Apr-­‐12  

26-­‐Apr-­‐12  

3-­‐May-­‐12  

10-­‐M

ay-­‐12  

17-­‐M

ay-­‐12  

24-­‐M

ay-­‐12  

31-­‐M

ay-­‐12  

Tempe

rature  (°F)  

Approach  Temperature  vs  Time  (Chiller  2)  

Evaporator   Condenser  

Page 4: Giant Case Study v2 - glwcasia.comglwcasia.com/casestudy/Giant Case Study.pdf · Giant Case Study v2.pptx Author: Bertram Created Date: 5/17/2013 4:46:22 AM

Time   Evaporated  water  (L)  

1  Day   40,921  

1  Month   1,227,636  

1  Year   14,731,632  

System  Descrip?on  Chiller:    500T  OpWview  Control  Center  MaxE  Centrifugal  Liquid  Chiller  with  so\  starter  (2  units)  Cooling  Tower:    700T  Truwater  Counter  Flow  (2  units)  

Projected  Cooling  Tower  Evapora?on  Volume  based  on  Giant  Hypermarket  Kota  Padawan  Condenser  System  

Assump?ons  •  Evapora)on  Rate:  15  USGPM  •  Equipment  Running:  1  Unit  Chiller  and  1  Unit  Cooling  Tower    •  Running  Time:  12  hours/day,  7  days/week  

4  

Note:  The  city  water  consumpWon  also  includes  water  usage  for  general  cleaning  purposes  for  cooling  towers,  rainwater  storage  tanks  and  the  surroundings.  

0  

1,000  

2,000  

3,000  

4,000  

5,000  

6,000  

7,000  

6-­‐Oct-­‐11  

15-­‐Oct-­‐11  

19-­‐Oct-­‐11  

28-­‐Oct-­‐11  

3-­‐Nov-­‐11  

9-­‐Nov-­‐11  

21-­‐Nov-­‐11  

29-­‐Nov-­‐11  

8-­‐De

c-­‐11  

17-­‐Apr-­‐12  

3-­‐Feb-­‐12  

17-­‐Feb

-­‐12  

29-­‐Feb

-­‐12  

9-­‐Mar-­‐12  

20-­‐M

ar-­‐12  

30-­‐M

ar-­‐12  

10-­‐Apr-­‐12  

20-­‐Apr-­‐12  

30-­‐Apr-­‐12  

15-­‐M

ay-­‐12  

Volume  (m

³)  

Cumula?ve  Water  Consump?on  

Rainwater  ConsumpWon   City  Water  ConsumpWon   Total  Water  ConsumpWon  

Key  Benefit  #2:    Water  Savings  

Page 5: Giant Case Study v2 - glwcasia.comglwcasia.com/casestudy/Giant Case Study.pdf · Giant Case Study v2.pptx Author: Bertram Created Date: 5/17/2013 4:46:22 AM

Safety  &  Health  All   ingredients   in  Clean  CT-­‐01  products   are  either   food  grade,  biodegradable  or  used  in  food  surface  preparaWons.      No   toxic   chemicals   are   used   on   site,   eliminaWng   hazards   associated   with  convenWonal   water   treatment   chemicals,   such   as   handling   and   storage.   It   also  reduces  health  risks  to  building  occupants  or  passersby  within  the  vicinity  of  the  cooling  towers.    

5  The  Great  LiUle  Water  Company  

Cooling  tower  is  clean  and  clear.  

No  algae  growth  is  observed  in  the  cooling  towers.  Scaling  has  also  been  prevented.  

Infill  view  from  inside  the  cooling  tower  shows  no  signs  of  algae  growth  and  scale.  

Key  Benefit  #3:    Clean  System,  Good  Safety  &  Health