Ghana
Commercial Agricultural Project
Procurement List
Table 1. Investment promotion and investment climate Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Capacity building to promote international and domestic investment
1. Training in country
Training for government officials /a pers. 12 12 - - - 24 1,000 12.0 12.0 - - - 24.0
AGI private sector operators pers. 2 2 - - - 4 1,000 2.0 2.0 - - - 4.0
Subtotal Training in country 14.0 14.0 - - - 28.0
2. Training outside the country
Training for government officials /b pers. 12 12 - - - 24 5,000 60.0 60.0 - - - 120.0
AGI private sector operators pers. 2 2 - - - 4 5,000 10.0 10.0 - - - 20.0
Subtotal Training outside the country 70.0 70.0 - - - 140.0
4. Development of promotional material
Training of GIPC officers pers 5 5 - - - 10 2,000 10.0 10.0 - - - 20.0
Production of promotion material lumpsum 1 1 1 1 1 5 35,000 35.0 35.0 35.0 35.0 35.0 175.0
Subtotal Development of promotional material 45.0 45.0 35.0 35.0 35.0 195.0
Subtotal Capacity building to promote international and domestic investment 129.0 279.0 185.0 185.0 185.0 963.0
C. Equipment
Car : Pick-up Unit 3 - - - - 3 40,000 120.0 - - - - 120.0
Car : 4WD Station wagon Unit 2 - - - - 2 85,000 170.0 - - - - 170.0
Office equipment Lump sum 1 - - - - 1 25,000 25.0 - - - - 25.0
Office software Lump sum 1 - - - - 1 20,000 20.0 - - - - 20.0
Website development Unit 1 - - - - 1 30,000 30.0 - - - - 30.0
Subtotal Equipment 365.0 - - - - 365.0
Total Investment Costs 548.0 361.0 267.0 267.0 227.0 1,670.0
Total 668.0 481.0 387.0 387.0 347.0 2,270.0
Table 2. Facilitate access to land and improve land governance Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Facilitation of Land Acquisition Process
1. Facilitation of community entry process
Vehicles : Pick-up Unit 5 - - - - 5 40,000 200.0 - - - - 200.0
Vehicles: station wagon Unit 1 - - - - 1 85,000 85.0 - - - - 85.0
Office equipment Lump sum 2 1 1 1 - 5 85,000 170.0 85.0 85.0 85.0 - 425.0
Subtotal Facilitation of community entry process 535.0 205.0 205.0 165.0 - 1,110.0
2. Studies in project intervention areas Lump sum 1 1 - - - 2 150,000 150.0 150.0 - - - 300.0
5. Preparation of map products and attribute data in project intervention areas /aLump sum 1 3 3 2 1 10 300,000 300.0 900.0 900.0 600.0 300.0 3,000.0
6. Software for Lidar Mapping Lump sum 1 - - - - 1 10,000 10.0 - - - - 10.0
7. Desktop equipment Unit 4 - - - - 4 2,500 10.0 - - - - 10.0
8. Preparation of maps : dual frequencies GPS Unit 2 - - - - 2 50,000 100.0 - - - - 100.0
Subtotal Facilitation of Land Acquisition Process 1,235.0 1,385.0 1,235.0 835.0 310.0 5,000.0
B. Implementation of Recommendations in Resettlement Action Plans (RAP)
Vehicles Unit 2 - - - - 2 40,000 80.0 - - - - 80.0
Office equipment Lump sum 1 - - - - 1 25,000 25.0 - - - - 25.0
Subtotal Implementation of Recommendations in Resettlement Action Plans (RAP) 105.0 - - - - 105.0
C. Facilitation of Establishment of Land Banks Concept
Preparation of map products and attribute data in project intervention areas Lump sum 1 1 1 1 1 5 200,000 200.0 200.0 200.0 200.0 200.0 1,000.0
Consultancy for compilation and publication of Land Bank register Lump sum 1 1 - - - 2 50,000 50.0 50.0 - - - 100.0
1
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Ghana
Commercial Agricultural Project
Procurement List
Subtotal Facilitation of Establishment of Land Banks Concept 250.0 250.0 200.0 200.0 200.0 1,100.0
Total Investment Costs 1,590.0 1,635.0 1,435.0 1,035.0 510.0 6,205.0
Total 1,890.0 1,950.0 1,750.0 1,335.0 780.0 7,705.0
2
Ghana
Commercial Agricultural Project
Procurement List
Table 3. Outgrower facilitation arrangements Quantities Unit Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Technical assistance on Outgrower schemes Lump sum 200.0 200.0 200.0 - - 600.0
B. Capacity building on Outgrower schemes promotion Lump sum 200.0 200.0 200.0 - - 600.0
C. Policy support on Outgrower schemes promotion Lump sum 200.0 200.0 200.0 - - 600.0
Total 600.0 600.0 600.0 - - 1,800.0
Table 4. Project Coordination, M&E and KM Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Support to PIU
1. Rehabilitation of PIU office Unit 1 - - - - 1 800,000 800.0 - - - - 800.0
2. Vehicles
Vehicle 4x4 SW Unit 1 - - - - 1 85,000 85.0 - - - - 85.0
Vehicle 4x4 Pick-up Unit 6 - - - - 6 40,000 240.0 - - - - 240.0
Motorbike Unit 6 - - - - 6 4,000 24.0 - - - - 24.0
Subtotal Vehicles 349.0 - - - - 349.0
3. Office equipment
Desktop computer sets set 7 - - 7 - 14 2,500 17.5 - - 17.5 - 35.0
Laptops Unit 6 - - 6 - 12 1,300 7.8 - - 7.8 - 15.6
Printer Unit 10 - - - - 10 900 9.0 - - - - 9.0
Air conditionner Unit 7 - - - - 7 600 4.2 - - - - 4.2
Communication Lump sum 1 - 1 - - 2 6,500 6.5 - 6.5 - - 13.0
PC Projector Unit 7 - - - - 7 2,500 17.5 - - - - 17.5
Photocopier (large) Unit 7 - - - - 7 2,500 17.5 - - - - 17.5
Office furniture Lump sum 1 - - - - 1 20,000 20.0 - - - - 20.0
Digital camera Unit 7 - - - - 7 1,000 7.0 - - - - 7.0
Subtotal Office equipment 107.0 - 6.5 25.3 - 138.8
4. Staff training
Staff training Lump sum 2 2 2 2 - 8 10,000 20.0 20.0 20.0 20.0 - 80.0
Exchange visits visit - 2 1 1 - 4 10,000 - 20.0 10.0 10.0 - 40.0
Subtotal Staff training 20.0 40.0 30.0 30.0 - 120.0
Subtotal Support to PIU 1,276.0 40.0 36.5 55.3 - 1,407.8
B. Establishment of SADA Satellite Team (SST)
1. Rehabilitation of SST office Lump sum 1 - - - - 1 200,000 200.0 - - - - 200.0
2. Vehicles
Vehicle 4x4 SW Unit 1 - - - - 1 85,000 85.0 - - - - 85.0
Vehicle 4x4 Pick-up Unit 1 - - - - 1 40,000 40.0 - - - - 40.0
Motorbike Unit 2 - - - - 2 4,000 8.0 - - - - 8.0
Subtotal Vehicles 133.0 - - - - 133.0
3. Office equipment
Desktop computer sets set 3 - - - - 3 2,500 7.5 - - - - 7.5
Laptops Unit 2 - - - - 2 1,300 2.6 - - - - 2.6
Printer Unit 3 - - - - 3 900 2.7 - - - - 2.7
Air conditionner Unit 2 - - - - 2 600 1.2 - - - - 1.2
Communication Lump sum 1 - - - - 1 6,500 6.5 - - - - 6.5
PC Projector Unit 1 - - - - 1 2,500 2.5 - - - - 2.5
Photocopier (large) Unit 1 - - - - 1 2,500 2.5 - - - - 2.5
3
Ghana
Commercial Agricultural Project
Procurement List
Office furniture Lump sum 1 - - - - 1 12,000 12.0 - - - - 12.0
Digital camera Unit 2 - - - - 2 1,000 2.0 - - - - 2.0
Subtotal Office equipment 39.5 - - - - 39.5
4. Staff training
Staff training Lump sum 1 1 - - - 2 10,000 10.0 10.0 - - - 20.0
Exchange visits visit - 2 1 1 - 4 10,000 - 20.0 10.0 10.0 - 40.0
Subtotal Staff training 10.0 30.0 10.0 10.0 - 60.0
Subtotal Establishment of SADA Satellite Team (SST) 382.5 30.0 10.0 10.0 - 432.5
4
Ghana
Commercial Agricultural Project
Procurement List
Table 4. Project Coordination, M&E and KM (Contd.) Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
E. Establish and operate M&E and KM systems
Unit 10 15 25 30 35 115 2,000 20.0 30.0 50.0 60.0 70.0 230.0
Baseline studies in the Accra Plains Unit 1 - - - - 1 20,000 20.0 - - - - 20.0
Baseline studies in the SADA zone Unit 1 - - - - 1 20,000 20.0 - - - - 20.0
Communication strategy design (contract) Unit 1 1 1 1 1 5 10,000 10.0 10.0 10.0 10.0 10.0 50.0
Beneficiary Assessment Unit 1 1 1 1 1 5 10,000 10.0 10.0 10.0 10.0 10.0 50.0
Environmental and social monitoring Person-
mth
- - 4 4 4 12 12,000 - - 48.0 48.0 48.0 144.0
Annual audit Unit 1 1 1 1 1 5 60,000 60.0 60.0 60.0 60.0 60.0 300.0
Mid-Term Review Unit - - 1 - - 1 100,000 - - 100.0 - - 100.0
Completition report Unit - - - - 1 1 200,000 - - - - 200.0 200.0
Monitoring visits Person-
mth
4 5 6 6 6 27 10,000 40.0 50.0 60.0 60.0 60.0 270.0
Monitoring report preparation Unit 6 12 12 12 12 54 1,000 6.0 12.0 12.0 12.0 12.0 54.0
Subtotal Establish and operate M&E and KM systems 186.0 172.0 350.0 260.0 470.0 1,438.0
Total Investment Costs 4,790.5 263.0 417.5 346.3 491.0 6,308.3
II. Recurrent Costs
A. Staff PIU (Recruitment)
Programme coordinator Person-
mth
12 12 12 12 12 60 6,500 78.0 78.0 78.0 78.0 78.0 390.0
PPP Irrigation Specialist Person-
mth
12 12 12 12 - 48 10,000 120.0 120.0 120.0 120.0 - 480.0
Infrastructure Development Specialist Person-
mth
12 12 12 12 12 60 4,000 48.0 48.0 48.0 48.0 48.0 240.0
Gender Specialist Person-
mth
12 12 12 12 12 60 5,500 66.0 66.0 66.0 66.0 66.0 330.0
Financial controller Person-
mth
12 12 12 12 12 60 5,500 66.0 66.0 66.0 66.0 66.0 330.0
Accountant Person-
mth
24 24 24 24 24 120 4,000 96.0 96.0 96.0 96.0 96.0 480.0
Procurement officer Person-
mth
12 12 12 12 12 60 3,000 36.0 36.0 36.0 36.0 36.0 180.0
M&E specialist Person-
mth
12 12 12 12 12 60 4,000 48.0 48.0 48.0 48.0 48.0 240.0
Secretary Person-
mth
12 12 12 12 12 60 1,200 14.4 14.4 14.4 14.4 14.4 72.0
Driver Person-
mth
60 60 60 60 60 300 800 48.0 48.0 48.0 48.0 48.0 240.0
Subtotal Staff PIU 620.4 620.4 620.4 620.4 500.4 2,982.0
B. Staff SST
Programme Assistant Person-
mth
12 12 12 12 12 60 2,000 24.0 24.0 24.0 24.0 24.0 120.0
Accountant Person-
mth
24 24 24 24 24 120 4,000 96.0 96.0 96.0 96.0 96.0 480.0
M&E assistant Person-
mth
12 12 12 12 12 60 4,000 48.0 48.0 48.0 48.0 48.0 240.0
Secretary Person-
mth
12 12 12 12 12 60 1,200 14.4 14.4 14.4 14.4 14.4 72.0
Driver Person-
mth
24 24 24 24 24 120 800 19.2 19.2 19.2 19.2 19.2 96.0
Subtotal Staff SST 201.6 201.6 201.6 201.6 201.6 1,008.0
Total Recurrent Costs 967.0 967.0 967.0 967.0 847.0 4,715.0
Total 5,757.5 1,230.0 1,384.5 1,313.3 1,338.0 11,023.3
Production of documented outputs (print publications, posters, videos,
radio programmes etc)
5
Ghana
Commercial Agricultural Project
Procurement List
Table 5. MOFA Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Plant Protection and Regulatory Services
Vehicles : Pick-up Unit 2 - - - - 2 40,000 80.0 - - - - 80.0
Office equipment Lump sum 2.5 - - - - 2.5
Subtotal Plant Protection and Regulatory Services 172.5 90.5 25.5 40.5 25.5 354.5
B. Environment Land and Water Management Unit (ELWMU)
Development of sensitivity map for SADA and Accra Plains Lump sum 100.0 100.0 - - - 200.0
Vehicles : Pick-up Unit 2 - - - - 4 40,000 80.0 - - - - 160.0
Office equipment Lump sum 5.0 - - - - 5.0
Subtotal Environment Land and Water Management Unit( ELWMU) 775.0 610.0 110.0 110.0 - 1,605.0
C. Women in Agricultural Development (WIAD)
Vehicles : Pick-up Unit 2 - - - - 1 40,000 80.0 - - - - 40.0
Office equipment Lump sum 1.3 - - - - 1.3
Subtotal Women in Agricultural Development(WIAD) 113.3 72.0 52.0 52.0 12.0 301.3
D. Ghana Irrigation Development Authority (GIDA)
Supervise infrastructure development Lump sum - 10.0 10.0 10.0 - 30.0
Vehicles : Pick-up Unit 2 - - - - 1 40,000 80.0 - - - - 40.0
Office equipment Lump sum 2.5 - - - - 2.5
Subtotal Ghana Irrigation Development Authority (GIDA) 142.5 50.0 10.0 10.0 - 212.5
E. Agricultural Engineering Services Directorate (AESD)
Vehicles : Pick-up Unit 1 - - - - 1 40,000 40.0 - - - - 40.0
Office equipment Lump sum 2.5 - - - - 2.5
Subtotal Agricultural Engineering Services Directorate (AESD) 112.5 60.0 60.0 60.0 - 292.5
F. Extension Services
Vehicles : Pick-up Unit 1 - - - - 1 40,000 40.0 - - - - 40.0
Office equipment Lump sum 5.0 - - - - 5.0
Subtotal Extension Services 145.0 18.0 18.0 18.0 18.0 217.0
G. College of Consumer and Agriculture Science
Lump sum 80.0 - - - - 80.0
Vehicles : Pick-up Unit 1 - - - - 1 40,000 40.0 - - - - 40.0
Office equipment Lump sum 1.3 - - - - 1.3
Field equipment Lump sum 50.0 - - - - 50.0
Subtotal College of Consumer and Agriculture Science 218.3 47.0 47.0 12.0 - 324.3
Total Investment Costs 1,679.0 947.5 322.5 302.5 55.5 3,307.0
II. Recurrent Costs
1,679.0 947.5 322.5 302.5 55.5 3,307.0
Table 6. Securing PPP and smallholder linkages in the Accra plains Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Tecnical assistance for PPP Lump sum 500.0 500.0 300.0 300.0 300.0 1,900.0
B. Feasibility study for PPP in the Accra plains Unit 1 - - - - 1 3,000,000 3,000.0 - - - - 3,000.0
C. Smallholder participation in PPP Unit 1 - - - - 1 500,000 500.0 - - - - 500.0
Rehabilation of SIRCE, Kpong and Leventis, Legon to train farmers and
youth in project area
6
Ghana
Commercial Agricultural Project
Procurement List
D. Viability gap funding Lump sum 40,000.0 - - - - 40,000.0
Total 44,000.0 500.0 300.0 300.0 300.0 45,400.0
7
Ghana
Commercial Agricultural Project
Procurement List
Quantities Unit Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Matching grants extension cost/firm /a Lump sum 450.0 450.0 450.0 450.0 450.0 2,250.0
B. Matching grants ICT/firm /b Lump sum 180.0 180.0 180.0 180.0 180.0 900.0
C. TA, facilitation, mediation Lump sum 540.0 540.0 540.0 540.0 540.0 2,700.0
Total 1,170.0 1,170.0 1,170.0 1,170.0 1,170.0 5,850.0
Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Infrastructure development
Infrastructure and land development cost nucleus Ha 1,000 1,000 1,000 1,000 - 4,000 3,000 3,000.0 3,000.0 3,000.0 3,000.0 - 12,000.0
Infrastructure and land development cost out-growers Ha 1,500 1,500 1,500 1,500 - 6,000 3,000 4,500.0 4,500.0 4,500.0 4,500.0 - 18,000.0
Subtotal Infrastructure development 7,500.0 7,500.0 7,500.0 7,500.0 - 30,000.0
B. Pre-feasibility studies inland valleys Unit 3 2 - - - 5 1,000,000 3,000.0 2,000.0 - - - 5,000.0
C. Power grid connectivity Unit 3 2 - - - 5 200,000 600.0 400.0 - - - 1,000.0
D. Power grid connectivity in private irrigation schemes Unit 1 1 1 1 1 5 200,000 200.0 200.0 200.0 200.0 200.0 1,000.0
Total 11,300.0 10,100.0 7,700.0 7,700.0 200.0 37,000.0
Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Civil Works
Unit 2 2 2 2 2 10 130,000 260.0 260.0 260.0 260.0 260.0 1,300.0
Unit 1 1 1 1 - 4 600,000 600.0 600.0 600.0 600.0 - 2,400.0
Unit 5 5 5 5 - 20 160,000 800.0 800.0 800.0 800.0 - 3,200.0
Unit 3 3 3 2 - 11 720,000 2,160.0 2,160.0 2,160.0 1,440.0 - 7,920.0
Subtotal Civil Works 3,820.0 3,820.0 3,820.0 3,100.0 260.0 14,820.0
B. TA, feasibility study Lump sum 300.0 300.0 - - - 600.0
C. Rehabilitation and concessioning of rice and maize mills Lump sum 2,500.0 2,500.0 - - - 5,000.0
Total 6,620.0 6,620.0 3,820.0 3,100.0 260.0 20,420.0
Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. BDS for input dealers, mechanization services Unit 20 20 20 20 20 100 10,000 200.0 200.0 200.0 200.0 200.0 1,000.0
Total 200.0 200.0 200.0 200.0 200.0 1,000.0
Table 8. Investing in nucleus farms, including inland valleys for
rice production: Comp_3.2
Table 7. Financing the establishment and the development of
contract farming arrangements: Comp_3.1
Table 9. Rehabilitation and new construction of agricultural
storage infrastructure: Comp_3.3
Table 10. BDS and investing in processing businesses: Comp_3.4
Rehabilitation cost/mt rural (2/3 of $200/mt)
Rehabilitation cost/mt urban (2/3 of $300/mt)
New warehouses rural areas (cost/mt $200) /a
New warehouses urban areas (cost/mt $300) /b
8
Ghana
Commercial Agricultural Project
Goods Procurement List
Table 1. Investment promotion and investment climate Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Capacity building to promote international and domestic investment
C. Equipment
Car : Pick-up Unit 3 - - - - 3 40,000 120.0 - - - - 120.0
Car : 4WD Station wagon Unit 2 - - - - 2 95,000 190.0 - - - - 190.0
Office equipment Lump sum 1 - - - - 1 25,000 25.0 - - - - 25.0
Office software Lump sum 1 - - - - 1 20,000 20.0 - - - - 20.0
Website Design and Domain Hosting Unit 1 - - - - 1 30,000 30.0 - - - - 30.0
Subtotal Equipment 385.0 - - - - 385.0
Table 2. Facilitate access to land and improve land governance Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Facilitation of Land Acquisition Process
1. Facilitation of community entry process
Vehicles : Pick-up Unit 5 - - - - 5 40,000 200.0 - - - - 200.0
Vehicles: station wagon Unit 1 - - - - 1 95,000 95.0 - - - - 95.0
Office equipment Lump sum 2 1 1 1 - 5 85,000 170.0 85.0 85.0 85.0 - 425.0
Subtotal Facilitation of community entry process 465.0 85.0 85.0 85.0 - 720.0
6. Software for Lidar Mapping Lump sum 1 - - - - 1 20,000 20.0 - - - - 20.0
7. Desktop equipment Unit 4 - - - - 4 2,500 10.0 - - - - 10.0
Subtotal Facilitation of Land Acquisition Process 30.0 - - - - 30.0
B. Implementation of Recommendations in Resettlement Action Plans (RAP)
Vehicles Unit 2 - - - - 2 40,000 80.0 - - - - 80.0
Office equipment Lump sum 1 - - - - 1 25,000 25.0 - - - - 25.0
Subtotal Implementation of Recommendations in Resettlement Action Plans (RAP) 105.0 - - - - 105.0
1 Procure - Goods
Ghana
Commercial Agricultural Project
Goods Procurement List
Table 4. Project Coordination, M&E and KM Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Support to PIU
2. Vehicles
Vehicle 4x4 SW Unit 1 - - - - 1 95,000 95.0 - - - - 85.0
Vehicle 4x4 Pick-up Unit 6 - - - - 6 40,000 240.0 - - - - 240.0
Motorbike Unit 6 - - - - 6 4,000 24.0 - - - - 24.0
Subtotal Vehicles 359.0 - - - - 349.0
3. Office equipment
Desktop computer sets set 7 - - 7 - 14 2,500 17.5 - - 17.5 - 35.0
Laptops Unit 6 - - 6 - 12 1,300 7.8 - - 7.8 - 15.6
Printer Unit 10 - - - - 10 900 9.0 - - - - 9.0
Air conditionner Unit 7 - - - - 7 1200 4.2 - - - - 4.2
Communication Lump sum 1 - 1 - - 2 6,500 6.5 - 6.5 - - 13.0
PC Projector Unit 7 - - - - 7 2,500 17.5 - - - - 17.5
Photocopier (desktop) Unit 7 - - - - 7 2,500 17.5 - - - - 17.5
Office furniture Lump sum 1 - - - - 1 20,000 20.0 - - - - 20.0
Digital camera Unit 7 - - - - 7 1,000 7.0 - - - - 7.0
Subtotal Office equipment 107.0 - 6.5 25.3 - 138.8
B. Establishment of SADA Satellite Team (SST)
2. Vehicles
Vehicle 4x4 SW Unit 1 - - - - 1 95,000 95.0 - - - - 85.0
Vehicle 4x4 Pick-up Unit 1 - - - - 1 40,000 40.0 - - - - 40.0
Motorbike Unit 2 - - - - 2 4,000 8.0 - - - - 8.0
Subtotal Vehicles 143.0 - - - - 133.0
3. Office equipment
Desktop computer sets set 3 - - - - 3 2,500 7.5 - - - - 7.5
Laptops Unit 2 - - - - 2 1,300 2.6 - - - - 2.6
Printer Unit 3 - - - - 3 900 2.7 - - - - 2.7
Air conditionner Unit 2 - - - - 2 1200 1.2 - - - - 1.2
Communication Lump sum 1 - - - - 1 6,500 6.5 - - - - 6.5
PC Projector Unit 1 - - - - 1 2,500 2.5 - - - - 2.5
Photocopier (desktop) Unit 1 - - - - 1 2,500 2.5 - - - - 2.5
Office furniture Lump sum 1 - - - - 1 12,000 12.0 - - - - 12.0
Digital camera Unit 2 - - - - 2 1,000 2.0 - - - - 2.0
Subtotal Office equipment 39.5 - - - - 39.5
2 Procure - Goods
Ghana
Commercial Agricultural Project
Goods Procurement List
Table 5. MOFA Quantities Base Cost ('000)
Unit 2013 2014 2015 2016 2017 Total Unit Cost 2013 2014 2015 2016 2017 Total
I. Investment Costs
A. Plant Protection and Regulatory Services
Vehicles : Pick-up Unit 2 - - - - 2 40,000 80.0 - - - - 80.0
Office equipment Lump sum 2.5 - - - - 2.5
Subtotal Plant Protection and Regulatory Services 82.5 - - - - 82.5
B. Environment Land and Water Management Unit (ELWMU)
Vehicles : Pick-up Unit 2 - - - - 2 40,000 80.0 - - - - 160.0
Office equipment Lump sum 5.0 - - - - 5.0
Subtotal Environment Land and Water Management Unit( ELWMU) 85.0 - - - - 165.0
C. Women in Agricultural Development (WIAD)
Vehicles : Pick-up Unit 2 - - - - 1 40,000 80.0 - - - - 40.0
Office equipment Lump sum 1.3 - - - - 1.3
Subtotal Women in Agricultural Development(WIAD) 81.3 - - - - 41.3
D. Ghana Irrigation Development Authority (GIDA)
Vehicles : Pick-up Unit 1 - - - - 1 40,000 40.0 - - - - 40.0
Office equipment Lump sum 2.5 - - - - 2.5
Subtotal Ghana Irrigation Development Authority (GIDA) 42.5 - - - - 42.5
E. Agricultural Engineering Services Directorate (AESD)
Vehicles : Pick-up Unit 1 - - - - 1 40,000 40.0 - - - - 40.0
Office equipment Lump sum 2.5 - - - - 2.5
Subtotal Agricultural Engineering Services Directorate (AESD) 42.5 - - - - 42.5
F. Extension Services
Vehicles : Pick-up Unit 2 - - - - 2 40,000 80.0 - - - - 40.0
Office equipment Lump sum 5.0 - - - - 5.0
Subtotal Extension Services 85.0 - - - - 45.0
G. College of Consumer and Agriculture Science
Vehicles : Pick-up Unit 1 - - - - 1 40,000 40.0 - - - - 40.0
Office equipment Lump sum 1.3 - - - - 1.3
Field equipment Lump sum 50.0 - - - - 50.0
Subtotal College of Consumer and Agriculture Science 91.3 - - - - 91.3
3 Procure - Goods
Ghana
Commercial Agricultural Project
Goods Procurement List
Qty Unit Amt Description Package
28 units 1,120,000.00 Pickups Lot 1
5 units 475,000.00 SW Lot 2
8 units 32,000.00 Motorcycles Lot 3
1,627,000.00
14 units 35,000.00 Desktop computer sets Lot 1
8 units 10,400.00 Laptops Lot 2
13 units 11,700.00 Printer Lot 3
2 lumps 40,000.00 Office software Lot 4
97,100.00
8 units 20,000.00 PC Projector Lot 1
8 units 20,000.00 Photocopier (large) Lot 2
2 sets 40,000.00 Office furniture Lot 3
9 units 9,000.00 Digital camera Lot 4
89,000.00
various lumps 240,000.00 Office Furniture various
1 lumps 50,000.00 Field equipment
1 lumps 30,000.00 Website development
2 sets 13,000.00 Communication Equipment
9 units 10,800.00 Air conditionner
4 Procure - Goods
No.Implementing
AgencyDescription
Package
Number
Plan vs.
Actual
Lot
Number
Estimated
Amount in US$
Procurement
Method
Pre-or Post
Qualification
Prior or Post
Review
Plan 30,000.00$
Actual 25,973.90$
Plan 1,627,000.00$
Actual
Plan 48,000.00$
Actual
Plan 46,000.00$
Actual
Plan 48,000.00$
Actual
Plan 200,000.00$
Actual
Plan 20,000.00$
Actual
Plan 46,000.00$
Actual
Plan 45,000.00$
Actual
Plan 45,000.00$
Actual
Plan 20,000.00$
Actual
Plan 40,000.00$
Actual
PostMOFA/GCAP/GE/NS/2013/09 1 NS Post11PIU Procurement of Office Software
PIU
PIU
PIU
PIU/SADA
PIU/GIDA
Procurement of Computers and
Accessories, PIU and SADA offices
1
Procurement of Field Equipment
Procurement of Communication
Equipment for Project Staff
PIU
PIU
PIU
PIU
PIU/SADA/IasProcurement of 2½HP Split Air
Conditioners for Project offices
1 NS
PostNS
10Procurement of Contract
Management Software & Training
Post
MOFA/GCAP/GE/NS/2013/11 1Procurement of vehicle tyres &
batteries for project vehicles
13
Procurement of Office Equipment
for PIU offices
MOFA/GCAP/GE/NS/2013/01
Post
Post
MOFA/GCAP/GE/NS/2013/01 4 NS Post
Procurement of Office Equipment,
SADA offices
Procurement of Office Furniture,
PIU & SADA offices
3
MOFA/GCAP/GE/NS/2013/08
Various
Post
BASIC DATA
Post Post
3 NS Post
Post
Prior
MOFA/GCAP/GE/NCB/2013/01 Various NCB Post
MOFA/GCAP/GE/NS/2013/02 4 NS
NS Post
4
5
6
8
2
NS
MOFA/GCAP/GE/NS/2013/04 1 NS7
MOFA/GCAP/GE/NS/2013/05 1
Post9 Procurement of Accounting
Software and Training
1MOFA/GCAP/GE/NS/2013/06
NS Post Post
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
MOFA/GCAP/GE/NS/2013/03
Post
PIU/SADA/IAsProcurement of Vehicles and
Motorcycles for Project Staff
MOFA/GCAP/GE/ICB/2013/01 3 ICB Post
Post
Post Post
Post
Plan 2,215,000.00$
ActualTotal Cost
No.Implementing
AgencyDescription
Package
Number
Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
MOFA/GCAP/GE/NS/2013/0911PIU Procurement of Office Software
PIU
PIU
PIU
PIU/SADA
PIU/GIDA
Procurement of Computers and
Accessories, PIU and SADA offices
1
Procurement of Field Equipment
Procurement of Communication
Equipment for Project Staff
PIU
PIU
PIU
PIU
PIU/SADA/IasProcurement of 2½HP Split Air
Conditioners for Project offices
10Procurement of Contract
Management Software & Training
MOFA/GCAP/GE/NS/2013/11Procurement of vehicle tyres &
batteries for project vehicles
13
Procurement of Office Equipment
for PIU offices
MOFA/GCAP/GE/NS/2013/01
MOFA/GCAP/GE/NS/2013/01
Procurement of Office Equipment,
SADA offices
Procurement of Office Furniture,
PIU & SADA offices
3
MOFA/GCAP/GE/NS/2013/08
MOFA/GCAP/GE/NCB/2013/01
MOFA/GCAP/GE/NS/2013/024
5
6
8
2
MOFA/GCAP/GE/NS/2013/047
MOFA/GCAP/GE/NS/2013/05
9 Procurement of Accounting
Software and Training
MOFA/GCAP/GE/NS/2013/06
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
MOFA/GCAP/GE/NS/2013/03
PIU/SADA/IAsProcurement of Vehicles and
Motorcycles for Project Staff
MOFA/GCAP/GE/ICB/2013/01
Spec. Proc Notice
Advert
Preparation &
SubmissionNo-objection
Date
On-line UNDB/
Gateway/
National Press
Bid Invitation
Date
Bid Closing/
Opening
Submission
Bid Evaluation
Report
22/12/2012 N/A N/A 23/12/2012 08/01/2013 06/02/2013
03/01/2013 11/01/2013 25/01/2013 28/01/2013
28/06/2013 12/07/2013 19/07/2013 20/07/2013 18/09/2013 17/10/2013
02/06/2013 N/A N/A 03/06/2013 19/06/2013 18/07/2013
02/06/2013 N/A N/A 03/06/2013 19/06/2013 18/07/2013
02/06/2013 N/A N/A 03/06/2013 19/06/2013 18/07/2013
30/08/2013 13/09/2013 20/09/2013 21/09/2013 02/11/2013 01/12/2013
12/06/2013 N/A N/A 19/06/2013 03/07/2013 10/07/2013
13/06/2013 N/A N/A 20/06/2013 04/07/2013 11/07/2013
25/06/2013 N/A N/A 02/07/2013 16/07/2013 23/07/2013
25/06/2013 N/A N/A 02/07/2013 16/07/2013 23/07/2013
13/06/2013 N/A N/A 20/06/2013 04/07/2013 11/07/2013
25/06/2013 N/A N/A 02/07/2013 16/07/2013 23/07/2013
Bid EvaluationBidding Period
Draft Bid Documents, including
specs and quantities, draft SPN
Plan
ActualTotal Cost
No.Implementing
AgencyDescription
Package
Number
Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
MOFA/GCAP/GE/NS/2013/0911PIU Procurement of Office Software
PIU
PIU
PIU
PIU/SADA
PIU/GIDA
Procurement of Computers and
Accessories, PIU and SADA offices
1
Procurement of Field Equipment
Procurement of Communication
Equipment for Project Staff
PIU
PIU
PIU
PIU
PIU/SADA/IasProcurement of 2½HP Split Air
Conditioners for Project offices
10Procurement of Contract
Management Software & Training
MOFA/GCAP/GE/NS/2013/11Procurement of vehicle tyres &
batteries for project vehicles
13
Procurement of Office Equipment
for PIU offices
MOFA/GCAP/GE/NS/2013/01
MOFA/GCAP/GE/NS/2013/01
Procurement of Office Equipment,
SADA offices
Procurement of Office Furniture,
PIU & SADA offices
3
MOFA/GCAP/GE/NS/2013/08
MOFA/GCAP/GE/NCB/2013/01
MOFA/GCAP/GE/NS/2013/024
5
6
8
2
MOFA/GCAP/GE/NS/2013/047
MOFA/GCAP/GE/NS/2013/05
9 Procurement of Accounting
Software and Training
MOFA/GCAP/GE/NS/2013/06
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
MOFA/GCAP/GE/NS/2013/03
PIU/SADA/IAsProcurement of Vehicles and
Motorcycles for Project Staff
MOFA/GCAP/GE/ICB/2013/01
No-objection
Date
18/02/2013
28/01/2013
30/10/2013
31/07/2013
30/07/2013
31/07/2013
14/12/2013
N/A
N/A
N/A
N/A
N/A
N/A
Bid Evaluation
Plan
ActualTotal Cost
No.Implementing
AgencyDescription
Package
Number
Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
MOFA/GCAP/GE/NS/2013/0911PIU Procurement of Office Software
PIU
PIU
PIU
PIU/SADA
PIU/GIDA
Procurement of Computers and
Accessories, PIU and SADA offices
1
Procurement of Field Equipment
Procurement of Communication
Equipment for Project Staff
PIU
PIU
PIU
PIU
PIU/SADA/IasProcurement of 2½HP Split Air
Conditioners for Project offices
10Procurement of Contract
Management Software & Training
MOFA/GCAP/GE/NS/2013/11Procurement of vehicle tyres &
batteries for project vehicles
13
Procurement of Office Equipment
for PIU offices
MOFA/GCAP/GE/NS/2013/01
MOFA/GCAP/GE/NS/2013/01
Procurement of Office Equipment,
SADA offices
Procurement of Office Furniture,
PIU & SADA offices
3
MOFA/GCAP/GE/NS/2013/08
MOFA/GCAP/GE/NCB/2013/01
MOFA/GCAP/GE/NS/2013/024
5
6
8
2
MOFA/GCAP/GE/NS/2013/047
MOFA/GCAP/GE/NS/2013/05
9 Procurement of Accounting
Software and Training
MOFA/GCAP/GE/NS/2013/06
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
MOFA/GCAP/GE/NS/2013/03
PIU/SADA/IAsProcurement of Vehicles and
Motorcycles for Project Staff
MOFA/GCAP/GE/ICB/2013/01
Contract Amount in
US$
Date
Contract
Award
Date
Contract
Signature
Name of Contract
Winner
$30,000.00 25/02/2013 18/03/2013
25,973.90$ 29/01/2013 31/01/2013
06/11/2013 27/11/2013
07/08/2013 28/08/2013
06/08/2013 27/08/2013
07/08/2013 28/08/2013
21/12/2013 11/01/2014
17/07/2013 24/07/2013
18/07/2013 25/07/2013
30/07/2013 06/08/2013
30/07/2013 06/08/2013
18/07/2013 25/07/2013
30/07/2013 06/08/2013
Contract Finalization
True Faith Trd.
Ent
Plan
ActualTotal Cost
55,973.90
No.Implementing
AgencyDescription
Package
Number
Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
MOFA/GCAP/GE/NS/2013/0911PIU Procurement of Office Software
PIU
PIU
PIU
PIU/SADA
PIU/GIDA
Procurement of Computers and
Accessories, PIU and SADA offices
1
Procurement of Field Equipment
Procurement of Communication
Equipment for Project Staff
PIU
PIU
PIU
PIU
PIU/SADA/IasProcurement of 2½HP Split Air
Conditioners for Project offices
10Procurement of Contract
Management Software & Training
MOFA/GCAP/GE/NS/2013/11Procurement of vehicle tyres &
batteries for project vehicles
13
Procurement of Office Equipment
for PIU offices
MOFA/GCAP/GE/NS/2013/01
MOFA/GCAP/GE/NS/2013/01
Procurement of Office Equipment,
SADA offices
Procurement of Office Furniture,
PIU & SADA offices
3
MOFA/GCAP/GE/NS/2013/08
MOFA/GCAP/GE/NCB/2013/01
MOFA/GCAP/GE/NS/2013/024
5
6
8
2
MOFA/GCAP/GE/NS/2013/047
MOFA/GCAP/GE/NS/2013/05
9 Procurement of Accounting
Software and Training
MOFA/GCAP/GE/NS/2013/06
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
MOFA/GCAP/GE/NS/2013/03
PIU/SADA/IAsProcurement of Vehicles and
Motorcycles for Project Staff
MOFA/GCAP/GE/ICB/2013/01
Opening of
Letter of Credit
Arrival
of
Goods
Inspection
Final
Acceptance
16/06/2013 16/07/2013
04/12/2013 25/02/2014 27/03/2014
26/11/2013 26/12/2013
25/11/2013 25/12/2013
26/11/2013 26/12/2013
11/04/2014 11/05/2014
22/08/2013 04/09/2013
23/08/2013 05/09/2013
13/08/2013 26/08/2013
13/08/2013 26/08/2013
23/08/2013 05/09/2013
13/08/2013 26/08/2013
Contract Implementation
Remarks
Plan
ActualTotal Cost
No.Implementing
AgencyDescription
Package
Number
Plan
vs.
Actual
Lot
Number
Lumpsum
or BoQ
Procureme
nt Method
Estimated
Amount in
US$
Pre or Post
Qualification
Prior or Post
Review
Plan 1,080,000.00$
Actual
Plan 7,500,000.00$
Actual
Plan 800,000.00$
Actual
Plan 860,000.00$
Actual
Plan 2,960,000.00$
Actual
Plan 2,500,000.00$
Actual
Total Cost Plan 15,700,000.00$
Actual -$
Pre Prior6 Rehabilitation of rice and maize mills,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/06 3 BoQ NCB
Prior
Post
BoQ NCB
3
Post
Prior
Post
3
Infrastructure and land development,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/02
MOFA/GCAP/WK/NCB/2013/03
10
PrePower grid connectivity to project
interventions areasPIU
Rehabilitation of GCAP Permanent
Office, SADA satelite Office and Col.
Of Agric. and Consumer Science, UG,
Legon.
MOFA/GCAP/WK/NCB/2013/01 3 BoQ NCB
Basic Data
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
1
2 Post
PIU
PIU
Post Post
NCB
4 BoQ NCB
NCB
Post
BoQ
BoQRehabilitation of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/044PIU
PIU
PIU
5 Construction of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/05 8
No.Implementing
AgencyDescription
Package
Number
Plan
vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Total Cost Plan
Actual
6 Rehabilitation of rice and maize mills,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/06
3
Infrastructure and land development,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/02
MOFA/GCAP/WK/NCB/2013/03Power grid connectivity to project
interventions areasPIU
Rehabilitation of GCAP Permanent
Office, SADA satelite Office and Col.
Of Agric. and Consumer Science, UG,
Legon.
MOFA/GCAP/WK/NCB/2013/01
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
1
2
PIU
PIU
Rehabilitation of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/044PIU
PIU
PIU
5 Construction of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/05
Spec Proc Notice
Advert
Preparation &
SubmissionNo-objection
Date
On-line UNDB
Gateway
National Press
Bid Invitation
Date
Bid Closing/
Opening
30/09/2013 14/10/2013 21/10/2013 21/10/2013 22/11/2013
30/12/2014 13/01/2015 20/01/2015 20/01/2015 21/02/2015
30/12/2014 N/A 20/01/2015 20/01/2015 21/02/2015
30/06/2014 N/A 21/07/2014 21/07/2014 22/08/2014
28/06/2014 N/A 19/07/2014 19/07/2014 23/08/2014
28/06/2014 12/07/2014 19/07/2014 19/07/2014 20/08/2014
Draft Bid Documents, including specs
and quantities, draft SPN Bidding Period
No.Implementing
AgencyDescription
Package
Number
Plan
vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Total Cost Plan
Actual
6 Rehabilitation of rice and maize mills,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/06
3
Infrastructure and land development,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/02
MOFA/GCAP/WK/NCB/2013/03Power grid connectivity to project
interventions areasPIU
Rehabilitation of GCAP Permanent
Office, SADA satelite Office and Col.
Of Agric. and Consumer Science, UG,
Legon.
MOFA/GCAP/WK/NCB/2013/01
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
1
2
PIU
PIU
Rehabilitation of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/044PIU
PIU
PIU
5 Construction of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/05
Submission
Bid Evaluation
Report
No-objection
Date
Contract Amount in
US$
Date
Contract
Award
Name of
Contract Winner
20/12/2013 03/01/2014 10/01/2014
21/03/2015 04/04/2015 11/04/2015
21/03/2015 N/A 02/05/2015
19/09/2014 31/10/2014
20/09/2014 N/A 01/11/2014
17/09/2014 01/10/2014 08/10/2014
#REF!
Contract FinalizationBid Evaluation
No.Implementing
AgencyDescription
Package
Number
Plan
vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Total Cost Plan
Actual
6 Rehabilitation of rice and maize mills,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/06
3
Infrastructure and land development,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/02
MOFA/GCAP/WK/NCB/2013/03Power grid connectivity to project
interventions areasPIU
Rehabilitation of GCAP Permanent
Office, SADA satelite Office and Col.
Of Agric. and Consumer Science, UG,
Legon.
MOFA/GCAP/WK/NCB/2013/01
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
1
2
PIU
PIU
Rehabilitation of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/044PIU
PIU
PIU
5 Construction of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/05
Date
Contract
Signature
03/02/2014
05/05/2015
26/05/2015
24/11/2014
25/11/2014
01/11/2014
Contract Finalization
No.Implementing
AgencyDescription
Package
Number
Plan
vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Total Cost Plan
Actual
6 Rehabilitation of rice and maize mills,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/06
3
Infrastructure and land development,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/02
MOFA/GCAP/WK/NCB/2013/03Power grid connectivity to project
interventions areasPIU
Rehabilitation of GCAP Permanent
Office, SADA satelite Office and Col.
Of Agric. and Consumer Science, UG,
Legon.
MOFA/GCAP/WK/NCB/2013/01
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
1
2
PIU
PIU
Rehabilitation of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/044PIU
PIU
PIU
5 Construction of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/05
Mobilization
Advance
Payment
Substantial
Completion
Final
Acceptance
Final
Cost
24/02/2014 23/08/2014 21/11/2014
26/05/2015 22/11/2015 20/02/2016
16/06/2015 13/12/2015 12/03/2016
15/12/2014 13/06/2015 11/09/2015
16/12/2014 14/06/2015 12/09/2015
22/11/2014 21/05/2015 19/08/2015
Contract Implementation
No.Implementing
AgencyDescription
Package
Number
Plan
vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Total Cost Plan
Actual
6 Rehabilitation of rice and maize mills,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/06
3
Infrastructure and land development,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/02
MOFA/GCAP/WK/NCB/2013/03Power grid connectivity to project
interventions areasPIU
Rehabilitation of GCAP Permanent
Office, SADA satelite Office and Col.
Of Agric. and Consumer Science, UG,
Legon.
MOFA/GCAP/WK/NCB/2013/01
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
1
2
PIU
PIU
Rehabilitation of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/044PIU
PIU
PIU
5 Construction of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/05
Remarks
No.Implementing
AgencyDescription
Package
Number
Plan
vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Total Cost Plan
Actual
6 Rehabilitation of rice and maize mills,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/06
3
Infrastructure and land development,
Accra Plains and SADA zone
MOFA/GCAP/WK/NCB/2013/02
MOFA/GCAP/WK/NCB/2013/03Power grid connectivity to project
interventions areasPIU
Rehabilitation of GCAP Permanent
Office, SADA satelite Office and Col.
Of Agric. and Consumer Science, UG,
Legon.
MOFA/GCAP/WK/NCB/2013/01
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
1
2
PIU
PIU
Rehabilitation of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/044PIU
PIU
PIU
5 Construction of agricultural storage
infrastructure, SADA zone
MOFA/GCAP/WK/NCB/2013/05
Contract
Type
No.Implementing
AgencyDescription
Package
Number Plan vs.
Actual
Selection
Method
Lumpsum/
Time-Based
Estimated
Amount
in US$
Prior/Post
Review
Plan $300,000.00
Actual
Plan $100,000.00
Actual
Plan $1,000,000.00
Actual
Plan $100,000.00
Actual
Plan $3,000,000.00
Actual
Plan $3,000,000.00
Actual
7 Plan $1,000,000.00
Actual
Plan $200,000.00
Actual
Consultancy Service to Undertake Full
Feasibility study for PPP in the SADA Zone
and Transaction Advisory Services
QBS
QBS Lumpsum
Lumpsum Consultancy Service forPre-feasibility
studies for Accra Plains PPP Irrigation
Project
8 Lumpsum
Prior
LCS
6
2
Consultancy Service to Undertake Full
Feasibility study for PPP in the Accra Plains
and Transaction Advisory Services
MOFA/GCAP/QBS/2013/02
MOFA/GCAP/LCS/2013/01Consultancy service for the redesign and
supervision of GCAP project offices to be
rehabilitated
MOFA/GCAP/QCBS/2012/01
Consultancy Services for the Capacity
Building in Procurement and Financial
Management of PIU/IAs
Post
Prior
Prior
PriorQCBS
Lumpsum
PriorQCBS
1
MOFA/GCAP/QBS/2013/03
Lumpsum
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
3
Technical assistance on Outgrower
schemes
MOFA/GCAP/QCBS/2013/02
PIU/GIDA
PIU
PIU
PIU
PIU/GIDA
PIU Consultancy Service to Undertake Market
Structure Survey of Warehouses and Design
& Supervision of Works
MOFA/GCAP/QCBS/2013/02 QCBS Lumpsum Prior
4 PIU MOFA/GCAP/CQS/2013/01 CQS Lumpsum Post
5 PIU Technical feasibility studies on investment
in land development for commercial
agriculture SADA, zone valleys
MOFA/GCAP/QBS/2013/01 QBS Lumpsum
Plan $500,000.00
Actual
Plan Lumpsum $150,000.00
Actual
Plan $50,000.00
Actual
Plan $40,000.00
Actual
Plan $180,000.00
Actual
Plan $20,000.00
Actual
Plan $30,000.00
Actual
Plan $150,000.00
Actual
Plan $40,000.00
Actual
Plan $200,000.00
Actual
Plan $100,000.00
Actual
Consultancy Service to Undertake Studies in
project intervention areas
Recruitment of project staff IC17 PIU
Consultancy Service to Research on
Investment Climate within the Agric Sector
IC
LCS
Time based Prior
MOFA/GCAP/CQS/2013/04
External Audit
Consultancy Service to Undertake
Beneficiary Assessment
MOFA/GCAP/LCS/2013/02
MOFA/GCAP/IC/2013/02
Lumpsum
QCBS
Post
MOFA/GCAP/IC/2013/01
Consultancy for compilation and publication
of Land Bank register
Consultancy Service to Undertake Baseline
studies in Project Areas
MOFA/GCAP/CQS/2013/01 Lumpsum Post
MOFA/GCAP/QCBS/2013/03
CQSMOFA/GCAP/CQS/2013/02
Prior
Post
9 PIU/IAs Lumpsum
LAP
10
MOFA/GCAP/CQS/2013/03
12
Technical assistance on PPP for institutions
responsible for project transactions
PIU
15 Lumpsum Post
16
14
Lumpsum
Consultancy Service to Design
Communication Strategy
Post
13 PIU
PIU
PIU
PIU Time based
Prior
19 Technical assistance and capacity building
for key policy reforms
MOFA/GCAP/QCBS/2013/04
MOFA/GCAP/IC/2013/03Consultancy Service to Develop strategic
plan for commercial agriculture investment
20
IC Time based
Lumpsum
Post
Prior
Post
QCBS
CQS Lumpsum MOFA/GCAP/CQS/2013/05
18
CQS
CQS
CQS
GIPC
PIU
GIPC
Plan $50,000.00
Actual
Plan $300,000.00
Actual
Plan $150,000.00
Actual
Plan $40,000.00
Actual
Plan $80,000.00
Actual
Plan $250,000.00
Actual
Plan $150,000.00
Actual
Plan $140,000.00
Actual
Plan $40,000.00
Actual
Plan $40,000.00
Actual
Plan $200,000.00
Consultancy Service to Develop Framework
for Out grower scheme
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
PIU
Consultancy Service for Participatory
Planning of Land use at Community Level
21
Technical assistance on PPP for investors
PIU/GIPC
PIU
22
23
24
28
Recruitment of Long-term irrigation PPP
advisor
Consultancy Service for Necessary
Safeguard Assessment
Consultancy Service Undertake Market Test
to Assess Perspective of Investors
Consultancy Service to Assess Alternative
Mechanisms for Irrigation, PPP
Consultancy Service (Fund Manager) to
manage Matching Grant
29
30
31
25
26
27
CQS
CQSMOFA/GCAP/CQS/2013/08
MOFA/GCAP/QCBS/2013/06Consultancy Service for Capacity Building
and Training on agribusiness related to PPP
Consultancy Service to Develop
Framework/Protocols for dealing with
investors at agric Sector Level
Post
Post
Post
Prior
Post
Lumpsum
Lumpsum
Prior
Time based
Time based
Prior
PriorMOFA/GCAP/QCBS/2013/05
MOFA/GCAP/IC/2013/05
QCBS
Lumpsum
MOFA/GCAP/CQS/2013/06
MOFA/GCAP/CQS/2013/07
Lumpsum
CQS
Lumpsum
Lumpsum
MOFA/GCAP/IC/2013/04
MOFA/GCAP/CQS/2013/09
IC
ICLAP
GIPC
PIU
PIU
IC Time based
PIU
PIU
PIU
GIPC/PIU
CQS
QCBS
Post
MOFA/GCAP/IC/2013/9 IC Time based
QCBSMOFA/GCAP/CQS/2013/10
Post
PriorLumpsum
MOFA/GCAP/IC/2013/06
Actual
Plan $150,000.00
Actual
Plan $150,000.00
Actual
Plan $40,000.00
Actual
Plan $150,000.00
Actual
Sub-total Cost Plan $12,090,000.00
Actual
Post
33 EPA/PIU Constultancy Service to Develop Strategic
Social and Environmtal Assessment, SADA
MOFA/GCAP/CQS/2013/13 CQS Lumpsum
MOFA/GCAP/CQS/2013/11 CQS Lumpsum
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
32
PIU
35
31
LCSConsultancy Service to Undertake Annual
Value Chain Survey and other surveys and
studies
Post
Consultancy Service to Develop
Implemention Plan of PPP on APIP and on
National scale
PostLumpsum MOFA/GCAP/LCS/2013/03PIU
PIU/GIDA
QCBSMOFA/GCAP/CQS/2013/10 PriorLumpsum
Post34 GIPC MOFA-ABSD Consultancy Service to Develop Database of
Active and Inactive Agric Sector Investors
MOFA/GCAP/CQS/2013/14 CQS Lumpsum
No.Implementing
AgencyDescription
Package
Number Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
7 Plan
Actual
Plan
Actual
Consultancy Service to Undertake Full
Feasibility study for PPP in the SADA Zone
and Transaction Advisory Services
Consultancy Service forPre-feasibility
studies for Accra Plains PPP Irrigation
Project
8
6
2
Consultancy Service to Undertake Full
Feasibility study for PPP in the Accra Plains
and Transaction Advisory Services
MOFA/GCAP/QBS/2013/02
MOFA/GCAP/LCS/2013/01Consultancy service for the redesign and
supervision of GCAP project offices to be
rehabilitated
MOFA/GCAP/QCBS/2012/01
Consultancy Services for the Capacity
Building in Procurement and Financial
Management of PIU/IAs
1
MOFA/GCAP/QBS/2013/03
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
3
Technical assistance on Outgrower
schemes
MOFA/GCAP/QCBS/2013/02
PIU/GIDA
PIU
PIU
PIU
PIU/GIDA
PIU Consultancy Service to Undertake Market
Structure Survey of Warehouses and Design
& Supervision of Works
MOFA/GCAP/QCBS/2013/02
4 PIU MOFA/GCAP/CQS/2013/01
5 PIU Technical feasibility studies on investment
in land development for commercial
agriculture SADA, zone valleys
MOFA/GCAP/QBS/2013/01
Prep &
Submission
No-objection
Date
On-line UNDB
Gateway
National Press
Lead-time
before shortlist
Submission
Date
05/04/2012 19/04/2012 02/03/2013 13/04/2013 05/04/2012
13/03/2012 14/03/2012 11/11/2011 07/12/2011 13/03/2012
10/04/2013 24/04/2013 20/02/2013 20/03/2013 10/04/2013
30/03/2013 14/04/2013 26/02/2013 19/03/2013 30/03/2013
20/02/2013 06/03/2013 01/02/2013 15/02/2013 20/02/2013
05/05/2013 19/05/2013 05/04/2013 19/04/2013 05/05/2013
20/08/2013 03/09/2013 02/07/2013 23/07/2013 20/08/2013
30/08/2013 13/09/2013 09/07/2013 30/07/2013 30/08/2013
01/10/2013 15/10/2013 23/08/2013 13/09/2013 01/10/2013
Request for EOI
(where required)Preparation
Request for Proposals
Short
List
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Consultancy Service to Undertake Studies in
project intervention areas
Recruitment of project staff17 PIU
Consultancy Service to Research on
Investment Climate within the Agric Sector
MOFA/GCAP/CQS/2013/04
External Audit
Consultancy Service to Undertake
Beneficiary Assessment
MOFA/GCAP/LCS/2013/02
MOFA/GCAP/IC/2013/02
MOFA/GCAP/IC/2013/01
Consultancy for compilation and publication
of Land Bank register
Consultancy Service to Undertake Baseline
studies in Project Areas
MOFA/GCAP/CQS/2013/01
MOFA/GCAP/QCBS/2013/03
MOFA/GCAP/CQS/2013/02
9 PIU/IAs
LAP
10
MOFA/GCAP/CQS/2013/03
12
Technical assistance on PPP for institutions
responsible for project transactions
PIU
15
16
14
Consultancy Service to Design
Communication Strategy
13 PIU
PIU
PIU
PIU
19 Technical assistance and capacity building
for key policy reforms
MOFA/GCAP/QCBS/2013/04
MOFA/GCAP/IC/2013/03Consultancy Service to Develop strategic
plan for commercial agriculture investment
20 MOFA/GCAP/CQS/2013/05
18 GIPC
PIU
GIPC
11/12/2013 26/12/2013 23/10/2013 13/11/2013 11/12/2013
04/06/2013 18/06/2013 23/04/2013 14/05/2013 04/06/2013
14/04/2013 28/04/2013 03/03/2013 07/04/2013 14/04/2013
11/05/2013 25/05/2013 31/03/2013 27/04/2013 11/05/2013
10/10/2013 24/10/2013 N/A N/A 10/10/2013
28/09/2013 12/10/2013 17/08/2013 14/09/2013 28/09/2013
29/10/2013 12/11/2013 N/A N/A 29/10/2013
31/03/2013 14/04/2013 N/A N/A 31/03/2013
22/07/2013 05/08/2013 N/A N/A 22/07/2013
13/10/2013 27/10/2013 25/08/2013 22/09/2013 13/10/2013
06/10/2013 20/10/2013 25/08/2013 22/09/2013 06/10/2013
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Consultancy Service to Develop Framework
for Out grower scheme
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
PIU
Consultancy Service for Participatory
Planning of Land use at Community Level
21
Technical assistance on PPP for investors
PIU/GIPC
PIU
22
23
24
28
Recruitment of Long-term irrigation PPP
advisor
Consultancy Service for Necessary
Safeguard Assessment
Consultancy Service Undertake Market Test
to Assess Perspective of Investors
Consultancy Service to Assess Alternative
Mechanisms for Irrigation, PPP
Consultancy Service (Fund Manager) to
manage Matching Grant
29
30
31
25
26
27 MOFA/GCAP/CQS/2013/08
MOFA/GCAP/QCBS/2013/06Consultancy Service for Capacity Building
and Training on agribusiness related to PPP
Consultancy Service to Develop
Framework/Protocols for dealing with
investors at agric Sector Level
MOFA/GCAP/QCBS/2013/05
MOFA/GCAP/IC/2013/05
MOFA/GCAP/CQS/2013/06
MOFA/GCAP/CQS/2013/07
MOFA/GCAP/IC/2013/04
MOFA/GCAP/CQS/2013/09
LAP
GIPC
PIU
PIU
PIU
PIU
PIU
GIPC/PIU
MOFA/GCAP/IC/2013/9
MOFA/GCAP/CQS/2013/10
MOFA/GCAP/IC/2013/06
07/06/2013 21/06/2013 26/04/2013 17/05/2013 07/06/2013
14/08/2013 28/08/2013 26/06/2013 24/07/2013 14/08/2013
17/12/2013 31/12/2013 N/A N/A 17/12/2013
03/06/2013 17/06/2013 22/04/2013 20/05/2013 03/06/2013
03/06/2013 17/06/2013 12/03/2013 09/04/2013 03/06/2013
08/12/2013 22/12/2013 20/05/2013 17/06/2013 08/12/2013
10/12/2013 24/12/2013 29/10/2013 26/11/2013 10/12/2013
12/12/2013 26/12/2013 29/10/2013 26/11/2013 12/12/2013
27/05/2013 10/06/2013 N/A N/A 27/05/2013
29/05/2013 12/06/2013 N/A N/A 29/05/2013
30/05/2013 13/06/2013 18/04/2013 16/05/2013 30/05/2013
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Sub-total Cost Plan
Actual
33 EPA/PIU Constultancy Service to Develop Strategic
Social and Environmtal Assessment, SADA
MOFA/GCAP/CQS/2013/13
MOFA/GCAP/CQS/2013/11
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
32
PIU
35
31
Consultancy Service to Undertake Annual
Value Chain Survey and other surveys and
studies
Consultancy Service to Develop
Implemention Plan of PPP on APIP and on
National scale
MOFA/GCAP/LCS/2013/03PIU
PIU/GIDA
MOFA/GCAP/CQS/2013/10
34 GIPC MOFA-ABSD Consultancy Service to Develop Database of
Active and Inactive Agric Sector Investors
MOFA/GCAP/CQS/2013/14
01/05/2013 15/05/2013 20/03/2013 17/04/2013 01/05/2013
15/04/2013 29/04/2013 04/03/2013 01/04/2013 15/04/2013
13/08/2013 27/08/2013 02/07/2013 30/07/2013 13/08/2013
13/05/2013 27/05/2013 01/04/2013 06/05/2013 13/05/2013
No.Implementing
AgencyDescription
Package
Number Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
7 Plan
Actual
Plan
Actual
Consultancy Service to Undertake Full
Feasibility study for PPP in the SADA Zone
and Transaction Advisory Services
Consultancy Service forPre-feasibility
studies for Accra Plains PPP Irrigation
Project
8
6
2
Consultancy Service to Undertake Full
Feasibility study for PPP in the Accra Plains
and Transaction Advisory Services
MOFA/GCAP/QBS/2013/02
MOFA/GCAP/LCS/2013/01Consultancy service for the redesign and
supervision of GCAP project offices to be
rehabilitated
MOFA/GCAP/QCBS/2012/01
Consultancy Services for the Capacity
Building in Procurement and Financial
Management of PIU/IAs
1
MOFA/GCAP/QBS/2013/03
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
3
Technical assistance on Outgrower
schemes
MOFA/GCAP/QCBS/2013/02
PIU/GIDA
PIU
PIU
PIU
PIU/GIDA
PIU Consultancy Service to Undertake Market
Structure Survey of Warehouses and Design
& Supervision of Works
MOFA/GCAP/QCBS/2013/02
4 PIU MOFA/GCAP/CQS/2013/01
5 PIU Technical feasibility studies on investment
in land development for commercial
agriculture SADA, zone valleys
MOFA/GCAP/QBS/2013/01
No-objection
Date
19/04/2012
14/03/2012
24/04/2013
13/04/2013
06/03/2013
19/05/2013
03/09/2013
13/09/2013
15/10/2013
Short
List
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Consultancy Service to Undertake Studies in
project intervention areas
Recruitment of project staff17 PIU
Consultancy Service to Research on
Investment Climate within the Agric Sector
MOFA/GCAP/CQS/2013/04
External Audit
Consultancy Service to Undertake
Beneficiary Assessment
MOFA/GCAP/LCS/2013/02
MOFA/GCAP/IC/2013/02
MOFA/GCAP/IC/2013/01
Consultancy for compilation and publication
of Land Bank register
Consultancy Service to Undertake Baseline
studies in Project Areas
MOFA/GCAP/CQS/2013/01
MOFA/GCAP/QCBS/2013/03
MOFA/GCAP/CQS/2013/02
9 PIU/IAs
LAP
10
MOFA/GCAP/CQS/2013/03
12
Technical assistance on PPP for institutions
responsible for project transactions
PIU
15
16
14
Consultancy Service to Design
Communication Strategy
13 PIU
PIU
PIU
PIU
19 Technical assistance and capacity building
for key policy reforms
MOFA/GCAP/QCBS/2013/04
MOFA/GCAP/IC/2013/03Consultancy Service to Develop strategic
plan for commercial agriculture investment
20 MOFA/GCAP/CQS/2013/05
18 GIPC
PIU
GIPC
25/12/2013
18/06/2013
28/04/2013
25/05/2013
24/10/2013
12/10/2013
12/11/2013
14/04/2013
05/08/2013
27/10/2013
20/10/2013
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Consultancy Service to Develop Framework
for Out grower scheme
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
PIU
Consultancy Service for Participatory
Planning of Land use at Community Level
21
Technical assistance on PPP for investors
PIU/GIPC
PIU
22
23
24
28
Recruitment of Long-term irrigation PPP
advisor
Consultancy Service for Necessary
Safeguard Assessment
Consultancy Service Undertake Market Test
to Assess Perspective of Investors
Consultancy Service to Assess Alternative
Mechanisms for Irrigation, PPP
Consultancy Service (Fund Manager) to
manage Matching Grant
29
30
31
25
26
27 MOFA/GCAP/CQS/2013/08
MOFA/GCAP/QCBS/2013/06Consultancy Service for Capacity Building
and Training on agribusiness related to PPP
Consultancy Service to Develop
Framework/Protocols for dealing with
investors at agric Sector Level
MOFA/GCAP/QCBS/2013/05
MOFA/GCAP/IC/2013/05
MOFA/GCAP/CQS/2013/06
MOFA/GCAP/CQS/2013/07
MOFA/GCAP/IC/2013/04
MOFA/GCAP/CQS/2013/09
LAP
GIPC
PIU
PIU
PIU
PIU
PIU
GIPC/PIU
MOFA/GCAP/IC/2013/9
MOFA/GCAP/CQS/2013/10
MOFA/GCAP/IC/2013/06
21/06/2013
28/08/2013
31/12/2013
17/06/2013
17/06/2013
22/12/2013
24/12/2013
26/12/2013
10/06/2013
12/06/2013
13/06/2013
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Sub-total Cost Plan
Actual
33 EPA/PIU Constultancy Service to Develop Strategic
Social and Environmtal Assessment, SADA
MOFA/GCAP/CQS/2013/13
MOFA/GCAP/CQS/2013/11
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
32
PIU
35
31
Consultancy Service to Undertake Annual
Value Chain Survey and other surveys and
studies
Consultancy Service to Develop
Implemention Plan of PPP on APIP and on
National scale
MOFA/GCAP/LCS/2013/03PIU
PIU/GIDA
MOFA/GCAP/CQS/2013/10
34 GIPC MOFA-ABSD Consultancy Service to Develop Database of
Active and Inactive Agric Sector Investors
MOFA/GCAP/CQS/2013/14
15/05/2013
29/04/2013
27/08/2013
27/05/2013
No.Implementing
AgencyDescription
Package
Number Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
7 Plan
Actual
Plan
Actual
Consultancy Service to Undertake Full
Feasibility study for PPP in the SADA Zone
and Transaction Advisory Services
Consultancy Service forPre-feasibility
studies for Accra Plains PPP Irrigation
Project
8
6
2
Consultancy Service to Undertake Full
Feasibility study for PPP in the Accra Plains
and Transaction Advisory Services
MOFA/GCAP/QBS/2013/02
MOFA/GCAP/LCS/2013/01Consultancy service for the redesign and
supervision of GCAP project offices to be
rehabilitated
MOFA/GCAP/QCBS/2012/01
Consultancy Services for the Capacity
Building in Procurement and Financial
Management of PIU/IAs
1
MOFA/GCAP/QBS/2013/03
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
3
Technical assistance on Outgrower
schemes
MOFA/GCAP/QCBS/2013/02
PIU/GIDA
PIU
PIU
PIU
PIU/GIDA
PIU Consultancy Service to Undertake Market
Structure Survey of Warehouses and Design
& Supervision of Works
MOFA/GCAP/QCBS/2013/02
4 PIU MOFA/GCAP/CQS/2013/01
5 PIU Technical feasibility studies on investment
in land development for commercial
agriculture SADA, zone valleys
MOFA/GCAP/QBS/2013/01
Invitation
Date
Submission/
Opening
Date
Submission
Evaluation
Report (T)
No-objection
Evaluation
Report (T)
Opening
Financial
Proposals
26/04/2012 15/10/2012 29/10/2012 12/11/2012 19/11/2012
25/05/2012 09/11/2012 20/11/2012 14/12/2012 24/12/2012
01/05/2013 30/05/2013 13/06/2013 27/06/2013 04/07/2013
20/04/2013 25/05/2013 08/06/2013 22/06/2013 29/06/2013
13/03/2013 01/09/2013 15/09/2013 29/09/2013 06/10/2013
26/05/2013 14/11/2013 28/11/2013 12/12/2013 19/12/2013
10/09/2013 22/10/2013 05/11/2013 19/11/2013 25/11/2013
20/09/2013 01/11/2013 15/11/2013 29/11/2013 05/12/2013
22/10/2013 26/11/2013 10/12/2013 24/12/2013 31/12/2013
Consultant
Proposals
Proposal Evaluation
Technical (T) & Financial (F)
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Consultancy Service to Undertake Studies in
project intervention areas
Recruitment of project staff17 PIU
Consultancy Service to Research on
Investment Climate within the Agric Sector
MOFA/GCAP/CQS/2013/04
External Audit
Consultancy Service to Undertake
Beneficiary Assessment
MOFA/GCAP/LCS/2013/02
MOFA/GCAP/IC/2013/02
MOFA/GCAP/IC/2013/01
Consultancy for compilation and publication
of Land Bank register
Consultancy Service to Undertake Baseline
studies in Project Areas
MOFA/GCAP/CQS/2013/01
MOFA/GCAP/QCBS/2013/03
MOFA/GCAP/CQS/2013/02
9 PIU/IAs
LAP
10
MOFA/GCAP/CQS/2013/03
12
Technical assistance on PPP for institutions
responsible for project transactions
PIU
15
16
14
Consultancy Service to Design
Communication Strategy
13 PIU
PIU
PIU
PIU
19 Technical assistance and capacity building
for key policy reforms
MOFA/GCAP/QCBS/2013/04
MOFA/GCAP/IC/2013/03Consultancy Service to Develop strategic
plan for commercial agriculture investment
20 MOFA/GCAP/CQS/2013/05
18 GIPC
PIU
GIPC
01/01/2014 09/02/2014 23/02/2014 09/03/2014 16/03/2014
25/06/2013 27/07/2013 10/08/2013 24/08/2013 31/08/2013
05/05/2013 05/06/2013 26/06/2013 10/07/2013 17/07/2013
01/06/2013 13/07/2013 27/07/2013 10/08/2013 17/08/2013
31/10/2013 12/12/2013 11/01/2014 18/01/2014 24/01/2014
28/09/2013 12/10/2013 19/10/2013
N/A N/A 29/10/2013 12/11/2013 19/11/2013
N/A N/A 31/03/2013 14/04/2013 17/04/2013
N/A N/A 22/07/2013 05/08/2013 12/08/2013
03/11/2013 08/12/2013 22/12/2013 05/01/2014 12/01/2014
N/A N/A 06/10/2013 20/10/2013 27/10/2013
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Consultancy Service to Develop Framework
for Out grower scheme
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
PIU
Consultancy Service for Participatory
Planning of Land use at Community Level
21
Technical assistance on PPP for investors
PIU/GIPC
PIU
22
23
24
28
Recruitment of Long-term irrigation PPP
advisor
Consultancy Service for Necessary
Safeguard Assessment
Consultancy Service Undertake Market Test
to Assess Perspective of Investors
Consultancy Service to Assess Alternative
Mechanisms for Irrigation, PPP
Consultancy Service (Fund Manager) to
manage Matching Grant
29
30
31
25
26
27 MOFA/GCAP/CQS/2013/08
MOFA/GCAP/QCBS/2013/06Consultancy Service for Capacity Building
and Training on agribusiness related to PPP
Consultancy Service to Develop
Framework/Protocols for dealing with
investors at agric Sector Level
MOFA/GCAP/QCBS/2013/05
MOFA/GCAP/IC/2013/05
MOFA/GCAP/CQS/2013/06
MOFA/GCAP/CQS/2013/07
MOFA/GCAP/IC/2013/04
MOFA/GCAP/CQS/2013/09
LAP
GIPC
PIU
PIU
PIU
PIU
PIU
GIPC/PIU
MOFA/GCAP/IC/2013/9
MOFA/GCAP/CQS/2013/10
MOFA/GCAP/IC/2013/06
N/A N/A 07/06/2013 21/06/2013 28/06/2013
04/09/2013 09/10/2013 23/10/2013 06/11/2013 13/11/2013
N/A N/A 17/12/2013 31/12/2013 07/01/2014
24/06/2013 29/07/2013 12/08/2013 26/08/2013 02/09/2013
24/06/2013 29/07/2013 12/08/2013 26/08/2013 02/09/2013
29/12/2013 02/02/2014 16/02/2014 02/03/2014 09/03/2014
31/12/2013 04/02/2014 18/02/2014 04/03/2014 11/03/2014
02/01/2014 06/02/2014 20/02/2014 06/03/2014 13/03/2014
N/A N/A 27/05/2013 10/06/2013 17/06/2013
N/A N/A 29/05/2013 12/06/2013 19/06/2013
20/06/2013 25/07/2013 08/08/2013 22/08/2013 29/08/2013
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Sub-total Cost Plan
Actual
33 EPA/PIU Constultancy Service to Develop Strategic
Social and Environmtal Assessment, SADA
MOFA/GCAP/CQS/2013/13
MOFA/GCAP/CQS/2013/11
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
32
PIU
35
31
Consultancy Service to Undertake Annual
Value Chain Survey and other surveys and
studies
Consultancy Service to Develop
Implemention Plan of PPP on APIP and on
National scale
MOFA/GCAP/LCS/2013/03PIU
PIU/GIDA
MOFA/GCAP/CQS/2013/10
34 GIPC MOFA-ABSD Consultancy Service to Develop Database of
Active and Inactive Agric Sector Investors
MOFA/GCAP/CQS/2013/14
22/05/2013 26/06/2013 10/07/2013 24/07/2013 29/07/2013
06/05/2013 10/06/2013 24/06/2013 08/07/2013 13/07/2013
03/09/2013 08/10/2013 22/10/2013 05/11/2013 10/11/2013
03/06/2013 04/07/2013 25/07/2013 08/08/2013 15/08/2013
No.Implementing
AgencyDescription
Package
Number Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
7 Plan
Actual
Plan
Actual
Consultancy Service to Undertake Full
Feasibility study for PPP in the SADA Zone
and Transaction Advisory Services
Consultancy Service forPre-feasibility
studies for Accra Plains PPP Irrigation
Project
8
6
2
Consultancy Service to Undertake Full
Feasibility study for PPP in the Accra Plains
and Transaction Advisory Services
MOFA/GCAP/QBS/2013/02
MOFA/GCAP/LCS/2013/01Consultancy service for the redesign and
supervision of GCAP project offices to be
rehabilitated
MOFA/GCAP/QCBS/2012/01
Consultancy Services for the Capacity
Building in Procurement and Financial
Management of PIU/IAs
1
MOFA/GCAP/QBS/2013/03
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
3
Technical assistance on Outgrower
schemes
MOFA/GCAP/QCBS/2013/02
PIU/GIDA
PIU
PIU
PIU
PIU/GIDA
PIU Consultancy Service to Undertake Market
Structure Survey of Warehouses and Design
& Supervision of Works
MOFA/GCAP/QCBS/2013/02
4 PIU MOFA/GCAP/CQS/2013/01
5 PIU Technical feasibility studies on investment
in land development for commercial
agriculture SADA, zone valleys
MOFA/GCAP/QBS/2013/01
Preparation
Eval Report
(T) (F) Negotiations Submission Date No-objection Date
26/11/2012 10/12/2012 17/12/2012 31/12/2012
11/07/2013 25/07/2013 01/08/2013 15/08/2013
06/07/2013 20/07/2013 27/07/2013 10/08/2013
13/10/2013 27/10/2013 03/11/2013 17/11/2013
26/12/2013 09/01/2014 16/01/2014 30/01/2014
03/12/2013 16/12/2013 24/12/2013 07/01/2014
13/12/2013 26/12/2013 03/01/2014 17/01/2014
07/01/2014 21/01/2014 28/01/2014 11/02/2014
Draft ContractProposal Evaluation and
Negotiation
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Consultancy Service to Undertake Studies in
project intervention areas
Recruitment of project staff17 PIU
Consultancy Service to Research on
Investment Climate within the Agric Sector
MOFA/GCAP/CQS/2013/04
External Audit
Consultancy Service to Undertake
Beneficiary Assessment
MOFA/GCAP/LCS/2013/02
MOFA/GCAP/IC/2013/02
MOFA/GCAP/IC/2013/01
Consultancy for compilation and publication
of Land Bank register
Consultancy Service to Undertake Baseline
studies in Project Areas
MOFA/GCAP/CQS/2013/01
MOFA/GCAP/QCBS/2013/03
MOFA/GCAP/CQS/2013/02
9 PIU/IAs
LAP
10
MOFA/GCAP/CQS/2013/03
12
Technical assistance on PPP for institutions
responsible for project transactions
PIU
15
16
14
Consultancy Service to Design
Communication Strategy
13 PIU
PIU
PIU
PIU
19 Technical assistance and capacity building
for key policy reforms
MOFA/GCAP/QCBS/2013/04
MOFA/GCAP/IC/2013/03Consultancy Service to Develop strategic
plan for commercial agriculture investment
20 MOFA/GCAP/CQS/2013/05
18 GIPC
PIU
GIPC
23/03/2014 06/04/2014 13/04/2014 27/04/2014
07/09/2013 21/09/2013 28/09/2013 12/10/2013
24/07/2013 31/07/2013 07/08/2013 21/08/2013
24/08/2013 07/09/2013 14/09/2013 28/09/2013
31/01/2014 07/02/2014 31/01/2014 07/02/2014
21/10/2013 26/10/2013 02/11/2013 16/11/2013
21/11/2013 27/11/2013 03/12/2013 17/12/2013
18/04/2013 23/04/2013 07/05/2013 21/05/2013
14/08/2013 19/08/2013 26/08/2013 09/09/2013
19/01/2014 02/02/2014 09/02/2014 23/02/2014
29/10/2013 03/11/2013 10/11/2013 24/11/2013
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Consultancy Service to Develop Framework
for Out grower scheme
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
PIU
Consultancy Service for Participatory
Planning of Land use at Community Level
21
Technical assistance on PPP for investors
PIU/GIPC
PIU
22
23
24
28
Recruitment of Long-term irrigation PPP
advisor
Consultancy Service for Necessary
Safeguard Assessment
Consultancy Service Undertake Market Test
to Assess Perspective of Investors
Consultancy Service to Assess Alternative
Mechanisms for Irrigation, PPP
Consultancy Service (Fund Manager) to
manage Matching Grant
29
30
31
25
26
27 MOFA/GCAP/CQS/2013/08
MOFA/GCAP/QCBS/2013/06Consultancy Service for Capacity Building
and Training on agribusiness related to PPP
Consultancy Service to Develop
Framework/Protocols for dealing with
investors at agric Sector Level
MOFA/GCAP/QCBS/2013/05
MOFA/GCAP/IC/2013/05
MOFA/GCAP/CQS/2013/06
MOFA/GCAP/CQS/2013/07
MOFA/GCAP/IC/2013/04
MOFA/GCAP/CQS/2013/09
LAP
GIPC
PIU
PIU
PIU
PIU
PIU
GIPC/PIU
MOFA/GCAP/IC/2013/9
MOFA/GCAP/CQS/2013/10
MOFA/GCAP/IC/2013/06
30/06/2013 05/07/2013 12/07/2013 26/07/2013
20/11/2013 04/12/2013 11/12/2013 25/12/2013
09/01/2014 14/01/2014 21/01/2014 04/02/2014
04/09/2013 09/09/2013 16/09/2013 30/09/2013
04/09/2013 09/09/2013 16/09/2013 30/09/2013
16/03/2014 30/03/2014 06/04/2014 20/04/2014
13/03/2014 18/03/2014 25/03/2014 08/04/2014
15/03/2014 20/03/2014 27/03/2014 10/04/2014
19/06/2013 24/06/2013 01/07/2013 15/07/2013
21/06/2013 26/06/2013 03/07/2013 17/07/2013
31/08/2013 05/09/2013 12/09/2013 26/09/2013
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Sub-total Cost Plan
Actual
33 EPA/PIU Constultancy Service to Develop Strategic
Social and Environmtal Assessment, SADA
MOFA/GCAP/CQS/2013/13
MOFA/GCAP/CQS/2013/11
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
32
PIU
35
31
Consultancy Service to Undertake Annual
Value Chain Survey and other surveys and
studies
Consultancy Service to Develop
Implemention Plan of PPP on APIP and on
National scale
MOFA/GCAP/LCS/2013/03PIU
PIU/GIDA
MOFA/GCAP/CQS/2013/10
34 GIPC MOFA-ABSD Consultancy Service to Develop Database of
Active and Inactive Agric Sector Investors
MOFA/GCAP/CQS/2013/14
31/07/2013 02/08/2013 16/08/2013 30/08/2013
15/07/2013 17/07/2013 31/07/2013 14/08/2013
12/11/2013 14/11/2013 28/11/2013 12/12/2013
22/08/2013 29/08/2013 05/09/2013 19/09/2013
No.Implementing
AgencyDescription
Package
Number Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
7 Plan
Actual
Plan
Actual
Consultancy Service to Undertake Full
Feasibility study for PPP in the SADA Zone
and Transaction Advisory Services
Consultancy Service forPre-feasibility
studies for Accra Plains PPP Irrigation
Project
8
6
2
Consultancy Service to Undertake Full
Feasibility study for PPP in the Accra Plains
and Transaction Advisory Services
MOFA/GCAP/QBS/2013/02
MOFA/GCAP/LCS/2013/01Consultancy service for the redesign and
supervision of GCAP project offices to be
rehabilitated
MOFA/GCAP/QCBS/2012/01
Consultancy Services for the Capacity
Building in Procurement and Financial
Management of PIU/IAs
1
MOFA/GCAP/QBS/2013/03
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
3
Technical assistance on Outgrower
schemes
MOFA/GCAP/QCBS/2013/02
PIU/GIDA
PIU
PIU
PIU
PIU/GIDA
PIU Consultancy Service to Undertake Market
Structure Survey of Warehouses and Design
& Supervision of Works
MOFA/GCAP/QCBS/2013/02
4 PIU MOFA/GCAP/CQS/2013/01
5 PIU Technical feasibility studies on investment
in land development for commercial
agriculture SADA, zone valleys
MOFA/GCAP/QBS/2013/01
Contract
Amount
Contract Award
Contract
Signature
Name of Contract
Winner
07/01/2013 14/01/2013
22/08/2013 29/08/2013
17/08/2013 24/08/2013
24/11/2013 01/12/2013
06/02/2014 13/02/2014
14/01/2014 21/01/2014
24/01/2014 31/01/2014
18/02/2014 25/02/2014
Contract Finalization
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Consultancy Service to Undertake Studies in
project intervention areas
Recruitment of project staff17 PIU
Consultancy Service to Research on
Investment Climate within the Agric Sector
MOFA/GCAP/CQS/2013/04
External Audit
Consultancy Service to Undertake
Beneficiary Assessment
MOFA/GCAP/LCS/2013/02
MOFA/GCAP/IC/2013/02
MOFA/GCAP/IC/2013/01
Consultancy for compilation and publication
of Land Bank register
Consultancy Service to Undertake Baseline
studies in Project Areas
MOFA/GCAP/CQS/2013/01
MOFA/GCAP/QCBS/2013/03
MOFA/GCAP/CQS/2013/02
9 PIU/IAs
LAP
10
MOFA/GCAP/CQS/2013/03
12
Technical assistance on PPP for institutions
responsible for project transactions
PIU
15
16
14
Consultancy Service to Design
Communication Strategy
13 PIU
PIU
PIU
PIU
19 Technical assistance and capacity building
for key policy reforms
MOFA/GCAP/QCBS/2013/04
MOFA/GCAP/IC/2013/03Consultancy Service to Develop strategic
plan for commercial agriculture investment
20 MOFA/GCAP/CQS/2013/05
18 GIPC
PIU
GIPC
04/05/2014 11/05/2014
19/10/2013 26/10/2013
28/08/2013 04/09/2013
05/10/2013 12/10/2013
14/02/2014 21/02/2014
23/11/2013 30/11/2013
24/12/2013 31/12/2013
28/05/2013 04/06/2013
16/09/2013 23/09/2013
02/03/2014 09/03/2014
01/12/2013 08/12/2013
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Consultancy Service to Develop Framework
for Out grower scheme
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
PIU
Consultancy Service for Participatory
Planning of Land use at Community Level
21
Technical assistance on PPP for investors
PIU/GIPC
PIU
22
23
24
28
Recruitment of Long-term irrigation PPP
advisor
Consultancy Service for Necessary
Safeguard Assessment
Consultancy Service Undertake Market Test
to Assess Perspective of Investors
Consultancy Service to Assess Alternative
Mechanisms for Irrigation, PPP
Consultancy Service (Fund Manager) to
manage Matching Grant
29
30
31
25
26
27 MOFA/GCAP/CQS/2013/08
MOFA/GCAP/QCBS/2013/06Consultancy Service for Capacity Building
and Training on agribusiness related to PPP
Consultancy Service to Develop
Framework/Protocols for dealing with
investors at agric Sector Level
MOFA/GCAP/QCBS/2013/05
MOFA/GCAP/IC/2013/05
MOFA/GCAP/CQS/2013/06
MOFA/GCAP/CQS/2013/07
MOFA/GCAP/IC/2013/04
MOFA/GCAP/CQS/2013/09
LAP
GIPC
PIU
PIU
PIU
PIU
PIU
GIPC/PIU
MOFA/GCAP/IC/2013/9
MOFA/GCAP/CQS/2013/10
MOFA/GCAP/IC/2013/06
02/08/2013 09/08/2013
01/01/2014 08/01/2014
11/02/2014 18/02/2014
07/10/2013 14/10/2013
07/10/2013 14/10/2013
27/04/2014 04/05/2014
15/04/2014 22/04/2014
17/04/2014 24/04/2014
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Sub-total Cost Plan
Actual
33 EPA/PIU Constultancy Service to Develop Strategic
Social and Environmtal Assessment, SADA
MOFA/GCAP/CQS/2013/13
MOFA/GCAP/CQS/2013/11
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
32
PIU
35
31
Consultancy Service to Undertake Annual
Value Chain Survey and other surveys and
studies
Consultancy Service to Develop
Implemention Plan of PPP on APIP and on
National scale
MOFA/GCAP/LCS/2013/03PIU
PIU/GIDA
MOFA/GCAP/CQS/2013/10
34 GIPC MOFA-ABSD Consultancy Service to Develop Database of
Active and Inactive Agric Sector Investors
MOFA/GCAP/CQS/2013/14
06/09/2013 13/09/2013
21/08/2013 28/08/2013
19/12/2013 26/12/2013
26/09/2013 03/10/2013
No.Implementing
AgencyDescription
Package
Number Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
7 Plan
Actual
Plan
Actual
Consultancy Service to Undertake Full
Feasibility study for PPP in the SADA Zone
and Transaction Advisory Services
Consultancy Service forPre-feasibility
studies for Accra Plains PPP Irrigation
Project
8
6
2
Consultancy Service to Undertake Full
Feasibility study for PPP in the Accra Plains
and Transaction Advisory Services
MOFA/GCAP/QBS/2013/02
MOFA/GCAP/LCS/2013/01Consultancy service for the redesign and
supervision of GCAP project offices to be
rehabilitated
MOFA/GCAP/QCBS/2012/01
Consultancy Services for the Capacity
Building in Procurement and Financial
Management of PIU/IAs
1
MOFA/GCAP/QBS/2013/03
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
3
Technical assistance on Outgrower
schemes
MOFA/GCAP/QCBS/2013/02
PIU/GIDA
PIU
PIU
PIU
PIU/GIDA
PIU Consultancy Service to Undertake Market
Structure Survey of Warehouses and Design
& Supervision of Works
MOFA/GCAP/QCBS/2013/02
4 PIU MOFA/GCAP/CQS/2013/01
5 PIU Technical feasibility studies on investment
in land development for commercial
agriculture SADA, zone valleys
MOFA/GCAP/QBS/2013/01
Mobilization
Advance
Payment
Draft
Report
Final
Report
Final
Cost
28/01/2013 13/05/2013 03/06/2013
12/09/2013 26/12/2013 16/01/2014
07/09/2013 21/12/2013 11/01/2014
15/12/2013 30/03/2014 20/04/2014
27/02/2014 12/06/2014 03/07/2014
04/02/2014 21/04/2014 12/05/2014
14/02/2014 01/05/2014 22/05/2014
11/03/2014 24/06/2014 15/07/2014
Contract Implementation
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Consultancy Service to Undertake Studies in
project intervention areas
Recruitment of project staff17 PIU
Consultancy Service to Research on
Investment Climate within the Agric Sector
MOFA/GCAP/CQS/2013/04
External Audit
Consultancy Service to Undertake
Beneficiary Assessment
MOFA/GCAP/LCS/2013/02
MOFA/GCAP/IC/2013/02
MOFA/GCAP/IC/2013/01
Consultancy for compilation and publication
of Land Bank register
Consultancy Service to Undertake Baseline
studies in Project Areas
MOFA/GCAP/CQS/2013/01
MOFA/GCAP/QCBS/2013/03
MOFA/GCAP/CQS/2013/02
9 PIU/IAs
LAP
10
MOFA/GCAP/CQS/2013/03
12
Technical assistance on PPP for institutions
responsible for project transactions
PIU
15
16
14
Consultancy Service to Design
Communication Strategy
13 PIU
PIU
PIU
PIU
19 Technical assistance and capacity building
for key policy reforms
MOFA/GCAP/QCBS/2013/04
MOFA/GCAP/IC/2013/03Consultancy Service to Develop strategic
plan for commercial agriculture investment
20 MOFA/GCAP/CQS/2013/05
18 GIPC
PIU
GIPC
25/05/2014 07/09/2014 28/09/2014
09/11/2013 24/01/2014 14/02/2014
18/09/2013 03/11/2013 17/11/2013
26/10/2013 08/02/2014 01/03/2014
22/03/2014 31/05/2014 14/06/2014
14/12/2013 29/01/2014 12/02/2014
14/01/2014 01/03/2014 15/03/2014
04/06/2015
07/10/2013 22/11/2013 06/12/2013
23/03/2014 06/07/2014 27/07/2014
22/12/2013 06/02/2014 20/02/2014
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Consultancy Service to Develop Framework
for Out grower scheme
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
PIU
Consultancy Service for Participatory
Planning of Land use at Community Level
21
Technical assistance on PPP for investors
PIU/GIPC
PIU
22
23
24
28
Recruitment of Long-term irrigation PPP
advisor
Consultancy Service for Necessary
Safeguard Assessment
Consultancy Service Undertake Market Test
to Assess Perspective of Investors
Consultancy Service to Assess Alternative
Mechanisms for Irrigation, PPP
Consultancy Service (Fund Manager) to
manage Matching Grant
29
30
31
25
26
27 MOFA/GCAP/CQS/2013/08
MOFA/GCAP/QCBS/2013/06Consultancy Service for Capacity Building
and Training on agribusiness related to PPP
Consultancy Service to Develop
Framework/Protocols for dealing with
investors at agric Sector Level
MOFA/GCAP/QCBS/2013/05
MOFA/GCAP/IC/2013/05
MOFA/GCAP/CQS/2013/06
MOFA/GCAP/CQS/2013/07
MOFA/GCAP/IC/2013/04
MOFA/GCAP/CQS/2013/09
LAP
GIPC
PIU
PIU
PIU
PIU
PIU
GIPC/PIU
MOFA/GCAP/IC/2013/9
MOFA/GCAP/CQS/2013/10
MOFA/GCAP/IC/2013/06
23/08/2013 08/10/2013 22/10/2013
22/01/2014 07/05/2014 28/05/2014
04/03/2014 19/04/2014 03/05/2014
28/10/2013 13/12/2013 27/12/2013
28/10/2013 13/12/2013 27/12/2013
18/05/2014 31/08/2014 21/09/2014
06/05/2014 21/06/2014 05/07/2014
08/05/2014 23/06/2014 07/07/2014
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Sub-total Cost Plan
Actual
33 EPA/PIU Constultancy Service to Develop Strategic
Social and Environmtal Assessment, SADA
MOFA/GCAP/CQS/2013/13
MOFA/GCAP/CQS/2013/11
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
32
PIU
35
31
Consultancy Service to Undertake Annual
Value Chain Survey and other surveys and
studies
Consultancy Service to Develop
Implemention Plan of PPP on APIP and on
National scale
MOFA/GCAP/LCS/2013/03PIU
PIU/GIDA
MOFA/GCAP/CQS/2013/10
34 GIPC MOFA-ABSD Consultancy Service to Develop Database of
Active and Inactive Agric Sector Investors
MOFA/GCAP/CQS/2013/14
13/09/2015
28/08/2015
26/12/2015
17/10/2013 02/12/2013 16/12/2013
No.Implementing
AgencyDescription
Package
Number Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
7 Plan
Actual
Plan
Actual
Consultancy Service to Undertake Full
Feasibility study for PPP in the SADA Zone
and Transaction Advisory Services
Consultancy Service forPre-feasibility
studies for Accra Plains PPP Irrigation
Project
8
6
2
Consultancy Service to Undertake Full
Feasibility study for PPP in the Accra Plains
and Transaction Advisory Services
MOFA/GCAP/QBS/2013/02
MOFA/GCAP/LCS/2013/01Consultancy service for the redesign and
supervision of GCAP project offices to be
rehabilitated
MOFA/GCAP/QCBS/2012/01
Consultancy Services for the Capacity
Building in Procurement and Financial
Management of PIU/IAs
1
MOFA/GCAP/QBS/2013/03
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
3
Technical assistance on Outgrower
schemes
MOFA/GCAP/QCBS/2013/02
PIU/GIDA
PIU
PIU
PIU
PIU/GIDA
PIU Consultancy Service to Undertake Market
Structure Survey of Warehouses and Design
& Supervision of Works
MOFA/GCAP/QCBS/2013/02
4 PIU MOFA/GCAP/CQS/2013/01
5 PIU Technical feasibility studies on investment
in land development for commercial
agriculture SADA, zone valleys
MOFA/GCAP/QBS/2013/01
Remarks
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Consultancy Service to Undertake Studies in
project intervention areas
Recruitment of project staff17 PIU
Consultancy Service to Research on
Investment Climate within the Agric Sector
MOFA/GCAP/CQS/2013/04
External Audit
Consultancy Service to Undertake
Beneficiary Assessment
MOFA/GCAP/LCS/2013/02
MOFA/GCAP/IC/2013/02
MOFA/GCAP/IC/2013/01
Consultancy for compilation and publication
of Land Bank register
Consultancy Service to Undertake Baseline
studies in Project Areas
MOFA/GCAP/CQS/2013/01
MOFA/GCAP/QCBS/2013/03
MOFA/GCAP/CQS/2013/02
9 PIU/IAs
LAP
10
MOFA/GCAP/CQS/2013/03
12
Technical assistance on PPP for institutions
responsible for project transactions
PIU
15
16
14
Consultancy Service to Design
Communication Strategy
13 PIU
PIU
PIU
PIU
19 Technical assistance and capacity building
for key policy reforms
MOFA/GCAP/QCBS/2013/04
MOFA/GCAP/IC/2013/03Consultancy Service to Develop strategic
plan for commercial agriculture investment
20 MOFA/GCAP/CQS/2013/05
18 GIPC
PIU
GIPC
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Consultancy Service to Develop Framework
for Out grower scheme
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
PIU
Consultancy Service for Participatory
Planning of Land use at Community Level
21
Technical assistance on PPP for investors
PIU/GIPC
PIU
22
23
24
28
Recruitment of Long-term irrigation PPP
advisor
Consultancy Service for Necessary
Safeguard Assessment
Consultancy Service Undertake Market Test
to Assess Perspective of Investors
Consultancy Service to Assess Alternative
Mechanisms for Irrigation, PPP
Consultancy Service (Fund Manager) to
manage Matching Grant
29
30
31
25
26
27 MOFA/GCAP/CQS/2013/08
MOFA/GCAP/QCBS/2013/06Consultancy Service for Capacity Building
and Training on agribusiness related to PPP
Consultancy Service to Develop
Framework/Protocols for dealing with
investors at agric Sector Level
MOFA/GCAP/QCBS/2013/05
MOFA/GCAP/IC/2013/05
MOFA/GCAP/CQS/2013/06
MOFA/GCAP/CQS/2013/07
MOFA/GCAP/IC/2013/04
MOFA/GCAP/CQS/2013/09
LAP
GIPC
PIU
PIU
PIU
PIU
PIU
GIPC/PIU
MOFA/GCAP/IC/2013/9
MOFA/GCAP/CQS/2013/10
MOFA/GCAP/IC/2013/06
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Sub-total Cost Plan
Actual
33 EPA/PIU Constultancy Service to Develop Strategic
Social and Environmtal Assessment, SADA
MOFA/GCAP/CQS/2013/13
MOFA/GCAP/CQS/2013/11
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
32
PIU
35
31
Consultancy Service to Undertake Annual
Value Chain Survey and other surveys and
studies
Consultancy Service to Develop
Implemention Plan of PPP on APIP and on
National scale
MOFA/GCAP/LCS/2013/03PIU
PIU/GIDA
MOFA/GCAP/CQS/2013/10
34 GIPC MOFA-ABSD Consultancy Service to Develop Database of
Active and Inactive Agric Sector Investors
MOFA/GCAP/CQS/2013/14
No.Implementing
AgencyDescription
Package
Number Plan vs.
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
7 Plan
Actual
Plan
Actual
Consultancy Service to Undertake Full
Feasibility study for PPP in the SADA Zone
and Transaction Advisory Services
Consultancy Service forPre-feasibility
studies for Accra Plains PPP Irrigation
Project
8
6
2
Consultancy Service to Undertake Full
Feasibility study for PPP in the Accra Plains
and Transaction Advisory Services
MOFA/GCAP/QBS/2013/02
MOFA/GCAP/LCS/2013/01Consultancy service for the redesign and
supervision of GCAP project offices to be
rehabilitated
MOFA/GCAP/QCBS/2012/01
Consultancy Services for the Capacity
Building in Procurement and Financial
Management of PIU/IAs
1
MOFA/GCAP/QBS/2013/03
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
3
Technical assistance on Outgrower
schemes
MOFA/GCAP/QCBS/2013/02
PIU/GIDA
PIU
PIU
PIU
PIU/GIDA
PIU Consultancy Service to Undertake Market
Structure Survey of Warehouses and Design
& Supervision of Works
MOFA/GCAP/QCBS/2013/02
4 PIU MOFA/GCAP/CQS/2013/01
5 PIU Technical feasibility studies on investment
in land development for commercial
agriculture SADA, zone valleys
MOFA/GCAP/QBS/2013/01
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Consultancy Service to Undertake Studies in
project intervention areas
Recruitment of project staff17 PIU
Consultancy Service to Research on
Investment Climate within the Agric Sector
MOFA/GCAP/CQS/2013/04
External Audit
Consultancy Service to Undertake
Beneficiary Assessment
MOFA/GCAP/LCS/2013/02
MOFA/GCAP/IC/2013/02
MOFA/GCAP/IC/2013/01
Consultancy for compilation and publication
of Land Bank register
Consultancy Service to Undertake Baseline
studies in Project Areas
MOFA/GCAP/CQS/2013/01
MOFA/GCAP/QCBS/2013/03
MOFA/GCAP/CQS/2013/02
9 PIU/IAs
LAP
10
MOFA/GCAP/CQS/2013/03
12
Technical assistance on PPP for institutions
responsible for project transactions
PIU
15
16
14
Consultancy Service to Design
Communication Strategy
13 PIU
PIU
PIU
PIU
19 Technical assistance and capacity building
for key policy reforms
MOFA/GCAP/QCBS/2013/04
MOFA/GCAP/IC/2013/03Consultancy Service to Develop strategic
plan for commercial agriculture investment
20 MOFA/GCAP/CQS/2013/05
18 GIPC
PIU
GIPC
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Consultancy Service to Develop Framework
for Out grower scheme
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
PIU
Consultancy Service for Participatory
Planning of Land use at Community Level
21
Technical assistance on PPP for investors
PIU/GIPC
PIU
22
23
24
28
Recruitment of Long-term irrigation PPP
advisor
Consultancy Service for Necessary
Safeguard Assessment
Consultancy Service Undertake Market Test
to Assess Perspective of Investors
Consultancy Service to Assess Alternative
Mechanisms for Irrigation, PPP
Consultancy Service (Fund Manager) to
manage Matching Grant
29
30
31
25
26
27 MOFA/GCAP/CQS/2013/08
MOFA/GCAP/QCBS/2013/06Consultancy Service for Capacity Building
and Training on agribusiness related to PPP
Consultancy Service to Develop
Framework/Protocols for dealing with
investors at agric Sector Level
MOFA/GCAP/QCBS/2013/05
MOFA/GCAP/IC/2013/05
MOFA/GCAP/CQS/2013/06
MOFA/GCAP/CQS/2013/07
MOFA/GCAP/IC/2013/04
MOFA/GCAP/CQS/2013/09
LAP
GIPC
PIU
PIU
PIU
PIU
PIU
GIPC/PIU
MOFA/GCAP/IC/2013/9
MOFA/GCAP/CQS/2013/10
MOFA/GCAP/IC/2013/06
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Sub-total Cost Plan
Actual
33 EPA/PIU Constultancy Service to Develop Strategic
Social and Environmtal Assessment, SADA
MOFA/GCAP/CQS/2013/13
MOFA/GCAP/CQS/2013/11
Technical Assistance for Community
Empowerment and Capacity Building in
SADA zone
32
PIU
35
31
Consultancy Service to Undertake Annual
Value Chain Survey and other surveys and
studies
Consultancy Service to Develop
Implemention Plan of PPP on APIP and on
National scale
MOFA/GCAP/LCS/2013/03PIU
PIU/GIDA
MOFA/GCAP/CQS/2013/10
34 GIPC MOFA-ABSD Consultancy Service to Develop Database of
Active and Inactive Agric Sector Investors
MOFA/GCAP/CQS/2013/14
No.Implementing
AgencyDescription
Package
Number
3
Maintenance of Vehicles and
Motorcycles9 PIU
MOFA/GCAP/NCS/NS/2013/09
PIU/GIPC
Printing of Brochures, flyers and
branded pendrives (Project
Information Pack)
MOFA/GCAP/NCS/NS/2013/03
4
5
6
7
Procurement of Event
Organizers/Facilitators for District
Planning Workshop
Procurement of Event
Organizers/Facilitators for Regional
Sensitazation Workshop
Procurement of Event
Organizers/Facilitators for Investors
Round Table Workshop
Procurement of Event
Organizers/Facilitators for Project
Implementation agencies on M&E data
collection Workshop
Procurement ofEvent
Organizers/Facilitators for the
preparation of composite
procurement manual Workshop
PIU
PIU/ISU-MOFA
PIU
PIU
PIU8
MOFA/GCAP/NCS/NS/2013/04
MOFA/GCAP/NCS/NS/2013/05
MOFA/GCAP/NCS/NS/2013/06
MOFA/GCAP/NCS/NS/2013/07
MOFA/GCAP/NCS/NS/2013/08
Country/Organisation: GHANA/MoFA
Programme: Ghana Commercial Agriculture Project (GCAP)
Credit Number: P114264
10 PIU/SADA Maintenance of Office equipmentMOFA/GCAP/NCS/NS/2013/10
Project Website Design and Domain
Hosting
MOFA/GCAP/NCS/NS/2013/011 PIU
16 PIU Maintenance of WebsiteMOFA/GCAP/NCS/NS/2013/16
Total Cost
15 PIU Maintenance of PhotocopiersMOFA/GCAP/NCS/NS/2013/15
PIU
14 PIU/SADAMaintenance of Computers &
AccessoriesMOFA/GCAP/NCS/NS/2013/14
13 PIU
12
Maintenance of Air conditionersMOFA/GCAP/NCS/NS/2013/13
Maintenance of Accounting SoftwareMOFA/GCAP/NCS/NS/2013/10
PIUMaintenance of Contract Management
SoftwareMOFA/GCAP/NCS/NS/2013/11
20 GIPC/PIUEvent Organizers/facilitators for
National Project LaunchMOFA/GCAP/NCS/NS/2013/20
11
17 GIPC/MOFAEvent Organizers/facilitators for
International Agribusiness FairMOFA/GCAP/NCS/NS/2013/17
18 GIPC/PIUEvent Organizers/facilitators for
International Investors ConferenceMOFA/GCAP/NCS/NS/2013/18
19 GIPC/PIUEvent Organizers/facilitators for Local
Investors ConferenceMOFA/GCAP/NCS/NS/2013/19
Plan vs.
Actual
Lot
Number
Estimated
Amount in US$
Procure
ment
Method
Pre-or
Post
Qualifica
tion
Prior or
Post
Review
Preparation &
Submission
Plan 40,000.00$ 11/03/2013
Actual
Plan $ 50,000.00 01/06/2013
Actual
Plan 25,000.00$ 11/06/2013
Actual
Plan 45,000.00$ 17/06/2013
Actual
Plan 60,000.00 13/03/2013
Actual
Plan 60,000.00 02/07/2013
Actual
Plan 15,000.00 05/02/2013
Actual
Plan 50,000.00$ 03/06/2013
Actual
Plan 12,000.00$ 04/06/2013
Actual
Post
Post Post
Post Post
Post Post
Post
Draft Bid Documents, including
specs and quantities, draft SPNBASIC DATA
2
3
Post
NS Post
NS Post Post
NS Post
Post
Post1
NS
NS
NS
2
1
1 NS
NS1
Post
4 Post
1
Post
NS
Plan 12,000.00$ 01/06/2013
Actual
Plan 12,000.00$ 06/02/2013
Actual
Plan 30,000.00$ 01/06/2013
Actual
Plan 27,000.00$ 10/06/2013
Actual
Plan 25,000.00$ 04/06/2013
Actual
Plan 15,000.00$ 12/06/2013
Actual
Plan 50,000.00$ 12/08/2013
Actual
Plan 50,000.00$ 12/06/2013
Actual
Plan 30,000.00$ 12/07/2013
Actual
Plan 50,000.00$ 12/06/2013
Actual
Plan 658,000.00$
Actual
1 Post
NS Post Post
NS Post
NS PostPost
NS Post
NS Post
PostNS
1
1 Post
Post
1
1 Post
1
1
NS Post
1
Post Post
NS Post Post
1
NS Post Post
Post
1 NS
Spec. Proc
Notice
Advert
No-objection
Date
On-line
UNDB/
Gateway/
National
Press
Bid Invitation
Date
Bid Closing/
Opening
Submission
Bid Evaluation
Report
No-objection
Date
N/A N/A 18/03/2013 01/04/2013 08/04/2013 N/A
N/A N/A 08/06/2013 22/06/2013 29/06/2013 N/A
N/A N/A 18/06/2013 02/07/2013 09/07/2013 N/A
N/A N/A 24/06/2013 08/07/2013 15/07/2013 N/A
N/A N/A 20/03/2013 03/04/2013 10/04/2013 N/A
N/A N/A 09/07/2013 23/07/2013 30/07/2013 N/A
N/A N/A 12/02/2013 26/02/2013 05/03/2013 N/A
N/A N/A 10/06/2013 24/06/2013 01/07/2013 N/A
N/A N/A 11/06/2013 25/06/2013 02/07/2013 N/A
Draft Bid Documents, including
specs and quantities, draft SPN Bid EvaluationBidding Period
N/A N/A 08/06/2013 22/06/2013 29/06/2013 N/A
N/A N/A 13/02/2013 27/02/2013 06/03/2013 N/A
N/A N/A 08/06/2013 22/06/2013 29/06/2013 N/A
N/A N/A 17/06/2013 01/07/2013 08/07/2013 N/A
N/A N/A 11/06/2013 25/06/2013 02/07/2013 N/A
N/A N/A 19/06/2013 03/07/2013 10/07/2013 N/A
N/A N/A 19/08/2013 02/09/2013 09/09/2013 N/A
N/A N/A 19/06/2013 03/07/2013 10/07/2013 N/A
N/A N/A 19/07/2013 02/08/2013 09/08/2013 N/A
N/A N/A 19/06/2013 03/07/2013 10/07/2013 N/A
Contract
Amount in US$
Date
Contract
Award
Date
Contract
Signature
Name of
Contract
Winner
Opening of Letter
of Credit
Arrival
of
Goods
15/04/2013 22/04/2013 21/05/2013
06/07/2013 13/07/2013 20/07/2013
16/07/2013 23/07/2013 21/08/2013
22/07/2013 29/07/2013 27/08/2013
17/04/2013 24/04/2013 23/05/2013
06/08/201313/08/2013 11/09/2013
12/03/201319/03/2013 17/04/2013
08/07/2013 15/07/2013 22/07/2013
09/07/2013 16/07/2013 23/07/2013
Contract ImplementationContract Finalization
06/07/2013 13/07/2013 20/07/2013
13/03/2013 20/03/2013 18/04/2013
06/07/2013 13/07/2013 20/07/2013
15/07/2013 22/07/2013 29/07/2013
09/07/2013 16/07/2013 23/07/2013
17/07/2013 24/07/2013 31/07/2013
16/09/2013 23/09/2013 30/09/2013
17/07/2013 24/07/2013 31/07/2013
16/08/2013 23/08/2013 30/08/2013
17/07/2013 24/07/2013 31/07/2013
0.00
Inspection
Final
Acceptance
03/06/2013
02/08/2013
03/09/2013
09/09/2013
05/06/2013
24/09/2013
30/04/2013
04/08/2013
05/08/2013
Contract Implementation
Remarks
02/08/2013
01/05/2013
02/08/2013
11/08/2013
05/08/2013
13/08/2013
13/10/2013
13/08/2013
12/09/2013
13/08/2013