GETTING THE CPP/IPP INTO THE GRID. REGULATORY ASPECTS. Harnessing Maximum Potential from Non-Convetional Energy Sources. SUITABLE PROMOTIONAL MEASURES FOR NON CONVENTIONAL ENERGY RESOURCES. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: - PowerPoint PPT Presentation
Citation preview
GETTING THE CPP/IPP GETTING THE CPP/IPP INTO THE GRIDINTO THE GRID
REGULATORY ASPECTSREGULATORY ASPECTS
Harnessing Maximum Potential Harnessing Maximum Potential
from from
Non-Convetional Energy Non-Convetional Energy
SourcesSources
SUITABLE PROMOTIONAL MEASURES SUITABLE PROMOTIONAL MEASURES FOR FOR
NON CONVENTIONAL ENERGY NON CONVENTIONAL ENERGY RESOURCESRESOURCES
EXTRACTS FROM ELECTRICITY ACT EXTRACTS FROM ELECTRICITY ACT 20032003
Para 3(1) NATIONAL ELECTRICITY POLICY AND Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN:PLAN:
The Central Government shall, from time to time, The Central Government shall, from time to time,
prepare the national electricity policy and tariff prepare the national electricity policy and tariff
policy, in consultation with the State Governments policy, in consultation with the State Governments
and the Authority for development of the power and the Authority for development of the power
system based on optimal utilisation of resources such system based on optimal utilisation of resources such
as coal, natural gas, nuclear substances or materials, as coal, natural gas, nuclear substances or materials,
hydro and renewable sources of energy.hydro and renewable sources of energy.
EXTRACTS FROM NATIONAL ELECTRICITYPOLICYEXTRACTS FROM NATIONAL ELECTRICITYPOLICYPara 3.2.Para 3.2.
ENVIRONMENTAL CONSIDERATIONS SHALL BE KEPT IN ENVIRONMENTAL CONSIDERATIONS SHALL BE KEPT IN MIND WHILE SELECTING/SUGGESTING:MIND WHILE SELECTING/SUGGESTING:
-- AREA / LOCATIONS FOR CAPACITY ADDITION-- AREA / LOCATIONS FOR CAPACITY ADDITION
-- FUEL CHOICES-- FUEL CHOICES
SUITABLE PROMOTIONAL MEASURES SUITABLE PROMOTIONAL MEASURES FOR FOR
ON CONVENTIONAL ENERGY RESOURCESON CONVENTIONAL ENERGY RESOURCES
Para 5.2.20 NON CONVENTIONAL ENERGY Para 5.2.20 NON CONVENTIONAL ENERGY RESOURCESRESOURCES
EFFORTS WOULD BE MADE TO ENCOURAGE EFFORTS WOULD BE MADE TO ENCOURAGE PRIVATE SECTOR PARTICIPATION THROUGH PRIVATE SECTOR PARTICIPATION THROUGH SUITABLE PROMOTIONAL MEANSSUITABLE PROMOTIONAL MEANS
Wind EnergyWind Energy
POSSIBLE OPTIONS FOR SALE OF WIND POSSIBLE OPTIONS FOR SALE OF WIND ENERGY:ENERGY:
- - Short Term Open AccessShort Term Open Access
- Unscheduled Interchange(UI)- Unscheduled Interchange(UI)
- Through Tariff determined by Regulator- Through Tariff determined by Regulator
ISSUES OF IMPORTANCE IN CASE ENCOURAGEMENT TO SOURCES LIKE WIND
ENERGY IS TO BE GIVEN
- FAVOURED ACCESS / WHEELING - FAVOURED ACCESS / WHEELING CHARGESCHARGES
- POSSIBILITY OF BANKING- POSSIBILITY OF BANKING
- - EXEMPTION FROM MERIT ORDEREXEMPTION FROM MERIT ORDER
- - MUST RUN STATUS MUST RUN STATUS POSSIBLY SIMILAR TREATMENT IS TO BE MOOTED TO SUCH OTHER RENEWABLE SOURCES VIZ. MINI / MICRO HYDEL ETC.
HOW TO GET CPP HOW TO GET CPP INTO THE GRIDINTO THE GRID
AN EVERY DAY AN EVERY DAY EXAMPLEEXAMPLE SEB
CPP + STEEL PLANT
CAPACITY : 2X65 MW
RATE : 180p/UNIT
REQUIREMENT : 120±10 MW
CAPABILITY : 120 MW
AVAILABILITY: FULL FOR 10 MONTHS, ONE UNIT ON OVERHAUL FOR 1 MONTH EVERY YEAR
CONNECTIVITYCONDITIONS
1) 30 MW MINIMUM DEMAND
2) 70 MW MAX DEMAND FOR 2 MONTHS
REPURCUSSIONS:
FOR 10 MONTHS THE CPP RUNS AT PART LOAD OF 90 MW DUE TO CONDITION 1) ABOVE
HARNESSING CPPsHARNESSING CPPs
SEB/TRANSCO’S CONCERN:-SEB/TRANSCO’S CONCERN:-
OVERLOADING OF LINE OVERLOADING OF LINE
COMPENSATION FOR LOSSESCOMPENSATION FOR LOSSES
WHEATHER ACCESS MECHANISM IN FORCEWHEATHER ACCESS MECHANISM IN FORCE
CPPs NEEDCPPs NEED
RELAXED CONSTRAINTS ON PLANT OPERATIONRELAXED CONSTRAINTS ON PLANT OPERATION
HIGH AVAILABILITY OF EVACUATION PATHHIGH AVAILABILITY OF EVACUATION PATH
‘‘OPEN ACCESS’OPEN ACCESS’
LET’S TALK MONEY……LET’S TALK MONEY……
THE CPP MUST GET A PRICE BETTER THAN THE CPP MUST GET A PRICE BETTER THAN HIS INCREMENTAL COSTHIS INCREMENTAL COST
THE PURCHASER SHOULD GET THE POWER THE PURCHASER SHOULD GET THE POWER AT THE BEST PRICEAT THE BEST PRICE
THE SEB’S/TRANSCO/DISCOM’S ARE THE THE SEB’S/TRANSCO/DISCOM’S ARE THE INEVITABLE INTERFACE – THEIR SUPPORT INEVITABLE INTERFACE – THEIR SUPPORT IS VITAL TO THE SUCCESS OF THE DEALIS VITAL TO THE SUCCESS OF THE DEAL
DIFFERENT CURVES FOR DIFFERENT CURVES FOR BUYING AND SELLINGBUYING AND SELLING
INSULATES THE TRANSCO FROM LOSSES AND INSULATES THE TRANSCO FROM LOSSES AND OTHER CHARGESOTHER CHARGES
SIMPLE AND TRANSPARENT PROCEDURESIMPLE AND TRANSPARENT PROCEDURE
SEAMLESS OPERATION FOR CPPsSEAMLESS OPERATION FOR CPPs
RESIDUAL UI:- SOME WAY OF APPORTIONING RESIDUAL UI:- SOME WAY OF APPORTIONING CAN BE WORKED OUTCAN BE WORKED OUT
WHAT THE REGULATOR CAN FURTHER DO WHAT THE REGULATOR CAN FURTHER DO TO BRING THE CPPs INTO THE GRIDTO BRING THE CPPs INTO THE GRID
FOR BILATERAL TRADESFOR BILATERAL TRADES TRANSMISSION FLOOR RATES IN SEB PERIPHERY TO BE TRANSMISSION FLOOR RATES IN SEB PERIPHERY TO BE
RATIONALISEDRATIONALISED TIME BOUND PROCEDURES FOR APPROVING OA TIME BOUND PROCEDURES FOR APPROVING OA
TRANSACTIONSTRANSACTIONS
FOR TRADES IN THE SPOT MARKETFOR TRADES IN THE SPOT MARKET MAKE CPPs REPRESENTATIVES MEMBERS OF MAKE CPPs REPRESENTATIVES MEMBERS OF
FORUMS/COMMITTEESFORUMS/COMMITTEES
MAKE THE UI CURVE STEEPERMAKE THE UI CURVE STEEPER VARIABLE COST OF CPPs ARE AROUND Rs 3-5, THIS WOULD VARIABLE COST OF CPPs ARE AROUND Rs 3-5, THIS WOULD
HELP DESPATCH THEM EARLIERHELP DESPATCH THEM EARLIER REGULATE THE ‘BUFFERED’ CURVES ON CASE TO CASE BASISREGULATE THE ‘BUFFERED’ CURVES ON CASE TO CASE BASIS
LINKSLINKSVARIABLE COST AND UI CHANGE
EFFECT
UI PRESENT ANDHYPOTHETICAL
OPPORTUNITYDURING CRISIS
CPP SCHEDULING DASHBOARD
25 MAY 05
CPP SCHEDULING DASHBOARD
11 MAY 05
HARNESSING CPPsHARNESSING CPPs
WHAT IS REQUIRED :-WHAT IS REQUIRED :-
ROBUST SETTLEMENT SYSTEM ROBUST SETTLEMENT SYSTEM
UI:- SPOT MARKET IN PLACEUI:- SPOT MARKET IN PLACE
FINE TUNING OF UI CURVEFINE TUNING OF UI CURVE
- Buffered Buy/Sell Curve- Buffered Buy/Sell Curve
- Further Rationalisation of slope- Further Rationalisation of slope
ESC TO EXIT
SALE OF WIND ENERGY THROUGH STOA:
- NOT A REAL TIME DISPATCHABLE - NOT A REAL TIME DISPATCHABLE ENERGY;ENERGY;
- AVAILABLE ON SEASONAL BASIS;- AVAILABLE ON SEASONAL BASIS;
- - TO BE TAPPED WHENEVER AVAILABLETO BE TAPPED WHENEVER AVAILABLE
- APPLICATION OF ACCESS CHARGES- APPLICATION OF ACCESS CHARGES (Access Charges could very from 10 -25 %)(Access Charges could very from 10 -25 %)
HENCE POSSIBILITY OF SELLING WIND HENCE POSSIBILITY OF SELLING WIND ENERGY THROUGH STOA IS NOT VERY ENERGY THROUGH STOA IS NOT VERY ENCOURAGING.ENCOURAGING.
SALE OF WIND ENERGY THROUGH UI
- CANNOT REGULATE THE GENERATION - CANNOT REGULATE THE GENERATION DEPENDING ON FREQUENCY DEPENDING ON FREQUENCY
AVG. UI RATE COMES IN THE RANGE OF AVG. UI RATE COMES IN THE RANGE OF AROUND Rs. 2.25 - 2.50/ Per unitAROUND Rs. 2.25 - 2.50/ Per unit
HENCE POSSIBILITY OF SELLING HENCE POSSIBILITY OF SELLING THROUGH UI IS ALSO NOT MUCH THROUGH UI IS ALSO NOT MUCH ENCOURAGING.ENCOURAGING.
DETAILS
EXTRACTS FROM KERC ORDER DATED 18EXTRACTS FROM KERC ORDER DATED 18THTH JAN 2005 JAN 2005 IN THE MATTER OF DETERMINATION OF TARIFF IN IN THE MATTER OF DETERMINATION OF TARIFF IN RESPECT OF RENEWABLE SOURCES OF ENERGY.RESPECT OF RENEWABLE SOURCES OF ENERGY.
TYPETYPE UNIT UNIT RATE(RS.)RATE(RS.)
MINI HYDEL PROJECTS (10 YEAR PERIOD)MINI HYDEL PROJECTS (10 YEAR PERIOD) 2.802.80
WIND PROJECTS (10 YEAR PERIOD)WIND PROJECTS (10 YEAR PERIOD) 3.403.40
CO-GENERATION PROJECTS (1CO-GENERATION PROJECTS (1STST YEAR AND YEAR AND 2% PER ANNUM ESCALATION FOR NEXT 9 2% PER ANNUM ESCALATION FOR NEXT 9 YEARS)YEARS)
2.802.80
BIO MASS PROJECTS (1BIO MASS PROJECTS (1STST YEAR AND 2% YEAR AND 2% PER ANNUM ESCALATION FOR NEXT 9 PER ANNUM ESCALATION FOR NEXT 9 YEARS)YEARS)
2.852.85
YEARYEAR AVG.UNIT AVG.UNIT RATE(RS.)RATE(RS.)
2002-032002-03 3.313.31
2003-042003-04 3.483.48
2004-052004-05 3.043.04
2005-062005-06 3.043.04
EXTRACTS FROM APERC ORDERS IN THE EXTRACTS FROM APERC ORDERS IN THE
MATTER OF DETERMINATION OF TARIFF IN MATTER OF DETERMINATION OF TARIFF IN
RESPECT OF RENEWABLE SOURCES OF ENERGY.RESPECT OF RENEWABLE SOURCES OF ENERGY.
GENERATOR
STUDISCOM 2
CONSUMER
DISCOM 1
ACCESS CHARGES UNDER STOA
CASE 1
WHEN BOTH GENERATOR AND CONSUMER ARE EMBEDDED CUSTOMER OF DISCOMS
GENERATOR
STU DISCOM 2
CONSUMER
ACCESS CHARGES UNDER STOA
CASE 2
WHEN ONLY CONSUMER IS EMBEDDED CUSTOMER OF DISCOM
GENERATOR
STU
CONSUMER
ACCESS CHARGES UNDER STOA
CASE 3
WHEN BOTH GENERATOR AND CONSUMER ARE DIRECTY CONNECTED TO STU
UI PRICE CURVE : BUY AND SELL
0
50
100
150
200
250
300
350
400
450
500
550
600
65048
.7
48.8
48.9 49
49.1
49.2
49.3
49.4
49.5
49.6
49.7
49.8
49.9 50
50.1
50.2
50.3
50.4
50.5
50.6
50.7
50.8
50.9 51
FREQUENCY IN HZ
UI P
RIC
E
"BUY" CURVE
"SELL" CURVE
WHY UNBUNDLE ?WHY UNBUNDLE ?
REGULATOR POLITICAL
COSTS
DEMAND SHORTAGE
DEMAND FORECAST
TRADER