Getting right the communication
backbone to address today and
tomorrow’s Smart Grid applications
Nabil Sahri
VP, Business Development
Jakarta – October 11, 2019
2 This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization
SAGEMCOM ENERGY & TELECOM
Infrastructure Micro & OffGridElectricity
Gas & WaterE-V, ,Asset O&M,
Predictive Maintenance
ENERGY BUSINESS LINEGRID & INFRASTRUCTURE SOLUTIONS
N0.1 (ELEC) & N0.1 (GAS)in EUROPE - MIDDLE EAST - AFRICA
3 This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization
SAGEMCOM’S SMART GRID SOLUTION PORTFOLIO
Dev
ices
Net
wo
rkSo
ftw
are
4 This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization
Electricity Gas Water
SAGEMCOM’S SMART GRID SOLUTION PORTFOLIO
IoT devices
UTILITY BUSINESS APPLICATIONS
Billing SystemPrepaymentSystem
WORKFORCE MANAGEMENT
METER DATA MANAGEMENT SYSTEM
Data ManagementData Storage
Business APPLICATIONS
Asset management
HEAD END SYSTEMPLC, LTE, NB-IoT, GPRS, RF
Network management system MACHINE-TO-MACHINE
Key Management System
5 This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization
P1 DSMR
SAGEMCOM: A FOUNDING MEMBER IN STRATEGIC ALLIANCES
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization6
Electricity Metering in numbers
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization7
AMI Software Solutions in numbers
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization8
Using the Power Line to
communicate
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization9
• Per Enedis (French DSO) mandates to have a
communication solution supporting:
• A balance of high data rate, robustness, quality of
service.
• The solution must cover up to the Routing layer with
IPV6 capability and proven in field
• Sagemcom with Maxim Integrated were selected as
Technology Inventors in 2009 for development of
G3-PLC system.
• G3-PLC PHY/MAC and routing specification
completed and passed ENEDIS tender
requirements in 2010.
• Sagemcom was key contributor to update and modify
of G.9903 ITU specification based on its experiences
at various field trials.
• Version 3 was ratified on February 2014.
How G3-PLC Solution Started
High data rate
IPV6 compliant for secure
data Transport
Security and Authentication
Robustness in data
Communication
Smart Grid
and additional
services
Low and High
density areas
Open specification Tailored
to Metering and Smart Grid
Application Globally and
building block for future
Expansion and
Development
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization10
Enedis Roll out strategy (2015-2021)
Courtesy of
G3
G3 G3 G3
G3
Past phases
Pilot deployment
(2009-2011) and
evaluation
2013 2014 2015 2016 2017 20192018 2020
PREPARATION MASS ROLLOUT35,000,000
Up to 8 million meters installed per year
2021
Phase 1 Phase 2
Million of Smart
meters
3 M
8 M
Le
op
ard
pa
ttern
rollo
ut
Start of
Commitmen
t
process
G1/G3
ELECTRICITY - SMART METER DEPLOYMENT
5 years
Smart Meter Roll-Out
2017 2022
20 years
Meter Lifetime
2018 2038
35 M Electricity
Smart Meters
ELECTRICITY - SMART METER DEPLOYMENT
10 Million Meters already
delivered by Sagemcom
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization11
DSOs Requirements G3-PLC Features
To be able to reliably
communicate in harsh
environment
Robustness
• Forward Error Correction + Reed Solomon Encoding + Robust modulation
• Mesh networking
To be able to answer future
needs… in a secure way
Future proof / Security
• IPv6 native
• 128-bit PSK Authentication and ciphering CCM at MAC layer
• Ability to download firmware over the power line
• Ability to accommodate future applications over IPv6
• Compliant with IoT (Internet of Things)
Multisourcing for independence
& better competitiveness
Interoperability
• G3-PLC is an international standard available for free at http://www.itu.int/rec/T-REC-G.9903
• G3-PLC Alliance ensures a large number of solutions served by a community of
silicon and meter vendors
• Availability of a certification program run by the G3-PLC Alliance
Minimum Installation efforts
Minimal maintenance costs
Simplicity
• Plug and Play (Stateless Address Self configuration embedded)
• Statistics available
To be able to operate with
clusters from 2 to 1500 nodes
(meters)
Scalability
• Supports up to 1000 nodes
• Mesh network with routing is self-reconstructing when a link is broken without
impacting the whole cluster
DSOs Requirements and G3-PLC Response
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization12
Main G3-PLC applications
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization13
Over 90 members from more then 30 countries today!
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization14
30 million G3-PLC products in operation in more then 30 countries worldwide
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization15
Examples of recent
developments in G3-PLC
applications
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization16
Making use of the FCC Band to improve the robustness
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization17
Neutralizing household equipment noise
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization18
Solar panels effect in the field
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization19
• Due to nature of power outage, several
approaches are adapted to monitor and notify
power outage by Sagemcom.
• Case 1
• When the power loss occurs at substation the
DCU with CT meter capability detects loss of
voltage and current and uses its internal battery
power to transmit power outage anomaly
through cellular link.
• Case 2
• Reports power outage within a cluster of
meters which is suitable for the feeder outage
management and it minimizes power outage
report into the few messages.
• Reduces network flooding from redundant
massages.
• Case 2a
• Uses similar approach as case 2 but detecting
single meter.
Out Management Notification – Design description
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization20
• G3-PLC uses distributed mesh routing where each node
has autonomous awareness of its surrounding meters
condition
• Each meter stores surrounding meter addresses and time
lapses from the last communication in its Neighbor Table
• When duration of the last communication exceeds the
norm, the surrounding Meters report the anomaly about
missing meters to the DCU
• Illustration of Case 2 :
• When duration of the last communication with meters
M2,M3,M4 and M5 reaches beyond the norm, Meter M12 and
Meter M1 reports the anomaly about these meters to the DCU.
• G3-PLC’s autonomous awareness of its surrounding can
also monitor each meters condition by including additional
steps into their last gasp process
• Illustration of Case 2a:
• DCU uses this information to initiate route discovery to M3 to
verify the lack of communication is not resulted from bad PLC
communication.
• If route discovery failed, the DCU report power outage to head-
end system.
Detecting Case 2 and Case 2a
Case 2: Feeder Outage
Case 2a: Single meter Outage
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization21
• The test is implemented in Enedis Lab for Linky project
where there are 120 meters distributed in 5 layers.
• There is an attenuation of 30 dB between each
layer.
• Control Panel turns meters to ON or OFF position for
Last Gasp detection.
Empirical implementation
DCU
Meters
30 dB attenuation
between layer 1 and 2
Control Panel to Turn
meter ON/OFF
ON OFF
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization22
• Monitor DCU to report state of all meters
• From Control Panel we turn one or several
meters to OFF position
Lab illustration
DCU reports all meters
are operational
Meter under test in ON
position
Meter under test is in
OFF position
Meter(s) under test in
OFF position
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization23
• Upon turning a meter(s) in OFF position. DCU starts receiving anomaly detection from neighboring
meters.
• DCU initiates a route discovery to verify the meter is offline
• DCU reports anomaly detection
Test configurations
DCU reports
Anomaly
detection
Meter’s ID
with power
outage
Duration
39 Seconds
DCU reports
Anomaly detection
Meters’ IDs with
power outage.Duration 171
Seconds
Feeder Outage Detection Single Meter Outage Detection
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization24
• Hybrid Use case
• More restrictive DSO’s requirement
• KPI reequipment changes from 9x% towards 99+%.
• Faster response time
• No communication technology can offer a consistent 99% KPI
• Hybrid solution using two communication can provide higher KPI consistently.
• C3-PLC routing is based on distributed intelligence allowing the support of several commination
technologies under single routing platform.
• Today G3-PLC is supporting PLC and RF SRD simultaneously.
G3-PLC support Multi Communication Devices
G3-PLC Routing
G3-PLC RF NB_IoT
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization25
• The proposed design adapted RF devices to work seamlessly within G3-PLC network.
• Network makes the decision to use RF or PLC as best connection to DCU
• It provides higher KPI
• Offer new services such as establishing multi energy network.
• It can also offer smart city application such as water level detection, greenhouse gas emissions/ air pollution,
Monitor of the energy radiated by cell stations, WiFi and other devices
PLC and RF Homogenous Network
Intranet
Recommend
RF connection
G3-PLC
Network
Head_End
Not Reliable PLC
Comunication
PLC
communication
problem
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization26
The SOGRID Project : End-to-End G3-PLC communication solution
Overall architecture of the telecommunication infrastructure
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization27
The SOGRID Project : Beyond the Low Voltage Applications
Functional diagram and experimentation
This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization28
G3-PLC is a powerful communication backbone for the Smart Grid
• G3-PLC has proven its robustness in the 30+ million AMI nodes already deployed worlwide
• Immunity to electrical network signal pertubations has been increased by covering mutliple frequency
bands (Cenelec, ARIB, FCC)
• Built-in features are enabled through sophisticated software analysis to address DSOs critical
electrical applications (Outage management, Phase detection, Network wiring mapping, …)
• Its robust routing mechanism enables multiple physical media communication technologies (RF,
Cellelular, PLC) to operate simultaniously for mission critical services.