Profile and Capability of GEP Infra Consultants

Page 2: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

2

Vision

“To be recognized as the best consultancy organisation in the field of Infrastructure Development for its

people performance, creativity, technical excellence and dedication”.

Mission

Our mission is acquisition and application of knowledge and thereby succeeds in service delivery from

winning the confidence of client through proven performance.

Company Background

GEP Infrastructure Private Limited (GEPIPL) is a professional multidisciplinary consultancy organization

committed to provide quality services in various disciplines of infrastructure and other developments.

GEPIPL is managed by engineers, planners and ably supported by experts in various disciplines of highest

caliber.

The major fields of specialization of GEPIPL relates to Traffic and Transportation systems of various types

which include highways, expressways, rural roads, urban roads, bridges, flyovers, grade-separated

interchanges amongst others and Water Supply and Sewerage Systems Planning and Design.

GEPIPL provides consultancy services in the following disciplines;

Traffic and Transportation

Traffic Surveys, Data Analysis, Demand Forecast and Traffic Assignment

Traffic/Cost Validation Studies

Pre-Bid Traffic Studies

Review of traffic forecast for Bankers/ Financial Institutes

Traffic Engineering and Management Studies

Traffic Dispersal Scheme

Design of Junction and Terminal Points

Freight and Public Transport Studies

Transportation Planning and System Analysis

Page 3: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

3

Road Way Design

Route Location Studies

Inventory and Visual Condition Assessment

Topographic and Hydrographical Survey

Geotechnical Investigation and Materials Testing

Road Roughness Measurement

Benkelman Beam Deflection Test

Pavement Evaluation and Design

Geometric Design

Design of Bridges, Flyovers, Interchanges and other related Structures

Detail Design of Road, Bridges & Cross Drains

Public Health Engineering

Feasibility study of the proposed system with respect to the demand, environment, supply and other factors Assessment of Water resources & water supply, preparation of preliminary estimate.

Design of Drinking water supply and distribution Network

Design of sewerage and storm water network

Design of the Sewage treatment plant.

Pre Tendering Services

Urban Planning

Quality Control and Assurance

SCOPE OF SERVICES

GEPIPL renders comprehensive consultancy services starting from initial fact finding and appraisal

studies, project preparation, formulation and concept planning, feasibility study, detailed engineering

and pre contract services. The services include:

Preliminary Investigations

Project Identification

Techno-Economic Feasibility Study

Page 4: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

4

Field Surveys/Investigations (Bathymetric, Construction Materials, Geotechnical, Socio-

economic, Topographical, Traffic, etc.) and Analysis.

Economic and Financial Analysis

Conceptual Design

Detailed Design and Engineering of Roads and Highways and Pavement, Infrastructural

development for Township , large commercial complexes, Special Economic Zones(SEZ)

Preparation of project reports, technical specifications, cost estimates, analysis of rates, tender

documents.

Detailed Design of Bridges, Culverts and Other Structures

Quality Control/Assurance

Page 5: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

5

Board of Directors

P.S.Potchi Reddy

P.S. Potchi Reddy is a graduate in Civil Engineering with Specialization in Transportation Planning with 20

years of experience in the field of traffic engineering and transport planning. He has experience in

organizing and conducting Traffic and Transportation and Engineering surveys, data processing and

analysis,, conducting of safety audits, junction design & improvements, feasibility studies for road corridors

expressways & bypasses, preparation of detailed project reports, traffic management plans and traffic

forecasting for road, parking and truck terminal projects.

Mr.Rama Krishna Has about 12 years of experience (includes 5 years Middle east & UK) in carrying out the concept design,

feasibility and detailed designs for Urban and Rural Expressways, Arterial / Collector Streets and Local

Streets, Sea land developments and town ships Has involved design reviews for major road projects in

India,UK and the Gulf region (in the State of Qatar, Libya & Bahrain) starting from Preliminary stage to

Tender and Construction stages.

Mr.E.Surya Prakash Reddy

He has 8 years of experience in the field of Transportation/Highway Engineering Consultancy and

Constructions. He has experience in conducting various Traffic and Transportation Surveys, data coding,

data analysis, traffic forecasting, and mathematical modeling. Conducting of safety audits, feasibility

studies for road corridors expressways & bypasses, preparation of detailed project reports and Financial

Analysis.

Mr.G.V.Ramana Rao He has more than 16 years of experience in the construction supervision of building construction and

road construction. He has also experience in Quality Control and Quality Assurance.

Page 6: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

6

Our Capability

1 Traffic and Transportation

With traffic on our roads forecast to grow multi-fold, there is an ever increasing need for

transport solutions that make the most of existing assets, including road space, whilst meeting

the needs of those who walk, cycle or take the bus.

Backed by our experts in various fields, we can ensure innovative solutions for our clients in

areas such as Traffic Forecast, Traffic Management including Parking Strategies & Traffic Signal

Design, Non-Motorized Transport (Walking & Cycling), Traffic Impact Studies, Traffic Engineering

Studies, etc.

Traffic Data Collection and Analysis

Classified Traffic Volume Counts

O– D Surveys

Willingness to Pay/ Stated Preference Surveys

Turning Movement Count Surveys at intersections

Speed and Delay surveys using Moving Car Method

Socio-Economic Surveys

Traffic Impact Studies

Development proposals that are subject to Planning Control Norms require a traffic

impact analysis to determine transportation concurrency and to estimate traffic impacts

and required improvement/ mitigation measures. We provide Development Proposals

for:

Special Economic Zone Projects

Mixed Development Projects

IT/ Office Complex

Residential projects of ten units or more;

Non-residential projects

Page 7: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

7

Parking Studies

Parking studies are carried out to determine location, use and adequacy of existing

parking facilities as well as future parking requirements including future demand.

The following is the range of issues that are generally addressed in a parking study: Survey of existing parking utilization Estimation of future parking demand Calculation of shared parking opportunities Design of on-street parking or parking lots Design and review of parking lot access and circulation Review of valet parking operations Parking management (time limits, enforcement, parking fees) Cost and financing of Parking lots or structures

Intersection Planning and Design

Intersection geometry, accident history, traffic conflicts, traffic volumes, signal timings

and human factors will be studied.

Traffic signal warrant study Signal design Intersection Geometric Improvement Study Warrants for Grade Separation

Traffic/Cost validation studies

We undertake pre and post bid stage traffic and cost validation studies for State

Highways and National Highways developed on BOT/Annuity basis.

Traffic Engineering Studies

Techno-Economic Feasibility Studies

Page 8: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

8

2. Road Way Design

We undertake geometric design of Highways using software like MX-Road together with

AutoCAD. The graphic files containing survey data will be transferred to design package and the

detailed design and quantity calculations will be executed through the following steps:

Generating Digital Terrain Model (DTM) followed by triangulation and contour plan of the existing ground surface

Designing horizontal alignment of the Proposed center line along the existing alignment and providing geometric improvement wherever necessary

Generating existing ground profile along the Proposed center line; designing vertical Alignment for the proposed center line, so as to match with the formation level of the existing alignment wherever possible and providing geometric improvement wherever necessary.

Creating cross-section templates and roadway libraries showing street-wise applicability of different template.

Running ‘roadway modeller’ to generate proposed road surface showing carriageway and shoulder edges, toe lines of proposed embankment etc.

Generating reports on proposed cross sections and setting out data as well as reports on Horizontal and vertical alignment, clearance of structures and

Utilities, utility relocation etc. using ‘Reports’ module. Calculating earthwork and sub Grade quantities

All the relevant drawings will be prepared in the format as stated in IRC: SP-19.

Collection of various Engineering Surveys Data

Road Inventory and Condition Survey

Pavement Condition survey

Inventory for Culverts, Bridges and Structures

Topographical Surveys and Soil Investigations

Page 9: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

9

Pavement Design

We have a dedicated team who can provide expert advice on the assessment of road

pavements and supporting infrastructure and their deterioration over time.

We can provide effective designs, with pavement testing for both during the

construction and the concession period.

Economic and Financial Analysis

3. Public Health Engineering

Water Supply, Sewerage and Storm Water Drainage System:

Feasibility study of the proposed system with respect to the demand, environment, supply and other factors Assessment of Water resources & water supply, preparation of preliminary estimate.

Water quality analysis, preparation of engineering study report involving population projection, economic analysis of rising main & distribution system.

Purification and recovery of waste water for irrigation and recharging of ground water aquifers.

Development and management of water Resources

Design of Drinking water supply and distribution network Design of sewerage and storm water network Design of the Sewage treatment plant.

Design of Drinking water supply and distribution Network

Page 10: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

10

Design of sewerage and storm water network

Design of the Sewage treatment plant.

Sewerage development and treatment of sewage

Aesthetic water bodies development for recreation designed sewer networks, trunk sewers, pumping stations, oxidation ponds and outfall

Preparation of technical specifications as per the required codal provisions

Preparation of detailed working drawings for the network, appurtenances and structure

4. Quality Assurance and Quality Control

Independent Review and Quality Monitoring the progress of projects

Periodical visits to the site in all stages of project execution

Preparation of standard check lists covering various activities and submit the

Performance report (fortnightly / monthly) to the client

Review test reports on materials that are tested by the Contractor as stated in the Individual Contract Documents.

Select additional materials on random basis for independent testing.

Page 11: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

11

Incorporate results in periodic testing reports and contract monitoring report.

Quality of workmanship.

To make unscheduled visits to site to ensure random surprise checks from time to time to the various works under construction.

5. Urban Planning

Master Planning

The Master Plan produces a concise written report summarizing the development

policies and phasing over time. It is accompanied by a plan defining the finer grain of the

urban frame work at the scale of the urban plot.

Assessment of the environmental, physical, economical, social and planning Context

Translation of vision into a detailed development frame work with the creation of a public realm spatial structure, a selection of appropriate uses and infrastructure.

Implementation and phasing, outlining a development schedule

Site Potential Analysis

Site potential analysis is a process designed for the prospective developer. It provides an

ideal bargaining tool in the early negotiation phase with the planning authorities and the

public. Before land is acquired and before substantial financial means are committed to

the project the client is given at the outset an idea of economic implications.

Site potential analysis assesses development potential so as to determine the likelihood

of obtaining planning permission. It involves the following stages

Visual appraisal of site context and site conditions Design brief development Establishment of preliminary Master Plan Production of final presentation in 2 dimensional and 3 – dimensional formats.

Page 12: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

12

Manpower

S.No. Name of the Staff Member

Qualification Specialisation Number of years

experience 1 P.S.P.Reddy B.E., Master of

Planning Transport Planning

21 2. Ramakrishna R B.Tech., Master of

Urban Engineering Urban Transportation 12

3 E.Surya Prakash Reddy M.Tech. Transportation Engineering 8

4 Ramana Rao D.C.E Civil Engineering 16

5 A.Kamal Kumar M.Tech. Structural Engineering 11

6 T.Gnaneswar M.Tech. Transportation Engineering 2

7 Shruthi Srinivasan M.Tech. Transportation Engineering 6

8 J.Sandeep M.Tech. Transportation Engineering 1

9 Phaneendra STP B.Tech. Civil Engineering 1

10 K.B.Krishna Murthy M.Engg. Public Health Engineering Retd. C.E.

11 S.K.Moinuzzama B.Arch. Urban Planning Retd.P.O.

12 Lovin D.C.E AutoCAD draftsman 6

13 B.Veerendar Intermediate Surveys supervisor 1

14 Srinivas Graduate Surveys supervisor 2

Page 13: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

13

Office address Regd. Office : 504, Maheswari Chambers, Somajiguda, Hyderabad- 500 082

Phone : 040-65742613, 9949473774 Email : [email protected], [email protected] Web Site : www.gepinfra.com

Our Divisions

Page 14: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

14

Our Clients Ramky Infrastructure Limited

AMR Constructions Private Limited

GVR Infra Projects

GKC Constructions

Sowbhagya Projects Private Limited

Jindal Cements Limited

GMR Maharashtra Energy Limited

Roads & Buildings, Govt. of A.P.

IVRCL Ltd.

Association with other Indian Firms Systra MVA Consulting(India) Private Limited Tandon Urban Solutions Private Limited CRAPHTS Consultants (India) Private Limited Artefact Projects Limited Consulting Engineering Services(India) Private Limited Varna Engineering Consulatnts Pvt Ltd.

Page 15: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

15

Summary of Project Experience of the Firm

S.No. Name of the Project Name and Address of

the Client Date of Brief Scope of Work Starting Ending

1 Assessment of Traffic on Jetpur to Somanath section of NH-8D in Gujrath State

M/s Value Engineering, Bangalore 08.06.2010 30.06.2010

Conducting Traffic surveys, Estimation of Traffic, Estimation of traffic leakage, identification of alternate competing routes, Estimation of Toll Revenue, Toll Plaza Locations,

2 Preparation of Detailed Project Report, Execution designs for BRTS in Vizag

GVR Infra Ltd., Chennai 04.07.2010 08.09.2010

Conducting total station survey, soil investigations, preparation of geometric design, pavement design, Bill of quantities(BOQ), Cost Estimation, tender document preparation and evaluation

3

Preparation of Detailed Project Report, Execution designs for Kadapa-Pulivendula (Annutiy Project)

Ms Soubaghya Constructions 01.06.2010 09.09.2010

Conducting total station survey, soil investigations, preparation of geometric design, pavement design, Bill of quantities(BOQ), Cost Estimation, tender document preparation and evaluation

4

Preparation of Intersection Design and Signal Design for the junction along the BRTS corridor in Visakhapatnam

M/s GKC Constructions, Hyderabad 03.06.2010 10.08.2010 Conducting intersection traffic volume count surveys, total

station survey, intersection design and signal design

5 Estimation of Parking Demand around Charminar area in Hyderabad

M/s MVA Systra (India) Private Limited, Mumbai 05.10.2010 10.11.2010 Conducting parking survey, demand estimation

6

Preparation of Detailed Project Report(DPR) for the construction of Hill Road connecting Ultratech Cement near Tadpatri, Anathapur District, Andhra Pradesh

M/s G.Soma Sekhara Reddy,

Anathapur 11.02.2010 15.03.2010

Conducting total station survey, soil investigations, preparation of geometric design, pavement design, Bill of quantities(BOQ), Cost Estimation

7

Preparation of Detailed Project Report(DPR) for the connecting road to Jindal Cement Factory, near Nandyal, Kurnool district, Andhra Pradesh

M/s Jindal Steel Works, Hyderabad 23.12.2010 22.01.2011

Conducting total station survey, soil investigations, preparation of geometric design, pavement design, Bill of quantities(BOQ), Cost Estimation, tender document preparation and evaluation

8 Preparation of Detailed Feasibility Report(DFR) for

Roads and Buildings Division, 18.02.2011 15.04.2011 Conducting total station survey, soil investigations,

preparation of geometric design, pavement design, Bill of

Page 16: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

16

widening from single lane to two lane of Kodangal to Gulbaraga Road in Mahboobnagar district

Mahaboobnagar, Andhara Pradesh

quantities(BOQ), Cost Estimation, tender document preparation and evaluation

9

Preparation of Pre-Feasibility and Feasibility Study Report for Signal Free Corridor from Cubban Road to Outer Ring Road via Kamraj Road in Benguluru.

Tandon Urban Solutions Private Limited, Mumbai. 19.03.2011 On going

Conceptual design of elevated corridor and Technical and Economical Feasibility Study for Signal Free Corridor from Cubban Road from Outer Ring Road via Kamraj Road.

10 Preparation of Pilani Urban Infrastructure Project, Pilani, Rajasthan.

Birla Charitable Trust 30.04.2011 06.06.2011

Preparation of Pre-Feasibility study for the improvement of infrastructure facilities like Roads, Sewerage, Storm Water Drainage, Solid Waste Management, Street Lighting, Rain Water Harvesting etc.

11

Preparation of Detailed Design of Hata-Silapuri-Darguwan Road on BOT(Toll plus Annuity) in Madhya Pradesh.

Soubhagya Projects Private Limited,

Hyderabad. 15.06.2011 On going

Conducting total station survey, soil investigations, preparation of geometric design, pavement design, Bill of quantities(BOQ), Cost Estimation,

12

Engagement of Consultant for carrying out detailed engineering services for the approach road from the Umbarghar jetty to the proposed site, for the proposed 1200 MW Gas based combined cycle power plant of GMR Maharastra Energy Lmited (GMEL) at Dapoli Taluka, Ratnagiri District, Maharastra.

GMR Energy Ltd 23.07.2011 On going Surveys, Investigations, Detailed designs for proposed road, including preparation of Bill of quantities, cost estimates and preparation of Tender documents.

13

GVMC – Projects – JNNURM-Balance stretch of 2 km – Investigation, survey, Design and execution of Bus Rapid Transit System (BRTS) Corridor from ch. 14 to ch 16 with 2 years defect liability under EPC system.

GVR Infra Projects Ltd., 25.07.2011 On going Surveys, Investigations, Detailed designs for proposed road, including preparation of Bill of quantities, and cost estimates.

Page 17: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

17

14

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Angul – Sambalpur section of NH-42 (km 112 – km 265) in the state of Orissa under NHDP-IV on Design, Build, Finance Operate and Transfer on BOT (TOLL) basis.

Ramky Infrastructure Ltd 27.07.2011 22.08.2011

Traffic surveys and analysis Estimate toll revenue for the concession period Identification of project risks Road and Bridge Inventory Earth work calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations like borrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis.

15

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Sanga Reddy to MH_KNT border section of NH-9(km 348.000 – km 493.000) under NHDP-IV on Design, Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Ramky Infrastructure Ltd 06.09.2011 20.09.2011

Traffic surveys and analysis Estimate toll revenue for the concession period Identification of project risks Road and Bridge Inventory Earth work calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations like borrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis.

16

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Cuttak - Angul section of NH-9(km 0.000 – km 112.000) in the state of Orissa under NHDP-IV on Design, Build, Finance, Operate and Transfer on BOT (TOLL) basis.

AMR Constructions Hyderabad 06.09.2011 20.09.2011

Traffic surveys and analysis Estimate toll revenue for the concession period Identification of project risks Road and Bridge Inventory Earth work calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations like borrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis.

17

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Zirakpur to Patiala section of NH-64(km 0.000 – km 50.700) in the

Ramky Infrastructure Ltd 22.10.2011 04.11.2011

Traffic surveys and analysis Estimate toll revenue for the concession period Identification of project risks Road and Bridge Inventory Earth work calculations

Page 18: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

18

state of Punjab on Design, Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Preparation of GAD for structures Preliminary Pavement design Filed Investigations like borrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis.

18

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Birmitrapur to Barakote section of NH-23(km 211.200–km 335.800) in the state of Orissa on Design, Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Ramky Infrastructure Ltd 18.11.2011 01.12.2011

Traffic surveys and analysis Estimate toll revenue for the concession period Identification of project risks Road and Bridge Inventory Earth work calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations like borrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis.

19 Preparation Road Safety Audit for National Highway No. 5, 215 and 203 in the state of Orissa.

CRAPHTS Consultants (India) Private Limited,

New Delhi. 01.12.2011 On going

Collection and analysis of Accidents data from the police stations along the project corridors for the last two years. Preparation of safety audit report during development stage and construction stage.

20

Pre-tendering Engineering services for Four Laning of Obedullaganj Betul section of NH-69 from km 2.800 to 8.300 and from km 20.700 to km 137.000 (approx. length 121.36 km) (excluding wild life sanctuary from km 8.300 to km 20.700)(Except Bypass 28.000 to km 61.500 as Two Lane with paved shoulder) in the state of MP to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase III

Ramky Infrastructure Ltd 17.12.2011 07.01.2012

Traffic surveys and analysis Estimate toll revenue for the concession period Identification of project risks Road and Bridge Inventory Earth work calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations like borrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis.

Page 19: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

19

21

Pre-tendering Engineering services for Four laning of CHANDIKHOLE-DUBARI-TALCHER section of NH-200 from km 301.890 to km 428.030 including km 8.500 to km 15.750 of NH-23 in the state of Orissa to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase III

Ramky Infrastructure Ltd 07.02.2012 20.02.2012

Traffic surveys and analysis Estimate toll revenue for the concession period Identification of project risks Road and Bridge Inventory Earth work calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations like borrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis.

22

Pre-tendering Engineering services for Four Laning of Solapur-Bijapur section of NH – 13 from km. 0.00 to km. 110.542 to be executed as BOT (Toll) basis on DBFOT Pattern under NHDP Phase III

Ramky Infrastructure Ltd 03.03.2012 16.03.2012

Traffic surveys and analysis Estimate toll revenue for the concession period Identification of project risks Road and Bridge Inventory Earth work calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations like borrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis.

23

Pre-tendering Engineering services for Four laning of Coimbatore-Mettupalayam section of NH-67 from Km 377.780 in the state of Tamilnadu to be executed as BOT on DBFOT(Toll) Basis

AMR Constructions Hyderabad 03.03.2012 26.03.2012

Traffic surveys and analysis Estimate toll revenue for the concession period Identification of project risks Road and Bridge Inventory Earth work calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations like borrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis.

24 Pre-tendering Engineering services for Rehabilitation and upgradation to Six laning of

IVRCL Limted Vishakapatnam 03.03.2012 28.03.2012

Traffic surveys and analysis Estimate toll revenue for the concession period Identification of project risks

Page 20: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

20

Anakapalli- Anandapuram section of NH-5 from Km 682+980 to Km 741+202 in the state of Andhra Pradesh to be executed as BOT (toll) on DBFOT Pattern UNDER NHDP PHASE- V

Road and Bridge Inventory Earth work calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations like borrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis

25

Pre-tendering Engineering services for Rehabilitation and upgradation to Six laning of Gundugolanu to Rajahmundry section of NH-5 from Km 80+000 to Km 200+000 in the state of Andhra Pradesh to be executed as BOT (toll) on DBFOT Pattern UNDER NHDP PHASE- V

IVRCL Limted Vishakapatnam 03.03.2012 28.03.2012

Traffic surveys and analysis Estimate toll revenue for the concession period Identification of project risks Road and Bridge Inventory Earth work calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations like borrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis

26

Detailed Design and Engineering Services for two laning of Bahri-Hanumana BOT(Toll+Annuty) in the state of Madhya Pradesh

GVR Infra Projects Ltd., 22.03.2012 On Going

27

Preparation of plan and profile Design for 2 MDR of Length 135 Km in the state of Madhya Pradesh

Varna Engineering Consultants Pvt Ltd. 26.03.2012 On going

Pavement Design Plan and Profile Design Junction Design Sign and Markings Preparation of Detailed BOQ with analysis

Page 21: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

21

28 Preparation of Detailed Project Report for Comprehensive Water Supply Scheme in Adoni Municipality.

Adoni Municipality,ADONI.

06.03.2012 On going Reviewing the existing situation and undertaking necessary assessments.

Feasibility analysis and detailed planning. Keeping the view the broader thrust, as stated

above, the specific scope of study is again broken up as given below:

Reviewing population projections for horizon years 2013, 2028, 2043.

Review of maps and drawings available with concerned authorities.

Water demand assessments. Analysis, scoping and screening of key social,

environmental aspects

Page 22: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

22

Name of Staff : Mr. P.S. Potchi Reddy

Date of Birth : 2nd November, 1964

Nationality : Indian

Educational Qualifications:

B.E. in Civil Engineering from Marathwada University, Aurangabad, in 1990.

Master of Planning with Specialization in Transportation Planning, School of Planning and

Architecture, New Delhi, 1998.

Membership of Professional Societies :

Member, Institute of Urban Transport, India

Member, Indian Roads Congress

Trainings :

Attended two weeks training programme on “Traffic and Transportation Planning” conducted by

Central Road Research Institute (CRRI), New Delhi.

Attended one week training programme on “Metropolitan Transport Management” conducted

by Yaswantrao Chavan Academy of Development Administration (YASHADA), Pune.

Publication :

Paper on “Accident Analysis on National Highways” case study Pimpalgoan-Gonde section of

NH-3, 2001.

Paper on “Preparation of Master Plan with innovative techniques” case study Master Plan for

Visakhapatnam Metropolitan Region, 2004.

Page 23: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

23

Employment Record:

From March,2011 M/sGEP Infrastructure Private Limited, Hyderabad

Managing Director

1. Consultancy Services for Preparation of Detailed Project Report(DPR) for the connecting road to Jindal Cement Factory, near Nandyal, Kurnool district, Andhra Pradesh

Project Length : 22. Km, 2 lane Rigid pavement

Funding : Jindal Steel Limited

Client : Jindal Steel Limited

Position : Team Leader and Traffic Engineer

Location : Nandyal

2. Preparation of Detailed Feasibility Report(DFR) for widening from single lane to two lane

of Kodangal to Gulbaraga Road in Mahboobnagar district

Project Length : 5.0 Km, 2 lane

Funding : Roads & Buildings Department

Client : Roads & Buildings Department

Position : Team Leader and Traffic Engineer

Location : Kodangal

3. Preparation of Pre-Feasibility and Feasibility Study Report for Signal Free Corridor from

Cubban Road to Outer Ring Road via Kamraj Road in Benguluru. Project Length : 18.5 Km

Funding : Bangalore Development Authority(BDA)

Client : Tandon Urban Solutions Private Limited, Mumbai

Position : Team Leader and Traffic Engineer

Location : Bangalore

4. Preparation of Detailed Design of Hata-Silapuri-Darguwan Road on BOT(Toll plus Annuity)

in Madhya Pradesh. Project Length : 64.0 Km

Funding : Madhya Pradesh Road Development Corporation(MPRDCL)

Client : Soubhagya Projects Private Limited

Position : Team Leader and Traffic Engineer

Location : Madhya Pradesh

Page 24: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

24

5. Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Angul – Sambalpur section of NH-42 (km 112 – km 265) in the state of Orissa under NHDP-IV on design,build,finanace operate and transfer on BOT (TOLL) basis. Project Length : 153.0 Km

Funding : Ramky Infrastructure Limited

Client : Ramky Infrastructure Limited

Position : Team Leader and Traffic Engineer

Location : Orissa

6. Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of MH_KN- Border to Sanga Reddy section of NH-9 from km 348.00 to Km 493.00 under NHDP-IV on design,build,finanace operate and transfer on BOT (TOLL) basis. Project Length : 145.0 Km

Funding : Ramky Infrastructure Limited

Client : Ramky Infrastructure Limited

Position : Team Leader and Traffic Engineer

Location : Andhra Pradesh

7. Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Cuttack - Angul section of NH-42 (km 0.000 - km 112) in the state of Orissa under NHDP-IV on design,build,finanace operate and transfer on BOT (TOLL) basis.

Project Length : 112.0 Km

Funding : AMR Constructions Limited

Client : AMR Constructions Limited

Position : Team Leader and Traffic Engineer

Location : Orissa

From Sep 2010 to March,2011 M/s Arvee Associates Architects Engineers

& Consultants Pvt. Ltd. Vice President

1. Consultancy Services for labeling, conducting traffic surveys, road inventory survey and

prioritization of 3 lane and above major roads for strengthening in Greater Hyderabad

Municipal Corporation jurisdiction.

Project Length : 800 Km, 3 lane and above

Funding : Greater Hyderabad Municipal Corporation (GHMC)

Page 25: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

25

Client : Greater Hyderabad Municipal Corporation (GHMC)

Position : Team Leader and Traffic Engineer

Location : Hyderabad

2. Consultancy Services for preparation of revision of Master Plan for Rajahmundry

Municipal Corporation area.

Project area : 80 Sq.Km

Funding : Rajahmundry Municipal Corporation

Client : Rajahmundry Municipal Corporation

Position : Traffic and Transportation Expert

Location : Rajahmundry

3. Consultancy Services for assessment of traffic impact due to the development of

Knowledge City at Hitech City in Hyderabad.

Project area : 31.5 acres(6.0 million sq.ft. area development)

Funding : DLF Limited

Client : DLF Limited

Position : Team Leader cum Traffic and Transportation Expert

Location : Hyderabad

Mar 2002 to Aug 2010 Consulting Engineering Services (I) Ltd., New Delhi

Senior Engineer/Deputy Project Manager/Project

Manager/Deputy General Manager/General Manager

4. Consultancy for Preparation of Pre-feasibility report for the Construction of Ring

Road/Bypass for Lucknow and Varansi cities of length 250 kms of 4 lanes in the state of

Uttar Pradesh.

Project Length : 250 Km, 4 lane

Project Cost : INR 3250 Crores

Funding : National Highways Authority of India

Client : National Highways Authority of India

Position : Traffic Engineer cum Safety Expert

Location : Uttar Pradesh

Page 26: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

26

5. Consultancy Services for Preparation of Feasibility-cum-Preliminary Design for Standalone

Bypasses/Ring Road of length 445 kms of 6 lane for Viskhapatnam City in the State of

Andhra Pradesh under NHDP Phase VII.

Project Length : 45 Km, 6 lane

Project Cost : INR 450 Crores

Funding : National Highways Authority of India

Client : National Highways Authority of India

Position : Traffic Engineer cum Safety Expert

Location : Andhra Pradesh

Job scope, responsibilities includes:

As Traffic Engineer-cum-Safety Expert he was responsible for developing Quality Assurance

Plan and implementation procedure; evolve, finalize; formats and requirement of traffic

surveys including location of traffic surveys; supervise all traffic surveys and analyze traffic

data; identify bypass locations and location of traffic control; carryout preliminary design of

intersection and interchanges; identify and design road furniture, traffic safety facilities

including traffic safety measures. He was also involved in preparation of Traffic

Management Plans, assist Team Leader in conducting Road Safety Audit; suggesting the

complete layout and design of access regulation measures, traffic safety facilities and

provide such solutions which enhance safety during construction and operation phase.

6. Consultancy Services for preparation of Detailed Project Report for infrastructure facilities

in Aviation Special Economic Zone (SEZ), Shamshabad, Hyderabad.

Project Length : 50 Km, 4 lane

Project Cost : INR 450 Crores

Funding : GMR

Client : GMR

Position : Project Co-ordinator / Traffic & Transportation Expert

Location : Andhra Pradesh

Job scope, responsibilities includes:

As Project Coordinator/Traffic & Transportation Expert he was responsible for preparation

of traffic management plans, conducting traffic surveys, data collection, analysis, liaison,

bills processing and realization of payments.

Page 27: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

27

7. Preparation of Detailed Feasibility Report for Upgradation of Single lane and Intermediate

lane roads into 2/4 lane roads from Kalwakurthy to Nandyal of length 174 kms in the state

of Andhra Pradesh

Project Length : 174 Km, 2/4 lane

Project Cost : INR 430 Crores

Funding : Andhra Pradesh Road Development Corporation

Client : Andhra Pradesh Road Development Corporation

Position : Traffic Engineer

Location : Andhra Pradesh

8. Preparation of Detailed Project Report for Bus Rapid Transit System in Vijayawada in the

state of Andhra Pradesh

Project Length : 50 Km, 4 lane

Project Cost : INR 90 Crores

Funding : JNNURM

Client : Vijayawada Municipal Corporation (VMC)

Position : Traffic Engineer

Location : Andhra Pradesh

9. Preparation of Detailed Feasibility Report for the construction of Bridge across River

Tungabhadra near Alampur in Mahaboob Nagar district in the state of Andhra Pradesh.

Project Length : Road : 2.2 kms (Bridge : 1.2 kms) of 2 lanes

Project Cost : INR 33.09 Crores

Funding : Andhra Pradesh Road Development Corporation (APRDC)

Client : Andhra Pradesh Road Development Corporation (APRDC)

Position : Traffic Engineer

Location : Andhra Pradesh

Page 28: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

28

10. Preparation of Detailed Feasibility Report for the Construction of Bridge across River

Krishna to connecting Kollapur in Mahaboob Nagar district and Siddeswaram in Kurnool

district.

Project Length : Roads : 11.6 kms (Bridge : 2 kms) of 2 lanes

Project Cost : INR 131.08 Crores

Funding : Andhra Pradesh Road Development Corporation (APRDC)

Client : Andhra Pradesh Road Development Corporation (APRDC)

Position : Traffic Engineer

Location : Andhra Pradesh

Job scope, responsibilities includes:

As Traffic Engineer he was responsible for organizing and monitoring traffic surveys, data

analysis, estimation of growth rates, safety studies, preparation of traffic management

plans, pavement condition survey of existing roads through visual assessment, BBD surveys,

various soil tests, identification of borrow areas and quarry sites, analyzing the data

obtained from testing of soil and aggregate samples traffic forecasting, identification of

major accidents points and preparation of traffic management / safety manuals and

strategies, conducting safety audits for enhancing traffic safety along the project highway

etc.

He was involved in review of data analysis and implementation of safety manuals as per

the data incorporated in safety audits. Intermittent inputs interms of – Review of growth

rate estimation and re-identification of accident spots during Project Management

Consultancy Phase. He was also involved in preparation of safe alignment of approach

roads to the bridge, Geometric and pavement design of the approach roads and preparation

of Detailed Feasibility Report including Transaction services.

11. Preparation of Comprehensive Traffic and Transportation Plan for Vijayawada Municipal

Corporation area.

Project Area : 61.88 Sq.kms

Project Cost : INR 5500 Crores

Funding : Vijayawada Municipal Corporation, Vijayawada

Client : Vijayawada Municipal Corporation, Vijayawada

Position : Transportation Planner

Location : Andhra Pradesh

Page 29: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

29

Job scope, responsibilities includes:

Comprehensive study of traffic problems and to evolve feasible solutions to the problems,

Vijayawada Municipal Corporation has initiated a study on Comprehensive Traffic and

Transportation.

As Transportation Planner he was responsible for collecting traffic data, planning of road

networks, junction improvement studies, safety aspects, planning / conducting field and

traffic surveys including household survey, data analysis and preparation of base year

network.

12. Preparation of Perspective Transportation Plan for Navi Mumbai Special Economic Zone,

Navi Mumbai. (comprising of roads of length 125 kms of 6/8 lanes)

Project Length : 125 kms, 6/8 lanes

Project Cost : INR 1000 Crores

Funding : Navi Mumbai Special Economic Zone Company Limited

Client : Navi Mumbai Special Economic Zone Company Limited

Position : Traffic Engineer

Location : Andhra Pradesh

Job scope, responsibilities includes:

The Government has appointed NMSEZ Company Limited owned by Reliance India Limited

to develop Special Economic Zone in Navi Mumbai. The Navi Mumbai Special Economic

Zone consists of Dronagiri, Kalamboli and Ulwe nodes in Navi Mumbai. The NMSEZ

Company Limited has assigned the study to prepare Feasible Transportation Plan.

As Traffic Engineer he has conducted all types of Traffic and Transportation Surveys,

preparation of traffic management plans, analysis of the Survey Data and estimated the

impact of SEZ on the surrounding road network. He has also estimated traffic generated by

different activities proposed in NMSEZ area, distribution of trips between various activities

and preparation of external connectivity to SEZ area.

13. Preparation of Detailed Project Report for Bus Rapid Transit System in Hyderabad with

roads of length 16.5 kms of 4 lanes.

Project Length : 16.5 kms, 4 lanes

Project Cost : INR 424.32 Crores

Funding : Greater Hyderabad Municipal Corporation (GHMC)

Page 30: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

30

Client : Greater Hyderabad Municipal Corporation (GHMC)

Position : Traffic Engineer

Location : Andhra Pradesh

Job scope, responsibilities includes:

As Traffic Engineer he was responsible for organizing topographic surveys, traffic surveys,

pavement condition survey of existing roads through visual assessment, BBD surveys,

various soil tests, identification of borrow areas and quarry sites, testing of soil and

aggregate samples etc and data analysis.

14. Preparation of Feasibility and Detailed Project Report for the Construction of Tunnel across

Simhachalam Hill in Visakhapatnam City

Project Length : 3.5 kms, 6 lanes

Project Cost : INR 138 Crores

Funding : GVMC & JNNURM

Client : Greater Visakhapatnam Municipal Corporation (GVMC),

Visakhapatnam

Position : Resident Project Manager / Traffic Engineer

Location : Andhra Pradesh

Job scope, responsibilities includes:

The Greater Visakhapatnam Municipal Corporation (GVMC) has proposed to construct a

tunnel across Simhachalam Hill to provide access to the commuters of near by habitations.

As Resident Project Manager/Traffic Engineer he was responsible for planning and

organizing Engineering surveys, geo-technical investigations and total station survey, traffic

surveys including opinion survey, data analysis, estimation of growth rates, traffic

projection, lane requirement and estimation of traffic diverted to Tunnel. He was also

involved in the Geometric Design and Pavement design of the approach roads to the

Tunnel.

15. Preparation of Techno-Economic Feasibility and Detailed Project Report for the

construction of Road Over Bridge and Road Under bridge in lieu of Level crossings in

Chennai.

Project Length : 2.5 kms, 2 lanes

Project Cost : INR 25 Crores

Funding : World Bank

Page 31: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

31

Client : Chennai Metropolitan Development Authority

Position : Traffic Engineer

Location : Chennai

Job scope, responsibilities includes:

As Traffic Engineer he was responsible for planning, organizing and monitoring traffic

surveys, topographic surveys, data analysis, estimation of growth rates, traffic forecasting,

identification of major accident points and preparation of traffic management / safety

manuals, and preparation of feasibility report on the basis of EIRR developing strategies for

enhancing traffic safety along the project highway. He was also involved in Expressway

traffic estimation based on traffic surveys and network assignment.

16. Preparation of Feasibility and Detailed Project Report for the Construction of

Flyovers/Underpasses in Visakhapatnam City.

Project Length : 6 kms, 4 lanes

Project Cost : INR 60 Crores

Funding : Greater Visakhapatnam Municipal Corporation (GVMC),

Visakhapatnam

Client : Greater Visakhapatnam Municipal Corporation (GVMC),

Visakhapatnam

Position : Traffic Engineer

Location : Noida

Job scope, responsibilities includes:

GVMC has proposed, under this project, to construct flyovers at selected locations to ease

traffic congestion in Visakhapatnam City.

As Traffic Engineer he was responsible for planning and organizing Engineering and traffic

surveys, analysis and preparation of feasibility report on the basis of EIRR.

17. Revision of Master plan for Visakhapatnam Metropolitan Region and Zonal Development

Plan for five town’s viz. Anakapalli, Gajuwaka, Visakhapatnam, Bheemunipatnam and

Vizianagaram.

Project Area : 1750 sq kms; (Road Length: 500 kms of 2/4 lanes)

Project Cost : INR 12000 Crores

Funding : VUDA & State Government

Page 32: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

32

Client : Visakhapatnam Urban Development Authority (VUDA),

Visakhapatnam

Position : Transportation Planner

Location : Noida

Job scope, responsibilities includes:

VUDA has taken up to revise the Master plan for Visakhapatnam Metropolitan Region(VMR)

and Zonal Development Plan for Visakhapatnam, Gajuwaka, Anakapalli, Bheemunipatnam

and Viziangaram which was prepared in 1989.

As Overall In-Charge of Project Site at Visakhapatnam in general, he was responsible for

Traffic and Transportation aspects in particular.

As Transportation Planner he was responsible for collecting data, planning and organizing

traffic surveys including Household survey and Land use survey, data analysis and

preparation of Traffic Management Schemes and preparation of pre-feasibility report for

introduction of Integrated Mass rapid Transit System in Visakhapatnam City.

18. Traffic Studies for 4 laning of Tindivanam-Trichy section of NH-45 and Trichy - Madurai

section of NH-45B of total length 45 kms in the state of Tamil Nadu.

Project Area : 45 kms (4 lanes)

Project Cost : INR 500 Crores

Funding : Council for Industrial Development Corporation

Client : Council for Industrial Development Corporation

Position : Traffic Engineer

Location : Tamilnadu

Job scope, responsibilities includes:

As Traffic Engineer he was responsible for organizing and monitoring traffic surveys, data

analysis, estimation of growth rates, traffic forecasting, identification of major accidents

points and preparation of safety manual / strategy for enhancing traffic safety along the

project highway.

Page 33: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

33

Aug 2001 to Feb 2002 Sheladia Associates & Consultants Pvt. Ltd.

Senior Engineer / Traffic Engineer

19. Detailed Project Report for Proposed Widening from existing 2 lane to 4 lane of Mumbai-

Agra section of NH-3 road from Pimplegaon to Gonde of length 60 kms on BOT basis.

Project Area : 60 kms (4 lanes)

Project Cost : INR 330 Crores

Funding : BOT basis (PPP Project)

Client : Ministry of Road Transport and Highways, New Delhi

Position : Traffic Engineer

Location : Maharashtra

Job scope, responsibilities includes:

Ministry of Road Transport and Highway(MORTH) has taken up the improvement of major

National Highways operating under NHDP. Mumbai – Agra Road (NH-3) is one such

improvement corridor.

As Traffic Engineer he was responsible for organizing and monitoring traffic surveys, data

analysis, estimation of growth rates, traffic forecasting, identification of major accident

black points, preparation of strategy for enhancing traffic safety.

20. Station Area Traffic Improvement Schemes for Borivali Railway Station project comprising

of roads of total length 75 kms of 2/4 lanes.

Project Area : 75 kms (2/4 lanes)

Project Cost : INR 30 Crores

Funding : World Bank

Client : Mumbai Metropolitan Region Development Authority, Mumbai

Position : Traffic Engineer

Location : Maharashtra

Job scope, responsibilities includes:

To improve the traffic condition in and around sub urban railway stations in Mumbai,

MMRDA proposed Station Area Traffic Improvement Scheme (SATIS) at selected sub urban

railway stations including Borivali under Mumbai Urban Transport Project (MUTP).

Page 34: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

34

As Traffic Engineer, responsible for review of earlier studies conducted by various

organizations, planning and organizing of Traffic surveys including Rail and Bus commuter

survey, preparation of alternative Traffic Improvement Schemes and recommending a

Traffic Management Scheme for implementation.

Sep 1992 to Jul 2001 Mumbai Metropolitan Region Development

Authority

Jun 1997 to Dec 1998 Pursued 'Master of Planning'

(Employer Sponsored)

On behalf of MMRDA he has worked on World Bank assisted Mumbai Urban Transport

Project (MUTP-II) preparatory studies, involved in the preparation of Terms of Reference

(TOR), evaluation and selection of consultants and monitoring and scrutiny of consultant’s

performance. MUTP is a multi-model project prepared by Government of Maharashtra to

seek financial assistance from World Bank.

His other assignments include:

21. As Traffic Engineer, Prepared Road Network Improvement schemes in and around Bandra

Kurla Complex, Bandra, Road Length: 12.0 kms of 4 lanes.

22. As Traffic Engineer, Conducted Traffic surveys, analysed and prepared Feasibility Report for

the construction of Road Over Bridge (ROB) in lieu of Level Crossing near Virar on Western

Railway, Road Length: 2.5 kms of 4 lanes.

23. As Traffic Engineer, Conducted Traffic Volume count surveys, pedestrian count surveys, and

pedestrian opinion surveys and prepared Feasibility Report for the construction of

Pedestrian Subways in Greater Mumbai, Road length: 15.0 kms of 4 lanes.

24. As Traffic Engineer, Prepared Traffic Management Schemes by conducting traffic surveys for

Road Over Bridges (ROBs) in Greater Mumbai, Road length: 10.0 kms of 4 lanes.

25. As Traffic Engineer, Conducted various traffic surveys, commuter surveys at railways

stations, analysed and prepared Station Area Traffic Improvement Schemes (SATIS) for 3

railway stations in Greater Mumbai, Road length: 45.0 kms of 2/4 lanes; Project Cost: Rs

60.00 crores

Page 35: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

35

26. As Traffic Engineer, Carried out traffic volume count and pedestrian count surveys for the

Preparation of Feasibility Report for the construction of Catwalk between C.S.T.Railway

Station and Churchgate Railway Station, Road length: 2.0 kms of 4 lanes.

27. As Traffic Engineer, Prepared Traffic Management Scheme around Mantralaya in Greater

Mumbai, Road length: 15.0 kms of 4 lanes.

28. As Traffic Engineer, Conducted traffic volume count surveys, parking surveys and prepared

road improvement proposal for Sion Dharavi Link Road in Mumbai, Road length: 5.0 kms of

4 lanes.

29. As Junior Transportation Planner, Supervised and Monitored the traffic surveys and the

progress of the Comprehensive Traffic and Transportation Study for Mumbai Metropolitan

Region (MMR), Road length : 5000.00 kms of 2/4/6 lanes.

Feb 1991 to Sep 1992 CRAPHTS, New Delhi

Traffic Engineer / Asst. Traffic Engineer

30. Conducted Traffic Surveys, Parking surveys, analyzed and prepared Parking and Traffic

Circulation System for 9 NDMC Markets in New Delhi, Client: NDMC, New Delhi; Project

length: 10.0 kms of 4 lanes.

31. Parking and Traffic Circulation System for Ring Railway Stations in New Delhi, RITES.

32. Parking and Traffic Circulation System for Metro Railway Stations in New Delhi, RITES.

Page 36: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

36

Name R.Ramakrishna PROFESSION Highway Engineer SPECIALISATION Highway Design / Traffic & Transportation planning NATIONALITY Indian QUALIFICATION Master of Engineering, in Urban Engineering, Division of Urban Transport

Systems Development, (ANNA UNIVERSITY, INDIA

Bachelor of Technology, in Civil Engineering (NGARJUNA UNIVERSITY, INDIA) KEY EXPERIENCE Has about 10 years of experience (includes 5 years Middle east & UK) in carrying out the concept design,

feasibility and detailed designs for Urban and Rural Expressways, Arterial / Collector Streets and Local

Streets, Sea land developments and town ships Has involved design reviews for major road projects in

India,UK and the Gulf region (in the State of Qatar, Libya & Bahrain) starting from Preliminary stage to

Tender and Construction stages. Well versed with

QATAR/BAHRAIN/ABUDHABI/AASHTO/DMRB/AUSTROADS and IRC design standards and conversant

with the geometric design of expressways, roundabouts, major/minor junctions, Parking Areas and

Pavement design including flexible and Rigid, preparation of cost estimates, project design reports, and Bill

of Quantities. Has good experience in conceptual planning of townships and carrying out the feasibility

and detailed designs of township roads and infrastructure components. Well experienced in Geometric designs for Motorways/NH/Hill Roads and Town Ships includes Multi

Level Inter changes, At Grade Major Junctions, Roundabout and Priority Junctions.

Well experienced in Pavement designs for different Geographic standards for flexible, Rigid and Paver

Blocks designs for Highways and local streets.

Has involved in Traffic Impact and Transportation planning studies in The State of QATAR, Kingdom of

Bahrain, Libya, Kuwait and India. Well experienced in TRIP generation estimates as per DUBAI Traffic

manual for various developments, Junction capacity analysis, Traffic signal designs using aaSIDRA

Well experienced in Bilingual Sign face designs, sign post and sign foundation design, road signs &

markings for different regions in Middle East & India Has good exposure to KEY SIGNS software for sign

face designs in UK region.

Page 37: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

37

Experience in Independent Quality Audit and Quality control tests for Major road construction projects in

India funded by World Bank and Asian Development Bank. Has involved in construction supervision for

major highway works in India.

Work experience in conducting Road Safety Audits during concept, preliminary, detailed design stage and

also pre and post construction stage for different roads and developments.

Work experience Major surface and multi level car parking studies in India and Middle East region. Has

involved in review internal circulation plans, access and egress arrangement and pedestrian facilities in

parking areas.

Well experience in design coordination with various design teams and CAD teams for timely deliverables

and proven record of client satisfaction

Good exposure in using MX software, aaSIDRA, arcady, Picady and well versed with all engineering surveys

required for major highway projects (Road Inventory and Pavement Condition survey, BBD survey,

Bridge/Culvert Condition survey, Traffic Surveys) and analysis of data obtained from the surveys.

EMPLOYMENT RECORD

May,2011-Till date Director, GEP Infrastructure Private Limited

March 2010 –April.2011

DY. General Manager (Highway Design) – CEG

Apr 2005 – March 2010 Highway cum Transportation Engineer, ATKINS - UK,ME & India

May 2001 – Apr 2005 Highway Engineer, Wilbur Smith Associates, INDIA

MAJOR LAND MARK - PROJECTS INVOLVED Designation Project Client

Highway Design Engineer DBFO – LONDON RING ROAD – M25 MOTORWAY WIDENING

Highway Agency UK

Highway Design Engineer New Doha International Airport – Roads and Infrastructure

Ashgal (Ministry of Public Works), Qatar (PMC – Bechtel)

Highway Design Engineer Bahrain Bay – New Township – Roads and Infrastructure (on reclaimed fill) in Bahrain

Bahrain Bay Development Company, Bahrain

Highway Design Engineer Education City – New Township – Roads and Infrastructure

Qatar Foundation (QF)

Page 38: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

38

Highway Design Engineer Upgradation of existing 2-lane Dukhan road (Qatar Primary route) to 8-lane expressway

Ministry of Public Works

Traffic & Transportation Planner

Education city – Transport model development

Qatar Foundation

Transportation planner & Project Coordinator

Education city – Pedestrian model development

Qatar Foundation

Transportation planner Libya CBD –city gate Traffic Impact study

MAF Libya

PROFESSIONAL EXPERIENCE

March 2010 – till date

Dy General Manager – Highway Design: Handed and Delivered the following projects highways design team in CEG Hyderabad and coordinating with Design Team in Head office Jaipur.

Improvement of existing TWO lane road to 4lanning configuration of NH 3 from Gwalior to Dewas km 123 to km 526 – BOT (406 km) – Madhya Pradesh

Improvement of existing TWO lane road to 4lanning configuration of NH 50 from Khed to Sinnar km 42 to km 177 – BOT (135 km) - Maharashtra

Improvement of existing road to 2 lane paved shoulder of NH 222 from km 342 to km 442 – BOT (100 km) - Maharashtra

Improvement of existing road to 2 lane paved shoulder of NH 106 from km 0 to km 136 (136 km) – WORLD BANK AIDED.- Bihar

Improvement of existing road to 2 lane paved shoulder of NH 30A from km 0 to km 67 (67 km) – WORLD BANK AIDED.- Bihar

WS ATKINS – UINITED KINGDOM

M25 DBFO– Design Engineer Responsible design of 8/10 lane motorway 25 (M25). M25 is the Major connecting corridor in UK and busiest Network in entire Europe. Also know as LONDON Ring Road. As a Highway Design Engineer I was involved in Geometric Designs for main road, Slip road designs, Intersection Improvements, Pavement Designs, Signs design, earthworks and safety barrier design. Coordination with highway Agency and UK safe roads team.

WS ATKINS, Bangalore, INDIA

A14 Ellington to Fen Ditton – Review of MX design for section 2, 3, Trinity Foot junction, Dry Drayton junction and M11 junction 14 (Girton interchange).

WS ATKINS, DOHA, QATAR

Consultant for Primary Infrastructure Design Services - Education City, Doha, Qatar

Page 39: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

39

The scope of work includes “Planning and Detailed Design” of the new township to cater exclusively for education needs for the State of Qatar with the state of the art facilities. The township is spread over an area of 12 sq. kms.

The following responsibilities are carried out as a Highway engineer Preparation of Road layouts Geometric Cross Sections Horizontal & Vertical alignment of project roads using MX Design of Roundabouts Junction Designs using MX Capacity analysis of junction using aaSIDRA Pavement Designs The following responsibilities are carried out as a Transport planner for 3 major car parks namely Northeast car park South east car park And West car park located in South campus of Education city Reviewing the car park layout plans & internal circulation arrangements Suggesting to improve internal circulation Reviewing the internal access arrangement and its improvement proposal Internal junction proposal and capacity analysis using aaSIDRA Internal access proposals. External entry and Exit arrangement improvement proposals. Capacity Analysis of Qatar Academy Intersection, Ghrarraffa Intersection and South Gharraffa

Intersection. Signal Designs Using aaSIDRA Sign face designs

DUKHAN EXPRESS WAY – 8 Lane Access Control Highway - DOHA QATAR

Client: ASHGAL PWD, Doha, Qatar

The following responsibilities are carried out as a Highway engineer Geometric Cross Sections Horizontal & Vertical alignment of project roads using MX Design of Roundabouts Multi Level Junction Designs using MX Capacity analysis of junction using aaSIDRA Pavement Designs Signal Designs using aaSIDRA

Page 40: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

40

New Doha International Airport - AIRSIDE LANDSIDE ROADWAYS &PARKING

Client: NDIA (New Doha International Airport)

The project is under D&B (Design and Build) Contract. The new airport is partially built on reclaimed fill and is estimated to handle 2.0 million passengers per day. Scope of work consists of planning, design and development of access interchanges to the passenger terminal, cargo terminal and commercial terminal, runway and the providing service roads within the airport area to cater to the cargo vehicles, improvement of existing dual two lane carriageway into 8-lane expressway and providing interchanges (trumpet & cloverleaf) to provide access to the terminal buildings.

The following responsibilities are carried out Preparation of Road layouts Geometric Cross Sections Horizontal & Vertical alignment of project road using MX Reviewing Pavement Designs Design of Traffic Signs Intersection Designs Bahrain bay Infrastructure Design, Manama, Bahrain

Client: BBD (Bahrain bay Development, Manama, Bahrain)

The Bahrain Business Bay is the flagship component in the future growth of Bahrain and its capital city of Manama. It is part of a larger response to economic development in the Persian Gulf and will be the catalyst and model for growth and development in the greater North Manama master plan. Its close proximity to the Airport, Bahrain Financial Harbor, world Trade Centre, and the Diplomatic Area make it a prestigious site bursting with Potential.

The following responsibilities area carried out Complete Roadway design Using MX Detail Design for all Road Components Design of Traffic Signs and Markings Pavement Designs Signal designs using aaSIDRA

Page 41: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

41

Detailed Engineering Study for Supreme Education council Headquarters, DOHA

Client: Supreme Educational Council, Ministry of Education Qatar

Design of approach roads and Junctions using MX Trip Generation Estimates Junction Improvement Measures using aaSIDRA/ Arcady Signal designs for external junctions Preparation of Junction Improvement Plans Parking arrangements and circulation plans Pedestrian Studies for Education City, Doha, Qatar

Client: Qatar Foundation, Doha, Qatar

Design Coordination with UK Teams Model development/ Network review with UK teams Finalisation of footpaths locations and pedestrian crossing points People mover system (Light Rail system) platform/staircase size fixing.

Durrat Al Bahrain Traffic Impact Study

Trip Generation Estimates Reviewing of VISSIM Outputs Junction Improvement Measures using aaSIDRA Signal designs for external junctions Libya CBD Traffic Impact Study

Client: MAF Libya

Trip Generation Estimates Junction Improvement Measures using aaSIDRA/ Arcady Signal designs for external junctions Preparation of Junction Improvement Plans

M/s WILBUR SMITH ASSOCIATES, INDIA

Integrated Infrastructure Development of Thiru VI KA Industrial Estate, Guindy, Chennai, India

Client: TNRDC (Tamil Nadu Road Development Company, INDIA)

Page 42: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

42

The following responsibilities are carried out Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis

of primary and secondary data, Finalization of design standards and geometric design of the project road Design of flexible pavement for estate roads Geometric design for the road & Junction designs Design of lighting systems design of all road furniture’s Preparation of Rate analysis and Preparation of Detailed Estimates, Bill of Quantities.

Engineering Study for Roads in CMA (TNUDP- III), Chennai, India. Client: Highways Department, Tamil Nadu. The following responsibilities are carried out Co ordination for Pavement, Road, CD and Bridges Analysis of Pavement and Road Data Finalization of Geometric cross sections for the Project road Horizontal and vertical alignment for the project road Design of Flexible pavement for the Project Road Junction Designs, Design of all Road furniture’s and Truck lay byes Preparation of Standard drawings Rate analysis for Road and Bridge Items Preparations of Detailed Estimates and Bill of Quantities Study for Second Road Bridge over river Kharkai in Adityapur , INDIA Client: ILFS (Infrastructure Lease and Financial Services) The study involves preparation of Detailed Project Report for new road bridge project & Improvements existing Truck terminal Road in Adityapur and Jamshedpur. The following responsibilities are carried out Co – ordination for All traffic Surveys Fixing the New alignment for Road and bridge using GPS Co- ordination for Topographical and soil Investigation surveys Analysis of primary and secondary data Finalisation of Geometric cross section for the project roads Horizontal and Vertical design for the project road

Page 43: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

43

Design of Flexible pavement for new alignment & Paver block design for truck terminal Road & for Truck lay byes.

Design of all Road furniture’s including lighting Preparation of Standard drawings Preparation of Rate Analysis Preparation of detailed Estimates and Bill of Quantities.

Consultancy services: Feasibility study & DPR for 4/6 lanning of NH-52A and NH-52 from Itanagar to Halem in the states of Arunachalpradesh & Assam (NHAI) The study involves prepartion of Detailed Feasibility and Detailed project report for 4 lanning of NH 52 & 52A Client: NHAI (National Highways Authority of India) The following responsibilities are carried out Assisting the Team leader in planning the surveys and preparation of reports. Analysis of Primary and Secondary data Such as Road Inventory, Pavement Condition survey,

BBD, Roughness, Axle load data, Culvert and Bridge data. Design of Flexible & Rigid pavements (IRC: 37 & IRC 58) Preparation of monthly progress reports Finalisation of Geometric cross sections for project road Junctions and cross roads designs Design of all road furniture’s Design of bus bays Design of Parking lots and Truck lay byes Preparation of standard drawings Preparation of Rate Analysis Preparation of Detailed Estimates and Bill of Quantities. Consultancy Services for Feasibility and DPR of Kovalam Redevelopment Project ,Kerala, INDIA Client: IIDC (Trivandrum) The following responsibilities are carried out Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis

of primary and secondary data, Finalization of design standards and geometric design of the project road Design of flexible

pavement for the project road

Page 44: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

44

Independent Technical Review for First year Road Maintenance work Tamil Nadu, INDIA Client: TNRSP (Tamilnadu Road Sector Project, State Highways Department) The scope of the work involved in review of Pavement design, Project costing and Bill of Quantities. And independent review of Execution of work before and after construction, preparation of progress reports. The following responsibilities are carried out Involved In Pavement design review for the various project roads Review of the detailed estimates and bill of quantities Redesigning the pavements for various project roads Preparation of detailed estimates and bill of quantities for various project roads Conducting the Various Field tests and verifying the test results for Pavement materials, CD &

Drain works.

Preparation of Detailed Project Report for Four Laning of TPP Road, Chennai, Tamil Nadu, INDIA

Client: TNRDC (Tamil Nadu Road Development Company)

The following responsibilities are carried out Co ordination for Pavement, Road surveys, CD and Bridges Analysis of Pavement and Road Data Finalization of Geometric cross sections for the Project road Horizontal and vertical alignment for the project road Design of Flexible pavement for the Project Road Junction Designs, Design of all Road furniture’s and Truck lay byes Preparation of Standard drawings Rate analysis for Road and Bridge Items Preparations of Detailed Estimates and Bill of Quantities Strengthening and widening of Manali Oil Refinery and Inner Ring Road, Chennai, Tamil Nadu, INDIA Client: TNRDC (Tamil Nadu Road Development Company) The study involves preparation of detailed project report for four laning & strengthening of the 15km long project road. Scope of the work involved in four laning and strengthening of MOR and IRR road to National Highways standards.

Page 45: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

45

The following responsibilities are carried out Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis

of primary and secondary data, Finalization of design standards and geometric design of the project road Design of flexible pavement for the project road, Design of Horizontal and vertical alignment for the project road Junction Designs Design of lighting systems design of all road furniture’s, design of truck laybyes, Rate analysis and Preparation of Detailed Estimates and Bill of Quantities. Third Party Quality Assurance Study, Andhra Pradesh, INDIA

Client: (Govt. of AP – PHMED)

Scope of the work involved in third party quality checking for different municipal road and drainage Conducting Material Testing for all road items. Conducting Material Testing for CD & Drain Items.

Detailed Engineering Study for OMR (IT Corridor) (km 0/0 to 30/4), Chennai, Tamil Nadu, INDIA Client: TNRDC (Tamil Nadu Road Development Company) The study involves preparation of detailed project report widening and strengthening of Old mahabalipuram Road (IT Corridor) to six lanes The following responsibilities are carried out Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis

of primary and secondary data, Finalization of design standards and geometric design of the project road Design of flexible & Rigid pavement for the Project road Geometric design for the road & Junction designs Design of lighting systems design of all road furniture’s Preparation of Rate analysis and Cost comparison of Flexible and rigid Pavement Preparation of Detailed Estimates, Bill of Quantities. And Bid documents

Page 46: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

46

Consultancy for Preparation of Detailed Project Report for Construction of Bridges in Chennai Corporation, Chennai, Tamil Nadu, INDIA

Client: TNUIFSL

The following responsibilities are carried out Co ordination for Traffic surveys Analysis of traffic Data Preparation of Detailed Estimates, Bill of Quantities.

Feasibility Study/Detailed Engineering studies for Improving Old Mahabalipuram Road from Siruseri Jn of ECR (OMR) (Km 30/2 to 54/6), Chennai,

Client: TNRDC (Tamil Nadu Road Development Company)

Scope of the work involved in Strengthening of OMR four lane road/ feasibility for widening to six lane configuration. The work involved in conducting The following responsibilities are carried out Road Inventory Survey, Pavement co ordination for Topo surveys, Co ordination for Road and pavement condition surveys. Analysis of primary and secondary data, Finalization of design standards and geometric design of the project road Design of flexible for the Project road Geometric design for the road & Junction designs Design of lighting systems design of all road furniture’s Preparation of Rate analysis and Preparation of Detailed Estimates and Bill of Quantities Detailed Engineering Study for TPP Road (Two Lane – Strengthening and Widening), Chennai, Tamil Nadu, INDIA Client: TNRDC (Tamil Nadu Road Development Company) The study involves preparation of detailed project report for Two laning & strengthening of the 10km long project road. The following responsibilities are carried out Finalization of design standards and geometric design of the project road Design of flexible pavement for the project road, design of Horizontal and vertical alignment,

Page 47: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

47

Junction Designs design of lighting systems design of all road furniture’s, design of truck lay byes, Rate analysis and Preparation of Detailed Estimates and Bill of Quantities. Construction Supervision of the proposed roads and Storm water drains in Tiruvannamalai Municipality, Tiruvannamalai, Tamil Nadu, INDIA Client: TNUIFSL The following responsibilities are carried out Evaluation of Tender Documents, construction and supervision of Road works and Storm water drains, Preparation of billing documents. Preparation of DPR for the Improvement of Road Connecting TPP Road and Ennore Port and NCTPP, Chennai, Tamil Nadu, INDIA Client: TNRDC (Tamil Nadu Road Development Company) The following responsibilities are carried out Conducting Road Inventory Survey, Pavement Condition Survey, BBD survey, Soil Test Pit Survey, Analysis of Survey Data, Pavement Design, Geometric Designs Junction Designs Design of road furniture, Preparation of Rate Analysis, Preparation of detailed Costing and preparation of BOQ.

DPR for Provision of Bus terminal in Krishnagiri Municipality, Krishnagiri, Tamil Nadu, INDIA Client: TNUIFSL The following responsibilities are carried out Co ordination for soil investigations, Topo survey, co ordination for traffic surveys, Design of Rigid Pavement and flexible Pavements for Bus Terminal Area, Preparation of Rate Analysis for Building and Road items Preparation of Detailed costing and preparation of BOQ for Building and Road Items

Page 48: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

48

DPR for Improvement of Traffic facilities in Coimbatore Corporation, Coimbatore, Tamil Nadu, INDIA

Client: TNUIFSL The following responsibilities are carried out Co-ordination for Topographic Survey, Traffic surveys, and Collection Secondary data such as under ground utility lines, Design of flexible and rigid pavements and Preparation of Rate Analysis for pavement Items Cost estimate for pavement items. Estimation and Marking of Required Right of Way on Ennore Expressway for EMRIP, Chennai, Tamil Nadu, INDIA Client: TNRDC (Tamil Nadu Road Development Company) The scope of the project includes design of flexible and Rigid pavements for the project road and cost estimates for the same. The following responsibilities are carried out Finalisation of Geometric cross sections and Junction designs Geometric design of the Project road Preparation of Rate Analysis Preparations of Detailed Estimate & Bill of Quantities Quality Audit for Road Works in Chennai Corporation, Chennai, Tamil Nadu, INDIA

Client: TNUIFSL

The work involved in quality audit consultancy for the Chennai Corporation roads monitoring Quality of the work while execution in three Zones of Chennai Corporation. About 15 kms. of Road length of Semi Dense Bituminous Concrete road.

DPR Integrated Infrastructure Development of Guindy Industrial Area, Chennai, Tamil Nadu.

Client: TNRDC (Tamil Nadu Road Development Company)

The following responsibilities are carried out The scope of the project includes work out the deficiency analysis for the estate roads and

design the roads work involved in co ordination of benkleman beam survey

Page 49: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

49

study pavement condition and road inventory surveys Analysis and design of Estate roads Design of Road furniture’s, Preparation of Rate Analysis Preparation of detailed estimate and BOQ for the same.

Traffic Revalidation Study for IT expressway, Chennai, Tamil Nadu.

Client: TNRDC (Tamil Nadu Road Development Company)

The study involves preparation of detailed project report for six lanning of the IT corridor popularly known as Old Mahabalipuram road (OMR) near Chennai.

Co ordination for Traffic surveys and analysis of Traffic data Preparation of Reports

Construction of Cement Concrete Roads, Chennai, Tamil Nadu.

Client: TNUIFSL

The scope of the project include preparation DPR and Bid documents for the construction of Cement concrete road for 13 Km of corporation roads The following responsibilities are carried out work involved in co ordination for pavement test pits and design of Rigid pavements, Preparation of Rate Analysis Preparation of detailed estimate and BOQ and Preparation of Tender document. Preparation of Engineering & Landscape Report from Kathipara Junction to Meenambakkam Airport on NH45 , Chennai, Tamil Nadu.

Client: TNRDC (Tamil Nadu Road Development Company) The following responsibilities are carried out The study is to improve the urban stretch between Tambaram and Kathipara Junction on the

NH45 to international standards, with pavement strengthening, appropriate landscaping, beautification, modern pedestrian facility and proper road marking and furniture work involved

Co ordination for surveys. analysis of primary and secondary data, finalization of design standards and geometric design of the project road Design of flexible & Rigid pavement for the Project road

Page 50: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

50

Geometric design for the road & Junction designs design of lighting systems design of all road furniture’s Preparation of Rate analysis and Cost comparison of Flexible and rigid Pavement Preparation of Detailed Estimates, Bill of Quantities. And Bid documents As a Post Graduation Student I was involved in Many Traffic and Transportation studies such as Volume survey, Parking surveys, OD surveys, Speed delay surveys, Parking Surveys. I was Involved in Many Government sponsored projects such as Traffic Operational and Management Plans for various cities, Area traffic Management plans, Parking plans, Junction Improvements plans and Signal designs

COMPUTER KNOWLEDGE

Packages: MX, aaSIDRA. Arcady, Picady, KEY SIGNS, VISSIM (learning)

Page 51: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

51

Name of Staff : A.KAMALAKUMAR

Date of Birth : 20/06/1975

Nationality : Indian

Educational Qualifications :

a) B.Tech (Civil)

: Bapatla Engineering College

1998-2001

b) M. Tech (Structural Engineering)

: MS University, Baroda 2001-2002

Membership of Professional Societies : Nil

Employment Record : From March 2003 to till date

Position Held : Bridge Engineer/Structural Engineer

Preparation of Detailed Project report for Rehabilitation and Upgrading to 2-Lane with paved

shoulder configuration of Ahmedabad – Dani Section from Kim river to Dandi of length

109Kms of National Highways No: 228 in the state of Gujarat.

Major bridges

Bridge over KIM River at Km 277.00 (2x40.0 of length 85m)

Bridge over Mindola River at Km 346.100 (2x40.0 of length 85m)

Preparation of feasibility study and detailed project report for four laning of Sambalput-Bargarh-orissa/chittisgarh border section of NH-6 in the state of Orissa under NHDP phase-III (Total length 88 kms)

Major bridges (6-laning)

1. Bridge over Mahanathi at Km 7.200 (25x30.48+2x10.0 of length 842.50m)

2. Bridge over jainjore at Km27.324(7x12.4 of length 92.8m)

3. Bridge over Danta River at Km 39.755(11x16.0 of length 186m)

4. Bridge over jeera river on bargarh by-pass (7x33.50+2x10.50)

5. Bridge over nala on sohila by-pass (3x21m of length 64.800m)

Minor bridges(6-laning)

13 minor bridges and 2 Robs including under passes, RE walls and flyovers.

Page 52: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

52

Design Review for Rehabilitation & Up-gradation of km 229.250 to km 381.000 of NH-76 to 4-lane configuration in the State of Rajasthan - Consultancy Services for construction supervision Package-I ADB Funded.

Preparation of Detailed Project Report for construction of approach roads to the proposed Bogibeel Rail-cum-Road Bridge across river Brahmaputra along NH-52B near Dibrugarh in Assam

Major bridges (3-lane)

Bridge at Km 22.560 over tangani river of length 208m (10 x 18.30)

Bridge at Km 22.010 of length 68 m(1 x 7.157 + 1x13.4 + 1 x13.45 + 1x13.45 + 1x 13.4 + 1x7.157) Two minor bridges and one Rob

Major Bridges(6-lane) 1) Bridge over Kuni River at km 149.678 (length 130.0 m) 2) Bridge of span 3 x 21 m at 141.321 (length 63.0 m) Flyovers(6-lane) 1) Flyover crossing of MSH-6 at km 132.850 i.e. Wani road junction 2) Flyover crossing of MSH-6 at km 139.900 i.e. Yavatmal, Mumbai road Junction

Preparation of feasibility study and detailed project report for four laning of Nalbari

to Guwahati section of NH-31 from km 1065.00 to km 1124.00 (Pkg. C-III/24) under

East-West Corridor Project in the State of Assam. - Designing of 3 ROBs (one of 20 m

and 2 of 313 m) + 4 major bridges of 3 x 41 m span (123 m) PSC Girder and 2 x 41 m

span (82 m) PSC Girder & 23 other bridges) for NHAI. (Project Cost = Rs. 400 Crores)

3 Nos. of PSC Girder Bridge (3 x 41 m span of length 123 m)

2 Nos. of PSC Girder Bridge (2 x 41 m span of length 82 m)

4 Nos. of PSC Girder Bridge (1 x 41 m span of length 41 m)

3 RoBs including approaches (length of 330m,330m & 20m each)

Consultancy Services for Preparation of Detailed Project Report for for Pilot Project for Construction of Cement Concrete Roads in 4 districts of Andhra Pradesh & 4 districts of Karnataka (Total Length = 27 km) under PMGSY for NCCBM, New Delhi. (Project Cost = Rs. 9 crores)

Page 53: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

53

Consultancy Services for preparation of DPR for widening to 2-lane from Km 220.00 to Km 352.00 of NH-155 in the state of Nagaland.

Survey, Investigation and preparation of Detailed project report for improvement of Road HAYULIANG-CHANGWANTI-HAWAI (65 Kms) to NH Double lane specifications in the state of Arunachalpradesh.

Survey, Investigation and preparation of Detailed project report for improvement of Road HUNLI - ANINI (138 Kms) to NH Double lane specifications in the state of Arunachalpradesh.

Proof Consultancy Services for 2 Flyovers to a length of 1.8 Km at Basheerbagh & Telugu Talli & Ambedkar Statue Junctions, that includes checking of designs, field Supervision, checking of alignment, location and Geometric design, Bridge Designs.

Summary of the CV

A) Education:

i) Field of Graduation and year : B.Tech (Civil) - 2001 ii) Field of Post Graduation and year : M. Tech. (Structures)- 2003

B) Experience:

i) Total experience in Highways : 8 1/2 years

ii) Responsibilities held : i) Bridge Engineer/Structural Engineer / MC Consulting Engineers (P) Ltd. – 8 1/2 years

iii) Relevant Experience : 8 1/2 years

Page 54: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

54

Name of Staff : Shruthi Srinivas

Profession : Traffic and Transportation Engineer

Date of Birth : 15th June, 1983

Nationality : Indian

Education

Master’s Degree in Transportation Engineering and Management from BMS College Engineering, Bangalore, Visveswaraiah Technological University-2008

Bachelor of Transportation Engineering from BMS College of Engineering, Bangalore Visveswaraiah Technological University-2005

Employment Record

September,2011 to date

October 2010- August2011

: Project Engineer, GEP Infrastructure Private Limited

: Manager (Technical), Transport Training Institute and

Consultancy

May 2007- September 2010

: Transportation Planner, Traffic and Transportation Division,

Wilbur Smith Associates Inc, Bangalore

Aug 2005 – Apr 2007 : Engineer, Traffic and Transportation Division, Wilbur Smith

Associates Private Limited, Bangalore. Key Qualifications

Six Years of Experience in Transportation Planning and Traffic Engineering Studies. Has professional experience in Traffic Engineering, Transportation Planning, Transport Modeling, Highway Traffic Forecasting and Parking Studies. Involved in preparation of survey formats, supervising all the traffic and transportation surveys, assisting and analyzing all the traffic and transportation surveys, Development of 4 stage Travel Demand Model using the state-of-the art GIS travel demand modeling software such as TransCAD and CUBE.

Professional Experience:

2010-2011 Transport System Management Measures for Benniganahalli Ward

The main objective of the study is to conduct a detailed traffic study at a local level and propose all the solutions needed to alleviate traffic and transportation problems of the area.

Page 55: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

55

As a Transportation Planner, involved in conducting and organizing Traffic Surveys, evaluating existing situation and arriving at alternate solutions, Signal Design and preparation of Block Cost Estimates.

2009-2010 Transportation Planner, Comprehensive Traffic and Transportation Study for Bellary (Client:

The major goal of the study is to prepare a Comprehensive Traffic and Transportation Plan for Bellary Local Planning Area to understand the travel characteristics of the city and the LPA and formulate short, medium and long-term solutions to alleviate traffic and transport problems. As a Transportation Planner, involved in testing of different transport strategies for the horizon years using CUBE, the state-of-the art GIS travel demand modeling software, involved in formulating short, medium and long-term measures and also involved in data analysis and block cost estimates.

Transportation Planner, Comprehensive Traffic and Transportation Study for Gulbarga

The major goal of the study is to prepare a Comprehensive Traffic and Transportation Plan for Gulbarga Local Planning Area to understand the travel characteristics of the city and the LPA and formulate short, medium and long-term solutions to alleviate traffic and transport problems. As a Transportation Planner, involved in testing of different transport strategies for the horizon years using CUBE, the state-of-the art GIS travel demand modeling software, involved in formulating short, medium and long-term measures and also involved in data analysis and block cost estimates.

Consultancy Services for Preparation of DPR for Upgrading to 2 lane with Paved Shoulders of Mangalore – Belur Section of NH-234 in the State of Karnataka (Package no. SP/B/2) The main objective of the consultancy service is to establish the technical, environmental, social, economical, and financial viability of the project and prepare detailed project reports for rehabilitation and upgrading of the existing road to 2-lane/2-lane with paved shoulders configuration and/or its strengthening. As a Transport Planner involved in the Data Collection, Detailed Traffic Analysis, Traffic Forecasting and in the preparation of Feasibility Report.

Page 56: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

56

Consultancy Services for Preparation of DPR for Rehabilitation and upgrading to 2 lane with Paved Shoulders of Madhugiri – AP Border Section of NH-234 in the State of Karnataka (Package no. SP/A/2) The main objective of the consultancy service is to establish the technical, environmental, social, economical, and financial viability of the project and prepare detailed project reports for rehabilitation and upgrading of the existing road to 2-lane/2-lane with paved shoulders configuration and/or its strengthening. As a Transport Planner involved in the Data Collection, Detailed Traffic Analysis, Traffic Forecasting and in the preparation of Feasibility Report.

Due Diligence Study for Varanasi-Aurangabad Section of NH-2 Primary objective of the present study is to revalidate the earlier reports, determine deviations, if any in terms of AADT, growth rates, travel pattern and risks involved. As a Transport Planner involved in the preparation of survey formats, zone delineation, Detailed Traffic Analysis, Traffic Forecasting and in the preparation of report.

Due Diligence Study for Kishanngarh-Beawar Section of NH-8

Primary objective of the present study is to revalidate the earlier reports, determine deviations, if any in terms of AADT, growth rates, travel pattern and risks involved. As a Transport Planner involved in the preparation of survey formats, zone delineation, Detailed Traffic Analysis, Traffic Forecasting and in the preparation of report.

Transportation Planner, Comprehensive Mobility Plan for Jodhpur City

The main objective of the study is to explore the feasibility of Mass Transit systems and study aspects like the city’s population, expanse, human density, traffic conditions, number of vehicles, private and public transport, sewerage and drainage network, power and water distribution etc. As a Transportation Planner involved in the traffic and transportation survey analysis such as Mid-Block, Turning Volume count, Household Interview Survey, Roadside Interview Survey, Pedestrian Survey and Parking Survey and also involved in the demographic analysis and Projections.

Transportation Planner, Comprehensive Traffic and Transportation Study for Bangalore

Metropolitan Region The major goal of the study is to prepare a Comprehensive Traffic and Transportation Plan for Bangalore Metropolitan Region to ensure adequate accessibility and smooth mobility for all

Page 57: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

57

sections of the population. As a Transportation Planner / Modeler involved:

In the preparation of Inception report In the preparation of Traffic Management Plan for the nine satellite towns within

Bangalore Metropolitan Region In the demographic analysis and Population and Employment projections for the entire

Bangalore Metropolitan Region The preparation of study area Zone map and building city network Developing O-D matrices required for the travel demand model Giving input to all the basic details necessary to do highway and transit assignment,

thereby validating and calibrating the model for the base year, 2009. CUBE, the state-of-the art GIS travel demand modeling software was used for development and application of the model.

In the traffic and transportation survey analysis such as Mid-Block, Turning Volume count, Household Interview Survey, Roadside Interview Survey, Pedestrian Survey and Parking Survey.

2008 - 2009

Transportation Planner, Comprehensive Transportation Study for Chennai Metropolitan Area

A Comprehensive Traffic and Transportation Study is being carried out in Chennai to access the growth of the city to evolve short term, medium term and long term strategies to ameliorate traffic problems in the city.

As Transportation Planner was responsible in assisting and analyzing all the traffic and transportation survey data such as Mid-Block, Turning Volume count, Household Interview Survey, Roadside Interview Survey, Pedestrian Survey and Parking Survey.

Transportation Planner, Preparation of CLIP Report for 36 Towns in Karnataka (Client: KUIDFC) Responsible in conducting Traffic Surveys, in overall Traffic data analysis and also assisted in the preparation of City Level Infrastructure Plan (CLIP) for six towns of Tumkur District.

Transportation Planner, Comprehensive Mobility Plan for Faridabad-Ballabgarh Urban Complex (Client: Department of Town & Country Planning, Haryana) The development of Faridabad city infrastructure was given in phases by this mobility plan. As a Transportation Planner involved:

Involved in the Demographic Analysis and Projections In the development of OD-matrices required for the travel demand model

Page 58: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

58

In the validation and calibration of the travel demand model. Using base year calibrated functions, forecast runs were carried out for various traffic management options like bus augmentation, introduction of BRT, Commuter rail and the effect of extension of Delhi metro to Faridabad .TransCAD, the state-of-the art GIS travel demand modeling software was used for development and application of the model.

Involved in suggesting suitable traffic management measures (short, Medium and Long Term measures) to overcome the existing traffic problems inside the city. Was also involved in the cost estimation.

Transportation Planner, Comprehensive Mobility Plan for Guwahati City The mobility plan should set direction for transportation investments for 2008 through 2030. The comprehensive mobility plan would focus on developing a strategy built around the urban mass/public transport systems. The CMP is expected to identify several interventions and projects for implementation in a phased manner (short, medium and long-term). As a transport modeler/ planner, was responsible in assisting and analyzing all traffic and transportation surveys. Responsible in building an over all travel demand model for the city and testing different scenarios suitable for the study area.

Transportation Planner, Mahindra World City - Traffic Impact Study The objective of the traffic impact study is to address the current and future needs of the transportation system in and surrounding the World City so the transportation system operates efficiently and sustains the vibrant growth of the project area. As a transportation planner, involved in Junction analysis, Traffic Volume Count Analysis, traffic assignment and also involved in the preparation of traffic impact report.

Transportation Planner for Development of Multilevel Parking Facilities in Greater Mumbai The objective of this study is to assess the existing and future parking demand and supply for the area, assess the feasibility of the site with respect to vehicular circulation in and around the site, and other factors that might affect the proposed site. As a transportation planner, involved in Junction analysis, Mid Block analysis, Parking accumulation, duration and turnover analysis.

Transportation Planner for Comprehensive Mobility Plan for Gurgaon

The focus of the study would be on analyzing the existing transportation scenario, examine the pattern of growth of the city and projecting the passenger and freight mobility requirements for the future, keeping in view the attributes like population, employment, business, commerce, industry, growth of the city, upcoming SEZ and other developments. As a transportation

Page 59: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

59

planner, involved in traffic survey analysis such as turning volume count survey, parking survey and pedestrian survey.

Transportation Planner, Third Road User Satisfaction Survey

The main objective of project is to Conduct surveys on various types of roads (NH, SH, MDR) covering all 27 districts of Karnataka. Target groups to includes drivers / owners of various types of motorised vehicles, cyclists, pedestrians, and various associations like Truck operators, Academicians, Journalists, Workshops etc. The total sample size for the survey shall be 7000 samples. Elicit views on public perceptions of current roads, PWD performance, government policies, and future policy priorities. Compare findings from the study with outcomes from earlier surveys conducted in 2002 and 2004.Present the findings to senior decision-makers of Government of Karnataka. As a transportation planner, involved in identification of primary network, preparation of opinion survey questionnaire for road user survey. Also involved in analyzing the opinion survey data collected on identified network of National Highways, State Highways and Major District Roads covering all 27 districts. Also involved in the preparation of Pilot Survey Report and the Final Report.

2007 - 2008

Transportation Planner, Comprehensive Mobility Plan for Pune City

The main objective of the study is to Review and Synthesis of Recommendations of Past Studies and Ongoing Works; Data Collection and Analysis, Planning of short term / immediate improvement measures; Development and Operation of Transportation Model; Planning of transportation strategies and actions/measures; Development of Integrated Multi Modal Mass Transportation System; Draft Mobility Strategy Investment Program; Stakeholder Consultation Institutional mechanism. As a Transportation Planner was responsible in carrying out over all traffic data analysis, traffic projections, building city network, developing O-D matrices required for the travel demand model, giving input to all the basic details necessary to do highway and transit assignment, thereby validating and calibrating the model for the base year, 2007. Involved in suggesting suitable traffic management measures to overcome the existing traffic problems inside the city. CUBE, the state-of-the art GIS travel demand modeling software was used for development and application of the model.

Page 60: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

60

Transportation Planner, Pune BRT Operation Plan The main objective of the study is to address various elements of the BRTS Implementation such as: route identification; technology elements with regards the bus fleet, information systems (including ITS), typical road configurations for various situations; operational & functional elements such as signal systems, ticketing, passenger facilities & amenities (including bus shelters), fleet deployment, inter & intra-modal coordination / synchronization, etc.; cost and revenue estimations and financial & economic viability assessments; branding strategy, information dissemination and change management strategies / plans, etc As a Transport modeler was involved in ridership estimation and forecasting. CUBE, the state-of-the art GIS travel demand modeling software was used for development and application of the model.

Transportation Planner for Bicycle Master Plan for Hi-Tech City, Hyderabad The objective of the study is to develop a Bicycle Master Plan in Hi Tech City (HTC) environs to facilitate and encourage Bicycle Ridership for HTC employees. As a transportation planner, involved in preparation of Bicycle Master Plan, Junction Analysis and Bicycle Ridership estimates.

Transportation Planner in Traffic and Transportation policies and Strategies in Urban Areas in India Involved in building models for Hyderabad, Bhuvaneshwar, Amritsar and Raipur Cities. It includes development of base network, traffic and travel characteristics, development of transportation models which can integrate landuse and transport development, and development of suitable urban transport policies. TransCAD and CUBE, the state-of-the art travel demand modelling softwares were used for development and application of the model.

Comprehensive Mobility Plan and Improvements of Traffic Facilities in Coimbatore City under JNNURM Scheme The objective of the present study is to prepare a Detailed Project Report for the identified roads improvement. Responsible in assisting and analyzing the traffic surveys like Classified Volume count survey, Origin and Destination survey and Junction Analysis.

Page 61: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

61

2006 - 2007

Comprehensive Traffic and Transportation Study for Kakinada Town The objective of this study is to identify and implement traffic management improvements in the town of Kakinada. Responsible in assisting and analyzing the traffic surveys like Classified Volume count survey, Origin and Destination survey, Pedestrian Survey, Public Transport studies, Speed and delay characteristics, Household Interview survey, parking survey, Road Inventory Survey.

Comprehensive Traffic and Transportation Study for Nellore Town

The objective of this study is to identify and implement traffic management improvements in the town of Nellore. Responsible in analyzing the traffic surveys like Classified Volume count survey, Origin and Destination survey, Pedestrian Survey, Public Transport studies, Speed and delay characteristics, Household Interview survey, parking survey, Road Inventory Survey. Also involved in the cost estimation and preparation of CTTS report.

Comprehensive Traffic and Transportation Study for Anantapur Town The objective of this study is to identify and implement traffic management improvements in the town of Anantapur. Responsible in analyzing the traffic surveys like Classified Volume count survey, Origin and Destination survey, Pedestrian Survey, Public Transport studies, Speed and delay characteristics, Household Interview survey, parking survey, Road Inventory Survey.

Comprehensive Traffic and Transportation Study for Nizamabad Town The objective of this study is to identify and implement traffic management improvements in the town of Nizamabad. Responsible in analyzing the traffic surveys like Classified Volume count survey, Origin and Destination survey, Pedestrian Survey, Public Transport studies, Speed and delay characteristics, parking survey, Road Inventory Survey. Also involved in the cost estimation and preparation of CTTS report.

Comprehensive Traffic and Transportation Study for Ongole Town

The objective of this study is to identify and implement traffic management improvements in the town of Ongole.

Page 62: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

62

Responsible in assisting and analyzing the traffic surveys like Classified Volume count survey, Origin and Destination survey, Pedestrian Survey, Public Transport studies, Speed and delay characteristics, Household Interview survey, parking survey, Road Inventory Survey. Also involved in the cost estimation and preparation of CTTS report.

Transportation Planner, Second Road User Satisfaction Survey

The main objective of project is to Conduct surveys on various types of roads covering all 14 districts of Karnataka. Target groups to includes drivers / owners of various types of motorised vehicles, cyclists, pedestrians, and various associations like Truck operators, Academicians, Journalists, Workshops etc. The total sample size for the survey shall be 5000 samples. Elicit views on public perceptions of current roads, PWD performance, government policies, and future policy priorities. Compare findings from the study with outcomes from earlier surveys conducted in 2003 .Present the findings to senior decision-makers of Government of Kerala. As transportation planner, involved in analyzing the opinion survey data collected on identified network covering all 14 districts. Also involved in the preparation of Road user Satisfaction Survey document.

2005 - 2006 Pre-Feasibility Study for Development of an Efficient Urban Transportation System for Jaipur

The main objective of the study is to conduct a study for developing an efficient, economical and environmentally friendly Mass Transport system for the city. Responsible in analyzing the traffic surveys like Classified Volume count survey, Origin and Destination survey, Pedestrian Survey, Public Transport studies, Speed and delay characteristics, Household Interview survey, parking survey and Road Inventory Survey.

Mass Transport Option Study for Thiruvananthapuram Urban Area The main objective of the study is to conduct a study for developing an efficient, economical and environmentally friendly Mass Transport system for the city. Responsible in analyzing the traffic surveys like Classified Volume count survey, Origin and Destination survey, Pedestrian Survey, Public Transport studies, Speed and delay characteristics, Household Interview survey, parking survey and Road Inventory Survey.

Page 63: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

63

Software Awareness:

CUBE, State-of-the art GIS based travel demand modeling software

TransCAD, State-of-the art GIS based travel demand modeling software

ArcGIS

Microsoft Office

Page 64: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

64

Name of Staff : E.Surya Prakash Reddy

Profession : Highway /Traffic Engineering

Date of Birth : 9th Aug 1980

Nationality : Indian

Membership of Professional Societies

Indian Road Congress(IRC)

Member in Institute of Urban Transport,New Delhi

Member in American Society For Civil Engineers, VA ,USA.(Student)

Details of Tasks Carried Out

Resonsible for Traffic survey data analysis and preparation traffic reports.

Responsible for Estimating Divertible traffic,Traffic Projections and tollable Traffic.

Responsible for Traffic forecasting and modelling.

Responsible for Financial and Economical Analysis.

Responsible for carrying out Classified Traffic Volume Counts, Turning Movement Counts, O-D Survey,

Wayside amenities, Willingness to pay and collection of fuel consumption data.

BBD data for characteristic deflections, investigation of failures of pavement, homogeneous sections by

unit delineation method, flexible and rigid pavement design by IRC, preparation of draft feasibility report.

Analysis of DCP data, calculation of vehicle damage factors, and million standards axle.

Logging of pavement composition and thickness, evaluation of soil subgrade by Dynamic Cone

Penetrometer test (DCP), study of axle load spectrums by axle load survey and structural evaluation of

pavement by Benkelman Beam Deflection (BBD) Technique.

Responsible for carrying out road inventory, visual pavement condition survey.

Preparation of Technical Proposals for consultancy services.

Page 65: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

65

KEY QUALIFICATIONS: I have 7 years of experience in the field of Transportation/Highway Consultancy. Has been also responsible for traffic surveys, data coding, data analysis, traffic forecasting, and mathematical modeling. Responsible for preparation of comprehensive road safety audit checklists, road safety audit prompt lists, conducting road safety audits on rural highways and urban arterials, development of methodologies for identification and prioritization of accident black spots. Development of accident prediction models and application of models, suggestion of suitable accident reduction countermeasures. Has been extensively working on inventory and road condition surveys, inventory and condition of CD structures, visual pavement condition surveys, pavement investigations including trial pitting, logging pavement composition, and field density. Has been responsible for preparation of Inception Report, Interim Report, Draft and Final Feasibility Reports, Preparation of Main and Design Report Volumes in Preliminary Project Reports, and Detailed Project Reports. Has conversant with relevant codes of practice such as IRC/MORTH, IS, AASHTO and Overseas Road Notes. EDUCATIONAL QUALIFICATIONS:

M.Tech (Transportation Engineering)

JNT University College of Engineering, Hyderabad, Andhrapradesh.

2003-05 First class

B.Tech (Civil Engineering) JNT University College of Engineering,

Ananthapur. Andhra Pradesh. 1998-02 First class

D.C.E (Diploma in Civil Engineering)

Govt.Polytechnic, Mahabub Nagar. 1995-98 First class

Page 66: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

66

EMPLOYMENT RECORD: Oct 2011 to Tilldate: Director, GEP Infrastructures PVT LTD, Hyderabad. Preparation of Safety Audit for National Highways(NH-5, NH-215 and NH-203) In the State of

Orissa.

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Barakote to Birmitrapur section of NH-23(km 211.000 – km 335.000) in the state of Orissa on Design, Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Zirakpur

to Patiala section of NH-64(km 0.000 – km 50.700) in the state of Punjab on Design, Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Cuttak -

Angul section of NH-42(km 0.000 – km 112.000) in the state of Orissa under NHDP-IV on Design, Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Sanga

Reddy to MH_KNT border section of NH-9(km 348.000 – km 493.000) under NHDP-IV on Design, Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Angul –

Sambalpur section of NH-42 (km 112 – km 265) in the state of Orissa under NHDP-IV on Design, Build, Finance Operate and Transfer on BOT (TOLL) basis.

GVMC – Projects – JNNURM-Balance stretch of 2 km – Investigation, survey, Design and

execution of Bus Rapid Transit System (BRTS) Corridor from ch. 14 to ch 16 with 2 years defect liability under EPC system.

Engagement of Consultant for carrying out detailed engineering services for the approach road

from the Umbarghar jetty to the proposed site, for the proposed 1200 MW Gas based combined cycle power plant of GMR Maharastra Energy Lmited (GMEL) at Dapoli Taluka, Ratnagiri District, Maharastra.

Preparation of Detailed Design of Hata-Silapuri-Darguwan Road on BOT(Toll plus Annuity) in

Madhya Pradesh. Preparation of Pilani Urban Infrastructure Project, Pilani, Rajasthan.

Page 67: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

67

Preparation of Pre-Feasibility and Feasibility Study Report for Signal Free Corridor from Cubban Road to Outer Ring Road via Kamraj Road in Benguluru.

Preparation of Detailed Feasibility Report(DFR) for widening from single lane to two lane of

Kodangal to Gulbaraga Road in Mahboobnagar district Preparation of Detailed Project Report(DPR) for the connecting road to Jindal Cement Factory,

near Nandyal, Kurnool district, Andhra Pradesh Preparation of Detailed Project Report, Execution designs for BRTS in Vizag Assessment of Traffic on Jetpur to Somnath section of NH-8D in Gujarath State RESPONSIBILITIES: Responsible for Analysis of traffic surveys i.e., classified volume count, turning movement

surveys, speed & delay survey, O-D surveys, user surveys, traffic projection and capacity analysis.

Preparation of Draft and Final Feasibility Reports, Main and Design Report Volumes in Draft Detailed Project Report.

Responsible for estimating divertible traffic, Induced traffic and traffic forecasting. Toll Revenue Calculation Financial Modelling. Nov 2007 to Oct 2011 date (Except Oct 2008-Feb 2009) Engineer (Traffic & Transportation Dept.), Consulting Engineering Services (I) Pvt.Ltd,Hyderabad.

Preparation of a comprehensive Detailed Project Report for the Selected Prioritized road

stretches 3 lane and above including ducting system in GHMC,Hyderabad.

Preparation of Detailed Project Report for Four laning of Ropar-Nawashahar-Banga-Phagwara Road.Punjab Public works Dept.(B&R) Punjab Infrastructure Development Board.

Design Engineering for the Infrastructure Services in the GMR Aviation SEZ Area, Hyderabad Feasibility Study and Technical Assistance for MRTS in Nairobi Metropolitan Region

Preparation of Feasibility -cum-Preliminary Design for construction of stand alone Ring

Road/Bypass in the State of Uttar Pradesh (Lucknow & Varanasi)

Preparation of Detailed Feasibility Report (DFR) for Kalwakurthy-Kollapur-Nandyal Road,

Page 68: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

68

Preparation Detailed Feasibility Report for Proposed Bridge Across River Thungabadhra near Alampur, Mahabubnagar.

Bus Rapid Transit System (BRTS),Hyderabad

Detailed Feasibility Report (DFR) for Bridge at Kollapur on River Krishna. RESPONSIBILITIES: Responsible for preparation Site Appreciation, Inception Report and Interim Report. Responsible for Analysis of traffic surveys i.e., classified volume count, turning movement

surveys, speed & delay survey, O-D surveys, user surveys, stated preference surveys, traffic projection and capacity analysis. Preparation of Draft and Final Feasibility Reports, Main and Design Report Volumes in Draft Detailed Project Report.

Responsible for estimating divertible traffic, Induced traffic and traffic forecasting. Responsible for economic analysis. Responsible for Analysis of classified volume count survey, Axle load survey data, capacity

analysis and flexible pavement design as per Road Design Manual. Responsible for conducting road inventory, visual pavement condition survey Oct 2008 to Feb 2009: Assistant Manager, Highway Department, Maytas Infrastructures PVT LTD, Hyderabad. Project Feasibility Report for Hyderabad Deccan Economic Corridor,AP RESPONSIBILITIES: Responsible for Analysis of traffic surveys i.e., classified volume count, turning movement

surveys, O-D surveys, traffic prediction and capacity analysis. Preparation of Draft and Final Feasibility Reports.

Economic and Financial Analysis Dec 2006 to Oct 2007: Senior Project Associate, Highway Department, FEED BACK VENTURES PVT LTD, NEW DELHI. Prebid Advisory Services to Reliance Energy Limited for Eastern Peripheral Expressway, Delhi.

Independent Consultancy Services for Panthnagar Industrial Area. Panthnagar

Consultancy Services for Up gradation of Existing 2 lanes to 4 lanes Jirakpur –Parwanoo Road on

BOT Basis.

Page 69: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

69

RESPONSIBILITIES: Responsible for Analysis of traffic surveys i.e., classified volume count, turning movement

surveys, spot speed study, speed & delay survey, O-D surveys, traffic prediction and capacity analysis. Preparation of Draft and Final Feasibility Reports, Main and Design Report Volumes in Draft Detailed Project Report.

Responsible for Analysis of classified volume count survey, Axle load survey data, capacity

analysis and flexible pavement design as per Road Design Manual.

Responsible for conducting road inventory, visual pavement condition survey, logging of pavement composition and thickness, evaluation of soil sub grade by Dynamic Cone Penetro meter test (DCP), study of axle load spectrums by axle load survey and structural evaluation of pavement by Benkelman Beam Deflection (BBD) Technique.

Calculation of vehicle damage factors, and million standards axle, BBD data for characteristic

deflections, investigation of failures of pavement, homogeneous sections by unit delineation method, flexible and rigid pavements design by IRC.

Responsible for conducting engineering surveys and investigations include road inventory,

pavement condition survey, Benkelman beam deflection studies, inventory & condition survey of culverts, material identification, pavement composition, DCP, axle load and O-D survey. Analysis of all engineering surveys data and preparation of draft feasibility report.

Willingness to pay, Wayside amenities and collection of fuel consumption data. Jul 2004 to Sep 2006 : Traffic Engineer (Freelancer) ,TECONS Consulting Services, Hyderabad,AP. Identification and Improvement of Accident Black spots on the Hyderabad Road Network.

RESPONSIBILITIES: Responsible for coordinating the activities between the Centre, Police department, Consultants

and Client. Involved in accident data collection, analysis, site visits and detailed field investigations at

accident black spots, suggestion of suitable accident reduction countermeasures, and preparation of detailed designs, providing technical inputs to the Client during execution, economic evaluation and monitoring.

Responsible for training the engineers of the Public Works Department on integration of safety aspects in road design.

Responsible for making technical presentations to the MCH and the Clients.

Page 70: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

70

Responsible for preparation of comprehensive road safety audit checklists, road safety audit prompt lists, conducting road safety audits on rural highways and urban arterials, development of methodologies for identification and prioritization of accident black spots.

Development of accident prediction models and application of models, suggestion of suitable accident reduction countermeasures.

Responsible for making technical presentations to the monitoring committee and expert review committee.

Organised a seminar on Urban Safety Management at Hyderabad, INDIA.

Visual Road Condition Survey (VRCS). This Project Funded By World bank and Allotted to SMEC Consultancy for conduct Visual Road condition Surveys and SMEC is out sourced to TECONS, HYD. Transportation Engineering Consultancy Services (TECONS) undertaken the Coastal Districts For Conduct Visual Road condition Surveys. In Coastal Districts We Are allotted to Prakasham and Nellore divisions. Providing the physical features and the condition of State Highways and Major District Roads by visual observation. The physical features such as number of lanes, shoulders,Bridgs, Culverts, Junctions, Curves, Terrain and pavement condition such as number of Cracks, Potholes, Edge Failure, Roughness and their size, coordinates of each village and bridges by a Captured by GPS. RESPONSIBILITIES Road Condition Survey Pavement Condition Survey. Safety Considerations. Bridges and Culverts Inventory. Capturing GPS Coordinates at Villages, Bridges and Land marks Along Road.

Exhibition Impact on Hyderabad Road Network. In Hyderabad every year Government conducts the Exhibitions at Nampally and Shilparamam. People come from various places across in India and various parts of Andhra Pradesh. Due to heavy Crowds the regular flow is affected and often traffic jams occurring. To know impact of exhibitions we conducted surveys and analysed the data. Conducted Origination and Destination Surveys to know Influence of Traffic on Road network For 2 Occasions.

Page 71: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

71

RESPONSIBILITIES Classified Volume Counts at Mid Blocks and Intersections. Turning moment Volume Counts. Origination and Destination Surveys. Parking Surveys. INDUSTRY – INSTITUTE INTERACTION TRAINING Involved in scrutiny of designs and estimates of road works proposed for construction under the

Pradhan Mantri Gram Sadak Yojana (PMGSY) Schedule. COMPUTER KNOWLEDGE: TransCad/CUBE Primavera / MS Project Microsoft Office Auto Cad HDM-IV

Page 72: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

72

Name of Staff : T.GNANESWAR Profession : Highway /Traffic Engineering

Date of Birth : 12th August,1986

Nationality : Indian

Educational Qualifications:

B.E. in Civil Engineering from Osmania University, Hyderabad, in 2008.

Master of Technology in Transportation Engineering, Indian Institute of Technology (IIT),

Chennai in 2010.

COMPUTER SKILLS:

Programming Languages : C/C++, MATLAB, and Visual Basic.

Softwares : Mx Roads,STAAD Pro, Auto-CAD, KENLAYER, RIDS and Microsoft Office.

INTERNSHIP

Duration: 2 Months

At CRRI (Central Road Research Institute), New Delhi,

Project Title : “Refinement of Road Investment Decision Software (RIDS) and Fuel

Consumption Equations”.

Traffic Surveys : 1. Time Delay Studies was carried out for Delhi-Gurgoan Toll Plaza.

2. Traffic Data was collected on NH2 like Spot Speeds, Volume Count for the

Road User Cost Study.

EXPERIENCE May 2011 – Present

Firm : GEP Infrastructure Pvt Ltd (GEPIPL).

Position : Design Engineer

Page 73: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

73

Engagement of Consultant for carrying out detailed engineering services for the approach road

from the Umbarghar jetty to the proposed site, for the proposed 1200 MW Gas based combined

cycle power plant of GMR Maharashtra Energy Limited (GMEL) at Dapoli Taluka, Ratnagiri

District, Maharashtra.

Preparation of Pre-Feasibility and Feasibility Study Report for Signal Free Corridor from Cubban

Road to Outer Ring Road via Kamraj Road in Benguluru.

Investigation, survey, Design of Bus Rapid Transit System (BRTS) Corridor from Adivivaram

Junction (km. 14.000) to Goshala Junction (km 16.000) with 2 years defect liability under EPC

system.

Preparation of Detailed Design of Hata-Silapuri-Darguwan Road on BOT(Toll plus Annuity) in

Madhya Pradesh.

Preparation of Pilani Urban Infrastructure Project, Pilani, Rajasthan.

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Zirakpur

to Patiala section of NH-64(km 0.000 – km 50.700) in the state of Punjab on Design, Build,

Finance, Operate and Transfer on BOT (TOLL) basis.

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Sanga

Reddy to MH_KNT border section of NH-9(km 348.000 – km 493.000) under NHDP-IV on Design,

Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Cuttak -

Angul section of NH-42(km 0.000 – km 112.000) in the state of Orissa under NHDP-IV on Design,

Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Barakote

to Birmitrapur section of NH-23(km 211.000 – km 335.000) in the state of Orissa on Design,

Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Page 74: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

74

May 2010 – April 2011

Firm : Consulting Engineers Group Ltd (CEG).

Position : Traffic & Transportation Engineer

Detailed Project Report for Rehabilitation and Upgradation of Khed -Sinnar section of NH 50

under NHDP-IV B in the state of Maharashtra.

Detailed Project Report for Rehabilitation and Upgradation of Km.342 to Km.442 section of NH

222 under NHDP-IV B in the state of Maharashtra

Preparation of Detailed Project Report for Rehabilitation and Upgradation to 2-Lane/2-Lane

with Paved Shoulders from km 0 to km 136 of Birpur–Bihpur Section of NH 106 in the State of

Bihar.

Page 75: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

75

J. Sandeep Name : Jalda Sandeep Qualification : M.E.(Hons) Transportation with B-Tech Civil Engineering Date of Birth : 18th Febraury1988 Position Held : Highway Engineer/Quantity Surveyor

Educational Qualification

Year of Passing

Qualification/Degree Institution Grade (CGPA/%)

2011 M.E./M.Tech BITS-PILANI 8.2

2009 B-Tech Civil Engineering VNR Vignana Joythi 67

2005 Board of Intermediate Education,

Andhra Pradesh Narayana Junior College 85

2003 Board of Secondary Education,

Andhra Pradesh Jyothi Vidyalaya High

School 88

Industrial Experience/ Internship

Internship : Project Assistant in IIT-M Project Title : ADVANCED TRAVELER INFORMATION SYSTEMS Description : Providing information in advance to the commuters both

through a website & enroute information through VMS (variable message signs).

Duration : 2months (Summer 2K10) Internship/PS : Trainee Engineer in CEG India (Hyd Branch) Project Title : NH 222, NH 50, Prebid NH 9 & NH 106. Description : Conducting and Analyzing Traffic surveys & Material surveys, Preparation of Material reports Annexure and other chapters. Duration : 6months (Jan 2K11-June 2K11) October,2011 to date : Engineer , GEP Infrastructure Private Limited, hyderabad Project Title : NH 64, NH 23, NH 5, NH 215 & NH 203. Description : Conducting and Analyzing Traffic surveys & Safety Audit, Preparation of reports. Duration : Oct 2K11 - present

Page 76: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

76

Projects Completed

Optimization of 10bar Truss using Genetic Algorithm Case study on Widening of Two lane to Four lane of Jhansi Laknadon NH 29 Estimation of Pavement Service Life using Cox Proportional Hazards Method Improving the Soil Strength using waste materials & fibers Feasibility studies of already existing intersections in BITS-Pilani campus Area occupancy studies of the Jaipur-Sikar highway A case study on Dubai metro

Skill Sets

Basics in C & MATLAB

MX Roads

ARCGIS, MAPINFO

Auto CAD

STAAD PRO

Interest

Pavement Design Material Testing Transportation Planning Geometric Design

Academic Achievements/ Contributions

Active member of CEA (CIVIL ENGINEERING ASSOCIATION) in organizing STHAPANA

(civil engineering association feast) Captain of VNR VJIET cricket team, Vice-captain volleyball & football teams Head Boy, Jyothi Vidyala High School (2002-2003)

Extra-Curricular Activities

Won BSIT gold in cricket in 2K7 (A.P. 1st) Member of VNR volleyball & football teams Represented our college team in cricket, volleyball & football at national level Led C.E.D (Civil Engineering Dept) Cricket, Handball team and Volleyball team to First and Second

position respectively in “Intra Mural Sports” held at VNRVJIET for the Academic year 2K6-2K7, 2K7-2K8 & 2K8-2K9

Was part of both volley ball JNTU zonal and Slast’09, ranked as runners

Page 77: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

77

S.T.P.Sriphanindra

Profession : Civil Engineer

Date of Birth : 18th March,1990

Nationality : Indian

Educational Qualification

Year of Passing

Qualification/Degree Institution Grade (%)

2011

B-Tech in Civil Engineering Vitam Engineering College 64

2007 Board of Intermediate

Education, Andhra Pradesh Sri Chaitanya Junior College 81

2005 Board of Secondary Education,

Andhra Pradesh Vidwan English medium School 75

Project Experience

August, 2011 to Date: Engineer, GEP Infrastructure Private Limited, Hyderabad.

Feasibility study of Foot over Bridges at Maddilapalem jn. in Visakhapatnam Rehabilitation of poor settlement areas at Aganampudi Investigation, survey, Design of Bus Rapid Transit System (BRTS) Corridor from Adivivaram

Junction (km. 14.000) to Goshala Junction (km 16.000) with 2 years defect liability under EPC

system.

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Barakote

to Birmitrapur section of NH-23(km 211.000 – km 335.000) in the state of Orissa on Design,

Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Sanga

Reddy to MH_KNT border section of NH-9(km 348.000 – km 493.000) under NHDP-IV on Design,

Build, Finance, Operate and Transfer on BOT (TOLL) basis.

Page 78: GEPIPL Profile 9.5.12-web

G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082.

Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:[email protected],[email protected]

78

Skill Sets

Basics in C

MS Office

Auto CAD

Area of Interest

Construction management

Transportation Engineering

Structural Engineering

Academic Achievements/ Contributions

Winner of Chess Championship in School level during 2K3-2K5

Class representative of Civil engineering during 2K7-2K11

Editor of College news letter SATVICAM during 2K8-2K10

Team member in conducting college fest ACE-11