Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics Pty Ltd ABN 93 056 929 483 1/18 Hurley Drive Coffs Harbour NSW 2450 Australia SURFACE BONDED ACM REMOVAL AND ADDITIONAL ASBESTOS ASSESSMENT Church Street Redevelopment, Bellingen NSW GEOTCOFH02887AC-AB 19 October 2012

GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW

Coffey Geotechnics Pty Ltd ABN 93 056 929 483 1/18 Hurley Drive Coffs Harbour NSW 2450 Australia

SURFACE BONDED ACM REMOVAL AND ADDITIONAL ASBESTOS ASSESSMENT

Church Street Redevelopment, Bellingen NSW

GEOTCOFH02887AC-AB

19 October 2012

Page 2: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Coffey Geotechnics Pty Ltd ABN 93 056 929 483 GEOTCOFH02887AC-AB 1/18 Hurley Drive Coffs Harbour NSW 2450 Australia PO Box 704 Coffs Harbour 2450 Australia T (+61) (2) 1300 513 213 F (+61) (2) 6651 5194 coffey.com

19 October 2012

The General Manager Bellingen Shire Council PO Box 117 Bellingen NSW 2454

Attention: Daan Schiebaan

RE: Surface Bonded ACM Removal and Additional Asbestos Assessment - Church Street Redevelopment, Bellingen NSW

1 INTRODUCTION

Coffey Geotechnics Pty Ltd (Coffey) was engaged by Bellingen Shire Council (Council) to oversee the removal (by a licenced asbestos removal contractor) of bonded asbestos containing material (ACM) previously identified on the embankment surface at the northern end of the Church Street redevelopment site. At the completion of bonded ACM removal works additional soil samples were also collected for soil validation purposes. The additional asbestos assessment outlined within this report were undertaken following the discovery of suspected ACM in the form of fibro sheeting at the site on Thursday 20 September 2012. The scope of the assessment was based on the findings and recommendations of the Preliminary Hazardous Materials Assessment completed by Coffey at the site, report reference GEOTCOFH02887AB-AB, dated 27 September 2012.

2 BACKGROUND

Council as part of the redevelopment of Church Street engaged a revegetation contractor to revegetate the embankment located on the northern end of the street and nearby to the viewing platform. During tree planting works the revegetation contractor discovered suspected ACM material consisting of 5 to 6 small pieces of fibro sheeting. An immediate stop work was placed on this area of the site pending further investigation.

Coffey was engaged by Council to conduct the initial preliminary hazardous materials assessment. This assessment involved a site walkover and the collection of preliminary soil validation samples in order to assess whether asbestos was present in soil at the site. The findings of this assessment identified two Areas of Environmental Concern (AECs) based on the site walkover and the reported results from the analysis of soil samples collected from the site. These AECs are detailed below:

Page 3: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW

Coffey Geotechnics GEOTCOFH02887AC-AB 19 October 2012

2

AEC1: Free asbestos fibres in soil in the vicinity of soil sample SS1, located in the exclusion area where the initial bonded ACM fragment was detected by revegetation contractors.

AEC2: Bonded ACM fragments observed in various locations across the surface of the embankment of the site.

3 OBJECTIVE AND SCOPE OF WORKS

The objective of this additional assessment was to collect and dispose bonded ACM fragments previously identified on the embankment surface in accordance with current NSW regulations and to further assess if the surface soils across the site contain asbestos fibres or ACM.

To satisfy this objective involved implementing the following scope of work.

Coffey observed the collection and removal by a licenced asbestos removal contractor of the bonded ACM sheeting identified across the surface of the embankment area.

Once the removal of bonded ACM fragments from the site surface had been completed by the asbestos removal contractor, Coffey collected an additional six (6) soil validation and delineation samples. The samples were submitted for asbestos analysis. The sampling density (coupled with the earlier soil sampling undertaken) satisfies the minimum requirements for site characterisation in Table A of the EPA 1995 Sampling Design Guidelines for a 1,000m2 site area.

Soil samples were submitted to MGT LabMark Environmental, a NATA accredited laboratory for asbestos analysis using priority turnaround times to enable results to be available within 3 days of sample receipt by the laboratory.

Preparation of this letter report advising the results of the remediation work for the cleanup of the bonded ACM fragments and the additional testing performed. The report includes our assessment if the soil materials contain ACM contamination and if further investigation and/or remediation is required.

4 SITE DESCRIPTION

The site is located on a steep embankment adjacent to the northern end of Church Street, Bellingen and occupies an area of approximately 1,000m2. The site is bounded by a public footpath and viewing platform to the south and east, Jarrett Park to the north and bush/grassland to the west, see attached site locality plan (Figure 1). Within the investigation area is a large stormwater drain made of gabian baskets located in the central portion of the site.

The initial site walkover was undertaken by a Coffey Environmental Scientist in the afternoon of 24 September 2012. The embankment surface consisted of bare soil, some areas of landscaping, weed mat remnants, woodchip and gravels. Two large established trees are located in the central portion of the site. Evidence of waste materials, including building and household waste, was observed to be intermixed with surface soils. The preliminary hazardous materials assessment completed by Coffey observed bonded ACM at several locations across the embankment surface during the initial site walkover.

Page 4: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW

Coffey Geotechnics GEOTCOFH02887AC-AB 19 October 2012

3

5 SOIL INVESTIGATION LEVELS (SILS)

NSW DEC (2006) states that there are currently no national or NSW Environmental Protection Agency endorsed guidelines relating to human health or environmental investigation of soils containing asbestos on sites. For this site, Coffey has adopted a conservative criterion for asbestos of ‘no detectable asbestos’ present for initial screening purposes.

6 FIELD INVESTIGATIONS

John Lacy Demolition Pty Ltd, a licenced asbestos removal contractor, was engaged by Council to undertake the ‘emu-bob’ ACM removal works across the embankment area. Coffey observed the ‘emu-bob’ works carried out on the 5 October 2012. Photographs of the ACM removal works are attached. A total of less than 15kgs of ACM was removed from the site surface by the contractor and disposed of as asbestos waste to the Coffs Coast Resource Recovery Facility at Englands Road, Coffs Harbour.

At the completion of ACM removal works by the contractor, Coffey collected four (4) additional soil validation samples from surface soils across the investigation area. Further assessment of AEC1 was completed on 11 October 2012 where Coffey collected an additional two (2) delineation samples in the vicinity of sample SS1 where free asbestos fibres in soil were previously identified.

Soil samples were placed into laboratory prepared 250ml glass jars and zip lock bags for asbestos sampling. Soil samples were placed immediately into a chilled insulated container for temporary storage and transport to the laboratory. Chain of custody documentation was completed at the time of sample collection and the documentation accompanied the samples to the laboratory.

Hand tools (stainless steel shovel) used for the collection of surface soil samples were decontaminated before and between each sample by brush scrubbing with potable water, phosphate free detergent (Decon 90™) and final rinse with potable water. A clean pair of disposable nitrile gloves was worn for the collection of each sample.

The approximate investigation locations are shown in attached sample location plan (Figure 2).

7 LABORATORY RESULTS

A summary of the laboratory analysis results are presented in Table 1 below. The laboratory analysis certificates and chain of custody are attached to this letter report.

Table 1 – Summary Laboratory Analysis Results

Sample Number

Type of Sample Purpose of Sample Asbestos Detected

SS5 Soil sample Validation No asbestos detected

SS6 Soil sample Validation No asbestos detected

SS7 Soil Sample Validation No asbestos detected

SS8 Soil Sample Validation No asbestos detected

Page 5: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW

Coffey Geotechnics GEOTCOFH02887AC-AB 19 October 2012

4

Sample Number

Type of Sample Purpose of Sample Asbestos Detected

SS1-A Soil Sample Delineation of SS1 sample result No asbestos detected

SS1-B Soil Sample Delineation of SS1 sample result No asbestos detected

The following points are noted in Table 1:

No asbestos fibres or ACM was detected in soil collected from sample locations SS5 to SS8,

SS1-A and SS1-B.

8 DISCUSSION OF RESULTS

As outlined in Section 2 above, two Areas of Environmental Concern (AEC) were previously identified at the site. These are detailed below:

AEC1: Free asbestos fibres in soil in the vicinity of soil sample SS1, located in the exclusion area where the initial bonded ACM fragment was detected by revegetation contractors.

AEC2: Bonded ACM fragments observed in various locations across the surface of the embankment of the site.

The free asbestos fibres detected at soil sample SS1, and defined within AEC1, were laterally delineated during the current assessment. No asbestos fibres were detected in the two delineation soil samples (SS1-A and SS1-B) collected within the vicinity of SS1. The delineation sampling has shown the area of asbestos fibres in soil detected at SS1 is limited in extent and is considered to be a defined hotspot area of approximately 5m2.

The bonded ACM fragment collection and disposal works completed by John Lacey Demolition during the current assessment removed the visible bonded ACM fragments from the embankment surface. The soil samples collected by Coffey from across the embankment (excluding the area within AEC1) did not detect asbestos fibres in soil.

Page 6: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW

Coffey Geotechnics GEOTCOFH02887AC-AB 19 October 2012

5

9 CONCLUSIONS AND RECOMMENDATIONS

Remediation to remove the visible bonded ACM fragments from the ground surface of the site, identified as AEC2, has been completed by a licenced asbestos removal contractor. Analysis of soil samples collected from locations across the AEC2 area embankment did not detect asbestos in soil. It is considered that the visible bonded ACM fragments identified on the embankment surface within AEC2 have been appropriately remediated.

It is considered that the asbestos fibres in soil in AEC1 from sample location SS1 has been delineated to an area of approximately 5m2.

Based on the findings of the assessment, Coffey recommends the following:

• Further remediation of defined hotspot area in the vicinity of soil sample SS1 (AEC1). Remediation of AEC1 is to be undertaken in accordance with WorkCover NSW 2012, How to Safely Remove Asbestos, Code of Practice requirements. The remediation works will include:

o Council is to engage the services of a licensed Class A (friable) asbestos removal contractor to remove the asbestos impacted soils within the AEC1 area. As there is limited access for machinery to the site and the volume of impacted soil to be removed is low it is anticipated that the soil remediation work would be completed by hand.

o All of impacted soil material removed from the site will be double bagged and removed by the contractor for proper disposal to a licensed landfill that can accept asbestos waste. The contractor will provide Council with a receipt from the landfill for this waste disposal.

o Coffey will conduct air monitoring for the duration of the remediation works in accordance with How to Safely Remove Asbestos, Code of Practice requirements.

o Once the AEC1 remediation work is complete Coffey will then collect two (2) validation soil samples for laboratory analysis. The soil and air monitoring samples collected by Coffey will be submitted to a NATA accredited laboratory under chain of custody for asbestos analysis using priority turnaround times.

o Following receipt of the laboratory test results Coffey1 will then prepare a brief site validation assessment advising Council of the findings of the remediation work for AEC1, results of the air monitoring undertaken, and the asbestos testing performed. Once the AEC1 remediation is complete Coffey will provide a surface clearance certificate in accordance with How to Safely Remove Asbestos, Code of Practice requirements and our assessment of the suitability of this site, following remediation, for its proposed future use as public parkland.

• Resumption of revegetation works on the embankment area may proceed, however no work is to proceed within the area demarcated as AEC1.

• It is recommended that any contractors working at the site are made aware, and follow, a suitable protocol for managing unexpected finds (such as potential ACM) at the site.

• Coffey recommends that the site remain temporarily fenced and secured to prevent unauthorised public access while the appropriate remediation strategies for AEC1 are implemented.

1 Coffey will discuss the laboratory results with Council once we have received and advise if further remediation was required.

Page 7: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Surface bo

Coffey GeoGEOTCOF19 October

10 LIM

The findinaccordanreasonabcan it be observednature, th

In preparfollowed. understa

This repocontains

No warrathis reporso at theishould se

We draw Site Asse

For and o

Andrew BAssociat

Encl:

onded ACM re

otechnics H02887AC-AB

r 2012

MITATIONS

ngs containence with normble interpretaconsidered t

d during conshen an enviro

ring this repo This work hnding of the

ort was prepaACM, and if

anty, expressrt. The repoir own risk aneek expert ad

w your attentioessment” wh

on behalf of C

Ballard te Environm

Importa

Figure 1

Figure 2

Photogr

Laborat

Chain o

emoval & addi

S

ed in this repmal practicesation of the pthat these finstruction thatonmental co

ort, current guhas been conclient’s brief

ared for Bellinecessary, t

sed or impliedrt is not intennd should sadvice in relat

on to the attaich outline a

Coffey Geote

mental Scien

ant Information

1 – Site Locali

2 – Sample Lo

raphs

tory Certificate

of Custody

itional asbesto

ort are the res and standaast and presndings represt does not consultant shou

uidelines for nducted in gof and general

ngen Shire Cto provide a

d, is made anded for otheatisfy themsetion to the pa

ached sheet nd discuss th

echnics Pty L

ntist

n About Your C

ity Plan

ocation Plan

es of Analysis

os assessmen

esult of discrrds. To the b

sent uses of tsent the actuonform to thauld be conta

assessmentood faith in al accepted p

Council with basis for mo

s to the inforer parties or elves concernarticular situa

“Important Inhe limitations

Ltd

Coffey Environ

nt, Church Stre

rete/specific mbest of our knthe site. Undual state of that described cted and furt

t and managaccordance wractice for en

the objectiveore detailed in

rmation and other uses. ning its appliation.

nformation As associated

nmental Site A

eet Redevelop

methodologienowledge, thder no circumhe site at all in this reportther assessm

ement of conwith Coffey Gnvironmental

e to assess ifnvestigation

professional Anyone usincability and,

About Your Cwith interpre

Assessment

pment, Belling

es used in hey represenmstances, ho

points. If mat, or is suspicments undert

ntaminated lGeotechnics l consulting.

f soil at the sor site reme

advice inclung this documwhere nece

Coffey Enviroeting this rep

gen NSW

6

t a wever, aterial is cious in taken.

and were

site ediation.

uded in ment does ssary,

nmental port.

Page 8: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Uncertainties as to what lies below the ground on potentially contaminated sites can lead toremediation costs blow outs, reduction in the value of the land and to delays in theredevelopment of land. These uncertainties are an inherent part of dealing with landcontamination. The following notes have been prepared by Coffey to help you interpret andunderstand the limitations of your environmental site assessment report.

Your report has been writtenfor a specific purpose

Your report has been developed on the basis of aspecific purpose as understood by Coffey and appliesonly to the site or area investigated. For example, thepurpose of your report may be:● To assess the environmental effects of an on-going operation.● To provide due diligence on behalf of a property vendor.● To provide due diligence on behalf of a property purchaser.● To provide information related to redevelopment of the site due to a proposed change in use, for example, industrial use to a residential use.● To assess the existing baseline environmental, and sometimes geological and hydrological conditions or constraints of a site prior to an activity which may alter the sites environmental, geological or hydrological condition.

For each purpose, a specific approach to the assessmentof potential soil and groundwater contamination isrequired. In most cases, a key objective is to identify, and if possible, quantify risks that both recognisedand unrecognised contamination pose to the proposedactivity. Such risks may be both financial (for example,clean up costs or limitations to the site use) andphysical (for example, potential health risks to usersof the site or the general public).

Subsurface conditions can change

Interpretation of factual data

Your report will only givepreliminary recommendations

Subsurface conditions are created by natural processesand the activity of man and may change with time.For example, groundwater levels can vary with time,fill may be placed on a site and pollutants may migratewith time. Because a report is based on conditionswhich existed at the time of the subsurface exploration,decisions should not be based on a report whoseadequacy may have been affected by time. ConsultCoffey to be advised how time may have impacted onthe project and/or on the property.

Environmental site assessments identify actual subsurfaceconditions only at those points where samples aretaken and when they are taken. Data derived fromindirect field measurements and sometimes otherreports on the site are interpreted by geologists,engineers or scientists to provide an opinion aboutoverall site conditions, their likely impact with respectto the report purpose and recommended actions.Actual conditions may differ from those inferred to exist,because no professional, no matter how well qualified,can reveal what is hidden by earth, rock and time.The actual interface between materials may be far moregradual or abrupt than assumed based on the factsobtained. Nothing can be done to change the actualsite conditions which exist, but steps can be taken toreduce the impact of unexpected conditions. For thisreason, parties involved with land acquisition,management and/or redevelopment should retain theservices of Coffey through the development and useof the site to identify variances, conduct additional testsif required, and recommend solutions to unexpectedconditions or other problems encountered on site.

Your report is based on the assumption that the siteconditions as revealed through selective point samplingare indicative of actual conditions throughout an area.This assumption cannot be substantiated until projectimplementation has commenced and therefore yourreport recommendations can only be regarded aspreliminary. Only Coffey, who prepared the report,is fully familiar with the background information neededto assess whether or not the report's recommendationsare valid and whether or not changes should beconsidered with redevelopment or on-going use ofthe site. If another party undertakes the implementationof the recommendations of this report there is a riskthat the report will be misinterpreted and Coffey cannotbe held responsible for such misinterpretation.

Important information about your Coffey Environmental Site Assessment

Coffey Geotechnics Pty Ltd ABN 93 056 929 483

Page 9: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Data should not be separated from the report

The report as a whole presents the findings of the siteassessment and the report should not be copied inpart or altered in any way. Logs, figures, laboratorydata, drawings, etc. are customarily included in ourreports and are developed by scientists, engineers orgeologists based on their interpretation of field logs(assembled by field personnel), field testing andlaboratory evaluation of field samples. This informationshould not under any circumstances be redrawn forinclusion in other documents or separated from thereport in any way.

Contact Coffey for additional assistanceCoffey is familiar with a variety of techniques andapproaches that can be used to helo reduce risks forall parties to land development and land use. It iscommon that not all approaches will be necessarilydealt with in your environmental site assessment reportdue to concepts proposed at that time. As a projectprogresses through planning and design towardconstruction and/or maintenance, speak with Coffeyto develop alternative approaches to problems that maybe of genuine benefit both in time and cost.

Environmental reporting relies on interpretation offactual information based on judgement and opinionand has a level of uncertainty attached to it, which isfar less exact than other design disciplines. This hasoften resulted in claims being lodged against consultants,which are unfounded. To help prevent this problem,a number of clauses have been developed for use incontracts, reports and other documents. Responsibilityclauses do not transfer appropriate liabilities fromCoffey to other parties but are included to identifywhere Coffey's responsibilities begin and end. Their useis intended to help all parties involved to recognise theirindividual responsibilities. Read all documents fromCoffey closely and do not hesitate to ask any questionsyou may have.

Responsibility

Important information about your Coffey Environmental Site Assessment

Coffey Geotechnics Pty Ltd ABN 93 056 929 483

Your report is prepared forspecific purposes and persons

Interpretation by other professionals

To avoid misuse of the information contained in yourreport it is recommended that you confer with Coffeybefore passing your report on to another party whomay not be familiar with the background and thepurpose of the report. In particular, a due diligencereport for a property vendor may not be suitable forsatisfying the needs of a purchaser. Your report shouldnot be applied for any purpose other than that originallyspecified at the time the report was issued.

Costly problems can occur when other professionalsdevelop their plans based on misinterpretations of areport. To help avoid misinterpretations, retain Coffeyto work with other professionals who are affected bythe report. Have Coffey explain the report implicationsto professionals affected by them and then review plansand specifications produced to see how they haveincorporated the report findings.

Page 10: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Source: Google Earth 2011

drawn OH client: Bellingen Shire Council

approved AB project: Surface Bonded ACM Removal and Additional Asbestos Assessment - Church St Redevelopment Bellingen, NSW

date 18/10/12

scale NTS title: Site Locality Plan

originalsize A4 project no: GEOTCOFH02887AC-AB figure no: 1

SITE LOCATION

Page 11: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Source: Sixviewer – LPMA 2010

drawn OH client: Bellingen Shire Council

approved AB project: Surface Bonded ACM Removal and Additional Asbestos Assessment - Church St Redevelopment Bellingen, NSW

date 18/10/12

scale NTS title: Sample Location Plan

originalsize A4 project no: GEOTCOFH02887AC figure no: 2

SS4

SS8

SS3

SS7

SS2

SS1

SS6

SS5

Site Boundary

SS1-ASS1-B

- Delineation Sample

- Validation Sample (asbestos detected)

AEC1

- Validation Sample (no asbestos

Page 12: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Photo 1, shows the site secured with temporary fencing, view towards the south east.

Photo 2, shows the bonded ACM removal works in progress, view towards the south east.

Page 13: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Photo 3, shows the AEC1 area where delineation samples SS1-A and SS1-B were collected, view is to the north.

Page 14: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

SUITE 710 / 90 GEORGE STREET, HORNSBY NSW 2077 – P.O. BOX 1644 HORNSBY WESTFIELD NSW 1635

PHONE: (02) 99872183 FAX: (02)99872151 EMAIL: [email protected] WEBSITE: www.Ausset.com.au

Page 1 of 1

OCCUPATIONAL HEALTH & SAFETY STUDIES • INDOOR AIR QUALITY SURVEYS • HAZARDOUS MATERIAL SURVEYS • RADIATION SURVEYS • ASBESTOS SURVEYS

ASBESTOS DETECTION & IDENTIFICATION • REPAIR & CALIBRATION OF SCIENTIFIC EQUIPMENT • AIRBORNE FIBRE & SILICA MONITORING

Our ref : ASET31244/ 34424 / 1 - 2

Your ref: 355242

NATA Accreditation No: 14484

15 October 2012

MGT- Labmark Environmental Pty Ltd

Unit F3, Building F, 16 Mars Road

Lane Cove NSW 2066

Attn: Dr Robert Symons

Laboratory & Technical Manager

Dear Robert

Asbestos Identification

This report presents the results of two samples, forwarded by MGT- Labmark Environmental Pty Ltd

on 12 October 2012, for analysis for asbestos.

1.Introduction:Two samples forwarded were examined and analysed for the presence of asbestos.

2. Methods : The samples were examined under a Stereo Microscope and selected fibres were

analysed by Polarized Light Microscopy in conjunction with Dispersion Staining method.

(Safer Environment Method 1.)

3. Results : Sample No. 1. ASET31244 / 34424 / 1. SS1 - A - 0.1 - 0.3m - OC10909.

Approx dimensions 4.7 cm x 4.5 cm x 3.9 cm

The sample consisted of a mixture of clayish soil, stones, plant matter and fragments of

bitumen.

No asbestos detected.

Sample No. 2. ASET31244 / 34424 / 2. SS1 - B - 0.1 - 0.3m - OC10910.

Approx dimensions 4.5 cm x 3.6 cm x 3.2 cm

The sample consisted of a mixture of clayish soil, stones, plant matter and fragments of

bitumen.

No asbestos detected.

Analysed and reported by,

Laxman Dias. BSc

Analyst / Approved Identifier.

Approved Signatory

AUSTRALIAN SAFER ENVIRONMENT & TECHNOLOGY PTY LTD ABN 36 088 095 112

This document is issued in accordance with

NATA’s Accreditation requirements. Accredited

for compliance with ISO/IEC 17025.

Page 15: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

SUITE 710 / 90 GEORGE STREET, HORNSBY NSW 2077 – P.O. BOX 1644 HORNSBY WESTFIELD NSW 1635

PHONE: (02) 99872183 FAX: (02)99872151 EMAIL: [email protected] WEBSITE: www.Ausset.com.au

Page 1 of 2

OCCUPATIONAL HEALTH & SAFETY STUDIES • INDOOR AIR QUALITY SURVEYS • HAZARDOUS MATERIAL SURVEYS • RADIATION SURVEYS • ASBESTOS SURVEYS

ASBESTOS DETECTION & IDENTIFICATION • REPAIR & CALIBRATION OF SCIENTIFIC EQUIPMENT • AIRBORNE FIBRE & SILICA MONITORING

Our ref : ASET31190/ 34370 / 1 - 4

Your ref :354619

NATA Accreditation No: 14484

9 October 2012

MGT- Labmark Environmental Pty Ltd

Unit F3, Building F, 16, Mars Road

Lane Cove

NSW 2066

Attn: Ms Leanne Knowles

Dear Leanne

Asbestos Identification

This report presents the results of four samples, forwarded by MGT- Labmark Environmental Pty Ltd

on 8 October 2012, for analysis for asbestos.

1.Introduction:Four samples forwarded were examined and analysed for the presence of asbestos.

2. Methods : The samples were examined under a Stereo Microscope and selected fibres were

analysed by Polarized Light Microscopy in conjunction with Dispersion Staining

method (Safer Environment Method 1.)

3. Results : Sample No. 1. ASET31190 / 34370 / 1. 354619 - SS5 - 0.1 - 0.1 -Oc06364.

Approx dimensions 7.0 cm x 7.0 cm x 2.25 cm

The sample consisted of a mixture of clayish soil, stones, fragments of plaster, brick and

glass.

No asbestos detected.

Sample No. 2. ASET31190 / 34370 / 2. 354619 - SS 6 -0.1 - 0.3 - Oc06365.

Approx dimensions 7.5 cm x 7.0 cm x 2.5 cm

The sample consisted of a mixture of clayish soil, stones, plant matter and fragments of

plaster and plastic.

No asbestos detected.

Sample No. 3. ASET31190 / 34370 / 3. 354619 - SS7 -0.1 - 0.3 - Oc06366.

Approx dimensions 7.5 cm x 7.5 cm x 2.25 cm

The sample consisted of a mixture of clayish soil, stones, plant matter and fragments of

plaster and brick like material.

No asbestos detected.

AUSTRALIAN SAFER ENVIRONMENT & TECHNOLOGY PTY LTD ABN 36 088 095 112

Page 16: GEOTCOFH02887AC-AB Surface Bonded ACM Removal and ...€¦ · Surface bonded ACM removal & additional asbestos assessment, Church Street Redevelopment, Bellingen NSW Coffey Geotechnics

Page 2 of 2

Sample No. 4. ASET31190 / 34370 / 4. 354619 - SS8 - 0.1 - 0.3 - Oc06367.

Approx dimensions 8.0 cm x 8.0 cm x 2.5 cm

The sample consisted of a mixture of clayish soil, stones, plant matter and fragments of

plaster, shale and brick.

No asbestos detected.

Analysed and reported by,

Mahen De Silva. BSc, MSc, Grad Dip (Occ Hyg)

Occupational Hygienist / Approved Identifier.

Approved Signatory

This document is issued in accordance with

NATA’s Accreditation requirements. Accredited

for compliance with ISO/IEC 17025.