5
GEOSS Architecture Implementation Pilot Phase 2 (AIP-2) Name of Working Group Name of Scenario May 4-8, 2009 The Palazzo dei Congressi di Stresa Stresa, Italy

GEOSS Architecture Implementation Pilot Phase 2 (AIP-2) Name of Working Group Name of Scenario May 4-8, 2009 The Palazzo dei Congressi di Stresa Stresa,

Embed Size (px)

Citation preview

Page 1: GEOSS Architecture Implementation Pilot Phase 2 (AIP-2) Name of Working Group Name of Scenario May 4-8, 2009 The Palazzo dei Congressi di Stresa Stresa,

GEOSS Architecture Implementation Pilot Phase 2 (AIP-2)

Name of Working GroupName of Scenario

May 4-8, 2009

The Palazzo dei Congressi di Stresa

Stresa, Italy

Page 2: GEOSS Architecture Implementation Pilot Phase 2 (AIP-2) Name of Working Group Name of Scenario May 4-8, 2009 The Palazzo dei Congressi di Stresa Stresa,

Screen Capture

• Screen capture recordings of Scenario clients – 3-5 Min

• Outline00:00 Opening Title

00:05 Intro text and graphic

00:15 Screen captures

popups to highlight a message.

wiring diagrams from powerpoint interspersed

02:45 Recap text and graphic

02:55 Credits title

03:00 End

Page 3: GEOSS Architecture Implementation Pilot Phase 2 (AIP-2) Name of Working Group Name of Scenario May 4-8, 2009 The Palazzo dei Congressi di Stresa Stresa,

Guidelines for demo capture• Guidelines for software (Camtasia 6) and a “how-to” will be

provided– Camtasia 5 is okay– File types: .mov, .wmv

• a ppt template will be provided• 3-5 min for each scenario + IOC process• Check out AIP-1 videos for an idea of what is expected.

– Demos at http://www.ogcnetwork.net/AIPdemos– Download at

http://www.ogcnetwork.net/pub/ogcnetwork/GEOSS/AI_Pilot_Demo.zip

• Script and storyboards for videos.• Speaker support available• Contact Nadine Alameh for additional information

Page 4: GEOSS Architecture Implementation Pilot Phase 2 (AIP-2) Name of Working Group Name of Scenario May 4-8, 2009 The Palazzo dei Congressi di Stresa Stresa,

Icons and Other Graphics

OGC Service

Non-OGC Service

Workflow engine

Clients

Page 5: GEOSS Architecture Implementation Pilot Phase 2 (AIP-2) Name of Working Group Name of Scenario May 4-8, 2009 The Palazzo dei Congressi di Stresa Stresa,

Sample Information Flow

PEP SOS

PDP WFS

req

req

PDP checks policies to decide on request authorization.

res

PEP forwards authorized request to SOS

res

resreq

req