November 2015
GEOSEA
2
DEME - OFFSHORE WIND
ORGANISATION
• Soil Investigation
• EPCI Foundations
• Wind Turbines
Transport &
Installation
• Cable Installation
• Scour Protection
• Rock Dumping
• Dredging Works
• Infill of gravity-
based foundations
• Heavy Lifts
• Installation of
Offshore
Substations
• Maintenance &
Services
Leading flag in Offshore Wind = GeoSea
• Investment & partnering: DEME Concessions, Power@Sea
• New Technologies: High Wind, Flidar
Protected by Patent Applications by DEME group
- Company based in Zwijndrecht, Belgium
- Over 300 Employees (most of whom Engineers)
- Providing geotechnical and offshore solutions to Customers
- 100% subsidiary to the DEME group
- Working around the globe
- Turnover 2011 / 2012 / 2013 : € 163 / € 180 / € 545 Mio
INTRODUCING GEOSEA
4
GEOSEA IN A NUTSHELL
• A DEME member: reliable, stable and
financially strong
• First-class offshore contracting
• From design to full lifecycle
management
• In-house design and engineering
• Cost-efficient and client-centered
• State-of the-art technology
• Continuous innovation
• Experts from around the world
• Offshore wind, wave and tidal
5
OFFSHORE WIND – OUR SERVICES ) projects
• Transport and Installation of wind
turbines, foundations, met masts and
offshore substations.
• Engineering, Procurement,
Construction and Installation (EPCI)
projects
• Full Life Cycle Management:
• Repair
• Maintenance
• Logistics
• Installing Offshore Wind Farms since
2002
• Installed to date:
• 164 WTGs and counting….
• 638 foundations and counting…
6
More than 35 referenced projects
OFFSHORE WIND: OUR EXPERIENCE
Protected by Patent Applications by DEME group
GEOSEA FLEET
• New build vessel – preparations started – “Apollo” (end 2016)
8
WIND TURBINE INSTALLATION
• Alpha Ventus – 6 * 5MW Senvion
WTGs
• Thornton Bank 1 – 6 * 5MW Senvion
WTGs
• Thornton Bank 2 & 3 – 48 * 6MW
Senvion WTGs
• Northwind – 72 * 3MW V112 Vestas –
MHI WTGs
• Kentish Flats Ext – 15 * 3.3MW V126
Vestas-MHI WTGs
• Also; Baltic II - under JV with Hochtief
and Global Tech I - Innovation used to
install turbine rotors
Belgium | Thorntonbank
Ph I: 5 MW / Ph II & III : 6.15MW
9
FOUNDATION INSTALLATION
Baltic 2; Westermost Rough; Borkum West II; Thornton Bank
Phases 1-3; Walney I & II; Ormonde; Alpha Ventus; Beatrice
MPs, Jackets, GBFs and Suction Buckets
Protected by Patent Applications by DEME group
OHVS – EPCI AND T&I
Belwind I BE 330 MW Offshore Wind farm
London Array UK 630 MW Offshore Wind farm
West Duddon Sands UK 389 MW Offshore Wind farm
Amrumbank Germany 288 MW Offshore Wind farm
Godewind 1 & 2 Germany 550 MW Offshore Wind farm
Humber Gateway UK 240 MW Offshore Wind farm
Gemini NL 2*300 MW (220 kV) Offshore Wind farm
Butendiek Germany 288 MW Offshore Wind farm
Luchterduinen NL 132 MW Offshore Wind farm
Ormonde UK 150 MW Offshore Wind farm
Thornton BE 325 MW Offshore Wind farm
Lincs Offshore Windfarm UK 270 MW Offshore Wind farm
Walney I & II UK 2 x 185 MW Offshore Wind farm
10
All rights reserved - © D.E.M.E. NV
Operations Engineering
• Vessel Analysis
• Offshore Operations (positioning, jacking, lifting...)
• Meteorology (metocean data)
• Wave loads
• 4D-Modelling
• Motion Analysis
Design Management
• Foundation Engineering
• Structural and Offshore Engineering
Geological Engineering
• Soil Investigation and Analysis
• Drive-ability
• Leg Penetration
Fabrication Engineering
• Temporary Works
• Permanent Works
Research & Development
• Analysis and Measuring
• Fundamental R&D
• Applied R&D
DEME: Creating land for the future 11
DESIGN & ENGINEERING
12
CURRENT PROJECTS
• Plus GeoSea is actively tendering for several projects slated for
construction by 2020.
Project Name GOC Scope Construction
Start
Status
Galloper (UK) Design, fabrication and
installation of 56 steel
monopiles
End 2016 Some main
contractors selected,
rest of the process is
just starting
Race Bank (UK) T&I Foundations + scour
protection + met mast
decommissioning
2016 Port discussions
underway, in design
phase.
NNG (UK) EPCI foundations (WTGs
and offshore substation)
+ WTG installation
2017 Design phase only
Merkur (Germany) EPCI Balance of Plant First half, 2016 Design phase
Nordsee 1 (Germany) T&I WTG Foundations December 2015 Construction to
commence soon
Rentel (Belgium) EPCI Balance of Plant
Undisclosed EPCI Foundations 2017-2018
13
SUB-CONTRACT SERVICES Overall Project Fabrication Transport of
Foundations
Preparation, mobilization and
installation
Inspection and
Maintenance
• Engineering
works (temporary
and permanent
design)
• Skilled and semi-
skilled labour
• Engineers
• Inspectors
• Admin/secretarial
• Accommodation
on shore
• Office space
(short and long
term)
• Taxi/shuttle
services
• Pile fabrication
• Jacket
fabrication
• Monopile
fabrication
• Transition
piece
fabrication
• Cable
manufacturing
• Secundary
steel
fabrication
• Seafastning
Fabrication
• Crane &
SPMT hire
• Storage
area
• Quay wall
• Port
services
• Fabrication (temporary steel
works)
• Electrical services
(temporary/permanent)
• Hydraulics installation (temp)
• SPMT and crane services
• Port services/facilities (incl
agents, bunkering, chandlers,
laydown areas)
• Vessels (supply vessels / crew
vessels / helicopter)
• ROV and diving services
• Grouting services and supply
• Hydraulic hammer
• Large diameter drilling
• Generators/compressors
• Small tools/hardware
• Electrical services (Temporary
electrical set-up)
• Hydraulics (Temporary set-up)
• Vessel hire
• Electrical services (Temporary
electrical set-up)
• Skilled and
semi-skilled
labour
• Vessels
• Port services
• Accommodati
on
• Engineering
services
• ROV/diving
• Hydrographic
survey