10

Georgi_Bibin_Portfolio

Embed Size (px)

Citation preview

Page 1: Georgi_Bibin_Portfolio
Page 2: Georgi_Bibin_Portfolio

21090

21090

21090

21090

21090 210

90

21090

21090

21090

21090

21090

21090

20090200902009020090200902009020090200902009020090 2009020090

21090 210

80210

90

210

9021

090

21090 210

80210

90

21090210

80 210

9021

09021080 21

090

21090

210

90

180150

180150

150120

24080

24080

180180

24080

180150

24080

180150

180150

180150

150120

24080

24080

180180

180150

24080

24080

18015

0

200902009020090 20090

2009020090

21090

21090

240180

21090

21090

26090

26090

26090

26090

N

13

18

16 15

17 1423 20

22 21

19

24

4 450300 440 260 500 300 850 300 500 200 500 300

110 55 90 130 90 115 90 60 115 90 385 90 130 90 290 90 130 90 290 90 130 90 290 90 130 90 290 90 130 90 230 90 90

4 450

30 560 85 166 116 166 85 554 238 445 238 554 252 116 252 554 36

2 69

029

071

060

060

036

013

026

360

013

615

510

023

023

023

090

120

4513

090

140

130

2 69

029

071

060

060

036

013

026

360

013

615

510

023

016

023

070

120

624

300 600 600 300 850 300 500 200 500 300

200

330

390 228

200 470

430

460

200

200

592

745

180

275

557

745

275

180

348

745

330

470263180

138

745

348

330

665263180

138

592

745

180

275

557

745

275

180

348

745

330

470 263 180

138

745

348

330

665 263 180

138

460

180

186

296

275

456

562

180

186

296

275

456

562

180

186

275

456

562

180

186

275

456

562

296

296

774 774

774774

+4,30

A

2' 5 6'

6' 10

10

11

11

12' 13

13

A

B

C

D

E

C

D

E

1'

1' 2'

4

3'

7' 8'

7' 8'

9'

9'

12'

F"F"

H' H'

B

B

A A

0 5 10 15Level 1 +4,30m

-2,00

±0,00

+1,50

+4,30

+7,10

+10,00

+11,50

200

150

280

280

290

150

-2,00

±0,00

+1,50

+4,30

+7,10

+10,00

+11,50

200

150

280

280

290

150

-2,00

+1,50

+4,30

+7,10

-2,00

+1,50

+4,30

+7,10

330

2026

020

260

2039

0

330

2026

020

260

2026

0

330

2026

020

260

B - B

work title:salasuka home for elderly people

location:salasuka,bulgaria

gross floor area:1850 sqm

height/ storey:11,5m/ 2,5-storeys

structure:reinforced concrete

completion date:2013.12

description:The project aims to become exemplary for future elderly developments in Bulgaria. The architectural aim is toharmonize as much aspossible the investor’s requirements with the best world practices and thus achieving the goal of fully meeting the new higher standards, while tailoring the building to the specific climatic and area conditions.

architect

Georgi [email protected]+44 (0)75 840 53719

Page 3: Georgi_Bibin_Portfolio

work title:tree house

location:gorna dikanya, bulgaria

submission date:2013.09

description:the project was comissioned by a family who wanted tobuild themselves a tree house in their lakeestate.i have worked closely with my clients, so i was able to tailor my design fulfiling all their desires and expecta-tions.when i have cleared the design aspect of the project i had to start thinking of the building proccess.i have created a building system that allows the building to be erected without theneed of skilled labor, so that the project could be finished only by the family memberswhich was stated in the brief.i have designed and calculated the structu-re for the whole project. i have provided my clients not only with the standard archi-tectural and technicaldrawings, but i have delivered an extremelyuser friendly bim solu-tion which they can use on site.

1

2

3

4

5

6

7

8

9

10 11 12

3,9 m2

15,4 m2

17,0 m2

3013

046

250

65

±0,00

+0,30

+1,60

+2,06

+4,56

+5,21

132 9 65 325 65

22 4122

56 22 364 22

81°

Page 4: Georgi_Bibin_Portfolio

work title:bab competiton

location:manama,bahrain

submission date:2012.01

description:The main goal of my project named Fluid Park is the creation of high quality public spaces, horizontally and vertically, as well as preserving and improving the sense of space. The main element of the structu-re is the parking. It is elevated five meters above ground and is on two levels, provid-ing 800 parking places,200 more than the existing capacity. The sides of the parking act as bio canvas, with vegetation which can be periodically chang-ed, creating different compositions. The roof is a public space, green park with a 360 degree view of the sur-rounding area. It can be accessed directly from the ground level through several vertical connections.photovoltaic panels will reduce the energy demand of the building and promoting sustain-ability as trait of Bahrein, following the example of the World Trade Center located nearby.

Page 5: Georgi_Bibin_Portfolio

work title:post milano expo 2016

location:milan, italy

submission date:2012.01

description:the project is located on the site of the inter-national expo in milan,taking place in 2015.it’s aim is to give urbanand architectural solution for the site after the end of the expo.my concept was to useas much as possible of the infrastructure created for the event,minimising the costs of the new developments. i have not only kept, but enhanced the cardum and decumanum, linking the new site not only to the memory of the expo, but to the italianand roman cultural and historical heritage.i have also tried to incorporate my visionfor the green cities of the twenty first centuryin my proposal.

Page 6: Georgi_Bibin_Portfolio

work title:art complex anel(2nd extension)

location:sozopol,bulgaria

size:6 houses, spa and swim complex

structure:reinforced concrete

completion date:2010.05

description:the second extension compliments the initialproject of four houses.the task was to plansix new houses, spa center, outdor leisure and swim are, as well as landscape function-ing as open air art exhibition.the new buildings weredone with high end materials.while the building works where made the project evolved andchanges where made on site.the complex is still expanding and is considered to be one of the gems of the black sea.

Page 7: Georgi_Bibin_Portfolio

work title:invest bank head quarters

location:sofia,bulgaria

height/ storey:30m/ 9-storeys

structure:reinforced concrete

completion date:2009.09

description:located on 83 bulgariabulevard, between thethe festa barcelo hotel,awarded building of the year 2005 and bellissimo business center awarded building of the year 2006. initially the taskwas just for facade study, to determine thebest aproach for the very demanding plot.the investors where impressed by it and that lead to receiving the complete projectincluding the interior design of the building.

Page 8: Georgi_Bibin_Portfolio

work title:switch to pure volvo

location:italy

submission date:2013.04

description:the project aims to outline the design fea-tures of the volvo v60, particularly the harmo-ny between the installation and the car’s silhouette.the simplicity of the form brings the design of the vehicle to the foreground.the installation is com-posed of three main components:the main body made of opaque recycled plastic is assembled of 60 elements. interior elements, made of translucent plastic with built-in multicolor led tubes, allowing the creation of music and light shows; the elements can be placed In a random order in the main body, that allow creative interventions during the showcase.rotating podium giving the ability to complete-ly showcase the car; the complete project will be way under the maximum budget of 60 000 euro and is designed to be easily assembled and disassembled by two people for less than an hour.

Page 9: Georgi_Bibin_Portfolio

work title:collider activity center,for walltopia

location:sofia, bulgaria

submission date:2013.02

description:the competition briefhas three main aspects: urban, archi-tectural, and lands-cape. the plot is located in the fringe area of the city, bordering the oldresidential blocks,the green belt around it, and the new businessdistrict.my approach was to create a space that isextremly functional,respecting 100% thedesign brief, as well asmy personal sustain-ability criterias, it had to be budget smart, soit could be easily built.the landscape is complimenting the overall concept of the box in the box i have used to amplify the monumental impact the project will have on the area, the community, and the city itself, as this isgoing to be the firstcomplete indoor climb-ing center of its kind.

5

6

7

8

9

10

11

12

13

14

15

0 1 2 3 4 5 10 15

S-01 S-01

45,00

45,00

45,0

0

45,0

0

7,30

±0,00

high wall area

bolders area

funtopiaRestaurant

lobby & cafe

info point

bar&

reception

Storage&

Washing

party area

kitchencoldstore

storage staffM

staffFstorage

inner court

N

-3,50

±0,00

+6,00

+12,00

+16,00

+22,00

+45,00

-3,50

±0,00

+6,00

+12,00

+16,00

+22,00

+45,00

3,50

6,00

6,00

4,00

6,00

23,0

0

3,50

6,00

6,00

4,00

6,00

23,0

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

Page 10: Georgi_Bibin_Portfolio

work title:new wing of the medical collegeyordanka filaretova

location:sofia, bulgaria

submission date:2009.01

description:this is a student project done during my bachelor degree.it is an actual brief, delivered to several of the bigest architectural practices in the country.the project is located in the center of the city,the available plot wasnarrow, bordering anancient church on the north. the brief was extremly complicated,as it covered plenty requirements and building functions.one of the biggest quests was to fulfill it,with the current building parameters and restrictions in thearea.my project aimed to deliver a very neuturaland functional building,that could be built withlow budget, but not sacrificing its sustain-ability.