Page 1: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH

PRECAST DECK PANELS WITH UHPC CLOSURE JOINTS

SR 211 OVER BEECH CREEK

Bill DuVall, P.E. and Dexter Whaley, P.E.Georgia Department of Transportation

Office of Bridge Design

Page 2: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

• SR 211 / Beech Creek

• Rapid Deck Replacement

• Rapid Span Replacement

• Use of Precast Elements

• Ongoing and Future Work

ABC TECHNIQUES IN GEORGIA

2

Page 3: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

RAPID DECK REPLACEMENT

I-285 over Cobb

Parkway

I-285 over Buford

Highway

3

Page 4: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

EXODERMIC DECK PANELS

4

Page 5: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

RAPID SPAN REPLACEMENT

5

Page 6: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

RAPID SPAN REPLACEMENT

6

Page 7: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

PRECAST BRIDGE ELEMENTS

7

Page 8: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

PRECAST SUBSTRUCTURE

8

Page 9: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

SPMT

9

Page 10: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

SR 211 / BEECH CREEK

10

Page 11: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

• 148’ Single Span Bridge

• 40’ Gutter to Gutter

• Ultra High Performance Concrete (UHPC) for Joint Connections

• Full Depth Precast Deck Panels

• 60 Day Road Closure

PROJECT OVERVIEW

11

Page 12: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

DEMOLITION

• Clearing & Grubbing• Work Bridge• Demolition – June 1st

• 4 Days

12

Page 13: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

END BENTS

• HP 14 x 102 Piles• 3500 psi 24hr Accelerated Concrete• Cast In Place• 7 Days

13

Page 14: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

BEAMS

• 72” Bulb Tees• 10,000 psi Concrete• Steel Diaphragms• 2 Days

14

Page 15: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

FULL DEPTH PRECAST PANELS

• 4500 psi Concrete• 8 ¾” Depth• #5 Bars

• 6” T&B, Trans• 12”/6” T&B, Long

• 8’/9’ x 21’-5”

15

Page 16: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

JOINTS

• 2” Joint Top Opening• 5” Bar Lap• Why UHPC?

16

Page 17: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

SHEAR CONNECTION

• #5 Bar Hoop – 4”• 2” Minimum Depth

17

Page 18: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

PLACING PANELS

• 20 Minutes per Panel• 2 Days

Page 19: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

UHPC MIXING PLANTS

• 2 Mixers• Continuous Pour• Batch about 15 Minutes• LaFarge Personnel On-site• 2 Days

19

Page 20: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

UHPC COMPONENTS

• Cement - 1 Bag• Steel Fibers – 4 Bags• Safety Gear Required

• Tyvek Suits• Respirators• Gloves

Page 21: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

UHPC COMPONENTS

• Water/Ice – 130 lbs• P150 Super Plasticizer – 33.6 lbs• Digital Scale

21

Page 22: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

TESTING UHPC

22

Page 23: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

PLACING UHPC

23

Page 24: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

CONSTANT HEAD PRESSURE

• Chimneys• Covered Joints

24

Page 25: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

FORMWORKS

• Wood• Steel?• 8 Days

25

Page 26: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

ENDWALLS

• Forming Endwalls • Backfilling• Approach Slabs• Barriers• 9 Days

26

Page 27: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

FINISHING TOUCHES

• Paving• Bridge Grooving• Final Grading• Striping• 3 Days

27

Page 28: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

OPEN TO TRAFFIC

59 DAYS!

28

Page 29: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

LESSONS LEARNED

• Experience Using UHPC

• Larger Joint Openings

• Cost vs. Benefit

• Tolerances

• 30 Day Road Closure

29

Page 30: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

CONTRACT INFORMATION

Award: July 31, 2015

Bid Amount: $2,681,640.30

E.R. Snell Contractor, Inc.

Structural Engineering Solutions, LLC

30

Page 31: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

SPECIAL THANKS

Lawrence Kahn, Ph.D., P.E. – Georgia Institute of Technology

Ben Graybeal, Ph.D., P.E. – Federal Highway Administration

31

Page 32: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

FUTURE PROJECTS

• Elliott Road Bridge Replacement

– Precast Deck Panels

• Blackhall Road Bridge

– Decked Bulb-T’s

• Courtland Street Bridge Replacement

– Anticipate Incremental Launching

32

Page 33: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017  · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over

CONTACT INFORMATION

Bill DuVall, P.E.

[email protected]

404-631-1985

Dexter Whaley, P.E.

[email protected]

404-631-1909