GEOPHYSICAL SURVEY REPORT
O M
NEK ELLIOTT BLOCK CLAIMS
MAGNETOMETER AND ELECTROMAGNET!C
SURVEYS
ELLIOTT TOWNSHIP
LARDER LAKE MINING DIVISION
DISTRICT OF TIMISKAMING, ONTARIO
NTS 32D/5
FOR 9, , , .
TIGER GOLD EXPLORATION CORPORATION
OCTOBER HJ, 2003
RECEIVED
GEOSClENCf ASSESSMENT OFFICE _____.
MISS WENDY K, WELLER GEOTECH
32D05NW2150 2.26446 ELLIOTT 010
GEOPHYSICAL SURVEY REPORT
ON
NEVI ELLIOTT BLOCK CLA.'MS
(MAGNETOMETER AND ELECTROMAGNETIC
SURVEYS
ELLIOTT TOWNSHIP
LARDER LAKE MINING DIVISION
DISTRICT OF TIMISKAMING, ONTARIO
NTS 23D/5
INTRODUCTION
The Claim Group consists of 64 unpatented mining claims, 9 claims and l block (10 Claims) of which are included in this report.
The winter 1999 North East Grid was recut and two man chained. The grid was extended east to the Tannahill Township line. The original baseline was recut and chained, picket lines were re-turned off every 100 meters along the baseline, stations were measured every 25 meters.
The linecutting and chaining was contracted out to Miss Wendy K. Weller and crew.
The magnetometer survey was- performed by Mr. John E. Perron, the electromagnetic survey was performed by Miss Wendy K. Weller. All drafting, contouring and report writing was done by Miss Wendy K. Weller.
Ownership of the aforementioned unpatented mining claims has been attested to by Tiger Gold Exploration Corporation, and Mr. Alexander H. Perron, and was not independently ascertained by the writer.
LOCATION AND ACCESS
Highway 672, better known js the Harker-Holloway Road, extends north-south across the eastern boundary of the mapped area. The property is therefore reached from Kirkland Lake by travelling 13 km east on High way 66, then 36 km north on 672 to the claims. Conversely, the claims may be reached by travelling 45 km east from Matheson on Highway 101 and then 14 km south on 672. (See Figure la) and Figure Id).
TABLE OF CONTENTS,
SUMMARY. . . . . . . . . . . . . . . . . . . . . . . . . i
INTRODUCTION . . . . . . . . , , . . . . , . , . . . . . i
LOCATION AND ACCESS. . . . . . . . . . . . . . . . . . . l
F.EEVIOUS HISTORY . . . . . . . . . . . . . . . . . . . . 2
TOPOGRAPHY . . . . . . . . . . . . . . . . . . . . . . . 2
GENERAL GEOLOGY. . , . , , . , , , , , , , . , , , , , , l
INSTRUMENTATION. . . . . . . . . . . . . . . . . . . . . l,
PRESENTATION AND DISCUSSION Or RESULTS . . . . . . . . . 3,
OBSERVATIONS AND CONCLUSIONS . . . . . . . . . . . . . . :
LIST OF CLAIMS . . . . . . . . . . . . . . . . . . . . . :
TECHNICAL DATA . . . . . . . . . . . . . . . . . . . . . i
ASSESSMENT DATA FORM . . . . . . . . . . . . . . . . . . 3
GIGLIOGRAPHY . . . . . . . . . . . . , . . . . . . . . . ?
MAPS, FIGURES A.N3 TA5LES
CLAIM LOCATION MAP - FIGURE la). . . . . . . . . . . . .
LOCATION MA? - FIGURE Id). . . . . . . . . . . . . . . .
TABLE l - TABLE C r LITHOLOGIC UNITS - FIGURE le; . . . .It]
AERCMAGNETICS (CNT. GEOL.SURVEY 1933) - FIGURE Ib) . . . 7
GROUND VLF-EN SURVEY NTS-320/5 - MAP NO "B/2003/vlf ;
GROUND MAGNETOMETER SURVEY NTS-32D/5 - MAP NO. EB/2003/mag '
SUMMARY i!
This report is a geophysical survey as required by The Ministry of Northern Development and Mines for assessment work purposes, following the recommendation set forth in The Mini ne Act Regulations 1S91.
The report includes an introduction to the property, general geology, field results and conclusions based en the field survey."
Technical data is provided on The Assessment Cat2 form found at the back of the report. Field Data is compiled en the accompanying plan raps found at the back of this report, Nap No. EB/2003/vlf and Map No. EB/2003/mag.
HARKER TOWNSHIP
6M RM
n3 O
O
7J902S l 7,m57S l 738810 73SOOT l 738404 'l l fl 73WM
738837 l 7M5O l 739T45 l l
!x x " i ' J 'i---y*----i----i--f-i---7352*3 73M42 I73V34 l ;W2J7 '?9
738607 7:85061
- ^.. - -^-.. -f.|-- -,1 ---- 738*30 j 7?8844 | 736218 | /33J44 . 73OT11
. - - .i ' ^--"1 *v \----~--^-. --L -\~ :r'" ~ ~l r(W*95 l l "^ 8WJ06 ^)8W704 . -.- J ----|- ---p ̂ --i-t-4-- --r-'--r---T X l
-- .... ' -,, .u... I An tllSJT . ...^.. ...— ...X.... t r ni-H-in l A^Mmj l •lt^'*Al73M35 i 73W45 | 6027OT
l
^I'/T'^lsril^rWUm K-*1*f ***08J
^-GlH a'80X31
t440M
1217466
-J 1226y "'"j 1239305 l/
t
12223271222417
KIM? H71M),
2ISSI X j
^ —— -J .l 871813 ISJIBIO
mi* mm *M*m nomi - i
C L M \ 3 9 B* j 1226798 7^707, Kj___^^l
to*** N MIII7
KI:-;S7
KIPOO Is7's;i a?iwn r s7'R37
/i- — -NlwV I871WI
C 8J1M7 1871WS
.~-^,*-r - ^—1
x f ',x ^ |5218X l
aZIRO! J - '\ . "* l — — l
R.-MRJ1 l 921B28
, ,tfv- -r .1,^ MU14 C'!"
- - - t--
821*07 121802 R21S2J l fyi*/* '8J1873 1-^dEipLw
A -L
IS1B31 J .—' — j. - — l - 1821(14
'H^a—^-j}v ^ 5 , ^^-]
-. ; IBW^X' r.V^", 1821887 l f221E4
..^J 3^5/53r i
•2^5f
9353H.
9353W
I8JH80
1 l
T|225945,
I9354M l
' ^ i j1248882, ; 2 j 1242835 j
S' *
i iV————————1——f---V J 1" I?H). l 1 10717
x r ~" r"' ! |iio 7 ?^ i H 10 M 5
. X f— ~ff'——'
-l b)-
^ v,,,,.,^,,, -4 jx^j, ,jr t cl n .^-^ h(3'''" E!:-.v::: ~,\;', -,i UW. J:^^±^^b^^^^v : ---^^,-^^^a^.^^ ;^r^^^T^^rv 'hi x -^HV ^-:
^VU7COT j ip L^!^!;U!;^:V--- ;\SlfAHfE ^S...,V.WP rfV^V-lJ-pl'.-.'./: i
Xon G cnv.il'i l l M't'"7*5^ ' 1^ - /^J
Location Map
PREVIOUS HISTORY ~ 2 ~
1936 - Perron Inc. Air Electromagnetic 4 Air Magnetometer Reports.
March 1994 - Ken Germundson, Geological Report Ghost-50 Group of claims Elliott Township, 32D/5.
March 1994 - Wendy K. Weller, Ground Magnetometer over Ghost Lake Grid-94 Elliott Township, NTS 320D/5.
October 21, 1997 - Geophysical Survey Report on 50-Ghost EAST/WEST Grid, as well as GEoph,.sica1 Survey Nov. 16, 1993, on 50-Ghost North/West Grid.
Nov. 27, 1993 - Wend,, K. Heller Geophysical Survey 50-Ghost East Grid, Magnetometer S Electromagnetic Surveys.
Dec. 24, 1998, Wendy K. Weller - Geophysical Survey 50-Ghost East Grid, Magnetometer S Electromagnetic Surveys, Also Jan. 5, 1999 Mag i YLF Eas: Grid
October 31, 1999, Uendy K. Weller - Geophysical Survey 50-Ghost Eas t/ North Grid. Also on November 16, 1999, November 26, 1999 S Nov. 23, 1999.
TOPOGRAPHY
conof
Tne majority of the property has been logged, and se growth consisting of tag alder and/or willow is present. Some the logged area has been sprayed in order to s to 3 the growth of deciduous trees ar.j shrubs. Considerable areas ha;e bee", repla with pine. A few stands c f spruce have been spare-; generally ceiar swamp have been left uncut.
Relief over the claims does not exceed 20 or 25 meters. Th terrain is flat to gently rolling to rugged with the development of cliffs.
GENERAL GEOLOGY
( jGS- 3eol ogy ) of 7na:\eray, Elliott, Tannani l i an j Do- '.s "ownsh i ps )by L. S. Jensen states '(The area is underlain ~.j Early ?re- camorian (Archean) volcanic rocks. Northeast trending diabase iikes of Middle to Late Precambrian age intrude the volcanic rocks.))
Tne tholeiitic volcanic rocks occur in Elliott Townshi:. Tne theoleiitic sequence is composed of three rock types, low-T-on, ragnes i urn rich tholeiitic Disalt, iron-rich tholeiitic casalt ";": tnolei i tic rhyo' i te.
Table of Litnologic L'nits for Elliott Township. (See -igj^e
INSTRUMENTATION
Magnetometer Survey:
This system uses a backward motion of spinning protons of a hydrogen atom within fluid of hydrogen and carbon. These sp inn ing magnetic protons are caused to have two opposite poles by applyng a magnetic fluid using a current within a coil of wire. This frequency of precision is proportional to the earth's total magnetic fielc.
-Z aj-
FIGURE 1C
TABLE 1 TABLE 07 LITHOLOGIC UNITS FOR THS THACKERAY, ELLIO: TANNAKILL, AND DOKIS TOWNSHIPS.
PHANEROZOIC CENOZOIC
QUATERNARYPLSISTOCENS AND RECENT
Till, r:vYorkcd till, aikcr (2nd and cr:vcl, varved clay, dun* i:rd, s.'lvjvl
nnd pc.it
PHECAMQRIANMIDDLE TO LATEPRSCAMCniAN (PnOTEHOZ
MAFIC l.'iTP.'JSIVE ROCKSClab.va nr.d quart: dliban
t. v r r, 'j: i v: ea ,v TA c r
EARLY PRSCAMin.'AN (AHCH2AM rSlSIC INTRUSIVE ROCKS
SYENITIC INTP.'JjlVS RCCK3G^'j - firu!,?r arc! porp^yrli'c rycrcd'
porp.'iyr^, pc^atlt J acd liir-.prrp^y
/.v r/"^ - p^/ vs cc -V r/^ c *NITIC I.NTRUllVS RCCX3
IftTP.'JStVS CONTACT
M A? l C !NTRU::v* RCCK3
i.'ir~-j::v~ CC.-ITA:*,
PKYCLITIC A'i'3 CACir:C VCLCA'.'IC P.CC^3
CalC'A:* j,"n3 Cuil-lMj::!vu breccia, flew br;cc!a. pyroclj:'. 'c b':c:'a, t j .'f. C-, :'-.l : . ".
lo -c,' .il, r ."i y sill 'c and daclllc roc!(i f aid: p ac. ard c;v": per p '•y/. -
and ductile
Tho'eii'.ic Su'iaSjScrulltlc tuff arc! luff bracci, ard c k.cr:y luff, rhy-:;:'; 2 -d d:: :
V'AI.TIC AND A NO. 1.11 T! C VOLCANIC PC CK S
Ci'i-AV'sllnij SullaManion, pillov/iri hnrr'i. py^c'ii''!: h'-::'i, r.;'f s -'l :~- ": : ,". -
l"'d.il, per— hy f ^:0 fi'.Jipar bsi:!i'~ 3^- 9^'J.Ti': : r::'-i s"'. ;-:
j^d ar-nhlfcoliii fic'ai, nii.i-biiili'a s .-.d riij-t-ii!:: 1 : ,'::-i
Tholoniic CuiloCI.ic^ lo (f.irk crc^n, h'c^'lfon, nnn'vi. pillowed f'cv !co b'S':'.i.
bfsrrl/i. liy.iloclnitiC, vnrlollila nml nmy3<!.^lalrt.^l lM:.t:;!r; .i."J n
rocki nnd Inicrflov^ Kd'mcnli
C^cy in f]rocn. hi^h-mnrjnailum mn::Iv?, pi^cwcd, f'cw-tcp b'-Ct i.
ll'rrri.i. hyaloc.'dtllc. pnrprtyrlllc (:U:pnr. variol'llc ffi M~ , -''.
b-. inhlc roc^i ar.d Interflow ic-^mcnii
-3-
This Instrument Is read directly In gammas which is the absolute value of the earth's total field for that station.
The diurnal variation was monitored by closing each loop at any secondary check station, at a grid line, baseline Intersection. Diurnal corrections were applied by linear distribution of any obser ved variation over the time between base stations.
Electromagnetic Surveyj
The VLF-EM method uses as a source, several of the main submarine comninucations transmitters in the 15 to 25 kH: band fcunrl throughout the world.
The submarine communication radio waves travel in a single mode parallel to the surfaces of the earth s long the earth-air Interace.
VLF instruments are capable of picking up any structures that change the direction of the waves by measuring the tilt angle being zero on flat ground, but when a conductor 1s present, the tilt angle will acquire a finite value. The direction of tilt indicates tha direction of tha conductor.
Calculations of such, parameters as depth, depth extent, dip and width of the conductors 1s very minimal.
The VLF easily illustrates the location of the uppeMlmltof dipping structures which can be seen or plotted as VLF profile as areas of greatest change in tilt angle per unit of distance.
The Instrument used for this survey was a Ge:ni:s EM-l 5 Unit. The sensitivity of this unit is li for the inphase an: l'. for the quadrature. The operating frequency for the EM-15 fr:~ 13-Z: kHz and the station is made by plug-in units.
Further information on the VLF and the magnetometer can be found in the back of this report on the Technical Data and Assessment forms.
PRESENTATION AND DISCUSSION OF RESULTS
i) Magnetometer Survey 2003:
The field data is presented on Map No. EB/2003/mag at a scale of 1:50,000 found in the back pocket of this report,
The magnetic data is illustrated as isomagnetic contours, contour intervals 100 gammas, en a map of corre: ::c-J magnetic values recorded at each station.
-4-
The magnetic trend is in northeast direction. The magnetic relief ranges from 57,573 gammas to 57,963 gammas. This portion of the grid is found in the Blake River Group. The magnetic relief is very low, this is an indication there may not be any change in the host rock rock.
i i) Electromagnetic Survey:
The field data is presented on the Map No.EB/2003/vlf. The map is drawn at a scale of l to 50,000 meters. In the survey (3) distinctive anomalies were found.
CI - Crosses PL800N 340E to PL1500N 570E. The contact is in thesame direction as the magnetic trend (Northeast). The contactis found along the edge of a small linear low magnetic system.
C2 - Crosses PL800N 855N to PL1100N 950E. This contact is in the direction of a large creek/beaver pond system.
The topography of the area is flat alder, cedar swamp to the west edge of a small overburden covered outcrop. The O.G.S. Map 2368 has mapped the area as basalt and andesitic volcanic rocks.
C3 - Crosses PL800N 1325E to PL1400N 1525E. The contact is in thesame direction as the magnetic trend (Northeast). The contactis found along the edge of a small linear low magnetic system.
The topography of the area is flat alder, cedar swamp to the west edge of a small overburden covered outcrop. The O.G.S. Map 2368 has mapped the area as basalt and andesitic volcanic rocks.
OBSERVATIONS AND CONCLUSIONS
The purpose of the re-structuring of the 1999 winter grid is to help map out the volcanic/sedimentary contact which can be projected from Barrick's Deposit southwest through the entire Perron holdings.
These alternating highs and lows reflect an interlayered assemblage of Hidn Fe Tholeiitic Mafic Flows with intervening Fe and Mg Tholeiitic mafic flows with a lesser magnetic imprint. The magnetic lows also reflect thin continuous units of siliceous felsic tuff and/or clastic sedimentary rocks, and areas of per vasive rock alteration (silicification and carbonatization).
At the present time the Frazer Filter is being run to help eliminate background noise in the VLF-EM Survey.
Respectfully submitted,
October 10, 2003 Miss Wendy K/WellerGeotech
-5-
LIST OF CLAIMS WORK PERFORMED ON ELLIOTT TOUNSHIP
L-667842
L-667846
L-821830
L-821831
L-821832
L-821833
L-821834
L-822330
L-822333
L-3003152 10 CLAIMS
Technical Data 1.Line (mi/km):..... 2.1/.??.....!?........... Line traversed'... ...
No. of samples/stations;.. .8.64 ....... Line/picket spacing-.
ELECTROMAGNETIC SURVEY: Operator-...^.^^.'
Instrument-- GEONICS EfvM6 ........... Accuracy:..:...^.VERICAL AND . ,, ..
Coil configuration:..,. .,. HORIZONTAL.., Coil separation:
Method:., f 1X.E p.J, RANSM i m R. . . . . . . . . . . . . P a r a m e t e r s :.. J.NP H A SE, s, ,QU,Ap RA JURE .
Vertical scale^L™.:..:...4.0!-..-...- Horizontal
c 24 8 kHz Cf^Inn. CUTLER, MAINEFrequency:. .........::................... of a lion-... ... - ..!......."""
MAGNETIC SURVEY:
lnsfrument:....^HARjP:^ - pj5.'DTON - ^ M- Accuracy,..^.i..G.A^
Base stafion:..J.L50.qN^^^,^^..^.,... Diurnal method^
Base station time:.jy^L53 jli^l^.. Lccalion /value:.... B.L.5.0 ? N.
Contour interval L^L^.^'f.l....-.--. Datumn
Contoured by:.^As..yML^-..yr.L.LER^., Horizontal
Operational t
INDUCED POLARIZATION SURVEY
Transmitter used 1..,..................... Receiver used:.
Me l hod:..........,............................. Frequency:...........
On time:..................................... Range:...................
Off time:...............,...................... Delay time:............
Power source:,............................ Output :.................
Electrode array:..........,............. Electrode spacing^
Readings taken;........................,. Other data:..........
Operational technique 1-...... ................
ea
ot— 4 U-
559505 Ol1t./Pcr^c^ Res. Ghost 50 Claims Elliott Twp., Ontario Aeromagnctics (Ont.
Gcol. Surv., 1983)
A
-3-
Assessment Data FormType of Work.-Prospecting:............................... Geolpglcal'.Physicah LINE CUTTING AND CHAINING~ u , t ELECTROMAGNETIC (l STATION) AND MAGNETOMETER SURVEY Geophysical ! .__...,...^
Geochemical:..............-.......... Drill ing:..._............
Assays/Analyses:^,..,....,,...,.... Other
Cost of Workt.A1.1.'. 7-9.?:.0.0......... Dollars Applied:.* 11.* 794 - 00PERREX RESOURCES INC./
Recorded Holder: ^rg^gNfLDS u r v e y Company:Name.TIGER GOLD EXPL.CORP/ALEX H.PERRON Name. TIGER GOLD EXPLORATION CORPORATION
Address-. 103 GOVERNMENT ROAD EAST, Address; 103 GOVERNMENT F.OAQ EAST,
KIRKLAND LAKE, ONTARIO P2N IA9 K. I!?iLA ''i? LA ^ E.' ONTARIO F2N [A3
Survey/Report Information:Start of work: SEPTEMBER 2, 2003 End of work". OCTOBER l, 2003
Draughting tin^e^^:^^3 -Report- timeC^^^^;;
Completion of r e por t-...OCTOBER ^10^ 2003 /\ u \ hor:....'jjss. I^NP.Y..KJ. IJE.LLER
Work performed on claim(s) ...............L-667842, L-667846, L-821830, L-821831, L-821832, L-821833, L-821834,","!"-^
V/Ork applied tO claim(s)..L-: 7.8.48.6.9.^j. : 7.8.4.8.7.0J ^L.-7,8J871. l ..L.^^
L-799503, L-930273, L-980274, L-980275, L-980276, L-980277, L-980278, L-980281,
L-980300, L-980301, L-980302, L-980303, L-980304, L-980305, L-980306, L-980323,
L-980324.
Persons who performed work (supervisor first):,TIGER GOLD EXPLORATION CORPORATION
WENDY K. WELLER
JOHN E. PERRON
ALAIN PARISCOAT AMD CREW
-9-
BIBLIOGRAPHY
R. Ken Germundson - Geological Report, Ghost-50 Group of Mineral ClaimsElliott Township, Ontario (32D/6) March 7, 1994
- Geology of Thackeray, Elliott, Tannahill and Dokis Townships, District of Cochrane, Ontario Ontario Division of Mines, Geological Report 165, 71pp. Accompanied by maps 2367 and 2368 Scale l In. = 1/2 mile. 1978.
Wendy K. Weller - March 1994, Ground Magnetometer over Ghost LakeGrid-94 m Elliott Township, NTS 32D/5.
Wendy K. Weller - Geophysical Survey Report on 50-Ghost East/West Grid.Magnetometer S Electromagnetic Surveys, Elliott Township, Larder Lake Mining Division,
. District of Timiskaming, Ontario October 21, 1997.
Wendy K. Weller - Geophysical Survey Report 50-Ghost North/West GridMagnetometer i Electromagnetic Surveys, Elliott Township, District of Timiskaming, Ontario November 15, 1993.
Wendy K. Weller - Geophysical Survey Report (50-Ghost East Grid)Magnetometer 4 Electromagnetic Surveys, Elliott Township, District of Timiskaming, Ont. NTS 32D/5 Novemver 27, 1998
Wendy K. Weller - Geophysical Survey Report (50-Ghost Esst Grid)Magnetometer 3 Electromagnetic Surveys, Elliott Township, District of Timiskaming, Ontario NTS 320/5 December 2^, 1993.
\. Weller - Geoonysical Survey Report (50-3host East Grid) Magnetometer i Electromagnetic Surveys Elliott Township, Larder Lake Mining Division District of Timiskaming, Ontario January 5, 1999
Wendy K. Weller - Geophysical Survey Reoort on (50-Ghost East/South Grid:Magnetometer and Electromagnetic Surveys Elliott Township, District of Timiskaming, Larder Lake Mining Division - October 31, 1999
Wendy K. Weller - Geophysical Survey Report (50-Ghost East/North GridMagnetometer S Electromagnetic Surveys, Elliott Township, Larder Lake Mining Division District of Timiskaming, Ontario November 16, 1999
Hendy K. Weller - Geophysical Survey Report on (50-Ghost East/North Grid)Magnetometer 4 Electromagnetic Surveys Elliott Township, District of Timiskaming, Nov. 26, 1999
Wendy K. Weller - Geoohysical Survey Report on (50-Ghost West/North Grid)Magnetometer 4 Electromagnetic Surveys, Elliott Twsp. District of Timiskaming, Ont. Nov. 23/99
Wendy K. Weller - Geophysical Survey Report on 50-Ghost East/North GridMAGNETOMETER 4 ELECTROMAGNETIC SURVEYS, ELLIOTT TOWNSHIP Larder Lake Mining Division, District of Timiskaming, Ontario - Decembe r 9, 1999 - Wendy K. Weller
-10-
CERTIFICATE
I, Wendy K. Weller, of Virginiatown, Ontario, do hereby
certify:
1) That I am a Geotech and reside at:
204 Connell Avenue, Box 252, Virginiatown, Ontario POK IXO
2) That I graduated from the Haileybury School of Mines as a certified Diamond Driller in 1982. I have had a staking licence for the past 15 years.
3) That I was employed as a Diamond Driller for Heath S
Sherwood for l year.
4) That I have been practising as a Geotech for a period of fifteen (15) years and I am qualified to write this
report.
5) That I supervised and participated in this survey.
Date Wendy K/ Weller'Geotech f
ONTARIO MINISTRY OF NORTHERN DEVELOPMENT AND MINES
Work Report Summary
Transaction No: W0380.01608 Status: APPROVED Recording Date: 2003-OCT-10 Work Done from: 2003-SEP-02
Approval Date: 2003-OCT-15 to: 2003-OCT-01
Client(s):181187 PERREX RESOURCES INC.
181257 PERRON, ALEXANDER H. il|| l 1 1 lill 1 1 200912 THE PERRON GOLD CORPORATION li III llillllll
400683 TIGER GOLD EXPLORATION CORPORATION 32D05NW2150 2.
Survey Type(s):LG MAG VLF
llillllll26446 ELLIOTT
Work Report Details:
Claim*
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
667842
667846
784869
784870
784871
784872
799502
799503
821830
821831
821832
821833
821834
822330
822333
980273
980274
980275
980276
980277
980278
980281
980282
980283
980284
980285
980286
980287
980288
980299
980300
980301
PerformS428
S439
SO
SO
SO
SO
SO
SO
S733
S608
S387
S912
S880
S421
S402
SO
SO
SO
SO
SO
SO
SO
soSO
soSO
sosoSO
SO
SOSO
Perform Approve
S428
S439
SO
SO
SO
SO
SO
SO
S733
5608
S387
S912
S880
S421
S402
SO
SO
SO
SO
SO
soSO
SO
SO
SO
SO
soSO
SO
soSO
so
Applied
soso
S355
S400
5400
S400
S400
S239
SO
SO
SO
SO
SO
SO
SO
S400
S400
S400
S400
S400
S400
S400
S400
S400
S400
S400
S400
S400
S400
S400
S400
S400
Applied Approve
soSO
S355
S400
S400
S400
5400
5239
SO
SO
SO
SO
SO
SO
SO
S400
5400
S400
5400
5400
5400
5400
5400
5400
5400
5400
5400
5400
5400
5400
5400
5400
Assign Reserve Assign Approve Reserve Approve Due Date
S428
S439
SO
SO
SO
SO
SO
SO
S733
S608
S387
S912
S880
S421
S402
SO
SO
SO
SO
SO
sosoSO
sososoSO
soSO
SO
SO
so
428
439
0
0
0
0
0
0
733
608
387
912
880
421
402
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
SO
SO
SO
SO
SO
SO
SO
SO
SO
SO
soSO
SO
soSO
soSO
SO
SO
SO
soSOSO
SO
soSO
soSO
SO
soSOSO
SO 2003-JAN-11
SO 2003-JAN-11
SO 2004-OCT-22
SO 2004-OCT-22
SO 2004-OCT-22
SO 2004-OCT-22
SO 2004-OCT-22
SO 2003-OCT-22
SO 2002-NOV-29
SO 2002-NOV-29
SO 2002-NOV-29
SO 2002-NOV-29
SO 2002-NOV-29
SO 2002-DEC-10
SO 2002-DEC-10
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
900
2003-Oct-24 12:41 Armstrong Page 1 of 2
MINISTRY OF NORTHERN DEVELOPMENT AND MINES
Work Report Summary
Transaction No: W0380.01608
Recording Date: 2003-OCT-1 0
Approval Date: 2003-OCT-15
Work Report Details:
Claim*
L
L
L
L
L
L
L
L
980302
980303
980304
980305
980306
980323
980324
3003152
Perform
soSO
sososososo
56,584
511,794
External Credits:
Perform Approve
SO
so50SO
SO
soso
56,584
511,794
SO
Applied
S400
S400
5400
S400
S400
S400
S400
SO
51 1 ,794
Status: APPROVED
Work Done from: 2003-SEP-02
to: 2003-OCT-01
Applied Approve
5400
5400
5400
S400
S400
5400
S400
50
511,794
Assign
SO
SO
so50SO
50so
56,584
511,794
Assign Reserve Approve Reserve Approve Due Date
0
0
0
0
0
0
0
6,584
511,794
SO
50
SO
SO
SO
SO
SO
50
50
SO 2004-APR-13
50 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
SO 2004-APR-13
50 2004-APR-13
SO 2005-APR-08
SO
Reserve:SO Reserve of Work Report* W0380.01608
50 Total Remaining
Status of claim is based on information currently on record.
2003-Oct-24 12:41 Armstrong^! Page 2 of 2
Ministry ofNorthern Developmentand Mines
Date: 2003-OCT-23
Ministere du Developpement du Nord etdes Mines Ontario
GEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E 6B5
TIGER GOLD EXPLORATION CORPORATION 1595 GRIFFITHS PLACE KELOWNA, BRITISH COLUMBIA V1Z2T7 CANADA
Tel :(888)415-9845 Fax:(877)670-1555
Dear Sir or Madam
Submission Number: 2.26446 Transaction Number(s): W0380.01608
Subject: Approval of Assessment Work
We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.
At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.
If you have any question regarding this correspondence, please contact STEVEN BENETEAU by email at [email protected] or by phone at (705) 670-5855.
Yours Sincerely,
/f,Ron C. GashinskiSenior Manager, Mining Lands Section
Cc: Resident Geologist
Perrex Resources Inc. (Claim Holder)
Assessment File Library
Alexander H. Perron (Claim Holder)
The Perron Gold Corporation (Claim Holder)
Wendy Kathleen Weller (Agent)
Tiger Gold Exploration Corporation (Claim Holder)
Tiger Gold Exploration Corporation (Assessment Office)
Visit our website at http://www.gov.on.ca/MNDM/LANDS/mlsmnpge.htm Page: 1 Correspondence 10:18784
32D05NW2150 2.26446 ELLIOTT 200
-iiK:^'mmmmff;xm;:-fM^gt;^mtWi l iiiilllllillliillp^rtfllll M
f ' M JS' -*
^i^wiii^mm.
iiiiiiliiiiiiiiliiii liiiiIllttilisi mmm
22ZDW—T '•"-™.,,,.-*~i V, J .x ..-.-i-- ; '\ i
* v y ^' t i ^™,4j.23^r-X--rlY-X(--ff-"-"--rV
k s r U^* y^ilH 1nlM
Those wlthlno to stake mining claims should eormU with th* Provincial Mining Recorders' OfYIco of (ho Ministry of Northern Development and Mines fer additional General Information and Limitationsinformation on the status of th* lands shown hareon. TW* map Is not intended for navigational, survey, or land title determination purposes as the information Contact Information:ttwwm w tt^ma^ H oompltal 1rom various COWOM. Gomptttanass anii accuracy ara not guaranteed. Additional Information may also be obtained through the Provincial Mining Recorders'Officelocal Land Tmea or Reulstry Office, or the Ministry of Natural Resources. Willet Orean Miller Centre 933 Ramsey Lsl~,,_ .,-,,-..,,.. ,,
Sudbury ON P3E8BSThe Infornialton shown IB derived from dioltal data available in the Provincial Mining Recorders' Office at the lime of downloading from the Minlltry of Northern Home Page: wvw.mndm.eov.on.ca/MNDM/MINEM.ANDS/ml6mnpge.hrm
* Development and Mines web site.
This map may not show unregistered land tenure and intwefttftln land including certain patents, lessee, easements, right of way*,
Provindal Mining RKcordwf Office Tel: 1 (688) 416-8645 ea S7t*jeclion-. UTM (6 degree) torttttsi rights, licences, or oftef forms of disposition of rights md Willet Oreen Miller Centre 933 Rairney LsR* Road Fax: 1 (877) 870-1444 Topographic Dart Sounw: Land IntonratJon OnUrlo Interest from the Crown. Also certain land tenure and land uses Sudbury ON P3E 8BS Mining Land Tenure Source: Provlneili Mining Recorders' Ofta t1"' ™8trta ^ l'mnlbl1 *" wtIV "o t*** "**it claims may net De Home Paae: www.mndm.oov.on.ca/MNDM/MINEM.ANDS/mlemnpae.Mm illustrated.
Toil Free Map Datum' NAD 83Tel: 1 (SS8) 41S-8B4B ett 67ttojection: UTM (6 d*o^)
MHUBYKV OP NOMTHBRH DEVELOPMENT MM WNG8 Mining Land Tenure
Map
Date ; Time of iMue: Wed Dot 15 12:56:41 EOT 2003
TOWNSHIP l AREA PLAN ELLIOTT G-3833
ADMINISTRATIVE DISTRICTS l DIVISIONSMining DivisionLand Titles/Registry DivisionMinistry of Natural Resources District
Larder Lake COCHRANE KIRKLAND LAKE
TOPOGRAPHIC Land Tenure
Fnntimd PWM
Coownwton, Urt
MMngWghHCMy
,....... Ciwteur
B MM.8MHH
4 MtwHMWtn
9tV*w AM Mining WU
EE1 ikirtBaSghlsOnlySif^^llil
til
03m mm m m
MM* Right. Only
Onkr In Council I.NM rjpsn far Making)
Wdter Power Letsa Agmrnanl
MMngOnlm
FM OnV Mining CliMt
LAND TENURE WITHDRAWALS
Wim Wl
OflWf In Council WltiiMwill TnwRufbe* Asa Mlwa Righto wlttittfswn
;j;;;JW;;;;;j;3 IMPORTANT NOTICES
LAND TENURE WITHDRAWAL DESCRIPTIONSUftMMw Typ* Date DcteHptlon
3397 Wm Jan1, 2001 LAND USB PERMIT NO. 117130, PENDING APPLICATION UNDER PUBLIC LANI3481 Wm Jan 1.2001 MNR OUAVB. PIT 3O-34EASEMENT Wl Ju! 2,1002 Crown Ejwmiwt CRE 396 CL 1080( purl 1EASEMENT W s Jul2,2M2 Crown SuMmontCRE 396 CL 10KJ9 pt* 10EASEMENT Wf Jul 2, 2002 Crown E.MUHNH CRE SOS CL 1080* purl 11BASEMENT W. Jul 2, IDOZ Crown InHrantCREMS 0.10108 part 12EASEMENT Wt Jul 2, 2002 Crown bMfflwtCRE 396 CL 10808 pill 2EASEMENT Wt Jul 2,1002 Crown Ensomsnt ORE 398 CL 1080* f M 3EASEMENT Wt Jul 2. 2002 Crown bHrmnl ORE 390 CL 10609 part 4EASEMENT Wl Jul 2.2002 Crown Eawntent CRE 385 CL 10808 part SEASEMENT Wl Jul 2, 2002 Crown Eesemm! CRE 365 CL 1080D part 6EASEMENT Wl Jul 2,2002 Crown Easement CRE 38S CL 10109 Dart 7EASEMENT Wt Jul 2, 2002 Crown Emwnant CRE 39S CL 10806 part tEASEMENT W. Jul 2,2002 Crown Eawmwil CRE 386 CL 10809 (MM 9EASEMENT Won Jul 2. 2002 Crown Easwront CRE 395 CL 10761 part 1EASEMENT WOT Jul 2,2002 Crown ilMiwrnl CR6 385 CL 10TJ1 pin 2EASEMENT Wtm Jul 2,2002 Crown Easement CRE 385 CL 1081B parti
Problem Page The original page in this document had a problem when scanned and as a result was unable to convert to Portable Document Format (PDF). We apologize for the inconvenience. Problème de conversion de page Un problème est survenu au moment de balayer la page originale dans ce document. La page n'a donc pu être convertie en format PDF. Nous regrettons tout inconvénient occasionné par ce problème.