Chartered Land Surveyors & Engineers
What we Think..!!
Solutions Provided
• Land & Hydrographic Surveying
• Terrestrial mapping of architectural sites
• Engineering & Construction Projects Surveying and
Mapping
• Dimensional control on mechanical installations
• Cadastral Surveying
• Deformation monitoring
Services Provided
4
• Geomatics• Civil Engineering Consulting• Project Management • Architectural • Highway/Road Design• Airport Engineering• Geotechnical Engineering• GIS• Photogrammetry• Housing Schemes• Computer Aided Drafting• Construction Supervision
GPS Control Survey Projects
• Gabral Kalam Hydropower Project (Swat) – KPK
• Shagarthang Hydropower Project – Gilgit Baltistan
• Power Transmission Line – Neelum Jhelum HPP to Rawat
to Ghakhar Sub-Stations - 335 Km. Punjab & AJK
• Bostan-Zob Railways – 295 Km.- Balochistan
• Azad Pattan Hydropower Project – AJK
5
GPS Control Survey Projects
• Sarkand – Moro Powerline Powers Setting out – 100 Km -
Sindh
• Solar Power Plant – Kallar Kahar – 300 acres Topo Survey-
Punjab
• Potohar Climate Change Smart Irrigated Agriculture Project
• 10,000 acres Topo Survey – Punjab
• Iran-Pakistan Gas Pipeline – 800 Km – Balochistan & Sindh
6
• Kabul River Bed sounding using lead line - KPK• Ashkot Hydropower Project - AJK• Tanda Dam – KPK• Gulpur Hydropower Project AJK
7
Project Photos
Project Photos
Survey work at Ghazi Barotha Hydropower Project
8
Project Photos…
9
Vehicle mounted GPS
Setting out of works at construction site
10
Project Photos
Monitoring concrete placement
11
Project Photos
Dimensional control on Mechanical Fabrications & Installations
12
Project Photos
Iran Pakistan Gas Pipeline
13
Project Photos
Iran Pakistan Gas Pipeline
14
Project Photos
Iran Pakistan Gas Pipeline
15
Project Photos
Monitoring vertical settlement on a thermal power plant installations using N-3 precise level and invar staves.
16
Project Photos
Water Resources & Power Development Projects
• Jinnah Hydropower Project – Mianwali (Punjab)
• Patrind Hydropower Project – AJK & KPK
• Kheyal Kawar Hydropower Project – KPK
• Dasu Hydropower Project – KPK
• Ashkot Hydropower Project – AJK
• Gulpur Hydropower Project –AJK
• Suki Kinari Hydropower Project – AJK
• Shagarthang Hydropower Project – G&B
17
Gas Pipeline Projects
• 6 km – Gas line for Thermal Station – Zam Zama Gas Field
• Establishment of Survey Control along ≈ 800 km Iran –
Pakistan Gas Pipeline Project.
• Topo Survey for Pumping Station
• River and Streams crossing survey for the Gas Pipeline
• Topo Survey of 200 km section of the Iran- Pakistan Gas
Pipeline (200 m wide strip).
18
Survey Instruments
19
Total Stations• Topcon GPT-3502LN (Reflectorless
up to 2km range) – Japan• Sokkia Set 530 R – Japan• Sokkia Set 610 K – Japan• Sokkia Set 630 R – Japan• Leica TPC 407 – Swiss• Nikon DTM 332 – Japan• DADI - China
Leveling Instruments
• Wild NA – 2 Swiss• Leica NA – 728• Sprinter Electronic - Swiss
Theodolites T2 -Swiss
20
Survey Instruments
GPS Dual Frequency Geodetic Class
• Leica GPS 500 Series + RTK - 6 Units
• Leica GPS 1200 Series + RTK - 2 Units
Hand Held GPS
• Magellan SporTrak – 2 Units
• Garmin GPS 12 – 1 Unit
• Magellan Triton – 1 Unit
• Garmin eTrex 30 – 3 Units
• Wild Plane Table + Alidade RK-1
• 6 Persons Rubber Boat – 1
• Echo Sounder – OHMEX (U.K.)
SonarMite SM 3 – 1 Unit
SonarMite SM 4 – 1 Unit
Hand Held Echo Sounder – Japan – 1 Unit
• Lap Top Computer Field Use – 6 units
• HP A-0 Size Plotter Design Jet 500 Series
21
Survey Instruments
22
Project Locations
23
Our Clients
24
for your attention.