31M84NW8011 63.5231 STRATHY 010
GEOLOGICAL EVALUATION REPORT
ON THE
KANICHEE MINE PROPERTY
LEASED MINERAL CLAIMS NUMBERED EB 26, TR 3187, TRT 3448,
4310, 4311, 4369, 4370, 4371, 4381, 5953, 5954,
5955, 5956, 6763, 6773STRATHY TOWNSHIP
TEMAGAMI TOWNSHIP MUNICIPALITY
SUDBURY MINING DIVISION
NIPISSING LAND DISTRICT
TEMAGAMI, ONTARIO
NTS 31-M-4
N. LAT. 47006'30" W. LONG. 79 0 50'30"
for
NORTHERN PLATINUM LTD.Suite 800
543 Granville StreetVancouver, B. C.
V6C 1X8
by
DONALD W. TULLY, P. ENG., West Vancouver, B. C.
March 4, 1988
DON TULLY ENGINEERING LTD.SUITE 1203, 555-13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N8
31M04NWeen 63.5231 STRATHY 010C
TABLE OF CONTENTS
I.O INTRODUCTION.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . l
2 . O SUMMARY AND CONCLUSIONS.................................. l
3.0 PROPERTY - LOCATION, ACCESS, PHYSIOGRAPHYAND ENVIRONMENTAL CONSIDERATIONS...................... 5
4.O CLAIMS................................. ... . .. . . . .. . . . . . . . 7
5.0 HISTORY - PREVIOUS DEVELOPMENT........................... 8
6.O REFERENCES............................................... 21
7.0 REGIONAL AND LOCAL GEOLOGICAL SETTING.................... 26
8.0 MINERALIZATION - ASSAYS - 1987 D.D. PROGRAM.............. 29
9.0 RECOMMENDATIONS.......................................... 35
10.0 ESTIMATED COST OF THE PROPOSED WORK PROGRAM..,........... 37
II.0 CERTIFICATE.."............................................ 38
MAPS
Figure l - Location Map............................(Frontispiece)
Figure 2 - Area Map.............. ............... .(Follows page l)
Figure 3 - Topographic Map...........................(APPENDIX l)
Figure 4 - Claim Map - Strathy Township..............(APPENDIX l)
Figure 5 - Compilation Plan - Kanichee Mine..........,(In Pocket)
Figure 6 - General Geology.........,............(Follows page 2)
Figure 7 - Exploration data Map (GDIF 201)...........(APPENDIX l)
Figure 8 - Magnetometer Plan.........................(APPENDIX I)
Figure 9 - Plan - IP * Resistivity Survey............(APPENDIX l)
Figure 10 - Section of IP Resistivity Survey..........(APPENDIX l)
Figure 11 - Cunipitau Shaft - Surface Area............(APPENDIX l)
Figure 12 - Cunipitau Shaft - Vertical Section........(APPENDIX l)
Figure 13 - Cunipitau Shaft - Plan 100-foot level.....(APPENDIX l)
Figure 14 - Plan W.G.Wahl - Ore Reserve Calculation...(APPENDIX l)
Figure 15 - Vertical Section - 2+OON..................(APPENDIX l)
Figure 16 - Vertical Section - 1+OON......,...........(APPENDIX l)
Figure 17 - Vertical Section - 0+00 ..................(APPENDIX l)
TABLE OF CONTENTS (Cont'd)
MAPS
Figure 18 - Vertical Section - 1+OOS (APPENDIX l)
Figure 19 - Vertical Section - 3+OOS (APPENDIX I)
Figure 20 - Vertical Section - 9+OOS (APPENDIX I)
Figure 21 - Vertical Section - 10+COS (APPENDIX I)Figure 22 - Vertical Section - 15+COS (APPENDIX l)
Figure 23 - Vertical Section - D. D. Holes 4D, 5D, 6D,7D, 8D. .. .. (APPENDIX l)
Figure 24 - Vertical Section - D. D. H. #87-N-l, N- 2. . . (APPENDIX I)
Figure 25 - Vertical Section - D. D. H. #8 7-N-3. . . . . . . . (APPENDIX l)
Figure 26 - Vertical Section - D. D. H. #87 - N-4. . . . . . (APPENDIX I)Figure 27 - Vertical Section - D. D. H. #87 - N-5 . . . . . . (APPENDIX l)Figure 28 - Vertical Section - A - A 1 . . . . . . . . . . . . . . . . (APPENDIX I)
Figure 29 - Vertical Section - B - B' . . . . ... . . . . . . . . . . (APPENDIX l)
Figure 30 - Vertical Section - 8+OOS. . . . . . . . . . . . . . . . . (APPENDIX I)
APPENDIX I
Maps 3, 4, 7 - 30 - Mar Pocket
APPENDIX 2
Logs of D. D. Holes 87-N-l thru 5 incl . (5 holes)T-l thru T-3 incl. (3 holes)
APPENDIX 3
Assay Certificates - File #86-2321- File #87-5874- File #87-6141- File #87-6150 (p- File #87-6305 (pp.- File #87-6305R (IP)
APPENDIX 4
Summary of available diamond drill hole information
DON TULLY ENGINEERING LTD.SUITE 1205, BBS-OTH STREET
WEST VANCOUVER, BRITISH COLUMBIAVTT2N*
MANITOBA,
*"*
PLATINUM"- ' U'
Hudson
R 0 QUEBEC
CHICAGO
ZOO 300 Km
FIGURE L
PROPERTY LOCATIONKANICHEE MINE
PROPERTY
SCALE AS SHOWN
MARCH 4, 1988
DONALD, w. TUULY.RENG.
1..0 INTRODUCTION
1.1 This report was prepared pursuant to a requestfrom the Directors of Northern Platinum Ltd., Suite 800,543 Granville Street, Vancouver, British Columbia V6C 1X8.
1.2 The purpose of this report is to summarize and
evaluate the results of the previous mineral development
work performed on the KANICHEE Mine property and assess
the mine-making potential of the claim group.
1.3 This report is based upon an examination of the ground, previously known as the Trebor Mine, on August 18, 1958 and again on February 15, 1988, as well as a study of available reports, maps, records and personal communications.
1.4 A program of mineral exploration is recommended*
2.0 SUMMARY AND CONCLUSIONS
2.1 The KANICHEE MINE is held by Northern Platinum Ltd.
2.2 The property consists of fifteen contiguous leased mineral claims, 582.73 acres (235.83 hectares), located in Strathy Township Temagami Area, Northeastern Ontario.
2.3 Access to the property is by logging road leading
westward some 4^ km from Net Lake on Highway No. 11. Net
Lake is located about 4-f km north of the Town of Temagami,
Nipissing District. The City of North Bay is situated at
the junction of Highways No. 11 and 17 some 110 road km to
the south-south-east.
2.4 The KANICHEE Mine was formerly known as the Cunip-
tau Mine. It was discovered in the period just prior toDON TULLY ENGINEERING LTD.SUITE 12O5, 55S-13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2NS
EDITION l NL-17
0 AFrWv ' : ^ 1 '^r-'sW-p'^ ;'- fi*!J ' ^ 1r . " K ' 'tj i r x). , - ?
TRT4ZJO l Ho OLIVINE DIABASE
60 QUARTZ PDR
5d PERIDOTITE
5 b, c GABBRO
hlo 2o,b,c INTER. VOLCANICS
lo MAFIC VOLCANICS
GENERAL GEOLOGY(AFTER OGS-2323)
SCALE 1-311,680
MARCH 4,1988
DONALD W. TULLY, P.ENG
2.
World War I. In 1934, a vertical shaft was sunk to a depth of 24 feet and lateral mine development amounting to 2,200
feet was carried out on the 100-foot and 225-foot level ele
vations. The property consisted of eleven claims at that
time and has changed ownership at least seven times since 1938. An agreement covering the present group of 15 claims
was filed in favour of Northern Platinum Ltd., on January 13, 1988.
2.5 The geology of the claim area is early Pre-Cam-
brian in age. The basement rocks are Keewatin basic and
acidic volcanics which have been intruded by pre-Algoman diorite, quartz-diorite, diabase (Haileyburian or Nipissing)
and an ultramafic mass of peridotite. Later Algoman felsic
intrusives and lamprophyre dykes have been mapped. A Kee-
weenan diabase dyke occurs with the copper-nickel sulphide mineralization in the open-pit area just west of the shaft.
The trend of the basement geology is northeasterly. Fault
structures interpreted from magnetic surveys and topographic linears trend north-northeast.
2.6 Abundant chalcopyrite, pyrrhotite, pyrite mineral
ization has been indicated on the KANICHEE MINE property.
A large mass of disseminated sulphides carrying copper,
nickel, cobalt, gold, silver, platinum and palladium miner
alization has been developed in a north-trending apophysis of an ultrabasic (peridotite) intrusive by diamond drilling.
The core of this mass of copper-nickel bearing pyrrhotite,
chalcopyrite and pyritic body was mined out from underground
and by open pit during the operations by Cunipitau Mines
during the 1934-1936 period. At that time, the shaft re mained intact. Later operations in 1974-1975 by Kanichee
Mining and Jack Koza Limited enlarged the open pit and removed the shaft pillar. The open pit and the underground workings
are now floodedo The earlier (pre-1974) ore calculations
have been depleted as a result of the Kanichee-Mining Inc. -
DON TULLY ENGINEERING LTD.SUITE 12OS, BS5-IJTH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T ZN*
3.
Jack Koza Limited joint venture operation.
2.7 G.H. Dumont, P.Eng., calculated the ore reserves
in 1961, from his experience as resident engineer at the
Trebor Mine during the major diamond drilling program car
ried out during the late 1948-1950 period, in the four
drilled ore zones as follows:
Orezone
Shaft (S) Orebody
"A" Orebody
"A" South Exten sion
"E" (north of Shaft)
2.8 John C.
Tonnage
369,000
735,000
3,764,000
547,0005,415,000
Dumbrille
serves in the shaft area in
Orezone
Shaft
Tonnage
900,000
Copper
0.89
0.45
0.32
0.29
, P.Eng.,
February
Copper
0.61
Nickel Remarks
0.53 Has PGM and content
0.26 "
0.19 "
0.16 "
calculated the ore re-1966 as follows s
Nickel Remarks
0.37 With PGM andcontent
2.9 D.G. Wahl, P.Eng., calculated the ore reserves in
June 1972 for Jack Koza Limited and did a feasibility report
for the proposed Kanichee Mining-Jack Koza Limited joint ven
ture. Wahl calculated the recoverable ore in the shaft area
as follows:
DON TULLY ENGINEERING LTD.SUITE 1205, 585- 1STH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T8N*
Mineralized Zone
Shaft Orebody
"A" Orebody (Partial)
Tonnage
373,863
55,513
Copper
0.79
0.50
Nickel
0.44
0.2B
Overburden (Cu.vds.)
37,789
12,893 (To
Waste (tons)
427,920
91,820 be stockpiled)
429,376
How much of the calculated ore reserves that was mined
during the 1974-1975 operation is apparently not available.
2.10 A 50-ton pilot smelter plant was erected at the shaft
site in 1934 and produced a nickel-copper matte. The production
record of the Kanichee Mine property is as follows:
Period Production
1934-36 212,118
1974-75
Recovery CtrHMi
11. 37 910
Pt Pd(ozs) (ozs)
52.7 196.3
Remarks Remarks
Mining handbooks record a 500-ton mill was erected and production was commenced in the first quarter of 1974 by the Kanichee Mining - Jack Koza Limited Joint Venture .
2.11 Numerous metallurgical test project results indi
cate no concentrating problems other than a preliminary talc float prior to flotation of the copper and nickel concen trates.
2.12 A total of 165 diamond drill holes have been ac counted for on the Kanichee mine property. 155 of these
holes totalled 50,365 feet of diamond drilling.
2.13 The host rock of the sulphides bearing the copper- nickel, precious metal and platinum group metals, is a peri
dotite with serpentinized horizons to elongate along a NE-
trend. The peridotite mass is oval to elongate along a NE-
trend in configuration. The body appears to dip to the
DON TULLY ENGINEERING LTD.SUITE 1205, 5S5- 13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2ISI*
5.
northeast and plunge to the southeast. An apophysis of the
peridotite occurs in the north-northwest perimeter of the
main mass which has been compiled on Figure 5 from various
reports and file records. The sulphides are chiefly pyrite,
pyrrhotite and chalcopyrite and occur as disseminated blebs
and aggregates. Higher values occur with quartz veins and veinlets and massive to heavily mineralized aggregates of
the sulphides. Copper-nickel mineralization is frequently
found in the peridotite mass in the contact areas of the
basic lava host rocks, as shown on Figure 30 in D.D. Holes CO-20 and CO-21.
2.14 The Kanichee Mineral deposit may be tentatively
classified as orthomagmatic. B.F. Liar d mapped the property
in 1961 and advanced the concept of the mixing of more than
one magma from field mapping evidence and the sulphide min
eral deposit forming within the magmatic environment of the
Ajax Intrusion.
2.15 It is concluded the Kanichee Mining Property isan excellent exploration bet in a favourable geological en vironment to discover more deposits of copper-nickel with PGM metal content.
2.16 A program of mineral exploration is recommended
at an estimated total cost of 1251,377.
3.0 PROPERTY - LOCATION, ACCESS, PHYSIOGRAPHY
AND ENVIRONMENTAL CONSIDERATIONS
3.1 The group of claims comprising the KANICHEE MINE
property consists of fifteen contiguous mineral leases lo
cated in the west central sector of Strathy Township, some
five kilometres northwest of the Town of Temagami, North
eastern Ontario. The claims have been surveyed and cover
an area of 582.73 acres (235.83 ha).DON TULLY ENGINEERING LTD.SUITE 1205, 553-UTM STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N8
6.
3.2 The City of North Bay is located about 110 road
km to the southeast of the property at the junction of Hwy
11 and Hwy 17. Access to the ground is by logging road some
4i km extending westward from Hwy 11 at Net Lake as 'shown on
Figure 3. The former railway station of Goward (now called
North Temagami) is noted on many of the older maps of the
area on the north side of Net Lake. The Ontario Northland
Railway traverses the country, more or less parallel to Hwy
11, en route to Cobalt and points northward to Cochrane.
Cobalt is situated some 35 km to the north of the claim area
where the Office of the Resident Geologist for the Ontario
Geological Survey is located.
3.3 The topography is of low relief and ranges between
elevations of +980 feet and * 1,075 feet above sea-level. The
topographic trend is northeasterly and is marked by a series
of low, rocky ridges and intervening valleys of muskeg with
a few small ponds or lakes.
3.4 The overburden is sand, gravel and glacial boulders.
3.5 The timber is spruce, jackpine, birch and poplarof relatively small size, having been ravaged by forest fires over the years.
3.6 Kanichee Lake borders the claim group in the north east extremity of the property. Ample water is available for any immediate industrial purpose. Hydro electric power lines are present at the Strathcona Iron Mine currently producing some 4 km to the south of the Kanichee minesite (Figure 3).
3.7 In the environmental sense, the property area is considered to be sensitive by reason of an ownership of CAUTION filed by the Timagami Band of Native Indians. All staking was banned in Strathy Township effective March 16, 1984.
DON TULLY ENGINEERING LTD.SUITE 1209. S5S-1JTH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N*
4.0 CLAIMS
4.1 Fifteen surveyed and contiguous leased mining
claims are located in Strathy Township, Nipissing Land
District, Sudbury Mining Division, Temagami, Northeastern
Ontario. The following information was obtained from the
Ontario Land Registry Office, Nipissing Land District,
176 Main Street West, North Bay, Ontario PIE 2P5, (Phone
(705) 474-2270).
Claim No.
EB
TR
TRT
TRT
TRT
TRT
TRT
TRT
TRT
TRT TRT TRT TRT
TRT
TRT
26
3187
3448
4310
4311
4369
4370
4371
4381
5953} 5954 5955) 5956)
6763
6773
Mining Lease No,
102609
18039
102795
18242
38241
18040
18041
18042
16043
102536
18239
18240
Parcel No.
3348
1025
3464
1525
1526
1468
1469
1470
1471
3202
2269
2268
Land Rights
**MRO
**MRO
**MRO
**MRO
**MRO
**MRO
**MRO
**MRO
**MRO
**MRO
**MRO
**MRO
TOTAL
Acreage
40.45
31
41
38
55
42
43
41
27
(3D (41 (42 (35
21
42
582
.42
.00
.45
.80
.50
.23
.80
.85
.93)
.45)
.30)
.70)
.43
.43
Held
Held
Held
Held
Held
Held
Held
Held
Held
Held
Held
Remarks
by *N.P.
byby
bybyby
by
byby
by
by
.73 acres (235.
*N
*N
*N
*N
*N
*N
*N
*N
*N
*N
83
.P.
.P.
.P.
.P.
.P.
.P.
.P.
.P.
.P.
.P.
hs.
LTD.
LTD.
LTD.
LTD.
LTD.
LTD.
LTD.
LTD.
LTD.
LTD.
LTD.
)
Northern Platinum Ltd. (N.P. LTD.) acquired control of the claims by agreement with J.P. Sheridan.
MRO (Mining Rights Only with some surface privileges).
DON TULLY ENGINEERING LTD.SUITE 12O5. 555-13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T 2N8
8,
4.2 The claims are shown on Claim Map (Figure 4).
5.0 HISTORY - PREVIOUS DEVELOPMENT
5.1 The area of Strathy Township was first mapped
during the 1887-95 period by A.E. Barlow for the Geological
Survey of Canada. Iron deposits in the Temagami Area were
mapped and described by A.P. Coleman and W.G. Millar for
the Ontario Department of Mines during 1899-1901.
5*2 One leased claim of the present claim group, EB 26,
was staked in 1910 and surveyed in 1911. Claim TR 3187 was
surveyed in 1915 and leased by H.G. Watkins in 1916. Most
of the remaining thirteen claims of the present group of 15
were surveyed and leased during the period 1922-1934, Cuni-
pitau Mines Limited acquired eleven of these claims numbered
EB 26, TR 3187 and TRT 3448, 4310, 4311, 4369, 4370, 4371,
4381, 5953, 5954, totalling 440 acres, in 1932. According
to a report by P.E. Hopkins, the property was controlled in
1929 by H.G. Watkins when platinum was first reported here.
5.3 Prospecting for iron was carried out in the Tima-
gami Lake Area prior to and during the period of World War I.
A shipment of iron pyrites was made by the Rand Syndicate in
1916 from claim TR 3187. National Mines of Cobalt optioned
the claims in 1919 and did a limited amount of diamond drill
ing. (See OGS-GDIF #201, p. 27).
5.4 The record indicates that Cunipitau Mines did a
ground magnetometer survey and diamond drilled six holes
totalling 1,492 feet in 1933. Trenching, stripping and one
DON TULLY ENGINEERING LTD.SUITE 1205, 555- I3TH STREET
WEST VANCOUVER. BRITISH COLUMBIAV7T2NB
9.
hole (65.5 feet in depth) was drilled in preparation for a shaft sinking in 1934. This same year, Cunipitau Mines
sank a vertical shaft to 245 feet with levels at the 100- foot and 225-foot elevations on claim TR 3187. Some 2,200
feet of lateral undergound was also done. This work out
lined a body of disseminated chalcopyrite, pyrrhotite and pyrite containing pockets and veins of massive sulphide mineralization associated with quartz-carbonate veining.
The body of disseminated and massive sulphide mineraliza
tion was calculated to have an average north-south dimen sion of some 300 feet and an average width of about 60 feet.
The grade was calculated to be 1.49 percent combined copper-
nickel after dilution. T.H. Janes stated in his report for Trebor Mines Limited dated October 6, 1948, that a 50-ton
pilot smelter plant had operated at the minesite during
1936 and had milled 212,000 pounds of matte containing:
98,924 Ibs. copper
65,434 Ibs. nickel 37.02 ounces of gold
82.7 ounces of platinum 196.28 ounces of palladium
909.90 ounces of silver
According to Janes, two bulk samples were shipped from the minesite and the results were as follows:
Copper Nickel Amount Consignee
l ton International Nickel Co. 7.48 3.75 0.075 0.22 0.56
18 ton American Nickel Co. 9.45 2.64 0.260 0.41 (not reported)
5.5 Cunipitau Mines ceased operations in 1937 and the
assets including the claims were acquired by the Ontario
Nickel Corporation. In 1943, Ontario Nickel Mines Limited
acquired control of the Ontario Nickel Corporation on a l for 3
DON TULLY ENGINEERING LTD.SUITE 1205, 559- 1JTH STREET
WEST VANCOUVER, BRITISH COLUMBIAVTT 2N*
10,
share basis. Trebor Mines Limited was incorporated in 1947
and acquired a group of claims which are the core of the
present property from both Ontario Nickel Mines and Tima-
gami Gold Mines Ltd.
5.6 T.H. Janes reported magnetometer and electrical
surveys had been carried out during the late summer of 1947.
The magnetometer survey was said to have outlined a strong
north-trending magnetic anomaly in the area of the Cunipitau
Shaft, within which zones of electrical conductivity were
located.
5.7 J.T. Randall reported on a program of geological
mapping, magnetometer and resistivity geophysical surveying
done over a portion (five claims) of the Trebor Mines Limi
ted property during the period of November 10 - December 8,
1948. The field work was done by the Geo-Technical Develop
ment Company Limited. Randall described the geology of the
map-area in detail and an offsetting fault in the zone of mineralization at the northern extremity of the peridotite
mass. He outlined six magnetic anomalies (A, B, C, D, E, F)
and reasoned that the resistivity survey had indicated sev
eral northeast trending shear zones.
5.8 Walter A. Rukeyser, Managing Director, Trebor Mines Limited, further evaluated the results of the 1947 and 1948
programs of geophysical surveying and commenced a program
of diamond drilling and spontaneous polarization (Self-Poten
tial) geophysical surveying to test those zones indicated by Randall as having high electrical conductivity (low resisti
vity). On April 8, 1949 Rukeyser reported that 508,000 tons
had been blocked out by diamond drilling southeast of the
shaft and were ready for open-cut mining. He quoted an
average grade of 0.15^ (1.4596?) combined copper-nickel con
tent with a gross value of #0.657ton in precious metals at
DON TULLY ENGINEERING LTD.SUITE I2O5, 555-IJTH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N8
11,
prevailing prices. On February 15, 1950, Rukeyser further
reported:
a) 38,857 feet of diamond drilling in 128 diamond drill
holes of AXT core size had been completed on the prop erty and adjacent option ground.
b) Falconbridge Nickel Mines Limited had performed a mag netometer survey on the property.
c) The Cuniptau Shaft had been de-watered and sampled.
d) Three zones (A, E and S-shaft) totalling 4,873,000 tons had been outlined having an estimated in-place value of 822,885,000 or S4.697ton at prevailing metal prices.
e) Shipments of bulk samples had been sent to the Depart ment of Mines, Ottawa and the Nepheline Products Company
for concentrate test purposes.
f) Interesting values in gold and silver, Sil. 37 over six
feet or S5.81 over sixteen feet when combined with ad
joining values, were intersected in one hole near the southwest corner of the Trebor Property. The location
and log of this drill hole have not been located.
5.9 B. Massey Williams in reporting on the TreborMines property on September 17, 1949 stated that the ton
nages and grades of the three zones had been calculated by Georges H. Dumont and were as follows:
Combined Precious Tons Ni * Cu Metals
Shaft or "S" Orebody 569,000 1 .42fo * Si.95"A" Extension 4,509,700 0.54# * SO.75"E" (North) 547.000 0.64# * SO.61
Total tonnage 5,425,700
Calculated at prevailing metal pricesDON TULLY ENGINEERING LTD.SUITE 12O5, SSS-IJTH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N*
12,
710 Koulomzine, Geoffrey, Brossard ft Co., Val D'Or,
Quebec did an electrical geophysical survey in several of
the diamond drill holes in the mineralized zones during
December 1949 and January 1950. They concluded there
was strong potential for mineralization along the down
dip contact zones of the peridotite.
5.11 John C. Durabrille reported on the Trebor Mines
Strathy Township property on May 12, 1950 for interests
represented by a Mr. G.H. Jackson. He calculated the
indicated ore reserves in five zones and concluded as follows:
Combined pt Tons Cu * Ni S
Total 4,727,500 0.62# SO.69
" The values in the closely drilled areas (1,297,000 tons) are apparently commercial. The tonnages in
Y the south areas, not fully drilled, are low, but ^ drilling may outline better grade sections of these
areas. "
5.12 The General Engineering Co. (Canada) Ltd. did a
study of the possibility of mining a section of the drill
indicated ore zone under the direction of W.S. Hargraft.
The report, dated April 3, 1952, concluded that some
800,000 - 850,000 tons grading 0.38# nickel and 0.65#
copper could be profitably concentrated into a bulk con
centrate at a 4:1 ratio. The recoveries from this complex
concentrate were estimated to range between 83.5# of the
copper to 59^ of the palladium and recommended a smelter contract arrangement be considered. Hargraft noted the
metallurgical tests showed the presence of talc in the ore.
5.13 OGS - GDIF 201 (page 39) reports five diamond drill holes numbered E-l, E-2, E-3, E-4, E-5 totalling 1,055 feet
were drilled in 1953. These, holes, were not located on the
DON TULLY ENGINEERING LTD.SUITE I2O9, 585-13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2NB
present claim group. In 1954, hole N-l was also reported
(page 38) drilled to a depth of,320 feet. All these holes
showed sulphides (APPENDIX 4.).
5.14 On May 18, 1956, George D. Purse studied the re
cords of the previous development on the property and con
cluded three magnetic anomalies had not yet been tested by
diamond drilling. He indicated the peridotite contact
should be further investigated in the area of claim TRT 4311
for mineralization.
5.15 In April 1961, Ajax Minerals Limited acquired
control of Trebor Mines Limited on a l for 4 share basis.
5*16 Georges H. Dumont, who was resident engineer at
the Trebor Mines property during the diamond drill program
in 1949-50, reported on the Trebor ground for Ajax Minerals
on May l, 1961. By this time the property had been increased to 15 contiguous leased claims covering an area of 582.73
acres in the west-central part of Strathy Township. Dumont
stated the Shaft (S) orebody had been diamond drilled with 80 holes on 50-foot centres. He gave a detailed account
of the geological setting of the mineral deposits and the
results of the metallurgical testing. Dumont outlined three zones of copper-nickel mineralization as follows:
Precious l Tons Copper Nickel Metals
13,
Shaft "orebody" 286,000 0.95 0.58 * 82.29
"A Orebody" 735,000 0.45 0.26 * Si.06
Additional tonnage 4,300,000 of lower grade
* Calculated at prevailing precious metal prices. He considered the Shaft and "A" "orebodies" to be contiguous and ready for open pitmining.
DON TULLY ENGINEERING LTD.SUITE I2O5, SSS-I3TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2NB
14,
Dumont reported that the total footage of diamond
drilling on the property was 40,915 feet (instead of the
figure of 38,857 feet reported by W.A. Rukeyser in his re
port of February 15, 1950) (APPENDIX 4).
5.17 According to Robert F. Liard, P.Eng., L.G. Phelan
logged D.D. Holes D-l through D-ll in late 1961 and wrote
Progress Reports on this work dated December l, 8, 21, 1961
and January 2 and February 5, 1962. These reports and the
logs of the diamond drill holes are apparently not available.
Figure 23 shows some of these drill holes with substantial
assay results. - .
5.18 According to R.F. Liard, McPhar Geophysics carried
out an induced polarization and resistivity survey over the
claim group for Trebor Mines under date of January 31, 1962. This report is apparently not available. Liard also reported
Hunting Survey Corporation carried out a Turam electromag
netic survey over the claim area for Trebor Mines in 1961.
This report dated September 1961 and the Turam survey data also do not appear to be available.
5.19 The Ajax Minerals property was again reviewed byR.M. Williams on June 12, 1961, who noted that the ore zones
did not lie entirely on the company ground and may occupy
part of adjacent claims numbered TR 1623 and TR 2911. He
recommended a claim survey in the area of the ore zones to
establish the actual tonnage owned by Ajax Minerals.
5.20 Robert F. Liard prepared a summary report on the
Strathy Township property for Ajax Minerals on July 9, 1962.
He had previously mapped the geology of these claims in 1961
and supervised the drilling of eleven diamond drill holes, aggregating 3,440.2 ft.during the period of November 1961
through February 1962 on the "North" anomaly zone. He
reported his geological mapping had designated four areas
DON TULLY ENGINEERING LTD.SUITE 1 205, 553-UTM STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N*
15
according to his report as the "North", "Central", "Mag Anom
aly" and "South" zones for further exploration. He noted
high-grade values in copper over short core lengths in D.D.
Hole 9D.
5.21 On October 9, 1964, R.M. UTilliams prepared a further
report on the Ajax Minerals claim holdings in Strathy Town
ship and recommended further diamond drill testing and also a survey of the claim lines in the area of the mine shaft.
5.22 John C. Dumbrille evaluated the Ajax Mines (Trebor
Mines) property in Strathy Township on February 9, 1966 and concluded that 900,000 tons of medium to low grade ore out
crops at the bedrock surface at the mineshaft site was ready
for open-pit mining. According to Dumbrille, this mineral
ization covers an area some 500 feet in north-south dimension
to the 200-foot subsurface level. He submitted a grade of
this proposed open-pit ore ass
Copper - 0.85#Nickel - 0.56#Cobalt - 0.03#Gold - 0.01 oz/tonSilver - 0.17 oz/tonPlatinum - 0.02 oz/tonPalladium - 0.03 oz/ton
Dumbrille recommended the production of a concen trate at the minesite on a ratio of 11.5 ' l that would con
tain 656- copper and 3^ nickel with 0.05 oz/ton PGM plus gold,
silver and cobalt.
5.23 Dumbrille further reported on May 12, 1966 that the present open-pit be rehabilitated and resampled for
metallurgical test purposes. J. Koza was reported to have drilled this ground in 1966 (OGS-GDIF #201, pp. 21, 35).
DON TULLY ENGINEERING LTD.SUITE 12OS, 55S-I3TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N*
16.
5.24 Dumbrille again studied the property mineraliza
tion in his report dated August 18, 1966 and recommended
that negotiations be opened with the owner of claim TRT 1623,
on which ground some of the shaft area mineralization appears
to occur. He also recommended that metallurgical testing be
performed on bulk samples from the proposed open-pit zone in
the Cunipitau mine-shaft area.
5.25 S'.V. Burr carried out a Self-Potential survey over
a portion of the Ajax Minerals claim group and diamond drill
ed five holes,SB-1, 2, 3, 4, 5, totalling 1,732 feet in the
period January 21 - February 15, 1968. This work was filed
for assessment purposes. Burr recommended trenching of anom
alies resulting from a self-potential survey over claim
TRT 5953. Two other diamond holes (D-9, D-10) were also
reported drilled (see OGS - GDIF #201, p. 29).
5.26 A report by E.L. MacVeigh, Haileybury, Ontario on
the Strathy Township Mining Area dated March 6, 1969, indi
cates he had numerous files on the early developments and
maps of the geophysical surveys at the Cuniptau Mine prop
erty, later known as the Trebor Mine and Ajax Minerals property.
5.27 J.M. Kilpatrick reported on March 16, 1970 forAjax Minerals and reviewed the previous developments on the
property. He discussed the results of a metallurgical test
by L.T. Higgins on a 400!-pound sample taken across the Shaft
Orebody. Higgins had previously done metallurgical tests
for General Engineering Co. Ltd. in January and February,
1953. Kilpatrick reported that the talc content of the ore
would need to be removed by separate flotation with a loss
of one percent of the contained metal. He also indicated
an 8 5?o r ecovery could be expected by producing a bulk con
centrate of both the copper and nickel. He concluded the
DON TULLY ENGINEERING LTD.SUITE I2O5. 559-13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T 2MB
17.
property contained areas where mineral exploration was war
ranted and recommended the present zones of mineralization
be diamond drilled to establish extension and continuity.
Kilpatrick proposed a bulk sample of the mineralization be
collected and forwarded to Lakefield Research for test pur poses.
5.28 Falconbridge Nickel Mines optioned the Ajax Min
erals property as well as a claim group adjoining on the southwest in 1971. Falconbridge drilled 1,754 feet of
sample-drilling for bulk-sample test purposes on the 5-
Shaft orebody. lil addition, 1,005 feet of AQ core size diamond drilling in two holes was drilled on a claim
L-244812 some 800 metres to the southwest of the Ajax
Minerals property. J.A. Kelly supervised the work program
for Falconbridge.
The results of the bulk-test sample were not submitted.
5.29 D.G. Wahl, P.Eng. for W.G. Wahl Limited, prepared
a detailed appraisal of the Ajax mineralization for Jack Koza Limited dated June 2, 1972. The property at that time
comprised thirty-two mineral claims which included the pre
sent leased claims. Wahl calculated the ore reserves in the Shaft Orebody and the A-Orebody as follows:
Mineralized Zone
Shaft Orebody
A - Orebody
Overburden (cu. yds.)
37,769
12.893
50,662
Waste (tons)
427,920
91.820
519,740
Mill Rock (tons)
373,863
55.513
429,376
Cui
0.79
0.50
0.75
Ni J*,
0.44
D. 28
0.42
DON TULLY ENGINEERING LTD.SUITE 12O5. 555-UTM STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N*
18,
The A - Orebody is located south of the diabase
dyke near the Shaft Orebody. Wahl reported he had computed
the grade and tonnage from the diamond drill data and it
compared well with earlier calculations. He concluded the
mine would have a life of 2.4 years at a mill rate of 500
tpd per calendar year. Wahl's report indicates that the
files of W.G. Wahl Limited and Jack Koza Limited could have
substantial diamond drill hole and assay data (Figure 14 ).
5.30 Lakefield Research tested samples for the commer
cial recovery of nickel and copper during the summer of
1972. The results of two flotation tests showing the sep
aration of the final concentrates for copper and nickel
were as follows:
____ Assays Distribution Product K, Cu ft Mi ft Cu ft Ni
Cu Cleaner Concentrate 1.78 26.55 0.30 66.7 0.9
Ni Cleaner Concentrate 4.36 1.38 8.01 8.5 57.2
A.C. Scobie reported on the testwork for Lakefield and recommended further studies on the optimization of the regrinding conditions for better recovery results. Scobie noted the presence of talc in the bulk test.
5.31 A magnetometer and VLF-EM survey was carried out over Ajax Minerals property during the summer of 1973 by Richard C. Beard, P.Eng. Beard described six magnetic anomalies and four VLF-EM conductor anomalies. The plans for these surveys are apparently not available.
5.32 Kanichee Mining Incorporated was formed during
the early 1970's. It was filed as c/o Belleterre (Quebec)
Mines Ltd. Kanichee Mining acquired a 3 0fo interest in the
Ajax Minerals Strathy Township property in 1972 with Joliet-
DON TULLY ENGINEERING LTD.SUITE I2OS. 5S5-UTM STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N*
19.
Quebec Mines Limited and Jack Koza Limited. The agreement
envisioned the construction of a 500-tpd mill on the Ajax
property. Production commenced in early 1974o At that
time, the Ajax property was reported as having ore reserves
calculated at 0.75^ copper and 0.42^ nickel with precious metal content additional. The operation was under the dir
ection of Jack Koza Limited, a private company, and it is
reported all operations ceased in early 1976. Production
was from the previous open pit area (Figure 23). Records of this production are apparently not available* Kanichee
Mining Incorporated went into receivership late in 1976 and Ajax Minerals Limited was dissolved on February 14, 1978.
5.33 Northern Platinum Ltd. carried out a program of
baseline and line control establishment and NQ core size diamond drilling during October-December 1987. A total
of 680.19 metres (2,231.02 feet) of core was drilled in
five holes and 8.75 km of line-cutting was done.
5.34 Summary of Diamond Drilling Done on Northern Platinum Property
DP Hole No. Date Drilled
5-1 thru 5-80 Jan. 1949 thru July 16/1950
AO-1 thru AD-10 Dec. 29/1948 thru Dec. 29/1948
AO-11 thru AO-14 ( ? )
Sub- Footage Total
T-l thru T-3 Oct. 16, 1949 thru Oct. 27, 1949
919.3
CO-1 thru CO-22 Jan. 9, 1949 thru 10,967.5Mar. 26, 1950
N-l 1954 320.0
DON TULLY ENGINEERING LTD.SUITE I2OS, 555-UTM STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T 2N9
Reference
(17,494.2) Dumbrille (1950) 17,522.0 17,522.0 G.H. Dumont (1961)
6,854.4 6,854.4
EO-1 thru EO-12 June 14, 1949 thru 4,653.3 4,653.3 Aug. 13, 1949
919.3
Referred to in report by Dumbrille (1950)
320.0 J.C. Dumbrille (1954)
20.
Summary of Diamond Drilling Done on Northern Platinum Propnrtv (Cont'd)
DD Hole No. Date Drilled FootageSub- Total Reference
CO-23 thru CO-24 Oct. 8, 1955 thru 1,724.0 12,691.5 Nov. 1955 __
ID (D-l) thru Nov. 11, 1961 thru 3,440.2 11D (D-ll)
3,440.2 R.F. Liard (1962)
SB-1 thru 5B-5 Jan. 21-Feb.l5, 1968 1,732.0 1,732.0 5.V. Burr (1968)
87-N-l thru Nov. , 19B7 thru 2,232.9 87-N-5 Dec. , 1987
2,232.9 Northern Platinum (1987)
TOTAL 50,365.6 ' (15,355.4 metres)
5.35 A total of 165 diamond drill holes have been accounted for in the development records for the Kanichee Mine Property.
Of this total, 155 drill holes have an aggregate total footage
of 50,365.6 feet. This does not account for 1,754 feet of
drilling on the Shaft Orebody for a bulk test by Falconbridge in 1971.
5.36 Northern Platinum Ltd. acquired control of the Kani chee Mine property on January 13, 1988.
DON TULLY ENGINEERING LTD.SUITE I2O5, 55S-13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T 2N8
21.
6.0 REFERENCES
6.1 Ontario Department of Mines (ODM)Annual Report 1901, Vol. 10, p. 169
1916, Vol. 25, Pt. I, p. 1041920, Vol. 29, Pt. I, pp. 213-214 and Map 29c1931, Vol. 40, Pt. I, p. 221934. Vol. 43, Pt. I, p. 1011935. Vol. 44, Pt. 7, pp. 48-551937. Vol. 46, Pt. I, p. 231938. Vol. 47, Pt. I, p. 261942. Vol. 51, Pt. 6, pp. 23-25, 220 and Map 51e
with P.R. 1941-41943. Vol. 52, Pt. I, p. 24, 2201944. Vol. 53, Pt. I, p. 46, 1881946. Vol. 55, Pt. 2, p. 931947. Vol. 56, Pt. 2, p. 1041948. Vol. 57, Pt. 2, p. 1051959. Vol. 68, Pt. 2, p. 931960. Vol. 69, Pt. 2, p. 94
Mineral Deposits Circular # 2, pp. 118-119#12, pp. 204-205, 210
Mineral Resources Circular #1, p. 65#2, p. 118
MR 213, p. 128 MR 18, p. 6 MR 43, pp. 83-84 MR '60, p. 177 Claim Plan Strathy Township No. 596
6.2 Ontario Geological Survey (OGS)Geological Data Inventory Folio (GDIF) 201 with 4 data maps
Open File Report (1974) OFR 5110 and Maps P.595, P.596, P.666, P. 667
Open File Report (1985) OFR 5559, p. 280
Open File Report (1986) OFR 5591
OGS Report 163 and colored maps 2323, 2324 (1978)
OGS Miscellaneous Paper 110
6.3 Geological Survey of Canada Aeromagnetic Map 1491G
Borehole Geophysics for Mining and Teotechnical Applications, Paper 85-27
DON TULLY ENGINEERING LTD.SUITE 1205. SS5-13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2NS
22,
Canadian Mines Handbook, Northern Miner, 1946, 1949, 1953, 1955, 1961, 1973-74, 1974-75 and Financial Post Survey of Mines for 1972, 1973, 1974, 1975, 1976 and 1983
6.5 Topographic Maps31 - M - 4 (l : 50,000) 31 - M (l : 250,000) NL - 17 (l : 1,000,000)
6.6 Economic Geology (1942), Vol. 37, pp. 173-l87j Cuniptau Mine by B.T. Sandefur
6.7 Geoscience Canada, Vol. 14, No. 3, pp. 155-156
6.8 Property Reports (available to the writer)(1929) Hopkins, P.E. - Letter reports for Cunipitau Mines (1933) and D.D. hole location sketches
dated July 24, 1929, November 30, 1933
(1933) Trebor Mines Limited - Logs of D.D. Holes T-l, T-2,T-3 and assessment filing sketches
(1934) Correspondence between Cunipitau Mines and ConiagasMines
(1934) Stevens, H.A. - Letter reports on Cunipitau Minesproperty and sketches of diamond drill sections
(1948) Janes, T.H. Report on Trebor Mines Limited datedOctober 6
(1948) Randall, J.T. - Report on Geological Magnetic AResistivity Surveys on a portion of the property held by Trebor Mines Limited dated December 10
(1949) Rukeyser, Walter A. - Trebor Mines Limited, ProgressReport No. l dated January 3
- Letter Report dated February 15
(1949) Business A Economic Service Limited, Trebor MinesLimited, Letter Report dated Feb ruary 18
(l949)Rukeyser, Walter A. - Trebor Mines Limited, LetterReport dated March 21
(1949) Rukeyser, Walter A. - Trebor Mines Limited, LetterReport dated April 8
(1949) Williams, R.M. - Report for Trebor Mines Limiteddated September 17
DON TULLY ENGINEERING LTD.SUITE 1205, 555-1STH STREET
WEST VANCOUVER. BRITISH COLUMBIAV7T2N6
23.
(1950) Koulomzine, Geoffrey St C o.- Electrical Survey in Drill Holes for Trebor Mines Limited, dated January
(1950) Thomson, J.E.- Report on Trebor Mines Property for the Ontario Department of Mines, dated April
(1950) Dumbrille, John C.- Report on Trebor Mines Limited, dated May 12
(1952) Hargraft, W.S.- General Report on the Property of Trebor Mines
Limited, dated April 3, 1952
(1953) MacVeigh, E.L.- Letter Report (pages 7-8 only) and logs of
D.D. Holes E-l, E-2(part), E-3, E-4, dated December (holes not located on present claim area)
(1954) Diamond Drill Hole N-l Assessment filing sketch dated August 3
(1956) Furse, George D.- Report on the Property of Trebor Mines Limited
dated May 18
(1961) Dumont, Georges H.- Report on the Strathy Township Property of
Aj ax Minerals Limited dated May l
(1961) Williams, R.M.- Summary Report on Holdings Strathy Township
for Ajax Minerals Limited dated June 12
(1962) Liard, Robert F.- Summary Reports on Ajax Minerals Limited Prop
erty in Strathy Township dated July 9
(1962) Dumbrille, John C.- Letter Reports to C.H. Franklin, Tribag Mining
Co. dated February 9 and May 16
(1964) Williams, R.M.- Ajax Minerals Limited - Report on Claim Hold
ings dated October 9
(1966) Dumbrille, John C.- Letter Report on Trebor Mines Limited for C.H.
Franklin dated February 9
(1966) Dumbrille, John C.- Letter Report on Ajax Minerals Limited Prop
erty for C.H. Franklin dated May 12 DON TULLY ENGINEERING LTD. SUITE 1205. 585-UTM STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N8
24,
(1966) Durabrille, John C.- Summary Report on Strathy Township Property
for Ajax Minerals Limited in Prospectus for Ontario Securities Commission dated August 18
(1968) Burr, S.V.- Assessment Report on Diamond Drilling and
Self-Potential Survey for Ajax Minerals Limited dated February 29
(1969) MacVeigh, E.L.- Report on the Strathy Township Mining Area
dated March 6, 1969
(1970) Kilpatrick, J.M.- Summary Report Ajax Minerals Limited, Strathy
Township Limited dated March 16
(1971) Kelly, J.A.- Falconbridge Ajax Option, Diamond Drill Assessment Report on D.D. Holes FGD #1 and 2 (not drilled on Kanichee Mine Property) and bulk sampling of open pit for metallurgical test purposes dated October 22
(1972) Wahl, W.G.- Appraisal Report on Ajax Minerals Limited Property in Strathy Township dated June 2
(1972) Scobie, A.G.- Recovery of Copper and Nickel from samples
from the Ajax Minerals Property by Lakefield. Research of Canada Limited for Jack Koza Limited and dated August 29, 1972
(1973) Beard, Richard C.- Report on the Magnetometer Survey and theVLF-EM Survey for Kanichee Mining Incorporated, Strathy Township dated August 28
6.9 Property reports and maps referred to in the above noted texts but apparently not available:
(1934) St. Clair, S.- Report on Cuniptau Mines Ltd. dated June 6
(1934) Morrison, J.W.- Report on Cuniptau Mines Ltd. dated June 12
(1935) Johnson, G.W.- Report to Shareholders, Cuniptau Mines Ltd.
dated March 31
DON TULLY ENGINEERING LTD.SUITE 1205, 555-1STH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N8
25.
(1937) Taylor, J.B.- Report on Cuniptau Mines Ltd. dated September
(1949) MacVeigh, E.L.- Files on Trebor Mines Limited dated January 3
(1953) Higgins, L.T.- Check Flotation Tests - Trebor ore dated January 9
(1961) Hunting Survey Corporation - Turam Electromagnetic Survey - Trebor Claim Group dated September (DWG #4692)
(1961) Liard, Robert F- Geological Map dated October 8
(1961) Liard, Robert F.- Magnetometric Survey Plan dated November
(1961) Phelan, L.G.- Progress Reports dated December l, 8, 21
(1962) Phelan, L.G.- Progress Reports dated January 2, February 5
(1961) Phelan, L.G.- Logs of Diamond Drill Holes D-l to D-ll
inclusive
(1962) McPhar Geophysics Limited- Report on the Induced Polarization and Re
sistivity Survey on the Trebor Mines Claim Group dated January 31
(1967) Dumbrille, J.C.- Report on Metallurgical Tests dated December 5
(1972) Jack Koza Limited (Cobalt, Ont.)- Files on Ajax Minerals Project (see W.G. Wahl)
DON TULLY ENGINEERING LTD. SUITE 12O5, SSS-1STH STREET
WEST VANCOUVER. BRITISH COLUMBIA
V7TZN8
26,
7.0 REGIONAL AND LOCAL GEOLOGICAL SETTING
7.1 The general geology of the Kanichee Mine Property
and its environs is shown on Figure 6.
7..2 The property is underlain by Keewatin volcanicswhich range from mafic to felsic in composition with inter
calated horizons of tuffs and fragmental rocks. These Pre
cambrian rocks are intruded by pre-Algoman diorite, quartz
diorite, diabase and an oval-shaped mass of peridotite (Ajax
Intrusion). Dykes and masses of quartz porphyry and pink
granite of Algoman age, are present. Olivine-bearing diabase dykes of Keweenawan age are the latest of the suite of intru- sives.
7.3 The following is a tentative timetable of geologic
events in the Kanichee Mine area.
Formation
Sand, gravel, loam and glacial debris
Dyke Intrusions
Mineralization, metamorphism, mineralization and quartz-calcite veining
Dyke Intrusions
Descriptio n/Ev e nt
Unconsolidated
(Erosional unconformity)
Dykes of post-ore age Lamprophyre and andesite
Age
Quaternary
Precambrian or later (?)
Compounds of gold, silver, Late Precambrian platinum, palladium, co- (?) bait, chrome and sulphides of iron, copper, nickel and arsenic
(Folding, faulting, shear ing and related tectonic activity)
Keweenawan olivine dia base
(Folding, faulting, shear ing and related tectonic activity - intrusive con tact)
DON TULLY ENGINEERING LTD.SUITE I2O5, 555 -1JTH STREET
WEST VANCOUVER, BRITISH COLUMBIAvrr 2Nt
Late Precambrian
27,
Formation
Intrusions
Intrusions
Keewatin volcanics
Description/Event
Pink granite, quartz porphyry dykes
(Folding, faulting, shear ing and related tectonic activity) - intrusive contact)
Diabase, quartz diorite, diorite, raetagabbro, Ajax Intrusion of peri dotite with serpentinized phases
{Folding, faulting, shear ing and related tectonic activity - intrusive con tact)
Mafic to rhyodacitic lavas porphyritic phases, pillow and well developed chlori tic metamorphism
Age
Algoman
Pre-Algoman (Haileyburian
Early Precambrian
7.4 A compilation of the property geology from portions
of maps of previous programs of geological mapping is shown on Figure 5. A new program of geological mapping is recom mended.
7.5 R.F. Liard, P.Eng., mapped the Kanichee Mine Prop erty for Ajax Minerals in 1961 and described the property
geology on pages 6-8 of his report dated July 9, 1962 as follows:
" On the Ajax repeated intrusion along a sheared contact zone between the rayolite and basic volcanics would account for the differentiated aspect of the complex occurring on theclaims.
The intrusive rocks vary from quartz diorite, southeast of Ajax to gabbro, "metadiabase", magnetite amphibolite de scribed in places as a fine grained magnetic basalt, mag netic peridotite, to scarce peridotite and serpentinized peridotite along the north and northeast margins.
DON TULLY ENGINEERING LTD.SUITE 12OS, 555-UTM STREET
WEST VANCOUVER, BRITISH COLUMBIAV7TZN8
28,
It is felt that the gabbroic and magnetic rocks were early in the sequence; they show the more intense alteration and evidence of intrusion by the diabases and peridotites.
The olivine diabase of "metadiabase" occurs along the south- east of the Ajax mass and appears to have reached surface in places as far north as Kamichee Lake, though outcrops near the lake are shown as Kaweenawan diabase on O.D.M. Map No. 532.
The peridotite, probably late in the sequence, due to its apparent underlying relationship can be considered the basal member for descriptive purposes.
The mass has been described as a basin whose axis plunges about 23 to the southeast. This concept appears to have been based on intensive drill hole evidence and on the shape of the outcrop area. The northeast alignment of the various members of the mass does tend to belie this con cept.
It is rather felt that locally the basic sills rolled, followed flat lying shear zones or were folded to the northeast.
Later erosion would present the peridotite as a rim along the north and northeast of a basin. To the north and south this peridotite horizon could be expected to occur, sill- like, along its original lines of strike.
The strike of the complex basic sill, conforming to the general structure of the area, would change from north east to north-northeast, nearer to Kanichee Lake. The intrusive, in such a case, would have a length, at surface, of more than one mile.
Faulting and shearing continued after the intrusion of all the rocks of the basic complex.
It should be noted that not only do peridotite rocks fol low the rim of the mass but do occur within its boundar ies. Some of the peridotite apparently followed the roll to the north while some intruded the early consolidated and faulted basic members.
This concept of repeated intrusions also tends to explain inclusions of "Keewatin rocks within the "basin". Some of the magnetic rocks may, in fact, be altered basaltic flows and acid to intermediate tuffs as well as metamor phosed peridotites.
In any case, known and postulated faults and shears are seen, and expected, to cut the basal peridotite where it follows the rim of the basin, where it can be projected
DON TULLY ENGINEERING LTD.SUITE 1205, SS5-11TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N8
29.
" to the northeast and to the southwest, and where it can be expected to occur beneath the other members of the basic complex.
The peridotite can be expected to be highly fractured where it is bent from almost vertical to somewhat flat lying.
An alternative concept would have the peridotite occur ring as separate irregular sills conforming to regional trends as mentioned above.
Schistocity of all rock types strikes generally to the northeast and is steeply dipping.
A strong northeast striking fault running through the small lake east of the shaft has been crossed under ground. Other linears in the area also have various geo-physical evidence suggesting faults. "
8.0 MINERALIZATION - ASSAYS - 1987 D.D. PROGRAM
8.1 R.F. Liard, P.Eng., studied the mineralization
on the Kanichee Mine property when he mapped the geology for Ajax Minerals in 1961. His report dated July 9, 1962 has described the economic geology on pages 4 through 9 as follows:
" In general the Strathy Township property is underlain by Keewatin lavas ranging in composition from acid to basic. They consist of rhyolite, tuffs, agglomerates, andesite, basalt, and coarse dioritic greenstones. Intruded into these is a peridotite mass which is now largely altered to serpentine. In places, while drilling, quite a number of asbestos filled narrow fractures were encountered. Both formations, lavas and peridotite, have been subse quently intruded by a series of northeasterly, south westerly striking, east-dipping dykes of olivine diabase. A few quartz-feldspar porphyry dykes only have been en countered but the great number of chloritic dykes inter sected in the peridotite within the mineralized area suggests strongly that these last dykes have some sort of relation with the ore deposition and the sulphide mineralization found in the altered marginal peridotite.
DON TULLY ENGINEERING LTD.SUITE 1 205, 355-UTM STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2NS
30.
The copper-nickel sulphides are found disseminated nearly everywhere in the peridotite intrusive with concentrations and enrichments in sulphide of the margins and lowest parts of the magma. Their consolidation gave rise to basic altered zones with sulphide content up to 10 or 20 percent. In places before their final consolidation, the zones were subjected to disturbance, as shown by the intrusions of diabase and chloritic dykes, forcing the sulphides toward places of less pressure or open frac tures, thus forming irregular masses and narrow veinlike deposits of 50 to 75 percent sulphides. Some of these narrow massive sulphide veins were even injected from the main ore zone into the enclosing rocks. "
" Regarding the general behaviour of the whole intrusive mass, so far all data indicates that any east-westerly section through it shows that the bottom has the shape of a trough. The long axis of this trough would have a direction of S-35030 f E, and a slope of 230 to the SE. This long axis reaches surface a few feet north of Sec tion 200 N and goes deeper and deeper towards the SE: its cross-section widening continuously to the SE, with Section 200 N being only 100 feet wide while for instance Section 900 S is 2,000 feet wide. The trough is expected to be at least 3,000 feet along the axis. As nothing is known about the dip of the south contact, it is diffi cult at this time to say whether or not it will be longer along the axis. If the south contact dips north, the trough will be at its total length and the peridotite mass would then occupy a real basin. If the south eon- tact dins south. the trough may go many more thousand feet down along the slope and, moreover, mineralization may occur in the top zone of the peridotite under the lavas in addition to the other walls and the bottom. "
8.2 G.H. Dumont, P. Eng., calculated the ore reserves
on the Trebor Mine property from his experience as resident
engineer during the major diamond drill program done in 1949 and 1950. In his later report dated May l, 1961, he
gave the following calculations:
DON TULLY ENGINEERING LTD.SUITE 120S, 55S-13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N*
31.
Drezone
Shaft or (S) Orebody
"A" Orebody
Tonnage Cu # Ni #
369,000 O.B9 0.53
735,000 0.45 0.26
"A" South 3,764,000 0.32 0.19 Extension
"E" (North of 547,000 0.29 0.16 Shaft)
Precious Metal Content
Pt = 0.008 opt Pd ^ 0.016 opt Au rs 0.01 opt Ag = 0.13
0.75 opt comb.
0.75 opt comb.
0.66 opt comb.
Remarks
(less 63,000 tons of 0.70* Cu 4- D .35% Ni on adjoining claim TR 1623)
(drilled on 50-foot centres]
(drilled on 100-foot centres)
(drilled on 100-foot centres)
8.3 John C. Durabrille, P. Eng., calculated the ore re
serves at the Trebor Mine and reported on May 12, 1950 as follows:
Total Tonnage Net Tons Mineable
Block
West of Diabase
Tons
Assay Cu
Ni Pt. Gross
Value/ton
Net Tons
Assay Cu
Ni Pt. Gross
Value/ton
Net
546,306 1.16 .60 16.61 85.00 491,251 1.29 .66 87.37 85.56 **
** Of this tonnage 436,692 tons is mineable by open cut method and after discarding waste in mining 409,091 tons would be mill feed.
East of diabase to Sec.225 5
Total close drilled
5ec.225S-400S Sec.400S-900S
Total indi cated date
976.575 -37 S3.51 82.73 606.005 .45 83.53 S3.03
1,522,861 .78 .45 |4.51 S3.41 1,297,257 .91 .53 85.24 83.99
1,297,756 .54 .32 83.12 82.37 1,297,758 .54 .32 83.13 12.37) 2,132,500 .49 ..32 82.55 82.18 2,132,500 .49 .32 82.77 82.18)
Hf These tonnages indicated by few holes
4,953,139 .59 .36 83.07 82.60 4,727,515 .62 .38 83.34 82.68
The total tonnages shown in column l are tonnages within ore outlines. The net mineable tonnages eliminate such waste as would probably be discardable in mining.
DON TULLY ENGINEERING LTD.SUITE 12OS, 558-1JTH STREET
WEST VANCOUVER. BRITISH COLUMBIAvrrtNt
32.
Gross values are estimated at 18 cents per pound for copper and 38 cents per pound for nickel - a combined value of 26 cents per pound base metal.
Net values allow 5 cents per pound for copper and 10 cents per pound for nickel, smelter charges and deductions - a combined value of 19 cents per pound of base metal. It is estimated (see pege 5) that platinoid values as shown above (from Trebor assay plans) are low, therefore the reported tonnages and values should be as follows:
Cu-HNi PtMineable ore - west of diabase 491,000 tons B 1.2995 Si.44 ^ SB.15 gross - S6.34 net
Drilled east of diabase 806.000 tons 0 .61 0.76 3.B4 - 3.44 net Total drilled areas 1,297,000 tons S .91 Si.02 S5.73 S4.48 Sec.225S to 4005 1,298,000 tons @ .54 SO.60 S3.41 S2.65 Sec.4005 to 9005 2.132.500 tons @ .49 SO.55 S3.DO S2.41
Total indicated to date 4,727,500 tons @ .62# SO.69 - S3.65 gross - S3.05 net
The values in the closely drilled areas (1,297,000 tons) are apparently commercial. The tonnages in the south areas, not yet fully drilled, are low, but drilling may outline better grade sections of these areas. "
8.4 D.G. Wahl, P.Eng., calculated the ore reserves for an appraisal of the property for Jack Koza Limited in his re
port dated June 2, 1972 . His calculations were as follows:
" SHAFT OREBODYOverburden Waste
Section
1234567e9
TOTAL
yd 3
5,3082,2873,2653,4785,5942,8416,1174,1014. 798
37.789
Tons
11,9348,57115,36134,63685,94767,28047,56861,28775.336
427.920
Mill RockTons
13,83836,06946,65831,76186,48581,49534,81942.738
373.863
#' Cu
.56
.64
.701.17.80.93.64.68
Ni
.25
.32
.30
.36
.46
.54
.46
.54
Tons (#)Cu
7,74923,08432,66137,16069,18875,790
.., 22.; 2 94. 29.062
296.978
Tons (#) ?Ni Cu
3,45911,54213,99711,43439,78344,00716,01723.079
163.318 .79
SNi
.44
A - OREBODY (PARTIAL)
101112
TOTAL
5,7304,2532.910
12,893
70,80916,8454.166
91,820
18,41029,3687.735
55,513
.50
.52
.43
.32
.27
.22
9,20515,2713.326
27,802
5,8917,9291.702
15,522 .50 .28
DON TULLY ENGINEERING LTD.SUITE I2O5, 555-tlTH STREET
WEST VANCOUVER, BRITISH COLUMBIA
V7T2N*
33.
8.5 R.F. Liard, P.Eng., reported that the higher
grade copper-nickel mineralization in the open-pit occurs
frequently with veins of quartz that accompany narrow
lenses of massive sulphides and enrich the orezone.
8.6 Strong magnetic intensity is shown on Figure 8
in the area of the open-pit body of pyrrhotite, chalcopy
rite, pyrite mineralization in the peridotite host rock.
For this reason numerous magnetometer surveys have been
reported on this ground. Figure 8 is the only available
plan of this work and shows in addition, a strong magnetic
response extending north-south across the common boundary
of claims TR 3187 and TRT 4310. A detailed and precise
magnetometer survey is recommended over the area of a group
of nine claims numbered EB 26, TR 3187, TRT 3448, 4310,
4311, 4369, 5953, 5954, 5955 on the property area.
8.7 Strong induced polarization response is indicated
on Line 46E in the area of the known body of mineralization
as shown on Figure 9. A trend of induced polarization re
sponses are indicated striking northeasterly into the south-
east sector of claim TRT 4369. Figure 10 is a pseudo-pro
file along Line 46E. Induced polarization response is also
noted trending across the area of magnetometer response
indicated on Figure 8 in the common boundary area of claims
TR 3187 and TRT 4310. In addition, the induced polariza
tion response associated with this trend is also noted on
claims TRT 4311 and to the southwest on claim TRT 5954 as
shown on Figure 9.
8.8 In 1968, S.V. Burr did a self-potential survey
under winter conditions and found anomalous conditions in
the southeast sector of claim TRT 4311. He drilled four
diamond drill holes numbered SB-1 thru SB-4 on this zone.
Burr reported on February 28, 1968 that D.D. Holes SB-1,
SB-2 and SB-4 encountered copper-nickel mineralization and
DON TULLY ENGINEERING LTD.SUITE 1205. 555-UTM STREET
WEST VANCOUVER. BRITISH COLUMBIAV7T *N*
34.
that the drilling indicated the basic intrusive contact
dips to the north in this area.
8.9 The 1987 program of mineral exploration included
8.75 km of line-control and the drilling of five diamond
drill holes of NQ core size totalling 680.79 metres (2,232.9
feet) shown on Figure 5 and Figures 24 thru 29. The drill
ing was done during the period November 6 and December 14.
140 split core samples were assayed for copperiisixicke^j
cobalt, chromium, gold, silver, platinum, palladium and
rhodium- The logs and assay certificates for these holes
are shown in APPENDIX 2 and APPENDIX 3. A summary of the
results i s as follows:
P.P. Hole # Direction Dip Depth
87-N-l 2920 -420 138.38 m.
This hole intersected peridotite and pyroxenite to a depth of 133.6 m. and bottomed in basic volcanics. Copper, nickel mineralization was intersected -
47 m. - 51 m. ( 4 m) values range from 1,407 ppm to2,537 - copper
70 m c - 134 m. (64 m) values range from 60 ppm to2,554 - nickel with significant values in chromium (Figure 24)
87-N-2 2700 -85 0 232.87 m.
Hole collared in peridotite-pyroxenite veined with quartz to 49.15 m. and continued to the bottom in
serpentinized and foliated schist. The core from
this hole was not assayed.
87-N-3 283 0 -600 110.64 m. Hole collared in mineralized peridotite-pyroxenite
with quartz veining to 102 feet. The hole continued
to the bottom in sheared volcanics. Copper-nickel was intersected -
DON TULLY ENGINEERING LTD.SUITE 1205, 555- 13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T 2MB
35.87-N-3 (Cont'd)
O - 102 m. values range from 85 ppm to 3,856 ppm - copper
from 200 ppm to 2,547 ppm - nickel
with significant values in chromium and cobalt (Figure 25) .
87-N-4 2700 -65 0 122.90 m.
Hole collared in an altered complex of peridotite, ser
pentine and volcanics and continued in the same rock
types to the bottom. Copper-nickel values were intersected O - 113 m. values range from 453 ppm to 3,595 ppm - copper
from 764 ppm to 2,252 ppm - nickel
with significant values in chromium (Figure 26).
87-N-5 285 0 -50O 86.00 m.
Hole collared in a complex of serpentinized peridotite
and volcanics. Copper-nickel mineralization was inter sected -
3 - 65 m. values range from 21 ppm to 9,012 ppm - copper
from 710 ppm to 8,778 ppm - nickel with significant values in chromium and cobalt (Figure 27).
9.0 RECOMMENDATIONS
9.1 a) A detailed magnetometer survey (using a 50-metre grid)
is proposed to integrate and expand the area of magnetic
intensity indicated on Figure 8 over the area of claims
EB 26, TR 3187, TRT 3448, 4310, 4311, 4369, 5953, 5954, 5955 (9 claims area). This survey may assist in the
selection of bulldozer trench sites in overburden areas.
b) Geological mapping is recommended over the same grid
as the magnetometer survey. The geological mapping
will confirm the geological compilation shown on Figure
5 and may give additional interpretation to bedrock geologic types and basement rock structures. This
proposed geological survey may also assist in the pre
ference of bulldozer trench-site selection particularlyDON TULLY ENGINEERING LTD.SUITE 1205, 5SS-1JTH STREET
WEST VANCOUVER, BRITISH COLUMBIAY7T ZN*
36.
in the southern sector of claims TRT 4310, 4311, 5953 and the eastern portion of EB26.
c) Bulldozer trenching is recommended in-conjunction
with the magnetometer and geological surveys to ex
pose the bedrock beneath the muskeg and overburdened
areas for the presence of copper-nickel mineraliza
tion particularly in the contact areas of the perido
tite and the basic lava host rocks. The contacts of
the Keweenawan diabase dykes that trend northeasterly
thru the claim area should be investigated in areas of magnetic intensity.
d) Mineralization noted in diamond drill holes in the
north portion of TR 3187 in the area north of the
open-pit and in the southeast sector of TRT 4369, is
considered for further diamond drill testing. In
addition, the presence of copper-nickel mineralization
in the deeper contact areas of the lavas and the basic
intrusive complex, as indicated on Figure 30, are
target areas for diamond drill testing.
e) Each diamond drill hole should be tested by down-the-
hole electromagnetic and magnetic borehole geophysical
methods, considering the nature of the mineralization
being pyrite, pyrrhotite and chalcopyrite. Should an
area of sizeable electromagnetic and coincident mag
netic intensity be encountered, a gravity survey could
be studied with a view to applying a gravity survey to
the indicated anomaly area or areas.
f) The construction of a mine model is proposed to better
understand the configuration of the mineralization and
projections for further exploration.
DON TULLY ENGINEERING LTD.SUITE 1205, SS5-IJTH STREET
WEST VANCOUVER. BRITISH COLUMBIAV7T2N*
37.
.O ESTIMATED COST OF THE PROPOSED WORK PROGRAM——————————————————10.1 (a) Magnetometer survey over 9 claims 3 12,000
(b) Detailed geological survey over9 claims 6,000
(c) Bulldozer trenching(Estimate 175 hours x 395/hour 16,625
(d) Mapping and sampling trenchingsusing rock-channel cutting machine 3,500
(e) 2,800 metres NO core size diamonddrilling @ 866Xmetre (2800 x 866/m) 184,800
(f) D.D. Hole electromagnetic * magneticborehole surveying (2800 x S2.007m) 5,600
Contingency @ l Ofo o f above cost 22,852
Total of estimated costs
Respectfully submitted,
March 4, 1988 Donald W. Tully, P. Eng.
DON TULLY ENGINEERING LTD.SUITE 12OS, 5SS-13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N8
38.
11.0 CERTIFICATE
I, DONALD WILLIAM TULLY, of the Corporation of West Vancouver, Province of British Columbia, hereby cer tify as follows:
11.1 I am a Consulting Geologist with an office at Suite 1205, 555 - 13tli Street, West Vancouver, B.C. V7T 2N8.
11.2 I am a registered Professional Engineer of the Provinces of British Columbia and Ontario and a Charter Member Pel- low of the G.A.C.
11.3 I graduated with a degree of Bachelor of Science, Honours Geology, from McGill University in 1943.
11 C 4 I have practiced my profession for forty-two years.
Ilo5 I have no direct, indirect or contingent interest in thesecurities of Northern Platinum Ltd. or the group of fifteen leased mineral claims numbered EB 26, TR 3187, TRT 3448, 4310, 4311, 4369, 4370, 4371, 4381, 5953, 5954, 5955, 5956, 6763, 6773, subject of this report, nor do I intend to have any interest.
11c6 This report dated March 4, 1988, is based on personalfield examinations made on August 18, 1958 and again on February 15, 1988, and from information gathered from available maps, reports and personal communications.
11.7 I have not examined any mineral properties or claims within the past five years that are located within ten kilometres of the Kanichee Mine Property.
11.8 Written permission is required from the author to publishthis report dated March 4, 1988 in any Prospectus, Exchange Offering Prospectus or Statement of Material Facts.
DATED at West Vancouver, Province of British Col umbia, this 16th day of March, 1988.
DONALD W. TULLY, P. ENG., Consulting Geologist
DON TULLY ENGINEERING LTD.SUITE 1ZOS. SS5-1STH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7TZN8
APPENDIX I
DON TULLY ENGINEERING LTD.SUITE 12O5, SS5-1JTH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7TSN*
TOPOGRAPHY MAP
DONALD W TULLY, P.ENG
gr-'W
'ftfrr*i*
^.^
;?^^^^
^'**wT
I\":\ b
mTf\"' vii**;**?.l?^w
-'5V-1t':;'*
^:.-?7~':i'''i'-H"'^
PREVIOUS 'MAMONO MILL HOLES
NORTHERN PLATINUM 1987MAMONO DRILL HOLE
LEASE BOUNDARYMX CLAIM POST
MAIN ROAD SECONDARY ROAD TRAIL
KANICHEE LAKE
T.R.T. 4370
T.R.T. 4371
T.R.T. 6773
zJ w m
T.R.T. 6753
oz
Lin. 3-tOO N
JJLin. 4*00 M
t "V
Insftf
PART of CLAIM T.R. 3
AO-12
CO-20 CO -21
"W*" I-*1 ' 0.66 -02929.0
.
^v
(800
(600''..
\ 'x
X,. *
\ .X
xx.
FIGURE 30MODIFIED TO ACCOMPANY
A REPORT BY
SCALE AS SHOWN
Cu-Ni
xx
0.166-0.153 40.0'
s.-z-x^?**i — i
\iilra
oicrr
\
0.23-0.; 44.5'
x
TREBOR MINES LTD. STRATHY TWP. PROPERTY
SECTION ' 8 + 00 S
U)lo
Surfoce
Ledge
200
400
600
800
DIABASE
PERIDOTITE
VVVVVVVVV W /.v •vXX-v.'VVVVWW V V VjXxtf
'VVVVVVVVVV VXXX
LEGEND
'WVVVWWWvvvvvvvvvv . ..•'WWW W VVVvX-
•vvvvvvvvvv vvvvvvvvv
•/VVVV W W ., .. ' V V V V V W VV :
' W V VV W ' VVVVV W\
•vvwv• V y v W•vvvv
'VVVVV W W V T ,v,,.
VVVVV V\'v-J •WWW /WWW WWW 'VVVV W V W
VVVV ' WV
FIGURE 29MODiriEO TO ACCOMPANY
A REPORT BYDONALD W. TULLY, PENG.
DATED MARCH 4. 1988
SCAtE AS SHOWN
VV•vV
VVVf T T . . , -. •^^-.-
WWW V- V* VVVVVVVVV V
^CONTACT ZONE
VVVVVVVTV TT T K—r- -^^ r^^- M.^- ^-j ; ..-.:,
WVWVVVVWV V W V V V V VV * .XXvwwwvwwwvvvvvvvvv y vVVVVV v'VV'
VVVVVVVVVV
r^vv] LAVAS SECTION B-B 1 - FACING NORTH
MINERALIZATION (Cu-Ni)
HIGH VALUES (Cu-Ni)
Geology from old records and 1987 Diamond Drilling
FROM KANICHEE MINE COMPOSITE MAP - 1988
^^'SS^df'
v v v vS'; ^' V W V
' V V V V V \
Vh/WWW'
" W V W W 1V V V W W *-.,:,.;..-::.:.j—.
' V V V V V V \l;lji:j: /3C
' W WVV V V V V"
' V V V•'V
io
Ledgego — Surfoce
Ledge i?
Pt: CONTACT ZONE
87-N-3 87-N-4
LEGEND
DIABASE
PERIDOTITE
LAVAS
MINERALIZATION { Cu - Ni )
HIGH VALUES (Cu-Ni)
Projected from 120 fi. to the North Projected from 175 ft. to the South
— 400
— 600
This hole not sampled
FIGURE 28MODIFIED TO ACCOMPANY
A REPORT 8rDONALD W. Tin IY, P EMG
DATED MARCH 4, 1988
SCALE AS SHOWN
SECTION A-A 1 - FACING NORTH
Geology from old records and 1987 Diamond Drilling
FROM KANICHEE MINE COMPOSITE MAP - 1988
100 O 100 200
,
r NORTHERN PLATINUM LTD.
KANICHEE MINE
DIAMOND DRILL HOLE 5
COPPER . NICKEL , PLATINUM , PALLADIUM , GOLD
ANALYSIS
LEGEND
^; fPt . (M . Au
(POD)
CASC - CASING
FIGURE 27MODIFIED TO ACCOMPANY
A REPORT BYDONALD W TULLY. P. ENG.
DATED MARCH 4,1988
SCALE AS SHOWN
IO
DDH 87 -N -5
i6 O if
\ D DH 87-N-5
"/'". V* '^-,V^ \ -** ^'•^f\'^ 'v '*. V^'J' ^ "'',
*NORTHERN PLATINUM LTD.
KANICHEE MINE
DIAMOND DRILL HOLE 4
COPPER . NICKEL , PLATINUM , PALLADIUM . GOLD
ANALYSIS
LEGEND
Cu . Mi fi Pt . W . *u
loom) [~j (PCX))
CASG - CASING
FIGURE 26MODIFIED TO ACCOMPANY
A REPORT BYDONALD WL TULLY, P. ENG.
DATED MARCH 4,1988
SCALE AS SHOWN
10
DOH 87 -N -4
225 E
Zrcrnbtf i'. .SB'
87 -N -4 ,,,,
' 'J*
"H
'"•^,- ''•^'"0
NORTHERN PLATINUM LTD.
KANICHEE MINE
DIAMOND DRILL HOLE 3
COPPER . NICKEL . PLATINUM . PALLADIUM , GOLD
ANALYSIS
LEGEND
Z* . Hi H P* . ft , Au (pom) ~ tpoe)
CASG - CASING
FIGURE 25MODIFIED TO ACCOMPANY
A REPORT BYDONALD mt TULLY. P.ENG.
DATED MARCH 4. 1988
SCALE AS SHOWN
DDH 87 -N -3
.'OMPLETED
"0 64 m
D*crmoe . 02. '967
7
"'* DDH 87- N -3
f&k-
NORTHERN PLATINUM LTD. jDOH 87-N - l DOH 87-N - Z
KANICHEE MINE
DIAMOND DRILL HOLE l
COPPER , NICKEL . PLATINUM , PALLADIUM , GOLD
ANALYSIS
LEGEND
DOH 87 - M -
ODH 87 - N - Z
FIGURE 24MODIFIED TO ACCOMPANY
A REPORT BYDONALD W. TULLY, P. ENG.
DATED MARCH 4,1986
SCALE AS SHOWN
232.87m•oc.t emco I N f*ix.r
0.63-0.89 35*
0.92-080 445'
4(0-4)
\ -..^ ——— JL'..-."^" J^ \ .I..'.-... -.ec-. \ ^-—v^irr"w" r" '
5D(D-5)60 (D-6) 7DCD-7
0.32- 0.3246' ——..
•--~" .jrTi?"".,:^ .^rSv*'.*'*——-- iiyf —— t.-Jr.f..,— •--•-" ^WHW- -^n * -r .-j
rS-s-y^if^-^sfe'
0.14-0.20 ^"^C /~50^~
.o.;wK".\ A ••g,'-?"- V-"-: v."Vr.--Vi i
0.33-Q29~-i- .i ..i .1—1. i
24.8
OPEN PIT AREA0.79-065 46J'
0.13-0.17 51' . ,Ji-'.v V'jvstn.-^ \
03I-O.28 61.4'
.V*
Cu-Ni
FIGURE 23MODIFIED TO ACCOMPANY
A REPORT 8YDONALD W. TULLY, P. ENG.
DATED MARCH 4. 1988
SCALE AS SHOWN
(9600') ^.
(9200).
SS2
AJAX MINERALS LIMITED STRATHY TWP. PROPERTY
SECTION' D. D. H. 4 D, 5 D, 6 D, 7D 8 D,
t
IlliiiLnijiiiiMailJUiailiail^^!1ppi!-^^^^ri;^^^^^?^pf!l^^i^T^^[ .'i^|3.j. !i. .-.... -,si . sr-^T -:. ~ ' " :' ' ' -' ' ^E;' : ;---:;-*- -" '"- "H.-;"-*- - i- - *- ^ y-*-- - - 1 : -- *' ' - l ili '-.:: ;, ^- '.j-.,:.
CO-18
(I0001 ).
(800')
(600*)
(400')
FIGURE 22MODIFIED TO ACCOMPANY
A REPORT BYDONALD W. TULLY, P. ENG.
DATED MARCH 4,1988
SCALE AS SHOWN
TREBOR MINES LTD. STRATHY TWP. PROPERTY
SECTION ' 15 H-00 S.
upper caMoc • f miotreliiolcn If holt t tomtit Itljr
tempi**.
MINERALIZATION (Cu.MO
HICH VALUES (Cu-N.)(Geology from old records
Section through l O i-OPS
looking north
SCALE l"to 200*B-B
FIGURE 21MODIFIED TO ACCOMPANY
A REPORT BYDONALD W. TULLY. P.ENG.
DATED MARCH 4, 1968
SCALE AS SHOWN
AJAX MINERALS LIMITED
STRATHY TWP PROPERTY
SUB-SURFACE PLAN -wof..t.SHOWING
DIAMOND DRILL HOLESScole: 200 feet to l inch.
AND
OTHFR Oci
:||ry" "i*fi
FIGURE 20TREBOR MINES LTD.
STRATHY TWP PROPERTYMODIFIED TO ACCOMPANYA REPORT BY
DONALD W. TULLY. P. ENG.DATED MARCH 4,1986 SECTION ' 9+00 SSCALE AS SHOWN
•**
MO O
M O O
o ft
oMl
o ot
o "lo o •o
Q tt
F": ^fifflP 7-^IW^
O O
OM)
O Ql"
o ow
o•o•o
oo
SURFACE
100'
200*
300'
400*
SECTION 30O STONS ..,-'.-J^.-— GRADE cu .......x
Nl
GROSS VALUE
TOTAL VALUE
REMARK
rt* TON
500
. v i
;:i
FIGURE 19MODIFIED TO ACCOMPANY
' A REPORT W DONALD W TULLY, P. ENG.
DATED MARCH 4,1986
SCALE AS SHOWN
TREBOR MINES LTD
HOLE N0..5ECTION 300
SECTION SMOV.INC IGCATION STMIKt. Olf. CtCtOCICAL
SIHOC1OHC. VALUCS.
•ICAlC:
. "y* *' \i i* * ' * *
0.42 -0.25 S
FIGURE 18MODIFIED TO ACCOMPANY
A REPORT BYDONALD W. TULLY, P. ENG.
DATED MARCH 4, 1966TREBOR MINES LTD.
STRATHY TWP. PROPERTY
' ! f
V ' ' t '-*-V-* -*—*- a — *--^..Y..au— A 4 . *^,* ^^. ,.~"r .
. V -#'.;.;.v - -
WWW
^* t* * *
* "
*
^r \
\
S* * *
*
.•^ ,, ,
..\ . . ,''^ .\.\ ; "X.,
rL
\, r"4 i
. ^ . \ . .Vx.
*"x'-- .X
" m *
*
- - - - - i^'..--j XV/: .'.- -^ .'^ *
*"\r.~*t""v* "s" '
. -, * * * * * ' '* \ * -***
"*^ "^
W * V " * * ' '—— *
x. '*•S^N.
^ """'^ * * * * *"x.v^
. v-. ."s.
(800')^
Cu-Ni
FEET(TOO'),
FIGURE 17MODIFIED TO ACCOMPANY
A REPORT BYDONALD W. TULLY. P. ENG.
DATED MARCH 4, 1988
SCALE AS SHOWN
TREBOR MINES LTD. STRATHY TWR PROPERTY
SECTION O + OO
f093-0.74
S-IO S-ll
S-9 S-8 S-3ZS-29
dooo')
(900'}
(800')
Cu-Ni (700')
FEET
FIGURE 16MODIFIED TO ACCOMPANY
A REPORT BYDONALD W. TULLY, P. EMC.
DATED MARCH 4, 1988
SCALE AS SHOWN
TREBOR MINES LTD STRATHY TWP. PROPERTY
SECTION ' l 4 OO N
,
0.53-0.22S-3
(1000*) ,..
(900').,
(800').
Co-Ni (TOO'),FEET
FIGURE 15MODIFIED TO ACCOMPANY
A REPORT BYDONALD W. TULLY, P. ENG.
DATED MARCH 4,1988
SCALE AS SHOWN
TREBOR MINES LTD STRATHY TWP. PROPERTY
SECTION' 2-fDON.
P'T O'JIUNE
N /l
4-10
S-W
.s-'*
i * o
FIGURE WMODIFIED TO ACCOMPANY
A REPORT BYDONALD W. TULLY. P. ENG.
DATED MARCH 4, 1968
SCALE AS SHOWN
MINERALS LIMITED
D. D.II. i SECTION PLAN ' l " to 100'
W.G.WAHL Ltd. MAY 1972
[.-i*
iMl.
CUNIPITAU SHAFT
ut Hire
[———j am i HI ut f to ivlrintrt
MODIFIED TO ACCOMPANYA REPORT BY
DONALD W. TULLY, P. ENG.DATED MARCH 4, 1988
SCALE l" * t 50'
MIMES L/M/TED- \scfiLt x //?. - soft.
'\
L
(
*
1
i'
/J*
e*IY.4.
tifff-lO
tst'
'"/^
t tt'
t-il\a -it -ttr
i .
t Hi
S
t- t S
f/ 1 *4 1.1 Itli'
! ~ writ
'tt":
*,"
utt Tt''
's -t t.
. . - .' t itn ae"••-1 -
'/4///V*'*/ f ' A*//***/***
"/r. J "*- l"/,**. O-ll
\t it
^t-Tr'
t tt. - ''.".S M
t- rt j -'/-**
••:-;' i"-"4V,4 \- . '
\ tie.' Ho | 9 14 ' l nI.... .. L. .-| . ,ft - J O il l 4*f
- ! f ! - 1 '
__ J '14/0 l
f"T
o . " rJn-J. -.
itt t 4-f,
t ( fliftjvv
vjtr••tt.Ut,
i no
1 110
t f H.
'•/at
iet)i Jirt lie,
f t IS{-A , M \""i'-f SO
rj
•i/ /ri*- '.",•W't ii
to* l
fa1 '.''i7-fe
' :,'
t tti
t rt'.:.——— MH^———
Ile
3 i4
It- H
n ttIS-tt
f S to
t tte tt
i nit- fi
1
1 II I * is^difAWJitas* " . - . .*.*
/V
"fc*"T**
M[.SC•etto *.""C*.* '
'til \'i-lit\ - .':
- * . 1 - . -. ' - .'•.'•':-'.' -
t ft \ e-*tti- . ".. - *- .5 ,-' t Hi'., fi /,J;X\
' 1 44411 ff-fto
0-Otl^ 0-Jil
ttffi. tin
t tftl f lac
'fin t ut
OOtffl 4 -4J0'
f f la' t 4fi
a tty tilt.' I t HI
OIOI\
, \ al lT*"
' " .
•7TT--
-.' :'
••.-,'
— --
.If. A.
'ttfCt
'•'-••-•f ^.
i-''*!-- 1
.-* ,- '
** *' .
v 1 '- 1 ' , .
- - '. -.'•.•• : '-.
. —
tvifici
ne mil J
l
tt'-t'li */ f. .H iV. HI l
i -i ''
———————————— T —————— ^
'•J"
3ri*-•:-
••:,*
,: H
1
—i
l......
———
——
___
j
•H
*.44I (
** * * i
^
l
-s.
s
IHM'lt 't
'j t' ttnrli
tteff Itrtt
CUNIPITAU SHAFT
nlt'ii t it, 'Hf-tU tiff
rf* i
if At/ ntvirif]
FIGURE 12MODIFIED TO ACCOMPANY
A REPORT BY DONALD W. TULLY, P. EN6.
DATED MARCH 4, 1988 .
SCALE AS SHOWN
OPLN PIJ~ : too td f f /".-r fit ,ir;,r*t /eif . I tS
l*.'F* j;
j te'fti i until ' ~tilt
SULK t AM fit fO AMt.gtCAM MtfAL CO.
.^f ft? Htcval co.____ ;l r*i l t tt j **w l T/il •••' 1.L.— - — l .......J .. - .-.-i- -. i .. l y
FIGUREMODIFIED TO ACCOMPANY
A REPORT BYDONALD W. TULLY, P. ENG.
DATED MARCH 4, 1968
.SVftfi
CUNIPITAU SHAFT
McPHAR GEOPHYSICS LIMITEDEDUCED POLARIZATION AND RESISTIVITY SURVEY
0/27T
30N
AJAX MINERALS LIMITEDUAGAMI AREA, TIMISKAMING MINING DIVISION^ ONTARIO
Scole-One Inch-200 Feet
FIGURE 10MODIFIED TO ACCOMPANY
A REPORT BYDONALD W TULLY, P. ENG
DATED MARCH 4,1988
SCALE AS SHOWN
UJto5J-
6
ui
Qt)
nx
ELECTRODE CONFIGURATION
X - 200
McPHAR GEOPHYSICS LIMITEDINDUCED POLARIZATION AND RESISTIVITY SURVEY
2
l 2Z2
- 2S -^^^^^*
2N 4N 6N
1380 1200
"0
8K ION 12N 14N 16N 11
1
2
1.9
1.9 12.8
2.7 3.8
2.3 4.0
ALDUS ZONEPOSSIBLE ANOMALOUS ZONE — — —*
NOTELOGARITHMIC CONTOUR INTERVAL
AJAX MINERALS LIMITEDTEMAGAMI AREA, TIMISKAMING MINING DIVISION^, ONTARIO
Scale-One inch-200 Feet
MePHAR GEOPHYSICS LIMITEDMMCCO POIMI71TIO* *MO HttlJTtVltT
IOC*TKW "W
"
MODIFIED TO ACCOMPANYA REPORT BY
DONALD W. TULLY, P. ENG.DATED MARCH 4, 1988
AJAX MINERALS LIMITEDI AMCA. TtWISKAHWO MIMIHO
200' *c^-c 600' 800' 1000'
OWO.XISC4OT2
- C f CAMMA
O
m
OiUUfcO fttrtvlf IN **l* Of 1MMT ANO**1N f AU t T
TREBOR MINES LIMITEDISO-DYNAMIC CONTOUHS Or VLHnCAL INTCNSITICS
STRATHY TO*NJM1^ OISTmCT OF NIPISSING
ONTARIO
lunvit t*i
GEO - TECHNICAL OCVCLOPMCNT COMPANY
ill
tlCIN O
f ' Unit CMAiNlo.lMCxlllC MIINlllilt HOl'IC
/~x^'*" utcmtic coNteu*
——— *rriioiiu*ii connet
-r-rtpi*
GEOCHEMICAL AND GEOCHRONOLOGICAL DATA
Geochemical sample site, with reference number
Area of geochemical sampling, with reference numoer
Q l A.1 l Age dating material samolinq site, with reference number
GEOPHYSICAL ANOMALIES
Airborne Magnetometer Anomaly
Airborne Electromagnetometar Anomaly Length of anomaly along flight line
Airborne Electromagnetemeter Anomaly. Location of anomaly along flight line
Airborne EtoctramMjneiometer Anomaly Conductor AIM: definite, probable, possible
Airborne Radiometric Anomaly
Ground Magnetometer Anomaly
Ground Elect i omagne tome ter Anomaly (VL - Vertical Loop; HL - Horizontal LOOP: VLF - Very low fnwu Turam:JEM - Crone EM -161
Ground Radfameoic Anomaly
Induced Polarization Anomaly
Self Potential Anomaly
inetome ter anomaly(total imeraityl
RoKtnitv Anomaly
Granty Anomaly
Atfborn* Electromagnetic Anomaty
l Rock quarry
Sand and/or gravel pit
NOTE: Consult the text that aecomoanm mn m*o for o*rti- nent Ints of data, references, and abbreviations.
Ministry of HO" *Un w. Pope,. . , MinisterNatural
John R. SloanResources
Ontario
ONTARIO GEOLOGICAL SURVEY
EXPLORATION DATA MAP
GEOLOGICAL DATA INVENTORY FOLIO 201
( Mao 4 of 4 )
STRATHY TOWNSHIPDISTRICT OF NIPISSING
Scale' 1:31 680
GEOLOGICAL AND MINING SYMBOLS
TYPES OF DATA SHOWN ON THIS MAP
MINERAL OCCURRENCES
Mineral occurrence at surface, with reference letter
Mineral ocOitf 11 i'icn witfl tfiwt. dtpth 9*wwt WMH reference le tier
^OS-
63 j**^*- l
S3 l A*i^3 A, l LjJJjSJ
Mineral occurrence teoorted taut exact locatMreference letter
rtain,
o O) eaw*
•M Fe^
Mmeralind Float w.th reference letter
MineraliMd Float with property reference number
DRILL HOLES
1 l Location of single drill hot*, with reference number
Location of closely spaced group of drill hota. with reference number
Drill hole, exact location uncertain, with reference number.
Property with underground drill holes in this general area, with reference number
Property with drill holes which have not been plotted on map. with reference number
Reverse Circulation Drill Hole: Chum drilling, with reference number
FIGURE 7MODIFIED TO ACCOMPANY
A REPORT BYDONALD W. TULLY. P. ENG.
DATED MARCH 4, 1988
SCALE AS SHOWN
APPENDIX 2
r
DON TUU.Y ENGINEERING LTD.SUITE I20S. 9SS.1ITH STREET
WEST VANCOUVER. BRITISH COLUMBIAV7T2Nt
miernauonai ueosysiems Lorporation
771^ ^c1' ~ftiisr sw^sss"""" n^RGeolog System Ceofoi
Alphi S D " Zffio 1 B One I * Two f * Stvcn 0 * Alpha O ) or i * Atph* l i * A lphj *ini f "iauiilH' l"' " 1117*11." "' " ""i'"'i*fd: r iiffiaa; -r-rrr^TTTJCTffiffHfcfEi ScUi-
ill b t* 4 i l Ut J IS* *t*l Vi* WW.* f **t**l II.* *w\S* LSV/ VJCWIU1
AlpM i O " If to 1 * On* 3 a Two 9 m Seven Alphi O l O' i . Alphj t | . Alphi~1 ™ii*iii* "" r*coi)w*iMe'~r***i*c l u^*m* l c ooio l ..^ , l . . l
l " l ** l gO l MM l •P- ]tM*lM*t l i* l ITtllM l t***J^Wl" l '.Ci i"i^T^tJ^fe'J^u:]'' ! "^ !! PS'i in -
TH l B'l 'l ""BM-i^^-M^BMJ ———i. . II . . l .J —— . -f- -f- . --j-..-?rr rr,rr-l P. I ri l
InterriationalGeosystems 'Corporation' Geolog System" Ceofof m Alphi S O * l*!* 1 - Ont J - two t m f ton 0 m A lphl O l V l ' Alplu l t * Alptij 2
.1.1.1..u.....c...i.li!iswee&im ism a _.-IL. ,, M U .--rr; : ' i i i i.;
If International Geosystems Corporation Geoldg System CeofoS-Alptu J o "Itie t* Out I* Two * Seven 0 B Alptu O J o* l * Alphj l i * Alpha t
tffdmHIgrl-Tf l rTTTi fete
International Geosystems Corporation Geolog System,
International Geosystems Corporation Geolog System Ceofo0*AlphiO Ixi'Alphil I mUftut
'f.iff W, U IVU'N
T'l.!
International Geosystems Corporation Geolog System CeofoiO J ttID 1 a OlX i - two t m Scvtn 0-AlphjO lon-Alphll i.AI(,hj2
:l. l iniiS l (••••i-x-
TT TT TT'l.rKIK-.I •r^L^n i i i , i i i i . . i i i
lAtriNC "K* l ItlVAIION Jl\t.TTTTrrV.Trl i i m i.:MtltATlOM k MMMIMItAIKMMfMIitUNl^S IMV*
international Geosystems Corporation Geolog System Ceofor{MAIphiS O'lno 1-OfM J-Two ?*Scvcn 0*AlphiO loo-Alphji l * Uftnl
International Geosystems Corporation Geolog System GeoforAlpha 2f 'AlphaS O'ttf* 1 -On* l -two f B Seven 0- Alpha O lw i* Alpha l
International Geosystems Corporation Geolog System Ceoforf B AI0tu f O a Zero 1 - One J B Two 9 * Seven 0 * Alphi O l or i * Alphj l I - Alphj i
International Geosystems Corporationt* Alpha I O'ttie 1*O Two ' •icvtn 0 -AlpiuO lofi-AtpMi
,. ni,_,
lllNC tlitlt - r 'l -p-r-i i i T I I l t l L. i l l
~iTTTi' n~n~rr
—...T. r.rl'^is -—11 T1 1 vJIt
International Geosystems Corporation Geoiog System Ceoforrf-AJpM* O vitro 1 aOnt 3 m Two ? m Seven 0 * Alpha O J v t * A lpha) f *
International Geosystems Corporation oeoiog bystem""f * Alphji O'Ino 1 *Ont 3 B Two 9 * Stvin 0* Alpha O lot i * Alphj l i -
IlTilrf.! l™ " iiiiiil"1 |~76i**i*id"'I'wHiiMc* l tutvivio l too*i^i^rjj-fT: m "n^ ft f l n- ITTT i •i'*j'a**i *U* l i* ' ' * * ' * ' ' * " i * *"
IllVAHON JfJ.
m i m.!t " ' ' '" W wilt ,.
'JStT*^^*-* c?JT'f*^s rs*C"-T ' ~T
international Geosystems Corporation Geolog System Geofor:
lAltINC 2|lt l HI**
International Geosystems Corporation Geo log System CeofoitllQ*Jl*IU'M l "CI J '"
TT i: r i Iolite
International Geosystems Corpocation Geolog System GeotonO* Zero 1 *Ont 2 -Two 9 • Seven 0 -AIphjQ Ion - Alpha, i s AlpluZ
International Geosystems Corporation Geolog System GeofoiS* Alpha S O *Zcro 1 * OM J w T wo l* Seven 0 * Alpha O Ion- Alph.il t m
International Geosystems Corporation Geolog System GeofonAlphi S O * Zero 1 * One 3 * Two 9 * Stvt n 0 * Alpha o l Of i " Alph* l t * Alpha Z
International Geosystems Corporation Geolog System Geofor
International Geosystems Corporation Geolog System Ceofor
oci-it
l : l i l W Wi gjd'tiigr^ibBll l l l l l Ml II lU,|iLiU lil i-l3 !T[lT i|.l ILhM l mn* |..nilMMt,|..__tliijil ___j____."T.??___. l-.?!'.'**?. I...W ... l . .. . '•"W!
nninar*niaic/r 9/vnarN
iitit,inuuuiiai vjcu3jr.9i.CM o Lieoron
1(1*
3 fa 5
t Si
2 Z
L
^ 2
JK S
f *AlphjS 0*2trt*Mi"J" ffowiitif *l"*i--|.
•s., l. m.. . ....
J. Two ?-tf.tn 0 *AlphiO lori*Alpli4l i - Alphj I
* ii im nn i NVM*H J miKxi l f f i MM,,.,-,.j , TT n r li. r i' " * ' '"** *rltl-
5 S1
55
A lg
^
J a
ZEfc
lie
International Geosystems Corporation Geolog System GeofoiIIO*C*W*t|tNfM| I'AlpkiS O'ltio 1*Ont I'Toe ?*Snin p 'AlphtO lwi*Alplul J "Alpha J
0*u
iowrt fie*
'
-
-
-
1)1 4 11X ———— ———
" y^"
S
A
(( \-r
H
s-
AH -
/
—t*
t *s
S
f
J.
^
^
hl'
|)
j?
bP
|)
P
F^
K
J
t
HAG0
ri" N
1
laK&ll
•uc
l
-,
r
y
t/
i,
v/
V
^
v
D
ft-
l/
j)
*j-r1
t 1
IUC
cr
f:
^
o
b.
*
J
f
yL
g
^
T
fc'
r
^
A/
L
A
/V
lit
K
T
^
K
k!
^*
JSKoN(10)
MO\R\Y
me
0
Aiit
•-M-f"*.ri
ft*4inof*3itcrOfltU* HOMCItUMiOul
?P?lAi
/l//P ib
to. x
i 1 1 1 i
r *
f
f
^
.T
5"
A,
f
(g
L
(a
(n
f
6
t
In
^
5
^
^
^
L
P
5
/n
ff
(n
R
J'
1
^
i
M
•jr
^
f
7
f.
5:
f
y
f
^i
f
y
c
0
o
/t
0
f
o
•^.
o
0
it
•*M*
.li:.l
y..
jn.^t
tt
Til
-
'*
W
f
if
61
^
•\
^
L
f
b
h
li
X
ti
?
f-
(*
2
^
^
O
V
y
^
y,k
l"
[7dp
A.
3
J!
o
3
y
'j.
f
0.'
^
L,..''
re
;5
^
0
r)
(i
,^
0
O
76
ft
D14
•u'l'l1'" "m!""3J!i i 1 "4R48"Pjr p|4MT/lt
RI?^
"w"ti
tOtM MMW
iffj-•o*
4J*
iip
-•'
(^
11
6
•s
t*
^
f-
f
j-
H
T-1 •L-
"Pr~
i. 1^
I^ JT
**
i
"
''
1Tl/J
uincM.Ml
-
)CI
RMv
!r
p
fy
ftt
(j
S
f
stf
p
D
ky
/p
t)l^
t
^
^
Y
/L
g.
Y,
j
(•*0ft4-•ra
H-j
^
t*i
^
^
.j
V
4
ft
7
i/i
''•fr,-4 "
t!
IL
|f]
y
1
V
V
,p
^1
2
x
A
ft
r
/)•f
(Mr HM
*IM ,
1
f
Li
4i*,.
r
W1.
IB.
-
ftA
oviwi.
V1
- —
^
JL
/*
^y'
^J
^
^
--
1
s 1
Ui
j(
f
ft
x
x1
'lli'
y" "
iii1
•;, -
B*** "
.o*
M-f
f
c
J
r
1*
D
if*
d
x
^
0
"
^ nL *Tw\ 1
V}'
V.ANC JJU|
4-n~
s?
^
^
c
1
fc
9'
r
'
i
fo
t
^
-
5**
-
|
H
ra
ik
--
^
^
^
•-.
.!-p
M
I
4
0
~
^L
fi
rfi
--
n
lrfai" •*
II
^t\
-
fi
-
4-
"
1
H
7
J-
-
fj
*f
"
MM
MWieu
t
k
H
i
xc
-
s
i
i
lv
^k
V
t
f
L
^
*
vi
*JV
**
f
1
"
f*
tt
'
i
^
(1
f
-
ir
flu
M
1
sy
x
-
-
-
•'
r*MMw
h
w-p
tA
**
•MUM*
^FI1
•r
A
4
3h"
J
u
Jf
A
41 14
At•1
e
L-
7i/-
-
-
~
-
-
-"
t*r—r-i
/!C*yair' 1
li
a
in
w
!T
f-/l-
-
-
-
-
—
•-
•1
^f
Y
^
i?^
-
:p
^]/-
**
r:F*1
1?"T
^
3r
^
X
't
j
/
7
f/-
M
g * t** M* ff|-T-
-iSimrn
fAf/t/ltfiNOIIHINC ^J.t,
t
f
•*
-
-
T•I*±
4
.
-
-
)
-
—
-
-
1
2
2
it
—
^
-
—
-~
-
-
—,--
y i?i*
f6
Of
L
i-
^
2
i
t2
w i*
•r9 '
V
L
o
9!
3
*y
B
0
Q
i
JO
M
37
TVIM
f
"
-
-
-
**
'
y
It
u
-
-
-
**
'/,
-
-
-
-
**
flff'Ri* I CO W
rID •^
i l i i i * i ! 'UttlNC *',?
II 11.
,(M Hi'\i\i
t
-
-
*"
•y*
~
IT
f'IK
j
*?
:~
r
s i
jU
jte
r M
IIIK^t
TffttlH
,
r
[71
f•-
•i- ~T
-.
R•* **
ga
"Jr ut
f
^
-
-
"
"T
i
p
1
iJ
41
J
-
111
Et
y
t-
^.
^
-
L
r rf-IDT1
c*•o*/^. i .. .1 hUlvilion" -f Tl"
TM |l*
-
-
J
-,T
B
-
z
^
..
~r- "~"
4-** '*
4
,,-
—
-
-
-
,
a
--
r.;
l J
/Is-1-
1
1
~
t
— — r— f-
41-i-1 1 ^
*M"1" "
. iyLoi'J.
s"
-,. .
1
"1
1
-
..
i t-- -
-
l '
,'L-
International Geosystems Corporation Geolog System GeoforAlpha S Ovltr* 1 B One I m T wo ? - Srvtrt 0-AlpMO J Of t- A lpha l is Alpha l
tillite c'6**iitie F Miumc "l wtvitio l como 1 r.A ., , l . . ! "
Tll^TtThTT^TrhTFiih'fa*
li In x ——
MriMr OiU
if ^
i:
ter—7 —
s
s:
A
J/''
natffjqi'i-j-
^i-A . H .f :
J
;^^b~)
T?-D
t)
3T/1
t)
P-
.^
-
ional Geosystems Corporation•mimMCM itewnviiiiMiMI
FI AC
Df
i*
N
1
KM
^rui
t1
s
s
V
5
f
S
s
c
i/
i
cl
r
•p
ft
f
c
7-
^-
y
/!
7-
f
r
R
ft
/\
l-
f
(7
ft
L
A
K
fCMMAI VUUON
J|O|)?ITvie
^ i.*.!fjvt..~. x
omutraoMct
^L 40w~
IpcSSoilII
Q
L~l\
x^****r^ ~T." "i |
•M*. -——T|f-.-|V
mmrLi lin
- i'
f
f
1
f
l
f
rIU
ij
''f
4
i
x/
1
x
7
^
Wfei
7
t
t
t)
o
i
f
X
}
fV
i;a
4
3
O
^
^
o
i
T
0
i
\t** C
r
o
o
0
o
u
y
,;
0
.1
-
-
71
y
f
t
f
7
f
s
*l
^•j
0
X
7
X
2
^
t
c
^
^
X
^
.J
x
2
y
M
3
o
^
^
f
p
j
?
,
ir
S
o
0
0
0
y
o
O~
Q
O
ii u
6pjkfu-J-
S^t
I"WMU j "wsir'-H-i/f^l TL
toui Mrm
•ICOvMT
iEFh~ps
-A
(S-JT
-
ir
^
7*
/f
•f*•7
--
at
*J|*
1
i
1
--
H
^4-
/j*
fi
f
-
'~.'l
"f8!H|H|
',i.-
L
fr
i
tfc
dy(
Mn
U
-
^
-
c
i.
JM
M -/UWHI II *
. J. H
HOCKfCNl-]~
IM
mc
V
j
p
f'
i
c^
-
^
i
i-•1
sRr
t.
fi*
/s
f
/
c
fa?l/c
y
e.
C.'v
^
ir
rxy
^
?
x
V
*
C
x.
jl,
ij
(*
}
7
^
^
i,
i?
,i
-T-T
,, .4"
'•'
1?
t*
eHfe
C
*j
~
^
f
P
SSKSt."jf
ir
!L.
C*
p
PT^lpx
^f
/J•f
-t
H
\\
fe-
" *
-
-
e
X
A
Ara
ir
.
'l-
B^
e
^
P
nf
7
c
f
A——
TT
^f
Geolog System1 * AlptuS 0 * ttto
•M
- fffiW]V.AHC St
tn~
L
^
-L
J.a
',
(
S
IT
FI
2
/z
\
•^
X:v
jj
IT
• l,:ttlfVMI#.
1
If
F
F
J
f
jf
V,
^j
h 1 fi
HTF
o
f
-
y
;
f-1i
^/{J
^y
f
n M
P
V
r
ifu
*
IT
•i
nfi
\j
c
^
/*
^
ff
•V "
m
tt
k
S
-
i
(i
s
,*
k
!K
^
^*
~-"
3
7
vt
k
If
S
41
ft*
n-
W- "
\ 1 iu^TTfK
S
3}
4
#
1
a
at
A
a
-
^p
-
^
^^l
ST
Ml
k
"M' J"
-L.
4
-
A
T
R
V
a
f
-
S
f^ii
*
V
S
-
-
?
^
-
IINMr .t*Ont
~-rTD tu
I M
oMS
r' * Stvtn 0 - Alpha or*- f^l^p \. •f
~"~ "" "' ~"~ "
lotl'Alphji *.
mm* w**(1 1 1
IU
C
fi
-
f.-
-
-M
rf~
~
-
*'
n
L
f!
-
—
f
-
Y
0'
-
-
-
-
•'•'^IL NO i fi
!3
5P"f-r
f-
f
A
t*l
-
?
''
a.ji
j
^
7
^
c
flY
f
-
fij
9
p
4f
-
TT ~ t.
kl(
tii
H
?
^
!
!
-
s
• IMINC gjjji
i
iJ.
•~
-
l-
—
-
"
V
..in ^,*"
l
5
f
L
f*-
-/:
6
TT
-
^
a
^
d
0
--
t*
O
1
C
J
---
x:-
r
IT
.1 fKl*
-
^
!*
-
-
'
IT
-
Sj
-
-
-
V
r1 tw
-
jf
-
ST
A
"
--
^r
'
IT
1 AITINC "UfafTrnfrrr'•B 1
Tsi In
•f
g
L
?
T
-
7
g
•K
T J
4/
-
-
f\
J
-
1
~T
.L
~r
-T-
JT V
t!
-
c-
--
b•sT
O
HJ
.
(Wr
XsM
^
i
f-•ij.
II-1 h
A) Wl
1?
i
2
-
i-i-fJtrIr
r
W(t A lpliJ I
T' i3(
0lil-.
IIIVATION t^l
T-T"M | n
-
A
-
^
jjf
-
^
.
-
'
^
7
-
1
1u
-1--
i^c
-
-f-
—
1 "M* Am*
J.1
i..p
•'
H-I'T"*i
--
ff
-•-
-P
—,
Jri"1
— t
1i
-i.
1TiJ i"^
i*
:
;oforo 1 .. -
A&i
HW
fi
t..L
.,-1
"i —
-1
l.
t?-'^
i-1
t
' T
- f
-i-
4,
~.rf M
41
~"I
)
-l
-,
1
1
-,
•-
-;
i -l
i
|- r
*\.
International Geosystems Corporation
(p International Geosystems Corporation Geolog System.— MiiiimxaiieKKiiinini I'AlphiJ 0 ' Itf* 1 M Ont J " T*O ? M S(vin 0M
fell
14**' r*. CtwbU
Ci•WUU
AW*C
N ————————
1
S
l
A
t"i-j-i-,^s-S'
1
l-AH -
/
X
/xx^
x*
x
J
s
1
1
f)f*'
D
j^
t
b
r,
^
,
D
h
Pr
•-
j?;
ff)
FLAG
Df
i*
N
1JSJ'c'Ji
KM
-
y
sf
z
V
l/
\/
V
s
-f
*l
i
7
rue
g^
^
Jr-
;
5,
(v/
\J
E
"i
L
Lr. '
;
*
M1
l1
j(
L
(^.'
J
D
P
K
^
^
l
ri
.x
imw
Kf|p|j?| T
RK
ri E.^.livhM
B,
x w noJ c i W!KM? MR^t\i "
•pHi-*
toX-
J 1 1 I 1 V-trflMM ' ———
Mvf
f
J
-
4'
'.'
ryi
?
'1
3
•J
J
3
3
?
•^,
,J
ut1
^
?
7
A. ?D
/,i
c0
k
(f1
A
Q
•)
^
P
^
^
v'J
7
7
fl
JU
c
c
0
p
0
A;-c
o
C)
rt
5
1 1 1 1IMKIIOt- ——
iMllJJiQInlil1 HU**H*MI* M
f
r
Si
^
^
.i
^
j
3
3
3
^
^
•-
if
7r
f?
x
4'
J
,/
J
a
f
jj'
z•'
W
2
3
-
;
^
U.vi
4,J
^y.
J^
7.!^
ff
p
jj
sjp
i,
0
S
iji.
0
f
O•.
Q'
0
Ml
1)YMI/I
•n I'MM i MIMIIIi[HRfr-|fj|-
MOiM ' "L1 l tofUM'HM
lHCOMIT
:h-
•i 'K
V .
?
fi
C i
, -
t
^ r
i! "
i
f(f 1^.
i
•a*
^*
r A,
r?0/2
1
- ..'
•j j'^
: nC L 1
v,; f^
H
4j
t:
x:7?
1
'MC
-
fT
V
F
ki
tt
W-;
^,
S
/:1i.
N*.
y^rn
^
x^x7J
(1
j
l
trf':
ltf \
\J
t
fH t'i
mutx?*OINOtl
.liMM j] 4
.
IOC
MV
f p
tt
tf/H
'(
f ^
/ (fi,,(
/C-s:*
'fr•* * '
/f*, , i?
1 VJ
XL' . a
f
MvA) V
II*on.-
i
M
f.
f
i
l
)
^
^.,-
xx.•5
0J.
f•fi
r•^(k
u
1!
A,
li.i-
ylix;
1
^
^1
VV
V.r"
^v^H1fi
f? M"
* i " •;
'M lilS
1
Lk
•j
i'.
xft
',;
: .
-
; .
*Maf"l
lu
V
4
f
,..l
i.
•s
'w!/)58 v!1 ——
,.
f
Jt
PI
^l
x#
TV
f
•fff•;
Y
'
*s*S 1
IU
U
ri
., l.
k
6
•i
^
^
ktt
A-
/t
,\
tf,T.•,
i''
1
lIf
-'i
ff
O,
y
i^^(*ft
(i*t*.gi
(J,.
:.
^).
f::Lfi;.
f MIT
V-AMC
St"
r
ndr
-
k4o
\.
r
f
5
Jr
t
fttmLBr***
•1 -
jj
i
^
•^
f•'
^,
y-fY
^
t
fi
ra
/5
7
sf
f
jX
Jf
y
y
ff.^jzi-
ij
f
•K*• T
tt.rai
0ti
A
X
d/'
Mt m
jjft'
A-1
j,'
iJ
•Q
Atfi(t••~.
V.
g/*/"r
P
ft
Vj,-
p(tx
V*J.
4
S"^
o
if
x/,''
li
lf?•'
t)MAlf KHM * f
fr
,*
f.
i
r
if•,,
i
V
|LfeJVC W
If*
. -
dh.
fi
•y
'i
^
t
•j
•'
^f,
r^-AJ
^
S .
*r
,*.
d9
i,
ii
A
^
•S
0
'
i,x,ifftf
fl
/*^^
,
k.
,.^
•.l-
Jr
f
jr
f0
c
I*H
(OM
•F i
1
yl .
? ^- ^
J -t
"'l
.! .
i'-
;
•i ''
i^V^'^T( S
•MtMCIf
J*
T
•y
_ .
f?
5
.•-
t-t
ulk AC
1
4
.v
\
^
"
IfV
C
~
1}
-
A"r
-~
-
~
~
Lj.-
j**
t
t,
i!
-
i
g
---
--
i2
T. H
mi
S
(JI
(C
xVf^,
"
^
*
n
i|5
Li
n
S
J.x
o
xJ7
y^
*
x
i
/if
IU.IIO If 1 MM 1 M
j
MM tt
ae iM.jiAffe, f
:?
P-
r
-
'••-
^
ffKA;-
S"
^(y
;-
x-'
-
-~
i?
*
S
2
1-
-
-'
-
(Jr-*
x
ST•L
—
—
AC
-~-
."!
• f'
-•:?
-
-
4x}7
-T"t
^
f•*
jtf2
j9
-
..
ift
d-
o
x-
5
oo
~
p
V
•ff
."Tsi's
4y
-'
;-*
J.
i)f^
,'
t
f
7
i-
•\
fje
1-i
49
--
( '
V
f.
-
•*,
SXJt/
t
^
y
^
-
?
;
:,-
;
..;
^7
M lw
AlpMOUMC* ' i MMI
1
IT
i* ir
il-Alptll
TTTTT — '— T"1 —
IA1TINC "f,?. m-ij
*
/t
^
—y
f
•:
-
T
Hi
V
All'
u
.J.
ifiZ
'
-
,.;
• p
-
;\
^
v7
8
ii
71• v
#
k
X
^
)
)
,,
1
i
3'
K
/5
^
^
V
V
J)
i
1
'
X
^
f
ffi
W
^
X
/e
i
t)
P•'
5;r
V
r^
'
•\
^
S^
)
i
c*
;.;
V
-
,
JI
^
.
H /.
-L
.f^
'.
i
.'.
i
:i
"
/.
IMMI
O
^
J
f
-.
J
c^
3
0
L)
Z
J
/j1•if'
a
i
i
^2
i*
•y
i
f
j
-
f
J-
f
f-
(/t
1^
1
1A
^ Geoforr
.^i;,. - j -..r"-"1^. •i-ys— rrr j -
IUVA1ION f
^MIXXcy
MO
fi
m2J1v-
^,
/-1
^
r
P1
^'j
*-i^/i-
a
s
-t
frii/
f
f
(
)
?
^
^JJ
^
^
i lifvir*"tp*
s^
"
'•'
~~
-*
t
-L
j,
,r
-
?l/.
e*
'
-.--
-
p
-•-
-
fy
]4*
T f"L**
- i
Z
-
-
-
-
O
~
-
'4
^
Ml 1
".ri
-f-
^ H
— r -
t
4-!
— -
4-i ii
-1feT,
International Geosystems Corporation "Geolog System GeofoiO-Iff* 1 "OiH 2* two * -tUvtn 0-AlphtO loci-Alphil i* Alptu2
international Geosystems Corporation "Geolog System" GeofonO vitro 1 "One 3-Two 9 m Stvcn 0 -AlphiO l w i-Alpha l i k Alpha 2/^
Dili
SWi
. lo*tr 1*1
' —— I*Amrf "
'
'
'
t J 1 4 14
/^
1
s
x
L
A
firr
!
X'
l-
A . H-
l/
sS
/
**
.x
Xl
-X
s
s
(If
l
D
U
/j
J5
7?
p
E
[^
|?
15
p1
FLAG0t
ii i
4WUU
'UC
UfJI
rw-
P
fi
S
f
i
S
5
S
S
S
'
E
e
1
L
t
fr
u
l)
J-
f
L
f'
M
V
^
f
l
f
l
t
p
R
T
fi4
ICtfMAT VII MOM
KJ! O| ivl^"
WU
Hf AOM
MMlltf*"***!
. ILDL.
ierir.i-*
-S? ffi
-
f.
t
-
t
.J
s1
S
5
f
^
^
G
rf
7--
1
ji .vfl
2
f
2
i
1
2
5-
f
2.
1
\^
^
?-
S
s'
i
t
#1
n
•j1
tfi
5
0
0
o
o
c
x
Q
0
K
ei.nrti(KIM no
Rljlsi
XXOIICI•ciiumMi'fi
M*-if
TOH
1 __ "k - ———
FL.VGPjrir^
-
-
-
-
-
"
-
-
11
MI*IRtf*v * ———
ITITTTTTMtl
ZMa
ffi"f*
r
^r
^
!j
(f
y
y^*
ir•^
0
D• Q"H
f
4
4
/
^
T
9
j
j.
7
^14
rrw*R?^.
y
si
^
j
J
2
J
ft
it
v^
L
6
U
3
4^
b
5-
fii-1
l
14
l-T
mvMI/11
f^MCOvta
EBa
0n
fl
f
t
ifi
X)
5^
-
4
M
i
o,
8
•'
lij "WtSiT 1 t. 41?'
ofM jiwlrl/iIOI M MriNAIHCM ^ 1
1
H
(-\
A
f
*
\
T-,^4
a
^
)
!
fQ
li
irnr
liHOC
TMf
dt VVt-
a"
c!
*
H
-
s4Z
gr
x^
IJ
f/
g
i
(J
^
rf
4
f
Q
?
l/
fi
tf/
(*W
I+110
HiL.
^
it
^
fAe
J
i
i
f.
/d
p
?
^
^
4f
0
f-
itj5f,
WY*
ji
/l
J
^
^^
xif
^
eA
f-M.rtjpjii 1;'
1IM ,'
1.
f
rt Jf.
f
@J0
t
^
f
L".
^
^
^
^•X
^i'/
"* /^TM jl
J
SiS. 1
1MI
1'nil,— H'
(^
ft
f-
6y-r
,'
i^4/^.
i
n.
X
fC
,
Ji
p
fci
PW
,u^
"
1
•5
TtrTTv-AMG
sOM*'14:
iQ
5
p
J
x
0
P
•f^
^
/7"
pniT H-
IT
H'-l
r i .'s-'i
•g** ippiit "H
— is ———
3
|
^
i
^
l^
f
4
.
JI
f
J
J
0V
^
'•i
x-^
2
iw
g
r
7
ti
r
(S
4"ZJA
p
f
3
i
B
p6
i"
,
j4
-
k
fDH u
If11
f-
If
d
rA
fi
|/
-s.
'T
l
b
tt
J
(^
d|
{
^/fff
^
T/i
f
:
ffr
\jI14
TMwieu
ln
li
if
^
J
1
^r4^
4
**
r
H
if
^
H"
Ju
4^
f
j
f4
s1
2A
f
4
B^
bd
^(7/"
i
* -ji
1^
H
k
Li
7?ftf
ft
JJ
e*
A
4ft
y!
-'J|
i
•gRM
k
r*
,o
-
?
u
•*
ITXTtV K
JSVJUBafss!paB 1—
1
•i
^
t/
t
..
f*
'r*
—
-
J,J
3
-
^
-
1 **
B
Stt
--
-
4sA.
-'~
—
fi
-
-
"
rVrfffFl-T- ft'flTrM**|T|* 1 f 00*
• l 1 tfttl ID 1
m1" 1 ".*
li
44
-
-
~
e.
-
-
-
j:y-
-
.-
-
u
tii
JJL (Rf/
/*
^
?
-
y'tA
"
r. 1Kl
*
f
B
ifd
7
4
'
f
**
NOININC JJ5,'H
li
U-
Hf
"
T-i7.r
ih, ,.
-
^2^
^^
*-
-
-
^iJ
-
/"
-
u u
3.
iW
P3
^
/tC
*
^
i-
W
-T—i*
it T*
i
ft
ff0
-
1
fC.
J"
•1
f*
J[^
d
E?
i
^
rX-
o"
u
1.1
3
(i!
x
ij
-"
[
f.
-
-
-
/fJ
c
u
rr
:T** 1*#
~-
-
xi
Py
-
-"
~
t'f
tf
-'*u
- "T^^Pfrrr
.T•t J dt-'-4-
^
(jj0
xf-
'*
p
2'
2
^
i -J l
r ia-
-^
f At;*
^
'2
f ^
j ?
^r c"
t .t-
D
J)-
,J4 -O
-
-
-f
f^^-
i
-is^^
3"!-}
-f
li u
tga
^
-
J'
^s
-
7-
0~
•'
f
^/J
SI
r
i*
jiz
{ r
J
tf/O\f
it
-u
J
g-
T
JJ
^
i
X.
2
^
f
^
^
•jfc*
T"CM
1 f y "0 . .5
'(a)
M | (1
J
J
^*
1 '
^
r
De
--
rh
7
f
j7r-
u
^?
-
rj
IIIVA
t
..
ri
-
-
l
-
-
40
-
tlOM ^fcM*
1 B
TT• iU fo-1
^x
il4
n-
''
-
Amt
H
1*.
-
v\fi7\9
-—
-
- -
•~
Jl
4-•ir l*
to *
.— i
M X
ij- -iT
1
-T-?
k
- -
+
;,i
-r
TTH
MI -
1
i"*"*
l
"
-
,
Vs#!
-1i
-
:
TJ
nl ;
International Geosystems Corporation Geolog Systemt m Afetu l O * IltO 1 * OM l i Two f m St.en p m Aiphi O l w i * Alpha l l * Alphj 2
luu
Ww,OtU
UffflnGmuu
linvr* ttrt CrMljlJ
; /Lff
1
S
/
l
A
1
l
t
x x
llA H
-
(.
r.u
P'N
ft
f)
D
s
ft
HA
OT,
r,l;M*. Ci
N
1
m f
Z-
P
y
q
f
^
^
e
c
A
1.
L
rL
t.
L
f?
L
tH
1
**.
M
M
i
Y
K
T
t
T
fs.
7-
VIIVCM
NioiRir- H Mtl 4*
~rr
.'infcfTOl•j
7w
7
efa
.
jjf-?
t"i
7•j
3
Wl
ojiflit
L
(M *V4 'ION! 1 IUMKJUI
RlM IPlUfl
TO
1 PLLJ TT" ojr.j..ff;
1 J 1 U"*IOhj^J^j^l'rj^
4
y'
3
0
)
fi
7
4
0
p
0
3
O
•^
-
-
-
-
"7
-
'J'
v^
a
tob
f-fa3
1
1
1
p
rLD —
P,'?
5-
j:
o
o
0
r
7
I
rwo
5
)
c
0
0
^
4fin/ ir*Ml/Ill1 11
'
•-
f
i-
o.
0
t*'l I NU44KI l O*
581 fflhl :38".. "r
;
•^
*OIM MMN4IMCI** J| AIM Hou'J3fm
0*p.Yd'
-
J^ly
-
i |
-
gS'
NW
S
/4^
Mil
1——
-
Y4.
-
•l i IIR
j
H
i-25
^
y
(9
l?
A"
BCKfl
iwTii-L
ryJT
t.
g
/l
-.
,."
•J
'
kj)
P
t)
J
t
i
Ml
'O
P
T-{
*if
r
-c
U
^
-
I.I
a
^
f*
b
t
11
rfifep\
f
^
'
M
lT '
V1
"t
1;
p
t.Zif
ft
i7
is^
4
l
—————— —rTW-in u H J! J, H )| || W
ff
c(P
rioc
V
•*
"
TlKiSiJ"i viK"1 rrn 1 i lM*
! E
l,
t,
4(
^
^
J
Z,
;.
W
r"IT
EIK
"T^VB-"
if
8 li
3 L7 r
7
^
3
x^
f
jI— L.~n
—ft— 1—
1
W
L
7
74fi/
"f.^
y*
;.i
HH
IL
f
5i
f\)
fIr
h
-
•.
V.
H
f"-.rpT-' !'-6
-
y.
4
d
FI
f
).
^
F
^/i/r-
',
4
^
-
JT
mi.1
TTT: (•ji""
Mf
SK
-
^
•-
-
-
-
n
to
.t
*l
-:
-
W
'
TT•fi
1';
JL
-
-
--
-
ff
J -
••f.''
rL-i —
-
?5
irU
If
•4
ttj
-
z
-
*"."^". -N' 1 *C*H fi! C^!j^j.c
S41
~
-
T
-
-
-
-
1,
tl
41
-
*
-
-
~
-
-
tr
Ui/*
^
tv
p*
1
r
I '
.r
lUMtPit"i:nw/.jaI c—. -.
J
mie
Tss-s W4*lflft 1 (0O'"i IT" e 9 • TT- hJ-Oi 1. \os\\s-
l i i i i"":.ra*— i — t-fe
j
st
4
i
!-
li
-
AI
--
H
-
d
;i.
tr
~
-
'^
-
ir
•^t **
1
--
/?
^.
-
1
.••.
V
fi5
2
*
J^
;
ir
Io
yf
y
0
:-
ir
'
t1 —
-
J
IT
'
I..
M
-
-
ir
t
^
M
-
-
-
-
,
r
lt
M
-
^
"
[At
' '
fj?
t"'
A|.!tl!;.^r
.•
^
^
J
A]
-
IT
j.
..
K.
f
i
-
-
ir
..
X
tr
M
-'i
f
f
IT
UNO
i-4-
ir ir
"".- rrf!"••—li/a~^
-
-IT
^
-
l
J
1-i
-
ir ir
I1IVA
1
Rfe-
^
r*
--
ir
-
"
j"
-
IT
-
X
^
-
IT
d
:
-
"OH JJ'
111 Tr •fe
-
•?.-
-
--
-
1Tt i;
1
—
-
!-
-IT TT
t*
1*
-
y
w
"j
M
-
e
-
-
-
IT
-
-
Ti
i"
rt*
n-
ex
-i
M'
i
-
.
T-
-
-
-
IT
L
-
H
ir'
1 - - *'-ty Trebor
1 OCIfiiiWD J\ A. TtMltKAKINO ,N JX^No^vieg^
LOG OF DIAMOND DRILL HOLE Mo T t l ,
?ninee Limited1 h Claim TRT 6763 Strethr T'wn ; 720 ft went of No. 2 Tost, 7 ft north of
Stnxe H.yQO.j, ,, *6uU claim lineDlpatcollar SQO atlOO* 200' 3QO 3001 400" 500' 600' 700* 8001 900* 1000"Length 282.3 f*etLatitude Departure
. Logged by .o.H.Dumont Assayed by2ore Housed at Trahnr nora houaaIping Started Finished)rilUng Started October 13,1949 Finished October 16,1940
FROM TO
0
' . 5
". ' ' . J 71
5 i
, ill.r,.'...- ' ; ---. -..v. .-:j
125,f
-•f ' - , ~ ~ '
:. ' ! 162. '. ! '75.
k .-''i
; . 237.i
•' ' 245.
,
i'.-
0 5.0
0 71.0
0 111.0
0 125.5
5 162.1
1 175.9
9 178.5
5 237.4
4 245.2
2 282.3
DESCRtPTOH
CasingC^arse-ffrained diorite or old dinbnse
1" qtst-oarb str nt !^o,9 6" " " " at 43.o,A4,g 3" ** * "at"^.** g" " " " at 57." F.riidote alteration 59 - AS
Fine-ffrained diorite 1" nt7.-oarb strs nt 76.0,76.2,77.0 3" " " " wt 77.5
P^!7, 04.9ln5l8,n9.S W/. 1,94.0 .
1" " " " at 110.2
Medium-drained diorite Scattered pyrite 119-180 8" qtz-oarb str at 180. R
Fine-rrnined diorite ASSF-Ow 3" ?-5* nyrite at 120.:- 2" atz-oerb etrs at l:'- 1.", 1^3.0 Sowttored nyrite l"l-l-*r, 141-148 4" ntz-carb epidote f- Porno ^yrite at 14
Intermediate frormental nnd omvdaloldal IPVBS Feldsrar porphyry. 'Joattered fin** pyriteIntermediate frawirentel anrt Bmydaloidal lavas
1^6.3 - lfo , 6 'elds^nr *onhvry and otz-carb atra * Dvr 1P7.P-1BR.3
Fine-drained diorite dyke Mn^rallssed ""ith sc^tt-rsrod ~vrite nnd ntz-oarb strs. P.39.B - P^o.n on*- otr-cerb chlorite en
some ff^idoteIntermediate fr^rmental 'and ""ivdrloldftl Invas.
F.HD OF TIOLK
onmT*le8 to be of'snvod for "OldP60 from ?n to 79 . rC5 from 176 to 179 ngl 0? ion n(?r* 1 06 1^9 no? tin l Zf\ n rt7 JV/.7 ?.^9 or,;* irfi 1^7 r f- r •"'•"•^ ?*1
SAMPLE
Fro*
.4
T*
W
^•^
Ooid MTon
W
1
1
1
i'i
i.i
' ' '. V
P' ^ 'frebor VI 11 "1 ** 1 *A 'a- " m Him TOT 5954^
^p.-ike H.7^0-W. Wnati.p at collar 350 at 100'
Section Line 2800irlv alone azimuth200' 300' 400"
S. 460 ft east of Base Line jof Section Line ' i
500- 6001 7001 800' 900' 1000" !mgth 394 feetitltude Departure
by Q.H.Dumont Assayed by fie/fjre Housed at Tr*hftr fin™ Hm,™ ' ' ^ ^ 1pingStarted Finishedrilling Started October 19 1 194 9 Finished October 22,1949
•ROM TO
'.0
10.0
" ' . f149.
(. 152 '
210.
236,
258
869
277,
281
ft* ' '292
vezl
1 10.0
149.2
'
2 152.9
9 210.0
0 236.5
5 258.0
0 269.7
7 277.7
7 281.6
6 292.8
8 302. d
o W .1
OBSCRIPTON
Casing!Medium-grained slightly altered peridotite
Asb. threads 1/8" at 13.0, 13.7 Sea tt. pyr 25-30 J" mud seem at 35 1" flat carb str k prr 67.0*70.5 2" sil k alteration at 84.6 3" carb, srp atr at 94.7 1" low angle oarb serp str at 108.4 1" oarb str at 113.1, 116.0 Scattered pyrite 101-108, 106.6-107.5,
182-124, 185-130,132-13- i" carb str at 139.7, 141.4
Fine-grained basic dykeCoarse-grained slightly eltered peridotite
1" carb str at 157.3 Carbonatized 198.0-199.4
Medium-grained slightly altered peridotite Slightly sheared 811.5-813.5 1" oarb str at 81*. 2 Brecciated and pyrite mineralization
880.0-880.8
Fine-grained basic dyke (chloritic) ACCf Min. with scattered cubes of pyrite flOOL Broken core Low angle 1" qtz str 844-246 Slightly sheared and J" qtz-oarb strs at
248.0, 84B?5,-848.B, 849.1 Low angle 8" qtz-oarb str at 853.0 1/4" qtz strs at 856.6,857.0,857.4 (chai
Highly carbonatized t breooiated peridotite 1" mud seam at 860.1, 869.1 Scattered fine pyrite
Fine-grained basic dyke Scattered qtz-oarb strs Min pyr 870-271
Carbonatized peridotite
Fine-drained basic dyke Sparse pyrite 281.6-289.0 Min. with pyrite 2B9. 0-293.0 1" qtz-oarb at 891.5
Vein material - - Altered k brecciated peridotit — - ' and 6056 qtz-carb.
Well win. with pyrite P9P.O-301.5 Low angle contact at 308.0
d/T/fta' —w*/ ear ffff *"7s'tx tt f-**rj*- jrf.i~tfj /" f f' J* *4
1 AMPLE
PtOB
SSMI
po)
c\^e
!te •f
To
:r:i
^GEt. w k
OCT2TEMf8K
^c
OoUoi Ton .
1
VOR!'
Tp^r c5 ?3O4 •a,.**t!K'0 IVI9*C-srxsZ
* •••••;. .'- ' - '
j ' ' ;,.
Ii'. : ' ' - .'i. 'i ' ;i ' .
l '
0s .i . .
^ -\
t- ' '~
ii
LOG OF DIAMOND DRILL HOLE No T-1-or *Y. o. nrikep at collar ngth
atKXX 200* 300* 400* 5001 600* 7(W 8001 9001 1000*
.tltudc Departureggedby Assayed byre Housed at•ARK Started Finished•illing Started Finished
ROM TO
.-v
1 'f ' J48.8
167.7•t
172.1
J74.4
.-•- ..,-. v ' ' ' t
1 ti
' -'.' ' ' ' '' ' . . - - -'
A1^ '
1 348.8
367.7
372.1
374,4
394.0
"
DBSCRIPTON
Hole T-2 (Sheet No. 21Fine-grained basic dyke (chloritic)
Well Bin. with pyr cubes 332 - 339w * " " H 345 . 349
i" to J" qtz-oarb strs and pyr. at 331.8,332.1,338.6,334.2,334.4,335.6, •36.0,336.4,336.6,337.0,338.8, 339.6,344.8,345.2,345.4,346.0,34347.7,348.0,348.8
Altered and oarbonatlzed doarde-grained peridotite5 - t" Q*z Pyr Btrs 359.6 - 360.5J" qtz-oarb pyr at 367.5
Intermediate fragmental and amygdaloidal, lavasJ" qtz-oarb strs at 368.0, 366.5
* 'Fine-grained basic dykeKin. .with pyrite cubes
Fragmental and amygdaloidal lavasIntermediate 374.4-380.0Basic 380.0-394.0 A^F^QMFNT Lost core 381.5-384.0 /WOE.OOIIIU1I
END OF HOLS
Samples for gold and silver870 220-221 l 1 882 299-300 1* , *4 * *871 236-246 10* 883 300-301 1* ./n'"872 246-257 11* 884 301-302 1*873 257-258 1' 885 332-335 3'074 258-263 5' 886 335-338 3'875 263-269 6* 887 338-3*5 7'876 269-271 2' 888 3*5-347 2'877 2B1-289 8* 889 347-349 2f878 289-293 4* 890 359*361 2'879 293-295 2' 891 367-S68 l 1880 295-298 3' 892 372-375 3*881 298r899 l'.*J.,^
RemarksThis is a very Interesting hole. An the contact area we have a new set of oondltlo
1- No chalco and no pyrrhotite2- K"uoh pyrite mineralization 3- Wore ouartz than. carbonate In stringer zo 4- The basic dykes are now fractured and mln
The* are barren in sections 200N to 1200S 5- Possibilities for rolrt In nuartz-oorb pyi
SAMPLE-
Peon ' Te
6.2,3)18.4
l
wok
4*./^**— *
ns
nes eraliIte z
led.
me a.
Ooid ac Ten
"
'' - ' ' '
j
- '- : - :- '.
l'.' . .
:. L...-,i1t .
: -i
i
n ' ''*
C
LOG OF DIAMOND DRILL HOLE NoT - 8
W. DEPT. MIMESNOVl 1949
'itlon Claim THT 5954, Strathy T'WD.. ——————————————————————— 5 ——————————— "* —.•..nui ———————— -(Section 2380S. 22 feet east of base line
j
at collar Rso at 100* 200' 300' 400* 500* 600* 700* 80ff 9001 1000"Zth gig r*attude Departuref^ft hi/ d* ** ^ ' A •caimjj f\u ' 'f6" of B T H T nninnnt: ASSayeu Dy
! Housed at IVAhni* fin r* TTniiHA
lg Starteding Started Ontnhnr P.4 1040
finished jFinished October 27.1949
)M TO
.5.
, t
J2.C
8.^
i4.1
s ,(
5.0
65.0
122.0
148.4
164.1
209.6
p
243.0
DESCRIPTON
CasingFine-drained peridotite
Scattered otz-carb strs k threadsMedium-era ined peridotite
Scattered otz-oarb strs * threadsRusty carb 65-87i" mud seam at 91.3Sheared ft 50* carb at 107.5-10P.2
Altered peridotite A few specks of sulphides 133-136, 142-1Scattered sulphides 146.0-14B.4
Intermediate LavasBrecciated 159.4-164.1, carb threads andsome pyrite.
Quartz Porphyry dykeScattered pyrite and e oat t qtz-onrb thre4" qtz str at 165.9Mud seam 195.0-195.3Cemented rook and mud 195.3-196.1
Intermediate fragmental lavasAltered 209.6 - 222.0Min. with pyrite 209.6-211.0, 215.0-217.1
225.0-235.0t" qtz-cerb Dyr at 223.4, 224.2Lavas becom fine-crained from 234.
KND OF HOLE
Samples for npld
P93 159-164 5* ASSESSMENT WORKP94 164-170 6'895 170-175 5' ^?896 175-1PO 5' (f 897 1PO-185 5' li89fl 185-190 ' 5' \899 190-195 5' ^900 195-200 5"901 200-205 5'902 205-210 5 1903 210-217 7'904 ?.?S-235 l" 1
SAMPLE
Proa
4
ds
^s^S?v^*
Od/u TE*^^^a
To
TFv2} H
ISKAKi!
Q DlV-z-
Ooid c* Ton
^3^19.o*o*/"^^^
*
-
APPENDIX 3
i i
mDON TULLY ENGINEERING LTD.SUITE 1205. SSS-1JTH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N*
FLECK RESOURCES FILE l* 66-2321 PAGE 4
SAMPLE*
D*l 156-15? D#l 210-213 D#l 396-400 K-H K-L
K-M-1 K-M-2 STD C/FA-AU
CuPPM
62C:TW *
1940189'11165'
37464 i35764 ,
59
AgPPM
.3
.2
. 122.46. 1
18.816.87.1
NiPPM
305152232971
20653'14764'
76727728
71
CoPPM
1118871
647404
23823229
AU**PPB
S"3m
li81868
12427651
Pt**PPB
1212•7
1567'712
10061013
-
Pd**PPB
264620
2951'1264
18371796
-
fth**PPB
75278'
74
5866,-
f
. Assay required /or ccmeel result —
WS&
/
01 y
fif: y .
ACME ANALV^kL LABORATORIES LTD. 852 E. HASTINGS ST. VANCOU\'"~^.C. V6A 1R6 PHONE (604)253-3 1 58 FAX(604)253-l
GEOCMEMICAL- AN AU. YO I 8 CERT 1 GATE
ICF - .SOfl (KM SAWtC IS llfESTEI IITN M. H-2 NCHMMM IT fi KC. C FM ONE MM M IS IIUTEI TO It ft. IITN MTEX, THIS UACX IS mriM. FMINFCCIPUOKMTIIIlia) UNITO FM M K IW K. W KTICTION LUIT IT ICF II J FFB.- SMVU mtl IK* chin Mtit mi mi wu iv FA-IS./
DATE RECEIVED t WV 34 IM7 DATE REPORT MAILEDi
NORTHERN PLATINUM
r.DEAN TOYE, CERTIFIED B.C. ASSAYER
Pi l* II 87-5874
SAMPLE**
87-N-lS7-N-187-N-l87-N-l87-N-l
87-N-l87-N-l87-N-l87-N-l87-N-l
87-N-l87-N-lB7-N-187-N-l87-N-l
87-N-l87-N-l87-N-lB7-N-187-N-l
87-N-l87-N-lB7-N-187-N-l87-N-l
87-N-l87-N-lB7-N-187-N-l87-N-l
87-N-lB7-N-187-N-l87-N-l
47-49M COMP49-5 l M COMP70-72M COMP72-74M COMP74-76M COMP
76-78M COMP78-80M COMP80-82M COMP84-86M COMP86-88M COMP
88-90M COMP90-92M COMP92-94M COMP94-96M COMP96-98M COMP
98-100M COMP100-102M COMP102-104M COMP104-106M COMP106-108M COMP
108- MOM COMP110-112M COMP112-114M COMP114-116M COMP116-1 IBM COMP
118-120(1 COMP120-122M COMP122-124M COMP124-126M COMP126-128M COMP
128-130M COMP130-132M COMP132-134M COMP134-136M COMP
87-NP-l VE IN- l
87-NP-2 VEIN-2STD C/FA-5X
CUPPM
14072537378269601
7387595561278374
9621263772580238
307818
210417531900
13751101374934622520
1387499
279133171277
1901107734952y
99999^
ASPPM
t
1.t
4
4
4
*
*
,
t
4
t
t
,
*
4
4
1..'
1.4
2.2.1.
1.t
2.3.1.
2.1.1.
.184.
B5111
43151
47331
12378
17439
1373S
661J^
99999*215.160 7.1
NIPPM
14382257135012961396
1271109211621237831
119312791066827499
654110365819691502
24021106244521482397
137557225542419951
117510B8489
, 60497
t 19868
COPPM
89127919091
7877757552
7979716339
SO754711995
15375137118150
933816215073
7469422141
2727
CRPPM
496474649668715
946111493816311834
15601SB6149817261930
17191S0812791SS91529
879539151312741513
1682181613591098884
1229124667618236
8258
AU** PT**PPB
1947198
20
2119111211
2049673414
947715685
6879169132121
652412310449
6010S5
1090
37300 V100
PPB
94159542937
20849334530
5673404028
3144387788
9961153125157
1157212510140
6646172
4680
2565102
PDt* RHttPPB
2073731076772
3949970113S3
1041378173SO
4910295172216
245156403361270
154102313242107
145122232
17153
17700105
PPB
1022633
334232
3S222
23212B
114
112019
IB3
2175
46224
219
/.i ASSAY REQUIRED FOR CORRECT RESULT -
l
C
NORTHERN PLATINUM
SAMPLE** cuPPM
A6 PPM
NI PPM
87-NP-3 PERIDOTILE 4308 2.2 2691 B7-NP-5 VEINED 77691X 53.3X 6782
tU PPM
lit 86
i 87-5874
CR AU** PT** PD** RH** PPM PPB PPB PPB PPB
P
996 83 139 480 821 247 5830 5110 112
ACME ANAL^^AL LABORATORIES LTD. 852 E. HASTINGS ST. VANCOU""""" B.C. V6A IRA
AIMAL.Y8*8 C
PHONE(604)253-3l58 FAX(604)253-1
icr - .soo IRM IMW n iiiEira un si H-J KHMHQO IT n KC. c rat BC MM in n iitmi TO 10 M. nn urn.mi LEACH II MftTIM. FMMFfCArUttKUTIIIM UNIT! l m M X MM.. M KTECTNM UNIT IT W H J WU - IMU TYKi Rock CM|i WU PTtt Nit Mtl IY flHB.
DATE RECEIVED: KC 11 1917 DATE REPORT MAILEDl
NORTHERN PLATINUM Fi l* t 87-6141
.DEAN TOYE, CERTIFIED B.C. ASSAYER
P*g* l
SAMPLE*
87-N-l87-N-lB7-N-1B7-N-1B7-N-1
B7-N-187-N-3B7-N-387-N-3B7-N-3
87-N-387-N-387-N-3B7-N-387-N-3
B7-N-3B7-N-387-N-387-N-387-N-3
B7-N-3B7-N-387-N-3B7-N-387-N-3
B7-N-387-N-3B7-N-387-N-387-N-3
B7-N-3S7-N-3B7-N-387-N-387-N-3
87-N-3
18.70-21M32-34M34-36M36-3BM38-40M
40-42M0-2M2-4M4-6M6-8M
8-1OM10-12M12-14M14-16M16-1BM
1B-20M20-22M22-23M23-24M24-2SM
25-27M27-29M29-3 1M31-33M33-35M
35-37M37-39M39-41M41-43M43-45M
45-47M47-49M49-31 M31-33M53-53M
55-37MSTD C/FA-SX
CUPPM
587614606468573
6546068052781923
7806331199588822
12751315128322081759
5461399148325511962
14292280290046513856
34172797258022743227
224761
A6PPM
9
9
9
9
9
9
.
9
9
9
.
.
9
9
9
9
9
9
9
9
9
9
9
9
1.
.
.1.2.1.
*
.
.
.
9
9
7.
11111
12339
61712
329BB
25360
S8779
29210
63
NIPPM
16731755164915591262
13587546702001054
66481911388771137
15601482113123331703
7021493172222091523
15342147250321202771
22632284197815982547
235667
COPPM
12011611911096
9767942275
SO64796282
959869136120
se9310111093
99119133115146
12112511597137
11829
CRPPM
471516595533725
5801389222522291561
12771641108515601373
11999901848979970
17301O22997804749
915871962689829
858878876811850
83561
AU* tPPB
149127
23
629226
815S3127
12158
2011
312
1346839
474368
3631561
5369318985
41100
PTt*PPB
5442604039
39445771127
4883643945
8390' 70
13893
43787814480
87120146118156
143164107114148
137102
PDt*PPB
121971769496
95100127SB246
9514814387132
212209213458276
96207216358260
244317399323482
399449375274415
345105
RH*tPPB
74735
S66310
2S646
1311101312
69181510
1012161618
1517141114
1120
NORTHERN PLATINUM
SAMPLE*
B7-N-3 57-59M B7-N-3 59-6lM 87-N-3 61-63M 87-N-3 63-64.5M 87-N-3 64.5-66M
CU PPM
AG PPM
NI PPM
Lw PPM
280329781519es
2021
2.02.01.3.1
1.4
2411249017735791594
1321311015799
7978539537721002
d 87-6141
CR AU** PT** PD** RHM PPM PPB PPB PPB PPB
73 160 399 1393 163 413 1728 71 208 B23 3 1 78 460 72 218 7
fiCHE IflBSMftR 16 '88 I7:e ACME LABS 294 P01
ACME ANALYTICAL LABORATORIES LTD. DATE RECEIVEDi FEB 18 1988952 E. HASTINGS ST. VANCOUVER B.C. V6A 1R6PHONE(604)253-3138 FAX(604)253-1716 DATE REPORT MAILEDi tt to Jt/ft..
CERT X F" I GATE
- SAMPLE TYPE! Pulp AU" SY FIRE ASSAY FROM 1/2 A.T.
ASSAYERi V,.'. AVr^. D.TOYE OR C.LEONG, CERTIFIED B.C. A88AYER8
NORTHERN PLATINUM File tt B7-6141R
SAMPLE*
C i\~ - kjL?**4s n9 4 a m f i l t 9tf m Ut
oz/t
07-N-3 41-43M .003
ACME ANA ^CAL LABORATORIES LTD. 852 E. HASTINGS ST. VANCC ! B.C. V6A 1R6 PHONE(604)253-3158 FAX (604)253-
GEOCHEMICAL. AIMAL.V8X8 CERTIFICATE
Iff - .SM MM SAVU It IIKSTEII1TI M. M-2 KHMOHQI AT W KC, C FM M MM AW IIIIUTD TO IIK IITN lATEt. THIS ICACN IS PARTIAL FMMFECArUtttfMTIHINI UIITa Ft* IA I AM AL, AU KTCCTIN URIT W W 111 m. - SAVIC TTFfi lick Ckiii AVII ANAITIIS W FA*AA FMH II M IAVU. Ak* Pt, W,r
DATE RECEIVED i DEC l! 1917 DATE REPORT MAILEDl
NORTHERN PLATINUM
AS8AYER..
Fi l* * 87-6150
AN TOYE, CERTIFIED B.C. ASSAYER
SAMPLE*
87-N-3 66-68 B7-N-3 68-70 87-N-3 70-72 87-N-3 72-74 87-N-3 74-76
87-N-3 76-78 87-N-3 78-80 87-N-3 80-82 87-N-3 82-84 87-N-3 84-86
S7-N-3 86-88 B7-N-3 88-90 B7-N-3 90-92 87-N-3 92-94 87-N-3 94-96
87-N-3 98-10087-N-3 100-10187-N-3 101-10287-N-3 102-10387-N-3 103-104.S
STD C/FA-SX
cuPPM
23452457268020393813
36091857361421932145
31402797302619721395
23251232122831137
AGPPM
2.21.81.81.72.7
2.51.42.51.31.6
2.32.12.21.41.1
1.8.7
1.2.2.3
NIPPM
17922042214919012225
16721822203817851568
22102530220116901539
1722837510269368
COPPM
119130127112144
103105128113100
13315513110795
9955623549
CRPPM
86398697013641037
15181665118012911507
118711068609351003
9461965203812911190
AUtffi
36257060140
201891225244
1011039081SI
64252421
BDnrnH^H!
819399105137
168134165108105
15414514610069
143741462314
PtrtiPPB
217229271250371
559292377262250
336295293194140
24415920555IS
PWTPPB
913121112
1212111114
132198S
128522
63 7.4 71 31 61 100 103 105 19
ACME AN* LABORATORIES LTD. 852 E. HASTINGS ST. VANCC ; B.C. V&A l RA PHONE (604) 253-3 1 58 FAX (604)253-
GEOCHEMICAL. ANAL.V8XS CERT X PI O ATE
ICf - .!M MM SMtfti IS IKEiTEI IITN M M4 KL-NNOMn IT W KC, t ft* ONE MM Ml 11 IRITtl 10 It N. IITN MTU. THIS UACK IS MITI*. FM M Ft CI t U tt K M Tl 1 1 Ml UNITE! FM U K Ml M.. M KTECTIOII UNIT IT Iff IS J Ffi.
TWi IK* Chipi wu fin ran wu ir NH&DATE RECEIVED i (EC K 1 117 DATE REPORT MAILEDl
NORTHERN PLATINUM File t 87-6305
..DEAN TOYE, CERTIFIED B.C. ASSAYER
P*g* l
SAMPLE*
87-N-487-N-487-N-4B7-N-487-N-4
B7-N-487-N-487-N-487-N-487-N-4
S7-N-487-N-487-N-4B7-N-487-N-4
87-N-487-N-487-N-487-N-4B7-N-4
B7-N-4B7-N-487-N-487-N-487-N-4
87-N-487-N-487-N-487-N-4B7-N-4
87-N-487-N-487-N-487-N-487-N-4
B7-N-4
0-22-44-66-88-10
10-1212-13.313.3-1515-1717-19
19-2121-2323-2525-2727-29*
29-3131-3333-3535-3737-39
39-4141-4343-4544-4747-49
49-5151-5353-5555-5757-59
59-6161-6363-6565-6767-69
69-71STD C/FA-5X
CUPPM
1330489455380670
9821161710433714
5335165271488787
761251028351198453
15581009188614831463
23271789114514992139
82951615961612709
196157
AGPPM
.7
.1
.5
.2
.4
.5
.7
.4
.3
.5
.1
.4
.3
.9
.5
.71.92.21.1.S
.9
.0
.5
.3
.1
.8
.4
.4
.2
.8
.8
.51.11.4.5
1.47.5
NIPPM
16691334132214061544
179214351S7614101697
1481141612S31965952
730170619851074989
1295938155414641370
17051747108511961686
84089311981152764
142467
COPPM
105909196102
1108910396108
97968410961
47961177157
7958858278
9388706489
5563625847
8927
CRPPM
741544564410390
378S71416349378
422446575539875
89812901076708
2205
18101898149710211536
14241407158419251407
1584144914858591859
119757
AU* tPPB
1999
2220
2929141119
1815182058
1219SO118ie25IS3522142
4625310892530
713259312
201OO
PT*tPPB
5635333946
74seSS44se4433469846
681251728375
10674110125114
1241876896150
6437102112se951O5
POOPPB
135706576114
18613612583129
838095
22687
113307379171139
201131257222205
236232205183263
10963190260105
206102
RHt*PPB
8S4S6
95657
54575
51413eeB61098
13114S
11
4S8
11e1321
NORTHERN PLATINUM E i 87-6303
SAMPLE*
87-N-487-N-487-N-487-N-487-N-4
B7-N-487-N-487-N-487-N-487-N-4
B7-N-487-N-487-N-487-N-487-N-4
87-N-487-N-587-N-587-N-5B7-N-5
87-N-587-N-587-N-587-N-587-N-5
87-N-587-N-587-N-587-N-587-N-5
87-N-587-N-S87-N-587-N-587-N-5
87-N-S
.
71-7373-7575-7777-7979-81
81-8393.8-9696-9899-1001 OO-102
102-104104-106106-1081O8-110110-112
112-1133-55-77-99-11
11-1313-1515-1717-1919-21
21-2323-2525-2727-2828-29
29-303O-3131-3232-33.2533.25-35
35-37STD C/FA-SX
CUPPM
363656
225414391397
25212S71233112881418
1292616141318633595
18433596166732483081
33301920162614062081
34753084530228293080
4039196713741615
21
27957
AGPPM
111
22211
1
113
13122
21
11
22324
2131
7
.5
.7
.8
.4
.6
.3
.1
.1
.2
.3
.2
.8
.5
.4
.1
.6
.7
.8
.4
.3
.1
.2
.9
.0
.3
.2
.5
.7
.3
.7
.9
.8
.0
.2
.3
.4
.3
NIPPM
781858162816331532
20221898198813441514
1215992164615572252
1508195491415872057
18052299153214481840
19902589257324283355
2559269918001386710
88768
COPPM
S3571019588
1171121198392
806897103124
100894673104
9796868380
107128132116151
117126846040
4828
CRPPM
13831369103612081144
9879118728611134
18021902122511491041
1572787121814921553
1309122011441165961
1020929710681856
1092931741830
2404
175056
AU* tPP8
B15282125
731041549480
46325455
201
82211
919336
4161321923
41214215324152
13411127279
198
PT* tPPB
3443879577
12489954580
6158102132198
7415968148155
1521229885142
146221264234184
151145S32418
2099
PO**PPB
5481
230183170
282200229112178
134143218279489
156406199328462
389336235181336
359559598597480
4003511817838
4495
RH**PPB
447
117
139e38
66101415
S1791237
17167B14
1426262320
21262933
423
NORTHERN PLATINUM .E * 87-6305 •9*
SAMPLE*
87-N-5 37-39.1 87-N-5 39.1-39.25 87-N-5 39.25-41 87-N-S 41-43 87-N-S 43-45
87-N-5 45-47 87-N-S 47-49 87-N-5 49-51 87-N-5 51-52.3 87-N-5 54.75-56
B7-N-5 56-58 87-N-5 58-60 87-N-5 60-62 87-N-5 62-64 87-N-5 64-65
151290121495250025S9
.96.51.02.52.7
14488778187917402085
743909395113
15723258631000861
186045777
206
8430710789156
185524270245418
CU AB NI CO CR AU** PT** PD** RH** PPM PPM PPM PPM PPM PPB PPB PPB PPB
113211713
2627311412
2519 IS56
4620 3879 6624 1818 2030
3.3 3.35.6 1.7 1.6
3225 3593 4149 2830 3355
158 153 181 123 148
778 744 979 1917 1646
178 36 30 41 114
211 178 221 173 162
598 609 479 472 440
4309375922641170698
3.02.71.5.9.6
51072582223611541215
135 1054116 864102 91868 90374 960
93 242 65657 201 54040 ISO 37334 72 15820 43 103
STO C/FA-5X 57 7.4 67 27 56 97 101 102 22
ACME ANALYTICAL LABORATORIES LTD. DATE RECEIVEDi FEB 22 1988852 E. HASTINGS ST. VANCOUVER B.C. V6A 1R6PHONE(604)253-3158 FAX(604)253-1716 DATE REPORT MAILED!
ASSAY CERTIRICATE
AUM PTtt POtt RHtt BY FIRE ASSAY, - SAHPLE TYPEl Pulpc c ' m
W.J.ttra. D.ASSAYERi V-7 . .'.'. . . .t-. D.TOYE OR C.LEONQ, CERTIFIED B.C. ASSAYERS
NORTHERN PLATINUM File # 87-6305R
SAMPLE*
87-N-S 27-28 87-N-S 45-47
cuy.
.33
.52
AGOZ/T
.07
.08
NI7.
.36
.46
COy.
.02
.03
AU**OZ/T
.008
.005
PT**OZ/T
.006
.005
PD**OZ/T
.015
.015
RH**OZ/T
.001
.001
APPENDIX 4
(
DON TULLY ENGINEERING LTD.SUITE 12OS, 855-13TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N8
(i)APPENDIX 4
DIAMOND DRILLING
DATABASE COMPILATION OP D. D . HOLE INFORMATIONGLEANED PROM AVAILABLE VERTICAL CROSS-SECTION
DDK No.
S- 1S- 2S- 3S- 4S- 5S- 6S- 7S- 8
S- 9S-10S-llS-12S-13S-14
S-15S-16
S-17AS-17S-18S-19S-20
S-21S-22S-23S-24
TreborN-S
2+OON
2+OON
2+OON1+50N1+50N1+50N1+5 ON1+OON
1+OON1+OON1+OON0+50N0+50N0+5 ON
2+OOS0+002+00
2+OOS0+000+00
2+OOS
0+000*00
1+OOS0+5 ON
Baseline, E-V
0+50V0+00
0+40E0+00
0+50W1+OOW0+50E0+50E
,0+GO0+OOW0+50V0+3 5E0+000+50W
4+OOE0+00
3+90E3+80E0+50E1+50E3+50E
2+OOE2+50E2+50E2+50E
Dir ' n . Dip-900-900-900-900
- -900-900-900-900
-900-900-900-900
-900
-900
-900-900
-900
-900-900-900-900
Depth(ft.) Remarks
121 ' J. E. Thomson (1950)44136'
169' Cu+Ni Values 9' - 156'108' Cu+Ni Values 6' -112' Cu+Ni Values 12' -116'
275' (Cu+Ni Values 7' -(Cu+Ni Values 78' -
89' Cu+Ni Values 8' -143' Cu+Ni Values 22' -146' Cu+Ni Values 7' -215' Cu+Ni Values 14' -
164' (Cu+Ni Values 16' -(Cu+Ni Values 74' -
193' Cu+Ni Values 5' -
218' Cu+Ni Values 8" -75' Cu+Ni Values 27' -
113' 59' -509' Cu+Ni Values ( 55'-
(435'-178' Cu+Ni Values 7' -250' Cu+Ni Values 15' -266' Cu+Ni Values 99' -139' Cu+Ni Values 21' -
92'41'
236'218'79'30'76'
152'
45'100'155'
85'73'
105'398'458'93'
172'193'75'
DON TULLY ENGINEERING LTD.SUITE 1209, BBS-19TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N*
APPENDIX 4 (continued)
(ii)
Trebor BaselineDDK No
S-25
S-26S-27
S-28
S-29S-30S-31S-32S-33
S-34S-35
S-36S-37S-38
S-39S-40S-41S-42
S-42AS-43S-44S-45S-46S-47S-48S-49S-50S-51
N-S
2+OOS
0+5 ON1+OOS
2+OOS
1+OON1+OOS1+50S1+OON1+50S
1+OOS1+50S
0+50S0+5 ON1+50S
0+50N0+5 OS0+50S0+50S0+000+000+002+OON0+50S0+000+50S0+50
0+50S0+50S
E-T Dir'n. Dip
2+95E
2+OOE2+95E
2+50E
2+OOE3+4 5E2+50E0+3 5E SE2+95E
4+OOE3+50E
4+OOE0+40E SE3+95E
2+OOE NW3+OOE3+50E2+50E4+OOE3+50E3+OOE1+OOW2+OOE0+50W1+OOE0+00
1+50E0+50W
-900
-900-900
-900
-900-900
-600-900
-900-900
-900-600-900
-600-900-900-900-900-900-900-900-900-900-900-900-900-900
(ft.)
289'
258'262'
278'
66'288'
162'185'
249'393'
276'253'300'
280'190'242'277'30'
149'165'109'64'
202'70'
214'18'
214.5'
Remarks
Cu+Ni Values
Cu+NiCu+Ni
Cu+Ni
Cu+NI
Cu+NiCu+Ni
Cu+NiCu+Ni
Cu+NiCu+NiCu+Ni
Cu+NiCu+NiCu+NiCu+Ni
Cu+Ni
Cu+NiCu+NiCu+NiCu+Ni
Cu+Ni
ValuesValues
Values
Values
ValuesValues
ValuesValues
ValuesValuesValues
ValuesValuesValuesValues
Values
ValuesValuesValuesValues
Values
( 27(17363'
( 51'(127'( 39'(144'
50'
9'
( 37'(156'
80'
( 57'(221'
76'13'
( 95'(130*114'50'68'54 1
54 1
10'2'
60'5'
46'
- 136'- 242'- 146'- 61'- 187'- 100'- 161 '
- 178'
- 107'- 66'- 185'- 215'- 185'- 282'- 189'- 184'- 104'- 225'- 186'- 138'- 122'- 170'
- 90'
- 35'- 45'- 70'- 75'
- 53'DON TULLY ENGINEERING LTD.SUITE 12O5. SSS-IJTH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7TZN*
APPENDIX 4 (continued)
(iii)
(
Trebor BaselineDDK No. N-S
S-52
S-53
S-54S-55S-56S-57S-58
S-59S-60S-61S-62S-63S-64S-65
S-66
S-67S-68S-69S- 70S-71S-72S-73S-74
S-75S-76
0+50S
1+OOS
1+OOS1+OOS1+OOS1+OOS1+50S
1+50S1+50S1+50S2+OOS2+OOS1+50S3+OOS
2+OOS
2+50S1+OOS0+50S2+OOS2+50S2+50S2+50S3+OOS
3+OOS3+OOS
E-V Dir'n. Dip
0+3 5E
1+50E
0+00 .0+50E1+OOE2+OOE1+95E
1+40E0+90E0+45E2+OOE1+OOE4+40E4+OOE
4+40E
3+95E4+40E4+45E4+90E4+45E4+95E5+45E4+50E
5+OOE2+50E
-900
-900
-900-900-900-900-900
-900-900-900-900-900-900-900
-900
-900-900-900-900-900-900-900-900
-900-900
Depth(ft.)
203'
197'
61'128'143'261'267'
205'128'45'
272'93'
291'
(7)
326'
(7)185136'390'212'349'388'
(7)
(7)538'
Remarks
Cu+Ni
Cu+Ni
Cu+NiCu+Ni
Cu+NiCu+Ni
Cu+Ni
Cu+NiCu+Ni
Cu+Ni
Cu+Ni
Cu+NiCu+NiCu+NiCu+Ni
Cu+NiCu+Ni
Values
Values
ValuesValues
ValuesValues
Values
ValuesValues
Values
Values
ValuesValuesValuesValues
ValuesValues
( 12'(102'( 3'( 78'(169'
86'
( 84'(113'
69'28'
31'
250'
( 20'(300'( 8'(236'
40'
7'101'231'
( 17'(325'
13'
( 85'(340'
- 25'- 114'- 15'- 106'- 181'
,- 118'- 97'- 121'- 88'- 32'
- 63'
- 267'- 240'- 745'- 147'- 266'- 475'
- 213'- 316'- 390'- 209'- 830'- 756'- 245'- 367'
S-77 3+OOS 2+OOE -900 525' Cu+Ni Values 170' - 240'
DON TULLY ENGINEERING LTD.SUITE 1205, 55S-IJTH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N*
APPENDIX 4 (continued)
(iv)
Trebor Baseline DepthDDK No
S-78
S-79
S-80
AO-1AO-2
AO-3AO-4AO-5
AO-6AO-7AO-8AO-9
AO-10AO-11AO-12AO-13AO-14
. N-S
3+OOS
3+OOS
2+50S
0+000+00
4+OOS4+OOS4+OOS
9+OOS9+OOS4+OOS4+OOS5+OOS6+OOS8+OOS
11+50S11+50S
E-W
3+OOE
3+50E
3+95E
TOTAL
# #
0+85E1+OOE
0+60E1+OOE4+40E
0+75E2+60E2+40E4+50E4+50E4+50E4+50E1+lOE1+30E
Dir'n.
—
NW
-
* * #
SE
SESENW
SE—--
NWNWNW--
Total
Dip (ft.
-900 548'
-900 800'
-670 125'
(17,494.
17,522.
* # * # *
r900 (?)-450 500'
-440 622'-430 487'-280 714'
-300 521'-900 390'-900 440'-900 667'-300 700'-300 6170-300 482'-900 35'-900 42'
6.854.
) Remarks
Cu+Ni Values ( 90' - 290'(350' - 425'
Cu+Ni Values (120' - 230'(272' - 600'(640' - 675'
Cu+Ni Values 76' - 180'
2) feet (Drilled Jan. 30/49 -
Dumbrille)0 feet (G. H. Dumont 1961)
# *
Good Cu+Ni values over75# of holeCu+Ni Values 378' - 500'Cu+Ni Values 84' - 487'See Figure 5Cu+Ni Values 80' - 652'Cu+Ni Values 346' - 451'Cu+Ni Values 246' - 341'Cu+Ni Values 45' - 372'Gu+Ni Values 545' - 615'
Cu+Ni Values 302' - 406'
4 feet Drilled Der. 2Q. 1 94,- Jan. 5. (?), 1949 - J.C. Dumbrille)
DON TULLY ENGINEERING LTD.SUITE 12O5, 5S5-ISTH STREET
WEST VANCOUVER, BRITISH COLUMBIAvrranf
(v)
APPENDIX 4 ( continued)
DDH
EO-EO-
EO-
EO-
EO-EO-EO-
EO-
EO-
No.
12
3
4
567
8
9
EO-10
EO-11EO-12
Trebor' N-S
4+OOS4+OOS
3+50S
3+50S
5+OOS5+OOS4+OOS
3+OOS
3+OOS
3+OOS
3+OOS3+OOS
BaselineE-W
7+OOE7+OOS
9+OOE
9-i-OOE
8+50E8+50E8+25E
5+50E
5+50E
6+50E
6+50E5+60E
,
Dir'n.
i^
SE
^
SE
SESENNE
NNE
NNE
NNE
NNENNE
Total
Dip
-90-45
-90
-60
-45-45-45
-45
-65
-45
-30-45
0
o
0
0
0
0
0
0
0
0
0
0
4
Depth(ft.)914'601'
402'(4+OOS)218'(4+OOS)(?)205'312'
238'
260'
212'
192'223'
Remarks
Cu+Ni values (425'(515 !
Cu+Ni values (125'(354'
Cu+Ni values 80'
Low Cu+Ni values(Sect 17+OOE)Cu+Ni values 178'(Sect 15+OOE)Low Cu+Ni values(Sect 15+OOE)Low Cu+Ni values(Sect 13+OOE)Low Cu+Ni values(Sect 13+OOE)(Sect 11+OOE)Cu+Ni values 51'
,653.3 feet (Drilled June
- 458'- 576'- 275'- 405'- 100'
- 255'
- 143'
14/49
J. C. Dumbrille)
T-lT-2T-3
Claim TBTClaim TRTClaim TRT
676359545954
WNWNW
TOWTotal
D .D. logsnotavailable
Claim TRT 6763Claim TRT 5954Claim TRT 5954
919.3 feet (Drilled Oct. 16/49
J.C. Dumbrille)
DON TULLY ENGINEERING LTD.SUITE I2O5, 555-UTH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2N*
(vi)
APPENDIX 4 ( continued)
(
TreborDDK No. N-S
CO- 1CO- 2CO- 3CO- 4CO- 5CO- 6CO- 7CO- 8CO- 9CO-10CO-11CO-12
CO-13
CO-14CO-15CO-16CO-17CO-18CO-19CO-20CO-21
CO-22
8+OOS8+OOS8+OOS8+OOS8+OOS9+OOS9+OOS9+OOS
12+OOS12+OOS14+OOS3+008
2+OOS
9+OOS11+OOS5+OOS10+OOS1 5+OOS9+OOS8+OOS8+OOS
9+OOS
BaselineE-W
3+20E2+20E2+60E1+75E1+75E0+75E2+60E5+60E2+75E2+40E3+OOE5+60E
5+50E
4+50E4+50E5+65E
4+OOE4+OOE4+50E6+10E7+10E
7+20E
Dir'n.
NWSENWSENWSENWNWNWSENWNW
NW
SSWSSWNWNNW
Depth Dip (ft.)
-630 300' Cu+1-630-440-460-450-300-300-400-450-300-450-400
-380
-400-450-300-400-420-900-900-900
-900
Sub-total 10
CO-23,CO-24
7+OOS7+OOS
4+5 OE4+50E
NNW
NWSub-total 1
Total 12
305'
297' Cu+1272 ' Cu+1226'346'
575' Cu+1612' Cu+15941 4i4509'350'
698' SeaT O 4*6OrV
493' Seat if o T. '
AO" V
395' (Se316' (Se300'203'662'
998 ' GU+](?) GU+]740' Cu+1
815'
,967.5 feet
, 724.0 feet
,691.5 feet
Remarks
Cu+Ni values 29' - 44'
Cu+Ni values 138' - 258' Cu+Ni values 17' - 272'
Cu+Ni values 310' - 365' Cu+Ni values 533' - 593'
l -426', 0.003 Pt, 0.008 P
Scattered Cu+Ni minerali zationScattered Cu+Ni minerali zation(Sect. 10+OOE) (Sect. 10+OOE)
Cu+Ni values 723' Cu+Ni values 682'Cu+Ni values(107'
(607*
766'
.722'137' 652'
feet (drilled Jan. 9/49 - Mar. 26/50) J.C. Dumbrille)
feet (drilled Oct. 8/55 - Nov. 7/55
DON TULLY ENGINEERING LTD.SUITE 1205, BBS-UTH STREET
WEST VANCOUVER, BRITISH COLUMBIAVTT2N8
(vii)
APPENDIX 4 (continued)
DDH NO. Location
ID (D- 1) ) ) Southeast Zone
2D (D- 2) ) (Claim TRT 5954) ) See Figure 5
3D (D- 3) )
4D (D- 4) )
)5D (D- 5) ) Shaft Zone
) (Claim TR 3187)6D (D- 6) )
7D (D- 7) -)) .
8D (D- 8) )
9D (D- 9) )j (Claim TRT 4369)'. North Zone
IDD (D-10) )
11D (D-ll) (TR-3187)
Dir'n. Dip
NW -SO0
SE -480
NW -450
NW -450
NW . -450
NW -450
SE -620
SE -450
NW -470
NW *-450
E -600
TOTAL
Intersection Core
Depth Length
317' (See report by R. F. Uard - 1962)
364'
393'
(?) (44.5 feet of 0.92* Cu + 0.80* Ni(35.0 feet of 0.83* Cu -
(?) 104.0 feet of 1.35* Cu -
(7) 46.1 feet of 0.79* Cu
{? ) (28.1 feet of 0*79* Cu :( 8.0 feet of 0.58* Cu -
299* (50.0 feet of 0.14* Cu H(99.0 feet of 0.28* Cu H
306' (0.6 feet of 6.60* Cu(0.5 feet of 11.60* Cu(1.8 feet of 0.76* Cu
402'
351' (See Figures 5, 23)
3,440.2 feet (Drilled Nov. 11/61
f 0.89* Ni
f 0.97* Ni
4- 0.65* Ni
f 0*71* Nif 1.16* Ni1- 0.20* Nih 0.28* Ni
* 0.86* Ni+ 3 .40* Ni4- 0.69* Ni
- Feb.A2)
DD Holes ID thru 11D (D-l thru D-ll) logged by L.G. Phelan December 1961 - February 1962, according to R.F. Liard
Cunipitau Mines diamond drilled three holes in 1939 and 3 holes in 1934 (OGS-GDIF, #201, pp. 29, 38.
Trebor Mines also drilled four holes (H-1 thru H-4 in 1949)(OGS-GDIF #201, p. 31)
DON TULLY ENGINEERING LTD.SUITE 12O5, SSS-irm STREET
WEST VANCOUVER, BRITISH COLUMBIAvrraN*
PENDIX 4 - (continued)(viii
DDH No. LocationDepth Core
Jir'n. Dip (ft.) Length Remarks
SB-1 Claim TRT 4311
SB-2 Claim TRT 4311
SB-3 Claim TRT 4310
SB-4 Claim TRT 4311
SB-5 Claim TRT 4369
S17UE
S170E
SE
SE
NW
DP.
Logs
not
avail
able
j((
North (Zone (
(
(
TOTAL 1,T32'0
************
( (See report by( S. V. Burr( February 15/68)
N-l Claim TRT 6763 NW -451
TOTAL
320'
320'(J.C. Dumbrille - 1954)
************
Nor. Plat. Baseline
B7-N-1 1400N 2-KDOE
87-N-2 1-KDDN 3+60E
87-N-3 1+25N 0498E
87-N-4 0450N 2+25E
B7-N-5 1+50N 1490E
2920 -420 454' NQ core (
2700 -850 763.8' NQ core (
2B30 -600 363'
2700 -650 403 '
t
NQ cofe ( (Fleck Resources( c/o Northern Platinum)
NQ core (
2BS0 -SO0 282.1* NQ core {
TOTAL 2,232.9' (660.79 m.) Drilled Nov. 6 - Dec.1987
50,363.7 (15,354.79 metres) of diamond drilling has been reported in 155 drill holes.
DON TULLY ENGINEERING LTD.SUITE 1205, B9S-I1TH STREET
WEST VANCOUVER, BRITISH COLUMBIAV7T2NS
r (
^
i
7 '\fyrr firs J
NORTHERN PLATINUM LTD.-00-543 QRANVILLE ST., VANCOUVER. B.C. V6C 1X8 - — - - (604)688-2726 FAX (8O4i 687-8533
Escrow @ U S 7,500 750,000 shares
Seed stock @ 25* 1129,500 518,000
Flow-through @ 35* S 84,450 241,285
Directors: John P. McGoran, R.H. Pyke, J. Watt 4 C.J. McGoran
Officers: R. H. Pyke, J.P. McGoran, C. PyKe, C.J. McGoran.
PRIMARY ISSUE: 500,000 shares @ 0.65* to net 57.5*
Northern Platinum has purchased a 1 01 NPI Interest in a 4 to 5 million ton, near surface deposit of platinum metals, copper and nickel. Northern Platinum Ltd. can earn 5056 working interest by spending l million dollars in four years.
Four of five drill holes in 1987 have confirmed this near surface deposit.
After financing, Northern Platinum will drill to intersect high grade zones.