38
www.genesys4s.ro Smart Cabling Infrastructure Solutions for Data Centers Constantin Ciuperca Project Manager Genesys Systems

Genesys System - 8dec2010

Embed Size (px)

Citation preview

Page 1: Genesys System - 8dec2010

www.genesys4s.ro

Smart Cabling InfrastructureSolutions for Data Centers

Smart Cabling InfrastructureSolutions for Data Centers

Constantin CiupercaProject ManagerGenesys Systems

Constantin CiupercaProject ManagerGenesys Systems

Page 2: Genesys System - 8dec2010

www.genesys4s.ro

AgendaAgenda

Data Center Infrastructure requirements

Smart Cabling Solutions for Data Center Infrastructures

Page 3: Genesys System - 8dec2010

www.genesys4s.ro

Strategic Division for Strategic Division for Complete Communication InfrastructuresComplete Communication Infrastructures

Tyco Electronics – Tyco Electronics – AMP NETCONNECTAMP NETCONNECT

Page 4: Genesys System - 8dec2010

www.genesys4s.ro

Data Center InfrastructureRequirements

Data Center InfrastructureRequirements

Page 5: Genesys System - 8dec2010

www.genesys4s.ro

CablingInfrastructure

IT Security

Control system

Raised floor

Air Conditioning & Ventilation

Systems

Early fireWarning system

Fire detectionFire

extinguishing

Water warning systems Access control

Monitoring&

InfrastructureManagement

Systems

Power Supply,UPS & Generator

Systems

Data Center – Data Center – Overview / SubsystemsOverview / Subsystems

Page 6: Genesys System - 8dec2010

www.genesys4s.ro

Main issues & concerns of Data Center Owners &

Operators

0,0% 5,0% 10,0% 15,0% 20,0% 25,0% 30,0% 35,0%

Power Consumption

Speed of Change

Cooling

Lack of standardization

Datacenter Management

Costs of Operation

Security

Power Shortage

High Density

Environmental concerns

Nothing in particular

(Source: Datacenter Dynamics)

Data Center – Data Center – What is important ?What is important ?

Page 7: Genesys System - 8dec2010

www.genesys4s.ro

Power supply and air conditioning have become the limiting factor for implementation of Data Centers.

Picture: Knürr

Data CenterData Center - Limiting Factors - Limiting Factors

Page 8: Genesys System - 8dec2010

www.genesys4s.ro

Sources: EYP Mission Critical Facilities, Cisco IT, Network World, Customer Interviews, APC

Reducing Data Center Power Consumption is a multi-faceted challenge. All areas need to be addressed to maximize data center compute capacity and minimize power costs.

Network Equip, 12%

Pwr Loss, 10%

Lighting, 3%

Cooling, 50%Server, 25%

Data Center – Data Center – Power ConsumptionPower Consumption

Page 9: Genesys System - 8dec2010

www.genesys4s.ro

Cold air pumped into plenum space beneath floor tiles and vented into cold aisles and returns through a ceiling plenum.

Data Center – Data Center – Airflow EfficiencyAirflow Efficiency

Page 10: Genesys System - 8dec2010

www.genesys4s.ro

Airflow is blocked by a fully loaded raised floor

For new buildings, cabling in the ceiling shall be considered for better management and improved airflow.

Cable trays

Cable trays

Cable trays

Cable trays

Cable trays

Cable trays

Power cables Power cables Power cables

Data Center – Data Center – Airflow & Cable PlacementAirflow & Cable Placement

Page 11: Genesys System - 8dec2010

www.genesys4s.ro

0

5

10

15

20

25

302

00

0

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

100M 1G 10G 40G 100G

mill

ion

s se

rver

un

its

Data Center – Data Center – Server TrendsServer Trends(1G, 10G, 40G and 100G)(1G, 10G, 40G and 100G)

Source: Intel & Broadcom

10 year transition for 1G Ethernet 6 years for 10GBE 5 years for 40GBE

Page 12: Genesys System - 8dec2010

www.genesys4s.ro

Comparison: Comparison: Office Cabling <> Data Center CablingOffice Cabling <> Data Center Cabling

Office Cabling: Static after installation Technology cycle: 5-10 years Lower density acceptable Downtimes less critical Physical environment

less important

Data Center Cabling: Dynamic Technology cycle: 3-5 years Highest density required Downtimes very critical Physical environment

very important

Page 13: Genesys System - 8dec2010

www.genesys4s.ro

Data Center – Data Center – Infrastructure RequirementsInfrastructure Requirements

Highest Reliability and Availability (= Quality).

High Infrastructure Performanceto support various kinds of services.

Shortest Deployment Time for Moves, Adds & Changes (MAC’s).

Highest Density of all equipment.

Redundancy

Support to save Power

Best possible control via Network and InfrastructureManagement (including reliable documentation).

Page 14: Genesys System - 8dec2010

www.genesys4s.ro

Smart Cabling Solutionsfor Data Center Infrastructures

Smart Cabling Solutionsfor Data Center Infrastructures

Page 15: Genesys System - 8dec2010

www.genesys4s.ro

EN 50173-5 Data Center Cabling

ISO/IEC 24764(created according EN 50173-5)

EIA/TIA 942 “Telecommunications Infrastructure Standards for Data Centers”

Data CenterData Center – – Relevant Standards Relevant Standards

Page 16: Genesys System - 8dec2010

www.genesys4s.ro

Ad-hoc growth and cabling Point to point cabling

Pathway confusion Documentation errors

Network Cabinets

Server Cabinets

Server Cabinets

Server Cabinets

Server Cabinets

More an evolution than a real planning fromthe beginning

Finally leading to a difficult to handle chaos !

Data CenterData Center – – Why standards ?Why standards ?

Page 17: Genesys System - 8dec2010

www.genesys4s.ro

Data CenterData Center – – Structure acc. StandardsStructure acc. Standards

MDAMDA

HDAHDA

EDAEDA

TelecommunicationRoom

Page 18: Genesys System - 8dec2010

www.genesys4s.ro

Data CenterData Center – – Structure & Cabling RequirementsStructure & Cabling Requirements

HDAHDA

EDAEDA

ZDAZDA

HC HC HC

MC

PrimaryEntrance Room

HC ScondaryEntrance Room

Access Providers

Access Providers

Access Providers

Offices, Operations CenterSupport Rooms

Telecom Room

Interconnect

Active Equip.Storage AreaDevices etc.

Interconnect

ActiveEquipment

Interconnect

ActiveEquipment

ActiveEquipment

Interconnect

Backbone Cabling

Backbone Cabling

Backbone Cabling

Horizontal Cabling

Horizontal Cabling

Horizontal Cabling

MDAMDA

Main DistributionArea (MDA)

Horizontal DistributionArea (HDA)

Equipment DistributionArea (EDA)

Optional:Zone DistributionArea (ZDA)

Highest Performance Cat. 6A / 7A or Fiber Optic

Density & Flexibility MRJ 21 MPO “Plug & Go”

Page 19: Genesys System - 8dec2010

www.genesys4s.ro

Complete Data Center SolutionsComplete Data Center Solutions

AMP NETCONNECT provide the complete

Cabling Infrastructure:

Classical High PerformanceCabling Systems

Data Center OptimizedPlug&Go Solutions“Smart Cabling for Data Centers”“Smart Cabling for Data Centers”

Cable Management Systems

ready to be integrated into Intelligent Infrastructure Management System (IIMS)

Page 20: Genesys System - 8dec2010

www.genesys4s.ro

Data Center Optimized SolutionsData Center Optimized Solutions“Smart Cabling for Data Centers”“Smart Cabling for Data Centers”

MRJ21, Σ-LinkΣ-Link & MPO Cabling Systems Shortest deployment time Fastest Moves, Adds & Changes 100% factory pre-tested Highest Density Easy to plan & design Re-useable AMPTRAC Ready

Page 21: Genesys System - 8dec2010

www.genesys4s.ro

Data Center Optimized – Pre-Terminated SolutionsData Center Optimized – Pre-Terminated Solutions

“AMP Σ-Link System”“AMP Σ-Link System”

Pre-Terminated Solutions based onBundled Cables & Cassettes.

Class FA (Cat.7A), Class EA (Cat.6A)Shielded Solutions

Class E (Cat.6) UTP Solution

Page 22: Genesys System - 8dec2010

www.genesys4s.ro

Special designed High Density Systems: Easy to install (just Plug & Go) Easy to change without interference of other channels 6 x 1000Base-T in one compact cable & interface Space saving Compact Pre-Terminated

Trunk Cables allow efficientairflow

Re-useable

Example: MRJ21 Plug&Go System

http://www.cisco.com/pcgi-bin/ctdp/displayProfile.pl?PARTNER_ID=59368

Data Center Optimized – Pre-Terminated SolutionsData Center Optimized – Pre-Terminated Solutions

MRJ21 SystemMRJ21 System

Page 23: Genesys System - 8dec2010

www.genesys4s.ro

Data Center Optimized - Pre-Terminated SolutionsData Center Optimized - Pre-Terminated Solutions MRJ21 Plug & Go SystemMRJ21 Plug & Go System

MRJ21 Panel to Panel configuration:

Page 24: Genesys System - 8dec2010

www.genesys4s.ro

MRJ21 System - MRJ21 System - ApplicationsApplications Compact, Flexible & Easy to manage Consistent Quality & Performance

Page 25: Genesys System - 8dec2010

www.genesys4s.ro

Fiber Optic Plug&Go System: Based on the industry standard MT-Ferrule 12 Fibers OM2, OM3, OM4 or Singlemode Cassettes for all important

Interfaces (LC, SC, MT-RJ) Compact & Consistent Quality

(100% Factory tested!) No installation errors AMPTRAC Ready!

Data Center Optimized – Pre-Terminated SolutionsData Center Optimized – Pre-Terminated Solutions

MPO Fiber Optic SystemMPO Fiber Optic SystemStandard MT

2.45mm

6.4mm

Page 26: Genesys System - 8dec2010

www.genesys4s.ro

ZDMD LDP EQENI

ISO/IEC 24764 model for Data CentersENI

Network access cabling

subsystem

Main distribution cabling

subsystem

Zone distribution cabling subsystem

MPO Next Generation Low LossMPO Next Generation Low Loss

MPOptimate MPOptimate SystemSystem

Insertion Loss: 0,35 dB/Cassette maximum != Best performing MPO System in the world market

Page 27: Genesys System - 8dec2010

www.genesys4s.ro

Benefits:

Fast Setup Time and MAC’s All Performance requirement (1/10/40/100 GBit) Pre-Tested Improved Cable Management Efficient Airflow Management

Data Center Optimized SolutionsData Center Optimized Solutions“Smart Cabling for Data Centers”“Smart Cabling for Data Centers”

Page 28: Genesys System - 8dec2010

www.genesys4s.ro

Unmanaged and unstructured connections No documentation 30-40% abandoned patch cords after

1 year of operation Dead ports in switches and cable

runs 30-40% unused capacity MAC time > 1h per port Adds up to 150% of operational cost Adds up to 200% of floorspace needed Heat sinks creation (blocking of air flow)

Poor Cable Management - Poor Cable Management - ConsequencesConsequences

Page 29: Genesys System - 8dec2010

www.genesys4s.ro

Hi-D – Hi-D – Cable Management PlatformCable Management Platform

Very high density Side Cable Management

saves space for horizontalmanagement

Requires 800mm Rack Compatible with all

Copper & Fiber Panels Controlled Bend Radius

= Easy access to eachPatchcord in caseof changes!

Page 30: Genesys System - 8dec2010

www.genesys4s.ro

Page 31: Genesys System - 8dec2010

www.genesys4s.ro

SystemBenefits:

Integrates all AMP NETCONNECTHigh Density Data Center Solutions(MPO, MRJ21 & Classical Cabling)

Visualizes & Documents complete Data Center Network(Updates all changes automatically)

Notifies all changes

= Increasing control over complex Data Center Infrastructures

= Reduction of Downtimes!

Page 32: Genesys System - 8dec2010

www.genesys4s.ro

System – Process overview

Page 33: Genesys System - 8dec2010

www.genesys4s.ro

Infrastructure Manager

Page 34: Genesys System - 8dec2010

www.genesys4s.ro

AMP NETCONNECT – Total Solution

Page 35: Genesys System - 8dec2010

www.genesys4s.ro

Data Center – Data Center – Green ITGreen IT

The AMP NETCONNECT Data CenterSolutions support the Green Initiative:

Re-duce Energy consumption= cost saving= preserves natural resources

Re-useable solutions= cost saving= preserves natural resources

Re-cycable solutionsUse only environmental friendly materials(RoHS compliant)

Page 36: Genesys System - 8dec2010

www.genesys4s.ro

It is worthwhile to invest into guaranteed Performance & Quality!

One Solution for Your Datacenter !One Solution for Your Datacenter !

Page 37: Genesys System - 8dec2010

www.genesys4s.ro

AMP NETCONNECT AMP NETCONNECT Data Center SolutionsData Center Solutions

Your Benefits

Unique Solution – optimized exactly for the special needsin a Data Center(we do not just try to implement office infrastructures into a data center – as many others do)

All changes in a data center (which happens often!) can be donein very short time – without interruption of other services.= maximized uptime!= highest flexibility

Space & Energy saving solution= $$$$ savings on operational costs= fast return on investment

Complete Management & Documentation Solution (AMPTRAC)= comes up with IT SM requirements from ITIL

Page 38: Genesys System - 8dec2010

www.genesys4s.ro

Thank You ! - Thank You ! - Questions ?Questions ?

A Solid Foundationfor Your

Communication Infrastructure