Generic 1 & 2 & E

Embed Size (px)

Citation preview

  • 8/13/2019 Generic 1 & 2 & E

    1/20

    GENERIC NQF 1 with Road Construction electives at NQF 1 & 2 added

    Title IDNumber

    Specific outcomes Range statement NQF

    Credits

    Addtogeneicqu

    al.

    Apply health and safety to

    work area 9964

    1. Identify potential hazards in the work area. 2.

    Limit damage to persons or property in the case

    of an emergency. 3. Follow procedures that apply

    to illness or injury in the work area.

    1. Implications of exposure to hazardous substances andhazards include reference to a possible chain of events that

    could result from not removing, reducing or reporting a hazard.

    2. A health and safety program includes hazard identification,

    risk assessment and a health and safety plan. 3. Statutory

    requirements include current national regulations applicable to

    construction, including acts and regulations, ordinances, by-

    laws, directives, standards, guidelines, and codes, issued by a

    legislative body such as parliament, provincial administrations,

    local authorities and other bodies so empowered by any of the

    former. 4. Regarding Acts and Regulations, all pertinent national

    legislation is included. 2 3 YES

    Apply hot mix asphalt 14554

    1. Demonstrate knowledge of technology of

    applying hot mix asphalt. 2. Prepare a road layer

    to receive premix asphalt. 3. Apply a premix

    asphalt layer. 4. Complete a promix asphalt layer. 2 5 YES

    Apply labour intensive

    construction systems and

    techniques to work

    activities 114921

    1. Understand and explain the Labour Intensive

    Construction philosophy. 2. Implement LabourIntensive Construction Systems. 3. Implement

    resource management techniques for Labour

    Intensive Construction projects. 4. Train, coach

    and develop team members in LIC methods. 5.

    Implement LIC administrative systems.

    The typical scope of this unit standard is : 1. Pre-planning a

    LIC activity includes the establishment of LIC procedures and systems,

    supervisory information systems, and the development of an appropriate and

    resourced time schedule (bar chart) programme. 2. Project-specific systems are

    those incorporated in the project specifications, such as specific measurement

    and recording proformas. 2 12

  • 8/13/2019 Generic 1 & 2 & E

    2/20

  • 8/13/2019 Generic 1 & 2 & E

    3/20

  • 8/13/2019 Generic 1 & 2 & E

    4/20

  • 8/13/2019 Generic 1 & 2 & E

    5/20

  • 8/13/2019 Generic 1 & 2 & E

    6/20

  • 8/13/2019 Generic 1 & 2 & E

    7/20

  • 8/13/2019 Generic 1 & 2 & E

    8/20

  • 8/13/2019 Generic 1 & 2 & E

    9/20

  • 8/13/2019 Generic 1 & 2 & E

    10/20

  • 8/13/2019 Generic 1 & 2 & E

    11/20

  • 8/13/2019 Generic 1 & 2 & E

    12/20

  • 8/13/2019 Generic 1 & 2 & E

    13/20

  • 8/13/2019 Generic 1 & 2 & E

    14/20

  • 8/13/2019 Generic 1 & 2 & E

    15/20

  • 8/13/2019 Generic 1 & 2 & E

    16/20

  • 8/13/2019 Generic 1 & 2 & E

    17/20

  • 8/13/2019 Generic 1 & 2 & E

    18/20

  • 8/13/2019 Generic 1 & 2 & E

    19/20

  • 8/13/2019 Generic 1 & 2 & E

    20/20