AES coupling. Raised connector. AES pipe. 150 150 150 NOTES 300 300 750 min. micron liner. PLAN CROSS SECTION A:A LONG SECTION High level air outlet vent (beyond) to be at least 3m higher than low vent - refer to vent notes. 20mm washed stones with liner folded above and below - allowing gas to escape. 3000 150 450 150 900 300 750 450 1050 150 150 Ground level Underdrain - refer to underdrain notes. AES pipes. 150mm min. topsoil with ground mounded and extended 1m past AES bed / extension excavation. AES system sand. Filter cloth or sand to protect liner from punctures. Pea gravel. Drainage metal. 750 min. micron liner. AES offset adapter / end cap. AES coupling. 3000 Topsoil. 1:100 fall to base of AES bed and underdrain - refer to underdrain notes. AES pipe. Scale @A3 Dwg: 1:20 AES LB02 Scale @A4 1:40 Version: 01 1050 150 A Section A 750 150 300 AES system sand. High level air outlet vent to be at least 3m higher than low vent - refer to vent notes. AES offset adapter / end cap. . 100mm inlet @ 1:100 min fall from septic tank. 300 300 150 300 Raised connector. Underdrain - refer to underdrain notes. AES bed. Ground level. Low level air inlet vent (beyond) to be at least 3m lower than high vent - refer to vent notes. Low level air inlet vent to be at least 3m lower than high vent - refer to vent notes. AES system sand. Low level air inlet vent (beyond) to be at least 3m lower than high vent - refer to vent notes. AES bed. Raised connector. Flange tank fitting to suit diameter of underdrain outlet. Extend topsoil mound 1m past AES bed / extension excavation. Extend topsoil mound 1m past AES bed / extension excavation. 1000 Outlet @ 1:100 min. fall back toward AES bed. 1000 [email protected] - www.et.nz This generic drawing is the Copyright © of Environment Technology Ltd (Et). It is supplied by Et for use in New Zealand and may not address site specific aspects of an AES treatment system design. Use of this drawing as part of a design proposal must be in accordance with Et Copyright and conditions of use - available at https://www.et.nz/disclaimer-and-copyright/ Each designer using this drawing for a design for a particular site: (a) Shall be solely responsible for the wastewater treatment system design for that site having regard to all the circumstances applying at that site and; (b) By using this generic material, the designer guarantees that Et shall have no liability for plans submitted by that designer to clients, local authorities or any other person. Refer to landscaping note. This generic drawing is the Copyright © of Environment Technology Ltd (Et). It is supplied by Et for use in New Zealand and may not address site specific aspects of an AES treatment system design. Use of this drawing as part of a design proposal must be in accordance with Et Copyright and conditions of use - available at https://www.et.nz/disclaimer-and-copyright/ Each designer using this drawing for a design for a particular site: (a) Shall be solely responsible for the wastewater treatment system design for that site having regard to all the circumstances applying at that site and; (b) By using this generic material, the designer guarantees that Et shall have no liability for plans submitted by that designer to clients, local authorities or any other person. Lined AES Beds and Underdrains · Designer to specify the proposed construction detail incorporating: · Specification of the lining membrane incorporating a minimum 25 year design life. Minimum standard of 750micron LDPE required. · Detail of protection of the membrane from perforation by the surrounding ground utilising a minimum of Bidim A14 non-woven filter cloth or equivalent. · Minimum 1:100 fall to collection pipe on bed base. · Minimum 50mm diameter collection pipe as DWV or PN10 and detail of collection perforations at 4 and 8 o’clock at 300mm centres as 10mm diameter holes or 100mm long horizontal 3mm wide saw cuts. · The collection pipe preferably enclosed in suitable larger diameter perforated ‘draincoil’. · The up grade end of the collection pipe brought to the surface of the bed and capped with a suitable vent cap. · Detail of the flanged connection sealing the perforation of the lining membrane. · Pea metal drainage media from base of AES sand bed to collection pipework. If crushed pea metal drainage media used further A14 material placed over lining membrane to the edge of the collection bed. · If ‘Draincoil’ screening is not provided then nominal 20mm drainage metal surrounding the collection pipe. General · Advanced Enviro-Septic (AES) pipes, fittings and bed to be constructed/installed in accordance with the AES Installation Manual. · AES pipes and fittings are supplied by Environment Technology Ltd, Et. · All associated pipework to comply with NZ Building Code G13, Foul Water, Acceptable Solutions, relevant standards and local/regional council requirements. · Unless otherwise stated all dimensions are in millimetres and all dimensions are minimums except pipe diameters and fittings. Venting of AES Pipework to Maintain Aerobic Internal Conditions · The high level air exhaust vent to be 100, 80, or 65mm diameter DWV pipe, suitably supported on an adjacent building or post, to be 3m vertically elevated above the air entry vent. 2 x 50mm DWV pipe can be used in internal building framing. Support to be provided to 1 meter below the top of the DWV vent pipe. · The low level air entry vent to be 100mm DWV, positioned as close as practical to the AES bed and isolated with respect to air passage wherever practical from upstream influent pipework. Refer to the specific design of each project. · The location of air entry and exit vents can be remote from the AES bed with additional pipework to suit topography, building structures or landscaping. Air exit vents should be positioned considering potential downdrafts or adjacent disturbed air flows. AES Bed Construction · An areal extension to the AES bed may be required to suit the permeability of the receiving soil in passive installations. These extensions may be on any or all sides of the bed. Refer to the AES bed dimensions noted on the specific design. N/A or not applicable denotes an extension is not required in this design. · A minimum of 50mm of fall is required between the septic tank outlet invert and the invert of the inlet to the AES bed or distribution box. · Trees/large shrubs cannot be planted on the AES bed. · AES bed ‘System Sand’ specification is usually met with within the local concrete sand specification. Refer ET website www.et.nz/system-sand-suppliers/ for Et tested AES System Sand suppliers. Et offers cost free sand sieve analysis upon receipt of a two cupful size sample. 1000mm 500 0 Total no. AES pipes Total AES bed, incl. extension: Infiltration area m2 Width m Length m

General Section A Installation Manual. Technology Ltd, Et.Scale @A4 1:40 Version: 01 1 0 5 0 1 5 0 A Section A 7 5 0 1 5 0 300 AES system sand. High level air outlet vent to be at

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • AES coupling.

    Raised connector.

    AES pipe.

    15

    01

    50

    15

    0

    NOTES

    300 300

    750 min. micron liner.

    PLAN

    CROSSSECTION A:A

    LONGSECTION

    High level air outlet vent(beyond) to be at least 3mhigher than low vent - refer tovent notes.

    20mm washed stones withliner folded above and below- allowing gas to escape.

    30

    00

    15

    0

    45

    0

    15

    0

    90

    0

    30

    0

    75

    0

    450

    1050

    150

    15

    0

    Ground level

    Underdrain - refer to underdrainnotes.

    AES pipes.

    150mm min. topsoil with groundmounded and extended 1m pastAES bed / extension excavation.

    AES system sand.

    Filter cloth or sand to protectliner from punctures.

    Pea gravel.

    Drainage metal.

    750 min. micron liner.

    AES offset adapter / end cap.

    AES coupling.

    30

    00

    Topsoil.

    1:100 fall to base of AES bedand underdrain - refer tounderdrain notes.

    AES pipe.

    Scale @A3

    Dwg:

    1:20

    AES LB02

    Scale @A4 1:40

    Version: 01

    10

    50

    15

    0

    A

    Section A

    75

    01

    50

    300

    AES system sand.

    High level air outlet ventto be at least 3m higherthan low vent - refer tovent notes.

    AES offset adapter / end cap.

    .

    100mm inlet @ 1:100 minfall from septic tank.

    300 300

    15

    03

    00

    Raised connector.

    Underdrain - refer tounderdrain notes.

    AES bed.

    Ground level.

    Low level air inlet vent (beyond)to be at least 3m lower than highvent - refer to vent notes.

    Low level air inlet vent to be atleast 3m lower than high vent -refer to vent notes.

    AES system sand.

    Low level air inlet vent (beyond)to be at least 3m lower than highvent - refer to vent notes.

    AES bed.

    Raised connector.

    Flange tank fitting to suitdiameter of underdrainoutlet.

    Extend topsoil mound1m past AES bed /extension excavation.

    Extend topsoil mound1m past AES bed /extension excavation.

    1000

    Outlet @ 1:100 min. fall backtoward AES bed.

    1000

    [email protected] - www.et.nz

    This generic drawing is the Copyright © of Environment Technology Ltd (Et). It is supplied by Et for use in New Zealand and may not address sitespecific aspects of an AES treatment system design. Use of this drawing as part of a design proposal must be in accordance with Et Copyrightand conditions of use - available at https://www.et.nz/disclaimer-and-copyright/Each designer using this drawing for a design for a particular site: (a) Shall be solely responsible for the wastewater treatment system design forthat site having regard to all the circumstances applying at that site and; (b) By using this generic material, the designer guarantees that Et shallhave no liability for plans submitted by that designer to clients, local authorities or any other person.

    Refer to landscaping note.

    This generic drawing is the Copyright © of Environment Technology Ltd (Et). It is supplied by Et for use in New Zealand and may not address sitespecific aspects of an AES treatment system design. Use of this drawing as part of a design proposal must be in accordance with Et Copyrightand conditions of use - available at https://www.et.nz/disclaimer-and-copyright/Each designer using this drawing for a design for a particular site: (a) Shall be solely responsible for the wastewater treatment system design forthat site having regard to all the circumstances applying at that site and; (b) By using this generic material, the designer guarantees that Et shallhave no liability for plans submitted by that designer to clients, local authorities or any other person.

    Lined AES Beds and Underdrains· Designer to specify the proposed construction detailincorporating:· Specification of the lining membrane incorporating aminimum 25 year design life. Minimum standard of750micron LDPE required.· Detail of protection of the membrane from perforationby the surrounding ground utilising a minimum of BidimA14 non-woven filter cloth or equivalent.· Minimum 1:100 fall to collection pipe on bed base.· Minimum 50mm diameter collection pipe as DWV orPN10 and detail of collection perforations at 4 and 8o’clock at 300mm centres as 10mm diameter holes or100mm long horizontal 3mm wide saw cuts.· The collection pipe preferably enclosed in suitablelarger diameter perforated ‘draincoil’.· The up grade end of the collection pipe brought to thesurface of the bed and capped with a suitable vent cap.· Detail of the flanged connection sealing the perforationof the lining membrane.· Pea metal drainage media from base of AES sand bedto collection pipework. If crushed pea metal drainagemedia used further A14 material placed over liningmembrane to the edge of the collection bed.· If ‘Draincoil’ screening is not provided then nominal20mm drainage metal surrounding the collection pipe.

    General· Advanced Enviro-Septic (AES) pipes, fittings and bedto be constructed/installed in accordance with the AESInstallation Manual.· AES pipes and fittings are supplied by EnvironmentTechnology Ltd, Et.· All associated pipework to comply with NZ BuildingCode G13, Foul Water, Acceptable Solutions, relevantstandards and local/regional council requirements.· Unless otherwise stated all dimensions are inmillimetres and all dimensions are minimums exceptpipe diameters and fittings.

    Venting of AES Pipework to Maintain AerobicInternal Conditions· The high level air exhaust vent to be 100, 80, or 65mmdiameter DWV pipe, suitably supported on an adjacentbuilding or post, to be 3m vertically elevated above theair entry vent. 2 x 50mm DWV pipe can be used ininternal building framing. Support to be provided to 1meter below the top of the DWV vent pipe.· The low level air entry vent to be 100mm DWV,positioned as close as practical to the AES bed andisolated with respect to air passage wherever practicalfrom upstream influent pipework. Refer to the specificdesign of each project.· The location of air entry and exit vents can be remotefrom the AES bed with additional pipework to suittopography, building structures or landscaping. Air exitvents should be positioned considering potentialdowndrafts or adjacent disturbed air flows.

    AES Bed Construction· An areal extension to the AES bed may be required tosuit the permeability of the receiving soil in passiveinstallations. These extensions may be on any or allsides of the bed. Refer to the AES bed dimensionsnoted on the specific design. N/A or not applicabledenotes an extension is not required in this design.· A minimum of 50mm of fall is required between theseptic tank outlet invert and the invert of the inlet to theAES bed or distribution box.· Trees/large shrubs cannot be planted on the AES bed.· AES bed ‘System Sand’ specification is usually metwith within the local concrete sand specification. ReferET website www.et.nz/system-sand-suppliers/ for Ettested AES System Sand suppliers. Et offers cost freesand sieve analysis upon receipt of a two cupful sizesample.

    1000mm500

    0

    Total no. AES pipes

    Total AES bed, incl. extension:

    Infiltration area m2

    Width m

    Length m

    Text1-LB02 Notes: Text3-Design Title & Location: Project Information:Text4-AES Bed Dimensions: Text5-No: AES Pipes:

    Text6-AES Bed Length: Text2-Designed by: Designed By: