GENERAL QUALITY ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities? - Those which may have an adverse affect on items required for safe operation and protection of the-public. Why have Quality Assurance? - 1. ·It is a regulatory requirement. 2, Economically beneficial to accomplish an activity correctly the first time. What is the QA Goal? - Provide that equipment, structure and activities are accomplished in a manner consistent with the established requirements for the identified activities. What are Established Requirements? - Requirements contained in the issued procedure for the work activity or function. The requirements are derived from many sources; regulatory commitments, industrial standards, and company imposed policies such as economics, reliability.

GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

  • Upload
    others

  • View
    16

  • Download
    2

Embed Size (px)

Citation preview

Page 1: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

• GENERAL QUALITY ASSURANCE

What is Quality Assurance? - A program for the control of all important

activities.

What are Important Activities? - Those ~ctivities which may have an adverse affect on

items required for safe operation and protection of

the-public.

Why have Quality Assurance? - 1. ·It is a regulatory requirement.

2, Economically beneficial to accomplish an activity

correctly the first time.

What is the QA Goal? - Provide confiden~e that equipment, structure and

activities are accomplished in a manner consistent

with the established requirements for the identified

activities.

What are Established Requirements? - Requirements contained in the issued procedure for

the work activity or function. The requirements are

derived from many sources; regulatory commitments,

industrial standards, and company imposed policies

such as economics, reliability.

Page 2: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

• QA PROGRAM RESPONSIBILITIES

EVERYONE HAS A RESPONSIBILITY FOR SOME ASPECT OF THE QA PROGRAM

DOERS

EXAMPLES: Mechanics

Technicians

Engineers

Designers

Supervisors J

Accomplish activity

in accordance with

the procedure

Plan, schedule,

implementation

accountability

Primary individuals for the

quality of the work activity

INDEPENDENT VERIFICATION

QA Organizations

Review

Inspection

Monitoring

Audit

Analysis - Problem identification

Page 3: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

• WHY DO WE NEED PROCEDURES?

Define activity to be accomplished.

Provide the method to accomplish activity in a

consistent manner .

. Note important characteristics or changes to prior

methods.

Provide the method to document the a .. ctivity;

Provide method to accomplish activity such that

established requirements are met.

WHAT HAPPENS WHEN YOU DON'T HAVE A PROCEDURE, OR WHEN A

PROCEDURE IS INADEQUATE?

Schedule delay due to inadequate tools or

material.

Damaged equipment due to faulty

disassembly-reassembly.

Lack of performance/failure due to incorrect part

being used.

Personal hazards; radiation exposure etc.

Outage delay/extension

a) Fines, penalties

b) replacement energy costs.

Potential of duplication of work exists.

Page 4: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

••

CONTROL OF NONCONFORMING MATERIAL

PURPOSE: Prevent use of material which does not meet

established requirements.

HOW:

l. Identify

2. Segregating/Tagging

3. Disposition

a) . Repair

b)

c)

d)

Rework

Use as is

Scrap

approved by

appropriate Rep

IMPLEMENTATION - Accomplish disposition in

controlled manner.

VERIFICATION

1. Test

2. Inspection

3 • Review

4. Monitor

Page 5: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

• CORRECTIVE ACTION

PURPOSE:

HOW:

To assure that activities adverse to quality

are identified, reviewed and corrected.

1) Identification: Everyone is responsible for identify-

2) Review:

ing to their supervisor areas which they feel

require correction.

Supervision is responsible for reviewing and

assessing the needed correction and assign

action to correct (within the area of

responsibility)

3) Implementation: Responsible organization reviews and

determines method of accomplishing the

correction and institutes action to correct.

Page 6: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

• EQUIPMENT HISTORY RECORDS

PURPOSE: Record all critical corrective and preventive action

accomplished on equipment to assure reliable, dependable

equipment performance.

Records must be traceable throughout the life cycle of the

the equipment from manufacture, receiving, st9rage, installation

test, operation, maintenance and scrap.

Activity A Traceability

Act.i vi ty B Traceability

Activity c

••

Page 7: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

TRAINING

Qualification

formal education

work history

O.J.T.

Certification

Statement from supervision indicating ability to

perform.

Re-Training

Maintenance proficiency

Page 8: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

Commercial Catalog Item - An item which complies with all of

the following requirements:

(1) The item is not unique to facilities or activities

licensed by the NRC.

(2) The item is manufactured in quantity to published

manufactuer's fixed design and quality requirment.

(3) The item part number i§ listed in the supplier's

catalog as opposed to a manufacturer's bulletin or

circular.

(4) The item requires no supplier documentation.

(5) The item is identifiable by physical marking, tagging

or containerization and is maintained throughout

storage.

Note: For replacement (CCI) items, a document must exist

which identifies the item (to be ordered) as an authorized

replacement-in-kind for the original or existing item.

documents include the manufacturer's part list, bill of

material, repair, maintenance or instruction manual or a

PSE&G engineering list of replacement or interchangeable

parts. Any proposed substitution or authorized parts

requires written engineerring approval.

Such

Page 9: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

EXAMPLES OF CCI'S

(1) Electronic components and assemblies such as resistors,

capacitors, integrated circuits, instrumentation.

(2) Electrical items such as relays, lamps, fuses,

transformers, switches, recorders.

(3) Mechanical components - bearings, gaskets, packing,

a-ring, non ASME code fittings, small nuts, bolts,

stud.

NON-CCI ITEMS

(1) Any component with a unique requirement (i.e. special

handing, selection, inspection or modification)

(2) ASME boiler and pressure vessel code items

The procurement of a CCI intended for use in safety related

equipment may be procured without specific quality

requirements. The receipt inspection and subsequent

installation test shall be sufficient to demonstrate proof

of satisfactory component acceptability. This method of

procurement does not alter the function of a CCI, nor does

it change the controls placed on the installation. Items in

the CCI category do not require imposition of 10 CFR part 21

on the supplier.

Page 10: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

• MATERIAL ORDER/ ITEM CLASSIFICATION FORM

MOIC

PURCHASING DEPARTMENT INITIATE PURCHASE ORDER

..

PROCUREMENT INITIATION

NUCLEAR QA NUCLEAR OP PROCUREMENT & SUPPLIER CONTROL MATERIAL CONTROL ESTABLISH ITEM -

CLASSIFICATIO~ AND -QUALITY REQUIREMENTS

!

! !

!

It

NUCLEAR PROCUREMENT & MATERIAL CONTROL PREPARE REQUISITION FROM COMPLETED

MOIC

. I~

QA NUCLEAR OPS. SUPPLIER CONTROL APPROVE REQUISITION & RETURN TO NUCLEAR PROC. & MAT'L CONTROL

p.-

~ -

NUCLEAR ENGINEERING ASSIST QA IN ITEM CLASSIFICATION & APPROVE MOIC

rel i:: ctl

u H 0 ~ i::

0 rel ·..-! (J) .µ .µ ·..-! (J) UJ r-l ·..-! n, ::l 8 tJ1 0 (J) u i:i::

Page 11: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

,..

WORK ORDER SYSTEM CHANGES

ALL NON-SAFETY RELATED WORK ORDERS ARE TO BE REVIEWED BY THE QA ORGANIZATION PRIOR TO

ISSUANCE AND STAMPED IN THE SPECIAL INSTRUCTION BLOCK SIGNIFYING AGREEMENT. NO NON-SAFETY

RELATED WORK ORDERS ARE TO BE IMPLEMENTED WITIIOUT A QC INSPECTION STAMP.

GOOD PRACTICE TO MAINTAIN DEPARTMENT LOG OF ALL CONTACTS WITH SPONSOR ENGINEER.

SEE ATTACHED SAMPLE W.O.

Page 12: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

.t.NT"

.CD SALEM IOF'l .

I

ICENTr..-rCATION

t.

~· ® :oaLEM/WORK DCS:CRIP'TION

@.

ctnun (2 O) :s D ,.~

REQUES~Y

QAR~ED

YU "-\_18;co 0 1'I J'l,I P ROTE c:T I Ot; TES D MOD

"ECIAI. INSTRUCTIONS

!EVI BY

.1 UNIT

I To:· (§_} D MAIHT.

Cl.ASSl,.ICATION

. ELECTRICIAN· TECMNICIAN

DOIL.ER REP'AIR MECMANIC

. llNGJAL' W9~2 iRoEo 5 G) 0

. - I"' OE>< ,..C -~- SYtT: I (8)°'"~0 0 l'ERF. 0 YAl'IO OTHER

RECEIVED~

D ... , •• "'E~MISSION REQUIRED

SSS/SS l'l:"MISllUON

QA NOTl,.IC:ATION/REVIE~.

IQA)NAMI!: (23)

TIME~--­

DATE

(QAI CIAJ'~"u;

. (23~

P'OLLOW-UP'/111 ETIEST R IEQU IRED -·--· ··- .

MANPOWER REQUIREMENTS

ESTIMATED NO.MEN

Cl.OCK HOURS

-{2 9

ESTIM"'-TED MAN HOURS

ACTUAL MAN tlOU~~

;ul'v. A~NED

Tl.CHNICAI. STATION MECHANIC• ASSISTANT

:>R'S. INi'"""\TEC

\.32) TECHNICAi. UTILITY MECHANIC• HICl.l'Elll

UMP NO./PROCEDU"E NO.

@· 0 TAGS Cl.EARED• TURNED OVER TO OP'El'IATIONS

SSS/SS @

CIATE

OESCRll'TION 0,. WORK P'ERP'Ol'tMEC

EST./UMP ACTUAb

TCTALS

coses THIS llilALP'UNCTION CONS7'.r0\TE AN IHCICENT

D '1"1:11 0NC SH/H -;--~~oeoo8~---------

l ,.01.L.OW-Ul'/l'tlETEST COM .. LETIE

SP'ARE P'Af!t.rS USECI

44) P'.O.ta.C. NO.

Page 13: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

• INTRODUCTION

The NRC requires in lOCFRSO that all activities which contribute

to (a) preventing accidents that could cause undue risk to the

health and safety of the Public or (b) mitigating the consequences

of such accidents should they occur be performed in accordance

with a quality assurance program. The necessary elements of such

a program are described in lOCFRSO App. B. The P.S. Quality

Assurance Program is described in the Quality Assurance Manual

and the~FSAR.

The Salem Q-List lists those systems and programs which are subject

to the Q.A. Program described above. Part of the Q-List is a docu~

ment called the Master Equipment List, or the MEL. The MEL lists

specific plant equipment components which were procured and installed

under the Q-Program. It is not currently complete with respect

to systems which have been added to the Operations Q-Program subse- .

quent to installation, e.g. spent fuel cooling .

• TNT 10 March 1983

Page 14: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

HISTORY OF MEL

During the design development of Salem, each Engineering division

was responsible for classifying equipment and maintaining records

of the classifications.

During construction, the Salem Project Manager prepared a consoli-

dated list of the classification of all safety-related equipment.

This list, Project Directive No. 7 (PD-7), was developed from the

purchasing records of the equipment.

In 1978 the NRC, during an inspection, noted that PD-7 was in need

of revision. Since the responsibility for the list had been trans-

ferred to the Engineering Department and since PD-7 was geared

more for construction, a commitment was made to develop a Master.

Equipment List (MEL) to provide a convenient list of the classifi-

cation of all safety-related components. The Unit No. 2 MEL was

issued on November 3, 1980 with a Revision 1 issued on

January 27, 1981 to incorporate fire protection components and

instruction sheets on the various fields of information. The Unit

No. 1 MEL was issued on July 15, 1981. The MEL is. some cases used

existing computerized engineering data files, and so may list more

than just safety-related components .

• LAR 10 March 1983

Page 15: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

UTILIZATION OF MEL

Physically, the MEL is a composite of printouts of six computer

files which were used by engineering during plant design and pro­

curement of equipment. These six sections are:

The Mechanical Section, which includes mechanical equipment,

manual and motor operated valves,

and cranes;

T_h_e Structural Section;

The Electrical Section;

The Controls Section, which is composed of 3 subsections:

ControJsValves (Air & Solenoid & Damper) ..

Controls Instruments

Controls Equipment.

One additional section of MEL has recently been added - a listing

of systems subject to the QA Program, and whether these systems

are on the list because of their safety-related, security, or

fire protection classification.

Each section of the list has a variety of information about the

listed equipment, and includes common fields denoting the seismic

class, nuclear code class (if applicable), safety-related status,

and applicabiiity of the Quality Program. The Controls Equipment

list also has a column designating if the item was procured as

a Commerical Catalog Item (CCI) . (Reference QAI-2-1)

Page 16: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

UTILIZATION OF MEL - Cont'd.

For Station personnel use, only five columns may be used as sources

of information for decisions relative to Quality related activities:

1. Safety-Related

2. QA Applicability

3 . CCI

4. Nuclear Class

5. Seismi.c Class

All other fields are engineering data subject to interpretation

by engineering.

For use in classifying work orders as to safety-related status

and QA Program applicability, Station pe~sonnel shall con~ult

the system's list of the MEL, not the component listing. All

work on any of the listed systems shall be performed based on

the classification of the system as a whole, not the individual

component in question.

For use in classifying items on procurement documents, both the

MEL systems listing and the MEL component listing shail be consulted.

Use of the information shall be as follows:

if the item is on the MEL component listing and its system

is on the system list, the classification on the component

list may be used on an MO/IC

- if the item is not on the component listing and its system

is not on the systems listing, the item may be assumed

to be non-safety related with no QA program requirements .

Page 17: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

UTILIZATION OF MEL - Cont'd.

- if the item is not on the component listing but its system

is on the system listing, the Nuclear Engineering Department

should be consulted regarding its true classification

- if an item is found on the MEL component listing but its

system is not on the systems listing, this is an error,

and Nuclear Engineering should be consulted to effect

MEL revision.

For items on the MEL component listing, the safety-related and

QA applicability columns may be used verbatim, unless the item

is listed CCI "Yes". In this case, care should be exercised as

the classificat.:ionfor safety-related and QA Program applicability

of "No" refer only to procurement, and in reality should be regarded

as "Yes" for ail other activities .

TNT

10 March 1983

Page 18: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

, • c Pll[lL Ir; SERVICE MEGHArJ I CAL DI v Is I or~ - 10/21/80 PAGE 0007

SALEH HASTE{ EQlJJPHENT LIST

II MiNIHUH DESIGN CLASSIFICATION

LIN IT SY5 TE11 i:ll.[)f1 Eu:v COHPOl\J!:f>JT DES GR JPTI ON SAf" SEIS· NUCL 'l~

I

2 .. 111q r: S TF.A;·I 2 !\4 VALVC: 2MS49 YES 111 YES

' 2 MAIN STE t.:1 2 1\4 VAL VE 2MS55 .YES 11 YES 2 · "Mfl I fJ ST f-A '1 2 A4 Vo\LVE 2M557 YES 111 YES 2 'MA IN STEAM 2 134 VAL VE 2MS58 YES II I YES

' 2 . \i A I i'J STEAM 2 84 VAi. Vf: 2'lSl32 YES 11 YF.S 2 Ht.JN SHAii -~ 1 no VAL VE 2MS20t YES 11 YES 2 HAJN STE AH 3 10 r:J VALVE 2MS202 YES II YES

( 2 MAIN S fE'A ti 3 1 nn VAL VE 2115203 YES I I YES 2 M.\J M STE All 3 1110 VAL VE ?.MS204 YES 11 YES 2 MAIN STEA"! 3 1 no VALVE 2MS205 YES JI YF.S 2 HA I ;1 STF: AM 3 1llO VAL VE 2HS206 YES II Yl:S 2 MA I i-J 5 TE A I~ 3 1 on VAL VE 21-1S207 YES I I YES 2 l·•A IN STEA•1 3 100 VALVE 2"15209 YES II YES 2 MAIN STEAM 3 100 VAL VE 2MS210 YES II YES ;;> HAJN S TF.A!1 3 100 VALVE 2MS211 YES II YES 2 MA (f·I STEAM 2 84 VALVE 2HS2t3 YES 111 YES 2 MA I ~l STE A •1 2 !14 VAL VE 2'1S902 YES I I I YES 2 MAIM SH'AM 2 114· VAL VE 2HS903 YES 111 YES 2 HAJN STEAM 2 !14 VAL VE 2HS904 YES 111 YES 2 11A 1 ll STEAM 2 04 VALVE 2HS905 YES 111 YES 2 MA IN ST!:A'1 2 A4 VALVE 2115906 YES I I I YES

.2 Mh JN STEAM 2 A4 VALVE 2MS907 YES I I I YES 2 MA I r.r STE Atl "° 130 VALVE 2H1S2 YES II YES 2 MA I i·J STEAM • 3 130 VALVE 21HS3 YES I I YES 2 MA.I I~ Slf:AM 3 130 VAL VE 21HS4 YES I I YES 2 HAIH STEA11 J 100 VALVE 21MS6 YES 11 YES 2 MAtN STEAM 3 t Oo VALVE 21MS,7 YES 11 YES 2 MA[ M STEllM 3 1 oo VAL VE 2111sa YES 11 YES 2 HAJN STEAM J 100 VAL VE 21HS9 YES I I YES 2 MA I !'I STF.Atl 3· 1 oo VALVE 2111s10 YES I I YES ?. MA If\: STE AM 3 1(10 'JALVE 21MS11 YES I I YES 2 MA [ N STEAi! 3 1 oo VAL VE 2LHS12 YES II YES 2 MA I ~I 5TF:AM J 1 Oo VAL VE HMS13 YES I I YES 2 MAIN STEAM 3 1110 VAL VE ?.1t1S14 YES II YES 2 ~A I rJ STE' A 11 .1 1 IJO VAL VE 21HS15 YES II YES ?. MAPI STEAM .s 1 no VAL VE 21M S 1 ll YES 11 YES 2 MAIN STEAM 3 100 VALVE .?111S'15 YES II YES 2 MA I IJ STF:A 1·1 3 1 on VALVE 21MS46 YES II YES ? Mii[ II STE ,HI 3 100 VAL VE ?1HS13(1 YES 11 YES 2 MAIN SH A ti 3 11)0 VAL VF. 21HSl3l YES I I YES ?. HA[N 5TE/IM ,J 1 no VALVE 2 ll1S1~5 YES 11 YES 2 MA[M SHAii :1 1 un VAL VE ll.MSl.14 YES II YES

2 llA IM STEAM ~ inn VAL VJ: 21.MS1'16 YES 11 YES ?. 11 f, 1 r1 ST[ Afl .1 1 nn VAL VE ?.tMSl67 YES I I Y!::S 2 MA I f1 S Tf A I~ 3 12n VAL VE ~1 ~rs tfili YES I I YES

2 llA IM STFAI·: .i 1 ?.II I/ AL VF: ;;> 1.i1Sl 69 YES 11 YES 2 MA I :·1 5 T FA~· ·' Un VALVE n~St7t YES I I YES ' ?. MA IN SHAii .j 11111 VAi. VF- 2JHS173 YFS I I YE:S

Page 19: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

• 11 u· 11· ~.:,-:. l':; : ,:,1· ·:! .·~: rir.;.cr· 1F·~ :· ;! 2.1 ·:1~.r-: [I !'.' :;;,F '..I: 13 :·i\ICI ~; at. ·1(·"=· ::11·-· 11 1 ~.:c;·:r:I ~:'.[.-",I. 1 .·,;1_~- ;.·:-;..r t:~l~T

·:··11·:'·1 ::l~t' .·!·.·I u:!CH·:: ~ JF.f1Ll'l.:1.,·.~' ::i;.: f·tflG ~

., [:-: 1 'ft "' .. IT~' n: " .. •' =:···'

.! ;-.) ·,I : r :- ~::.r:E. t1-~?r11· •• ~-··,r1~•J:J ::. :,u, f:! .. r~G

~ ~: ~ i:. ·1: rr ·1.· l cr1 ·.:1 ·: - ·-~ ,, ., l ~ ·11:::: ·rt' 11.:;

~ ·rL·.: 'fl. :..

1.:,; n. ,, ···: :.·.··i

••• • i .1. ~· I . ~ j ~·

1;: f'l ... . ~ : F ~-"\ ~;- ::. f' ~: : ' '-' ~~:... !:• l . -:. ., ! ::.:, f·: £. ~ ! ! ! . . ~: .. ' I!.

f ; J ! . . . . ; I . ~ ; I ; • L. f: .. _ :-:~ ! ! f. = ...

s fl '.; n ~

·; "l['.c' IES ::. ll::. '(\

.,.

.. ·. . ~ . 1·_.1 • • 11 • •. rL ·' /E'S 'fr:::

5 .J (' ,.~ YL ::;

i: ., '(!.~ n:;

. ~. -~· . .'. ~ ! : .: :~:. -~· ~ '::: :_ F ··.• E 1 !:. :=. ~ J 'i"L :: ·.·r:s

l'

Page 20: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

--...ii I ill' 11 l..1(1 1'.llMl'll\I·: '.';"11..<.1F

ii•• t!l I llo'il\I.

I ()l·J"()J() Fr··:· !,(••) i-1

1 .;11-i:-(1:rn Fl''•i ·.:·:('.1 11

I Hl'\H'! l'l"•i I l'i ':.)

I .. '. I r·(, ·1'? r r·•• I''"' ti ·,~

I /,I r·o.1•;· I' 1" 1' : •/ ,\ II ·,:!,

I -:I I·'•) 4 S1 l'T'\' ~ l I ·) (·1 'l

I ~.;J'l'(H'i' r "'"

:·.·:·;; II ·~~

I .,1 r·c, -1') Fl'O :·.'.'.• II ·:~

I /l"PO'l'I 11·0 :?/ Ii ~.~~

I :!Fl"() ".'..I Fi"O·J','!'! M :?

.l';'l'T'O•l'l Fr-·n·: 1:··.} ti 2

~1,'.l.:1··0:·:;<! 1'1'•'!"0•)

I II r·o:·;o Fl"<)'o1:• I ti ..... 1 iJ

I ''.I r·wrn rr···" ,\,.) II ... ~.-~ C) ~-:;

I :-s I: 1~· .::i :··;o Fl"'I:""' ~ II ···20!:;

I :1Fl'l)!',I) IT' 1 •'····\ II

!:.i 1·0:';(1 I : t . ,· I I I I .'i ~ '.i II

I /.I l'"'·_;f) I· I·'•'.·' ,i',/, II

I ·,.·1T·f.1:·;0 l''l••'•'. .0·1 11

I l<l'l•i)!'j() f'l ·11' ,.) II II· 20::.,

1 ?Fr-n·:·io r r·r·· ·'.>'l M

ll"l·l''0'.:;1 r f'i"" I. o II

I It: 1 ·o~·;·:~ IT'C•",''I II I /)

HY!il'E'i'i !i1"11"l"l Y cn1•F l'I I {l' I' (I

ii'. ... '.•)() Ill)

~1'.''.00 110

M:'.O() II•.)

11'.'.00 , !(l

112()0 Mil

t1::000 110

11'.'.0() MO

M?OO 11(1

M?OO t 10

M~'.00 MO

M'..''.00 MO

M200 llO

M::>OO MO

M200 MO

11200 MO

1 i:·:oo 110

li200 MO

M200 l!O

n:~oo NO

11200 0

1·10

M200 MO

n· .. :oo 11(1

11200 110

,l r It.:!:.

ilt::l'lliiillCi'il. l.H<.•lill:l·~rA:.;o1;:-rnu11 .....

pf;:l'Jli:i:l lll'f! !.:t.1.111111 :;11~1 Ill 111'\'ill..I<

Sf'l!'ltllT I !l 1!:1.r I ol·: ''· ,· .. Cl .• ·,t;!; Cl.1'1h:i Li 111 t'l I ~IT

tll'lll MOI I '11:: ~:;

llllM Mllll 'ff ti

t!Dtl 11111'1 '([!i

NllN NIJH 't'Lfi·

MllN NUN 1TS

MUM Ml.IN '([b

MOM NUN YEU

MUN 11111'1 )'ES

M1.1M MUN YES

MUN tHJM YES

IWM MOM YES

MOM t!Ull YES

MDr·I MOM YES

MUM MOM YES

MUii ti UN YES

Mllfl 110!'1 YES

MDII MOM YES

MUil t!DM YE!:>

i'!DM MOM YES

1'101'1 MUM YF~i

MOii MOM YE!i

MUM MUM YES

illlil llUN '1'EB

l:'i:lllll'HL::IH I. T!i'I

I

\'

l•o'11r:. l'1"1liL

Page 21: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

Ill/;•·• ;);:.·;; .:_·\J,~ ~ .:.;~·lr

.,,,.,,r.~ [l,jll'rll Ji

" ' ! ill" 'JI 'J:I - . I I ~ ·\ : 'J r I ·, I I .I : r J ( :: / : I ., ' ) . j :: .~ r

,; v" r cu:i: ·,:I IL

"ll ll 'i ' ;, A " - . J ~ I I .; J I s r A I I J l 4 II J - ., 4 1 i. 2 'I 0 " ) :.. r :: I 4 0

&011'17<'.J I: 'l'.11 v I I·'- 1\J)

::: 14 0

~140 Y-;- r .....

:: I 4 0

:: 14 u

su11r112~ 1.:J ·1.;:iv 11> :: I 4 0

£140 tE s

;, ti 11 •1 ·1 :) A 1\ - C J ~ I I 5 .HST A T I J'J '• II U - 2 4 0 !!. 2 Ii U '/ J LI E140 YES

; •Jr. ?< I :.i rl . A 11 !) 0 V V I f AL U US [140

:: 14 0

SUU~/J) ~;; ~:,a 'I v I fAL ~i:.n

(,(1[1:1/:ll

&llll»hJ .•,=> 4'1il'J t>l:SS llT~ llUS ll 40 YES

:: 1 110 Y:s

:: I 4 0 '(:: s

r.r1 o ~1 / , ·1 ... c ! _\ n v v ! r r, L 1 J c;

E 14 o YES

El 4 0

:. I 11?;. 1 ~ :J I 5 I I I ·' •1 c: ·I = :l '{ I I f. I'<~ A~ o IS '.:I 4 0

'J [

C l:L

H,~[J'.);l

:\I A'1[

;>Q c 0 ·~ [).

J - r - E I '1 P t: II ll 5 f ~ U 11

I-T-E l~PER E1573U6

I-T-E IHPER [157306

1 IE

E20417'J

'1:)[)1 L ~J'l;<'~I

,.... ... SI'! C:

'J;) (j

h 'I - 1 \ 111 Yr •·

y i .'.

v r <.

yr:.

vr:

y :' '·,

y I .'

y f :.

b 'J-1 ~Cl I yf ..

(, 'J - 1.l11 I yr:.'.

y I ~

Y['..

YL '.

YI ..

YI

Yf"

y =' y I •;

CA 1 NO

CAT 'Ill Yr

Page 22: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

I I

I •

I

..

I ... I'

!··I

-• r.s.E. &G. co. ELECTRIC ENGINEERING DEPARTMENT

ce I'

S • N. G • S • __ :-.. UN IT 2 .. INS 1 nUMENLLI ST_~_f_ILE .. N0._.12.4=.t.L_. ------~-----------------~------------·----·-·---·-· DATE 09/25/R[, PAGE OCJ01

INSlR MFG INSTR SlST S SAf ENV 0 TAGGillG MAKE TYPE MODEL&RG PS D\IG NO REQ & ·-- LlEf'LN0.----1-1lM .. !IO __ CODf._CL_Rf.L ____ (L __ A ___ ~N.LO.l!..MAI.I.O.N._· --------- -------------· ·----··-·· _________ ORDER NO

---------·--·-·-·-· ··--·-·- .. f" 0:J5 6 f T-4 4 6 R200 YE s-r A y 14 REACTOR COOLANT F&P MOD. 10B2496PB M 205201A876Q WESTING.

. FA OOl-5 l FT-435 R200 YES-F A ' 13 REACTOR COOLANT F&P MOD. 10B2496PB M 205201A8760 WESTING • ---- ---··-·---·---····-·--------·-···-.

Fl-436 R200 YE S-f A y 13 REACTOR COOLANT F&P MOO. 10~2496PB M Z05201A8760 WESTING.

!'1 _ ~A_C074 ___ Z_JT.:-!.24 __ ,R2.00_1_U.S._:.) __ A ___ Y __ 1LR..EH..UUL~-Q_QLMT __ H.L_l'l..Q.!!L..10J1.2!!..~6PB~--~M~. i 11

2 0 ~_i!_OJ_~_S_J_~_Q___ll ~STING __ ~

i"I FA 0075 l f T -4 2 5 R 200 YE S-F A y 12 REACTOR COOLANT F&P MOD. 10a2496PB M 205201 A8760 WESTING.

1

1:J

1"1

r\ !:n

··1

FA G076 ------···---------·--------------------- - - -·-· ····-·- ---- ...

12 REACTOR COOLANT F&P MOD. 10B2496PB M 205201A8760 WESTING. R2(10 fl -4 26 l YES-F A

FA 01 f)1___Z __ rT-51:L. G2_1_(l __ j_U.S::J_l\ ____ Y __ JJ_ll...f.Al!._G_f.JIE.!l!HO_!l __ R_O_S_tll_!l.UJtL.l15HJ!~.5/l_'Hf.B __ M __ 205.2 Q~~!lJJ> Q_wE ST I NG•

20520H8760 FA 0102 y G210 13 STEAM GENERATOR ROSEMOUNT .1153AHA5A92P8 WESTING. Fl-533 M /\ . YES-F

:·.1 I.'

i''\ lit

rA 0103 ROSEMOUNT 1153AHA5A92PB 205203A8760 r 1 -s 4 3 G 210 14 STEAM GENERATOR llESllNG. YE S-F A M y

.. J.A. __ C1_Q4__ .L__F_ L~2 3 ___ G.2J_Q_t __ H_S_:-L_~ ____ Y ___ 1.2_..U_E_!!'L.!i..UilB. ~T.9_!! ___ JtQ.HJ1QU~LJ.J.5_J!H/\_5 A 9 2 PB· M _]0_~ 20_~~.B!(>Q_ II E_S TI NG~

205228A8761 roxeoRO MOD. 1801SATS-BT rA 0117TTZT rT-110 N110 IHSTING. BORIC ACID MAKE-UP M YE S-F y

I:: '· 1::

---- ·-··---· ·----····-- ----- ... FA 0)18 M 205228A8761 WESTING. FIT- y DEMINERALIZER llATER S-tK 2 IN. l YE S-F

' !·. i .. / ... I

.· ..

Page 23: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

·r- J--··-·-·--9129/80-· -·-----· ----·-------------·-- ___ :.._·-----·----P.S.E:.i;b. CO.· Hlf>lNH:RJNG ll£:h\R1HE:Nl ,, I SALl:H NO. 2 UNIT MASTER EQUIPH£:Nl LJST CONTROL OlVJSlUN

1:1 PANEL

RACK NO. SYS CODE

s Cl

N CL

Sl\F REL

E:NV CL cc 1

Q A

[(JUI I' lU

TAGGING lNfURHh 110:~

·---··- ---------~·-·-··----·---~ ··-11.1' KE/HUIJI: Lil Yl'l:

<'. ··2PL-32'• CAl ION E:XCHANGR

' !~ 'm::m- -- ····----·-----· ---·- -----VES----N------- sr~;~LESS STEEL SHUT :~~~:F~"

l'ShP

l"i 2PL-32'• OFF VALVC:S SUIH OFF VALVE n- ------ ~:~=;;~------ ··-·-··-------------- . -----------~~~~~~~~~~ ~, ···-··--------( 1

111 2PL-324 N400 3 N P YES N LHLlE

l''l -····-----:7.PL-324--------------------- ·---·---·--··-· · --·--··-·--··---·-·· ---- ·----SlRAPlElt ~ ZPL-324 H~0.1200

(· ::.j····---~~~=;~~ -----N400---3----N---P----YES-N-·---·--···· --·-·--···· --·------·- -----·----~~~~~~T~l_l_> ______ -··---- __ • l'I

("· ,_., 2PL-324 FLOW INDICA llllt · I 7PL-32'• r·mo.14

l:LEC. J SCltl:HA Ill.

( i::: ·-- --· ~:~=~E:--·-·---~40~--1------ s (; YES y ----··----·-·-------·--····-·· --·- -··----~~~~~~~~·:~(~-~~--------·----.

< \1

':'11-. ----~~t=H~- ----~:oo N N P YES . N s-21--~-~~-_s_s_u_RE:-R::~:.~:----~~~~H~~t~f~N::-·-:~:~-~~---. ··-· --·-·-- -·· 7PL-374 . ···--·-·-·- ------------·---·--·-·-·--··------·-- --·-·-------- -··- ·- ··---. SlllPf.OY-PASS ... VALVES ·----lNSlR.VAL VE ---·---·-· --·-····

I; 2PL-32 1t HUO.P1"1MHS-31P ( u 2PL-324 • IJUAN111Yl2 I

!J--- ---·-- ~:~=~~~ ----·----N400---3----N----P----YES-N---·-· --- -::~~~~~~- ~~~~~!l~~~-----~~~~~~~ ~ -GA~-~~-------·---·

( i'\ 2PL-32'• HUO.lOC>'IS

('.=I --~~~=!i~ .. --··---·· ~~~~--1--N ---;·;---·-;------v-£s_N ___ s·:..:25 ··· --------···-·-·-·- ------- -· ~~!~~~!~~~~~urno n51r,1

(., 1,:.-: 22

PPLL=:22

41

t -- -- ---·-----·····. ····---·-· -------·· ·-·--··· · ·-·---~~~~~l~~~~~P-----·--··----- ·-- ------·! ------2PL-;2'• ---------------·-- -·- IJUANlllYlll

( ''' 7PL-32 11 N400 3 N N P YES N R-20 LUNK.HlllHHE:R U- -2PL-3Z4 .. ---·-··----···------ -··--· ··-·----·------·--·---·--·----- - .. - --···-·. ..GAl E VALVE ..... --··--·- ..... .

(,, "I 2PL-32'1 M(I0.2150 2PL-32'< QUANTJ1Yl21

,.. ---.l.PL-325----·---G2lb-l----N--N---P-----YfS---N-- --R-ll'• .. -·-· PNf.UMAT IC. AClUA lOR .. --··- LUNKENHl:'1Hl:R -·-·- ----- 135.1511 ..

(' "

.;i ,::.1

··1 ;.: H. r. r i ,. f"1

I . f-'/ · ,) ... I /./

2PL-325 ANO OOUY ALIUAlOR 2Pl-325 HDO.C.R-~O

---··- 7.P L-32 5 ---·--·--···- -·-···· .. . .... ·- ...... ·-·--· .. . .............. llUOV .HlJO. 701 XLO 2PL-325 2PL-32~

2PL-3Z5 2PL-~25

7PL-32~

-- 7PL-325 2PL-325 2PL-32">

--£PL-:::.25 2PL-32~

71'l.-32'.i 7PL-375

G216

G2lb

G2lb

N P Vl:S

N N P YES

3 N VfS

N

N

N

R-IJ•,

M-1 ::,o

PNtUHATJC. AC.TUATUR AND bUDY ..

VUAN T 11Y11 I LUNKf.Wll:IMER AC 1 UA llJtt Hlln.CR-30 UO[JY .H(J(>. ·rn JXL!i UlJ4N1JlVI11 f-1 SH!: R JlllUI: llJ1Y SWI lCllHlC. VALV£:. MOD. lb'1A-1d UUA:'-1111 Vt l I CUT LUt-llAMMEil

1357~9

PAGf .-,;.-

~ UllLllA~d:

ltlArll.1.

L - I U. '' 111

I -J liUlJ ,1;

t-J h h h 11 lJ

I• L-f .\h

Page 24: GENERAL QUALITY ASSURANCE ~ctivities which …GENERAL QUALITY • ASSURANCE What is Quality Assurance? - A program for the control of all important activities. What are Important Activities?

-----:- -----:,--- --

I

l 1 ... ' ~ . ·-· - .

I J *, , I

II ... 1,_l-- ------------- --

P.s. E.&G. CO, ELECTRIC ENGINEERING DEPARTMENT ! I ! :1 S • N • G • S • . - UN IT 2 . VHVE __ ll SJ.-~ .. _f IL f__NO •

0

__ 22 5-$._ ________ . --··· .

..-. I.. VAL VI M f G VA SYS S N SA F E NV Q V H VE 1 ; .. J _ -~~-f'.IP._i:__~_A_MPR CODL __ ~-~-J!~!,_ _____ C_L __ ~ ____ !\RK

TAGGING UHORMATION

~AKE TYPE HODEL&RG I !,! :.=_ __ ..... , .. ·-·····----·--· ----··- ~---------·- ..

' ' .. : i··\ 04 _ .J?_-1!! ___ 21 ... ______ ?_Q ____ 26 _____ J_L __________ . 05 06 -··-·········-·· -· ····- ·····-----------······- --·-- ... .. DO _02

_S V 07- ~J _________ N~_{)g--'.N'---__ NQ ___ A ____ !."<!_ ______ 1?. SAFETY I NJ EC T_I_p!_-1 ____ AS C 0 __ !.!.~_L_L_!l_X_~-~-61_~ .. .

SV0753 N600

SV(175_8 ___________ N_~.rn

SV0759 R600 •.,1

N NO NO COMMON 11 1 12 SAFETY

-'-'N __ --0'!.Q ____ ~-----N_Q ________ S A FETY INJECT I_()N __

N NO A NO PRESSURilER OUTLET

Asco TYPE L8X831654

.i.sco ·1ri>Ciais3n.H-·

AS~ 0 __ :T_!_~-~--!, _!!~_!!}_!_§!~ ___ _

ASCO TYPE LB831654

. i s v j 7 6 0 --------- ----- -ri-60 0 N N o----,.,---No---------,- p Ress u R i ZE R ou h-ix · As co ·-1, F>E-ieB 1e;s4 -·--- ·

. I :·1i

r r,

J s v u7 71 _____________ f:l 6.PO __ N __ t!_O ___ A ___ N() ___ • ______ c OM MON c HAR GING p ll11~--- As c 0 _!_!J'_U~ x 8 3 J§ ~ 4_ -

SVu772 N600 II NO A NO COMMON RESIDUAL HEAT ASCO TYPE LBX831614

l l i ''I SV0774 _._ ·!

• 1 SV0779 ·;

I" S Vll7 I! (l

I . I

i ;, ! '

II .·_ !::i

.1:, 1,'

• ,"I , .. 'I '.:·· '.

' : I' I 1,1

•I:· 1 :··\

l I

f' . , r:·!

,..;I ti

I . ·' I°' ~ I . ! !

sv~781

SVU782

SV078~

SV0784

svu7e.5

SV07l!6

SVC·7e!.._

SVG788

sv ,,789

·- ____ N6_00_.!!_ __ ~() ____ ~ ___ NO _______ ~_A_F E TY INJ EC r I_~N- _______ A_S_C_O ___ t.!_f~_!:_8_)(_~_31~_1_~----··

M921 YES-f Ii YES FUEL HAND·LING BLDG. ASCO TYPE HT8344A72

ASCO ii~t-·~ijji4•Ji

_M92L_J _____ '!~-~."'."..F --~-------~-~S _____________ _f_UEL llANDLING BLDG. ASCO TYPE JX8342A3

r.9 21 YE S-f YES

YES-F c VES

·- .. ____ M9_1_0 _________ !_~ S ::~---- C ______ H_S _______ -·-

M9l0

M910

_M9l0

M910

M910

YES-F C

YES-F c

YfS'.'.'F. C

YES-f

YE s-r

YES

YES

... YES

YES

YES

·FUEL HANDLING BLDG,

11, 12 RESIDUAL HEAT

11, 12 RESIDUAL HEAT

AUXILIARY BUILDING

AUXILIARY BUILDING

ASCO TYPE JX8342A3

ASCO t~~i-j~8ji2jj

ASCO ~.Y.Pf __ ~-~-8-~-~_?~~

ASCO TYPE JX8342A3

ASCO TYPE·-j:iiiifi.-2A3 ..

AUXILIARY BUILDING ASCO TYPE HT8344A72

AUXILIARY BUILDING ASCO TYPE HT8344A72

AUXILIARY BUILDING ASCO TYP~ J~~j~~A3

--

DAlE 09/2~/~U PAGE (;011

PS DRAWING NO REa R ORDER NO

09

CS 20751889491 WESTING,

CS 20751889491 WESTING.

CS 20751B0949l-WESl!NG,

CS 20751889491 WESTING, . ~. -

CS 21131099508 WESTING,

·CS 2iiJi089SOS ~EST ING,

CS 20753189492 WESTING,

CS 20751889491 WESTING,

cs 201s1ao9491 wesr1NG.

. CS 20751889491 WESTING,

CS ·22:513489556 E-75755

ts 22313409556 e-75755

CS 22313489556 E-73816

CS 22313489556 E-73816

CS 20750889491 E-75378

CS 20750889491 E-75378

CS 20750889491 E-73854

CS 20750889491. E-73854

cs 21132089508 £-757~9

CS 21132089508 E-75769

CS 211320n9508 E-7381~

c