3
ALIGN E E.3 14 14.2 14.4 14.5 E.4 E.5 E.7 GARAGE STORAGE 260 DATA CENTER 265 265 0774 0776 0775 0775 0775 0775 0775 1'-0" C 1 C.17 C.63 3' - 6" TEMP FARE RECEIVING T102 TEMP LINE MANAGER T101 T102 T101 IW-2 IW-1 F5-P F5-P F5-P F5-P F5-P 1190 0253 1192 T103A T103B F5-P F5-P F5-P 2 ' - 6 " 2 ' - 6 " E Q E Q 2 ' - 2 " 2' - 2" 2 ' - 2 " 1190 1190 1187 1187 1187 EQ EQ EQ EQ E Q E Q 2' - 0" 18' - 0" 2' - 0" 18' - 0" 9' - 1 43/256" 8' - 10 213/256" TEMP FACILITIES SHOP T103 260A 7 8 ' - 0 " 1 ' - 7 " 5 2 ' - 0 " 1 5 ' - 0 " 3 ' - 0 " 8 ' - 0 " 1123 1123 1123 1123 0252 0252 0252 1073 1073 1073 F A5.5 1 STOREROOM 191 STORES ROOM VESTIBULE 210 9 ' - 4 " 2 ' - 0 " 10' - 8" 210C 1' - 6" 6' - 6" 210B 1248 10 A8.2 210A 2 ' - 2 " 1073 7 E.95 F F.4 11 10 9 11.9 13.6 12.9 10.7 MAINTENANCE BAY 225 TRASH 186 MECHANIC'S LUNCHROOM 215 MECH. COMPUTER ROOM 216 FACILITIES PASSAGE 217 LUBE ROOM 218 DOCK MECHANICAL EQUIPMENT 222 215B 67' - 0" 216 5' - 0" 1' - 4" 5' - 0" 2' - 8" A8.1 1 2 M8-F M10-P M8-F M10-P IW-5 M8-P 218B 218C M8-F M10-P 3' - 4" 4' - 8" 32' - 0" 24" MIN. WASTE OIL 219 3' - 4" 2' - 0" 8' - 0" 1' - 4" 1150 1141 IW-3 2 0 ' - 4 " 3' - 6" 5' - 0" E Q . 6' - 0" 6' - 0" 0518 0438 215A 5 A4.2 0386 0303 EWC-1 217B 217A IW-3 IW-5 3' - 0" 1' - 4" E Q 5' - 4" 16' - 0" A8.1 3 9' - 4" 13' - 0" FLOOR FINISH PLANS: SEE / 4 A10.1 A5.5 6 A5.5 7 0580 0580 0580 1202 1202 1202 1202 1202 A4.1 1 F4-F M4-P 6' - 6" F4-F 218D 1202 1202 1202 M10-3 220 3' - 4" 6' - 4" BOILER ROOM 220 1171 0303 1073 1073 1073 16' - 10 1/2" 0418 1073 1073 0568 1194 1194 1194 0418 3' - 4" 4' - 8" 2210 2210 FE-1 EF-1 EF-1 GENERAL NOTES - ARCHITECTURAL PLANS 6. FOR PAVING AND SITE MODIFICATIONS, SEE CIVIL DRAWINGS 7. RELATIVE SLAB ELEVATION. VERIFY EXISTING CONDITIONS. MATCH SLAB EDGE TO SLOPE OF EXISTING SLAB. 2. EXISTING CONDITIONS SHALL BE FIELD VERIFIED. 3. EXISTING GRID LINES ARE DIMENSIONED FOR REFERENCE AND SHOULD BE FIELD VERIFY PRIOR TO CONSTRUCTION. 1. TOP OF THE EXISTING FIRST FLOOR SLAB IS 2'-6". 8. FOR CNG EQUIPMENT LAYOUT SEE CNG DRAWINGS. FOR CNG PLANT FENCING, GATES, EQUIPMENT PADS AND BOLLARD LAYOUT SEE CIVIL DRAWINGS. SEE ELECTRICAL DRAWINGS FOR TRANSFORMER AND SECONDARY CABINET LAYOUT. 9. HVAC DUCTWORK, EQUIPMENT, HOT WATER PIPING, JUNCTION BOXES, CONTROL WIRING, CONTROL CONDIUTS AND ASSOCIATED STRUCTURAL SUPPORT SYTESMS ROUTED WITHIN THIS AREA THAT ARE IN CONFLICT WITH THE PRPOSED ARCHITECTURAL LAYOUT SHALL BE RELOACTED AND RE-ROUTED TO ACCOMMODATE THE ARCHITECTURAL LAYOUT. COORDINATE RELOCATIONS PRIOR TO PERFORMING WORK. COORDINATE SCOPE WITH CM. 10. SEE ELECTRICAL DRAWINGS FOR LOCATION AND SPECIFICAION OF BATTERY ELECTRIC BUS CHARGING (BEBC) STATIONS AND REELS. 4. INFILL DIMENSIONS ARE PROVIDE AS REFERENCE AND SHALL BE FIELD VERIFIED. 5. ABOVE GRADE CMU CONTROL JOINTS SHALL OCCUR AT CHANGES IN WALL HEIGHT, WALL THICKNESS, AT ONE SIDE OF OPENINGS LESS THAN 6FT AND ON BOTH SIDES OF OPENINGS LARGER THAN 6FT BEGINNING AT ENDS OF LINTEL, AND ADJACENT TO CORNERS OF WALLS OR INTERSECTIONS WITHIN A DISTANCE EQUAL TO HALF THE CONTROL JOINT SPACING. CONTROL JOINT SPACING SHALL OF REINFORCED WALLS SHALL NOT EXCEED 25FT OR 1.5*HEIGHT, CONTROL JOINT SPACING OF UNREINFORCED WALLS SHALL NOT EXCEED 20FT. TYPICAL CONTROL JOINTS SHALL RECEIVE BACKER ROD AND SEALANT. RATED WALL CONTROL JOINS SHALL CONTAIN CERAMIC FIBER BLANKET. D 3' - 6" 9" 9" 2 ' - 0 " V . I . F . 0518 0386 0518 9 " DRAWING NO. DATES AND REVISIONS NOTICE A R C H I T E C T S S R E E N I G N E C ® O N S T R U C T I O N M A N A G E R S THIS ARCHITECTURAL AND ENGINEERING DRAWING IS GIVEN IN CONFIDENCE. NO USE OR DISSEMINATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF THE ARCHITECT. ALL RIGHTS ARE HEREBY SPECIFICALLY RESERVED. © 2019 RICHARD L. BOWEN + ASSOCIATES, INC. No. Date / Description 13000 Shaker Boulevard / Cleveland, Ohio 44120 Phone: (216) 491-9300 Fax: (216) 491-8053 www.rlba.com - [email protected] RICHARD L. BOWEN + ASSOCIATES INC. RLB NO.: CHECKED BY: DRAWN BY: 4/29/2019 4:41:14 PM COTA Fields Ave CNG Renovation 8966 1333 Fields Ave Columbus OH, 43215-3076 ENLARGED PLANS JBREVICK KEMLING 02/28/19 / BID-PERMIT SET 04/30/19 / REBID SET A1.20 SCALE: 1/8" = 1'-0" A1.20 3 DATA / IT SCALE: 1/4" = 1'-0" A1.20 2 TEMPORARY CONSTRUCTION SCALE: 1/4" = 1'-0" A1.20 4 01 - STORES WALK-UP VESTIBULE KEYNOTE LEGEND KEYNOTE DESCRIPTION 0252 OWNER TO RELOCATE FARE RECEIVING FURNITURE, N.I.C. 0253 RELOCATE SAFE, PROVIDE 4” BLOCK BASE. SEE EQUIPMENT DRAWINGS. 0303 REINFORCED CONCRETE FROST SLABS OCCUR AT EXTERIOR DOORS TYPICAL, REFER TO STRUCTURAL DRAWINGS FOR DETAILS. MIN 5'-0" X 5'-0" U.N.O. 0386 6" CONC. CURB, FACE OF CURB PAINTED. RADIUSED EDGE AND SLOPE TO MATCH EXISTING. 0418 TOOTH IN NEW CMU, WALL TYPE PER ARCH PLANS, TYP. 0438 PATCH CONCRETE PER STRUCTURAL, AS REQUIRED TO BE SMOOTH AND LEVEL WITH EXISTING SLAB. TRANSITION SHALL NOT EXCEED ADA TOLERANCES, TYP. 0518 POST-MOUNTED 8" DIA. BOLLARD, TYP. SEE DETAIL PER SHEET A5.1. 0568 GUARDRAIL QUESTION MARK END TREATMENT 0580 PATCH EXISTING INTERIOR CMU WALL, PAINT PER FINISH PLAN. 0774 ALL OPENINGS, AND ANY PENETRATION, INCLUDING ALL CONDUIT, CABLE TRAYS, OUTLETS, SWITCHES AND WIRE TROUGHS MUST BE CAULKED AND SEALED. 0775 NOTED IN 2009 DRAWINGS AS FULL HEIGHT PARTITION TERMINATE GYP. BD. AND STUDS AT DECK ABOVE SEAL AROUND ALL WALL PENETRATIONS. THIS SHOULD BE VERIFIED BY CONTRACTOR. 0776 IF A RAISED FLOOR CONTINUES OUT OF THE PROTECTED SPACE, BULKHEADS MUST BE INSTALLED UNDER THE FLOOR DIRECTLY UNDER THE PARTITIONS. THESE BULKHEADS MUST BE CAULKED TOP AND BOTTOM. 1073 FE-1; BRACKET-MOUNTED FIRE EXTINGUISHER. 1123 RELOCATED FACILITIES SHOP EQUIPMENT, SEE EQUIPMENT DRAWINGS. 1141 ICE MACHINE; N.I.C.; REFER TO PLUMBING DRAWINGS FOR CONNECTIONS AND FILTERS. 1150 VENDING MACHINES; N.I.C. 1171 REFRIGERATOR W/ TOP FREEZER; N.I.C. 1187 SCRAPE AND PAINT RELOCATED FAREBOX RECEIVING COLLAR. 1190 FAREBOX VAULT, SEE EQUIPMENT DRAWINGS. 1192 FAREBOX PROBE, SEE EQUIPMENT DRAWINGS. 1194 SEE EQUIPMENT DRAWINGS FOR LAYOUT AND DETAIL, TYP. 1202 OWNER PROVIDED FURNITURE,TYP, N.I.C. 1248 S.S. COUNTER TOP WITH BOX EDGE. 2210 EXISTING CONCRETE EQUIPMENT PADS, SEE PLUMBING DRAWINGS FOR EQUIPMENT AND DETAIL. SCALE: 1/8" = 1'-0" A1.20 1 INTERIOR PROGRAM - NORTH SCALE: 1/4" = 1'-0" A1.20 5 BEBC STATION CURB & BOLLARD 7

GENERAL NOTES - ARCHITECTURAL PLANS€¦ · a5.5 6 a5.5 7 0580 0580 0580 1202 1202 1202 1202 1202 a4.1 1 f4-f m4-p 6' - 6" f4-f 218d 1202 1202 1202 m10-3 220 3' - 4" 6' - 4" ... for

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GENERAL NOTES - ARCHITECTURAL PLANS€¦ · a5.5 6 a5.5 7 0580 0580 0580 1202 1202 1202 1202 1202 a4.1 1 f4-f m4-p 6' - 6" f4-f 218d 1202 1202 1202 m10-3 220 3' - 4" 6' - 4" ... for

ALIGN

E

E.3

14 14.2 14.4 14.5

E.4

E.5

E.7

GARAGESTORAGE

260

DATACENTER

265

265

0774

0776

0775

0775

0775

0775

0775

1'-0"

C

1

C.17

C.63

3' - 6"

TEMP FARERECEIVING

T102

TEMP LINEMANAGER

T101

T102

T101

IW-2

IW-1

F5-P

F5-P

F5-P

F5-P

F5-P

1190

0253

1192

T103A

T103B

F5-P

F5-P

F5-P

2' -

6"

2' -

6"

EQ

EQ

2' -

2"

2' - 2"

2' -

2"

1190

1190

1187

1187

1187

EQ EQ

EQ EQ

EQ

EQ

2' - 0" 18' - 0"

2' - 0" 18' - 0"

9' - 1 43/256" 8' - 10 213/256"

TEMPFACILITIES

SHOP

T103

260A

78' -

0"

1' -

7"

52' -

0"

15' -

0"

3' -

0"

8' -

0"

11231123

11231123

02520252

0252

1073

1073

1073

F

A5.5

1

STOREROOM

191

STORESROOM

VESTIBULE

2109'

- 4

"2'

- 0

"

10' - 8"

210C

1' - 6" 6' - 6"

210B

1248

10

A8.2

210A

2' -

2"

1073

7

E.95

F

F.4

11109 11.9

13.612.9

10.7

MAINTENANCEBAY

225

TRASH

186

MECHANIC'SLUNCHROOM

215

MECH.COMPUTER

ROOM

216

FACILITIESPASSAGE

217

LUBEROOM

218

DOCK

MECHANICALEQUIPMENT

222

215B

67' - 0"

216

5' - 0" 1' - 4" 5' - 0" 2' - 8"

A8.1 12

M8-F

M10-P

M8-F

M10-P

IW-5

M8-P

218B

218C

M8-F

M10-P

3' - 4" 4' - 8"

32' - 0"

24" MIN.

WASTE OIL

219

3' - 4" 2' - 0" 8' - 0" 1' - 4"1150

1141

IW-3

20' -

4"

3' - 6" 5' - 0"E

Q.

6' - 0"

6' - 0"

0518

0438

215A

5

A4.20386

0303

EWC-1

217B

217AIW-3 IW-5

3' - 0"1' - 4"

EQ

5' - 4" 16' - 0"

A8.1

3

9' - 4" 13' - 0"

FLOOR FINISH PLANS: SEE /4 A10.1

A5.5

6

A5.5

7

05800580

0580

1202

1202

1202

1202

1202

A4.1

1

F4-FM4-P

6' - 6"

F4-F218D

1202

1202

1202

M10-3

220

3' - 4"

6' - 4"

BOILERROOM

220

1171

0303

10731073

1073

16' - 10 1/2"

0418

1073

1073

0568

1194

11941194

0418

3' - 4" 4' - 8"

22102210

FE-1

EF-1

EF-1

GENERAL NOTES - ARCHITECTURAL PLANS

6. FOR PAVING AND SITE MODIFICATIONS, SEE CIVIL DRAWINGS

7. RELATIVE SLAB ELEVATION. VERIFY EXISTING CONDITIONS. MATCH SLAB EDGE TO SLOPE OF EXISTINGSLAB.

2. EXISTING CONDITIONS SHALL BE FIELD VERIFIED.

3. EXISTING GRID LINES ARE DIMENSIONED FOR REFERENCE AND SHOULD BE FIELD VERIFY PRIOR TOCONSTRUCTION.

1. TOP OF THE EXISTING FIRST FLOOR SLAB IS 2'-6".

8. FOR CNG EQUIPMENT LAYOUT SEE CNG DRAWINGS. FOR CNG PLANT FENCING, GATES, EQUIPMENT PADSAND BOLLARD LAYOUT SEE CIVIL DRAWINGS. SEE ELECTRICAL DRAWINGS FOR TRANSFORMER ANDSECONDARY CABINET LAYOUT.

9. HVAC DUCTWORK, EQUIPMENT, HOT WATER PIPING, JUNCTION BOXES, CONTROL WIRING, CONTROLCONDIUTS AND ASSOCIATED STRUCTURAL SUPPORT SYTESMS ROUTED WITHIN THIS AREA THAT ARE INCONFLICT WITH THE PRPOSED ARCHITECTURAL LAYOUT SHALL BE RELOACTED AND RE-ROUTED TOACCOMMODATE THE ARCHITECTURAL LAYOUT. COORDINATE RELOCATIONS PRIOR TO PERFORMINGWORK. COORDINATE SCOPE WITH CM.

10. SEE ELECTRICAL DRAWINGS FOR LOCATION AND SPECIFICAION OF BATTERY ELECTRIC BUS CHARGING(BEBC) STATIONS AND REELS.

4. INFILL DIMENSIONS ARE PROVIDE AS REFERENCE AND SHALL BE FIELD VERIFIED.

5. ABOVE GRADE CMU CONTROL JOINTS SHALL OCCUR AT CHANGES IN WALL HEIGHT, WALL THICKNESS, ATONE SIDE OF OPENINGS LESS THAN 6FT AND ON BOTH SIDES OF OPENINGS LARGER THAN 6FT BEGINNINGAT ENDS OF LINTEL, AND ADJACENT TO CORNERS OF WALLS OR INTERSECTIONS WITHIN A DISTANCEEQUAL TO HALF THE CONTROL JOINT SPACING. CONTROL JOINT SPACING SHALL OF REINFORCED WALLSSHALL NOT EXCEED 25FT OR 1.5*HEIGHT, CONTROL JOINT SPACING OF UNREINFORCED WALLS SHALL NOTEXCEED 20FT. TYPICAL CONTROL JOINTS SHALL RECEIVE BACKER ROD AND SEALANT. RATED WALLCONTROL JOINS SHALL CONTAIN CERAMIC FIBER BLANKET.

D

3' - 6"9" 9"

2' -

0"

V.I.

F.

0518 0386 0518

9"

DRAWING NO.

DATES AND REVISIONS

NOTICEARCH

ITE

CT

S

SREE

NIG

NE

C

®

ONST

RU

CT

I ON

MA

N

AGERS

THIS ARCHITECTURAL ANDENGINEERING DRAWING IS GIVEN

IN CONFIDENCE. NO USE ORDISSEMINATION MAY BE MADE

WITHOUT PRIOR WRITTENCONSENT OF THE ARCHITECT.

ALL RIGHTS ARE HEREBYSPECIFICALLY RESERVED.

© 2019 RICHARD L. BOWEN + ASSOCIATES, INC.

No. Date / Description

1300

0 S

hake

r B

oule

vard

/ C

leve

land

, O

hio

441

20P

hone

: (2

16)

491-

9300

Fax

: (2

16)

491-

8053

ww

w.r

lba.

com

-

em

ail@

rlba.

com

RIC

HA

RD

L. B

OW

EN

+ A

SS

OC

IAT

ES

INC

.

RLB NO.:

CHECKED BY:

DRAWN BY:

4/29

/201

9 4:

41:1

4 P

M

CO

TA

Fie

lds

Ave

CN

G R

enov

atio

n

8966

1333

Fie

lds

Ave

Col

umbu

s O

H, 4

3215

-307

6

EN

LAR

GE

D P

LAN

S

JBREVICK

KEMLING

02/28/19 / BID-PERMIT SET

04/30/19 / REBID SET

A1.20

SCALE: 1/8" = 1'-0"A1.20

3 DATA / IT

SCALE: 1/4" = 1'-0"A1.20

2 TEMPORARY CONSTRUCTION

SCALE: 1/4" = 1'-0"A1.20

4 01 - STORES WALK-UP VESTIBULE

KEYNOTE LEGEND

KEYNOTE DESCRIPTION0252 OWNER TO RELOCATE FARE RECEIVING FURNITURE, N.I.C.

0253 RELOCATE SAFE, PROVIDE 4” BLOCK BASE. SEE EQUIPMENT DRAWINGS.

0303 REINFORCED CONCRETE FROST SLABS OCCUR AT EXTERIOR DOORS TYPICAL, REFER TOSTRUCTURAL DRAWINGS FOR DETAILS. MIN 5'-0" X 5'-0" U.N.O.

0386 6" CONC. CURB, FACE OF CURB PAINTED. RADIUSED EDGE AND SLOPE TO MATCH EXISTING.

0418 TOOTH IN NEW CMU, WALL TYPE PER ARCH PLANS, TYP.

0438 PATCH CONCRETE PER STRUCTURAL, AS REQUIRED TO BE SMOOTH AND LEVEL WITH EXISTINGSLAB. TRANSITION SHALL NOT EXCEED ADA TOLERANCES, TYP.

0518 POST-MOUNTED 8" DIA. BOLLARD, TYP. SEE DETAIL PER SHEET A5.1.

0568 GUARDRAIL QUESTION MARK END TREATMENT

0580 PATCH EXISTING INTERIOR CMU WALL, PAINT PER FINISH PLAN.

0774 ALL OPENINGS, AND ANY PENETRATION, INCLUDING ALL CONDUIT, CABLE TRAYS, OUTLETS,SWITCHES AND WIRE TROUGHS MUST BE CAULKED AND SEALED.

0775 NOTED IN 2009 DRAWINGS AS FULL HEIGHT PARTITION TERMINATE GYP. BD. AND STUDS AT DECKABOVE SEAL AROUND ALL WALL PENETRATIONS. THIS SHOULD BE VERIFIED BY CONTRACTOR.

0776 IF A RAISED FLOOR CONTINUES OUT OF THE PROTECTED SPACE, BULKHEADS MUST BEINSTALLED UNDER THE FLOOR DIRECTLY UNDER THE PARTITIONS. THESE BULKHEADS MUST BECAULKED TOP AND BOTTOM.

1073 FE-1; BRACKET-MOUNTED FIRE EXTINGUISHER.

1123 RELOCATED FACILITIES SHOP EQUIPMENT, SEE EQUIPMENT DRAWINGS.

1141 ICE MACHINE; N.I.C.; REFER TO PLUMBING DRAWINGS FOR CONNECTIONS AND FILTERS.

1150 VENDING MACHINES; N.I.C.

1171 REFRIGERATOR W/ TOP FREEZER; N.I.C.

1187 SCRAPE AND PAINT RELOCATED FAREBOX RECEIVING COLLAR.

1190 FAREBOX VAULT, SEE EQUIPMENT DRAWINGS.

1192 FAREBOX PROBE, SEE EQUIPMENT DRAWINGS.

1194 SEE EQUIPMENT DRAWINGS FOR LAYOUT AND DETAIL, TYP.

1202 OWNER PROVIDED FURNITURE,TYP, N.I.C.

1248 S.S. COUNTER TOP WITH BOX EDGE.

2210 EXISTING CONCRETE EQUIPMENT PADS, SEE PLUMBING DRAWINGS FOR EQUIPMENT AND DETAIL.

SCALE: 1/8" = 1'-0"A1.20

1 INTERIOR PROGRAM - NORTH

SCALE: 1/4" = 1'-0"A1.20

5 BEBC STATION CURB & BOLLARD

7

Page 2: GENERAL NOTES - ARCHITECTURAL PLANS€¦ · a5.5 6 a5.5 7 0580 0580 0580 1202 1202 1202 1202 1202 a4.1 1 f4-f m4-p 6' - 6" f4-f 218d 1202 1202 1202 m10-3 220 3' - 4" 6' - 4" ... for

J J

J

JJ

J J J

J J J

FF

FFF

FF VW W

FFL L

FF LLF

F

L L

FF

LL FF

LL

FFL L

FF

FF

FFF

F

FF F

F

FF

LL FF

L L

FFL L

FFL L

FF

LL

FF

LL

VW

WV

F F F FF

F

F

F

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

BB

JJ

J

S S S S S S S S S S S S S S

J

JJ

J

J

J

JJ

J J J J

J J J J

F

FU

IU

IU

IU

IF

F

J

J

J

J

J

J

J

J

J

J

S

J

JJ J

S

S

JJ

S

S

J

S

J

S

S

JJ

J J

J J

J J

F

S

J J

J J

J J

J J

J

J

JA

B

C

D

131110987654321

D.02

E1.164

GARAGE STORAGE260

2MWGENERATOR

2500KVAXFMR PAD

TEMP FACILITIESSHOPT103

TEMP FARERECEIVING

T102

TEMP LINE MANAGERT101

NEW R3ATS-3ESDB

TEMP-7

TEMP-19

P18

[FARE BOX PROBE]

L3-24

P20

EL3XFMRT-EP3EP3

E1.141

E1.151

EL3B

EPL1-14

CONTROL ROOM301

IT ROOMEXIST

ELP1-18

ELP1-20

P37

P37

P37 P37P37

P37P37

P37

P37 P37 P37

P37

GF16' MHEP1-22

P41P41P41P41

E1.144

ESD (WP) [EQUIP.MOUNTED]

ESD (WP)[EQUIP.MOUNTED]

ESD (WP)

ESD (WP)

EP-CNG1-11

P47

P47

P47

EP-CNG1-9

EP-CNG1-13WP

WPESD (WP)

ESD (WP) [EQUIP.MOUNTED]

ESD (WP) [EQUIP.MOUNTED]

ESD (WP) [EQUIP.MOUNTED]

ESD (WP) [EQUIP.MOUNTED]

EP-CNG1-15WP

WP

WP

ESD (WP) [EQUIP.MOUNTED]

WP

EP-CNG1-17

M1M2

UH-10

P5-4/6/8

UH-9

EP-CNG1-19/21/23

TEMP

GF GF GF GFGF

GFGFGF

GFGF

GF

GFGF GF

TEMP-27

TEMP-29TEMP-31/33

TEMP-35

TEMP-37/39

TEMP-41

TEMP-8TEMP-10

TEMP-12

TEMP-14TEMP-16 TEMP-18

TEMP-9

TEMP-11

P26

P25

P23

P3

BEB2-1

P66

P67

P68

BEB2-2

P66

P67

P68

BEB2-3

P66

P67

P68

BEB2-4

P66

P67

P68

BEB2-5 P66

P67

P68

BEB2-6

P66

P67

P68

BEB2-7P66

P67

P68

BEB2-8

P66

P67

P68

BEB2-9P66

P67

P68

BEB2-10

P66

P68

P67

[MAU-8]

[CP-8]

[MAU-9]

[CP-9][MAU-10]

[CP-10]

P5-31/33

[MAU-12]

[CP-12][MAU-13]

[CP-13]

P6-31/33P6-35/37

[MAU-14]

[CP-14]

[MAU-15]

[CP-15]

[MAU-11]

[CP-11]

T-TEMP

EP3-40

P73

EP3-44

P73

EP3-46

P73

EP3-48

P73

EP3-52P73

EP3-1P74

P6-28/30

P80

TEMP-32/34TEMP-28/30

TEMP-24/26

TEMP-20/22

P65

P65(TYP.)

(TYP.)

TEMP-36/38

P65

TEMP-40/42

P65

7 7

EP3-50

P73

7 7

7

POWER -GENERAL NOTES

A REFER TO THE STARTERS AND DISCONNECTS SCHEDULE FOR FEEDER SIZE/QUANTITY, CONDUIT, AND ADDITIONAL ELECTRICAL INFORMATION FOR MECHANICAL/PLUMBING EQUIPMENT.

B CONNECT NEW FIRE ALARM DEVICES TO EXISTING FIRE ALARM SYSTEM. PROVIDE ALL NECESSARY EXPANSION CARDS, ACCESSORIES, AND SYSTEM PROGRAMMING FOR ANY NEW DEVICES.

PLAN NORTH

DRAWING NO.

DATES AND REVISIONS

NOTICE

ARCHITEC

TS

SREENIG

NE

C

®

ONSTRUC

TIO

NM

ANAGERS

THIS ARCHITECTURAL ANDENGINEERING DRAWING IS GIVEN

IN CONFIDENCE. NO USE ORDISSEMINATION MAY BE MADE

WITHOUT PRIOR WRITTENCONSENT OF THE ARCHITECT.

ALL RIGHTS ARE HEREBYSPECIFICALLY RESERVED.

© 2018 RICHARD L. BOWEN + ASSOCIATES, INC.

No. Date / Description

1300

0 Sha

ker B

oulev

ard /

Clev

eland

, Ohio

441

20Ph

one:

(216

) 491

-930

0 F

ax: (

216)

491-

8053

www.

rlba.c

om -

ema

il@rlb

a.com

RICH

ARD

L. BO

WEN

+ AS

SOCI

ATES

INC.

RLB NO.:

CHECKED BY:

DRAWN BY:

KEY PLAN

AREA - B

AREA - AC

08/14/18 / SD SUBMISSION10/31/18 / DD PREVIEW11/28/18 / 85%DD12/06/18 / DD SUBMISSION02/13/19 / CD PREVIEW 02/28/19 / BID-PERMIT SET 03/15/19 / ADDENDUM #2 2 03/28/19 / ADDENDUM #5 5 04/30/19 / REBID SET 7

4/29/2

019 2

:38:45

PM

COTA

Fiel

ds A

ve R

enov

ation

8966

1333

Fiel

ds A

veCo

lumbu

s OH,

4321

5-30

76

FIRS

T FL

OOR

POW

ER P

LAN

- ARE

A B

NIR

SMH

E2.12

PLAN NOTESP66 PROVIDE 125KW POWER CONTROL SYSTEM, PROTERRA 125KW SLOW CHARGE DEPOT

CHARGER OR EQUAL, FOR BATTERY ELECTRIC BUS CHARGING. PROVIDE 200A ENCLOSEDSHUNT TRIP CIRCUIT BREAKER IN NEMA 1 ENCLOSURE. PROVIDE (2)-#12 AND (1)-#12 GROUNDIN 3/4" CONDUIT FOR SHUNT TRIP COIL ELECTRICAL CONNECTION. PROVIDE (4)-3/0 AND(1)-#6 GROUND IN 2" CONDUIT FOR ELECTRICAL CONNECTION. EXTEND DC CABLE OVERHEADTO REMOTE CHARGING LOCATION. EXTEND CONCRETE CURB TO ACCOMMODATE FLOORMOUNTING OF CHARGING EQUIPMENT IF REQUIRED. PROVIDE ALL COMPONENTS ANDACCESSORIES FOR A COMPLETE SYSTEM. WIRE COMPLETE.

P67 EXTEND DC CABLE, PER MANUFACTURERS REQUIREMENTS, OVERHEAD VIA TRAY CABLE AT 13'A.F.F. TO REMOTE CHARGING LOCATION. MOUNT TRAY CABLE TO STRUCTURAL STEELOVERHEAD. PROVIDE ALL COMPONENTS FOR A COMPLETE SYSTEM.

P68 REPEL DC CABLE TO CHARGING LOCATION WITH PORT SAE J1772 CSS UNIVERSAL CHARGINGCONNECTOR. PROVIDE ALL REELS, MOUNTING BRACKETS, AND ACCESSORIES PER THEMANUFACTURERS REQUIREMENTS FOR A COMPLETE SYSTEM. WIRE COMPLETE.

P73 ELECTRICAL CONNECTION FOR GAS DETECTION CONTROL PANEL. INTERWIRE GAS DETECTIONPANEL WITH EXISTING FIRE ALARM SYSTEM. VERIFY FINAL PANEL LOCATION IN FIELD WITHEQUIPMENT MANUFACTURER. PROVIDE (2)-#12 AND (1)-#12 GROUND IN 3/4" CONDUIT FORELECTRICAL CONNECTION.

P74 ELECTRICAL CONNECTION FOR BAS/SCATA CONTROL PANEL. VERIFY FINAL PANEL LOCATION INFIELD WITH EQUIPMENT MANUFACTURER. PROVIDE (2)-#12 AND (1)-#12 GROUND IN 3/4"CONDUIT FOR ELECTRICAL CONNECTION.

P80 PROVIDE REMOTE METERING TO PANELBOARD CAPABLE OF PROVIDING RAW DATA FILE INKW, WATTS OR VOLTAGE, AND AMPERAGE READINGS IN AN EXCEL SPREADSHEET. THEMETERED DATA SHOULD HAVE A MAXIMUM OF 15-MINUTE INTERVALS OVER A MINIMUM OFA (2) WEEK PERIOD.

PLAN NOTESP25 ELECTRICAL CONNECTION FOR FAREBOX VAULT. PROVIDE (2)-#12 AND (1)-#12 GROUND IN

3/4" CONDUIT FOR POWER SUPPLY ELECTRICAL CONNECTION. PROVIDE A 20A-1P TOGGLESWITCH DISCONNECT AT UNIT.

P26 ELECTRICAL CONNECTION FOR FAREBOX PROBE. PROVIDE (2)-#12 AND (1)-#12 GROUND IN3/4" CONDUIT FOR POWER SUPPLY ELECTRICAL CONNECTION. PROVIDE A 20A-1P TOGGLESWITCH DISCONNECT AT UNIT.

P37 ELECTRICAL CONNECTION FOR ELECTRIC DOOR LOCK. PROVIDE (2)-#12 AND (1)-#12 GROUNDIN 3/4" CONDUIT FOR ELECTRONIC CONNECTION. REFER TO "SECURITY DEVICE ROUGH-INDETAIL ON SHEET T0.01 FOR FURTHER INFORMATION.

P41 PROVIDE 2" CONDUIT FOR EV CHARGING STATIONS. REFER TO SHEETS E2.13 AND ES1.11 FORFURTHER INFORMATION.

P47 ELECTRICAL CONNECTION FOR ELECTRIC DOOR STRIKE. PROVIDE (2)-#12 AND (1)-#12 GROUNDIN 3/4" CONDUIT FOR ELECTRICAL CONNECTION. WIRE COMPLETE.

P65 ELECTRICAL CONNECTION FOR RADIENT HEAT. PROVIDE 240V, 30A 2-POLE NON-FUSEDDISCONNECT TO DEVICE. PROVIDE (3)-#10 AND (1)-#10 GROUND IN 3/4" CONDUIT FORELECTRICAL CONNECTION.

PLAN NOTESP3 VERIFY FINAL NEMA RECEPTACLE CONFIGURATION WITH OWNER PRIOR TO ROUGH-IN.P18 THIS AREA TO BE BUILT FOR TEMPORARY USE. ALL ELECTRICAL SCOPE INSIDE THIS AREA TO BE

DEMOLISHED AT THE END OF CONSTRUCTION. COORDINATE SCHEDULING WITHCONSTRUCTION MANAGERS PHASING PLAN.

P20 REFER TO THE CIVIL UTILITY PLAN ON SHEET C1.10 FOR FURTHER INFORMATION. E.C. SHALL BERESPONSIBLE FOR THE UTILITY TRANSFORMER PRE-FORMED PAD AND VAULT. E.C. SHALL ALSOBE RESPONSIBLE FOR ALL TRENCHING, CONDUIT, AND PATHWAYS PRIMARY TO THETRANSFORMER.

P23 ELECTRICAL CONNECTION FOR PORTABLE WELDER. PROVIDE A 240V, 30A 2-POLE NON-FUSEDDISCONNECT SWITCH. PROVIDE (3)-#12 AND (1)-#13 GROUND IN 3/4" CONDUIT FOR POWERSUPPLY ELECTRICAL CONNECTION.

SCALE: 1/16" = 1'-0"E2.121 1ST FLOOR POWER PLAN - AREA B

855

Gran

dvie

w A

venu

e, 3

rd F

loor

Col

umbu

s, O

H 43

215

Phon

e: (6

14) 4

43-1

178

Fax:

(614

) 443

-159

4Em

ail:

dyna

mix@

dyna

mix-

ltd.c

omDE

L # 18

0010

AREA A

AREA B

AREA

A

AREA

C

GI

RS

S

RP

FE

O

E ET

L

IG

S

NAO N

RE

E

D

I

R

S

EN

E

HTAT

S

E OF

MACE E-50556

O

OI

MONTGOMERY E-66852GRIFFIN E-57049

Page 3: GENERAL NOTES - ARCHITECTURAL PLANS€¦ · a5.5 6 a5.5 7 0580 0580 0580 1202 1202 1202 1202 1202 a4.1 1 f4-f m4-p 6' - 6" f4-f 218d 1202 1202 1202 m10-3 220 3' - 4" 6' - 4" ... for