Upload
gridins-group
View
225
Download
0
Tags:
Embed Size (px)
DESCRIPTION
General GG catalog
Citation preview
1 - PRESENTATIONGRIDIN’S GROUP
Aleksandras GridinasMain owner of “Gridin’s group”
At the beginning of shipbuilding business development the situation inLithuania was not favourable as there were no berths and shipyards.We were searching for other opportunities exploring the globalshipbuilding companies. We tried and the results showed that we areable to work according to global quality standards. We realized thatwe can find solutions that exceed customers’ expectations! This wasour new opportunity. Today we are well known and this helps to gainconfidence, but we also understand that only the professionalism,responsibility and continuous improvement will enable us to preserveour current position and move forward for even greater results andopportunities.
GRIDIN’S GROUP PRESENTATION - 2
2009
2005 2005
3 - PRESENTATIONGRIDIN’S GROUP
Main projectsin 10 years
2007
2004
2006
2005
2001 2006
GRIDIN’S GROUP PRESENTATION - 4
2001 Renovation of sailing-vessel “Meridianas” (Lithuania)
2002 Renovation of the largest Riga cable-stayed bridge (Latvia)
2004 Dismounting of the third block at Ignalina nuclear power plant (Lithuania)
2005 Decommissioning and reconstruction of Atomium structure (Belgium)
2005 Renovation of Grendland bridge (Norway)
2005 Assembly and construction of Stena Line ferry superstructures (Norway)
2006 Inspection and renovation of Uddevalla bridge (Sweden)
2006 Inspection and renovation of Oresund bridge (Denmark)
2007 Fabrication of DSV, ROV, SRV vessels’ hulls (Sweden)
2009 Subcontractor of the world’s largest cruise vessel “Oasis of the Seas” (Finland)
Hull building
Steel constructionsAluminium constructionsPiping production works
Conversion of vesselsShipbuildingandR
Shipepair
5 - PRESENTATIONGRIDIN’S GROUP
Gridin s Group companies that started
producing sections and blocks for the ship
building industry as from 2002, today are
experienced enough to carry out complex
ship hull construction and various steel
structure production projects.
ompany also mastered executing piping
system production and assembly work.
Today Gridin s Group employs no less than
700 professional workers to
the ship building and repair sector.
’
The
c
’
and certified
GRIDIN’S GROUP PRESENTATION - 6
7 - PRESENTATIONGRIDIN’S GROUP
SHIPBUILDING AND SHIP REPAIR
Building Sections And Grand-BlocksFor The Biggest Cruise Vessels
STX Turku (Finland)
Freedom Of The SeasIndependence Of The SeasLiberty Of The SeasOasis Of The SeasAlure Of the Seas
Hull ConstructionFor Supply Vessels
Landskrona Varvet (Sweden)
Main dimensions of hulls:108,30 m96,60 m
24,00/28,00 m6,60 m9,60 m
12,50 m15,10 m17,90 m600 mm
Length O.A. -Length P.P. -Breadth -Depth to 1st. deck -Depth to 2st. deck -Depth to 3st. deck -Depth to 4st. deck -Depth to 5st. deck -Frame spacing -Accommodation for 72 for persons +hospital class: DNV*1A1, EO, RP,Comfort V(3)-C(3) Clean design, NautAW, Heldk-SH, ICE C (hull only)
NB 82 - m/v Geo CaspianNB 81 - m/v Deep SygnusNB 78 - m/v VolantisNB 77 - m/v Geowave EndeavourNB 76- m/v Bibby Topa
GRIDIN’S GROUP PRESENTATION - 8
Aluminiumconstructions
SHIPBUILDING AND SHIP REPAIR
9 - PRESENTATIONGRIDIN’S GROUP
Piping systems
10
11 - PRESENTATIONGRIDIN’S GROUP
SHIPBUILDING AND SHIP REPAIR
Heavy SteelProductionFor MachineryAnd Wind Turbines
GRIDIN’S GROUP PRESENTATION - 12
DrydockingIn Black AndBaltic SeaPorts
Gridin s Group companies started ship repairs activity in Klaipeda port ofBaltic Sea from 2002, today are experienced enough to carry outcomplex ship repairs, conversions and various steel structure productionprojects Baltic Sea port of Klaipeda (Lithuania) and Black sea ports ofOdessa, Sevastopol and Kerch (Ukraine) in docking and alongsiderepairs.
’
in
Company offers following works to be carried out and services provided:Dry-docking and alongside repairs;Maintenance and general repairs;Engine and other machinery repairs;Electrical repairs;Grit blasting and painting of hull, cargo holds, tanks;Steel works;Pipe works;Insulation works;Tail shaft and rudder repairs.
13 - PRESENTATIONGRIDIN’S GROUP
Docking capacities in Blac Sea area
JSC "KLAIPĖDOS LAIVŲ REMONTAS" (Klaipėda, Lithuania)
k(Odessa, Sevastopol, Kerch)
Length up to - 290 mBreath up to - 50 mLifting up to - 60 mCrane up to - 75 t
Floating docks:dimensions L x B = 65x14 m, 1200 tonsdimensions L x B = 65x14 m, 1000 tons
berthing up to 300 m lengthfloating crane 100 t capacity
GRIDIN’S GROUP PRESENTATION - 14
Rope AccessServices
JSC Gridins Enterprise LT specializes in variety of ropeaccess services. Rope access techniques assist inreaching places of difficult access without use ofscaffolding, cranes, or mobile platforms. The benefitsof using rope access are proven and clear: exemplarysafety record, time and cost efficiency, quick responseteams - all factors that can provide considerable costbenefits in solving practical problems.
Our membership in IRATA (International Rope AccessTrade Association) opened the doors to Oil & Gasindustry both onshore and offshore. Now IRATArequirements and guidelines are nearly universal andare widely used at offshore installations.
Gridins Enterprise LT is not only a labor supplyingcompany, we are also involved in projectdevelopment from the very beginning to the end,presenting the whole set of project documentationand reports. Our multi-skilled staff is ready to meetindustry challenges and perform a wide range ofservices.
15 - PRESENTATIONGRIDIN’S GROUP
GRIDIN’S GROUP PRESENTATION - 16
17 - PRESENTATIONGRIDIN’S GROUP
ROPE ACCESS SERVICES
Offshore
RiggingWater jettingInspection
Floating jack-up crane “Wind Lift I”Tank repair, Cyprus
Chimney repair, Cyprus
Maintenance & Repair
GRIDIN’S GROUP PRESENTATION - 18
ROPE ACCESS SERVICES
19 - PRESENTATIONGRIDIN’S GROUP
High RiseStructures –Bridges & Towers
bridge “Grenlandbrua”, Norwaybridge “Uddevalla”, Swedenbridge “Oresund”, Sweden“Aspire Tower”, Doha, Qatar
GRIDIN’S GROUP PRESENTATION - 20
FabricMaintenance
painting/blastinghigh pressure water jetting
application of coatingsindustrial cleaning
ROPE ACCESS SERVICES
cleaningrepairs at the rotor bladerepair of crackscorrosion treatment
21 - PRESENTATIONGRIDIN’S GROUP
WindTurbineMaintenance
GRIDIN’S GROUP PRESENTATION - 22
Installation &Decommissioning
stadium workspower plant services
chimney decommissioningequipment & device installation
- PRESENTATIONGRIDIN’S GROUP23
InternationalTraining Center
ROPE ACCESS SERVICES
Gridins enterprise LT is a full member of Irata from 24 March, 2004specializing in industrial rope access both off - and onshore. Since becominga member our company has carried out some important steps to promoteIRATA in Lithuania and to become a commited member. As a proof in early2010 we designed and opened the international training center.
GRIDIN’S GROUP PRESENTATION - 24
Our doors are open to all willing to be certified: technicians from Egypt, Moldavia,Latvia, Estonia, Russia and Azerbaijan were certified. Total number of certifiedtechnicians from mentioned countries this year is 34.
The international training center offers the training possibility both indoors andoutdoor. The training center constructions are suitable for special forces, firefightersand other authorities’ needs.
Center offers a fully equipped kitchen and canteen. All kitchen appliances arecertified according to EU standarts.
The international training center provides the possibility to gain the skills andqualification of welders, painters, fitters, riggers as well as rope access technicians.The major attention is paid to rope access training service. We strongly follow therequirements of Irata and try to provide the possibility for technicians to operate inmore real conditions during training. The technicians have the possibility to gettraining indoor facilities as well as outdoor. All the time we are cooperating withspecial forces, firefighters and emergency institutions. The training center providesthe cooperate trainings for mentioned institutions.
UAB “Klaip d N cent ” is one of the Gridin's Group companiesin Klaip da, Lithuania is involved in ultrasonic
thickness measurements, condition evaluation of ships and steelstructures, as well as inspections all over the world. hecompany provides repair recommendations and consulta c shipping
.
NKC Currently holding the following valid approval certificates issuedby: ABS, LR, DNV, GL, BV, RINA, RMRS. NKC implemented QMS systemidentical to ISO 9001:2000 as condition for approval gained byClassification Societies; however the QMS was not certified by any thirdparty. Our partner within Gridins Group “Gridins Enterprise”, whoprovides us IRATA qualified and certified UTM operators is holding ISO9001:2000 certificate issued by Lloyd’s Register as well as IRATA trainerand operator certificate.
ė os K ras ,based ė . The company
other UT Tn y for
and industry
General experience in Inspection works:
Non-DestructiveTesting
Our specialization is wide range of automatic and manual inspections onmetal structures (Marine & Industry) using Ultrasonic Technique &Equipment and qualified personnel, made according to any applicablestandards (ISO, EN, ASME). The following techniques are used:
P-scan for weld inspection;T-scan for corrosion mapping;Through Transmission for composite testing;TOFD for detection and sizing;Full A-scan recording for off-line processing;UTM of steel structures to determine residual thickness;UT Flaw Detection of welds.
25 - PRESENTATIONGRIDIN’S GROUP
GRIDIN’S GROUP PRESENTATION - 26
NON-DESTRUCTIVE TESTING
27 - PRESENTATIONGRIDIN’S GROUP
Ultrasonic thickness measurements of any type of the vessel: bulkcarrier, general cargo, oil tanker, crude oil tanker, chemical tanker,reefer, container, ro-ro, car carrier, liquified gas carrier, passenger shipor any other special type of the vessel. Experienced inCAP/CAS, URS-31, 19, 26, 27, and in providing technicalassistance to Superintendent while repairs.
UltrasonicThicknessMeasurements
Ultrasonic thickness measurments and
inspection of using
rope access methods
s industrial objects
. Experience in
carrying out work at significant heights.
Reports with visual presentation of
deficiencies. Preparation of work
specifications. Assistance in close- up
surveys using CCTV.
GRIDIN’S GROUP PRESENTATION - 28
When necessary, ultrasonic thickness
inspection works may be carried out by
IRATA certified rope access technicians.
Such works are carried out in the places of
restricted access without using scaffolding,
staging or rafting. It ensures safe, quick,
and efficient work without any additional
Customer’s expenses.