22
Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Embed Size (px)

Citation preview

Page 1: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Gene Therapy at Hammersmith Hospitals NHS

Trust

Northern Biological Safety Officers Meeting, Leeds

15 May 2006

Page 2: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Once upon a time……Jo’s Story

Sir John McMichael Centre Gestation 5+ years DOB - 9/10/00 Height - two floors Weight - equivalent of an inpatient ward

and outpatient area combined

Page 3: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Jo’s Story part 2…..

New addition to the family announced Spring 2000

Gene Therapy Suite required Due date early 2001 Plans adapted - from rooms originally

intended as a one-bedded patient room with en-suite facility…….

Page 4: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Office

Patient

Monitoring

L

a

b

Clinical

Pharmacology

Dr’sOfficeSingle

room

Interview room

Quiet Room

Office

Emergency Exit

StaffRoom

Clinical Store

Consulting2

Consulting1

DirtyUtility

Shower

Toilet

Domestic

Clean Utility Kitchen

Head Nurse

Ground Floor - C2

Page 5: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Female Bay

Male Bay

Nurses Station

Femaleside room

Male side

room

Gene Therapy Suite

Dayroom

Store

Office

Kitchen

Clean Utility

First Floor - C4

Page 6: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Sharon’s Story

Heard ‘by chance’ from two sources (Imperial College and Trust)

Registered premises / set up GMSC Consider Trustwide approach Assess 1st activity Design training Produce forms / procedures / guidance One system for Class 1 and 2

Page 7: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Areas involved

Pharmacy Primary ward Diagnostic labs Research labs

(HHT/ IC / MRC) Labs off site - inc

overseas

‘Secondary ward’ e.g. ITU / CCU

Theatres A/E Mortuary / PM room

Page 8: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

The GMSC Hammersmith Hospitals NHS Trust Gene Therapy

and Genetic Modification Safety Committee (HHT GT/GMSC)

Sub committee of the Trust’s Health, Safety, Fire and Security Committee (HSFSC)

Set up to consider gene therapy and GM proposals Chaired by Consultant in Infectious Diseases Terms of Reference – reviewed annually Risk register (one high risk – ‘adverse publicity’)

Page 9: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

HHT GT/GMSC

Safety Office R&D Office Partner Organisations Unions (JUP) Partner Organisations

Safety Office (GM Officer)

Dept of Infectious Diseases

Facilities Environmental

Manager Research Heads SJMMC Pharmacy Infection Control Occupational Health Ethics Committee

Page 10: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Biological Safety Officer

One for each project Not in the traditional role – support via

Safety Office (USC) First volunteer…? Support from Senior Management (via

Clinical and Non-clinical routes)

Page 11: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Communication issues

Academic and clinical staff Defined roles / responsibilities Defined reporting routes PI must talk to all involved Contingency plans / emergency contacts Cross representation on committees Accident reporting

Page 12: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Projects

11 approved so far 4 active (three now ‘closed’) – Schering,

Trovax, Oncovex and MetXia 2 about to start - approved in March 1 not directly Trust (drug administered

elsewhere - scans carried out on HHT premises) – need to be aware in event of emergency admissions

Page 13: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

GT/GM Risk Register

Adverse publicity Exposure to GMOs Unforeseen clinical

outcomes Release of GMOs

Waste management Unrecognised risks

of the biological agent used

Unauthorised work Malicious acts

Page 14: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Standards

1. Board level commitment to gene therapy development in the Trust

2. GMSC to endorse all GM activities, guidance, policy, monitoring etc

3. Properly constituted investigative team

4. Written policies, procedures, guidance

5. Regular report to HSFSC, Risk Management Committee and Trust Board

Page 15: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Standards continued…

6. GMSC and BSO have access to relevant, up to date legislation and guidance

7. Staff trained to an appropriate level

8. Monitoring and review by management

9. Audit – internal and external

10. Use of GMMs should comply with good research governance within the Trust and Partner Organisations

Page 16: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Contacts / Further Info

Josephine Studham

[email protected]

Sharon Wood

[email protected]

K.B. Bamford, S. Wood, R.J. Shaw ‘Standards for gene therapy clinical trials based on pro-active risk assessment in a London NHS Teaching Hospital Trust’ Q J Med 2005; 98 75-86

[email protected]

Page 17: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

First floor – C4

Page 18: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Gene therapy Suite

Page 19: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Suction containment

Page 20: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Waste

Page 21: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Labelling

Page 22: Gene Therapy at Hammersmith Hospitals NHS Trust Northern Biological Safety Officers Meeting, Leeds 15 May 2006

Procedures