Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
GEInfrastructure
2
GE Infrastructure
Business objectives
• Capitalize on strong markets
• Invest/win with great technology
• Globalize … emerging markets
• Growing services/adjacencies
• Operating excellence … lean
• Creating business synergies
Environment
• Aviation … industry strong … traffic �
• Energy … riding international strength
• Oil & Gas … � fuel price, � capex
• Transportation … int’l & mining �
• Water … Demand everywhere
Great markets … GE advantages … strong financials
3
Great markets … O&G “Visible” opportunities
~$50B+ “visible” opportunities
~$14B Middle East opportunities
� Saudi: $200B spend, up and downstream
� India: $60B plan in oil & gas projects
Opportunity geography Key opportunities
~$11B European opportunities
�North sea: strong sub-sea activity
� Russia: Artic LNG and new gas pipelines
N. America
MEA + India
~$15B Americas opportunities
�NA: focus on drilling and downstream
� Brazil: Petrobras to spend $87B
Latin America
Europe
Asia
15%
34%
22%
19%10%
4Global expansion driven by emerging
mkts, commodities growth
17
25 25 26 27
N. Am China Russia/CIS India L. Am
• RR’s critical in developing countries
• Coal & commodity growth
• Freight corridors, land bridges & mining
• Emphasis on reliability, life cycle, & emissions
Approx.Fleet Size
27,700 11,400 13,600 4,900 3,600
2003 2004 2005 2006 2007e
Global backlog (locos)
Key Wins:• Kaz/Russia/CIS (Loco’s, Mods, OHV) $1.0B+• China (Locos, Signaling, OHV, O&G, M&S) $800MM+• Middle East/Africa (Loco’s, M&S, Parts) $350MM+• SEA/ANZ (Loco’s, M&S) $130MM• Europe (Loco’s, Mods, Signaling, M&S) $150MM+• S. America (Loco’s, OH’s) $100MM
30110 120
640
760
Targets:• MEA (Loco’s, Mods, Signaling, MSA) $1.5B+• S. America (Loco’s, Signaling, MSA) $1.0B+• Europe/Russia/CIS (Loco’s, Mods, Signaling, MSA) $1.0B+• China/SEA/ANZ (Loco’s, Mods, Signaling, MSA) $1.0B+
Age of fleet (years)
Great markets … Transportation global growth
5
Great markets … unprecedented water challenges
Increasing water scarcity
Threat of waterborne illness
“Developing” growth
Rising energy costs New regulations Infrastructure demands
6
+$20MM annual operating
improvements
+$100MM asset value increase
Partner with GE Energy
• Win where others don’t see value …
GE Energy support in due diligence
• Improve EBITDA of investments …
efficiencies, expansions, O&M
optimization, NPI
• Identify under-valued opportunities
early
GE’s investments
� Variable frequency transformer, Linden 7 upgrade
� Capacity / Heat rate improvements
� Contract restructuring
Creating value
Linden, NJ: expansion & efficiency
� 30+ operating locations� Gas, coal & wind generation
7
GE advantage … adjacency growth in Wind
• Clear product strategy …technology differentiation
• Price > inflation• Operational rigor …global supply chain/logistics
Drivers
• 2.5 MW platform• Services execution
Beyond ‘08
$3.5
$2.3
'05 '06 '07E '08E
$4.3
’09E
~20%Sales($ in billions)
~25%
ROTC % U ~50 F
8
14,600
8,2004,300
21,900
4,600
12,600
Commercial engines Commercial installed base
GE advantage … Commercial Engines
EA‘96 ‘06 ‘16F
GE
CFM
Fleet in active commercial serviceSource: ACAS, GE internal studies
GP7000 developed by GE/P&W Engine AllianceCFM is a 50/50 joint company between GE and Snecma
• Best-selling on regionals … 800 engine backlog
• Best-selling on single-aisle … 4,500 engine backlog
• Best-selling on Boeing 787 … 630 engine backlog
• Best-selling on wide-bodies … 2,250 engine backlog
9
Strong financials … Energy business evolution
Invest + deliver
GE business model
+ ESBWR launch
GE ref plant
+ GE global footprint
Reinvestment & grid intelligence
Bently operational excellence
GT
Wind
Nuclear
Gasification
Gas engines
Environmental
T+D
Controls
Solar
Emissions operating efficiency
Differentiate with IP … business model / value prop
Engineering commitment
‘05 ’07E
5,100
~7,600
+50%
10
Strong financials … lean capacity at Aviation
GE90 Assembly and Test
CFM56 Turbine Blade
3730
19
'05 '06 '07 YTD
Cycle Time (days)
• Material kitting
• Standard blocks of work
• Automated test setup
• Single piece flow lines
• Quick change tooling
• Robotics
42
29
'06 '07 YTD
Cycle Time (days)
11
31 days
Sub-assemblies Paint Test
10days
AssemblyComponents
20 days
15 days
07
08
09
“Lean” to build capacity EVO Cost-Out
Reliability Remanufacturing
Launch 2007e
11% reduction
0
6
12
D-9
AC4400
AC6000
EVO '05
EVO '06
80% reduction
Failures / Loco Year (F/LY) 2005 2007e
Transportation CM%
+6 pts
•~10,000 loco’s under Service… ~$12B+ backlog
•Reman parts 30-40% less cost w/no adverse impact to performance
•$500MM+ life-cycle-cost oppt’y
Strong financials … expanding Transportation margins
12
Infrastructure: investor perspective
Great Markets … should be for a long time
• Three “macro tailwinds” … oil/gas, environmental, energy demand
• 2B+ people need what we sell
Unique GE advantage … “horizontal leverage”
• Technical breadth and execution
• Resources to invest in next-gen technologies and adjacencies
Strong financials … many products, many markets (vs. power bubble)
• Services mix should improve
• Supply chain excellence
40% of GE … in great shape
GEInfrastructure