GEI Consultants, Inc. .
Suffolk Building 53 Regional Drive Concord, NH 03301-8500
603-224-7979
June 7, 1994 Project 92113
Mr. James DiLorenzo Londonderry Remedial Project Manager US Environmental Protection Agency Waste Management Division JFK Federal Building HSN-CAN5 Boston, MA 02203
Subject: Tinkham Garage Site Management of Migration Water Quality Sampling Quarter 1 - June 1994
Dear Mr. DiLorenzo:
Based on our May 25, 1994 telephone conversation, GEI Consultants, Inc. (GEI) has scheduled the week of June 13, 1994 to initiate the Management of Migration (MOM) water quality monitoring program at the Tinkham Garage Site (site) in Londonderry, New Hampshire. Because the draft interim MOM Work Plan for ground water monitoring will be submitted while sampling is in progress, GEI proposes to conduct the Quarter 1 (Spring 1994) sampling event for volatile organic compounds (VOCs) hi general accordance with the prior EPA-approved document, Sampling and Analysis Plan (SAP) for On-Site Ground Water Discharge Evaluation. for the site, dated June 16, 1992 (GEI Project Number 89136). The following modifications to the June 1992 SAP are proposed:
• The MOM water quality monitoring program's sampling and data quality objectives are specifically outlined in the draft interim MOM Work Plan. These objectives, as drafted, take the place of the 1992 Sampling and Data Quality Objectives (Section 2). The data obtained from the water quality monitoring program will be used to evaluate concentrations of VOCs present in site ground water as the MOM remedy is implemented. Wells with detectable Total VOC results from the Quarter 1 sampling will be resampled in Quarter 2. The data quality objectives of representativeness and comparability are emphasized for the MOM monitoring program.
Winchester, Massachusetts L\.n\ er, Colorado Carlsbad, California Raleigh, North Carolina
Mr. James DiLorenzo - 2 - June 7, 1994
The site-specific Health and Safety Plan (HSP) of the June 1992 document will be revised to reflect the current GEI staffing for the sampling event. Section 6 of the HSP, Decontamination and Disposal, will have all references to decontamination with methanol removed. Alconox detergent will be used in place of methanol. We do not plan to containerize water purged from wells or water used for equipment decontamination.
Samples will be collected from the 56 wells designated in Table 4 of the draft interim MOM Work Plan (see attached). Well locations are shown on the draft Figure 2 (attached). Also attached for reference is the draft well summary table (Table 1) of the draft interim Work Plan document. The wells which will not be sampled in Quarter 1 of the water quality monitoring program are shown "shaded" in Table 4. GEI borings and well installations performed in 1992 were not intended for the purpose of ground water sampling. As such, they have been excluded from the water quality monitoring program. The reasons the "shaded" wells in Table 4 are not to be sampled include; the wells have been destroyed or have not been found; or the wells are currently non-functional for water quality sampling and require rehabilitation. Wells in strategic locations which have less than 75 percent of their screened or open-hole intervals open will be rehabilitated. Wells FW-11 and NAI-B will be proposed for rehabilitation (i.e., to reopen more of the installed screened section) between Quarter 1 and Quarter 2 (August 1994) of the water quality monitoring program sampling events. Other well rehabilitations, or exclusions from the water quality monitoring program, will be proposed based on the results of the Quarter 1 sampling.
Quarter 1 water quality samples will be collected by disposable PVC bailers for EPA Method 624 or Contract laboratory Program (CLP) Statement of Work (SOW) VOC analysis. The analyses will be performed by National Environmental Testing, Inc., Cambridge Division (NET), in Bedford, Massachusetts. The Quality Assurance Project Plan (QAPP) presented in the draft interim MOM Work Plan for water quality monitoring will supersede the June 1992 Appendix B QAPP where appropriate. NET's Laboratory Quality Assurance Plan (LQAP), Revision 4, dated April 15, 1994, and Standard Operating Procedure (SOP) for Volatile Organic Analysis of Aqueous Samples by Purge and Trap/Capillary or Packed Column Gas Chromatography/Mass Spectrometry, dated May 11, 1994, are provided in the MOM Work Plan and will be followed for the Quarter 1 water quality monitoring program analytical work. Tables 7.1 (pages 3 and 4, of 14) and 9.1 (pages 2 and 3, of 19) of the LQAP contain Quality Control Objectives, and Analytes and Reporting Limits, for Method 624 and CLP 3/90 SOW analyses as performed by NET.
Mr. James DiLorenzo - 3 - June 7, 1994
• Section 5, Sampling Equipment and Procedures, of the June 1992 document will be modified to include development for sampling of deep bedrock wells by a continuous (15 minute), slow (5 to 10 gallons per minute), single-depth purge of the well with a submersible pump (as proposed in the draft interim MOM Work Plan for water quality monitoring program sampling of deep bedrock wells). This method of well development is used by GEI for bedrock well sampling at another superfund site. The VOC samples will be collected from the developed-depth with disposable bailers. The length of tubing used to reach the development-depth (within the bottom one-third of the well) will be dedicated to the well. Should the water level in the well be lowered to the depth the pump has been set at, additional tubing will be added to the setup to lower the pump to within 90 percent of the total open well depth and the well's development will be continued for an additional 15 minutes at 5 to 10 gallons per minute or until the well goes dry. Decontamination of the pump will be performed with Alconox-soap solution washes and water rinses. One submersible pump equipment blank sample will be collected for every 10 uses of any pump used to develop wells for sampling.
• Section 7 of the 1992 document, Data Evaluation and Reporting, will be superseded where appropriate by the data evaluation and reporting requirements as presented in the draft interim MOM Work Plan. All VOC samples collected in Quarter 1 will provide Level III analytical data (OSWER Directive 9355.0-78) and will be reviewed for data completeness, holding times, blank analyses, duplicate analyses, matrix spike and surrogate spike analyses, laboratory control sample analysis, and reporting limits. Ten percent (10%) of the wells sampled in Quarter 1 will have split samples collected for Level IV CLP SOW VOC analysis. A Level IV data validation will be performed on the laboratory CLP deliverables.
• Section 8, Schedule, of the 1992 document will be revised as follows:
1. Collection of MOM water quality monitoring program samples for Quarter 1 is scheduled for June 13, 1994, provided EPA's/New Hampshire Department of Environmental Services' approval is given to proceed as outlined in this letter.
2. Analysis and reporting of analytical results by NET to GEI will be completed within three weeks following the completion of the Quarter 1 water quality monitoring program's sampling event.
3. Deleted.
Analysis of samples from the relatively large number of wells which we propose to sample in Quarter 1 will provide current, comprehensive, baseline data of ground water quality at the site. GEI will propose specific wells for rehabilitation or deletion from the MOM water quality monitoring program as soon as we move past the first quarter's water quality sampling. The next three sampling quarters (Quarter 2, August 1994; Quarter 3, November 1994; and
Mr. James DiLorenzo - 4 - June 7, 1994
Quarter 4, February 1995), prior to the one year anniversary sampling (Quarter 5; May 1995), will include sampling only those wells with detected VOC results. As you know, the MOM water level monitoring program has also begun.
We collected the second month of water level data on June 1, 1994. The monthly water level monitoring of all functional site wells will continue to be scheduled for the first week of each month.
Please call me if you have any questions.
Sincerely,
GEI CONSULTANTS, INC.
Robert A. Mullin, P.E. Project Manager
RAM:RVE/cab
(also faxed this date)
cc: Ms. Diane Leber Enclosure
TABLE 1 - SUMMARY OF MONITORING WELL CONSTRUCTION AND SAMPLING INFORMATION Management of Migration Tlnkham Garage Site Londonderry, New Hampshire
Well No
FW-01
FW-02
FW-02D
FW-03
FW-03D
FW04
FW05
FW-06
FW-07
FW-08
FW-08D
FW-09
Type of Well
overburden/shallow bedrock
shallow bedrock, gradient couplet
intermediate bedrock, gradient couplet
shallow bedrock, gradient couplet
intermediate bedrock, gradient couplet
shallow bedrock
shallow bedrock
shallow bedrock
overburden, pond water level measure
shallow bedrock, gradient couplet
intermediate bedrock, gradient couplet
overburden/shallow bedrock
Relationship to Site Installed Contamination, By and Location1"
Upgrad , 750' NE oftfl* Garage soils, NUS/FIT near the Tinkham fealtyBIgg 1983
1525' WSW ofXne Sarage\soik, NUS/FIT Off McAlltste/ Dnye / J 1983
1 525' WSW of the. Garage stills, / Nqs/FiT Off McAllister 1X^30' N .of FW-02/ 'NS983X
/ <. 1 075' WSW of Garage soils, / ~ -WUS/FJT between Mercury & McAllister Dr? > 1983/
^y 1075' WSW of the Garage soils, / NUS/FIT between Mercury & McAllister Drs \ /1 983 /
/"
1 100' SW of the Garage soils, NUS/FIT Mercury Dnve adj to ERT 02 1983
825' SW of the Garage soils, NUS/FIT Mercury Dnve ad) to ERT-01 1983
1600' Sw of the Garage soils, NUS/FIT Mercury Dnve adj to LGSW 1983
1700' SW of the Garage soils, NUS/FIT 150' SSEof well LGSW 1983
1475' SW of the garage soils, NUS/FIT 300' E of LGSW 1983
1475' SW of the Garage soils, NUS/FIT 300' E of LGSW 1983
600' W of the Garage soils, NUS/FIT 100' WSW of Tinkham Garage 1983
Construction
1 5" PVC
1 5" PVC
6" open hole
1 5" PVC
6" open.hole
, / /
1,5" PVC
/
/1 3" PVC / .
/ ' 1 5" PVC
1 5" PVC
1 5" PVC
6" open hole
1 5" PVC
Measunng Point Elm
Steel (S) or PVC (P),
(ft)
32779
29505
29717
29222
_(S|
29123 X
r \ 283,68
271 09
262 15/ /
27368
174 15
30743
Depth to Bottom
(ft)
402
255
101 0
230
1020
301
303
275
/X "> 45
29 1
1020
360
Approx Wetted
Vol (gal)
3
2 3
144
1 7
50
89
24
1 9
-
2
141
27
Most Recently Reported
VOCs fall) [date]
ND [02/13/92]
ND [12/18/84]
[07/01/83]
ND [01/03/85]
ND [04/02/85]
169 [12/27/84]
194 [12/27/84]
5 [12/26/84]
ND [12/27/84]
ND [12/18/84]
59 [12/18/84]
ND [02/13/92]
Sampling Equipment
g|3|
B
P,B'"
B
P.B
B
B
B
-
B
P,B
B
Project 92113 MOM SAP, Volume I of II FSP GEI Consultants, Inc Page 1 of 8 Revision 0, June 6, 1994
TABLE 1 - SUMMARY OF MONITORING WELL CONSTRUCTION AND SAMPLING INFORMATION Management of Migration Tinkham Garage Site Londonderry, New Hampshire
Well No Type of Well
Relationship to Site Contamination, and Location1'1
Installed By
Construction
FW-10 overburden, gradient couplet
600' S of the Garage/Sods, Off the dirt road / N^
NUS/FIT 1983
1 5" PVC
FW-10D shallow/intermediate bedrock, gradient couplet
6001 S of the GaragesoilsKOff the dirt ro&d / j
\ )
NUS/FIT 1983
6" open hole
FW-11
FW-11D
FW-12
FW-13
overburden, gradient couplet
shallow/intermediate bedrock, gradient couplet
shallow/intermediate bedrock,
overburden
6001 SE oi She Garage, soils/ / Off the dirt road^ ^X /
/ < 600' SE of the Garage soils, / ~ Off the dirt road < /
\/ 11 00' SSE of the Garage soils, / Off the dirt road <
1100' SSE of the Garage soils, Mercury Drive adj to ERT-01
NCJS/FIT -4983,
^NUS/F)T igja7
^US/FIT /1983
f
NUS/FIJ 1983
1 5" PVC
6" open hole
1 5""PVC
- / /
1,5" PVC
FW-14
FW-14D
overburden/shallow bedrock, gradient couplet
intermediate/deep bedrock, gradient couplet
1025' S of the Garage soils, Off the dirt road
1125' S of the Garage soils, Off the dirt road
NUS/FIT 1983
NUS/FIT 1983
/I S" PVC /
' // /
6" open hole
r
FW-15 overburden/shallow bedrock, gradient couplet
3200' SW of the Garage soils, 300' W of Bldg s K,L
NUS/FIT 1983
1 5" PVC
FW-15D intermediate/deep bedrock, gradient couplet
3200' SW of the Garage soils, 300' W of Bldg s k.L
NUS/FIT 1983
6" open hole
FW-18 overburden/shallow bedrock 2450' SW of the Garage soils, Capital Hill Or , adj to ERT-06
NUS/FIT 1983
1 5" PVC
FW-17 overburden/shallow bedrock 2650' SSW of the Garage soils, Capital Hill Or along the unnamed tributary
NUS/FIT 1984
1 5" PVC
Measuring Point Elm
Sleel (S) or PVC (P),
(ft)
291 55
29248
28280
28324
27963
27986
/^ ^. -?72,66
? / ' 281 67
/
284 29/
/ / < /
28608
25543
23345
Depth to Bottom
(«)
285
101 0
240
101 0
758
200
440
2050
/^- ) 370 '
2050
280
427
Approx Wetted
Vol (gal )
21
120
2
130
64
1 4
38
287
22
271
22
37
Most Recently Reported
VOCs to/L) [date]
ND [02/14/92]
ND [12/27/84]
1,074 [12/10/87]
268 [12/24/84]
ND [12/26/64]
ND [12/26/84]
ND [12/27/84]
10 [12/31/84]
ND [12/18/84]
ND [12/18/84]
278 [02/01/90]
79 [02/18/84]
Sampling Equipment
B
P.B
B
P.B
B
B
-
P.B
B
P.B
B
B
Protect 92113 MOM SAP, Volume I of II FSP GEI Consultants, Inc Page 2 of 8 Revision 0, June 6, 1994
TABLE 1 - SUMMARY OF MONITORING WELL CONSTRUCTION AND SAMPLING INFORMATION Management of Migration Tlnkham Garage Site Londonderry, New Hampshire
Well No
FW-18
FW-19
FW-20
FW-21
FW-21D
FW-22
FW-22D
FW-23
FW-23D
FW-24
Type of Well
overburden
overburden
overburden/shallow bedrock
overbuden/shallow bedrock. gradient couplet
intermediate/deep bedrock, gradient couplet
overburden/shallow bedrock, gradient couplet
Intermediate/deep bedrock. gradient couplet
overburden/shallow bedrock, gradient couplet
intermediate/deep bedrock, gradient couplet
overburden/shallow bedrock, gradient couplet
Relationship to Site Contamination, and Location'1'
2100' SW of the Garage soils, Constitutional Dr acrossfrom BldgsE.F / /\\
2225' SSW ofthyGarage loilJ. Constitutio/fal Dr across from/ / Bldg s E,F\ \_^/ / /
600' E of the Garage soils / <^
/ /^. < / ^
2225' SW of Garage the soils, ' Capitol Hill Dr , N of ERT-06 /
X 2275' SW of the Garage soils, Capitol Hill Dr . N of ERT-06
2000' S of the Garage soils, 200' E of Bldg s C,D
2000' S of the Garage soils, On strike with LGAW, 250 S of the Soil Pile
1700' SSW of the Garage soils, Behind the tennis courts, 225' NW of the Soil Pile
1750' SSW of the Garage soils, Behind the tennis courts, 150' NWof the Soil Pile
1900' SW of the Garage soils, Off Constitutional Dr , ad] to well ERT-03
Installed By
NUS/FIT 1984
NUS/FIT \1984
\
^bS>|T --J984 /
S
SUS/FIT /I984
1 /NUS/FIT 19§4 /
NUS/FIT 1984
NUS/FIT 1984
NUS/FIT 1984
NUS/FIT 1984
NUS/FIT 1984
Construction Measunng Point Elm
Steel (S) or PVC (P),
(ft)
1 5" PVC 25390
1 5" PVC 24921
1 5" PVC 281 61
1 5" PVC /
/I I6",opeh hole -I 1
^1 5/PVC /
< 7 /6" opefi hole
;
1 5" PVC
6" open hole
*
25843
25749
25,377 >
/ 253 54/ X
/
270 22// /
/ /
26073
1 5" PVC 25709
Depth to Bottom
(ft)
190
165
480
21 2
2050
200
2050
\
259
2050
285
Appro* Wetted
Vol (gal)
1 3
12
4 3
1 6
artesian
1 6
294
1 1
285
26
Most Recently Reported
VOCs (jig/L) [date]
5 [12/18/84]
5,637 [12/26/84]
3805 [12/17/93]
11 (12/26/84)
966 [02/01/90]
NO [12/17/84]
ND [12/17/84]
ND [12/17/84]
ND [12/26/84]
ND [12/17/84]
Sampling Equipment
B
B
B
B
P,B
B
P.B
B
P.B
B
Project 92113 MOM SAP, Volume I of II FSP GEI Consultants, Inc Page 3 of 8 Revision 0, June 6, 1994
TABLE 1 - SUMMARY OF MONITORING WELL CONSTRUCTION AND SAMPLING INFORMATION Management of Migration Tinkham Garage Site Londonderry, New Hampshire
Well No Type of Well
Relationship to Site Contamination, and Location1"
Installed By
Construction Measunng Point Elm
Steel (S) or PVC (P),
(ft)
FW-24D Intermediate/deep bedrock, gradient couplet
1900' SW of the Garag^ soils, Off Constitutional Dr, adj^to well ERT-03 / /\\
NUS/FIT 1984
6" open hole 25829
FW-25 overburden/shallow bedrock, gradient couplet
1325' ESE o/lhe/Garage sjoilsj On the dirVroad'off of the/curveof Ross DrNp GHcrest-Rd /
/ /
NUS/FIT \1984
X 1 5" PVC 28533
FW-25D intermediate/deep bedrock, gradient couplet
1375' ESE of Ihe Garage soils, / ^ On the dirt road off of the curye ~ of Ross Dr to Gilcrest Rd / / x
Ntys/fVr 09b4 }
, 6" open hole 28244
FW-26 overburden/shallow bedrock, gradient couplet
Upgrad , 800' ENE of Garage soils, / Edge of field behind the orchard V,
NUS/FIT / 1984
1 5" PVC 28540
FW-26D
FW-27
intermediate/deep bedrock, gradient couplet
overburden/shallow bedrock
Upgrad , 975' ENE of Garage soils, 225' NE of well FW-26, on stnke with FW10D and FW08D
400' SE of the Garage soils
NUS/FIT 1984
NUS/FIT 1984
6/open hole 7
/ / 1/5" PVC ' /
/ /
/ 291 76
N\ 28633
"> f
FW-28D intermediate/deep bedrock 1400' SE of the Garage Soils, on stnke with well LGAW. 'tagger* well for Ross Dr
NUS/FIT 1984
6" open hole 272 32 /
ERT-01 inermediate/deep bedrock 875' SW of the Garage soils, Off Mercury Dnve
EPA/ERT 1983
6" open hole 284 39/
"/
ERT-02 intermediate/deep bedrock, artesian
1100' SW of the Garage soils' Off Mercury Drive
EPA/ERT 1983
6" open hole 28213
ERT-03 intermediate bedrock 1900' SW of the Garage soils, Off Constitutional Dnve
EPA/ERT 1983
6" open hole 25739
Depth to Bottom
(ft)
2050
460
2050
245
1350
267
2050
X >x/
3000
600
600
Approx Wetted
Vol (gal)
188
36
279
1 9
191
23
290
artesian
83
87
Most Recently Reported
VOCs fc/g/L) [date]
ND [12/18/84]
ND [12/27/84]
ND [12/26/84]
ND [12/10/87]
ND [12/17/84]
171 [02/13/92]
ND [12/13/93]
449 [7/7/85]
187 [01/03/85]
5 [12/18/84]
Sampling Equipment
P.B
B
P.B
B
P,B
B
P.B
P.B
P.B
P,B
Project 92113 MOM SAP, Volume I of II FSP GEI Consultants, Inc Page 4 of 8 Revision 0, June 6, 1994
TABLE 1 - SUMMARY OF MONITORING WELL CONSTRUCTION AND SAMPLING INFORMATION Management of Migration Tlnkham Garage Site Londonderry, New Hampshire
Well No
ERT-04
ERT-06
ERT-08
MP-I-1S
MP-I-2S
MP-I-2D
MP-I-3S
MP-L-1S
MP-L-2S
MP-L-2D
Type of Well
Intermediate bedrock
intermediate bedrock
intermediate/deep bedrock
overburden
overburden
shallow bedrock
shallow bedrock
overburden
overburden
shallow bedrock
Relationship to Site Contamination. and Location"1
Installed By
Construction Measunng Point El <2)
Steel (S) or PVC (P),
(ft)
2725' SW of the Garage soils, Off Capitol Hill Dr/bedrobkwell closest to BMgs/K.LjjiAiqd l\
EPA/ERT 1983
6" open hole 26677
2475' SW of/Garage soils, ) 1 Off Caprtoj -lill |)nve / / /
"\ "^ ^ / / Upgrad , 975' WSWof garage soils, Off McAllister Drive / {
EPA/ERT \1983 \
"• EPA/ERT
6* open hole
6" open hole
25493
30698
125' WSW (upgradienl)of leachfield I/J
< / ^ ,
/
Malcolm Rimie
/1 987
2" PVC
, /
26474
Within leachfield I/J
Within leachfield I/J
Malcolm Pimie N 1987
Malcolm Pimie 1987
2'ypvcj j
x // /
/ ^
/
/
/
261 60
N x N
26)-69 ,
J < X
275' NE (downgradient) of leachfield I/J
Malcolm Pimie 1987
2" PVC 240 94 / /
/ /
ISO' SW (upgradient) of leachfield K/L
Malcolm Pimie 1987
2" PVC / /
Within leachfield K/L Malcolm Pimie
2" PVC 271 67
1987
Within leachfield K/L Malcolm Pimie 1987
2" PVC 271 55
Depth to Bottom
(ft)
Approx Wetted
Vol (gal)
Most Recently Reported
VOCs (pg/L) [date]
Sampling Equipment
600 67 HO [12/17/84]
P,B
600 82 12,340 [12/19/84]
P,B
3000 432 ND [04/02/85]
P,B
200 0 5 ND [12/03/87]
B
200 06 140 [12/03/87]
B
400 3 8 181 [12/03/87]
B
\ 28 Ox
/ x\y 34 50
[12/03/87] B
200 DRY 5 [12/03/87]
B
90 0 5 38 [12/03/87]
B
290 3 8 60 [12/03/87]
B
Project 92113 MOM SAP, Volume I of II FSP GEI Consultants, Inc Page 5 of 8 Revision 0, June 6, 1994
Well No
MP-L-3S
LGSW
LGEW
LGAW
NAI A1
NAI-A2
NAI-A3
NAI-B
NAI-C1
NAI-C2
NAI-C3
NAI-D1
Type of Well
shallow bedrock
intermediate/deep bedrock
intermediate/deep bedrock, artesian
Intermediate/deep bedrock, artesian
overburden
bedrock, gradient couplet
bedrock, gradient couplet
overburden
overburden
bedrock, gradient couplet
bedrock, gradient couplet
overburden
TABLE 1 - SUMMARY OF MONITORING WELL CONSTRUCTION AND SAMPLING INFORMATION Management of Migration Tlnkham Garage Site Londonderry, New Hampshire
Relationship to Site Contamination, and Location1'1
Installed By
Construction Measuring Point Elm
Steel (S) or PVC (P),
(ft)
Depth to Bottom
(«)
200' NE (downgradientl of leachfield K/L / \/x\
Malcolm Pimie 1987
2" PVC 26257 245
1600' SW ofihe^arage Sjjilsjoff Mercury 0{, ad( to well pw-tyb /
X. x ' / /1650' SW of thVQarage. soils, Off/ Mercury Dr / <
unknown
\
'sunkhqwn
unknown
unknown
26905
266 13
3000
3000
/ /\2425' SSW of the GArage sorts, Off N
Constitutional Dr •/ , unknown unknown
s' ~~
- 3000
440' southwest of the Garage soils
430' west of the Garage soils
430' southwest of the Garage soils
255' southwest of the Garage soils
60' southwest of the Garage soils
/NAI / 1982^ \ / N
NAI 1983
NAI 1983
NAI 1982
NAI 1982
^ 1 1 2-PVO
' I I
^ I6" open hole
/ / /
1 5" PVC/ /
< /
2" PVC
2" PVC
30229
\ X 303 83
'Xx
\/303 83 ,
X
304 47 /'
/ / 29^30 /
170
1000
1900
7*eK \/ 170
120' northwest of the Garage soils NAI 1983
6" open hole 30033 1000
120' northwest of the Garage soils NAI 1983
1 5" PVC 30033 1900
1 ,1 15' southwest of the Garage soils NAI 1982
2" PVC 27237 70
Approx Wetted
Vol (gal)
32
artesian
-
artesian
1 4
134
17
21
3
134
164
1 0
Most Recently Reported
VOCs (fig/L) [date]
62 [12/03/87J
36 [4/22/94]
28 [12/26/84]
47 [4/22/94]
88 [02/13/92]
64 [7/7/83]
72 [7/7/83]
6677 [11/19/82]
520 [12/13/92]
2537 [7/7/83]
362 [7/7/83]
ND [11/19/82]
Sampling Equipment
B
NA161
MA
NA
B
P,B
B
B
B
P,B
B
B
Project 92113 MOM SAP, Volume I of II FSP GEI Consultants. Inc Page 6 of 8 Revision 0, June 6, 1994
TABLE 1 - SUMMARY OF MONITORING WELL CONSTRUCTION AND SAMPLING INFORMATION
Well No.
NAI-D2
NAI-D3
NAI-E
NAI-F
NAI-H
NAI-I
NAI-J
NAI-K1
NAI-K2
NAI-L
NAI-M1
NAI-M2
Type of Well
bedrock, gradient couplet
bedrock, gradient couplet
overburden
overburden
overburden
overburden
overburden
overburden
bedrock
overburden
overburden; gradient couplet
bedrock, gradient couplet
Management of Migration Tinkham Garage Site Londonderry, New Hampshire
Construction
6" open hole
1 5" PVC
2" PVC
2" PVC
2" PVC ,
^1 /
2/pyc
/ 1 25" stainless > steel ,
/ ' 1 5" PVC /
1 5" PVC
1 25" stainless steel
1 5" PVC
1 5" PVC
Measuring Depth to Point El |2' Bottom
Steel (S) or (ft) PVC (P),
(ft)
274 15 1000
274 15 1900
28902 175
28352 250
28265 21 0
29392 170 v^
^ \ •- 301,72 35
/
? / ' 295 70 x 95
N
/ /\
295 56/ ' 227^ >
/ /
290 \y 28
29004 130
29004 2400
Approx Wetted
Vol (gal)
140
171
1 5
40
2 3
20
0 1
06
1 6
02
1 0
20
Most Recently Reported
VOCs (figli.) [date]
NO [7/7/83]
ND [7/7/83]
NO [11/19/82]
85 [12/13/92]
ND [11/19/82]
ND [12/13/92]
30 [7/7/83]
4400 [12/13/92]
1013 [12/13/92]
1411 [12/13/92]
1581 [7/7/83]
595 [12/13/92]
Sampling Equipment
P.B
B
B
B
B
B
B
B
B
B
B
B
Relationship to Site Contamination, and Location'11
1 ,260' southwest of tea Garage soils
1,260' southwest oUfie GaragV soils
775' soutri-soutnwgstjjf (he Garage / soils \^ / /
/ < SOS' south-southeast of the Garage, soils / / \
xy 920' south of the Garage soils /
240' south-southwest of the Garage soils
270' north of the Garage soils
60' northwest of the Garage soils
45' northwest of the Garage soils
210' east of the Garage soils
130' southeast of the Garage soils
1 30' southeast of the Garage soils
Installed By
MAI 1983
MAI 1983
N982^
^)19J2/
NAI /1982
N*T 1982'
NAI 1983
NAI 1983
NAI 1983
NAI 1983
NAI 1983
NAI 1983
Project 92113 MOM SAP, Volume I of II FSP GEI Consultants, Inc Page 7 of 8 Revision 0, June 6, 1994
TABLE 1 - SUMMARY OF MONITORING WELL CONSTRUCTION AND SAMPLING INFORMATION Management of Migration Tlnkham Garage Site Londonderry, New Hampshire
Well No Type of Well
overburden NAI-N
NAI-O overburden
NAI-P overburden
NAI-U overburden
RD-D bedrock (Ross Dnve-Deep)
RD-S overburden (Ross Dnve-Shallow)
Footnotes
Relationship to Site Contamination, and Location01
300' east of (he Garage soils / N.
470' southeaster the Garabe soils
< < / / /875' southeast of4hJLGarage' soils / X X /
785' northwest of the Garage soils i/.
< / ^
2,600' south of the Garage soils, off / end of Ross Dnve \
2,650' south of the Garage soils, off end of Ross Dnve
Installed By
NAI 1983
NAI 1983
X.
/M983N
WAI j 1982 '
/Unknown / /
/ "\/^
Unknown
Construction Measuring Point El |21
Steel (S) or PVC (P),
(ft)
1 25" stainless 28879 steel
1 25* stainless 28640 steel
1 25* stainless 281 04 seel
2" PVC 32758
6" open/hole
/ / 7 _
x// / Xj
2" PVC X
/ / \ \
O / *
Depth to Bottom
(ft)
32
74
30
170
200
30
Approx Wetted
Vol (gal)
02
03
02
1 9
295
36
Most Recently Reported
VOCs (M/L) [date]
ND [7/7/83]
ND [7/7/83]
ND [7/7/83]
ND [12/13/92]
8 [3/28/88]
8 [3/28/88]
Sampling Equipment
B
B
B
B
P.B
B
(1) Well location refer to Figure 2 of the FSP, MOM SAP, Volume I of II
(2) Elevation of the well reference point for well measurements, in feet above the National Geodetic Vertical Datum (NGVD) of 1929
(3) B = bailer to develop and sample
(4) P,B « submersible pump to develop and bailer to sample
(5) - = not known
(6) MA = not applicable
Project 92113 MOM SAP, Volume I of II FSP GEI Consultants Inc Page 8 of 8 Revision 0, June 6 1994
' ^?' 1i ^:
>-: 'i S !
if
''• ;
? (i Ol U' C\J1
i B
; ;* 5|1
p • 1
i A I 9
>> ; * e
k m
cas
u
I 5
M?0 >
^S 5 0)-O S!> co )
i i \ 1
-1
horiz
onta
not s
ecur 3
| arte
sian
!i[
i1j
1
I
ii 0
5 5
ll
5 ,9o
; co3 CO CO CO CO 3 CO CO CO u 9
~*
CO II
*? CO u
CO LU
/5 CO LU ic/)t UJ
CO LU
COII 9 ff)
J ;< i ico
-LU CO LU
CO LU
CO LU
CO LU
CO ll
CO u
0*
•slew .E
11$ 'ii sg O g> C V*
(J .C C
•o c J>
jrc
O)
{.r
f^
«
£ z
n c
§
3 R
n co t *f
5 c
8
,_
5
u
s
CO
s
8
CO 3>
r
5 c
r> CD
s s
•
<7> °
§
•
o> O)
a
«
O> 31
a
CM cn
CO x>
CM
s i?*
?».rt*
1
^
F' ""
tfi X
« I-1
eg
CM
-
CM
§
OO
s
&
OJ 0)
01 _
EM
8
o ^
£
<v .
4 t < \
w <O
^N
r
$
•<*
5
^
^
.-"
*
?«t ?, '?:
¥ fcti
??
* I
, > ;* |j ^ - ^
SB
..
^,
*
•;j j1-' •r'' / < '4-
o
9'o> «7 VJ>J
t!
•: i
^ t* CO
-S
Set,
in O)
CO in CO
in i
CM CO
in
-
*
D
T
5^
in CM
D
T
«
CM
§
in
in
8
CO X
a
O>^)W C (
•2-J'" CD 0.
\ f
>
^ s
S?
w« 53 C /« o o -3.
^ S "i
E
Is55 S c
~~ » Q. ^
n D 0
B o CO
(V.
in u
k Z
r !•-
3 c O CO
r >-
z
...^
8
u
CM O
CM
CO
in in
K
T
ol
(
y co ~ X
D O
r~
f
.
CO
OJ o
^ A
/
o
c
,-p
\
^>
CO o
c
S
CM
P
-^
in
u
oo
v
a
Si
S £•
f L
r -
O)
i
CO
&
V
in
CM o
CO
p
Q (O
O
8
01 c
T— CO
0
in ^ o
a ow O)
o •* 78
00 0
0 If
OJ
1*
in
T—
OO
*8
q r
^ <£3
An « * $ %
''X
tj
< ?
'•t
& a
\
J0 00
-CM
CM
in
OJ^
on o
^
a
in in
j.
in <o
T_
^
CO
a
,_ 00 CO
CM
CM c»
ro O)
in
u
m p
E
PI Q
§S 28 o Q
/
''V
CM
05
\
in
/
•"
/
CM O
p
P) C CO
u
CM i
?
5 OJ o
(OCO i*8
•
00 inh \
^ w *S
i -
SsCO
!? :;•.
S
i8
? o
00 in CO
CO T
CM
0) u
n
- *J-c
"0 CO nco 3) O)
t> CO 3) O> 8
a O)
oo o>
D co 3) C s 0 0 C
s V
$ '»
oo O)
0 00 o>
CO 0)
J1 ^T
^ a 0 li
%
qO)
oa-, - o>
a 00 O)
0 0 a 0
Q tivi- CM Q Q a Qo o 3C 8 CM "M CO p in CO 00 O) ip' *— CM CO * jj 00 0)i o o (• fe p — i— - 1—
3 O 1 f 1 1 1llr a: r cr E s 5JJ LU JJ UJ u LL J£ f LL LL LL u LL it LL LI Lt i. C J LL felt Lt tLL Lt it LL LL if if
1 *
I
I§ I !1
«.! CO CO CO CO co CO CO CO CO
II ii lli "? 0
C
[11
*fcf P1 S
c
fc3? It f
iss O 5
i_ <
.-§ > gS j
CO
II 0>0 8 LtD! ttLtLf BE
c
I 8 o§
CO T»— CM O>
I cT Q.
o c
I
O
§
TARGET SHEET
THE MATERIAL DESCRIBED BELOW WAS NOT SCANNED BECAUSE:
(X) OVERSIZED
() NON-PAPER MEDIA
() OTHER:
DESCRIPTION: DOC#. 11954, PROPOSAL FOR MANAGEMENT OF MIGRATION WATER QUALITY SAMPLING, PLAN, FIGURE 2, SITE FEATURES AND WELL LOCATIONS.
THE OMITTED MATERIAL IS AVAILABLE FOR REVIEW BY APPOINTMENT
AT THE EPA NEW ENGLAND SUPERFUND RECORDS CENTER, BOSTON, MA
AS WELL AS THE LEACH LIBRARY , 276 MAMMOUTH ROAD
LONDONDERRY, NH